Loading...
HomeMy WebLinkAbout05-11A HarrisFILE MEMORANDUM TO: ROY BROWNLOW, COMPLIANCE COORDINATOR FROM: M. TED TYNDALL, ASST. DIRECTOR SUBJECT: VIOLATION CASE CLOSURE RECOMMENDATIONS DATE: 02/01/2012 CC: RONDA BENNETT Investigation has disclosed information that warrants discontinuation of enforcement action on the case listed below. Therefore, based upon staff's review and circumstances in this case, I hereby authorize closing/discontinuing CAMA Violation case No.: 05 — ( (,4 �A M. TED TYNDALL, Assistant Director 02/0112012 Date S LB TB _RB LA MTT NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary November 28, 2005 John Harris W pg!!IW DWaves Village LLC �'I'PO Box 1839 Nags Head, NC 27959 0 2005 RE. RESTORATION ACCEPTANCE— CAMA WOLATION #05-11A Morehead City DCM Dear Mr. Harris: This letter is in reference to the Notice of Violation # 05-11A sent to you dated August 31, 2005 for the excavation of estuarine shoreline, the installation of pilings for the construction of a pedestrian ramp, the installation of numerous pilings for a bulkhead, the installation of pilings for a proposed dock, and the installation of riprap groins within the Estuarine Waters, Estuarine Shorelines, and Public Trust Areas in or near the Pamlico Sound. The violation tooK place on your property locatea at z44riz i%, Iz m or near me community of Waves in Dare County, North Carolina. This unauthorized activity constituted development and you were requested to: 1. Remove the 18 pilings associated with the construction of a pedestrian ramp, or incorporate this proposed development within a major permit application associated with a request for a dock and/or small boat launching platform; 2. Remove the 2 pilings associated with the construction of a proposed dock, or incorporate this proposed development within a major permit application; 3. Remove all riprap groin material placed in excess of the limitations of General Permit 40262A, or incorporate this proposed development within a major permit application, providing the site specific conditions that would justify groin structures of these lengths. 4. Remove the approximately 50 bulkhead pilings that have established a bulkhead alignment that is approximately an average of 33 feet beyond Normal Water Level. In accordance with the North Carolina Administrative Code, Title 15A, Subchapter 7J.0410, any violation involving development which is inconsistent with guidelines for development within Areas of Environmental Concern (AEC) must be corrected by restoring the project site to pre -development conditions to recover lost resources or to prevent further resource damage. I conducted a site visit at the aforementioned property on November 18, 2005 to inspect the restoration of the unauthorized activity addressed in the Notice of Violation 05-11A. Based on this inspection and your recent submission of a major permit application, it appears the restoration is accomplished to the satisfaction of this Division. Upon my submission of an enforcement report, you will be notified as to the 1367 U.S.17 South, Elizabeth City, North Carolina 27909 Phone: 252.264-39011 FAX: 252-264-372311nternet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight Waves Village LLC/John Harris November 28, 2005 amount of the civil penalty for undertaking this unauthorized activity within an Area of Environmental concern. Thank you for your attention and cooperation in this.matter. If you have any questions pertaining to this matter, please feelfree.to call me at 252-264-3901. Sinc ely, Joh ece Coastal Management Representative Cc Ted Tyndall, Assistant Director, NC Division of Coastal Management (DCM), Morehead City Ted Sampson, District Manager, DCM, Elizabeth City ERoy Brownlow, Compliance Coordinator, DCM, Morehead City 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264.3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight x 1"b I-- © '- NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary NOTICE OF VIOLATION August 31, 2005 CERTIFIED MAIL SEP 0 RETURN RECEIPT REQUESTED 2 2005 Mr. John Harris "O 'eFlead City DCM Waves Village LLC PO Box 1839 Nags Head, NC 27959 RE:NOTICE OF VIOLATION AND REQUEST TO CEASE UNAUTHORIZED DEVELOPMENT CAMA VIOLATION #05-11A Dear Mr. Harris: This letter confirms that on May 19, 2005 Mr. John Cece, Field Representative met you onsite at your property located at 24474 NC 12 adjacent