HomeMy WebLinkAboutEX20-22 Peterson (249 Sandpiper Dr.)ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Dlrector
NORTH CAROLINA,
Envlronmental Quallty
I'liay 5,2022 Exemption Number - EX20-22
Rick Peterson
249 Sandpiper Drive
North Topsail Beach, NC 28460
RE: EXEMPTED PROJECT. MAINTENANCE AND REPAIR OF STRUCTURES CONSISTENT WITH CURRENT
RULES [15A NCAC 07K.020e(c)]
PROJECT ADDRESS - 249 Sandpiper Dr.
AREA OF ENVIRONMENTAL CONCERN - Estuarine Shoreline AEC
Dear Mr. Peterson
I have reviewed the information submitted to this office in your inquiry conceming the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. After making a site inspection
on April 13,2022,1 have determined that the activity you propose is exempt from needing a minor development
permit as long as it remains consistent with your site drawing and materials list submifted on May 5,2022, and meets
the conditions specified below. lf your plans should change and your project will no longer meet these conditions,
please contact me before proceeding.
MAINTENANCE AND REPAIR - [15A NCAC 7K .0209(c)] - Any structure, or part thereof, consistent with cunent
CRC rules may be maintained, repaired or replaced in a similar manner, size and location as the existing structure
without requiring a permit, unless the repair or replacement would be in violation of the criteria set out below. This
exemption applies to those projects that are not within the exclusion for maintenance and repairs as set out in G,S.
1 13A-103(5)b.5., Rule ,01 03 of this Subchapter and Rule 07J .0210.
1. the development must not disturb a land area of greater than 200 square feet on a slope of greater than
10 percent;
2. the development must not involve removal, damage, or destruction of threatened or endangered animal
or plant species;
3. the development must not alter naturally or artificially created surface drainage channels;
4. the development must not alter the land form or vegetation of a frontal dune;
5. development must be consistent with all applicable use standards and local land use plans in effect at
the time the exemption is granted.
Structures may be repaired in a similar manner, size and location as the original structure. No expansions or
additions are permissible and the following specific conditions apply:
1. The prolect consists of the repair of 32' of an existing 80' retaining wall/bulkhead, as shown on the
attached drawing and materials list.
2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina
Building Code standards.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter
North Carolina Department of Environmental Quality I Division of Coastal Management
MoreheadCityOfficel4OOCommerceAvenuelMooreheadCity,NorthCarolina2S55T
252.EOE.2808
Sincerely
l=(WIA (rlqd
Curt Weychert , DCM Field Representative
NC Division of Coastal Management
400 Commerce Ave.
Morehead City, NC 28557
North Carollna Department of Envlronm.ntalQualfty I DMslon of c.oastal Managemcnt
Morch€adcttyomc. | 4oocommercc^vcnu. I Moorehcad City.Northcarolina2SssT
252aoa2ao8
I I
I
I I
I
3)'
zPI
A*
QasT
-I .I I il rIsil
Ir
-]€III
I
\
I
I I s)ce fa*/ fu grd- il*t-
(4/'fv
(t,u tPcl*lt &ftr't
ir* gth"o tt'*)
+u"ltt
w
tal
7I
rJ
A
gl
I
I
I
t'I
).11
s*4'7r
Google (34031,24,,N 7loz1,zs,'w) 176 ft
T
I
I
I
I
I
,
l
a
,ql
\<
o
fr
2D
\
I f
n a
L
5A/.
g('l
tpr
^fi{
a
12t28'l
{ App Storr
rt ?1.u
pvt
I