HomeMy WebLinkAbout85145B - Harper, Jerry ,e`j PICAMA I I DREDGE & FILL Zr,� N° 85145 A 13 C D
GENERAL PERMIT -T.p 44 ° 1 Previous permit
Date previous permit issued
0 New n Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC - n Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#(_)
Email Subdivision
City ZIP
Affected n CW n EW n PTA n ES ❑PIS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA In IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale:
Shoreline Length
•
Access Length
Pier(dock)length
Fixed Platform(s) •
Floating Platform(s)
Finger pier(s)
•
Total Platform area
Groin length/ft
Bulkhead/Riprap length
Avg distance offshore - •
Breakwater/Sill
Max distance/length
Basin,channel
•
Cubic yards
Boat ramp
Boathouse/Boatlift
Beach Bulldozing
Other
i
SAV observed: yes no
Moratorium: n/a yes no
Site Photos: yes no
Riparian Waiver Attached: yes no
A building permit/zoning permit may be required by:
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTEDt Name Permit Officer's PRINTED Name
�
Signature"Please read compliance statement on back of permit** Signature
Application Fee(s) Check ft/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
cwk _CAMA DREDGE & FILL 85145 ABCD
a -����� ! Previous permit
ii
GENERAL PERMIT Date previous permit issued
n New [ 1 Modification Complete Reissue ; Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC Rules attached. — General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n CW EW PTA ES I I PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): OEA n IHA UW I 1SPIMA —PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length j ; 1 t
l i
Pier(dock)length / I P
Fixed Platform(s) ,-v" }-r ---- r-r— •
Floating Platform(s)
_r • I
4
Finger pier(s) j i—
I
•
Total Platform area / i
Groin length/# i I I -
I 1
•
Bulkhead/Riprap length --- •- }-4 •y.--. - — — .
Avg distance offshore I - I
Breakwater/Sill '
Max distance/length
I ice.
Basin,channel —
Cubic yards —1--
-r — .
Boat ramp
i i i
Boathouse/Boatlift ;
Beach Bulldozing •
r i
Other • E
i JVA",. ; t I -
t i I s, - ,"✓
SAVobserved: yes no -t- 1 .7..___"--44-..4.._ ....._. •.. ____,_._. e , S • -.,. _ .. ...,
l
Moratorium: n/a yes no i ` � i 1 '
Site Photos: yes no 1�-- ---T--__.- --. - - - _
Riparian Waiver Attached: yes no
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
See note on back regarding River Basin rules
II See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St. Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
$ty< Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENwRONtleNTAL QUALM D(rgdur
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 &.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water •
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization •
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the •
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
•
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft.riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite,mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6)feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts. //))//
• Pre-project site conditions: rt.,e,q�,' cd 4wii — eeei/f Ic/%L«f i—YtA2
rip-
2,-7
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
S erY/ 171/51730t •
Agent or Applicant Printed Name Permit Officers Signature
•
Ag t or A licant Signature lss a Date
CAMA GENERAL PERMIT#: t3 -SI VX"
State of North Carolina I flrvhonmental Quality f Coastandanagement
• WashfngtonOffice 1943-Washington Square Mall Washington NC 27889 1252-946-6481
• Wilmington Office 1127 CardInaI Drive En.w&nfngtan NC284435-3845 1910796/715
Morehead City Office 1400Commerce Avenue Morehead City.NC 28557 1252-808 2808
3-29-22
Hi Shane,
it was nice meeting you the other day. Here are the permits to repair
existing boat ramp if possible. Placement of mooring ball out in front of our
property no further than 400ft, drive new dock pillions each side of my
existing dock and extend the dock approx. 100ft, The dock used to be
188ft a couple years ago there are still pillions from existing dock under
the water that I will have to take out. The dock will be no further out than
the docks left and right of me. Plus two additional posts on my side of the
property for a 4 way tie. I realize we need a different permit for dredging of
boat ramp and next to dock, Robbie has yet come down with a boat to
measure the depth of water out from the boat ramp, but a week or so ago
when we had a real low tide I put my rubber boots on and was able to
walk out to 188ft in line of the dock to the right of me that is that long or
longer and there was about 18" of water and the river was down at least
2ft so there's about 3-1/2ft plus of water out that far during normal tide.
don't remember how far you said I could go out to find the depth of water
to see if it could be dredged that deep back to the shoreline. Please let me
know how much the permits are going to run.
