Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
101-17 Blount, John
Permit Class Permit Number NEW 101-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Verrnit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to John Blount, 102 Northwest Ave. Washington, NC 27889 Authorizing development in Beaufort County at on the Pamlico River at 102 Northwest Ave. in Washington as requested in the permittee's application dated 6/5/17 including attached workplan drawings (2) both dated 6/16/17 This permit, issued on August 24, 2017 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )t these terms may be subject to rmes, rmprrsonmrenL ur civu UUL U r, yr May VQull u=l Shoreline Stabilization - Bulkhead and Rip Rap 1) The alignment of the authorized bulkhead and rip rap shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by DCM within a maximum of 30 days prior to the new expected start of construction. 2) The rip rap shall consist of clean rock or masonry materials such as, but not limited to, granite, marl, or broken concrete. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. 3) The bulkhead shall be constructed prior to any backfrlling activities. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by me aumonry Or me ocurctuly u= unY w,u Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee John Blount Permit No' 101-17 Page 2 of 2 ADDITIONAL CONDITIONS 4) The bulkhead shall be structurally tight so as to prevent, seepage of backfill materials through the structure. 5) The fill material shall be clean and free of any pollutants except in trace quantities. 6) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 7) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. 8) The alignment of the toe of rip rap shall not exceed the alignment as depicted in the attached permit application and workplan drawings. Sedimentation and Erosion Control 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 11) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 12) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-01491). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 3900 and assigned the project DWR Project No. 17-0890. NOTE: The permittee is advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc satisfied the Section 401 application processing fee requirements of the Division of Water Resources. 191 ■F4 APPLICATION for Major Development Perms (last revised 12127108) North Carolina DIVISION OF COASTAL MANAGEMENT 1 id Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name QI� C Applicant 2: First Name MI Last Name !f sdditonal applicants, please attach an additional page(s) with names listed. Mailing Address tR PO Box City State or ue-v.� 5'-aca �7c�5kin N.� ZIP Country Phone No. No. ext. Street Address (if diflerent from above) City State ZIP Email CrtraCtOr /tBfG; TY6a tic 7„ Business Name Agent/ Contractor 1: First Name _ "�... .,.. �: � �:'^ � � Sn e.. s.,• t MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 C Phone No. 2 _ ext. FAX No. Contractor # Street Address (if dfflbmt from above) City Stale ZIP Snail MUM <Forrn continues on back> JUL 1 V LUIf DCM- MHD CITY 252-808-2808 .. 1-888.4RCOAST .. www.nccoasta lmanagement. net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit County (can be mulliple) Street Address State Rd. # Oepw—` cbt Subdivision Name city State Zip Kc— -1$89 Phone No. Lot ) (if many, attach additional page with list) $2. -491a - S A 13 e)d. I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tot Ice ` 4tic - c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. a-V Le u a. Total length of shoreline on the tract (R) b. Size of entire tract (sq.ft) Oy r AS OLC-ms c. Size of individual lot(s) t�� DVA d. Approximate elevation of tract above NHW (normal high water) or list) NWL (normal water levee / ❑NHWor®NWL 8 (Hmany /of sizes, please attach additional page with a e. Vegetation on tract y°,rc�— �5 f. Manmade features and uses now on tract �orne - '�'rec g. Identify and describe the existing land uses adiecent to the proposed project site. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) I(1 []Yes 5ZNo []NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No 65NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does It involve a []Yes []No ®NA National Register listed or eligible property? n <Form continues on next page> I\V Vi-1Y`L/ JUL 19 2017 "ry 252-808-2808 .. 1-888-4RC®AST .. www.nccoastalmanagemen .ref Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? Dyes ®No (ii) Are there coastal wetlands on the site? ❑Yes JANo (III) If yes to either (i) or (it) above, has a delineation been conducted? ❑Yes RNo (Attach documentadon, lfavailable) n. Describe epsbng wastewater treatment facilities. SR-y�F, c- (A,, o. Describe edsting drinking water supply source. COtiw L4zp6'c.r rp, Descdbe ebsbng storm water management or treatment systems. awe — a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government t4Private/Community b. Give a brief description of purpose,, use, and daily operations of the project when complete. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. d. List all development activities you propose. Irs¢��c(0�^Ca &X-KV-'-\ealcL tCpv.'� o� 'nj \\Qlf eat. e. Are the proposed activities maintenance of an exlsbng project, new work, or both? ((�� f. What is the approbmate total disturbed land area resulting from the proposed project? S'OU ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes JQ,No DNA that the public has established use of? h. Describe location and type of wristing and proposed discharges to waters of the state. 5tk�� �-C" f i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ONO DdNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ONO RNA j. Is there any mitigation proposed? If attach a mitigation ❑Yes ONO 5dA E C E I i/ E yes, proposal. <Form continues on back> JUL 19 2017 MRA DCM- MHD CITY 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) a. A project narrative. APPLICATION for Major Development Permit b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please glue the present status or the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. rc. