HomeMy WebLinkAbout102-17 Letter of Refinement 2018K!
Coastal Management
ENVIRONMENTAL QUALITY
LETTER OF REFINEMENT
Permit #102.17
March 28, 2018
Dews Island Group, LLC
Attn: Mr. David Alban
500 World Commerce Parkway
St. Augustine, FL 32092
Dear Mr. Alban:
ROY COOPER
Goya nor
MICHAEL S. REGAN
Secremry
BRAXTON C. DAVIS
Director
This letter is in response to a March 26, 2018 letter, from Brian Rubino of Quible & Associates, P.C., in which it
was requested that Major Permit #102-17 be modified to expand the spoil stockpile on the northwest side of the
boat basin from 1,800 ft2 to 6,453 ftz, replace an additional 284' of existing bulkhead within the canal in the existing
alignment and replace 39' of a failing impoundment water control structure.
Major Permit #102-17 was issued to Dews Island Group, LLC, on September 1, 2017. This Permit is for dredging
of an access channel and basin, ±707' of bulkheading adjacent to the Currituck Sound, ±370' of bulkhead
replacement within a canal and the replacement of storm damaged docks within the basin.
The project is located on an Island addressed as 7019 Caratoke Highway (US-158), Grandy, per the Currituck
County tax records. It is known locally as Dews Island, and is the location of a historic waterfowl hunt and
management club. The island is adjacent to the Currituck Sound on the east side, Dowdy Bay on the north side
and Deep Creek to the west
Your modification request as described and/or depicted in your submittal dated March 26, 2018, is hereby
authorized as a refinement to CAMA Major permit #102-17. All existing conditions remain in effect, including the
expiration date of December 31, 2020. This letter is provided to you as a record of the authorization, and should
be included with the Permit file.
You may need to obtain a building permit from Currituck County.
If you have any questions, please contact Ron Renaldi, of this office at 252-264-3901.
Sincerely,
Frank Jennin s
District Manager, Northeastern District
Division of Coastal Management
FJ/rar RECEIVED
cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City APR 0 5 2018
Brian Rubino, Quible & Associates P.C.
John Wright, Dews Island, Jarvisburg
Chris Coleman, Carolina Marine Structures DC M- '1/ H D CITY
1. 'Nothing Compares
State of North Carolina I Environmental Quality I Coastal Management
401 S. Griffio St., Ste 300 1 Elizabeth City, NC 27909
252-264.39011252-331-2951 [fax]
Quible
Qulble & Ar=lates, P.C. P.O. Drawer 870
MY Howk, NC 27949
ENGINEERING • ENVIRONNENIALSCENCES • PLANNING • SURVEYING Phone: 25&491-8147
Fox: 252-491-8146
SINCE 1M Received web. qutft.com
March 26, 2018 ppyyMAR gq2pA6 2918
Ron Renaldi DMEC
NC Division of Coastal Management C
401 S. Griffin St. Suite 300
Elizabeth City, NC 27909
RE: Letter of Refinement Request (CAMA Major 102-17)
Dews Island, Currituck County, NC
Mr. Renaldi:
The purpose of this letter is to formally request a Letter of Refinement to CAMA Major Permit 102-17 for
the following items:
Item 1: Expansion of the spoil stockpile area on the northwest side of the boat basin from 1,800 sq.ft. to
6,453 sq.ft. The purpose of this is to have sufficient area to place wet spoil material between the dredge
and bulkhead backfill activities. This expanded area was reviewed on March 23, 2018. 1 did not observe
the presence of any jurisdictional features, and this expansion area is not located within the 30 ft CAMA
vegetative buffer.
Item 2: Replace an additional 284 linear feet (9) of existing and failing bulkhead and 39 If of a failing water
control structure along the canal to the west of the boat basin.
Item 3: Dredge period extension request for the area within the existing boat basin. The open water
dredge work will be complete prior to April 1, 2018, however, Carolina Marine (contractor) would need
some additional time to complete the permitted dredging within the boat basin. Therefore, we are
requesting that the dredging inside the basin is allowed to occur until April 20, 2018. In association with
this request, the contractor agrees to install a sediment curtain across the mouth of the boat basin.
Included with this letter are two copies of the updated CAMA plan. Thanks for your continued assistance
with this project. If you have any questions or if you need any additional information, please contact me
at 252.261.3300 or at brubino@quible.com.
Sincerely,
Quibfe & Associates, P.C.
B*ria Fuabi#/�
CC: John Wright, Dews Island
Chris Coleman, Carolina Marine Structures
RECEIVED
APR 0 5 2018
DCM- MHD CITY
Coastal Management
ENVIRONMENTAL QUALITY
March 28, 2018
Brian D. Rubino, P.G.
Quible & Associates, P.C.
P.O Drawer 870
Kitty Hawk, NC 27949
ROY COOPER
oA",,,,,
MICHAEL S. REGAN
BRAXTON C. DAVIS
Re: CAMA MP#102-17 — Dews Island Group LLC Dredge Period Extension Request
Dear Mr. Rubino:
This letter is in response to your request dated March 26, 2018 for Dews Island Group LLC to
extend their dredging efforts within the existing man-made upland basin beyond the April 1st
dredge moratorium as listed in Condition #8 of CAMA Major Permit #102-17. After Discussions
with representatives of the North Carolina Division of Marine Fisheries and the North Carolina
Wildlife Resources Commission, your request has been approved with the following condition:
• A turbidity curtain is to be properly installed at the mouth of the basin until dredging is
complete to reduce impacts to the open waters of the Currituck Sound. Per the
requested date, dredging is to be completed by April 20, 2018.
