HomeMy WebLinkAbout85286B - Brett Schemerhorn �a�°+`C--.4,cl ICAMA 7DREDGE & FILL ��s No. 85256 A s C D
GENERAL PERMIT J P t 1-0g1S Previous permit
s Date previous permit issued
I I New Modification n Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC L-- i h • i -0CD I 1 Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name 6 Y e! k 4 „ . ,. . Authorized Agent •
Address `I j I ( : , .. . • " c \t. Project Location(County):
City .1A),�k.f V i I C State •/-) C. ZIP 7¶1--;1 L.) Street Address/State Road/Lot#(s)
Phone#( S1 S Ls,` i •I (S i.
Email Subdivision ' : i .
City - .'' t- ZIP , s Cl
Affected I I CW 7 EW f l PTA I I ES I--I PTS Adj.Wtr.Body /n)x r_ :-- . c., c f(tiat/man/unk)
AEC(s): [7 DEA IHA I I UW I I SPIMA PWS Closest Maj.Wtr.Body 1?J)1A I I. ( it
ORW:yes/no PNA:yes/no
Type of Project/4ctivity (_ / ,l ' S/ '� f"r 1 r X t�� ;• _i r i I(c,//,y
_,Lie,--,- ii f 4-,►,•Yf (Scale:, - Sti:
Shoreline Length 4 I L C] '
I
Access Length T • - - - ;t_a,� i_._. - - , _� � ��_�.
Pier(dock)length 6s'= v `•S rJ r r i'
Fixed Platform(s) :!,.` I ->e.# PP1 �)6;i�7 -$ i si — 11��1���1� ��iwila
Floating Platform(s)
_ ,._____ _ .
j j
. . ____ 1
Finger pier(s) 1 I r _ �__ ,1 �1 Num , !N!IiHHI
•
..,.
....Tr..
Total Platform area ;',9i . .f- • 1 1
11
Groin length/# i ; I IIIII III
Bulkhead/Riprap length / .
III iEl: IIIIIICI:1
Avg distance offshore ' f---
Breakwater/Sill ' . + -l-
Max distance/length t IIHIHHHhIHHU
Cu channel i t I
Cubic yards I a,7 u � t 1.111111111111111011
Boat ramp i ` ) -+ti11 • ll111111���.
Boathouse/Boatlift �It III i HhiiiHHH
Beach Bulldozing
Other _I { 111 __�1����®� ���.
Liri'a
SAV observed: yes �j grir
• Dii , ,' '1
•iiiIiI!iHhiHUII
Moratorium: n/a yes Ka- L
Site Photos: yes no - 2- `.
Riparian Waiver Attached: yes no i i b l 1
ermit/zonin f A building
p g permit may be required by: ,+"'34-if‘,441'1 i i. �1.4-0 /
Permit Conditions t�.- 1 1�-\ .a, r
D TAR/PAM/NEUSE/BUFFER(circle one)
111 See note on back regarding River Basin rules
❑ See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) t, '
SS.._
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
o*°``'-'t-' 7CAMA DREDGE & FILL r 9 85256 ABCD
j " FT
GENERAL PERMIT 1D:i -1"! ' /�
1Previous permit
Date previous permit issued
New I IModification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address - Project Location(County):
City State ZIP - Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW EW PTA ES I PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): pi IDEA [1 IHA I I UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity "<' C •h"c Y
• (Scale: • )
Shoreline Length
Access Length . .�. ,__�_ -_ r P. \y *; i/� ✓r c 1=
Pier(dock)length ry,r1 li( r —` '
-d. —ti� r.
Fixed Platform(s) "r / I J �ir.�
L
,.,:i Floating Platform(s) #
;5
n •'• r
Finger pier(s) I g.� f _ I
Total Platform area I j
I
Groin length/4
Bulkhead/Riprap length -- '------ - ---- —� : r y[ �._r
Avg distance offshore i--....__._-_---, }--...--- -.-- 1 i 411-.—._- .+' { ---
Breakwater/Sill R • o
Max distance/length I
I -
Basin,channel ' ( j. I `
I , i. ,
Cubic yards a -
1 -I-. —
Boat ramp I I i
Boathouse/Boatlift 4 I I '
Beach Bulldozing •
Other
SAV observed: yes no (tt,^ 1 ! A tz
Moratorium: n/a yes no `z.,r- A ' ! I I 1�''
i Y I I. ,n 7"), 4
Site Photos: yes no f j A►`t"0 + ir,C+ N,) i j-r;
Riparian Waiver Attached: yes no i :L I I I
A building permit/zoning permit may be required by:
Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one)
See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit" Signature
Application Fee(s) Check 4/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
N.C. DIVISION OF COASTAL MANAtitmCN
ADJACENT RIPARIAN PROPERTY OWNER
NOTIFICATIONor HAND(MINOR DELIVER PERMIT)
CERTIFIED MAIL, RETURN RECEIPTREQUESTED
D
00,2•,`
Date
ame of Adjacent Riparian Property Owner
i o wt t1602k) )+e► _
a dress
:` 4 it2 _
ity, State Zip
a Whom It May Concern:
ais correspondence is to notify you as a riparian property owner thatI am applying for a CAMA Minor permit to
-
1 my property at t ZXING4a-k ------- —'
County, which is adjacent to your property. A copy of the application and project
cawing is attached/enclosed for your review.