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. a.. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name mr.S 7:S" & C.ivGSh:l'� v Phone No. ^ g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, If applicable. I j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act I understand that any permit issued in response to this application will allow only the development described in the The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 6' S" % Print Name T6 Signature Please indicate application attachments pertaining to your proposed project. JgDCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information RECEIVED JUL 19 2017 DCM- MHD CITY 25 2.808.2 808 .. 1-888.4 RC 0 A ST .. www. n ccoasta lmanagement. net Forth DCh1 MP-2 EXCAVATION (Excep!?or 6rfdges and culverts) and F1 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Jolnt Application that relate to this proposed project. Please Include all supplemental Information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet Length Width Avg, Existing Depth Final Project Depth Access Channel (NLW or NWL) Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater Other (excluding shoreline stabilization NA NA NA NA I. EXCAVATION a. Amount of material to be excavated from below NHW orNWLln cubic yards. _. (1) Does the area to be excavated include coastal wetlands/marsh (CW j, submerged -aquatic vegetation (SAV), shell bottom (SB). or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑ss _ OWL ❑None (it) Describe the purpose of the excavation in these. areas: Nnis section not be excavated. d. High -ground excavation in cubic yards. Z. DISPOSAL OF EXCAVATED MATERIAL j&]his section not applicable l i. Location of disposal area, b. Dimensions of disposal area. (I) Do you claim title to disposal area? Oyes ONO ❑NA (11) If no, attach a letter granting permission from the owner. (i) Does the disposal area include any coastal wetlandstmarsh (CW ), submerged aquatic vegetation (SAV), shell bottom (SB). or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW ❑SAV ❑SB _ ❑WL ❑None (11) Describe the purpose of disposal in these areas: d. (1) WiU a disposal area be available for future maintenance? ❑Yes ONO '❑NA (11) If yes, where? f. (1) Does the disposal include any area in the water? []Yes ❑No ❑NA (li) If yes, how much water area Is affected? JUL 19 2017 DCM- MHD CITY hO 3, SHORELINE STABILIZATION. ❑Th/s section not applicable (If development is a wood grbin, use MP-4 —Structures) a. stype of shoreline stabilization: h. t A�nth- r e• ®Bulkhead`"�prap —' -�Sfea cTwaFa7§III �Ofher _ c. Average distance waterward of NHW or NWL• I;.r __.._ Widih: t d. Maximum distance waterward of NHW or NWL' e. Type of stabilization material: f. 0) Has there been shoreline erosion during preceding 12 Woo — m0.f months? ❑Yes ®No ❑NA (11) It yes, state amount of erosion and source of erosion amount Information. ' g. Number of square feet of fill'lo be placed below water level. Bulkhead backfill SCb' Riprap Breakwater/Sill— � Other_ I. Source of fill material. / h. Type of Oil material. Sand. _/C.\&& f 4. OTHER RLL ACTIVITIES OThis section not applicable (Excluding Shoreline Stabilization) a. (1) Will fill material be brouoht to If yes, M) Amount of material to be placed in the water _ ()il) Dimensions of fill area (IV) Purpose of fill GENERAL a. How will excavated at NI material be. kepton site and erosion controlled? c. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No QNA (i) If yes, explain what type and how they will be implemented. Date C /9 (1) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WQ7 If any boxes are checked, provide the number of square feet affected. - QCW ❑SAV❑SS _ OWL ❑None (Iq Describe the purpose of the Min these areas: What type of construction equipment will be used (e.g.. dragiine, backhoe, or hydraulic dredge)? �C�k1no� d. (i) Will wetlands be crossed In transporting equipment to project site? []Yes ❑No %NA (ii) If yes. explain steps that will be taken to avoid or minimize environmental impacts. RFCEIVED Applicant Name 7-aHh'5LO4a7— JUL 192017 Project Name Ap�licantSigpplure ') - DCM— MHD CITY 6/192017 102 Northwest Avenue, Washington, NC - MapQuest Search Results for "sot Northwest Avenue, Washington, NC" page 1 of 1 Q 1. 102 Northwest Ave 102 Northwest Ave, Washington, NC 27889-5314 JUL 19 2017 httos'//www mama -t0/90Wachinnnn oG9nNCRMrinHinrvAlo _#GtlTlyl»na In - E�IhF�bs FL Tu..stw\ w Caci-er �\ y ' . �J c �a\dSohn dlein�.,$ C •n 6/�b/11 � Eax�want rn O� m i W t) o Lu N Qi s,n L L �w �ONv� �Iokv�C goo ace 61 Ib\\',\ Coastal Management ENVIRONMENTAL QUALITY August 28, 2017 John Blount ' 102 Northwest Ave. Washington, N.C. 27889 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, it Aft/uZ— Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 ji, ( r DCM Coordinator: _�O_otiI9FQ Permit #: !O(—I% ' AL4HJ NG DISTRIBUTION SHEET _.- Permitee: SoIoZ AILLD Ave- Z 7454 Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Bea4pt, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, '"Tyrrell) Josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffan (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Earley / Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARO) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton DEMLR/DWR: Karen Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwaterft Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquiman, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401(Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: LPO: Fax Distribution: Maria Dunn (WARO) f Permittee #: DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: John Blount County: Beaufort LOCATION OF PROJECT: Off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 19 June 2017 FIELD RECOMMENDATION: Attached: YES To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Kelly Spivey DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE RECD: $ 400.00 (60/40) PUBLIC NOTICE REC'D: END OF NOTICE DATE: RECEIVED JUL 19 2017 ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: DCM- M H D CITY APPLICATION AS§�I�E�D TO: 4ae t Ctnd.