HomeMy WebLinkAboutCasB_04-08_Shirkey/SpruillWIRO for Caswell Bch
Local Government
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management"
CWB # 04-08
Permit Number
Issued to Robert Shirkey and Kathleen Spruill, authorizing development in an Ocean Hazard Area of
Environmental Concern (AEC) at 130 Caswell Beach Road, Caswell Beach in Brunswick County as
requested in the permittee's application, dated April 10, 2004. This permit, issued on May 10, 2004, is
subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes the construction ojsecond story addition, exterior improvements, and reconstruction ojporches at
an existing house located at 130 Caswell Beach Road, Caswell Beach
(1) All proposed development and associated construction must be done in accordance with the permitte
work plat drawings(s) dated received April 10, 2004.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State an
Federal regulations. Contact the Town of Caswell Beach for applicable local ordinances and
Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land u 111rs ill req e
re-evaluation and modification of this permit. ll/j''
v 5 o �ME
Conditions continued on second page \� Ij
Go PS P\ M
This permit action may be appealed by the permittee or othe
qualified persons within twenty (20) days of the issuing date. Fro
the date of an appeal, any work conducted under this permit mus
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permi
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered unde
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007.
In issuing this permit it is agreed that this project is consistent wit
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without th
written approval of the Division of Coastal Management.
IF
. aScLGv.�
Local Permit 91ticial (signature)
CAMA Local Permit Official
Caroline Bellis
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Perm e
(Signature required if special conditions above apply to permit)
Shirkey and Spruill
Minor Permit CWB # 04-08
May 10, 2004
Page Two
(4) Any structure shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled
within two years of the time when it becomes imminently threatened, and in any case upon
its collapse or subsidence. However, if natural shoreline recovery or beach renourishment
takes place within two years of the time the structure becomes imminently threatened so
that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek
authorization of temporary protective measures allowed under CRC Rules.
(5) A copy of this permit shall be posted or available on site. Contact this office for a final inspection
at completion of work. 910/395-3900.
(6) Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold
or otherwise disposed of to a third -party.
re \ Date
9- +4�0� /7-k D� f
S0
Mo\v s\oA GEM�N�
cOPS,�P�M
WiRO for Caswell Bch
Lopal Government
CWB # 04-08
Permit Number
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management"
Issued to Robert Shirkey and Kathleen Spruill, authorizing development in an Ocean Hazard Area of
Environmental Concern (AEC) at 130 Caswell Beach Road, Caswell Beach in Brunswick County as
requested in the permittee's application, dated Aont 10, 2004. This permit, issued on May 10, 2004, is
subject to compliance with the application and site drawing (where consistent with the permit), al'
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorzes the construction ofsecond stay addition, exterior improvements, and reconstruction ofporches at
an existing house located at 130 Casivell Beach Road, Caswell Beach
(1) All proposed development and associated construction must be done in accordance with the permitte
work plat drawings(s) dated received April 10, 2004.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State an
Federal regulations. Contact the Town of Caswell Beach for applicable local ordinances and FEM
Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require
re-evaluation and modification of this permit.
Conditions continued on second page
This permit action may be appealed by the permittee or othe
qualified persons within twenty (20) days of the issuing date. Fro
the dale of an appeal, any work conducted under this permit mus
cease unfit the appeal is resolved.
This permit must be on the project site and accessible to the permi
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered unde
this permit, require furtherwdtten permit approval.
All work must cease when this permit expires on December 31,
2007.
In issuing this permit it is agreed that this project is consistent wit
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without th
written approval of the Division of Coastal Management.
rr
Local Permit Yfficial (signature)
CAMA Local Permit Official
Caroline Bellis
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Perrmillee
(Signature required if special conditions above apply to permit)
Shirkey and Spruill
Minor Permit CRT r 04-05
May 10, 2004
Paee Two
(4) Any structure shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled
within two years of the time when it becomes imminently threatened, and in any case upon
its collapse or subsidence. However, if natural shoreline recovery or beach renourishment
takes place within two years of the time the structure becomes imminently threatened so
that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek
authorization of temporary protective measures allowed under CRC Rules.
