Loading...
HomeMy WebLinkAbout85239_Mary Beth Poplyk_20220627 , =0`°°'"i T ,_-ICAMA DREDGE & FILL 1�K I N° 85239 ABC D s ; , s GENERAL PERMIT Date previous pliermit issued New Modification I I Complete Reissue Partial Reissue Previous permit As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC Rules attached. General Permit Rules available at the following link:www.deo.nc.gov/CAMArules Applicant Name `;. Authorized Agent Address .. Project Location(County): •71 City . i•i�' 1111 ,A..)y State , C. ZIP , R T•C';' Street Address/State Road/Lot#(s) Phone#( :r (7) (v?A -.• Email rr?ZQ t"it 1 Q t- ' -1-\ '-{ /!/:r 44 . I1 e+ Subdivision City ZIP 1.9 Affected I-i CW EW I I PTA n ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA IHA UW I I SPIMA I I PWS Closest Maj.Wtr.Body c_ �tt,_)C ;' ORW:yes/no PNA:yes/no Type of Project/Activity 1� (Scale: 3 d' Shoreline Length _ Access Length .- f-- -I • + - -._.__. { ►�..,i.F S F,+.,=ems Pier(dock)length -f I i Fixed Platform(s) J I = a • Floating Platform(s) j I I Finger pier(s) - -i - = } I Total Platform area _ / ,,..c5 Groin length/# I ; t_ 4' {I , Bulkhead Riprap length • C" I Avg distance offshore - • - -- — - -t,.-•=, V Breakwater/Sill I c-4` l`' ,t _\c. v1 r Max distance/length ( w 1`1 Basin,channel ts� -I. Cubic yards C, r`i„, I Boat ramp lG r�d i r -{�-� Boathouse/Boatlift i f . ' I ! j Beach Bulldozing i i Other SAV observed: yes no.- -' 3 i ' " Moratorium: n/a 'L 44(4 / Yes na . T� �/c/ z 1 I Site Photos: yes no l 0°4 i �''.' ,i ,\ 1-1 Riparian Waiver Attached: yes no 17•."rf't i I I ,---.a A building permit/zoning permit may be required by: O c ' CD.. Permit Conditions LA., I I TAR/PAM/NEUSE/BUFFER(circle one) eJ \ . I I'See note on back regarding River Basin rules II See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature"Please read compliance statement on back of permit" Signature 42i2. Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 a*23'''5r4,7 !CAMA ' 1 DREDGE & FILL No 85239 ABC D GENERAL PERMIT I 0 v5 Previous permit GE N Date previous permit issued New Modification I Complete Reissue Il Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State A3 C ZIP 4 I • Street Address/State Road/Lot#(s) Phone#( ) Email -c'+ Subdivision City ZIP Affected CW EW PTA ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA IHA UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ' ) Shoreline Length 1 I . Access LengthI. Pier(dock)length � a 4 Fixed Platform(s) Floating Platform(s) Finger pier(s) i Total Platform area I I Groin length/f _ , I fv Bulkhead/Riprap length - - I • Avg distance offshore -- I Breakwater/Sill s I . r Max distance/length A ' Basin,channel f . _, _ Cubic yards ..__..._.._.._._..� r ------ ._._.____Boat ramp x^ — .'..�_.._.—__ C r Boathouse/Boatlift I �` i I Beach Bulldozing ``t f Other ,� J i - — r , j SAV observed: yes no A---'-' f ' ! I • Moratorium: n/a yes no i�. t ,� ) Is 1. Site Photos: yes no l '' I l ` } , i 1 Riparian Waiver Attached: yes no I I i ---F° 'A building permit/zoning permit may be required by: Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one) `' See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 A A. ROY COOPER • t, Governor MICHAEL S. REGAN Secctmy Coastal Management BRAXTON DAVIS ENVIRONNENLAL OOAM) Director BUFFER AUTHORIZATION CERTIFICATE • FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233 & .0259.The Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies . with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the . construction and/or land clearing to a civil penalty by DWR of up to$25,000'per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as between 75 and 105 degrees)unless.otherwise approved by DCM.The • alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet. I 4. Project Drawing:The drawing on the CAIv1A General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts. (t / o Pre- roje site co ditions: � /Se Za, ,,LI J `�24..Lj By your signature below you agree to be held responsible for meeting all of the conditions listed above d verify that I 'nformation provided is complete and accurate. Age ca r Name Permit Off cer' gnatur • • k' -Al- -in, Agent or Applicant Signature Issue Date CAMA GENERAL PERMIT#: t5(93 l 0 State of North Carolina I Environmental Quality I Coastal Management Washington Office Pat i Washington Square Mall Washington.NC 278891252-946-6481 Wilmington Office 1127 Cardinal Drive rxt Wilmington,NC 28405-3845 1910-79f ms Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 • AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: __ cart' l4-•\ Mailing Address: ►01 clue,wc� �r GHoc0w n f- c Z7T 17 Phone Number: al t b -693g. 3 o Email Address: (naATjj EL. ( W I I4 D ST I certify that I have authorized /a-/,�fILG Cvtis /RUC Tin w� Agent/Contractor • to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: P cam dg -Plcro -,>, dock_ at my property located at 09 lit-I4-c- 0,1 Gt/lcxcc.Jc il in 'ram County. l furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management stag-the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: • Signet e t AR lit PorLvi. Print or Type Name _ Title 26,2 2- Date This certification is valid through / / N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Address of Property: Mailing Address of Owner: `L7 t uQn pr-- jr, ��t ^ (r- y Owner's email:ter �-�Owner's Phone#: Qj 10 - Agent's Name: Agent Phone#: Agent's Email: i ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adlacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing,with dimensions,must be provided with this letter. )4tW—.I DO NOT have objections to this proposal. i DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mali, Washington, NC 27889. DCM representatives can also be contacted at(252) 946.8481. No response Is considered the same as no objection if you have been notified by Certified Mall. WAIVER SECTION I understand that any proposed pier,dock,mooring pilings, boat ramp,breakwater,boathouse,lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments).(if you wish to waive the setback,you must skin the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- i do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Ownerr::, Typed/Printed name of ARPO: O')+ 'Y fF • NSA P,eaiDE-Jv j_ Mailing Address of ARPO: 5t r 1-0 (,J(1 I, CA/peobelk?/ i 1c 27 (7 ARPO's emall:rj y.),r //ti4 t et ARPO'S Phone#: �I#-y�/ d'�/60 Date: I//AA Y 202 - *waiver Is valid for up to one year from ARPO's Signature* Revised May 2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: f1 i,r Pcp1'7` Address of Property: D cct�t7-rS—,, � �c i Mailing Address of Owner: tid1 �h � Dr- ` �loC�c.c�c --� Owner's email Los Owner's Phone#: C21 t Agent's Name: Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing.with dimensions,must be provided with this letter. I DO NOT have objections to this proposal. i DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252)946.6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER pilings, I understand that any proposed pier,dock,mooringlin s,boat ramp,breakwater,boathouse,lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback ; Signature of Adjacent Riparian Properly Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) — Signature of Adjacent Riparian Property Own . Typed/Printed name of ARPO: 1 J M�`�� Y .r Mailing Address of ARPO: I COjtC-kt,— -\ 'P CJ--ic,ca • ARPO's email: ARPO's Phone#: as2 - Qj L. -- J Zg� Date: &A-7 �2o22. `waiver Is valid for up to one year from ARPO's Signature* Revised May 2021 cnccaa:• Via. J_rt-.... ..... _ . . _ . 1 i t • 1 I 1 • s. ock- • • •