HomeMy WebLinkAbout85272B - Evan Lewis ion ZCAMA 0 DREDGE & FILL r)J 2 1- IN? t5YL/L A % C- D
GENERAL PERMIT �- DatePreviore permitprevious
�/ue
previous permit Issued /.1'P.}
[ few ❑Modification 0 Complete Reissue 0 Partial Reissue
As authorized by the
eeFState of North Carolina,Department of Environmental Quality and the Coastal Resources Commission In an area of environmental concern pursuant to:
T ISA NCAC C . . I ZO° 0 Rules attached. jCerai Permit Rules available at the following yvww.link der}nt.wv/CAMArules
r 1 f� t )) L
Applicant Name EV�.tA/�r. ) eiJ.s y Authorized Agent�bby (ffgft°e• {,OHS/ '
Addres
s ss{{)3/o j/�rr�OLrI14Pte C.Q,Ir"1 Project Locadon(County): 3432.�•N+4
City Chinvsify State Me ZIP a't 1-$11- StreetAddress(,Sttaat�e Road/Lot#(s)
Phone#(Zfl S7,I- !00$$ IV° ifb bet lime Court Court
Emall4 I 7•1 e0, hell/VIA;1• car" Subdivipop S
) eam lot 'Ps i-k r1
ow C.ket.,.Essc.46t1'-I l tt70 d7'g 1.9
Affected Dew dEW [PTA ❑ES OPTS Ad).Wm Body/fJON^fnd[• e6nul (mat rg()
AEC(s): ,,tom❑DEA OEM ❑uw DOLMA ❑Pws Closest Maj.wt.Body rain lie b 12)�� vv
ORW:yes/ PNA:yess( Asa I Type of Project/Activity S 1SI 1 I to/X asi pi ei to A- A/7 pit Zoe L- plaiger n-t
/ (scale:/''30'
Shoreline Length T en 9e
Access Length
Pier(dock)length (o/x 20/ f17t}a 1h ��
Fixed Platforms) 17'x lc/
Floating Platforms) \1`r\I
Finger piers)
Total Platform area Slip A)(I-
Groln lengthfliyans r
Bulkhead//limp length try NV" IAA
Avg distance offshore i - al
Breakwater/Sill
Max distance/length • / Z°7
Basin,channel \ fs Y•
Cubic yards yr4,t6A
Boat ramp ii
Boathouse/Boatlift ,
Beach Bulldozing
Other — NWL��m.
'kestslim, gCIk1T.o�
1 SAV observed: yes .ah rj ` A a„ -�r1ePn
Moratorium: Oa yes ` (ion/
___ & 'FM? yy rr
Site Photos: yes �,{!N [7'7f1/
Riparian Waiver Attached: 9 t
n
A building permit/zoning may be required At /6T t'Lr'T- ea pi L
Permit Conditions Lo 1I. TS maim IGe. laws, . f ieoh4- 1oc � AM/NEUSE/BUFFER(cWe one)
,r lb4z Sec 4144r Qllos.xA/e ‘+s{e7"Vii . VAN('a suet,octal,
�See note onback
I. I)Oe nfri- of te�i j/f1 wiwty D'F CYee<. •N� w•:wr' `ding River Basin rules
'Hoe ,�;� ❑See additional notes/conditions on back
•
s. �K �bk�>nta F,^ IA1InTt�- c�c. reingnra
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND EV ED COMP NCE TATEMENT. (Please initial) J>K
B r
oak oral- A 2.Vnn—t et t � bran y
Ar�te�nt or Afptpliant PRllN1TED Na e P it tR is PRINTED of
S ure"rose re mmlpliance statement onb.ear permit" Signature
i /d '19 ° `ER 355i "q - - ?.ort- a 3- - Ott 2oz�
Application Fee(s) Check P/Money Order Issuing a Expiration Date
r
I
f- ROY COOPER
GaMw
MiCHAEL S. REGAN
Smeary
CoastalManayement BRAXTON DAVIS
effil160tblim.GIAtan
atictor
BUFFER AUTHORIZATION CERTIFICATE •
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources(DWR)regulations 15A NCAC 028.0233&.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project Is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
•
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft.riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless.othenvise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
z. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite,mulch,or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6)feet
a. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facllityand any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.c
• Pre-project site conditions: AL ;, /1?af;4;
c
By your signature below you agree to be held responsible for meeting all of the conditions listed above a verl
that all information provided Is complete and accurate.