(5) A copy of this permit shall be posted or available on site. Contact this office for a final inspection
at completion of work. 910/395-3900.
(6) Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold
or otherwise disposed of to a third -parry.
Signature Date
A r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
May 10, 2004
Kathleen Spruill
Robert Shirkey
130 Caswell Beach Road
Caswell Beach. NC 28465
Dear Mr. Shirkev and Ms. Spruill:
Attached is CAMA Minor Development Permit # CWB 04-08 for work to be done at 130 Caswell
Beach Road in Caswell Beach, Brunswick County.
In order to validate this permit, please sign both copies of the permit on the first and second sheets as
indicated. Retain the original for your files and return a signed copy to us within 20 days of receipt, in the
enclosed, self-addressed envelope. This is not a valid permit until it is signed and returned to our office
Your early attention to this matter would be appreciated.
Sincerely,
e�p�
Caroline Bellis
Field Representative
Enclosures
cc: Jim Gre2son
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-39001Fax: 910-350-20041Internet: http://dcm2.enr.state.ne.us
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled \10% Post Consumer Paper
Applicant:
Field Representative:
Received:
Check #:
MINOR PERMIT
NEW APPLICATION
s�Ir- keV � ya\-q IePhS
-it -O`1 —
�ece,vec�
6-f1 LJ— 3-0-4
Public Notice: Date Published
Comments S-
Green Slips: _ C(32-CQq
_ . __
,-
I _..L ., t �i -_...
�` ��
.... ._..
_ _ _
----. _
� ����
Z. 7 f-�' cr.�-z �v—� - ..-. .
__ - -_ _ �,n�r
-_ _. _ _ _
'Z'7��/ �-, ���'�' Off' / �7 .. _ _
_. .
�'o «��
__ S �) �a� .-a,,, ,Lam
....... . .........
_ _ __
L t �. . _�
Page 1 of 1
nis-its:Q:\Program%20Files\Intuit\QuickBooks%2OPreniier%20%2OContractor%20Editio... 4/14/2004
''RECEIPT
_-a�
m
m
man oniy; No insurance Coverage
Provided)
(Domestic
a
rq
m
m
dS7
ra
ra
Postage 8 O
O
O
O
0
cerlifed Fee a
`Hare
s O
,.�= O
0
0
Retum Reciept Fee
(Endorsear tRequired)
O
rR
O
r.1
Re+Hdded Delivery Fea
(Endorsement Requred)
----/
---- O
ra
O
r-R
d�
Total Postage & Fees $ Q
o
o
serw x:=sus_ M; ch- R
----k� �- .
- --
-
GR�_W.�.."BeA. GF]-R-.__----------
grPOearNo. -
cly,-sieretird utA.. '(je„achnCy(o�
:rn it
Service-,
U.S.
Postal
RECEIPT
MAIL,(Domestic
CERTIFIED
Mall
Only;
No insurance
Coverage Provided)
website
at Www.usPg
. n -0
a r9
m m
ri ri
0 0
0 0
0 0
0 0
0 0
'q ri
0 0
ri ra
rn 00 O 1 Sent o M - -- - A ?.
t` M1 Sheet. A-PL No.;y -. 3 -
orPOBox No. �..ki ,}4e:40Al..l�. .1[-�-----------------_---
C+N,State.L G�Mlek C. flG /-A2 O
.r
u- IH�
I i
;I
IT; f 1-1
�ill
.TA'[ 01 MART CARM 1,1
BRUh9WI CC :CJNTY
ROBERT W. POWELL,
RITA[.[ XI MAN* AND [[AL -Nis IN[
tl. DAY OF [ENTEMIR A.O. ittt ,
t[alt 9D. -632
LOT 20
FJERRGE 6RND
cAR0 ELP': 2 6.26'
T
z SEAL v
P L-B39 e �
M � N
�4r� fU.VIAa . J
P M.N6XP �ti CRm®
I
u
L07 29 1 STORY WOOD
m IMMi DV PILINGS
FF 1 ELI . 6.77'
FF E EL: • 16.17'
NOTE: PROPERTY IS LOCATED IN FLOOD NAZARO m
20Ni AS EASE ELEVATION 14'. REF.
