April 23, 2020
Asbury Beach HOA
Ms. Trish Moss (moss3778gnc.rr.com)
SUBJECT: Basin only addendum to the Moratorium Relief Request for Permit No. 19-20
Asbury Beach HOA, Carteret County, North Carolina
Dear Ma'am:
This letter is in response to the above referenced CAMA permit relief request received by the
DCM Morehead City office by email on April 15, 2020. To review this request, we coordinated
with the Division of Marine Fisheries and NC Wildlife Resources Commission.
This addendum to the original request is to dredge the basin starting no later than June 1" and
requested a total of 10 days. In consultation with the resource agencies authorization was given
with the following conditions:
1. The relief request is granted for the basin only, no dredging of the open water channel
is authorized.
2. Excavation shall not exceed -3.6 feet below the mean low water level within the basin. In
no case shall the depth of excavation exceed the depth of connecting waters.
3. The basin portion of the dredge template can occur with a turbidity curtain placed at the
mouth of the basin. The turbidity curtain shall remain in place for at least a 24-hour
period after completion of excavation or until the project areas has returned to ambient
conditions, whichever is greater, to prevent unnecessary siltation into the adjacent water
body.
4. The applicant has expressed that the dredging may occur earlier than June 1, 2020, in any
case the relief request if granted for a maximum of 10 days from the start of the
project. The 10-day work window must conclude by no later than June 10, 2020. The
sediment curtain removal is not part of the 10-day work window.
5. Every effort should be made to start and finish the project as early as possible. The
resource agencies have expressed that any request for additional time will not be granted.
D_ECZ��
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557
252.808.2808
6. The applicant shall notify the Division by email and on the day of occurrence, the start
date, end date and removal date of the turbidity curtain.
Therefore, the one-time moratorium relief request is granted with the above conditions. If you
have any questions concerning these matters, please feel free to contact me by telephone at (252)
808-2808 extension 215, or by email at gregg.bodnarkncdenngov
Sincerely,
Gregg Bodnar
U VW
Division of Coastal Management
Assistant Major Permits Coordinator
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Offl[e 1 400 Commerce Avenue I Morehead City, North Carolina 28557
252.8082808
Bodnar, Gregg
From: Dunn, Maria T.
Sent: Thursday, April 23, 2020 9:27 AM
To: Bodnar, Gregg; Deaton, Anne
Subject: RE: [External] Asbury beach dredging project
WRC concurs with DMF that a one-time 10-day allowance to dredge within the basin may occur as long as a turbidity
curtain is installed.
The email from Trish Moss states the contractor estimates the work to last for 10 days, so if the project starts on June 1,
it must conclude by June 10. The email also states the contractor may get to the site earlier than June 1. Perhaps the
allowance should be stated that a 10-day working window is allowed within the basin as long as a turbidity curtain is
installed. The 10-day working window must conclude by June 10.
Something tells me if we don't say that they can work earlier than June 1 that we will get an email in about 3 weeks
asking if they can start.
Maria T. Dunn
Coastal Coordinator
NC Wildlife Resources Commission
943 Washington Sq. Mall
Washington, NC 27889
office:252-948-3916
fax:252-975-3716
www.ncwildlife.org
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
-----Original Message -----
From: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Sent: Thursday, April 23, 2020 9:18 AM
To: Deaton, Anne <anne.deaton@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>
Subject: RE: [External] Asbury beach dredging project
That is something that the dredger is trying to obtain for the town. It is not related to this project.
Gregg
-----Original Message-----
Bodnar, Gregg
From: Deaton, Anne
Sent: Thursday, April 23, 2020 8:55 AM
To: Bodnar, Gregg; Dunn, Maria T.
Subject: RE: [External] Asbury beach dredging project
Never ass u me!
It means I'm contemplating or forgot about it.
In this case, DMF will not object to this one time request to dredge the basin for a maximum of 10 days, starting no later
than June 1, and using a turbidity curtain.