No other modifications to the previously proposed development are authorized by this letter
and all other permit conditions associated with Major Permit #102-17 remain in effect. This
deadline extension is valid only for dredging efforts between April 1— April 20, 2018.
Please do not hesitate to contact me if you have any questions or comments.
Sincerely,
Ron Renaldi
Field Representative
Division of Coastal Management
cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Shane Staples, Fisheries Resource Specialist, DCM, Washington
Maria Dunn, Coastal Coordinator, WRC, Washington RECEIVED
John Wright, Dews Island, Jarvisburg
Chris Coleman, Carolina Marine Structures APR 0 5 2018
^'Nothing Compares. DCM- MHD CITY
State of North Carolina I Environmental Quality I CoaatalManagemdrt -- -- -' -----
401 S. Giffin St- Ste Naf-E + city, MC 27909
252-264-3901 1 252-331-2951 [fiat]
Bodnar, Gregg
From: Staples, Shane
Sent: Tuesday, March 27, 2018 12:37 PM
To: Renaldi, Ronald
Cc: Dunn, Maria T.; Bodnar, Gregg ULS� L
Subject: RE: Dews Island CAMA Major Permit #102-17
Ron,
�l,•�ovt �S
DCM fisheries will grant relief from the condition for a dredging moratorium, April 1—September 30, until April 20, 2018
per the request for the portion of the project located within the upland basin provided a turbidity curtain is deployed
across the mouth of the basin to reduce impacts to the open waters of the Currituck Sound. DCM fisheries recognizes
the weather conditions this March have been rather unfavorable and that the contractor worked to complete the open
water portion of the dredging first.
Please keep me updated on the completion of the dredging activity and please call or e-mail if you have further
questions.
Thanks,
Shane
Shane F. Staples
Fisheries Resource Specialist
Division of Coastal Management
Department of Environmental Quality
252 948 3950 office
shane.staples(a)ncdenr.gov
943 Washington Square Mall
Washington, NC 27817
`> Nothing Compares -. _
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Renaldi, Ronald
Sent: Monday, March 26, 2018 3:53 PM
To: Staples, Shane <shane.sta pies@ ncdenr.gov>
Cc: Dunn, Maria T. <maria.dunn@ncwildlife.org>
Subject: RE: Dews Island CAMA Major Permit #102-17
Just received how's that for timing.
They are anticipating that the open water dredge work will be completed by April 1, but will need additional
time within the boat basin. They are requesting an extension until April 201", 2018 and the contractor (Carolina
Marine Structures) agrees to install a sediment curtain across the mouth of the boat basin. I believe they
started the project on Friday, March 23. They got a late start because of the weather.
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald. Renaldi(aMcdenr.00v
(252)264-3901 Ext. 237
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Nothing Compares � -
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Staples, Shane
Sent: Monday, March 26, 2018 2:48 PM
To: Renaldi, Ronald <ronald.renaldi(a)ncdenr.eov>; Dunn, Maria T. <maria.dunn@ncwildlife.ore>
Subject: RE: Dews Island CAMA Major Permit #102-17
Very likely, for work in an upland basin with a turbidity curtain to contain the area.
Just include an estimate of the amount of the amount of additional time requested and when they started the project.
Thanks
Shane
Shane F. Staples
Fisheries Resource Specialist
Division of Coastal Management
Department of Environmental Quality
252 948 3950 office
shane. staolesCcDncdenr.gov
943 Washington Square Mall
Washington, NC 27817
M1.7m-5"'Nothing Compares..,- -.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Renaldi, Ronald
Sent: Monday, March 26, 2018 2:31 PM
i
To: Dunn, Maria T. <maria Bunn@ncwildlife.ore>; Staples, Shane <shane.staoles@ncdenr.aov>
Subject: Dews Island CAMA Major Permit #102-17
Dews Island is working on their open water dredging and I'm anticipating a request for relief from the dredge
moratorium so they can dredge within the man-made basin area. If a turbidity curtain is used at the mouth of
the basin, what is the likelihood of getting additional time to dredge.
Thanks
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald. Renaldi(@ncdenr.aov
(252)264-3901 Ext. 237
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Nothing Compares..-,.....
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Bodnar, Gregg
From: Dunn, Maria T.
Sent: Wednesday, March 28, 2018 8.45 PM
To: Renaldi, Ronald; Staples, Shane
Cc: Bodnar, Gregg
Subject: RE: Dews Island CAMA Major Permit #102-17
Ron,
This is a follow up email to the voicemail I left regarding Dews Island. NCWRC does not object to the moratorium
extension until April 20 as long as the excavation work is only within the boat basin and a turbidity curtain is placed
across the mouth of the basin to minimize elevated turbidity levels in the adjacent water body.
Thank you for the contact. Please let me know if there is anything else.
Maria
Maria T. Dunn
Coastal Coordinator
NC Wildlife Resources Commission
943 Washington Sq. Mail
Washington, NC 27889
office: 252-948-3916
fax: 252-975-3716
www.ncwildlife.org
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
From: Renaldi, Ronald
Sent: Monday, March 26, 2018 3:53 PM
To: Staples, Shane <shane.stapies@ncdenr.gov>
Cc: Dunn, Maria T. <maria.dunn@ncwildlife.org>
Subject: RE: Dews Island CAMA Major Permit #102-17
Just received the request, how's that for timing.
They are anticipating that the open water dredge work will be completed by April 1, but will need additional
time within the boat basin. They are requesting an extension until April 20th, 2018 and the contractor (Carolina
Marine Structures) agrees to install a sediment curtain across the mouth of the boat basin. I believe they
started the project on Friday, March 23. They got a late start because of the weather.
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality