HomeMy WebLinkAboutEX27-20 Wellman
October 13, 2020
Wellman’s Construction Inc.
c/o Mr. David Wellman
PO Box 8
Holly Ridge, NC 28445
RE: EXEMPTED PROJECT SINGLE FAMILY RESIDENCES WITHIN THE ESTUARINE
SHORELINE AREA OF ENVIRONMENTAL CONCERN (15A NCAC 07K .0208).
PROJECT LOCATION/ADDRESS – Lot 29 Old Settlers Beach, North Topsail Beach
Dear Mr. Wellman,
I have reviewed the information you have submitted to our office concerning the necessary filing
of an application for a CAMA Minor Development Permit under the Coastal Area Management Act and
have determined that the activity you propose of a single family residence is exempt from needing a
CAMA Minor Development Permit as long as it remains consistent with your project drawing dated
August 18, 2020, and it also meets the conditions specified below. If your plans should change and your
project will no longer meet these conditions, please contact me before proceeding.
SINGLE FAMILY RESIDENCES WITHIN THE ESTAURINE SHORELINE AREA OF
ENVIRONMENTAL CONCERN EXEMPTED
1. All development shall be located at least 40 feet landward of the normal high water level from
waters classified as Outstanding Resource Waters (ORW). No ground disturbance or land
disturbing activity shall occur within 40 feet of the normal high water level of waters classified as
ORW.
2. The development may not exceed a 25% built upon area within 575 feet of the normal high water
level of waters classified as ORW.
3. The development shall be consistent with all other applicable CAMA permit standards, North
Carolina Building Code standards, local ordinances and local land use plans in effect at the time
the exemption is granted.
EX27-20
5. This exemption does not allow for any fill or excavation within any wetlands or open water areas.
Any proposal to modify or alter the development plan as proposed will require additional
authorization from the Division of Coastal Management.
This exemption does not eliminate your requirements to obtain any other State, Federal or Local
authorization. Construction of the structure authorized by this exemption shall be completed by
December 31 of the third year of the issuance date of this exemption.
Sincerely,
Brad Connell
Brad Connell
Environmental Specialist II, DCM
cc: Roy Brownlow, DCM
Kate Winzler, NTB Permitting Specialist