To clarify, they will not dredge the canal now but the town may request a minor cleanout permit later? What is a
cleanout permit?
Anne
-----Original Message -----
From: Bodnar, Gregg
Sent: Thursday, April 23, 2020 8:29 AM
To: Deaton, Anne <anne.deaton@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>
Subject: RE: [External] Asbury beach dredging project
Morning all,
I have not gotten a response concerning the moratorium relief request for the Asbury Beach HOA request to use the
turbidity curtain within the basin. Should I assume that the no response is a Yes?
Thanks,
Gregg
-----Original Message -----
From: Bodnar, Gregg
Sent: Friday, April 17, 2020 1:24 PM
To: Deaton, Anne <anne.deaton@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>
Subject: RE: [External] Asbury beach dredging project
Hey all,
Just checking in to see if you have any thoughts.
Gregg
-----Original Message -----
From: Bodnar, Gregg
Sent: Wednesday, April 15, 202012:27 PM
To: Deaton, Anne <anne.deaton@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>
Bodnar, Gregg
From:
Bodnar, Gregg
Sent:
Thursday, April 23, 2020 12:42 PM
To:
'Patricia Moss'
Cc: Styron, Heather M.
Subject: RE: [External] Asbury beach dredging project
Good. So dredging to the authorized depth will not interfere with the connecting waters. I should have something out
here soon.
Thanks,
Gregg
-----Original Message -----
From: Patricia Moss <moss3778@nc.rr.com>
Sent: Thursday, April 23, 2020 12:40 PM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: Re: [External] Asbury beach dredging project
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Yes you are correct according to the engineered survey the canal leading into the basin in the center is from 4 feet deep
to 4.8 feet deep.
Thank you
Trish
Sent from my iPhone
> On Apr 23, 2020, at 10:03 AM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
> Morning Trish,
> I was wondering if you can give me some info that I do not have on hand. With the request to dredge the basin only
now there is a potential concern with connecting waters. We can't have the basin deeper than the connecting waters in
the channel. So...
> 1. The dredge depth of the basin was authorized at -3.6 feet below MLW.
> 2. What is the depth of the channel outside the basin?
> In any case, a relief request would only allow the basin to be dredged no deeper than connecting waters. Hopefully
this will not be an issue since the channel waterward of the basin was authorized to -4 below MLW.
> Thanks for the help,
> Gregg
> -----Original Message-----
• From: Patricia Moss <moss3778@nc.rr.com>
> Sent: Thursday, April 23, 2020 8:20 AM
> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
> Subject: Re: [External] Asbury beach dredging project
> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.spam@nc.gov<maiIto: repo rt.spam@nc.gov>
> Good morning hope you both are doing well! Just checking in to see if you have heard any news on our asbury beach
basin project ? I am staying in touch with BENTLEY Brooks marine dredging.
> Thank you
> Trish
> 919-427-2238
> Sent from my !Phone
>> On Apr 17, 2020, at 1:23 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
>> No I have not. I will send a request again today.
>> Gregg
>> -----Original Message -----
>> From: Patricia Moss <moss3778@nc.rr.com>
>> Sent: Friday, April 17, 2020 1:08 PM
>> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
>> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
>> Subject: Re: [External] Asbury beach dredging project
>> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.spam@nc.gov<mai Ito: report.spam@nc.gov>
>> Good afternoon Gregg and Heather. Since it is Friday I was just checking in to see if you had heard anything in our
basin clean out. I am touching base with Bentley Brooks dredging tonight to give any updates.
>> Thank you
>> Trish
>> Sent from my iPhone
»» On Apr 15, 2020, at 12:26 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
>>> I will pass along to the resource agencies.
>>> Gregg
>>> -----Original Message -----
>>> From: Trish Moss <moss3778@nc.rr.com>
>>> Sent: Wednesday, April 15, 2020 12:10 PM
>>> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
>>> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
>>> Subject: Re: [External] Asbury beach dredging project
>>> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
>>> Good afternoon Gregg and Heather
>>> Hope you both had a nice Easter holiday!
