HomeMy WebLinkAboutCasB_04-04_Brian Keith Keesee Construction IncWIRO for Caswell Bch
Local Government
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
In an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management"
CWB # 04- 04
Permit Number
Issued to Brian Keith Keesee Construction, Inc., authorizing development in an Ocean Hazard Area of
Environmental Concern fAECI at 836 Caswell Beach Road Caswell Beach In Brunswick County as
requested in the permittee's application, dated March 17, 2004. This permit, issued on April 12, 2004, is
subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes the construction of a single family residence at 836 Caswell Beach Road, Caswell Beach
(1) All proposed development and associated construction must be done in accordance with the permitte
work plat drawings(s) dated received March 23, 2004.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State an
Federal regulations. Contact the Town of Caswell Beach for applicable local ordinances and FEM
Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require
re-evaluation and modification of this permit.
Conditions continued on second page
This permit action may be appealed by the permittee or othe
qualified persons within twenty (20) days of the issuing dale. Fro
the date of an appeal, any work conducted under this permit mus
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permi
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered unde
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007.
In issuing this permit it is agreed that this project is consistent wit
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without th
written approval of the Division of Coastal Management,
Local Permit Official (signature)
CAMA Local Permit Official
Caroline Bellis
Wilmington Regional Office
n 127 Cardinal Drive Extension
t, IImington, NCr 28405
Ptrmittee
(Signature required if special conditions above apply to permit)
s ry
� J 1
I_ .____ .__.._._ __._____.. __ _ _.._ ____.____.. _._.
r is i���. i` .r: .. �i �'.'..r Il:'I�! -f - =•� '., rr ,', i:f t. i.• �J .1.. �.G l.' I ,_• � r
.. ... r.. ..r .. ..�. _..
�r r„"ir. _ fi. ':J `ll ...�,. ., .... .. '..I � I � ;1' .u. .. 'i :i: i
.. .� i. �/ a i� .. 'Ir 'lil .� , ��\il ".�� r � ! ,.I". �. '.l i I
• Irv. .. - 'I � , r J7 1"'� , •) _ '. �.
Keesee
Minor Permit CWB # 04-04
April 12, 2004
Page Two
(4) Any structure shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled
within two years of the time when it becomes imminently threatened, and in any case upon
its collapse or subsidence. However, if natural shoreline recovery or beach renourishment
takes place within two years of the time the structure becomes imminently threatened so
that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek
authorization of temporary protective measures allowed under CRC Rules.
(6) The development must be accomplished in such a manner as not to alter the integrity of the
frontal or primary dunes.
(7) No grading or construction shall occur within any area seaward of where the new work is to be
located.
(8) Dune disturbance will be allowed only to the extent necessary for development and if the
dune's protective value is not weakened or reduced.
(9) A copy of this permit shall be posted or available on site. Contact this office for a final
inspection at completion of work. 910/395-3900.
(10) Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned,
transferred, sold or otherwise disposed of to a third -party.
G�AgiPl- M
r
NCDENR
North Carolina Department of Environment and Natural
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director
April 12, 2004
Brian Keesee
Brian Kieth Keesee Construction
226 NE 63rd Street
Oak Island, NC 28465
Dear Mr. Keesee:
Resources
William G. Ross Jr., Secretary
Attached is CAMA Minor Development Permit # CWB 04-4 for work to be done at 836 Caswell
Beach Road in Caswell Beach, Brunswick County.
In order to validate this permit, please sign both copies of the permit on the first and second sheets as
indicated. Retain the original for your files and return a signed copy to us within 20 days of receipt, in the
enclosed, self-addressed envelope. This is not a valid permit until it is signed and returned to our office
Your early attention to this matter would be appreciated.
Sincerely,
Caroline Bellis
Field Representative
Enclosures
cc: Jim Gregson
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-39539001Fax: 910-350-20041Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity 1 Arflrmative Action Employer- 50% Recycled 110% Post Consumer Paper