� ON: 1 i C) 75 DAY DEADLINE. ��{{ 150 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: STATE DUE DATE: FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTION S: YES NO NOTES Coastal Management - Regional Representative '10111- Coastal Management - LUP Consistency t� t Division of Community Assistance '( X Land Quality Section $�7 t7 �c Division of Water Quality J(O ( K t i " t.ogb Storm Water Management(DWQ) '11 I K , State Property Office q 1 Division of Archives & History 11 Division of Environmental Health rf 7 tt 1 IC Division of Highways Wildlife Resources Commission ; x Local Permit Office Division of Marine Fisheries Ihlt1 x Corps of Engineers �' l�.'(l"j k SAwsk ZOIi-Oly9( VW-7 1 t16h f MEMORANDUM TO: Doug Huggett THROUGH: Jonathan Howell'St` FROM: Kelly Spivey DATE: 17 July 2017 SUBJECT: John Blount 102 Northwest Avenue Washington, Beaufort County John Blount has submitted a CAMA Major Permit application request for the construction of a bulkhead at his property located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. Staff has reviewed the proposed project about rules found in Subchapter 7H concerning development in an Estuarine Water, Public Trust Area and Coastal Shoreline. It is staffs recommendation that the proposed project appears consistent with 15A NCAC 07H .0208 (b)(7)(D) as described below. This office feels the development is consistent with 15A NCAC 07H .0208(b)(7)(D) which states in part that (i) "the property has an identifiable erosion problem", (iii)" the bulkhead will not adversely impact public trust rights or the property of adjacent riparian owners", (v) "the property to be bulkheaded is in a non -oceanfront area'. This particular 30' wide eroding shoreline is located between two existing bulkheads. Staff recommends the following conditions be included if the project is permitted. The alignment of the authorized bulkhead/riprap shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 2. The bulkhead shall be constructed prior to any backfilling activities. 3. The bulkhead shall be structurally tight to prevent seepage of backfill materials through the structure. RECEIVED JUL 19 2017 DCM- MHD CITY Coastal Management ENVIRONMENTAL OVALITY MEMORANDUM TO: Ms. Rachael Love-Adrick District Planner Division of Coastal Management FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Respond to Greg Bodnar Morehead City Office PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY —?-- This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached �co] REG�� ents. Signed 29 3q JUL 19 2017 DC M- MHC CtiTY 'Nothing compares saIaNaGcaadm Eft% a 041Quality cmad Niel t«-n:! 943Wwh,MMS9aaa%1aU Rilhm1r .N'C:7ss5 25:946 6431 Coastal Management ENVIRONMENTAL OUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner _ Division of Coastal Management t`�IU`-1Q� (_7� SUBJECT: Major Permit request by John Blount DATE: July 24, 2017 ROY COOPER Governor MICHAEL S. REGAN secretory BRAXTON C. DAVIS Director Consistency Determination: The request is consistent with/not in conflict with the 2007 City of Washington CAMA Core Land Use Plan certified by the CRC on November 30, 2007. Overview: The .75-acre property has approximately 125 linear feet of shoreline, the eastern most 30' of the lot has not been stabilized with a bulkhead. 20' of the 30' feet has a breakwater. The applicant is proposing to convert the 20' breakwater into a bulkhead to bulkhead the remaining 10' of the property at 102 Northwest Ave, in the City of Washington ETJ, Beaufort County, North Carolina. Existing site improvements include a single-family dwelling, bulkhead, riprap and a pier with a boatlift. The project is in the Estuarine Water (EW) and Public Trust Area (PTA) Areas of Environmental Concern (AEC). The project is located along the Pamlico River; the water is classified as SB/NSW, are closed to the taking of shellfish. A review of PNA, SAV, and archaeological/cultural resources was not provided. Anticipated impacts resulting from this project are expected to include: the filling of 225 ft2 of river bottom. The project will result in localized turbidity due to construction of the bulkhead. Basis for Determination: The project site is in the ETJ of the City of Washington and is subject to the town's 2007 Land Use Plan. The Future Land Use Map (FLUM) designates the site as Medium Density Residential. Medium Density Residential is defined in the LUP as follows (pg. 227): The Medium Density Residential land use category is primarily intended for residential development of single-family homes on lots between 8,000 and 14,000 square feet in size. Residential densities shall be three (3) to five (5) dwelling units per acre, depending on lot size. This land use category also allows for Planned Unit Developments (PUD). PUDs are developments that allow for innovation in land use State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 that varies from standard single-family/single use projects as long as they meet certain minimum standards, such as density remaining below or equal to one dwelling unit per every 6,000 square feet of land. Allowable Density. Densities will be three (3) to five (5) dwelling units per acre, depending on lot size. Impervious Surface. The maximum impervious surface shall be 40% coverage of a parcel. Where impervious surface coverage exceeds 25% an on -site stormwater management plan will be required. This plan should address the first 1-112 inches of rainfall on -site. Maximum Building Height: The maximum building height shall be 50 feet. Permitted Uses: Single-family residential, open space, recreation, and conservation Land Use Policies: The following LUP policies may be applicable to this request. 