>>> I got up with Bentley Brooks and he is finishing up a sea wall and a couple other obligations. He said he could get to
our basin area no later than June 1st, possibly sooner. The clean out of basin area , he said to allow 10 working days.
On the 500 cu yds clean out of access into canal, for town of Atlantic Beach- Mark Schultze , he said the town could
possibly could get their own minor cleanout permit. I am asking you to please consider this request. We can not use our
canal this season otherwise. Also, we have already had all electrical undone on all boatlifts, spent money on engineer
surveys, and a lot of false promises by 2 other contractors that should have already completed our project. Asbury beach
homeowners desperately need a break and some enjoyment on the water at this point.
>>> Thank you both for all your support on our behalf!
>>> TRISH
>>> 919-427-2238
>>> Sent from my iPad
»»> On Apr 14, 2020, at 11:44 AM, Patricia Moss <moss3778@nc.rr.com> wrote:
»» Bentley took off for Easter. I will contact him tonight and get back with you ASAP.
»» Thank you
»» Trish
»» Sent from my iPhone
»»» On Apr 9, 2020, at 3:21 PM, Patricia Moss <moss3778@nc.rr.com> wrote:
»»> I will communicate with Bentley tonight.
»»> Thank you
»»> Trish
»»> Sent from my iPhone
»»»> On Apr 9, 2020, at 3:02 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
»»»
»»» The understanding for the excavation of the basin while using the turbidity curtain was that the project would be
done continuously after the channel was complete or April 10th, whichever came first. It was not intended to allow the
basin to be completed at any time as long as the turbidity curtain was used. At this point the open water channel's
deadline is April 10th. I will send the request to dredge the basin with the turbidity curtain by Bentley, but I'll need to
know a start date and overall number of days proposed. With it being 3pm on Thursday, with Friday being a holiday, I'm
not hopeful I would get a quick response anyway. When you have that info please let me know and I will coordinate.
»»»
»»» Thanks,
»»»
»»» Gregg
»»»
»»» -----Original Message-----
»»» From: Trish Moss <moss3778@nc.rr.com>
»»» Sent: Thursday, April 9, 2020 2:48 PM
»»» To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Styron, Heather M. <heather.m.styron@ncdenr.gov>
»»» Subject: [External] Asbury beach dredging project
»»»
»»» CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to repo rt.Spam@nc.gov<maiIto: repo rt.spam@nc.gov>
»»»
»»»
»»» Good afternoon to both of you! I hope everyone is staying healthy. Well long story short; as of today, we are
ending our contract with our contractor -Sawbucket dredging - Doug Niceley. Several reasons- bottom line not able to
fulfill their contractual obligations, equipment broke ,then after he got it fixed , they did not show back up for several
days. They both lost their phones and did not communicate for 5 days, even though we tried emailing to computer,
text to employee asking for return call etc.The list goes on without getting into his legal or personal matters.
»»» Therfore we have talked to Bentley Brooks Brooks marine dredging and would like to continue to move forward
with him as our contractor. After 2 contractors making false promises, we have had a lot of disappointment and school
of hard knocks.
»»» Bentley Brooks has agreed that he will get to our basin area ASAP but it would not be right away which to my
understanding in our previous emails their was no problem with doing the basin area after April loth. Bentley has the
contract with the town to dredge 500 cu yds access into our canal in the open water area. According to Mark Schultze
town manager, this can either be done under our permit or the town can get their own for the 500 cu. yds. Mark's goal
was to get this done by Memorial Day since it was in last years budget.
»»» Is the canal extension an option at this point or only the basin area and open water area? If we have to wait on
canal till October, we understand and want to thank you for working with us.
