HomeMy WebLinkAbout88071B - Cracknell, Paul •
P0,0`" CAMA n DREDGE & FILL ‘g' S N°. 88071 A (!) C D
` Q I Previous permit
ii• . GENERAL PERMIT
Date previous permit issued
New n Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC I 0 Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArvles
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s) ,
l
Phone#(r: )
Email Subdivision
City ZIP
Affected Ell CW I 'I EW In PTA ❑ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): 0 OEA 0 IHA fl UW n SPIMA n PWS Closest Maj.Wtr.Body - .
ORW:yes/no PNA:yes/no
Type of Project/Activity .
/ — i / > (Scale:, )
Shoreline Length
•
Access Length - --
Pier(dock)length L 1 1 1 i ' t
Fixed Platform(s) Y i
,
Floating Platform(s)
1 1 ...-,f _..__.. 4
Finger pier(s) , /._
Total Platform area ( .. '
Groin length/# t I -_
Bulkhead/Riprap length . - I----
Avg distance offshore _ _ -
Breakwater/Sill `
.r I
Max distance/length f --
Basin,channel
ffr 4 r-
Cubic yards • -. I f .l
r-
Boat ramp
Boathouse/Boatlift : 1
Beach Bulldozing I
{
Other i�
/ `i I i/
SAV observed: yes no —` .1
Moratorium: n/a yes no — r-w- r" i.�-+- t
Site Photos: yes no , -
Riparian Waiver Attached: yes no I I _LA + ` I 1 i
A building permit/zoning permit may be required by: .
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
❑ See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
+ i J / ,,4_,--
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature i--'
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
s.. .ham:'. ..l
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
,'''' "`'�,y LJCAMA I DREDGE & FILL
1N� 88071 ABCD
j i. 9M
GENERAL PERMIT Previous permit
Date previous permit issued
1 New fl Modification 'Complete Reissue Partial Reissue
As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n CW _EW PTA ES PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA IHA UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length ) —J.
i
Pier(dock)length
Fixed Platform(s) -------+— 1
Floating Platform(s) I
1
Finger pier(s) __ - •
Total Platform area
Groin length/# }
Bulkhead/Riprap length -, --j
Avg distance offshore - i ,- -_ —
-- -- --
Breakwater/Sill , I i
Max distance/length i t A
Basin,channel t '
{ 1 €
Cubic yards t ;—_.._
Boat ramp
- ... �..—
Boathouse/Boatlift
Beach Bulldozing
Other I I/
SAV observed: yes no 7—
Moratorium: n/a yes no } F• rmmorrrsrLyL -�; T T
Site Photos: yes no 1- j { i 1 f 6 �'-
Riparian Waiver Attached: yes no t, _ , . ,
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
See note on back regarding River Basin rules
- I I See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
4 ROY COOPER.
Cowernor
MICHAEL S. REGAN
- seaeteay
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE •
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 &.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your •
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.f
• Pre-project site conditions: 4-4 t.— /✓z/ // I
By your signature below you agree to be held responsible for meeting all of the conditions lis ed above and veri
that all information provided is complete and accurate.
14C/ SPi -"-
,ent or Applicant Printed Name rmit Officer's 1 re
!D -o2 2 -o2
Agent a Applic nt Signature Issue Date
CAMA GENERAL PERMIT#: G1'e U7/
state of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889I 252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-M5
Morehead City Office;400 Commerce Avenue Morehead City.NC 2855? 1252-808-2808
*IL
6/Yn.9 13 Au
a.1•od.ost nCpc.ouaaa.
lit
AGENT AUTHQJ AT10N FOR CAMA PgRMIT APPLICATION
Name of Property Owner Requesting Perm:t . � C ���� �''//
Mailing Address - 1`l j
Phone Number: O - 19j_7 - 52.2 • -
mil
Email Address. OC.Qti- /C,i,evy,z- f2 65,��,4y/ , TG,-�
RIP
I certify that I have authorized £i/c,C(/ .�/'.Cif __ ,
to act on my behalf, for the purpose of applying for and obtaining all CAMA permts
necessary for the following proposed development (f 0,.. ,E' e/-4(ry)- /
I
at my property located at ?elL- X CS"/ f 'i y r•-4/ t _il-'C �-'8•C)u
in County.
1 furthermore certify that I am authonzed to grant and do in fact grant permission to
Division of Coastal Management staff the t.oca!Permit Off cor and their agents to enter
on the eforemerttionrra lands rn connection with evaluating information related to this t..•1..'
permit application
Property Owner Information:
42e,X A."
car,
/7;34(Z .5-- 4 c�.ti P//
Print or Type Natno
pVl//j/C
n
Tittc
di /U 1 401'el,2.2..
This certi!cat on is valid through __Ad-- 13/ Z
.
�i,f -, 1,; w �`,coi. Y • .. aFHQKktaM3�V[} �YiIHtWRrOGMUUDkAu 64M
Y . rk' i s § 31W43Yi6S!NLYNrnLjhrrsp. �,?
:.�.a w.�..,.— .
I •M.Dist],77C11C.WOsx ..
taw.it 34 MA
N.C.OWISFON OF COASTAL MANAGEMENT
AOJACfNT � PROPERTY j__9 OpWNT NOT!TT iCAT10N1W
cial
iToo p0K,On W be COTTONed by awns!RC then agent)
Pawns L Q
d ��E�i�/ &4 1
A9.K.E+ataa—' ," l Ad�..11�G-�-T Jh-...LQ-
ACJAClNT R1PAlt11iN ps{OvfRT`7 9wNEWs CEATIFICATl0N(?
t=e t.d by L.