1.66 (pg. 213) The City of Washington will rely on the standards set forth in 15A NCAC 7H to regulate bulkhead construction. State of North Catofina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 Coastal Management ENVIRONMENTAL OUALITY RECEIVED JUL 1 9 2017 DOA STATEPROPERTY OFFICE MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Tim Walton Director State Property Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. p REPLY This office has no objection to the project as proposed. f P�`t��� 1 ✓ This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date ` \ G T Nothing Compares 3 or o!\arm Caediaa Eminuneal QaahW Caul Uama.w 943Wmh-vm Sq=*NLIH 1Va�hkgmIL\C27389 2$2 9a66431 RECEIVED JUL 2 4 top ©CM- M11r) CITY Coastal Management ENVIRONMENTAL OUALITY TO: u JUL 2 6 2017 II Shellfish Sanitation E 8e^reation N/�er_ouali,' S'c you al MEMORANDUM Mr. Shannon Jenkins NCDENR Division of Environmental Health ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY / This office has no objection to the project as proposed. V This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date -7 ( 7 '�D��Shat,v�rt� J�n�in RECEIVED Nothing Compares_ JUL 2 5 2017 sawom"Cudvu EA.ilo dA1Qutiry C=RJ\J,=1 , 943%%'Wh-VonSaw#\(Atl Ry,hmeq,,,�C :7889 Di�n- IVIHD CITY �':9A66A81 LI Bodnar, Gregg From: Thorpe, Roger Sent: Monday, July 24, 2017 11:06 AM To: Bodnar, Gregg Cc: Huggett, Doug Subject: CAMA Major - John Blount ,102 Proposed bulkhead Northwest Ave, Washington, NC, Beaufort County - Gregg The subject proposed bulkhead project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 "'-^Nothing Compares ,,., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. cooslnl Mkmoffrrmrrrlt rr. vi w,wv r rnt, ott:,i. r;, TO: MEMORANDUM Mr. Cliff Whitfield Public Water Supply Section NCDENR WARO ROY COOPER Governor MICHAELS.REGAN Secretary BRAXTON C. DAVIS Director JUL 17 2017 FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division y 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office.has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date! — i u a 17 S meo;\a�4 Cudim lEmimrvmrnl Paa:ip• Cwtu:\hro$emml 943 %Vxfhir;tonSO=a %fal:AVmhini:on, \C 27$S9 252946649! ROY COOPER Governor ®® MICHAEL S. REGAN Secretary (basfuf fENT7QUAL1 f[oast MM£ oJ , RECEIVED BRAXTON C. DAVIS JUL' 17 2017 Director MEMORANDUM DCM-Flaherley WARD TO: Mr. Shane Staples Division of Coastal Management 943 Washington Sq. Mall FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15, waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date /'/9/7 Ang 5 ute olSath Cudim . Entimr"aal Q40ity. . Cava! \lamremert 943R'athiq.-=Sgnue\I411 Riehiryton,SC:�65q :6:9466461 Coasral,%fonagement ENVIRONME NTAI OVAII TY MEMORANDUM TO: Mr. Lee Padrick. Division of Community Assistance ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division :? 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT:. John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return.this form by 7 August'2017. Please contact.Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. This office has no objection to the project as proposed. This office has no comment on the proposed, project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date Nothing Compares, 3 uw o:\n:,Cu�vu F.m+mu:wMal Q-.ANy1Ca'tA1Sl+,ut.Mt S33 R•Lhctton Sio+,a \{a3; \li4hinrm,\C :i3SS :S:SS56+61 Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17July 2017 RECEIVED SUBJECT: CAMA Application Review APPLICANT: John Blount AUG 16 2017 DCM- MHD CITY PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY / This office has no objection to the project as proposed. V This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed c— l a Date 8 - 3 -'3'otr ���Q�c,\6111�8I9p0 JUL 2017 -Nothing Compares_ RE ED S ou o!�wm Cardma Pa.ilomretal QeaSy Count \4mSaeaet Olt 9E)R'ytti�aanapRuo \{a0 R'a � ahir.Sue, \C :TSd9 :s:9aaaut DCM WIL 64G��N" AUG 0 7 2017 Coastal Management COVikONMENTAI OUALM TO: MEMORANDUM Ms. Renee Gledhill -Early NC Department of Cultural Resources Archives & History Building ROY COOPER Gopernor MICHAEL S.-REGAN Secretary BRAXTON C. DAVIS JUL 2 6 2017 FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE:. 17 July 2017 SUBJECT: CAMAApplication Review'�U��, APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately] 5' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact.Kelly Spivey at 252-948-3853, if you have any questions regarding the.,proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no.comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed DL4"� . bit Date I. O • I ?' Nothing Compares ,_ Suu ofNath Cufiim ; Emimnro a'l Qa,".iv i CND u1 Mrmtnntnl 94311'nhiq4:on Sawn %W1 I tCnhint"cn,\C 27SS9 21, 9466481 JUL 3 9 2017 P f;+ Water Resources ~ Environmental Quality Mr. John Blount 102 Northwest Avenue Washington, NC 27889 NOT A CAMA PERMIT August 10, 2017 ROY'COOPER Governor -- MICHAEL- S REGAN Secretary S. JAY ZIMMERMAN Director DWR # 17-0890 BEAUFORT County Subject: Approval of401 Water Quality Certification with Additional Conditions Approval ofTar•Pamlico Riparian Buffer Impacts with Additional Conditions' BLOUNT-102 NW AVENUE Dear Mr. Blount: You have our approval for the impacts listed below for the purpose described in your application dated July 17, 2017 and received by the.. Division of Water Resources (Division) on July 19, 2017. These impacts are covered by the attached Water Quality General Certification Number4097, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below, This certification is associated with the use of CAMA Major Permit and GeneralPerm!t(s) 198000291 issued by the US Army Corps of Engineers (USAGE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by'(but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met.- No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B. 0259(8)] Type of Impact Amount Approved (units) Permanent Amount.Reduced (units) Temporary Plan location/ Reference Attached Open Water ,OW-1 (Bulkhead Fill) 0.01(acres) 0 (acres) Sheet 1 of 2 Buffers -Zone 1 B-1(Bulkhead Installation) 0 (square feet) 375 (square feet) Sheetl of 2 2. Water Quality Certification The proposed project must comply with all the conditions,of the General Water Quality Certification(s)'4097. [15A NCAC 02B .0507(c)] State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section-Washinglon Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 BLOUNT-102 NW AVENUE DWR# 17-0890 401,AND BUFFER APPROVAL Page 2 of 3 Continuing Compliance 3. Turbidity Standard The permittee shall adhere specially to 15A NCAC 02B.'