»»»
»»» Thank you both again
»»»TRISH MOSS
»»» 919-427-2238
»»»
»»»
»»»
»»»
»»» Sent from my Pad
Bodnar, Gregg
From:
Bodnar, Gregg
Sent:
Thursday, April 23, 2020 1:00 PM
To:
Patricia Moss
Cc:
Styron, Heather M.
Subject:
RE: [External] Asbury beach dredging project
Attachments:
Asbury Beach HOA #19-20 Relief Request BASIN ONLY.docx
Afternoon Trish,
Please see above for the one time authorization to dredge the basin with a turbidity curtain with additional conditions.
In summary you have 10 days to complete the job and the job must finish by June 10th at the latest. If you start early,
which is preferred, you have 10 days from that start date to finish. Please email Heather and I the day of the start, finish
and when the curtain is removed. The removal of the curtain is not part of the 10 day limit, only the activity of dredging,
so keep the curtain up as long as needed to allow for the sediment to settle.
Thanks,
Gregg
-----Original Message -----
From: Bodnar, Gregg
Sent: Thursday, April 23, 2020 12:42 PM
To: 'Patricia Moss' <moss3778@nc.rr.com>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: RE: [External] Asbury beach dredging project
Good. So dredging to the authorized depth will not interfere with the connecting waters. I should have something out
here soon.
Thanks,
Gregg
-----Original Message -----
From: Patricia Moss <moss3778@nc.rr.com>
Sent: Thursday, April 23, 2020 12:40 PM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: Re: [External] Asbury beach dredging project
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Yes you are correct according to the engineered survey the canal leading into the basin in the center is from 4 feet deep
to 4.8 feet deep.
Thank you
Trish
Bodnar, Gregg
From: Trish Moss <moss3778@nc.rr.com>
Sent: Wednesday, April 15, 2020 12:10 PM
To: Bodnar, Gregg
Cc: Styron, Heather M.
Subject: Re: [External] Asbury beach dredging project
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.Spam@nc.gov<mailto:report.spam@nc.gov>
Good afternoon Gregg and Heather
Hope you both had a nice Easter holiday!
I got up with Bentley Brooks and he is finishing up a sea wall and a couple other obligations. He said he could get to our
basin area no later than June 1st, possibly sooner. The clean out of basin area , he said to allow 10 working days. On
the 500 cu yds clean out of access into canal, for town of Atlantic Beach- Mark Schultze , he said the town could possibly
could get their own minor cleanout permit. I am asking you to please consider this request. We can not use our canal
this season otherwise. Also, we have already had all electrical undone on all boatlifts, spent money on engineer surveys,
and a lot of false promises by 2 other contractors that should have already completed our project. Asbury beach
homeowners desperately need a break and some enjoyment on the water at this point.
Thank you both for all your support on our behalf!
TRISH
919-427-2238
Sent from my iPad
> On Apr 14, 2020, at 11:44 AM, Patricia Moss <moss3778@nc.rr.com> wrote:
> Bentley took off for Easter. I will contact him tonight and get back with you ASAP.
> Thank you
> Trish
> Sent from my iPhone
>> On Apr 9, 2020, at 3:21 PM, Patricia Moss <moss3778@nc.rr.com> wrote:
>> I will communicate with Bentley tonight.
>> Thank you
>> Trish
>> Sent from my iPhone
»» On Apr 9, 2020, at 3:02 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
>>> The understanding for the excavation of the basin while using the turbidity curtain was that the project would be
done continuously after the channel was complete or April 10th, whichever came first. It was not intended to allow the
basin to be completed at any time as long as the turbidity curtain was used. At this point the open water channel's
deadline is April loth. I will send the request to dredge the basin with the turbidity curtain by Bentley, but I'll need to
know a start date and overall number of days proposed. With it being 3pm on Thursday, with Friday being a holiday, I'm
not hopeful I would get a quick response anyway. When you have that info please let me know and I will coordinate.