F. I. A. M. m"PLINITY NO. :ME9L PANEL � CDUIIQp PORfjI
NUMBER DODS SW'FIN D" DATED f/91. .0'
LEGEND: I•
NIP • NIL IRON PIPE SET
ZIP . OUSTING IRON PIPE FOUND a ^�
TBN . TEMPORARY BZNCMMRRK :a
J6
•n
ty
A: .~r
el :'•ao, o'
LSO. 0' ALUMS R/W TD 4 N TaPaa' OWW
�•:-25, ACEESS BETWEEN
BLOCKS 1 B BLOCK E
I ®R
BLOCK 1
SECTION "B"
CASWELL BEACH, N.C.
LOT 27
�i
CASWELL BEACH ROAD 60 FT R4W
PLAT OF SURVEY FOR
KATHLEEN 0. SPRUILL
@ ROBERT L. SHIRKEY
LOT 26, BLOCK 1, SECTION t,2
CASWELL BEACH. NORTH CAROLINA
SCALLEE: V TOWNSHIP
SEPTEMBERHICX L0UNTY
19tn,992
JOB NO: 92456 FIELD SOCK! CASWELL III
20 :0 0 20 AO
DRA'NN BY JANF9 U. 9ATTCN 9-:9-92
nORE+IRY SL WEVIAG
MWrSTMW LOVAD SLARVA 1IRS
P. A AM 42J
LOE S.E. 40th SFAEEF
LAM: AX4010 M. C. JBIaB
FELL R19-fFP-ORN
cl::
LLJ
fon
ELEVATION CERTIFICATE 0; May3b7,•'0$:
FEDERAL EMERGENCY MANAGEMENT AGENCY
NATIONAL FLOOD INSURANCE PROGRAM
ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to
provide elevation information necessary to ensure compliance with applicable community floodplair, managemen: ordinances, to
determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR).
Instructions for completing this form can be found on the following pages.
SECTION A PROPERTY INFORMATION FOR INSURANCE COMPANY USE
SUILOIN9 OWNER'S NAM(� POLICY NUMBER
Ka.t leery W.
la S-ti', tl -r- $?obec-�- L , Sh , r lCe.�,
STREET ADDRES nnUutllne APL, U I, Suue n or eltl6. Numbjr) OR P. O'JTE AND SOX NUMBER i— COMPANY NA1C NUMBER
.OTHER DESCRIPTION (Lot and Bloch Numbers, otc.)
5ECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
Provide the following from the proper FIRM (See Instructions):
1. COMMUNITY NUMBER Z, PANEL NUMBEF 19UFFIX �, DATE OF FIRM INDEX 9. FIRM ZONE S. BASE FL00L
ON
3 rl° 3 q / 0 p1O� "-\ / rr / � l (in AO Zones)
Indicate the elevation datum system used on the FIRM for Base Flood/ Elevations (EFE): J NGVD'29 L. ] 0fher tdA-gnrihse nn han41
: a... e---- ^
-• • -• --•• -,. , ., " — uu orc is pruvlue0 on the t-imm, and the community has established a BFE for this building site, indicate
the community's BFE: L I I i I f,L f feet NGVD (or Other FIRM datum -see Section 8, item 7)•
SECTION C BUILDING ELEVATION INFORMATION
I. Using the Elevation Certificate Instructions, indicag the iagram number from tqe diagrams found on Pages 5 and 6 that best
describes the sub)ect building's reference level .4&-C, dommen*j
2(a). FIRM Zones Al-A30, AE, AH, and A (with BFE). The top of the relerence level CCOr from the selected ciiagram'is at an, elevation
of L j I ; l k ; I feet NGVD for other FIRM datum -see Section 8, he' i 7).
