HomeMy WebLinkAbout85247_Robert Davenport_20220524 .450-r4 ECAMA DREDGE & FILL 7 ' No 85247 A 6 C D
GENERAL PERMIT Zp44 10 u 0° Previouvious t
Date previous permit issued
I I New In Modification In Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC ' f' n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s) .
Phone#(_)
Email Subdivision
City ZIP
Affected —CW Pn EW I •.]PTA n ES I I PTs Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA I I IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: I
Shoreline Length
Access Length _ I --- - L..._IV, 1 1+,I_:r i # I_.. +—A-_
Pier(dock)length ) i I 7 —I
i ;
Fixed Platforms)
... _ -.... t i l L........_.._...._......._ i - - _y._.......,........._._._.
Floating Platform(s) . _ -.- : '0 �' i
Finger pier(s) is i0 I r r, `r J L'
,-- G 4--1 ty
1
Total Platform area ' 7113-i� ! } �� /� - I
Groin length/# I .' I
J - i ..�. E ....-
Bulkhead/Riprap length __.-_.._ v}t_:._�L �� i
d
Avg distance offshore ' _ ..__... —..—t--— —�-
i , '
Breakwater/Sill 1 - j f' : • 1
Max distance/length
I I
Basin,channel
I_ _Cubic yards
Boat ramp _ —_
1 ' '
Boathouse/Boatlift I
Beach Bulldozing I 1
Other I
I
i.i,, v _
i - i
SAV observed: yes no 'i. - ' ` k- -
Moratorium: n/a yes no-.3 ` t. - � i /- NI %r° y4 C.
i , I
Site Photos: yes no •• 7� — —1— I —
I t7�r i
Riparian Waiver Attached: yes no 4 ✓ i I I
A building permit/zoning permit may be required by: c,
0 TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
See note on back regarding River Basin rules
fnSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
! _
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 5. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
, ''°'S'a`�gr r CAMA C DREDGE & FILL `"'`- No 85247 ABCD
GENERAL PERMIT
6 -� �0 bv Previous permit
y '''""' Date previous permit issued
New PIModification I Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC I 1 Rules attached. I I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#(_)_
Email Subdivision
City ZIP
Affected CW I EW PTA I I ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): OEA —IHA UW I I SPIMA ❑PW Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: • )
Shoreline Length
Access Length ---•-
-
T..__ �um
� 1
�� ■� ■
Pier(dock)length U11111111111N1I ■■■■■ ■■RI■ 1��
Fixed Platform(s) ■. ■.�.■ I.■■
Floating Platform(s) Hon, , „,.,111N 11 11111 11
Finger pier(s) 1 1111111
11111 11111 11
11111
Total Platform area Groin length/p
Bulkhead/Riprap length _.-_;_.._..�__±1: 1111
ii
11111
fi
Avg distance offshore
Breakwater/Sill
Max distance/length
Basin,channel
Cubic yards iij
■■II Ohl!!! iii.
Boat ramp
Boathouse/Boatlift
Beach Bulldozing
III
Other ...__...... 111:1111:51111K:: .A_-111111i
I
SAV observed: yes no i 1 ::, miligiim
.› ..iiii
Moratorium: n/a yes no II,
" 1
Site Photos: yes no
ll
Riparian Waiver Attached: yes no ) l" % i i 1I
A building permit/zoning permit may be required by:
Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one)
1 See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit** Signature
Application Feels) Check It/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
>. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3 Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
a Pre-project site conditions: /s ld.0Jrt..
By your signature below you agree to be held responsible for meeting all of the conditions listed bove and verify
that . information provided is complete and accurate.
I: n#�Applicant Printed Nape�4;i
Permi Officer' iignature
A n or p is t Signature I �'2
S z�
sue #e
CAMA GENERAL PERMIT U: 2— 7
State of North Carolina Environmental Quality Coastal Management
Washington Office i 943 Washington Square Mall Washington,NC 27 889 252-946-6481
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 28405-38451 410-796-7215
Morehead City Office'400 Commerce Avenue Morehead City.NC 28557 252-808-2808
•
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
' I hereby certify that I own property adjacent toX A el
Properly located at (Name of Property Owner) 4 .s
(Address, Lot,Block,Road,etc.)
on
in do P.rtat(Waterbody) (City/Town an or County) aka.
The applicant has described to me, as shown below, the development proposed at the above
location. -
have no objection to this proposal-
i have objections to this proposal 't
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must MI in description befgw or attach a site
drawing)
S0^'ts- sew/ 4-9
understand that apier, WAIVER SECTION
dock, mooring pilings, boat ramp, breakwater, boathouse, lit or
must be set back a minimum distance of 15'from my area of riparian access unless 'Naiv groin
ed by
me.(If you wish to waive the setback,you must initial the appropriate blank below-)
t do wish to waive the 15'setback requirement -
I do not wish to waive the 15 setback requirement
(Pr9
o. fly Own Info r. ,t
(Adjacent:Properly roPerly Owner Inforrnafioo)
Srgnotrcre ✓ d969
,mature*
Print or ype Name y- `e />tig n r/� "
I� i dir..�i �® Pit rT N me �xn -S1lt4c. feR r[ Hg64
Madn A� PiU- 9 yjd3•
)(id M r Address
/ >�INP�r7 f a� .
Tele 1�e Number/email Vie rj�
Date Telephone Number/email address
f a — q Jul
Dates 1/ •
(Revised Au ci
"Valid for one calendar year after signature -
g 2014)
•
Xieho
.
ti_ _ - - - - ` _
Oft
f�� i Act
1° 4 g`
I ill 0
Au l'A it Sit
it Adirt 10 c0.4 ik\ AI ,
akk iiimumfgai
��v e Ib3 eril
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby Gerbil'that I own property adjacent to 4 }k ��u4 C
• property ?
located at o(� a �J� � i (Name of Property Owner)
(Address, Lot,Block,Road,etc.)
on (Waterbody) . in Iasi Jsr ii t ca N.C.
(CityfTown an or County)
The applicant has 4descrlbed to me, as shown below, the development proposed at the above
location. • _
I have no objection to this proposal -}
I have objections In this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must fill in description be(gw or attach a site drawing)
40 Lid 4. ,E,tl JJC'Q
XShLL DAS L!
WAIVER SECTION
I.understand that a pier, dock, mooring pings, boat ramp, breakwater, boathouse, I'rft, or groin
Me.
must be back aw ve minimum
distance of 15'from my area of riparian access unless Waived by
youf wish theSetback,you must initial the appropriate blank below.)
1 dci wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement
(Pro • , info - . . (Adjacent Property
� Owner Information)
Sl t e
ttlftt i �_rr a�� Signature*
Printorrype Nam / Pdnt orType Name
lir� �IG
Mate. Address Mailing Address
Clfyp ' gyp
Tele a Number email addressTelephone Number/army address
Dale l f" a
Dale*
'Valid for one calendar year alter signatures Aug.2014)
)40$ 91/46
WI
rl
Alt‘
Atirriot �--�
1 •
. :•'.,A, , A 'Pl . •I
. .
to
•
\ ,
w.it,„ •
er
, .,
..„
3c• \ .
. €
,z, 44". 4,,•-•. t--,-6-,-..t. .
IS
44;:r
• C 'er. .
i . C ;
,