.0220 Tidal Salt Water Quality for Class SB Waters (3)(g) pH: shall be:normal for waters in the, area, which generally shall range between'6.&..and 8.5 except that swamp waters may have a pH as low as 4.3 if'if is the result of natural conditions; (I)Turbidity: the turbidity in the receivingwatershall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased, [15A NCAC 02B..02201 Other Conditions 4. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees.or woody vegetation must be replanted with trees and woody.vegetation. Disturbed.areaswith pre-existing forest vegetation must be:replanted with forest vegetation including at least two different native hardwood tree species,at.a density sufficient to provide 260 trees per acre at maturity. This density can, usually be achieved byplant'ing approximately 360 (11x 11 spacing) to538 (9 x 9 spacing) trees, per acre.) Restoration of trees/shrubs/forest must be completed by the first subsequent< planting season (November 1. through March 30). Note, if the. tree plantings do, not.. survive, they will need to be replaced such that the density is sufficient to provide 320 trees per acre atmaturity, [15A NCAC 02H .0507 (c),15ANCAC 02H .0506 (b)(3),;and 15A NCAC 02B-.0259(6)] 5, The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30);days of project completion (available at'http://portal.ncdenr.org/web/wo/swp/ws/401/certsandpermits/apply/forms):. [15A NCAC 02H .0506(b)(5)] 6. This approval and its conditions are final and binding unless contested. [G.S.143-215.5] These Certifications. can be contested as provided in Articles'3 and 4 of General Statute 1508 by filing a written. petition for an administrative hearing to the Office of Administrative Hearings (hereby -known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office. at (919) 431-3000 for information. Within sixty (60)'calendar days of receipt of this notice, a: petition must be filed with the OAH. A petition is considered filed when the original and one (1) `copy along with any applicable,OAH filing fee is received In the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays).. The petition may be faxed to the OAH at (919)431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 BLOUNT-102 NW AVENUE DWRH 17-0890 401 AND BUFFER APPROVAL Page 3 of 3 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative He 1711 New Hope Church Road Raleigh, NC 27609-6285 One(1) copy of the petition must also be served to DEQ: William F. Lane,; General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This; letter completes the review of the Division undersection 401 of the Clean Water and Tar -Pamlico Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scarbraueh@ncdenr.Qov if you have any questions or concerns. Sincerely, rj3),z J1 Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources,,NCDEQ Enclosures: GC 4097 Certification of Completion cc: Gregg Bodnar, DCM Morehead City Office.(via email) Kelly Spivey, DCM WaRO Raleigh Bland, USACE Washington Regulatory Field Office (via email) Laserfiche File APPROVED NOM' CaroBna;EWronmentai Management Commission . ; T Division of yva3 R Resources Date f/u 20_C_ n� Permit AXe AIN Caei.« � a{ z ROY COOPER Governor MICHAEL S. REGAN LT. Secretary Coastal Management ENVIRONMENTAL QUALITY BRAXTON C. DAVIS RECEIVED Director MEMORANDUM AUG 14 2017 TO: Mr. Richard Peed DCM- MHD CITY DEMLR Land Quality 943 Washington Sq. Mall FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division y 400 Commerce Avenue Morehead City NC 28557 DATE: 17 July 2017 SUBJECT: CAMA Application Review APPLICANT: John Blount PROJECT LOCATION: Project site is located off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina PROPOSED PROJECT: Applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. Please indicate below your position or viewpoint on the proposed project and return this form by 7 August 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Nothing Compares i W1 �Ofb eMlrtlL�r.11N1001ryRl�QCiLb COYRI �LINj�rtllfil 91l iCahi41eaS0ou�>p;, R'a,Mn$em.\C :'$39 :':94664S: Date C� / �U JUL 1 8 2017 LAND OUALIT' "Fi;T:ON '',"FIINGTON Rr,-(,`...'.AL OFFICE Bodnar, Gregg From: Sent: To: Subject: John Blount Thanks! Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Wednesday, August 16, 2017 7:20 AM Bodnar, Gregg RE: Checking in SAW 2017-01491 PGP 198000291 Your Date No comments on the Minor Mods...... -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Tuesday, August 15, 2017 8:09 AM To: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Subject: [Non-DoD Source] Checking in Morning Raleigh, Just checking on a few that I'm not sure if you or Josh are handling... Blount, John in Washington County Lost Colony Research in Dare is a minor modification Wright in Southern Shores is a minor modification Hope all is going well this week, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANTS NAME: John Blount 2. LOCATION OF PROJECT SITE: Beaufort County off SR 1301 at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina Photo Index — 2000; 100-1141, T18 2006; 101-8142, X18 350 31' 34" N 770 01' 39" W 3. INVESTIGATION TYPE: CAMA & State Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 6 July 2017 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received —19 June 2017 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -1997 Beaufort County Land Use Plan Land Classification From LUP - Conservation (water), Transition (land) (B) AEC(s) Involved: Estuarine Water and Public Trust Area (C) Water Dependent: Yes (D) Intended Use: private (E) Wastewater Treatment: Existing - on -site septic tank Planned - N/A (F) Type of Strictures: Existing - residence, pier, platform, bulkhead, uncovered lift, rip rap Planned - bulkhead (G) Estimated Annual Rate of Erosion: N/A (II) Source - N/A 7. HABITAT DESCRIPTION: [AREA] nPunclM