Loading...
HomeMy WebLinkAboutEX14-20 Rodger April 28, 2020 Mr. Thomas Rodger 8114 6th Avenue N. Topsail Beach, NC 28460 RE: EXEMPTED PROJECT SINGLE FAMILY RESIDENCES WITHIN THE ESTUARINE SHORELINE AREA OF ENVIRONMENTAL CONCERN (15A NCAC 07K .0208). PROJECT LOCATION/ADDRESS – 8114 6th Avenue, North Topsail Beach Dear Mr. Rodger, I have reviewed the information you have submitted to our office concerning the necessary filing of an application for a CAMA Minor Development Permit under the Coastal Area Management Act and have determined that the activity you propose of deck construction is exempt from needing a CAMA Minor Development Permit as long as it remains consistent with your project description, submitted on April 28, 2020, and it also meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. SINGLE FAMILY RESIDENCES WITHIN THE ESTAURINE SHORELINE AREA OF ENVIRONMENTAL CONCERN EXEMPTED 1. All development shall be located at least 40 feet landward of the normal high water level from waters classified as Outstanding Resource Waters (ORW). 2. No ground disturbance or land disturbing activity shall occur within 40 feet of the normal high water level of waters classified as ORW. 3. The development may not exceed a 25% built upon area within 575 feet of the normal high water level of waters classified as ORW. 4. The development shall be consistent with all other applicable CAMA permit standards, North Carolina Building Code standards, local ordinances and local land use plans in effect at the time the exemption is granted. 5. This exemption does not allow for any fill or excavation within any wetlands or open water areas. Any proposal to modify or alter the development plan as proposed will require additional authorization from the Division of Coastal Management. EX14-20 Rodger Page 2 This exemption does not eliminate your requirements to obtain any other State, Federal or Local authorization. Construction of the structure authorized by this exemption shall be completed by December 31 of the third year of the issuance date of this exemption. Sincerely, Brad Connell Brad Connell Environmental Specialist II, DCM cc: Roy Brownlow, DCM Kate Winzler, NTB Permitting Specialist