to the Pamlico Sound located in or near Waves, Dare County, North Carolina. Also present at this meeting was Mr. Jeff Emanuelson (Emanuelson and Dad) and Mr. Brian Rubino (Quible and Associates). The purpose of the visit was to determine if groin and bulkhead development activity was continuing under General Permit 40262A which had expired on April 26,2005. Information gathered by me for the Division of Coastal Management (DCM) indicates that you have undertaken major development in violation of the Coastal Area Management Act (CAMA). No person may undertake Major Development in a designated Area of Environmental Concern (AEC) without first obtaining a permit from the North Carolina Department of Environment and Natural Resources. This requirement is imposed by North Carolina General Statute (N.C.G.S.) 11 3A-1 18. I have information that indicates you have undertaken or are legally responsible for the excavation of estuarine shoreline, the installation of pilings for the construction of a pedestrian/boat ramp, and the installation of pilings for a proposed dock on the aforementioned property, for which no CAMA or Dredge and Fill Permit had been issued. In addition, I have information that you have installed numerous pilings for a bulkhead not consistent with the alignment authorized under General Permit 40262A, and have installed riprap groin structures with dimensions in excess of those authorized under General Permit 40262A. These activities took place in Estuarine; Waters, Estuarine Shorelines, and Public Trust Areas that are contiguous with the Pamlico Sound. Estuarine Waters, Estuarine Shorelines, and Public Trust Areas are designated as Areas of Environmental Concern (AEC). General Permit 40262A was issued on January 25, 2005, and it expired on April 26, 2005. No additional permit was issued to you for work in this area. Based on these findings, I am initiating an enforcement action by issuing this Notice of Violation for violation of the Coastal Area Management Act. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-39011 FAX: 252-264-37231 Internet: www.nocoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer— 30% Recycled by Fiber Weight Waves Villagc LLC / John Harris AdIM'31, 2005 ii ii I request that you immediately CEASE AND DESIST any further unauthorized activities within designated Areas of Environmental Concern. A civil assessment of up to $2,500 may be assessed against any violator. Each day that the development described in this notice is continued or repeated may constitute a separate violation that is subject to an additional assessment of up to $2,500. An injunction or criminal penalty may also be sought to enforce any violation (N.C.G.S.113A-126). It is the policy of the Coastal Resources Commission to levy a minimum civil assessment of $500.00 not to exceed $2,500 against all violations. This is done to recoup some of the costs of investigating violations and/or to compensate the public for any damage to its natural resources. Whether a higher amount will be assessed depends on several factors, including the nature and area of the resources that were affected and the extent of the damage to them. You are also in violation of the State's Dredge and Fill Act which requires a permit from the North Carolina Department of Environment and Natural Resources before undertaking any excavating or filling in any estuarine waters, tidelands, marshlands, or state-owned lakes pursuant to N.C,G.S. 113-229. Therefore, I also request that you immediately CEASE AND DESIST such unauthorized activity and contact me about this matter as well. Violations of the State's Dredge and Fill Act may be enforced by a criminal penalty or a civil action for damages or an injunction in accordance with N.C.G.S.113-229. Based upon the North Carolina Administrative Code (NCAC), Title 15A, Subchapter 07H. State Guidelines for Areas of Environmental Concern, Subchapter 07J. Procedures for Handling Major Development Permits, and the North Carolina General Statutes (GS) the activities you have undertaken and relevant inconsistencies are summarized below: • The excavation of 420 square feet (35 feet by 12 feet) of estuarine shoreline is not consistent with GS 113-229(a), 15A NCAC 07J.0201, and 15A NCAC 07H.0209; • The installation of 18 pilings up to 55 feet beyond normal water level for the construction of a pedestrian/boat ramp is