(b). FIRM Zones V1-V30, VE, and V (with BFE). The bottom of the lowest horizon(& structural member of ;he reference level from
the selected diagram, is at an elevation of j I I I L i,U feet NGVD (or other FIRM datum -see Section B, Item 7).
(c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is 't U feet above C or
below ❑ (check one) the hlgl est grade adjacent :o the building.
(d). FIRM Zone AO. The floor used as the reference level Iran the selected diagram is LLj.i_-) feet above C or below C (check
one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference
level) elevated in accordance witn the community's fioodpiair management ordinance? �. Yes El No ❑ Unknown
3. Indicate the elevation datum system used in determining the above reference level eievaticrs: NGVD'29 J Other (describe
under Comments on Page 2), (NOTE; 10he elevation datum used;n measuring the elevations is different than that used on .
the FiRM (see Section, B, Item 71, risen convert rile elevations to the datum systsm used x, the FiRM and show the conversion
equation under Comments on Page 21
4. Elevation reference mark used appears on FIRM: Yes J No (See Instructions or, Page 4)
5, The reference level eievation is based on: Eractual construction C construction drawings
(NOTE: Use of construction drawings is only valid if the building does .not yet have the reference !eve! floor in place, in which
case this certificate wid only be valid for the building during the course of construction. A post -construction Elevation Certificate
will be required once consrruclion'is complete.)
6. The elevation of the lowest grade immediately adjacent to the building is: I i I .Q' fee: NGVD (or other FIRM datum -see
Section B, Item 7).
SECT ION D COMMUNITY IN POP MATION
1. It the community official responsible for verifying building elevations specifies the: the reference level indicated in Section C, Item 1
is not the "lowest floor" as defined in the commun,ty's fioodp!ain managerr.eat crc ranco, the eievation of the building's "lowest
floor" as defined by the ordinance Is: I! _ feet NGVD (Or olhcr --IR dat::-.-see Section 8, Lem 7).
2. Date of the start Of construction or substar!ia: i.T,;rOvc:me
n
SECTION E CERTIF!CATION
This certification is to be signed by a !and surveyor, cngiccer, or architect v+ktc is authorized by state or local law to certify elevation
information when the elevation informmation for Zones A!-A30, AE, Ali, A (with 6FE),V1-V30,VE, and V (wit) BFE) is required.
Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign,the
certilication, In the case of Zones A.0 and A. (witl:oul a FE?AA or Community issued --FE), a building official, a properly owner, or an
owner's representative may also sign the cartlECaticn.
Reference level diagrams o", 7 anc s - Ds::ngLi;h;ng Features -If the certifier is unable to certify to breakawayinon•breakaway`wall,
enclosure size, location of servicing equ;omen; araa use, wait openings, or unlinished area Fealure(s), than list the Features) nok
Included in the certification under Comments below. The diagram number, Section C,'Item 1; must still be entered.
f certify than the information in Sections 8 and C Or, ;his certificate represents my best efforts to interpret the dgta available.
If understand that ary,'alse aratemer,: ma.3a Donis.^.able by fine crimpdsonment under iQ U.S. Code, Section 1001.
013ERT B NiCHENRY wn
N.C.
CERTIFIERS rIAME � _ L- . •.
REGISTERED LAND SURVEYOR LICENSE NUMBER (orhlix Seaq
TIr�E IVi PENRY SURVEYING
COMPANY NAME
ADDRESS
_ c • J �/
` STATE ZIP'
l'lM•t' 't l:�
SIGNATURE—��r - � r��I r•) (919)27,8 9&74
CAIt PHONE
Copies should be made of this Certificate for: ) ba�,� duty ��lotK;, `) 5
t!y�W 3t 2 Insurance a enlfcompany, and ) building owner.