'you have no objections to the proposed activity, please mark the appropriate statement below and return to me as soon
possible. If no comments are received within 10 days of receipt of this notice, it will be considered that you have no
mmments or objections regarding this project.
'you have objections or comments,please mark the appropriate statement below and send your correspondence to:
.00AL PERMIT OFFICER,NAME OF LOCAL GOVERNMENT, MAILING ADDRESS CITY, STATE, ZIP CODE)
'you have any questions about the project, please do not hesitate to contact me at my address/number listed below, or
Intact(LOCAL PERMIT OFFICER) at (PHONE NUMBER), or by email at: (LPO EMAIL).
incerely,
2c 2 s44 cetgs
i7iteir-P574Werig-41ame Telephone Number
Address City State Zip
I have no objection to the project described in this correspondence.
I have objection(s)to the project described in this correspondence.
Adjacent Riparian Signature Date
414M CAP.444 A.) U°1 270 14'37
Print or Type Name Telephone Number
3 2 h l A Iv' it491476H- NC 2`?4 12--
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT).
CERTIFIED MAIL, RETURN RECEIPT REQUESTED or HAND DELIVERED
‘CAt(Zz e .
*)es 1 AC N2lt Date
Name of Adjacent Riparian Property Owner
fa" w11eptJ -Mat—
Address1?
City, r l ZipIv c Z e
To Whom It May Concern:
This correspondence is to notify you as a riparian property owner that I am applying for a CAMA Minor:permit to .
O u.� t..4 r,xametaSufBMrSr ,.,, ¢ of ,� t+,lyc,a Ca Wit-
on my property at LW WI Dc.,EG. 'DR.4S
in dG four! County,which is adjacent to your property. A copy of the application and project
drawing is attached/enclosed for your review.
If you have no objections to the proposed activity,please mark the appropriate istatement below and return to me as soon '
as possible. If no comments are received within 10 days of receipt of this notice,it will be considered that you have no
comments or objections regarding this project. , ,
If you have objections or comments,please mark the appropriate statement below and send your correspondence to:
(LOCAL PERMIT OFFICER,NAME OF LOCAL GOVERNMENT,MAILING ADDRESS CITY„STATE,ZIP CODE)
If you have any questions about the project,please do not hesitate to contact me at my address/number listed below,or
contact(LOCAL PERMIT OFFICER)at(PHONE NUMBER),or by email at (LPO EMAIL),
l .
T rngdrbeli 2Ct 8611'ng2 .
Property Owner's Name Telephone Number
WC11 GttZ u, 7 vt nr�. 2--?i5'1o,
'Address., .. City . State Zip
.K I have no objection M the project described in this correspondence.
have o''-ction(s)to the project described in this correspondences
r p �j
4 it
L /4/
A.'.centRiparianrignatore. • Date
alo
a1z1 i 24z "WI mini
Print br Type Name Telephone Number
Address City State Zip
Revised July 2021
�" ROY COOPER
E Governor
MICHAEL S. REGAN
.
.. secretary
Coastal Management BRAXTON DAVIS
EMVIRONMENtAA auauty
03n1m
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 1SA NCAC 02B.0233 & .0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable. .
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
i
a. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facilityand any requested access way.This
drawing will be used to aid in compliance and monitoring efforts. \\
• Pre-project site conditions: Le% / S Mil n k L Ac—sCC) \cloa,Pn .
By your signature below you agree to be held responsible for meeting all of the conditions listed above nd verify
that all information provided is complete and accurate.
e t or Applicant Printed Name Permit Off' er's S gnature
r man nature
Q r Issue Date
CAMA GENERAL PERMIT#: �J5'2SL 5
State of North Carolina 1 Environmental Quality[Coastal Mamgernent
Washington Office I943 Washington Square Mall Washington NC 278891252-946-6481
• Wilmington Office 1 127 Cardinal Drive Ext Wilmington,NC28405-38451910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808