HomeMy WebLinkAbout88070B - Turner, Prentice . ,,
I ICAMA Li DREDGE & FILL 01 °�3
8807 A B C D
�°"�
GENERAL PERMIT Previous permit
Date previous permit issued
n New n Modification I I Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC n Rules attached. n General Permit Rules available at the following link:www.deci.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County): ' -
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n cw n EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): OEA n IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: 6; )
Shoreline Length .._; 1 +—
Access Length I ....
i
Pier(dock)length k_._1 i -- .._._ L
Fixed Platform(s)
,
T
Floating Platform(s)
A r �r
Finger pier(s) ii/
Total Platform area
4
Groin length/#
Bulkhead/Riprap length I
Avg distance offshore j I - - • - _.
Breakwater/Sill y — ' '`" `- 1' _
Max distance/length
Basin,channel _ )
Cubic yards i
Boat ramp
I
Boathouse/Boatlift
Beach Bulldozing . i
Other
t -_-
t - i r
SAV observed: yes no t i►'';`L IIr
Moratorium: n/a yes no _.._. . _ _. _.._,_,.._.__ ._ . 1
Site Photos: yes no 1-- i- a E ;
Riparian Waiver Attached: yes no I 1 i... _It- 1 f _1 I__• , i I
A building permit/zoning permit may be required by: �--�l(
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions • l
I I See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) i
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
H.<Ta—r - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
P ^,s0(°'srk %�CAMA DREDGE & FILL - - 1 (') 3 No. 88070 ABCD
GENERAL PERMIT Date us permit previous ousp
Date permit issued
New I Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I SA NCAC n Rules attached. General Permit Rules available at the following link:www.deci.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW EW PTA ES PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): Ti OEA IHA UW Ti SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length • j f 1
Pier(dock)length j '
,
Fixed Platform(s) i 'trail... i
Floating Platform(s)
Finger pier(s) _
t—t- - , - 1 F........f
Total Platform area
� ��
Groin length/# ,n ,_jrz i __ _ i_•
1
Bulkhead/Riprap length
Avg distance offshore t - •
Breakwater/Sill j 1 : '
Max distance/length } •
-
i I i
Basin,channel I
Cubic yards — I__ ti 1. _ _ 1 _
_--._ 1 �_.. 1. ..- , —
Boat ramp I . - j I j '..... _. - I —
Boathouse/Boatlift
1 { i ,
Beach Bulldozing ' I ' I
Other ! i 1
( I - ----- _ .. i .L...__ ..-..-_ _._—.. I I i _.. ._..... '_-.-j
I
SAV observed: yes no I '
Moratorium: n/a yes no 1" " �"" �" v` .-.iI
Site Photos: yes no I j j I ! } ( 4 I I 1
Riparian Waiver Attached: yes no ; I I I ( l i ( 1� I i I,
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
1 See note on back regarding River Basin rules
1 1 See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Feels) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
Y
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALLT1 QOectvr
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02110233 & .0259. The
Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: L-4 eL(fi/, /7. (e
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that ail information provided is complete and accurate.if;
Spc
Agent or 1(pplicant Printed Name Permit Officer's Signatur
Agent or Appl cant Signature Issue Date
CAMA GENERAL PERMIT#: of 7, CJ
State of North Carolina I Environmental Quality Coati Management
Washington Office I a43 Washington Square Mail Washington.NC 27889 252-446-6481
Wilmington Office; 127 Cardinal Drive Ext.Wilmington,NC 28405-3845 910-T96-T215
Morehead City Office;400 Commerce Avenue Morehead Ciy,SIC 28557 1252-808-2808
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: irtM rice i. /Ltr/1e(
Mailing Address: ?S'f 7 San 6-6t.6r; ( ST-_
, IC 027.6(3
Phone Number: 9//- 3/(i 0!o!1
Email Address: Gt.r.(G4AI . &. 11ltr, (- _2e /owes, (o.
I certify that I have authorized qic cprius.e
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: f-)r �� /6 oa./
at my property located at 7 j !"oy n,L � -ti ,tX- Z go ,
"jl in fue-4- County. l
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff. the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Propert er Inform '
Signatur
A �f�
1 iitPI/cf itc/I.t/t1,
Print or Type Name
6 wn-.r'
_ Title
(Pl
Dale
This certification is valid through I I
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT)
CERTIFIED MAIL. RETURN RECEIPT REQUESTED or HAND DELIVERED
(o . /• r
Date
&.ate � 4...,•,4 s
Name of Adjacent Riparian Property Owner
3tcf Aisteusitio fuc4
Address
City.State Zip
To Whom It May Concern:
This eon-cspondcncc is to notify you as a riparian properly owner that I am applying for a CAMA Minor permit to I
on my property at _ ?I � i &k A/C-
in
6 Z �
jj�, f Cou/y nty.which is adjacent to your property. A copy of the application and project
drawing is attached/enclosed for your review...
If you have no objections to the proposed activity,please mark the appropriate statement below and return to mc as soon
as possible. lino comments arc received within 10 days of receipt of this notice, it will he considered that you have no
comments or objections regarding this project.
If you have objections or comments, please mark the appropriate statement below and send your correspondence to:
(LOCAL PERMIT OFFICER, NAME.OF LOCAL GOVERNMENT, MAILING ADDRESS CITY,STATE,ZIP CODE)
If you hate any questions about the project,please do not hesitate to contact mc at my address/number listed below,or
contact(LOCAL PERMIT OFFICER)at(PHONE NUMBER),or by email at: (LPO EMAIL).
Sincerely.
___ f /.�. ,..�,,� 4/9 • 3(6 • o(a/ (
Property Owner's Name Telephone Number
Address City State Zip
✓ I have no objection to the project described in this correspondence.
A ! have objection(s)to the project described in this correspondence.
Et irk L. • — G• c.• Za Z2
Adjartj Riparian Signature t)atc
d�e 3dh t.» c..)4$' 7052• 131 . lees°
Print or Type Name Telephone Number
Address City State Zip
Revised July 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT)
CERTIFIED MAIL, RETURN RECEIPT REQUESTED or HAND DELIVERED
Date
Naii‘34.Adjaccrit 1;ttpariLProp�*rty Owner
Atidres,-6 4 N 17
&(A
City, State Zip
To Whom It May Concern:
This correspondence it,to notitylouas:a riparian property owner that II am applying; for a C'AMA Minor permit to
on my roperty at 62414,
in c ( C' ty, which is adjacent to your proper y. iiklaryaftielipplicaiion and project
draping is attached/enclosed for your review.
If you have.no objections to the proposed activity,please mark the appropriate statement below and.rt um tome as soon
as possible. If no Continents ar .teceived within 10 days of receipt of this notice, it will be considered that you have no
comments or objections regardintd)is project.
I l'you have objections or comments,please mark the appropriate statement below and send your correspondence to;
(LOCAL PERMIT OFFICER, NAME OF LOCAL GOVERNMENT, MAILING ADDRESS CITY,STATE,ZIP.cODE)
.If you have any questions about the project,please do not hesitate*Contact net at my address/number listed`boiow,or
Contact(LOCALPERMITOFFICER):af(C'H(JFE NpMBER),bully email at: (LPO EMAIL).
' r /q• *V& oG/ r
Property Owner's Name Telephone Number
Address r t. N City t���-1-} State av --- ZIP
m objectnon to the projeadetciibed in this correspondence.
- F objections)to the project describer in this correspondeence.
.Adjacent Riparian Signatur Date
_ �3 Scat
Prim or Type Name Telephone Number
Address City State Zip
kevised July 2021