i ebo rat- K(2.14 ri-ecQ •
Agent
or Applicant
�Printed Nameee ermitOffl s nature
•
or Lie-am h — ZZ
Agent or ApplicantSignaturei c I ue Da
CAMA GENERAL PERMIT it: O 5,27a
Staten/North Cara/ha 1 Envlittimattal Quaky{CamYdMaagemml
WashMatanolAcel va;WasNru2tonSgaare Mad WashhgoonNCR8891252aa64481•
wdveliptonOffi¢I ID Car enalDrhe Ext.Wan mptw,NC28405-7&5l 910-7%925
Mcrehia4QlyOmce140ocon.,,e AvenueMarzfieal my NC 28557 1 252-60-2808
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: tlinge,,
Mailing Address: 3Co / "l!C/-/ � t ,
`Z, -c- j
Phone Number: fi 5 j / ' •— v C 7
Email Address: ft�'6. 1,1 G ` f >""� t'<----G�--1
I certify that I have authorized 44-?-7 p ,
Agent/Contractor /
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
at my property located at / .7
in /� -4�f,,. County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signature
Print or Type Name
Title
f/ I 1
Date
This certification is valid through I C ( /
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL . RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: Evan Lewis
Address of Property: 136 Maritime Court, Chocowinity, NC
Mailing Address of Owner: 136 Maritime Court, Chocowinity, NC 27817
Owner's email: egI71@hotmail.com Owners Phone#: 252-531-6058
Agent's Name:Bobby Cahoon Construction, Inc. Agent Phone#: 252-249-1617
Agent's Email: bobbycahoonconstruction@yahoo.corn
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. 9
descri tion or drawing,with dimensions,must be provided with this letter.
I DO NOT have objections to this proposal. I DO have obje
ctions to this proposal.
If you have objections to what Is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) In writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave.,Morehead City,NC 28557.DCM representatives can also be contacted
at(252) 808-2808.No response is considered the same as no objection if you have been notified by
Certified Mall.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings, boat ramp, breakwater, boathouse, lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must slun
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback iikei
(--.46
Signature of A acent Rparlan Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:� 1`�� flail
Typed/Printed name of ARPO: L 1 YO( c. 'o('rn
Mailing Address of ARPO: 1,-2 , Mari.iiipte C-f. ~~�� '/
ARPO's e all: ARPO's Phone# 025X'7/tb `7 Pit
Date: • �; 70a !waiver is valid for up to one year from ARPO's Signature*
Revised July 2021
SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY
■ Complete Items 1,2,and 3. A. Sign.r
■ Print your name and address on the reverse X ❑Agent
so that we can return the card to you. 0 Addressee
• Attach this card to the back of the mailplece, B. Received by(Printed Name C. Date of Delivery
or on the front If space permits. K'NNi tit W,te 'R D -
1. Article Addressed to: D. Is delivery address different from Item 1? ❑Yes
+ �L/G If YES,enter delivery address below: 0 No
LAD
/ as E�%2bro,)k r
10
3. ServIce Type 0 Priority Mail ExpresSG
1111111111111111111111111111 egistered Mar..
D0 AdNtSignature
d dl®Restricted Delivery 0 RRegistered Mail R�
9590 9402 7039 1225 2724 48 ❑Certified Mall Restricted Delivery ❑Signature Connor
C co a on Delivery 0 Signature Confirm
2. -.. •� � • L.w U Cabot on D9iivery Restricted Delivery Restricted Cellos
7021 1970 0001 7954 5776 astriatedDelivery
Tom,
PS Form 3811,July 2020 PSN 7530-02-000-9063 Domestic Return I.
1
EVAN LEWIS
136 MARITIME COURT
CHOCOWINITY, NC
DESCRIPTION
We propose to install a new concrete pier consisting of a 5'wide x 20' long
walkway connecting to a 17' wide x 20' long platform.
We propose to install a prefabricated Kayak launch.
1`
T\
Drawing by Bobby Cahoon Construction for:
2 „ Evan Lewis
136 Maritime Court Chocowinity
Proposed New Wood Dock
'4;
4 .
Ailr.). ...._kr.... A
--4.4
® o °r • I
5' x 20' Walkway
3 la g
0 0
re
fee,
or)
o i 'it
x.
17' x 20' Platform CO Ili
•
Di , This drawing is the sole property of
Milt: , I: ,i Bobby Cahoon Construction Inc.
IV and is not intended for use by any other entity.
Grandy, Ashley
From: Bobby Cahoon Construction <bobbycahoonconstruction@yahoo.com>
Sent: Friday, June 3, 2022 10:11 AM
To: Grandy,Ashley
Subject: Re: [External] Lewis, Evan - CAMA paperwork
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Derrick has talked to the customer and there was no more mention of a kayak launch. He was going to
purchase and we were going to install but it appears he has changed his mind so please don't include it on
the permit.
Thanks,
Deborah
Bobby Cahoon Marine Construction
6003 Neuse Road
Grantsboro, NC 28529
252-249-1617 office
252-249-9884 fax
www.bobbycahoonconstruction.com
bobbycahoonconstruction(ahyahoo.com
On Friday, June 3, 2022, 10:00:01 AM EDT, Grandy, Ashley <ashley.grandy@ncdenr.gov>wrote:
I will need to know the dimensions on the kayak launch for square-foot purposes thank you.
From: Bobby Cahoon Construction <bobbycahoonconstruction@yahoo.com>
Sent: Friday,June 3, 2022 8:14 AM
To:Grandy, Ashley<ashley.grandy@ncdenr.gov>
Subject: Re: [External] Lewis, Evan -CAMA paperwork
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
It was. I always send a written description of everything along with a drawing if I have one which I
usually do unless it's just a seawall.
Thanks!
Bobby Cahoon Marine Construction
6003 Neuse Road
Grantsboro, NC 28529
252-249-1617 office
252-249-9884 fax
1