Loading...
HomeMy WebLinkAbout14-17 Renewal 2021 Hoosier DaddyPermit Class RENEWAL Permit Number 14-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Hoosier Daddy, LLC, 6025 Tarin Rd., Wilmington, NC 28409 Authorizing development in New Hanover County at the NE Cape Fear River, at 1305 Rockhill Rd., in Castle Havne as requested in the permittee's application dated letter dated 2/15/21. This permit, issued on March 12, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suoiect to nnes, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the Permit No. 14-17, which was issued to the permittee on 1/30/17, as well as all subsequent renewals and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2010-0443v2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2007-00579. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. ((( Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee DCM Coordinator: 10 4tc.�-1 Permit #: I q -/ /� MAILING DISTRIBUTION SHEET Permittee: H0051 a, my 10 U16 Agents:_ VAA - [ff*VAA DCM Field Offices Elizabeth City Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: a 95 Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Chris Pullinger - 401 Clif Whitfield (WARD) Jimmy Harrison Tina Martin - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs - 404 (Brunswick, New Hanover) Holley Snider - 401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) (NCDOT) Travis Wilson Natural Heritage Program Rodney Butler LPO: NC Division of Coastal Management CAMA Major Permit Renewal Request i District: Wilmington Major Permit Staff: Katharine Elks Applicant Information i Namecant Hoosier Daddy, LLC 2/16/2021 Request Date: Last First 2/16/2021 Received in Office: Project Address: 1305 Rockhill Rd. Castle Hayne 28429 ' StmerAddreu City ZIP Code CAMA Permit 14-17 No.: Permit Expiration Date: 12131/2020Payment $ 100.00 Agent's Name: Dana Lutheran District Manager/Field Rep Approve? (Initial Appropriate Box) YES NO Other- Information No RProject 2010-0443v2 US ACE IDNo.ction SAW-2007-00579 Has substantial YES NO If Yes, development occurred? ❑ Explain: YES NO Recommend to Renew? If Not Approved, provide Justification: Staff �//JJ Date, Signature: c\'��C_ 1 • f Southern Environmental Group, Inc. EEG E F V'—b 1515 South College hoed, Suite r— Wilmington, NC 28+12 FEB 16 2021 910.+5L2711 • Fux 910.49L2899 - v zcgi.us r=�=- 15 February 2021 Via: Hand Delivery NC Division of Coastal Management, Wilmington District Office Attn: Ms. Kathnne Elks 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Permit Renewal Sunset Reach, CAMA Major Permit #14-17 New Hanover County, North Carolina Dear Kathrine, With this correspondence, Southern Environmental Group, Inc. (SEGi), on behalf of Hoosier Daddy, LLC (see attached Agent Authorization) is requesting a renewal of CAMA Major Permit #14-17 (see attached), which was issued 30 December 2017 and expired 31 December 2020: The permit authorized a community, marina facility that provides a maximum of 53 formalized boat slips. At this time, work on the marina facility has not yet commenced. However, they intend to do so within the next several weeks. There are no changes to the design of the previously authorized structure, which will be built in accordance with the conditions of CAMA Major Permit #14-17 and the work plat drawings, dated 11/14/16 (see attached). There are also no changes in the water depths and/or the existing conditions since the permit was originally issued. The filing fee, in the amount of $100, has been attached to this correspondence. It is my hope that the information provided within and attached this letter is sufficient and the renewal will be issued without delay. However, should you find that additional information is necessary, please feel free to call me, at 910.228.1841. Thank you for your time and assistance, with this project. jSincerely, am Dana A. Lutheran Southern Environmental Group, Inc. Enclosures (3) RECEIVED DCM WILMINGTON, NC FEB 16 2021 AGENT AUTHORIZATION FOR CANA PERMIT APPUCATION Name of Property Owner Requesting Permit �� a r s r es 014 jj LL C' Mailing Address: to (Z A aq Phone Number. --Xa 0 Email Address:. I certify that I have authorized Ix A-,g AMntJCcntmctor to act on my behalf, for the purpose of applying for and obtaining all LAMA permits necessary for the following proposed development SUINS&± atmyProperly located at 13oS in —NL�a2L�rl - Lcounty. 