HomeMy WebLinkAbout17-2D ACI Holdings LLCf�A
Coastal Management
ENVIRONMENTAL QUALITY
CERTIFIED MAIL 70142120000080554713
RETURN RECEIPT REQUESTED
October 23, 2017
ACI Holdings LLC
c/o David Brinkley
1480 Point Harbor Road
Wilmington, NC 28401
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
BRAXTON C. DAVIS
Director
RE. STOP WORK ORDER AND NOTICE OF FAILURE TOAPPLYFOR CAMA PERMIT
OR PERMIT MODIFICATION CASE #17-26 D
Dear Mr. Brinkley:
This letter confirms that on September 27, 2017, I was onsite at your property located at 1400
Point Harbor Road adjacent to Cape Fear River located in Wilmington, New Hanover County,
North Carolina. The purpose of the visit was to investigate unauthorized development of a
temporary concrete pier within the Estuarine Shoreline Area of Environmental Concern. This letter
also confirms our 7/7/17 conversation on site regarding this matter.
Information gathered by me shows that you are undertaking major development and no CAMA
Major Development Permit, is issued for this development activity. No person may undertake
major development in a designated Area of Environmental Concern without first obtaining a
permit from the North Carolina Department of Environment and Natural Resources, North
Carolina General Statutes (N.C.G.S.) I I3A-118.
On March 23, 2017 General Permit No. 65072 was issued to ACI Holdings LLC for a temporary
concrete docking facility within the Cape Fear River on property located in New Hanover County,
North Carolina. This permit was issued for development in Estuarine Water and Public Trust
Areas of Environmental Concern in accordance with North Carolina General Statutes (N.C.G.S.)
113A-118. This permit included the following terms and conditions(s):
1. Structure shall be removed entirely within 180 days of permit issuance.
RECEIVED
OCT 2 7 2017
State of North Carolina I Environmental Quality I Coastal Management D `s IVI _ iVl H D CITY
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
9107%7215
For the following reasons, you are in violation of the above terms and conditions(s) of your
permit:
1. The existing temporary concrete pier, measuring 35 feet in length and 18 feet in width,
has not been removed prior to the expiration of the General Permit on September 23,
2017.
You are hereby requested to STOP ANY ADDITIONAL WORK IMMEDIATELY IN
ASSOCIATION WITH THIS STRUCTURE and file the necessary application with this office
for a CAMA Major Development Permit or permit modification by November 24, 2017. NO
WORK OR MODIFICATIONS TO THE EXISTING PIER MAY PROCEED UNTIL THE
PERMIT OR MODIFICAITON IS ISSUED. If you comply voluntarily, no further action will
be necessary beyond the issuance of a permit.
Failure to file an application or continuation of work after receipt of this Notice may constitute a
violation of the Act and you may be subject to civil and/or criminal penalties as provided by North
Carolina General Statute (NCGS) 113A-126. Each day that the development described in this
Notice is continued or repeated may constitute a separate violation that is subject to an additional
assessment of $10,000. An injunction or criminal penalty may also be sought to enforce any
violation in accordance with NCGS 113A-126.
In this case, there will be no assessment levied against you. However, if you continue to violate
the Coastal Area Management Actyyou should consider yourself forewarned and expect a civil
penalty to be levied against you coistent with the North Carolina Administrative Code, Title
15A, Subchapter 7J, Section .0409, as adopted by the Coastal Resources Commission.
Thank you for your time and cooperation in resolving this important matter. The relevant statutes
and regulations are available from this office, and I am willing to assist you in complying with the
requirements of these laws.
Sincerely, O
Brooks Surgan
Coastal Management Representative
Cc: Debbie Wilson, District Manager, DCM
Tara MacPherson, District Compliance and Enforcement Representative, DCM
Roy Brownlow, Compliance Coordinator, DCM
Darrell Galloway, Local Permitting Officer, New Hanover County
State of North Caroilm I Emironmental Qwfity I Coastal Management
Wthnington Office 1 127 Cardinal Drive Extemlon I Wilmington. North Carohna 28405
910 796 7215
CM ENFORCEMENT TRACKING REPORT
--• `ltlaV! i r !U a
QT K , e ( ■
Initial Discovery Date
Violation Description
Respondent Name(s)
'I Z� Discovery Wthod
or
Violation Case No. ! ;L Lt
Permit No.
(rfapplicable)
Was activity permidable? Yes / No
Address W To.y+ y�v6 �d• — - City T� U
Phone # Fax #/Email
Corporate Name & Registered agent Pr l' 4w (d;v.PS LL
c-
idow nedAgent/Contractor)
State a_ Zip 2 8 `f01
Violation Type:
Project Type:
Authorizations Required:
Site Visits Respondent
Sde Visits Respondent
No Permit
d, Private/Community
MajorC4MA
Resent
p
Present
O Z q
Permit Condition
Govt/Public
Minor
D&F
t—
Cl
Expired Permit
Commercial
d General
Inconsistentw/Rules
TierLevel: 1 II
III
Violation Location and Site Description
Project Location: County /I,t t gdmad r
Street Address/ State Road/ Lot #(a )
Subdivision
City L661MMODC, ZIP 'VA 4 01
Phone # ( _),. /+ River Basin CFF—
Adj.Mr. Body CF2 at an /unlar)
ClosestMaj. Mr. Body m
Lat/Long '
Shoreline Length 5Qi4-
SAV: Not Sure
Yes No
Sandbags: Not Sure
Yes
PNA:
Ye No Adjacent
ORW.
Yes No Adjacent
Cnt. Help.
Yes No
Photos
G No
WawrRequired
Yes
95
In DWQ Buffer Area
Yes
Specify DWQ Bufferif applicable:
Restoration
Extension Granted Yes No /r
NOV Date Initial Req. Comp. Date
Restoration Letter
CNOV Date Date Comp. Observed Acceptance Date
Penalty Assessment
Sent to Respondent Date
Rcvd. by Dist Mgr. Date
Assessn-entExtendedYes
0
7J.0409 Ref.
Recornm Assess.
DCM Assess -
is
$
$
$
$ OCT 2
2017
Total
d��l ell 2-6 1Vv'
s
Formal Assessments, Appeals and Reductions
Date Long Form Submitted
Date Formal CPA Submitted
Final Assessrni
M
Attorney General's Office for Injunction or Formal Collection
AssessmentAppealed: Yes No
❑. Penalty modified
Date sent to AG d Respondent not responsive to penalty/NOV 7 Injunction to complete restoration
Date Collection Letter Sent Date Demand Letter Sent
Violation Activities and Impacts
AECs Affected: Wetlands Impacted? Y / No
FfF A If yes, w hichtypes:
CW �W PT ES PTS
OEA `MN/A SA DS cJ SY JR LS TY
PWS: FC: SS Sc SP IF BF 404
Other.
Restoration Required by the Respondent Yes /
Dlmensionsin excess Dimensionsto restore Finaldimensions Actually restored
of perm iv unauth oozed activities al lowed
14MN
Closing
Payment Received $ Date Date Case Gosed