. 1
COMMENTS: ,. SiC ft t ,T1 � t^ Q (1-:�`i p p OLTne mg S5C r
t41 t •S" �l �)` 21P izi.�la
n ... / r•v rY !
ON
SLGO
A v
ZONES ZONES
WC4
EASEMENT
ON PILES,
PIERS, OR OOLUM
A u
The diagrams above illustrate the poins at whic8 the elevations should be measured in A Zones and V Zones.
Elevations (Or all A Zones should be measured at the top of the reference level floor,
Elevations for aft V Zones ;hcutd be aasufcd at the bottom of the lowest horizontal structural member.
REPORT
THIS IS TO CE ?"; j ndVe .'I,t.0 C r, ; SiL'd6; :e pf'cfnlS@S 5lnndino in the name of
situated at k�4.�e
known as Street D
and shown on the
and from such inspection I found
to be in possession of said premises as
COUl Iiv
state
- - -- ""'I tile oun❑mg located thereon at the time of making such survey,
"A
I further certify as to the existence onon-existence of the folicwing: ltenanq or (owner)
r
1. Rights of _
said -remises:.
2, Springs,
S. Cemeteries or
old highways or abandoned roads, lanes or driveways, drains, sewer or water pipes over and across
0162t
nvers, drainage ditches, ponds or lakes located, bordering on.or running through said premises: _
,
4, Telephone, telecra ,-,c-
IN" W rossiay- said premises-.
wads located on said premises:
ano pipe ttnes.of every character,
5. Disputed boundaries or encroachments. (Specify definitely whether buildings on surveyed premises encroach on
adjoining propertie and whether buildings on adjoining properties encroach upon surveyed premises):
6. Are there My indications cf building construction, alterations or repairs within recent months? &
rJ n
7. Descriptipn of ptesQnt prove -en;s: r rc ,z eA ri L, _ . r.A.M Y, _
8. Building or possession. lines (in - e of city or to property specify definitely as to whether or not wafts are
independent walls or party wails and as tb all easemerns of support or "beam rights."
In case of county properly report as to .fence lines):
9. Any change in street lines either completed or officially proposed:
(a) Are there indications of racent street or sidewalk construction or repairs?
10. If any zoning or other municipal regulations affect the use of survey premises, do the improvements on the premises
and the use made of them comply with such?/.ri
11. If the surveyed premises are subject to restrictive covenants, do the improvements, use and occupancycompiywith
such? (If premises, pre ubject to restrctiveyb ts, have the examining attorney furnish you verbatim copy of them):
W �....oy
Daled at —_Z f 50. this ay p
L-83Si er ,19
J
i
•, : i
1q �•.
Dwieht Waeuner 101 NE 25 TH ST Oak Island NC 28465 910- 278-7061
Name: Robert Shirkey
address: 130 Caswell Beach Rd
address: Caswell Beach NC 28465
To Whom it may concern :
Authorization Letter
Dwight Wagoner
Wagoner Building & Home Improvement Inc
101 NE 25" ST
Oak Island NC 28465
I give Dwight Wagoner or Reba Wagoner of Wagoner Building & Home Improvement Inc
authorization to sign a Cama Permit as my agent for location listed below.
Property address :
130 Caswell Beach Rd
Caswell Beach NC 28465
i
III •�Building & Itome Improvement INC
Dwight Wagoner 101 NE 25 TH ST Oak Island NC 28465 910- 278-7061
Date
Name: William & Mellisa Alford
Address: 4733 Kuykendall Rd
Charlotte NC 28270
Dear Adjoining Property Owner
This letter is to inform you that I have applied for a Cama permit on NC _
Brunswick County. I have enclosed a copy of my permit application and a drawing of my project.