1 Autherr7role certify that I am allffiodzed to grant and do in laof grant parrigssion to Division Of Coastal Management staff, - -s'lb enter on th& WbraMan,,DnW !ands Ipa/rAffO a I Loce..., , . fikar and their agent a peft"it applicaflon. M connecff0n4&P eva(U*ng k7fon"Oft 1614ted, tbihis PMpeq Owner In[brm-910fl: L Pral ;VT=YP9 NAAT4 True I L9 Dat§ This certification is valid through 4 I R'EcEiv�lo I)CM WILMINGTON, NC FEB 1 6 2021 Coastal Management EMVIEOMMEMAL OVAUW January 30, 2016 Hoosier Daddy, LLC C/o Mr. James Yopp 6025 Tarin Road Wilmington, NC 28409 Dear Mr. Yopp: ROY COOPER MICHAEL S. REGAN Crmmn BRAXTON DAVIS n,r•um The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the gold original and the white copy and return the white .copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you plan to have the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the yellow Notice Cord just priorto work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, 0y.am Douglas V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management Enclosure: WiRO R �C m v F—P, Dana Lutheran, Agent DCMWILMING T CN, NC State ofNmth Ca line I Environmental Quality l Casslal Management FEB rEB 1 6 1021 127 cardinal Ddve Eat, WOmington, NC 29405 919 796 7215 Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for —2L Major Development in an Area of Environmental Concern pursuant toNCGS II3A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 14-17 Issued to Hoosier Daddy, LLC, 6025 Tarin Rd., Wilmington NC 28409 Authorizing development in New Hanover County at the NE Cape Fear River, 1305 Rockhill Rd Castle Aayne , as requested in the permittee's application dated Revised 11/14/16 incl _ attached workolan drawings (5) 1-5 of 5 dated 11/14/16 This permit issued on January 30.2017 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set fnrth helnw An., vWn fine -4vA ..e __-. ue suoJect TO Lines, imprisonment or civil action; or may cause the permit to be null and void. Marina Facility 1) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina facility. Any sewage discharge at the marina facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the state of North Carolina agrees that You project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. .FdYC Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. ....2 E'er «..• E n 'J Ev DCM VVIL MINGTO FFR 1 R 7091 Signature of Permittee Hoosier Daddy, LLC. ADDITIONAL CONDITIONS Permit No.14-17 Page 2 of 5 3) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed and operable at any easily accessible location. The pumpout facility shall be maintained and in operable condition for the life of the marina. 4) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrances and exits from each of the two main piers. 5) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a representative of the Division to ensure that the required pumpout facility is in place and operable. 6) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with T15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the marina facility. 7) No portion of the authorized docking facility shall extend more than one quarter width of the waterbody. Measurements to determine the width of the water body shall be made from the waterward edge of any coastal wetland vegetation which borders the waterbody. 