FTT.T.F.T) OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands River Bottom f 225 ft2 filled (C) Other (Uplands) (D) Total Area Disturbed: 225 R2 (0.005 acres) (E) Primary Nursery Area: No (F) Water Classification: SB NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead approximately 15' waterward of Normal water Level. RECEIVED JUL 19 2017 DCM- MHD CITY John Blount 102 Northwest Avenue, Washington Beaufort County Project setting The project site is located off SR 1301 at 102 Northwest Avenue in the North Shores Subdivision on the North side of the Pamlico River near the City of Washington in Beaufort County, North Carolina. The site is a .75-acre single-family residential lot. Existing man-made features on the lot consist of a single-family dwelling, bulkhead, riprap and a pier with boadift. Vegetation on the lot consist of St. Augustine grass, ornamental shrubs, numerous pine and hardwood trees. The lot has approximately 125 linear feet of shoreline. The eastern most 30 feet of the lot has not been stabilized with the bulkhead, although 20' of that 30' has a breakwater. The breakwater is located approximately 15' waterw rd of the Normal Water Level. Both the upstream (east)side and downstream (west) side are developed single family lots with shorelines stabilized with bulkheads. The project site is approximately 8 feet above normal water level. The Pamlico River is classified as SB NSW by the Environmental Management Commission at the project site. The Pamlico River is Coastal waters and is not open to shell fishing. Proiect description The applicant proposes to convert the 20' of breakwater into a bulkhead and bulkhead the remaining 10' of his property. The bulkhead will be a maximum of 15' waterward of the Normal Water level. Anticipated impacts The construction of the bulkhead will result in the filling of approximately t225 ftz of River bottom. The project will result in localized turbidity because of the construction of the bulkhead. Kelly Spivey —17 June 2017 RECEIVED JUL 19 2017 DCM- MHD CITY Project Narrative My property is located at 102 northwest Avenue in North Shores Subdivision in Washington, NC. Presently, most of the shoreline is armored with a freestanding bulkhead with riprap in front. However, there is a portion of my lot, totaling 10' that has not been protected. This proposal is to bulkhead and riprap the remaining portion of my lot to stop further erosion as well as reduce the amount of debris that ends up in my yard on a high wind tide due to this open area in the wall. There is a bulkhead of the same likeness on the adjacent property. I would like to connect to this bulkhead to completely protect the remaining of my property. RECEIVED JUL 19 2017 DCM- MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Ur air` P,ot�vx' 's (Name of Property Owner property located at 10 )- 016�-V. (Address, Lot, Block, Road, etc.) on po.w.\:co 9-:oer in N.C. (yyaterbody) (Ckffown and/or County) The applicant has described to me, as shown below, the development proposed at the above location I have no objection to this proposal. I have objections to this proposal. DESCRIPTION ANDIOR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) (o4-f � r � 01111 Y -F#geC VED JUL 19 2017 DCM- MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner information) Si to e Prim pe Narn Mailin 9 Addre�s,W� C y M Telephone Number/email address 2 5 z- 4"-c - s :)-113 Date �;-i3i /tut? 'Valid for one calendar year after signature' (Adjacent Property Owner Information) S/3 0 //-7 Date. 0 (Revised Aug. 2014) TarLot NO, ........ ....................... .................... .................................... Parcel Identifier No. ..... ............ .--- ...... ............... ..... _............. .... Varlfiedby .......... ...................... _..... .............................. Gamely on the ...- ..... ...... day of ........................................................ 0............ by.... ..... ....................... ............ ............ .................................................... ............. ..................... ............ ............ ................................................ _...... manafter eseordint ........................................................................................................................................... 9Fifteenth tAWas........................_............"....-.... --._...................................... This iamtrumaet was prepared by ..Lee.E.-Knatt..Jr. ..... ....... ..................... �.. ........ _... .._..._.._.._ .. _..... Brief description for the ledea Lots 6 and 7, Map Book 5 Pa e 3 NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ............. day of MAy_.......,......... . GRANTOR John Gray Blount and wife, Mary Bawer Blount. - ......... 19.g6......, by and between GRANTEE Mary Bowen Blount mar p..ppomw.r wort mr mrb rrlr: asma amrm, avA u ara+.pat,to, re.r.etw at .vut>, as mmanusv w pvtswwp The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, mescaline, feminine or neuter ae required by context. WITNESSETH. that the Grantor, for a Valuable consideration paid by the Grantee, the receipt of which is hereby aelmawledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of - ..... .............Long.. Aare_ ....._... Township, _Beaufort .. County, North Carolina and more particularly described As follows: Beginning at the Southwest intersection of Northwest Avenue and Pamlico Drive, running thence Westwardly with the Southern line of Northwest Avenue 104 ft. to the Northeast corner of Lot 8 (Eight); thence Southwerdly with the dividing line between Lot 8 (Eight) and Lot 7 (Seven) and parallel with Pamlico Drive a distance of 285 ft. to the low water mark of Pamlico River; thence Eastwerdly with the low water mark of Pamlico River to the Western side line of Pamlico Drive; thence with Pamlico Drive Nortfiwardly'250 ft. to the Southwest corner of Pam- lico Drive and Northwest Avenue, the point of beginning. Said land having a front of 104 ft. on the South side of Northwest Avenue and running Southerly between parallel line to Pamlico River and being Lots No. 6 (Six) and 7 (Seven), as said numbers appear upon a map of North Shore Development near Washington, made by Blake C. Lewis, Registered Surveyor, and registered In Map Book 5, Page 3, in the office of the Register of Deeds of Beaufort County, together with the pier extending from the river shore of said land out into Pamlico River. BFAUFORT COUNTY LAW RECORDS IR-FORMOOI / -458 ACCEPTED —ma,k) s-le vs Lend Retards Official Deb N.C. Y AVR, m.,. M., r D Ir1r. nrrW. ITT. RECEIVED JUL 19 2017 ®CM- MHD CITY aa1022Ps073 The Property haralnebove described was acquired by Granter by Luhvmsrt remNed to A mass, showln[ the above described Property is recorded in Plat Boob .......