Thank you,
/1
ad ticcw• � l/� ��.��
Jerry Harper �� ic s
325 Clark Rd
Bath, NC 27808
603-455-5660
•
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: J .Xx' AACif per
Address of Property: p\a UCH PVC, c n
Mailing Address of Owner: ar- C* ('t' 9
Owner's email: -C1YlO�er—kl4y0 Owner's Phone#: LOD 3 Li5-5-J`-&49°
VV CJ
Agent's Name:ROb )bp K n5 Agent Phone#: 05_ _9(014-3 ya(p
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
descriptio or drawing, with dimensions, must be provided with this letter.
_ ,/�/ I DO NOT have objections to this proposal. I DO have objections to this proposal.
if you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must scan
the appropriate blank below.) -
I DO wish to waive some/all of the 15' setback _ _ ---
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO: a/ A D/ lam/ /L,r- W-)
'
Mailing Address of ARPO: L :� Q ( i�! � / /CW
ARPO's email: V in 6-lei ( ce u ARPO's Phone#: S- 4 L V 2 S /y
Date: 0.3/)y/ Z, *waiver is valid for up to one year from ARPO's Signature*
Revised May 2021
46
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to ' Je-( , l ` f 's
(Name of Property Owner)
property located at 3 J C\Ct r G\
(Address, Lot, Block, Road, etc.)
on v`A.0 Sven 6 , in C. , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
loc;iek
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
• - cv\cloc kx x\\
Al
1Dr WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner I formation) (Ad'acent Property Owner Information)
S attire Si attire*
`)( t\c rJORA toF. Lf) r?
Print or� a Name Print or Type Name
f C 10,( r d '3 3 n Clark led
Mailing Address Mailing Address
it /State/Zip City/State/Zip
i0 b -u35 s lo(co Ali r.
Telephone Number/email address Telephone Number/email address
3-ow -a ca a q 6 V a s/ `
Date Date •*Voindet /a4/& Snd9
(Revised Aug. 2014)
*Valid for one calendar year after signature*
- . ♦
TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION &WAIVER FORMS
CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners(15A
NCAC 7J.0204(b)(5)). Proof of actual notice (a sign-off by the owner on this form) or certified mail return
receipts(showing delivery of notice)are needed, or any other method which satisfies the Local Permit Officer
(LPO) that a good faith effort has been made to provide notice.
The purpose of this notice is to make adjacent riparian property owners aware of the proposed development
so that they have an opportunity to provide comments (or potentially object to) the proposed development,
and to give DCM or the LPO an opportunity to consider these comments/objections before a permit decision
is made. "Permission" of adjacent property owners is not necessarily required for DCM to issue a permit;
however. permission must be obtained for certain types of proposed developments if they fall within a 15'
setback area along the riparian access area of the adjacent property, as determined solely by DCM. It is in
the applicant's best interest to provide comprehensive and accurate notice so that any concerns or objections
can be resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals
the permit decision, insufficient notice could be a basis for granting such an appeal.
Who is an Adjacent Riparian Property Owner?
What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors)
• A property that shares a boundary line with the site of proposed development; AND
• A property that fronts a natural or manmade waterbody that is connected to coastal waters and
can support some form of navigation, even a kayak or canoe, including a common canal system
or a manmade basin.
• Easement holders? Yes. if the easement could be impacted by the proposed development.
• Streets/Roads? Only if the street/road could be impacted by the proposed development. This
might include street-ends which might be used for parking and beach access.
• Holders of recognized submerged lands claims/shellfish franchises.
What is Riparian?
Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a
question about whether an adjacent property is considered "riparian," please reach out to DCM Staff -
especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water.
Who/What is a Property Owner?
For private individuals(or families), send notice to the address listed on the tax card. If the property is owned
by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of
State's Corporations Look Up site: https://www.sosnc.gov/search/index/corp. For Condominiums or
neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a
corporation, for which you send notice to its registered agent).
What is Notice, and how do I ensure it is received?
• You can meet with your adjacent property owner, provide a description or drawing of the
proposed development, and ask them to sign this form and return it to DCM; OR
• You can hand-deliver this form and a description or drawing, and ask your neighbor to return it to
DCM (consider providing them with a stamped envelope); OR
• You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you
choose this option, you must provide either the signed & returned green card OR track the
certified mail package number on USPS.GOV's online tracking system, and provide the tracking
print-out as proof of delivery to DCM
If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel
and we will work to answer your questions.
