HomeMy WebLinkAbout79888-B_David Purinai_20220429 .0 �CAMA/ ❑DREDGE & FILL Q�� N° 79888 A t C D
GENERAL PERMIT � 1) (Qy l Previous permit# t..//YA
> LINew ❑Modification CI]Complete Reissue ❑Partial Reissue Date previous permit issued 1..4!W
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC d -7 i-)- - / 7 o O
l fRules attached.
Applicant Name V 1/jr-D t LA 12-s- N Ali- Project Location: County *en..L.. -' C,
Address iit` ( i 3 )— S-I r,oy 6 l . TN'. Street Address/State Road/Lot#(s)
City L,..C IC- 010.4h0 State N( ZIP /5C"1 1 q(cC=' -5-G.c '- 'v1 S ..aCin— RI
Phone#('5Z4' C - 6 IS`/ E-Mail .pc)r;vqu; 4,111411 .c ter Subdivision N//
Authorized Agent ii)A City f`j )? N ZIP 7 cc)S.
Affected ❑CW 'DEW ,E 'TA ❑ES ❑PTS Phone# ( 5 2 �') C ,-la 1-`,..7`1River Basin 12 / ?AM
M
ri OEA ❑HHF ❑IH ❑UBA ❑N/A
AEC(s): Adj.Wtr. Body 41-1\ C2�e
ratIman /unkn)
PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body_ mL1C b fZ.l UC.Y
I- ,i 1ai1
Type of Project/Activity -vi 54 G j + I X I L (n c
(Scale: i - ;O' )
Pier(dock)length + S8 0 i
i I i I I 1.1011M-11,
Fixed Platform(s) / • —1 !�` 4 i
Floating Platform(s)length ... — ...... ._I
. _ T
Finger pier(s) i
Groin len h _ ; 1 I I II I I
number — .......... ... .._.._. — I
,
Bulkhead/Riprap length -- . -- ----. ._�.' ■■ �; -
OM
avg distance offshore I 1.111 _ • _.
max distance offshore \ IIII
Basin,channel h fL' I I
r I.f' fir._
iINN _11111 11111 �
cubic yards f ' i �
Boat ramp I 4 r n.
Boathouseakatli) l3"X 13 _....._..... +_.._+
Beach Bulldozing + _ 1 ' � u t .-
_ r Ili ►
I
Other y i4 i
I
i ' I
G
s (aOU
Shoreline Length I
NV � III
, 111
SAV: not sure yes n� -� H l I L [+ . . I`/f
74
.41 Moratorium: n/ayes n f!
1 s �,
' as Ib
Photos: yes no 1. _.. f.. ;
y� I I ,Y
Waiver Attached: `j.�(�no ,.r --— ---
A building permit may/bI r`equired by: eft`^T lX'c Co . . I\'1 See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) r I
Notes/Special Conditions i !� Mr&t i L.4" 1/:Lai IA ' 'yL' ✓{'eS J( �`'Yi..4
-,(41/10 U ,)(.41-,1-f.
1:)4u,e Pic r, 1JA F15/1ley ),G�s
Agent 41,or JiLL2
r Applicant Printed Name PermitOfficer's Printed Nome /
07
Signature `Please read compliance statement on back of permit Signature/
- _ 0 r ' 7 (.1:::- c/2 Li: 9 9 - ..p( - 2 c 2 2. - 2.'3 - f+l - z o ZZ
Application Fee(s) Check# Issuing Date Expiry ionDate
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves: Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford,Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http:I/portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0 CAMA / DREDGE & FILL N° 79888 ABCD
GENERAL PERMIT 1 ID (iy I Previous permit #
>G New Modification Complete Reissue Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to ISA NCAC .
Rules attached.
Applicant Name I Project Location: County
Address - : . - . ,, L. i `
t Street Address/State Road/Lot#(s)
City t✓ OML4P, State �i ZIP 1coLi ?. •.
Phone # ( ) - (: 7' E-Mail ; •e •-.-" r' y)1)k11 I •' fin,, Subdivision i ,
Authorized Agent 1- City "7:71 / f' ZIP ,2. 7 CS-
CW L EW PTA ES ❑PTS Phone # ( ) i C. j- ; ' River Basin r, , -, I
Affected OEA ! HHF IH UBA D WA (Ly
AEC(s): Adj. Wtr. Body 117)4T j1 L eL \ (nat /man /unkn)
PWS:
ORW: yes i no PNA yes / no Closest Maj. Wtr. Body f\Mbi:a 2‘.,( ;'_
Type of Project/Activity +; u, i i
(Scale: , - )
Pier(dock)length ' S54 L �!