If you have any comments on my proposed project, please contact the coastal Representative listed below. No
response within ten ( 10 ) days is the same as no objection when you have been notified by Certified Mail.
Cama Office
Caroline Bellis
127 Cardinal Dr Extention
Wihnington,NC 28405
#910-395-3900
Sincerely ,
Dwight & Reba Wagoner
Wagoner Building & Home Improvement Inc
101 NE 25 Th Street
Oak Island, NC 28465 r `
910-278-7061
r
..Building/
me Improvement INC
Dwight Wagoner 101 NE 25 TH ST Oak Island NC 28465 910- 278-7061
Date
Name: Mr & Mrs Michael J. Kemp
Address: 132 Caswell Beach Rd
Caswell Beach NC 28465
Dear Adjoining Property Owner:
This letter is to inform you that I have applied for a Cama permit on property a t 130 Caswelll Beach Rd Caswell
Beach NC 28465 Brunswick County. I have enclosed a copy of the permit application and a drawing of the project.
If you have any comments on my proposed project, please contact the coastal Representative listed below. No
response within ten ( 10 ) days is the same as no objection when you have been notified by Certified Mail .
Cama Office
Caroline Bellis
127 Cardinal Dr Extention
Wilmington,NC 28405
#910-395-3900
Sincerely ,
Dwight & Reba Wagoner
Wagoner Building & Home Improvement Inc
101 NE 25 Th Street
Oak Island, NC 28465
910-278-7061
AEC -HAZARD NOTICE
Project Is In An: 1/bcean Erodible Area High Hazard Flood Area Inlet Hazard Area
Date Lot Was Platted: _ S v-p+ Iqqq
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules onbuilding standards,oceanfront
setbacks and dune alteration are designed to minimize, but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources ission does not
guarantee the safety of the development and assumes no
liability for future damage to the Commdevelopment.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as g_J0 feet landward in a major storm.
The flood waters in a major storm are predicted to be about
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
Applicant's gnature
41. lD '04{
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
eo "11�e `fie LLt s
Local Permit Officer
Q'7 (tit c4 n OLQ br) Lc_
Address
6%IM1(It r7n NC
Locality
gld 395- .396y
Phone
1
rrp 1 6 20Gf
DIVJSION OF F
COASTAL MANAGEMENT
Revised 11193
BEFORE YOU BUILD
Setting Back for Safety: A Guide to Wise Development Along the Oceanfront
When you build along the oceanfront you take a calculated
risk. Natural forces of water and wind collide with tons of
force, even on calm days.
Man-made structures cannot be guaranteed to survive the
force of a hurricane. Long-term erosion (or barrier island
migration) may take from two to ten feet of the beach each
year and, sooner or later, will threaten oceanfront struc-
tures. These are the facts of life for oceanfront property
owners.
The Coastal Resources Commission (CRC) has adopted
rules for building along the oceanfront. The rules are in-
tended to avoid an unreasonable risk to life and property
and to limit public and private losses from storms and
long-term erosion. These rules lessen but do not eliminate
the element of risk in oceanfront development.
As you consider building along the oceanfront, the CRC
wants you to understand the rules and the risks. With this
knowledge you can make a more informed decision about
where and how to build in the coastal area.
The Rules
When you build along the oceanfront, coastal manage-
ment rules require that the structure be sited to fit safely
into the beach environment.
Structures along the oceanfront must be behind the frontal
dune, landward of the crest of the primary dune and set
back from the first line of natural stable vegetation a dis-
tance equal to 30 times the annual erosion rate (a minimum
of 60 feet). Large structures (multi -family residential struc-
tures greater than 5,000 square feet and non-residential
structures greater than 5,000 square feet) must be set back
from the first line of natural stable vegetation a distance
equal to 60 times the annual erosion rate or 120 feet,
SETBACK ' SETBACK ! FIRST LINE OF
10 � �-- STABLE
NATURAL
AVERAGE ALI AVERAGE ALI VEGETATION
coo (EROSION I EROSION
IRATE aIRATE I
I
(LARG�ALL
STRUCTURES) I STRUCTURES)(
whichever is greater. If the erosion rate is greater than 3.5
feet/year, the setback is 30 times the erosion rate plus 105
feet.