- ._....___........ _.. pare TO HAVE AND TO HOLD the af.reuid lot or pareal ay laud and all privilossa said apporteoancen thareb beloopng to tho GranW in fee aide. Aad the Grantor c...ft with tha Grantee that Grantor is seized of Ne yremier in fee simple. Lan tLe rifht to copvq the ram in fee simple, that title W maketable and free and clear of all encumbrances, and Nat Grantor will warrant and Ward the title against the lawful claim of all perique whomsoever esenpt for the exceptions hereinafter stated Title to the property herainabove described is subject to the following exceptions: W we:suss wcasor. u. can., r. W -r Wa wa.w.ar e. aaa,aY Y� M a. Barr .azk..Y.J .ales. ire uv w b w M.Yb amaree a .rY<4 of as . r un.eun. U. a., ..a rue 1. .. ra sa... sraaa _°l,L`'�"_^•� _-___-__-_-__._____u sct c4�dhpn bray B GBt ------------------- ------- --------- —----- ---- A&.,. 't--- —----- ----_------- -rea.ea.a x Mary Bowefl Blmlt Arreel: neAw9__—_ --------------------------------------------------- ------------------_-_--------------------------- ----------- w __------- ----------------- Saaaears lcr,...a seats a .-_,SAW D--__------- -------------------_----__----_-_-__---.- sur.sraaar soils causs s. --------- I. awry re. or W c•m r ease, reaaaaaa nrw sas dahn_6ray-H3autt_aad-inane,-- .'---------- Graaeas. :- • •'� n �'•. �. -` B v<e-..w .,,-••e earw .. nY w r a.aeaeer4ea W wrar r W tzars 1ea6Wet wu:r o 01....7Y . a¢ aae .mass m., -.at w. J L-- se, as __------- ---1ld,7f__----_—.---. C, ue�` ;-:: w r, rwea.aea was: .Q/a7 _/'�"------_._ 0't -- _-.IBC`!-t:_1--- ra.re.r ��. r -••••• •• •, soars cwaor.aFA•-.-ceeYr. - ... S . awarr ream r W ca ass saw .ror.ou...r —---- _---_------.._-_--____.-_-_.. . rns.w .... war. w w. w w .mewaY-a nw ____ w a -- ----- ----------_.._ saana.rr as d ..- s c..au— -...miss ass ass a w..w Yw NORTH GROUNA: BF UMRTCouan ._. ThefomsoinfmrBrcate of NotaryPub4dNraresrubtici✓a¢mrdfad be eoartct �. Filed If., . I sod rrmaded m offm iu BooklOT? . N, 7a This l�l� d"or Its �,t /�t�j�o'clock RRf hf W. .ra.a Rape of� BLs6Ql• �R o-� W— oud Me Y a .mvt TI. eaws-t ire Y e..rW.n an area r.eW<ee r W Yea .Y Yea W S W re.a weasel. aa— e W oar,anw..r. w-ael+ar/Aeaaw.a-.warm r Pars ✓ datae — Grantee Llefpd 1149ar /ieea.Fwm Ne.3sae]fl W.ba:ItPP Rate k/dP�aeataa:MaG PQ�o ti /%'73 JUL 19 20171 DCM- MHD CITY "`This is a word processing form to be completed in Microsoft Word — MC Division of Coastal Management Major Permit Application Computer shoot (11/012012) Applicant oa Date: Lo r} Pmojed Site County 1 fkn StafF f`lPcuy � District Elizabeth City lWwhingibn ❑Morehead Cily I ❑N4lmington ProjedName: per extension with platform Rover File: Date of initial application submittal (EX., 1/82007): r q J „ rim / --f- Date application 'received as complete' in the Field office (EX: 1AV"7): /4 , J N Permit Authorization: CAMA 00redge & Fill Both PNA: []Yes, ft Photos Taken: Yes ❑ Setback Required (riparian): Yes No Critical Habitat ❑Yes No Not Sure 15 foot waiver obtained Yes Xft Hazard Notification Returned- Yes_.,VNo SA El Yes)4No Not Sure Shell Bottom: Yes Not Sure Temporary Impacts: Yes No Sandbags: Yes fiJNo Not sure Did the land use classification come from county LUP.�Wes ❑No Mitigation Required (opfionail: ❑Yes;)jJNo Moratorium Conditions: C1 Yes No []NA❑Yes Eirvironmental Assessment Done: ❑No NA _ — OPTIONAL (chose MAX of 4) Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) Swamp Waters (SWJ High Quality Waters (HQM ❑ Outstanding Resource Waters (ORW) ❑ (404) Corp. of Engineers (Jurisdictional El (LS) Sea lavender (Limonium sp.) El (SS) Glasswod (Salk m—ia sp.) wetlands) El (CJ) Saw grass (Cladium jamatcense) (SA) Salt marsh cort/grass (Sparlina El (Sr Salt reed grass (Speftina alterrAM) cynosuroides) El PS) Salt or spike grass (Distichis, (SC) Bullrush or three square (Scirpus (TV? Cattail (Typha SO spicata) sp.) ❑ (JR) Black needlerush (Juncus (SP) SaWmeadow grass (Sparhna roemerianus) patens) No fee required - $0.00 lll(A) Private w/D&F up to 1 acre; 3490 X Ill(D) Priv. public orcomm w/D&F to 1 can be applied - $250 acre; 3490 cant be applied - $400 Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major El IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer-$100 ill(B)Public orcommercial w/D&Fto1 Express Permit -$2000 acre; 3490 can be applied - $400 Major development extension request - II Public or conrnerctalhro dredge R $100 arKt/or fig - VW [11. Private no dredge and/or 0 - $250 ❑ M(C) Priv. public or comet wA78F to 1 JUL 19 Z017 acre; 3490 can be applied; DCM creeds DWQ agreement - $400 Applicant: .3 o U rl -F-)to v r-) i— Date: !2 ju �17 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE - Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension, 4 One One New Work Replace % 6 Maint ❑ ❑ YW N New Work Replace . Maint ❑ ❑ Y ❑ N New Work Replace Maroc ❑ ❑ Y ❑ N New Work Rapleoe Math❑ ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Matnt ❑ ❑ Y ❑ N New Work Replace Matnt ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maim ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [:IN New Work Replace Makes❑ ❑Y❑N NewWodc Reptace Matnt ❑ ❑ Y ❑ N NewWoik Replace Maint [3 ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint❑ ❑Y❑N New Work Replace hWnt ❑ ❑ Y ❑ N New Work Replace maw[] ❑Y❑N New Work 0 Replace MaW❑ ❑Y❑N New tlbrk U Replace