8) In order to ensure compliance with Condition No. 7 of this permit; and to satisfy requirements of the U.S. Army Corps of Engineers, an as -built survey shall be conducted on the docking facility, and copies of the survey provided to the U.S. Army Corps of Engineers (USACE) and Division of Coastal Management, within 60 days of completion of construction of these portions of the project. At a minimum, this as -built survey shall show the new docking facility, one quarter distance of the waterbody, USACE channel and the USACE channel setback. NOTE: Failure to provide the survey required in Condition No. 8 may result in a violation of this permit. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 53 formalized boat slips. 12) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. IRECEk FE'Er DCPii VUiLKI IGTO'rd, NC FEB 1 6 2021 Hoosier Daddy, LLC. ADDITIONAL CONDITIONS Permit No.14-17 Page 3 of 5 13) In accordance with commitments made by the permittee, and to allow for public access to the waters located landward of the main docking structure, the portion of the northern access pier shall be elevated a minimum of six feet above normal high water level, as depicted on the attached workplan drawing 4 of 5 dated 11/14/16. 14) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 15) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 16) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant shall implement the U.S. Fish & Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements within. The guidelines can be found at: httn://www.fws.sov/nc-es/mammal/manatee guidelines ndf. 17) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the pennittee shall be required, upon due notice from the Corps of Engineers, to remove relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 18) 15A NCAC 07H .0208(b)(5)(D) of the Rules of the Coastal Resources Cornmission require that the no more than 27 square feet of public trust area per one linear foot of shoreline adjacent to these public areas shall be allowed for residential docking facilities. in order to ensure consistency with this requirement, deed restrictions shall be placed on all waterfront lots with the subdivision dedicating the entire shoreline of each lot to the proposed community access facility. The deed restriction shall further state that no T's, finger piers, platforms, or decks shall be allowed off of the waterfront lots in the future as long as the permitted access facility is in place. These deed restrictions shall be recorded with the New Hanover County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the access facility. Breakwater/Debris Deflector 19) The breakwater shall be marked with reflectors extending at least three feet above normal high water. One reflector shall be placed on each end of the breakwater and one in the middle. 20) The authorized breakwater shall adhere to the alignment depicted on the attached workplan drawings. P4EC : VED DOM WILMING TON, FEB 16 2021 Hoosier Daddy, LLC. ADDITIONAL CONDITIONS Sedimentation and Erosion Control Permit No.14-17 Page 4 of 5 NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environmental Quality, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. Stormwater 21) The Division of Energy, Mineral & Land Resources (DEMLR) approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW8-061026. Any violation of the permit approved by the DEMLR shall be considered a violation of this CAMA permit. Upland Development 22) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the 53-lot subdivision, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at(910)796-7215 for this determination. General 23) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 24) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 25) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit NOTE: The permittee is advised that backflow prevention is required between public water systems and waterfront facilities. Other requirements may apply if a well will serve the dock. Please contact the Department of Environmental Quality -Public Water Supply Section at (910) 796-7215 for additional information. .NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including, but not limited to, a special use permit from New Hanover County. DCM WILfJIING TON, NC FEB 16 2021 Hoosier Daddy, LLC. Permit No.14-17 Page 5 of 5 ADDITIONAL CONDITIONS NOTE: The U.S. Army Corps of Engineers assigned the proposed project Action ID No. SAW-2007- 00579. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 2010-0443v2. NOTE: An application processing fee of $400 was received by DCM for this project. FIF0.�°'''r'= DCf`✓i WfLf%,7!NCw T Or1 ' FEB 1 6 2021 Date Received Date Deposited Check From - u. Name of , Permit Holder Vendor Check Number Check urpount Permit :, ; Numberldomments, Rct, if 2/16/2021 River Road Constructtorr Hoosier paddy, LLC First,Bank 1620 $100.00 Major Renewal Fee #14-17,1305 KE rct. Rockhill Rd, Castle Hayne NHCo`", 13672 r v a y - r r • a a r• r .r r r v v yr a ev r ----------------------- Iev .. .�: • off` > .: / ev i I ni`m, nr¢a. I - 01 I •�r I i I � ler°m C- n I V 0> - • . ti RY NOT TO SCALE FEB 1 6 2921 Le end '"^"'+'°; mw.s+••+ 'eC111%Oun1YANBu•[ WbIwL%WNN<MN Wf.Y 'roperty Line — — . — 30' Buffer •"""Y9O°"' ramaw�%umoweuolrw PRELIMINARY :ontour Line --- -- CAMA 75' AEC e m „q`"`T, NOT FOR CONSTRUCTION Channel Width — - - - - -- wd NHC COD is m'®tda�'°•Qm°:a� "�a...a.„�a wu^•*+,o•a++%m+^.�..mm.m.s.vn.l:o'a^mw - P AHW Line — — Coastal Wetlands F.__ r•w.mwww'raums.. ® Attachment. B to aun°nw.e, ss-v.aa eeve s ae s — ,ae°e,%,,,m„m,",� ..a.« CAMA Major Permit, aak . _ i Application xeoefe. neddY. u.c +ym 6 � � 1 Ll area PI Tempm Mup rPumpau Vlbn i I v m USACE Channel Dock II 1 e, it D°ck3 � le P Channel Setback r, n'�o r 4 ]].oY �',e II / •.r ,ems 1�1 41 , 1 _ -�'� Npte3j .01 � � ° j `, i � Total Length of Access Decks is I Approximately 1799 feet. to e.tr a ` r^ Maximum Length of Fire Protectio prole / /I i i�'x --T / Stand Pipe is 960 rest DC 114 �xc annel Idth (b ed o outer I' its of If coast wetl ds an MHVV) _.-! 51 r, �' a Slip Summary I' I eaa +r(1 Y .. r, ,�'``♦�..," ' •I`I 'v 14-35'SHIP, 7-45'Slips `1 ♦♦ 6 -60' blips r, Dock �'stahtl�gpends 2-e0'so, e"'" ♦1.: 53 Total Slips r vv I ! 1 I NSA 30'ii far vv P r2♦ ♦♦ �rUN1�RC O OeVe �` - C 75'AE NF &BI 8 r.waawr,g. Plat ` u6... a '�' _,' �-•_ Legend ♦"a; ' ♦ L- PRELIMINARY PRELIMINARY y [ ," ♦`'. NOT FOR CONSTRUCT 5t"AECLi 7r�' AEC Line- •r• NOT FOR, CONSTRUCTION �' NHL COD ckk a �,• 1/4 Channel Width 5etbeck-- " vc ♦ nr .s. NOT : This Is Not An Engineered Or Survey Drea Property Line For Environmental Permitting Only. Contour Line - -- -'- prcka r---•o Sun"eleeM 13-34-16 P ge 2 E 5 MHW Line — — — Attachment B b,m: i„ Coastal Wetlands to LAMA Major Permit soosier Daddy LLC au '•Ip ° 1° Application TwY prviey I Navigation Channel 76AEC- Setback (52) Waterbody Wid UUhty Dock 30'Buffer NHC COD—\l A' 14'xG'Floafin 121 'x W Floafing Dock 7 'Wide Access Dock --4= - 1+)0 24 DO 34 DO 4+00 4=4+184 C FEB 1 6 2021 PRELIMINARY For Enwrmmnl PsffrMng Ory. NOT FOR CONSTRUCTION 11-14-16 Pa'. 3 of 5 Attachment B to rt CAMA Major Remit Application rm: F- I 'Wide Access Dock 5' x 16.5' Ramp Landing Coastal Wetlands - 611 FIE- - - 3E -- St,� --u al? 0+00 0+50 11 FEB 1 6'1021 1 Nore:Tniv ie not sn Eiglneema or survryorewtp. v.�eexm PRELIMINARY Fm envwmnemeiPomuup Dory. oruaun"O°"u�r.oi NOT FOR CONSTRUCTION S^a WN �11-1i-16 Page i of 5 �— Attachment H to � ,e Nooeiox D.d, LLC '� ;= CAMA Major PeYmit Application SIDE VIEW VIEW FROM UP5TRfAM ---Zg�� P.1.1 H.,3u hht mar 50br Powered Soar P FC, W.sYne Ught N"z:W.5EL.ted o Avod Damage ae�ed7A�D,:ge From OWv. Spaxd as From 1 It/ Needed Needed on Per �an 0 Q) LU LL- 04' M Lu M kTbv CBb.radWith DEmy4- pefiocb.p.� o, HD GAeewd FiW4 U) Gmde With Thm BdLlg 40/ Or E4.1ed 04'Moe'" Cap CID Bld Nded W.th lu we 10-Fauefiged Dredge Rye lo. E" Dr". fq- L322 .1V -'IV,, II en W HD G,l,..ed Th. Uolb,3 &.y 5/8'MD Qk..d Th. BA"q E" a . . . . . . . FEB 16 201 314- - I '-T Attachment ]a to e—u, T34� CANA Major Permit A�. Mud U. Application z FA..S'ID.qft' e, relcowtof Debra D DeW Page 5 dkotof 5