HomeMy WebLinkAbout87370C - Bryan, Clintit
tENERAL
AMA Cl DREDGE &FILL N� 8737U A g(�
C PERMIT Date Prepreous ou permit issued --�_
'A New []Modification [_]Complete Reiss �l Partial Reissue
As authorized /by the Slote f orth C olina, Department of Environmental Quail the Coastal Resources Commission in an area of environmental concern pursuant to:
I SA NCAC —_ _ ❑Rules attached. ❑General Penult Rules available at the following link: vVyyy,deq.i-.pov/CAMAr a
Applican me _ _ -. _ Authorized Agent
Add ss �,- _�•y� -- -- -- - Protect Location
City 1!1 _ Statue _ ZIP Street Address/State Road/lot N(s)
Phone #
Email — . --- - — SubdIvIsh,, --A�-
Affected I J CW [XW PTA
AEC(s): �❑�OEA ❑ IHA L/7U�W"
ORW: yes(nb 1 PNA: yes/( 1
City
F I ES ❑ PTS Adj. Wu•. Body-Lial
❑SPIMA ❑ PWS Closest Mai. Wtr. Body
ZIP
Type of Project/ Activity �}��/�(�,�_�,,/��_l, ))
(Scale:
Shoreline Length __•__
Access Length
Pier (dock) length
j j I
Fixed I1Platformis)' Sc�o--_
,j
Gs-SLCX�.S�1Gt�,
Floating Platform(s)'__,
I
Finger pier($) I I I 1 ! I
I j
Total Platform area
Bulkhead/ Riprap length --" y. y�; f ✓ i
Avg distance offshore ✓ I, j 1 i
Breakwater/Sill
Max distance/ length _.-• i
Basin, channel �
Cubic yards
Boat ramp
Boathouse/ tlift _
Beach Buildozing
Other
SAV observed: yes to
MoratClIUm: n/a yes
Site Photos:
Riparian Waiver Att lied: yes
A building permit/z T ter ((ii��,m`a be re [red by;..
_
Permit Conditions .3Lk.12 _�V _ ...-?
APPLY TO THIS PROJECT AND
or AppllcaiU PRIN
• •Pipit end complianco statement on back of nnit" C
n Feels) Check ft/Money Order
IIJ
PTC-
TARIPAM/NrUSE/BUFFER (circle one)
❑ See note on back regarding River Basin rules
❑ See additional notes/conditions on back
Initial)
Explration Date
°E(OAS ", c[ CAMA ❑ DREDGE & FILL N9 87370 A B �D
/GPrevious permit
GENERAL PERMIT
NNew
Date previous permit issued ❑ Modification ❑ Complete Reissue ❑ Partial Reissue
As authorized by the State orthCa olina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I SA NCAC ' If
V ❑ Rules attached. ❑ General Permit Rules available at the following link: www.deq.nc.gov/CAMArules
Appucan me Authorized Agent
Add ss Project Location (County):
Ci State ZIP Street Address/State Road/Lot #(s)
�s
Phone #
Email Subdivisi
City(46, ZIP
Affected ❑ CW W PTA ❑ ES ❑ PTS Adj. Wtr. Body (nat/man/unk)
AEC(s): 1❑ OEA ❑ IHA UW ❑ SPIMA ❑ PWS Closest Mal. Wtr. Body
ORW: yes nb'- PNA: yes/
Type of Project/ Activity an
(Scale:J� )
Shoreline Length
Access Length .
Pier (dock) length I ��
Fixed Platforms)
Floating Platform(s) 10
Finger pier(s)
Total Platform area
Groin length/# I ^ ( }}
Bulkhead/ Riprap length
Avg distance offshore
Breakwater/Sill
Max distance/ length
Basin, channel
Cubic yards
Boat ramp �- 5
Boathouse/ atlift
_1��
Beach Bulldozing ZN
Other
�l
SAV observed: yespbae:rfet
Moratorium: n/a yes
Site Photos:
Riparian Waiver Att �hedd: yesA building permit/f 6r t ma0
fired b
Permit Conditio ns
TAR/PAM/NEUSE/BUFFER (circle one)
4�Q tll, See note on back regarding River Basin rules
See additional notes/conditions on back
I Ap(I AWARE OF STATgTES, CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND gEI1/IEWED �QMPLIANIC SiATF NT. lease Initial)
n � n i i � . _ -ter
A e t or Applicant PRINTEDName Permit Offi e TED �i ee
X
Si ture **P re d compliance statement on back of rmit** Siaa4ere
n� nJ�
Application Fee(s) Check #/Money Order Issuing ate Expiration Date
d
�rcdEHR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
f'a; ",_,_,roiy Braxton C. Davis
Governor Director
®ate
Applicant Dame <�' /i
Failing Address _ ;2/G AS��orr� �iii¢..