+awm;;ropey*owed 10 CA a d,w!c,c�:cal VW".The.+O'atdtM rr9 tor r+M
►�7" ' ID MIL ae MOW a+ete aew b a x" n n vo
aa sloi t e 'dW*Roy a000 A
0114.1.0
Plat
- —o.t.tlor'a n Sac 100 Nava atacoore to lays t
ma.Pi.� Deetsor aI CwarI
•;t,::, ^,.r cti,.:r o-t CC wit-it is /0p M~BAN o/eiN n0 t Cc ; •chocdM b.
y�eft.tit r Wat ii an Square Mu&was eirron. NC 27 10 0CM repnsMumc cart e!so b.
comic ro atwasr..w4x n1Nopan tion x you ha-vs boon
comic ad at(2327 f+6s+a to:e coot;lard the soma OS no tt41K
.,oeA.a by Carlow Mae
1
WA.YFR SIC11ON
i vraawstard eat am PrOPuseC Per 4}:a rrc a iQ PRISOL WU WC-'''r t+.a',* t r.tearHes.t4t(r
WW11M1 be aid tart a taavnufa eRSRAtt•d tS ROM Ply NOS Of*Dena~sect44�tiess Is..ry 1'-,^,
era does.not aKiN W*Weida sr rem i,i s )t!f tem easmaa wove7rc ted.-i ,,-..r441_!
se
!re scv-4•°.)!e Nave 3.avor 7
t-�
)00 •r,aa•'awena'rid!x'S :y;;
S, o.eaed7A;ja:etrf.p;r.Y'PrIvort,Ow3,.
OR- IOW
'be not twt00•1.a-v.Rtr t 9'astt :►,ett a:at {nt,x Fe Nardi)
fx
T T7p.bf rlf4•4 rl 01 A7W0r�.-,� !LQGr' f' I'5,1.7 r/ ` r r
mai *ewes%toARPO �_Y/-�=�.c en �} PA� 14,-714Nj _ )- 7t. � 'l5
ARPO a alma W •L"1•t41=0 .;(_ — . // '•7 a� ..
aae 4-/1-yn j.Y•„i er i.*led Ma w to Om ytaM hart A11POta 64westte•
1tIY'AtEl Aa`r_--
* 4,
>Ay•s*A t*dcii:c0'9 7/1tiwaoltakoavoupwria O.SG AfLJtABVvrtY-?fsim. W53SvrwmsWJ,;•i,^/J t.7
Ike-MGM TKO•QAmft•
N G Oi PR ON Of GOOPERTY ER MAMAGMOT'i1CAEY NT
AESIACERT RIP OSI * ' FORM
OP11<1E.O NM- JiLIiei BEST
(T0P DW Wn ks bs ax•OMK►a by bora or fir Wed)
twrO d 0000•011000tw
s7l--015
�,.,..t.rr ,P�Cry-- Rcc�' .-
.41w.'fear (.. 1_7e4020_1SciLG ! j/Y!.lo..a -
AD/AM?RIPARIAN PRQ/ORT OPORR s c f*1 ICAT10N
Nem*citify IMO ownwlo4 Mppoi tsRe M+.Wisitio.1 Vapor*r+.eea.+".r.vc*rto a Ode
Now-w eate1111e r.e,r IMrr•M•h eusoe*Wet&Mr+Simoormo°"►4.41 Pr000sos A
$00 kw ties MpMe u w e.e MOM* MO hire to-„~dal
r,r --"Wl•ri se i/.tow+i Weir rrrre•e4 row mat am*is NC BiFifr far amespe
rtam near•roar)r Darin w NI rive•I~ea Ow*worm CorrespairliMO IMndM
wf.t.a r MT^^Myer iQwes$M MCMr7..A MC vas DClt rynee.wrr'SI etetf abe M
as.rmf.tt et ass Mow Ire nave^••w e *s .tl tns taw w we 40400110 I t'~*HS*ma
wsf/.tr av Crimps aim
gral tf a fecflCaf
t wrsom all twl 1 Irmlo1M pert,4o0_tt.e,.rf f plow,►u M farm treablmw.Watlofr ie ee
grim ttwet M milt fora•+r rats*Mow 4<tS Mom Mr MO d AMM mow wiles.nets or no
mu air No arm•►f1lt.msa x germ w+.r++.+ll0 MrtM tfhl►Ie mill^•sr..enr0►rob smialle
tttm fwtwn.n writ Whoa)
010 ern lit awn.rrtsa I A w•e r mow,
AAiPkt:iwreot.
t do fah w.- . ..•r- n^wy:.••3ff to Te SW)....,....�....�....a...._
...+..y►••.Cyr.r,C;}Irwr**cw La
t►MiPniderw•MetNM -f- - ... '.I r
Maw*^room w AMP* .t.�,,P ._ L .01 I
met
MVO,...,.:ei'k -7 a _.F,-9--f_2Af1. 0
par. -'•�I.Q-Ld.1.---we.1+r M..b�4,.1*ws war!0,4.4 A,MPO.
Rapp f j
„
p