The Reasons
The beachfront is an ever -changing landform. The beach
and the dunes are natural "shock absorbers", taking the
beatings of the winds and waves and protecting the inland
areas. By setting back 30 or 60 times the annual long-term
erosion rate, you have a good chance of enjoying the full
life of the structure. At first, it seems very inviting to build
your dream house as close to the beach as possible, but in
five years you could find the dream has become a
nightmare as high tides and storm tides threaten your
investment.
The Exception /v�A
The Coastal Resources Commission recognized that these
rules, initially passed in June of 1979, might prove a
hardship for some property owners. Therefore, they estab-
lished an exception for lots which cannot meet the setback
requirement. The exception allows buildings in front of the
setback line if the following conditions apply:
(1) the lot must have been platted as of June 1, 1979, and
not capable of being enlarged by combining with adjoining
land under the same ownership, (2) development must be
as far back on the property as possible and in no case less
than 60 feet landward of the vegetation line, (3) no
development can take place on the frontal dune (4) special
construction standards on piling depth and square footage
must be met and (5) all other CAMA, state and local
regulations must be met.
The exception is not available in the Inlet Hazard Area.
To determine eligibility for the exception, the Local Permit
Officer will make these measurements and observations:
required setback from vegetation line
exception setback (maximum feasible)
rear property line setback
max. allowable square footage on lowest floor
lot area as calculated from vegetation line
piling length needed to extend 4 feet below MSL
PRE -PERMIT STRUCTURE; INADEQUATE SETBACK
PERMITTED PRE -STORM BEACH PROFILE
STRUCTURE;
ADEQUATE POST -STORM BEACH PROFILE
SETBACK
ONE YEAR AFTER STORM/BEACH REBUILDING
After the storm, the house on the dune will be gone. The other house has a much better chance of survival.
Locality Permit Number
Ocean Hazard Estuarine Shoreline ORW Shoreline Public Trust Shoreline _Other_
(For official use only)
GENERAL INFORMATION
City C ^ N L i0 Ur1i (3LQ_ V 1 State nC - Zip V _(Abrj
AUTHORIZED AGENT
Name
Addre:
City (:" k :r-sI State '\C - Zip a?>%S Phone oTI Q. '7U�
LOCATION OF PROJECT. (Address, street name and/or directions to site. If not oceanfront, what is the name of
the adjacent waterbody?) /
DESCRIPTION OF PROJECT. (List all proposed construction and land disturbance.) tam `oil L Q
WIM011.0.• .,
SIZE OF LOT/PARCEL: '? 3 $ . 5 C) square feet acres
PROPOSED USE: Residential (Single-family Multi -family _) Commerical/Industrial _
Other
TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI-
RONMENTAL CONCERN (AEC): IS 64 square feet (includes all floors and roof -covered decks)
SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON S RFACES IN
THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): a& sq. ft.
(Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or masonry patios,
etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
Choose the AEC area that applies to your
property-(1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC J s t
(2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstanding ;y
Resource Waters
(3) within 30 feet of the Public Trust Shoreline AEC
(Contact your Local Permit Officer if you are not sure which AEC applies to your property.)
C
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a
State Stormwater Management Permit issued by the N.C. Division of Water Quality?
YES_ NOl
If yes, list the total built -upon area/impervious surface allowed for your lot or parcel. square feet.
OTHER PERMITS MAYBE REQUIRED: The activity you are planning may require permits other than the CAMA minor
development permit. Asa service we have compiled a list of the kinds of permits that might be required. We suggest you check over the list
with your LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic Tank (or other sanitary waste
treatment system), Building, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification,
Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway, Connection, and others.
