Loading...
HomeMy WebLinkAboutOIB_04-117_John MohrIssued By CRC Ocean Isle Beach � �Y 1L� C 3 :V Variance Local Government 0113 - 04 - 117 FEB 1 8 2p05 Permit Number CAMA COASTAL 1mAEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment, and Natural Resources and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management" Issued to John Mohr, authorizing development in Estuarine Shoreline AEC at 1 Pender Street (Lot 25 Canal 6 Section A & B) as requested in the permittee's application, dated October 15. 2004. This permit, issued on February 15. 2005, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit is issued by Coastal Resources Commission Variance - Final Order dated, February 7, 2005. All proposed development and associated construction must be done in accordance with the application and work plat drawings dated (received/revised on) October 15, 2004, and subject to the following stipulations of the CRC Variance Final Order and additional permit conditions listed on Page 2. CRC Variance Final Order (1) The permittee shall obtain a stormwater management plan meeting the requirements of 15A NCAC71-1.0209 (dx10)(.1)(iv), certified by an individual who meets applicable State occupational licensing requirements for the type of system proposed, and approved by the appropriate governmental authority during the permit application process; (2) Prior to occupancy of the residence and issuance of final Certificate of Occupancy (CO) by the local permitting authority, the permittee shall provide a certification from the design professional that the stormwater System has been inspected and installed in accordance with this permit, the approved plans and specifications and other supporting documentation. (3) The permittee shall provide the proper operation and maintenance necessary to insure that the engineered stormwater management system functions at optimum efficiency and within the design specifications for the life of the project; and (4) The permittee shall insure that the obligation for operation and maintenance of the stormwater management system becomes a permanent obligation of future property owners. !Additional Permit Conditions — Page 21 This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease unfit the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2008 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Local Permit Official (signature) Justin Whiteside CAMA Local Permit Official Permittee (signature required if conditions above apply to permit) Name: John Mohr Minor Permit #: OIB 04-1 1 7 Date: February 15. 2005 Additional CAMA Minor Permit Conditions (5) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. (6) Any change or changes in the plans for development, construction, or land use activities will require a re- evaluation and modification of this permit. (7) A copy of this permit shall be available onsite for regulatory inspection. TM �1V6 FEB 18 2005 COASTAL DIVISION OF MANAGEMENT