MakM ❑ ❑ Y ❑ N nrnA_ r%AHn rIT Applicant: J O #4V-1 j3wti ry j Date: ) } .)N L,-j T':- Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. -- DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp im FINAL Sq. Ft (Anticipated final disturbance. Excludes any restoration andror temp amount TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration arxtror temp impact amount Dredge ❑ Fie ❑ Both ❑ Other ❑ �u it Dredge ❑ Fib ❑ Both ❑ Other ❑ Zp D —rF � QO S+►s+ct_vw ,TAM Dredge ❑ Fill ❑ Both ❑ Ofirer ❑ .L 2 ZS f 'L-7lj %z Dredge ❑ Fis 0 Both 0 Other Dredge ❑ Fifi ❑ Both ❑ Other ❑ Dredge ❑ R# ❑ Both ❑ Other ❑ Dredge ❑ Ft ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ FB ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fit ❑ Both ❑ Other ❑ Dredge ❑ Fig ❑ Both ❑ Other ❑ Dredge ❑ Fa ❑ Both ❑ Other ❑ Dredge ❑ Fit ❑ Both ❑ Other ❑ RECEIVED JUL 19 2017 DCM- MHD CITY ROY COOPER Govemor MICHAEL S. REGAN semlary Coastal Management ENVIRONMENTAL QUALITY BRAXTON C. DAVIS Director 17 July 2017 John G.Blount 102 Northwest Avenue Washington, NC 27889 Dear Mr. Blount: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1301 at 102 Northwest Avenue in the North Shores Subdivision on the North side of the Pamlico River near the City of Washington in Beaufort County, North Carolina It was received on 19 June 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is 2 September 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Kelly Spivey, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3853 or via email at Kelly. S ivevna,nedenr.gov if you have any questions. If this agency does not render a permit decision within 70 days from 19 June 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. RECEIVED -"Nothinq Compares` JUL 18 2017 Sme0f\0N6Crd= Entimemrtal QoaliHiCmtd%fz=g m t 943W.hi,g Sqm M,U R1ah,y NC27889 ^`. 2529466431 DCM- M iu", CITY Mr. John G. Blount 17 July 2017 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sinc�xelyy��� Kelly Spivey Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator WARO JUL 19 2(w DCM- MH,,- MAJOR PERF`t�fiF T FEE NIATRIX Salaction I Davaio rrt sat 7s 1 Fes 1 DCiA % DWQ % v 1 �Ec (14300 1601435100093 1625 6253) 1 (243001602 435100095 2341) development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands ` (� II. Public or commercial development that does not $4.00 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a [1$250 100% ($250) 0% ($0) Manor Modification t. I II. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if . $250 r 100% ($250) 0% ($0) General Water Quality 7 Certification No. 3490 (See III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be aoDlied: ality Certification No. $400 60% ($240) 40%($160) 00 (see attached) could applied, but DCM staff ®®CC RECEIVED terminedthat additional 2S��aEB V G® view and written DWQ ncurrence is needed JUL 19 2017 cause of concerns ated to water quality or aquatic life: DCM- MHD CIT i0excavation D). If General Water ality Certification No. $400 60%($240) 40%($160) 00 (see attached) cannot a lied: For development that El olves the filling and/or $475 60%($285) 40%($190) of more than e acre of wetlands and/or en water areas: Water Resources ENVIRONMENTAL QUALITY Washington Daily News PO Box 1788 Washington, NC 27899 17 July 2017 Attention: Legal Advertising Department ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Please include the enclosed Notice of Filing in the Public Notice section of the Thursday, July 20, 2017 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3920. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to: Thank you. ATTACHMENT Cc: File Melissa Sebastian NCDENR COASTAL MANAGEMENT DIVISION 400 COMMERCE AVENUE MOREHEAD NC 28557 252-808-2808 ext. 229 sincerely, Della Robbins, Administrative Assistant Division of Coastal Management —'�'"Noftm Corttpar=�, RECEIVED JUL 19 2017 DCM- MHD CITY SoaoCiaNh C,rchm Eeim ,"Qpahy:C=Wltanr t 943W=h-9=Sq=,u1n n;ahmgII,:,IL,vc27839 2529466491 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. 113A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the Coastal Area Management Act (CAMA) was received on 19 lime, 2017. According to the said application submitted by John G. Blount, applicant proposes to construct a bulkhead approximately 15' waterward of normal water level at 102 Northwest Avenue on the Pamlico River near the City of Washington in Beaufort County, North Carolina. A copy of the entire application maybe examined or copied at the office of Jonathan R. Howell, District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC, during normal business hours. Public comments received by 8 August 2017 will be considered Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request Please publish on: 20 July 2017 Kelly Spivey, Field Representative Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 (252)948-3853 JUL 19 2017 DCM- MHD CITY \T(1'1'IC1: AMA PERMIT APPLIED FOR PROJECT: w U �� I�Jastiu vvccgqi "O VI dal I� W 5 COMMENTS ACCEPTED THROUGH APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: . • � A MOAM WAAV .. MEN Whok, A&M-FWA �j c ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. MSS �u�?yC�ce�tr'he 9590 9402 2977 7094 8208 30 2. Article Ni „nhe r mn. from —1i, fahon 7017e 1070 0000 7794 0990 A. Signature X A u B. Rjverl by Vonted Name) I O.O.Deafl � D. Is de/livery address different from item t Yee If YES, enter delivery address below: 0 No a, service IyPe ❑ Pdorey Mall Express® ❑ Adult Signature ❑ Registered Mail- ❑ Adult Signature Restricted Delivery ❑ Registered Mail Restricted ❑ Codified WHO Delivery ❑ Certified Mail Restricted Delivery ❑ Return Recelpt for ❑ Collect on Delivery Merchandise ❑ Collect on Delivery Restricted Delivery O Signature ConffnnatlonTM '+cured Mall ❑ Signature Confirmation - Mal Restricted Delivery —Do) Restricted Delivery iPS Form 3811, July 2015 PSN 7530-02-000-9053 Domestic Return Receipt IIIIIUSP�l�ptt{ST{tJj�RAy�u�upCKNG # I III II111111HU�� la III I III P ms INo G-10 Paid 9590 9402 1247',t094 8208 30 United States Postal Service your 31,hlllllil„Id,IIIII,,,,i„,,,i1IpI