STATEMENT OF OWNERSHIP:
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein. This interest can be
described as: (check one)
L.a� a8 3SEc.E;on. a
�an owner or record title. Tide is vested in _._ , see Deed Book
page in the
County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
�if other interest, such as written contract or lease, explain below or use a separate sheet and attach to this application.
�,L_ L��
OF ADJACEL�ROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(Name)
(Addre-W
.2846r.3
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to
erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associ-
ated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing tech-
niques.
PERMISSION TO ENTER ON LAND:
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to
enter on the aforementioned lands in connection with evaluating information related to this permit application.
This application includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor-
mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated
without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any
person developing in an AEC without permit is subject to civil, criminal and administrative action.
+ti
This the (C day of _CA_PT;l, 20
I
Landowner or person authorized to act as hts age for purpose Not ing permit application.
SITE DRAWING/APPLICATION CHECKLIST
Please make sure your site drawing includes the following information• required for a CAMA minor development
permit. The drawing may be simple and not necessarily to scale. The Local Permit Officer will help you, if
requested.
PHYSICAL DIMENSIONS
✓ Label roads
V Label highways ri t-of-ways
/ Label local setbac lines
Label any and all structures and driveways currently existing on property
PHYSICAL CHARACTERISTICS
✓ Draw and label mean high water mark
✓ Draw location of on -site wastewater system
If you will be working in the ocean hazard area:
Draw and label dune ridges (note height)
Draw and label toe of dune
Identify and locate first line of stable vegetation
Draw and label setback line under CAMA
Draw and label topographical features (optional)
If you will be working in an estuarine shoreline area:
Draw and label landward limit of AEC
Describe terrain (slope)
DEVELOPMENT PLANS
Draw and label areas that will be disturbed
If a house is to be placed on lot, describe location of house
Note size of piling and depth to be placed in ground
Draw and label all areas to be paved or graveled
Describe composition of surface
Note and list fully all trees and vegetation to be removed or relo few' .
Show landscaping
NOTE TO APPLICANT /
Have you:
• completed all blanks and / or indicated if not applicable? '
• notified and listed adjacent property owners?
• included your site drawing/
• signed both application and statement of ownership?
• enclosed the $100.00 fee?
• completed an AEC Hazard Notice, if necessary?
FOR STAFF USE
Site Notice Posted Final Inspection Fee Received
Site Inspections
Date of Action: Issued Exempted
Denied Appeal Deadline (20 days)
40 APPLICATION FOR
CAMA MINOR
z ~ DEVELOPMENT
r r _ PERMIT
In 1974, the North Carolina General Assembly passed the Coastal Area
Management Act and set the stage for guiding development in fragile
and productive areas that border the state's sounds and oceanfront. Along
with requiring special care by those who build and develop, the General
Assembly directed the Coastal Resources Commission (CRC) to imple-
ment clear regulations that minimize the burden on the applicant.
This application for a minor development permit under CAMA is part
of the Commission's effort to meet the spirit and intent of the General
Assembly. It has been designed to be straightforward and require no
more time or effort necessary from the applicant. Please go over this
folder with the Local Permit Officer (LPO) for the locality in which you
plan to build to be certain that you understand whatinformation he or
she needs.
Under CAMA regulations, the minor permit is to be issued within 25
days once a complete application is in hand. Often less time is needed if
the project is simple. The process generally takes about 18 days. You
can speed the approval process by making certain that your application
is complete and signed, that your drawing meets the specifications given
inside and that your application fee is attached.
Other permits are sometimes required for development in the coastal
area. While these are not CAMA-related, we urge you to check -with the
P'r•. it Local Permit Officer to determine which of these you may need. A
2 listing is included on page 2 of this folder.
We appreciate your cooperation with the North Carolina Coastal Man-
agement Program and your willingness to build in a way that protects
the resources of our beautiful and productive coast.
Coastal Resources Commission
Division of Coastal Management
Revised 3/2003