C
John E. Skvarla, III
Secretary
L_� . -,�- 7"7 4-,--
I certify that I have authorized (agent) -/ S to act on my behalf, for the
purpose of applying for and obtaining all CANLA Permits necessary to install or construct (activity)
— X el- eIr— 1_'/91n 14-71_li _/�� , at (location)
This certification is valid th ru (date) 3
Signature
400 Commerce Ave., Morehead City, NC 28557
Phone: 252-808-28081 FAX: 252-247-3330 Internet: www,nccoastalmanagement.net
An Equal Opportunity1 Affirmative Action Employer
/*RECEIVED
MAY 12 202?
DCM-MHD CITY
One
NorthCarohna
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Propei
Address of Prof
Mailing Addres:
Owner's email:
Agent's Name: ��� ,.S Agent Phone#:�� 7
Agent's Email: 1 e v c (2 2
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing with dimensions must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal
/f you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave., Morehead City, NC 23557. DCM representatives can also be contacted
at (252) 808-2808. No response is considered the same as no objection if you have been notified by
Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (if you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
nature of 'acent Ripan pert er
-OR-
Sig
I do not wish to waive the 15' setback requirement (initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO: - „;aJA . b-P-Ae
Mailing Address of ARPO: 9249 1W AyerL ^tee_ ._9 ,"), A) •C • Z7S36
ARPO's email: )Aj,,ARPO's Phone#: 7.97.-q32-333
• J v
Date: 3-?lf - 2Z `waiver is valid for up to one year from ARPO's Signature" ECIFI U)
Revised May 2021
MAY 1V
TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION & WAIVER FORMS
CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners (15A
NCAC 7J.0204(b)(5)). Proof of actual notice (a sign -off by the owner on this form) or certified mail return
receipts (showing delivery of notice) are needed, or any other method which satisfies the Local Permit Officer
(LPO) that a good faith effort has been made to provide notice.
The purpose of this notice is to make adjacent riparian property owners aware of the proposed development
so that they have an opportunity to provide comments (or potentially object to) the proposed development,
and to give DCM or the LPO an opportunity to consider these comments/objections before a permit decision
is made. "Permission" of adjacent property owners is not necessarily required for DCM to issue a permit;
however, permission must be obtained for certain types of proposed developments if they fall within a 15'
setback area along the riparian access area of the adjacent property, as determined solely by DCM. It is in
the applicant's best interest to provide comprehensive and accurate notice so that any concerns or objections
can be resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals
the permit decision, insufficient notice could be a basis for granting such an appeal.
Who is an Adjacent Riparian Property Owner?
What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors)
• A property that shares a boundary line with the site of proposed development; AND
• A property that fronts a natural or manmade waterbody that is connected to coastal waters and
can support some form of navigation, even a kayak or canoe, including a common canal system
or a manmade basin.
• Easement holders? Yes, if the easement could be impacted by the proposed development.
• Streets/Roads? Only if the street/road could be impacted by the proposed development. This
might include street -ends which might be used for parking and beach access.
• Holders of recognized submerged lands claims/shellfish franchises.
What its Ripad3^1
Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a
question about whether an adjacent property is considered "riparian," please reach out to DCM Staff -
especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water.
Who/What is a Property Owner?
For private individuals (or families), send notice to the address listed on the tax card. If the property is owned
by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of
State's Corporations Look Up site: ntt_s./hvww.scsnc.ci(Dv/searchiiiicle;vc,oro. For Condominiums or
neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a
corporation, for which you send notice to its registered agent).
What is Notice, and how do I ensure it is received?
• You can meet with your adjacent property owner, provide a description or drawing of the
proposed development, and ask them to sign this form and return it to DCM; OR
• You can hand -deliver this form and a description or drawing, and ask your neighbor to return it to
DCM (consider providing them with a stamped envelope); OR
• You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you
choose this option, you must provide either the signed & returned green card OR track the
certified mail package number on USPS.GOV's online tracking system, and provide the tracking
print-out as proof of delivery to DCM
If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel
and we will work to answer your questions.
F('IF'IVP,F'}
Revised May 2021
MAY 12 ZO
()CM-MHD CITY
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner:
Address of Property: I d S5vun.��`�
Mailing Address of Owner: -4to %is4�ar�� 1i�v�e r'tITS�d� '�- • z731Z
Owner's email: Ni4SAw).ArQwner's Phone#: 919 -�aSJ�
Agent's Name: ja;f- Agent Phone#:
Agent's Email: e-- //i's a
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing, with dimensions must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
if you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave., Morehead City, NC 28557. DCM representatives can also be contacted
at (252) 808-2808. No response is considered the same as no objection if you have been notified by
Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requirement (initial the blank)
Signature of Adjacent Riparian Property Owner�X
Typed/Printed name of ARPO: 6,8441,e-
Mailing Address of ARPO: 10i, 7:Qwen) 4i"cJ--�-Aihs6 Te", A) . Lea( Z
ARPO's email:
Date: ,2\ zz
ARPO's Phone#: 5►9 - 34.4 -yao*
*waiver is valid for up to one year from ARPO's Signature` RFCpIV)
Revised May 2021
MAY 1. 2 2012
DCM-MH D CITY
RECEIVU.,
MAY 12 ?Ox/
DCM-MHD CITY 12
Pi