>>> Thanks,
>>> Gregg
>>> -----Original Message -----
>>> From: Trish Moss <moss3778@nc.rr.com>
>>> Sent: Thursday, April 9, 2020 2:48 PM
>>> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Styron, Heather M. <heather.m.styron@ncdenr.gov>
>>> Subject: [External] Asbury beach dredging project
>>> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.spam@nc.gov<maiIto: repo rt.spam@nc.gov>
>>> Good afternoon to both of you! I hope everyone is staying healthy. Well long story short; as of today, we are ending
our contract with our contractor -Sawbucket dredging - Doug Niceley. Several reasons- bottom line not able to fulfill
their contractual obligations, equipment broke then after he got it fixed , they did not show back up for several days.
They both lost their phones and did not communicate for 5 days, even though we tried emailing to computer, text to
employee asking for return call etc.The list goes on without getting into his legal or personal matters.
>>> Therfore we have talked to Bentley Brooks Brooks marine dredging and would like to continue to move forward
with him as our contractor. After 2 contractors making false promises, we have had a lot of disappointment and school
of hard knocks.
>>> Bentley Brooks has agreed that he will get to our basin area ASAP but it would not be right away which to my
understanding in our previous emails their was no problem with doing the basin area after April 10th. Bentley has the
contract with the town to dredge 500 cu yds access into our canal in the open water area. According to Mark Schultze
town manager, this can either be done under our permit or the town can get their own for the 500 cu. yds. Mark's goal
was to get this done by Memorial Day since it was in last years budget.
>>> Is the canal extension an option at this point or only the basin area and open water area? If we have to wait on canal
till October, we understand and want to thank you for working with us.
>>> Thank you both again
>>> TRISH MOSS
>>> 919-427-2238
>>> Sent from my iPad
Bodnar, Gregg
From:
Bodnar, Gregg
Sent:
Thursday, April 23, 2020 10:04 AM
To:
Patricia Moss
Cc:
Styron, Heather M.
Subject:
RE: [External] Asbury beach dredging project
Morning Trish,
I was wondering if you can give me some info that I do not have on hand. With the request to dredge the basin only
now there is a potential concern with connecting waters. We can't have the basin deeper than the connecting waters in
the channel. So...
1. The dredge depth of the basin was authorized at -3.6 feet below MLW.
2. What is the depth of the channel outside the basin?
In any case, a relief request would only allow the basin to be dredged no deeper than connecting waters. Hopefully this
will not be an issue since the channel waterward of the basin was authorized to -4 below MLW.
Thanks for the help,
Gregg
-----Original Message -----
From: Patricia Moss <moss3778@nc.rr.com>
Sent: Thursday, April 23, 2020 8:20 AM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
Subject: Re: [External] Asbury beach dredging project
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.Spam@nc.gov<mai Ito: repo rt.spam@nc.gov>
Good morning hope you both are doing well! Just checking in to see if you have heard any news on our asbury beach
basin project ? I am staying in touch with BENTLEY Brooks marine dredging.
Thank you
Trish
919-427-2238
Sent from my iPhone
> On Apr 17, 2020, at 1:23 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
> No I have not. I will send a request again today.
> Gregg
> -----Original Message-----
> From: Patricia Moss <moss3778@nc.rr.com>
> Sent: Friday, April 17, 2020 1:08 PM
> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
> Subject: Re: [External] Asbury beach dredging project
> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.spam@nc.gov<mai Ito: repo rt.spam@nc.gov>
> Good afternoon Gregg and Heather. Since it is Friday I was just checking in to see if you had heard anything in our
basin clean out. I am touching base with Bentley Brooks dredging tonight to give any updates.
> Thank you
> Trish
> Sent from my iPhone
>> On Apr 15, 2020, at 12:26 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
>> I will pass along to the resource agencies.
