Loading...
HomeMy WebLinkAbout85282_Jason Molina_20220629 „e“-°mr"`4cnCAMA DREDGE & FILL RK, N9 85282 A. c D I 7-D#17 09� Previous permit /►A Z GENERAL PERMIT Date previous permit issued I1/A [7-New I I Modification ❑Complete Reissue I I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC n Rules attached. I I General Permit Rules available at the following link www.dea.nc.gov/CAMArules Applicant Name , ' i r%t•- r-1 n Authorized Agent - `}�i�y • Address ,, F'''‘'•`S r Project Location(County): 2,r:«�7tY'-} City State J y ZIP Street Address/State Road/Lot#(s) Phone#(�! T) 1`- T-- 4`- Email , <, C � ' - •�_4 i,- . Subdivision City - ZIP • ? Affected nCW nEW nPTA nES ❑PTS Adj.Wtr.Body 0-1 r r D Ri'JC r (nat)man/unk) AEC(s): ❑IDEA n IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body ! Q rri i i f p R I -'' r ORW:yes/no PNA:yes/no Type of Project/Activity A ,y l_ 7'!. ( ,, (scale:),:-3q Shoreline Length r0- Access Length fi' )a VS. .-.. i }_. Cn`v , e, D--e"c'”-- Pier(dock)length Ate. 1 ‘,,,_�t�-ti qv- Is —' E —A— Fixed Platform(s) `: R 1 CA Floating Platforms) {N. 1 -tF Finger pier(s) i Total Platform area _ _ j — Groin length/# __ `\K Bulkhead/Riprap length S =-- __.: C 5►.1�� Avg distance offshore - { ~ e.0—T- i_ Breakwater/Sill 1 • U��r �'r y Max distance/length ! — �^S ub�r Basin,channel t' �L'r Cubic yards r - —. Boat ram } ...1-, ,.. ... �, , � i ,,' ,�_..". �. Boathouse/Boatlift ' Beach Bulldozing ) . Other ( C, V i r• i l 0- c.), 4' \,c, 0 \- SAV observed: yes ,rill I I J� I Moratorium: n/a yes i Site Photos: yes no i Riparian Waiver Attached: yes no � .��� } A building permit/zoning permit may be required by: ; '• I C � 1, / Permit Conditions ❑TAR/PAM/NEUSE/BUFFER(circle one) 111 See note on back regarding River Basin rules 7 nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name r4: ! i Signature**Please read compliance statement on back of permit** Signature - _- ......._ Application Fee(s) Check U/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 °."'.'` _!CAMA ._1 DREDGE & FILL 1, -/ No 85282 ABC D �j GENERAL PERMIT MI)# U`i` 5 Previoussous permit y Date previous permit issued I New j Modification I I Complete Reissue 7 Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC Rules attached. I General Permit Rules available at the following link:www.deci.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected CIA/ EW I I PTA ES I I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA n UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: (:)' Shoreline Length Access Length r r v y,c •_-T..-f — • --- P,v.r,� .,� D,‘-`- ✓ I - 1� .. Pier(dock)length rr1 I -- ----7 i Fixed Platform(s) r I � I I - _ - ..,__I� r- I f , Floating Platform(s) ',,tI', _— _ I Finger pier(s) _i__, Total Platform area I 1 Groin length/# ' i —. I - ��P, " Bulkhead/Riprap length - - 1 S� �' L. W •�.._--. ....---- - — ' + - _ t., rl .._....._ Avg distance offshore 1 7 I \ `_w. > Breakwater/Sill I ti- V? aS c Max distance/length r. W lo Basin,channel ( ti Cubic yards I,/ s 1 rat t Boat ramp t ; 4 - r _ i y �. _ i Boathouse/Boatlift Beach Bulldozingi - • el Other t �_ j 1 - � 4-3151-7 I , SAV observed: yes no {' c =17, :,i 1. C: N. L 4= Moratorium: n/a yes no I 1 I Site Photos: yes no I - I 1 ".-) •_ .r r' Riparian Waiver Attached: yes no I I I b :`r ,\ ,4 ` y�-.�,. t A building permit/zoning permit may be required by: _ r TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules 1 1 See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check It/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 - ROY COOPER IC Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 1SA NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. { Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. z. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and • filling in the buffer is a violation of the riparian buffer rules. 2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to (I this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkh d. Il • Pre-project site conditions: r f ��ei, A-is,,,/- GO ��/y .4r/ 4hZecr 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and anyassociated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions a verify that all information is complete and accurate. T, ',4'V -41tiy-e7 Agent or Applicant Pfinted Name Per it Off s ignature ���-- al - e 4-e — 22- Agent or Applicant ' nature Issue Date CAMA GENERAL PERMIT It: 55R p2, 13 State of North Carolina I Environmental Quality I Coastal Manag ement Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481 Wilminotan Office I I77 Carrinai nrive Fvt Wilmington..NC 28105-3245! 'W2-796_7215 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 Grandy, Ashley From: Pullinger, Robert C Sent: Wednesday, March 2, 2022 9:22 AM To: Grandy, Ashley; ivan@bulkheadsnc.com Cc: Martin, Tina R Subject: Lots 6 - 9, Friedman Drive (Blount's Creek/Bay) Ashley, Tina and I spoke with Ivan this morning, and told him that it was ok to use the general buffer authorization certificate as his buffer authorization for cutting/filling the unstable slopes(using the cut to fill behind the"'9' bulkhead/shoreline stabilization), similar to what we talked about on the lot between the two bulkheads (River Hills Road). r J, Ws. or •�-F Y� 44 rots to be,stabililzed ,r 1 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Jason Molina Mailing Address: 1008 N. Queens Ave., Lindenhurst, NY 11757 Phone Number: 347-992-8755 Email Address: Jom0305@yahoo.com I certify that I have authorized Ivan Sawyer Jr Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Constructing a bulkhead. at my property located at Lot #8 Freidman Dr., Blounts Creek, NC in Beaufort County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Jason Molina Print or Type Name Title 4 l7 /2022 Date This certification is valid through 12 31 2022 / N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Jason Molina Address of Property: Lot# 8 Freidman Drive, Blounts Creek, NC Mailing Address of Owner: 1008 N. Queens Avenue, Lindenhurst, NY 11757 Owner's email: Jom0305©yahoo.com Owner's Phone#: 347-992-8755 Agent's Name: N/A Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions. must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -O R- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: , ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* Revised July 2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Jason Molina Address of Property: Lot#8 Freidman Drive, Blounts Creek, NC Mailing Address of Owner. 1008 N. Queens Avenue, Lindenhurst, NY 11757 Owner's email: Jom0305@yahoo.com Owner's Phone#: 347-992-8755 Agents Name: NIA Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A des ription or drawing,with dimensions,must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. !f ou have objections to what is being proposed, you must notify the N.C. Division of Coastal anagement(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252)946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback,you must skin the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature d cent iparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: 2cJ f 0/J t"7..J it �L>Mailing Address of ARPO: O /{ct.4,/tt/I `cr /7 D r' ARPO's email: JI71/4.504.)• /..C- Q.QA'Itlt t•60APO's Phone#: U l mil- Sob ('/lc 7'/ Date: V-91. /or a `waiver is valid for up to one year from ARPO's Signature* Revised July 2021