Revised May 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner'. lt�1c r` \ '1 ` -t Y �t
Address of Property. a • \ -t 6 KCk 1 fit'\-v )�- aI v-0.1-
Mailing Address of Owner. '35 C\Q-+f [1 0 L 1.�C\* NC a S0`,
Owner's email/YO(0 t Sitr5rACCiI.(owner's Phone#: CD Oa Y rS /vt°0
Agent's Name:I?OU H)I645 Agent Phone*: a 5)--9Yq-�f35L0
Agent's Email! 1
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing,with dimensions, must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater,boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of nparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback 72/7 �� ,'r``
C L L
Signature of Adjacent Riparian P►opedy Owner
-OR-
1 do not wish to waive the 15' setback requirement (initial the blank)
Signature of Adjacent Riparian Property Owner: (14'.C P ��
A•e
Typed/Printed name of ARPO:1-:\1_1C(' OCR_'
Mailing Address of ARPO: Cl .\. (. \ a( AN )(>L t' tit?
ARPO's email: ' itiE. n (, ARPO's Phonon:CM -"&//' T5
Date: ..5 _6724, _'
?_ waiver is valid for up to one year from ARPO's Signature'
Revised May 2021
Mail Mali IVHASe-l./uuook
5/2J22, 11-46 AM
N.0 DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM
CERTIFJDMAIL RLr URN.I?LC,EIt't rat ciUL0111)..t)r..iAf4P_D.ELIY. R1.
(Top portion to be completed by owner or their Agent)
Name or Property Ownerc,4 1\� All c)('_C ..
Address of Property` )___S ,G-,r 1S `A 123(gy :]Yl t`w.1 c DIA
LACYLACYS Mailing Address of Owner? —' ( J �� +LpK'I 1 PI ^ tY`` t i &I1
Owner s email. ftviak._L.1M h"r'W".%Pt.y ii _4 I ..j k.'�iS,''u 10 t,pt�
`�r�r' C1�3tL1S�s`
Agents Narne:.j ji1 C.._�v. 'l't t"�. Aueni Phvnr.N : y ,.) -C;VUII"-‘,"i35
Agent's Email. — —_ ._._
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
tBgttom Portion to be completed by the Adjacent Property Owner)
i hereby certify that I own property adjacent to the above referenced property The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are procosirx_ A
deey•
t or drawing.+Faith dimensions.must be provided with this letter.
I DO NOT have obdions to this proposal. I DO have objections to this procr�sa
ff you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should 04
mailed to 943 Washington Square Malls Washington, NC 27889. DCM representatives can also '..e
contacted at(252) 946-6481.No response is considered the same as no objection if you have beer
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings,boat ramp,breakwater, boathouse,Vt, cc
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(tfis does not apply to bulkheads or riprap revetments).(if you wish to waive the setback.you must sign
the appcopnate blank below.)
^-4
I DO wish to waive some/all of the 15'setback
Signature of Adjaceo. Riparian Property Owner
-OR
i do not wish to waive the 15' setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:Typed/Printed name of ARPO: Mo_ e 1-''r
t'3 - �
Mailing Address of ARPO: l � :- Y�tI � Q vc t-\ A..4'V .-Si t- E- tare'E 'N.J.,\\e o C_
ma++e,neci..3epe <"OntwI.con ARPO's Phone*: ���l �" �'t1 1
5.E
ARPO's email:
Date; .SAL --1L *waiver is valid for up to one year from ARPO's Signature'
Revised May 2021
, ..__.,,.....1_,1..,rfi,-a1FS rnmrmaiirmhrodiriiAAnkADM3ZiYONINht_TkxNTItNGMxYSO4NZR)LTBjMDE4NmRIMG.IjNwAQANIbicvwZRxlndRvgmgMwIW
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
42
Name of Property Owner Requesting Permit: _I L e el° T 1 -n V
Mailing Address: .3&3 C ) c- i K I?Ci
xt.+-G 1 1J1C 37s-Ds
Phone Number: 0 -. _ L/5..5 Streo CD
Email Address: b%o.- i 17t (Q`7i ! kli2 '. C&Jt' -
I certify that I have authorized g'ibbie:, . -Ha .c‹ 1 S- ._��..__,
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: (-6Q1 ✓ E'.y 1 Sf 7r-i. (60 _
c 7L b°L , J}- A d oI- 'v9 /3,92z 6oc.¢7c;'/41
at my property located at `Yl GI 0 P c/ete-K le(' _._. Y
in ie County. VA et'
1'
OR
I furthermore certify that I am authorized to grant, and do in fact grant permission to �.
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connectio with evaluating i ormation related to this
permit application. A'' , 44:1 MIDP Ft _
Property Owner Information: !/
t7/1147114 444.- miii# 0.<:,
)<:, 4,01
S nature
x M,¢L co`HI .i-1402
Print or Type Name 4 4
0
Aft ..,.i7 z.•..v� D 49Nd1�
Title
Date
CALL. yy��e ( GvL iv, i f' 'it i
,9vP��/ Qv silks- ge 59%,
yd �/
This certification is valid through / I
. .