>> Gregg
>> -----Original Message -----
>> From: Trish Moss <moss3778@nc.rr.com>
>> Sent: Wednesday, April 15, 2020 12:10 PM
>> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
>> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>
>> Subject: Re: [External] Asbury beach dredging project
>> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to repo rt.spam@nc.gov<maiIto: repo rt.spam@nc.gov>
>> Good afternoon Gregg and Heather
>> Hope you both had a nice Easter holiday!
>> I got up with Bentley Brooks and he is finishing'up a sea wall and a couple other obligations. He said he could get to
our basin area no later than June 1st, possibly sooner. The clean out of basin area , he said to allow 10 working days.
On the 500 cu yds clean out of access into canal, for town of Atlantic Beach- Mark Schultze, he said the town could
possibly could get their own minor cleanout permit. I am asking you to please consider this request. We can not use our
canal this season otherwise. Also, we have already had all electrical undone on all boatlifts, spent money on engineer
surveys, and a lot of false promises by 2 other contractors that should have already completed our project. Asbury beach
homeowners desperately need a break and some enjoyment on the water at this point.
>> Thank you both for all your support on our behalf!
>> TRISH
>> 919-427-2238
>> Sent from my iPad
»» On Apr 14, 2020, at 11:44 AM, Patricia Moss <moss3778@nc.rr.com> wrote:
>>> Bentley took off for Easter. I will contact him tonight and get back with you ASAP.
>>> Thank you
>>> Trish
>>> Sent from my iPhone
»»> On Apr 9, 2020, at 3:21 PM, Patricia Moss <moss3778@nc.rr.com> wrote:
»» I will communicate with Bentley tonight.
»» Thank you
»» Trish
»» Sent from my iPhone
»»» On Apr 9, 2020, at 3:02 PM, Bodnar, Gregg <gregg.bodnar@ncdenr.gov> wrote:
»»> The understanding for the excavation of the basin while using the turbidity curtain was that the project would be
done continuously after the channel was complete or April loth, whichever came first. It was not intended to allow the
basin to be completed at any time as long as the turbidity curtain was used. At this point the open water channel's
deadline is April 10th. I will send the request to dredge the basin with the turbidity curtain by Bentley, but I'll need to
know a start date and overall number of days proposed. With it being 3pm on Thursday, with Friday being a holiday, I'm
not hopeful I would.get a quick response anyway. When you have that info please let me know and I will coordinate.
»»> Thanks,
»»> Gregg
»»> ----- Original Message-----
»»> From: Trish Moss <moss3778@nc.rr.com>
»»> Sent: Thursday, April 9, 2020 2:48 PM
»»> To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Styron, Heather M. <heather.m.styron@ncdenr.gov>
»»> Subject: [External] Asbury beach dredging project
»»> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
»»> Good afternoon to both of you! I hope everyone is staying healthy. Well long story short; as of today, we are
ending our contract with our contractor -Sawbucket dredging - Doug Niceley. Several reasons- bottom line not able to
fulfill their contractual obligations, equipment broke ,then after he got it fixed , they did not show back up for several
days. They both lost their phones and did not communicate for 5 days, even though we tried emailing to computer,
text to employee asking for return call etc.The list goes on without getting into his legal or personal matters.
»»> Therfore we have talked to Bentley Brooks Brooks marine dredging and would like to continue to move forward
with him as our contractor. After 2 contractors making false promises, we have had a lot of disappointment and school
of hard knocks.
»»> Bentley Brooks has agreed that he will get to our basin area ASAP but it would not be right away which to my
understanding in our previous emails their was no problem with doing the basin area after April loth. Bentley has the
contract with the town to dredge 500 cu yds access into our canal in the open water area. According to Mark Schultze
town manager, this can either be done under our permit or the town can get their own for the 500 cu. yds. Mark's goal
was to get this done by Memorial Day since it was in last years budget.
»»> Is the canal extension an option at this point or only the basin area and open water area? If we have to wait on
canal till October, we understand and want to thank you for working with us.
»»> Thank you both again
»»>TRISH MOSS
»»> 919-427-2238
»»> Sent from my Wad