I I i 1�
Fixed Platform(s) i — 1-1 ; C. t'C K 4:.."�i •
Floating Platform(s) I . I I - 1 j di— ,_�--- --
Finger pier(s)
Groin length i i 1 I
number + -- I -- -i 1 i .
Bulkhead/Riprap length i I )-+
.� I
.�avg distance offshore I
max distance offshore ! i + 13 r,1'1 .0- I j
3
• ii
Basin,channel `�1� 1 1
i f.I .•1
cubic yards _.�
Boat ramp IHk.,
I i i i
_ S a
Boathouse/Boatlifc / i
i ' I
..) i 74,0".• Mill
•
Beach Bulldozing crre s } I I ------_. I I
Other I j��
1 �. I I 1 i,
.4t, .. 1 I
i 1 I
Shoreline Length _ i C. i I I I
IIIII
SAV: not sure yes no __L___.._. i 7 t l-'•t U.`r y,#.;
�.-....._ T . ---�E f t
Moratorium: n/a yes no I ,. ,s f' `,i ���
f -'^7I
Photos: yes no _ * t I I I �F' 11,
i i t f ,rs• 1 1
Waiver Attached: yes no .., • I .i�� I
r+ I
A building permit may be required by: &I See note on back regarding River Basin rules.
( Note Local Planning Jurisdiction) {{
Notes/Special Conditions t.. 4,-."- F s •:- / y..;r i, 1,/."!S / 5' i"l f :!-
DiiE/;, r4r, J4 't FItifIIe . j
Agent or Applicant Printed Name PermitOfficer•s Printed Name
J .,,,r, p!, /. • . r ---" / t(j.7 ^ (y..s'/i--lam-.
Signature **Please read compliance statement on back of permit** Signature ,
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
1 I Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven, Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
``" ROY COOPER
Governor
MICHAEL S. REGAN
. _ Secretory
Coastal Management BRAXTON DAVIS
EN\9RONMENTAi.QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233 &.0259. The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless.otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
z. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts. /
o Pre-prof/`t site conditions: Zee If /121/e - lal5ed irtrrt-,
t iln fees / 54-Let/kr ef- .7—c
By your signature below you agree to be held responsible for meeting all of the conditions listed abov a veri
that all informaton provided is complete and accurate.
/a ,Y 'et/N/l t
Agent(Applicant P '' ted Name Permit O cer's Signature
a - r - ZbZZ
Ag•n 'r Applicant Signature Issue Date
CAMA GENERAL PERMIT ft: 7 /Q 0G&E--
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943.Washington Square Mall Washington.NC 27889 252-946-6481
• Wilmington Office 127 Cardinal Drive Ext Wilmington.NC 28405-3845 1910-796-ms
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 12552-808-2808
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
•
Name of Property Owner: ��1��'��� i'(,_r (( Z{ .��r�L H i
Address of Property: 5 �c J/,A_:ic>,, �14,1,'rite?' : Ni- �, 10e,8
tt / i7
Mailing Address of Owner✓i�� �J o%y,1/1, C.•,'c rC - e-< ll // icki r ,i c 7ce,y
Owner's email: par,. 'j , N C`_clixr'•(•'c Owner's Phone#: .Q5..-- /6- f-a c/
Agent's Name. Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me. as shown on the attached drawing, the development they are proposing. A
description or drawing,with dimensions, must be provided with this letter.
X I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.) ,
I DO wish to waive some/ail of the 15' setback
Ac/
Signature of Adjacent iparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO: Sum' P Everett
Mailing Address of ARPO: PO Box 1012
ARPO's email: surrycverett(u:bath-nc.com ARPO's Phone#: 252-943-9402
Date: October 21, 2021 'waiver Is valid for up to one year from ARPO's Signature'
Revised July 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed AR
owner or their agent)
•
Name of Property Owner: �9t/iC 41,/ e v"-'/f
Address of Property: 104 o lc/-/`L.id'✓ JkAir fee? six we. 67700
Mailing Address of Owner Je r4</c Y at /neve/✓rit/C '---,goy
Owner's email: Tarimft, 64 G501a,(.cO Owner's Phone#: o� ��' / o 75 Y
Agent's Name: Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing,with dimensions, must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection If you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings, boat ramp, breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback,you must sign
the appropriate blank below.) (�
I DO wish to waive some/all of the 15'setbaci )C
Signature of A 'acent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO:
Mailing Address of ARPO:
ARPO's email: ARPO's Phone#:
Date: *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021