not consistent with 15A NCAC 07J.0201, and 15A NCAC 07H.1305(a) and (b); • The installation of 50 bulkhead pilings an average of 33 feet beyond normal water level is not consistent with the development authorized under General Permit 40262A and 15A NCAC 07H.0206, 15A NCAC 07H.0207,15A NCAC 07H.0208(b)(7),15A NCAC 07H.1102(b)(1) and (c); • The installation of riprap groins is not consistent with the development authorized under General Permit 40262A, and 15A NCAC 07H.0206,15A NCAC 07H.0207,15A NCAC 07H.0208(b)(9)(A) in that the dimensions exceed those authorized by the General Permit, with the northern groin being approximately twice the length authorized; and • The installation of two pilings approximately 100 feet offshore for a proposed dock is not consistent with 15A NCAC 07J.0201. Waves Village LLC / John Harris August 31, 2005 Therefore, I am requesting that you: 1. Remove the 18 pilings associated with the construction of a pedestrian/boat ramp, or incorporate this proposed development within a major permit application associated with a request for a dock and/or small boat launching platform; 2. Remove the 2 pilings associated with the construction of a proposed dock, or incorporate this proposed development within a major permit application; 3. Remove all riprap groin material placed in excess of the limitations of General Permit 40262A, or incorporate this proposed development within a major permit application, providing the site specific conditions that would justify groin structures of these lengths. 4. Remove the approximately 50 bulkhead pilings that have established a bulkhead alignment that is approximately an average of 33 feet beyond Normal Water Level. The enclosed Restoration Plan describes the action necessary to bring this project into compliance with the Act. If you intend to cooperate with my request, please sign one of the attached Restoration Agreements and return it to me in the enclosed, self-addressed envelope within ten (10) days of receipt of this letter. Failure to comply with this request or respond back to this office prior to the requested deadline with an acceptable schedule for compliance will be interpreted as a refusal to cooperate and will result in a Notice of Continuing Violation, as well as a court injunction being sought ordering compliance. If you intend to cooperate with my request, please accomplish the required onsite restoration, and submit the required major permit application by September 30, 2005. Failure to comply with this request or respond back to this office prior to the requested deadline with an acceptable schedule for compliance will be interpreted as a refusal to cooperate and will result in a Notice of Continuing Violation, as well as a court injunction being sought ordering compliance. The relevant statutes and regulations are available from this office, and I am willing to assist you in complying with the requirements of these laws. A site inspection will be made in the near future to determine whether this REQUEST TO CEASE AND DESIST has been complied with. I request that you contact me immediately. Thank you for your time and cooperation in resolving this important matter. If you have any questions about this or related matters, please call me at 252-264-3901. Upon completion of the required onsite restoration activities, and receipt and review of the major permit application to the satisfaction of the Division of Coastal Management, you will be notified as to the amount of the civil assessment for undertaking development without first obtaining the proper permit(s) and/or development that is inconsistent with Coastal Resources Commission rules. Waves Village LLC / John Harris August 31, 2005 Sincerely, r n JohPCece r. Coastal Management Representative Cc: Ted Tyndall, Assistant Director, NC Division of Coastal Management (DCM), Morehead City Ted Sampson, District Manager, DCM, Elizabeth City Frank Jennings, Field Representative, DCM, Elizabeth City Roy Brownlow, Compliance Coordinator, DCM, Morehead City Raleigh Bland, Army Corps of Engineers, Washington Joe Lassiter, Quible and Associates, Kitty Hawk NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary RESTORATION PLAN For Waves Village LLC / John Harris Property Property located st 244712 NC 12 in Waves, Dare County Rt5mUvE 061CIC PIG►A16S 69 1(*IC000Rf+R= IN rlk3TX p6pyiir fir.f 0-1 oa gogrgarnP PILIINrgS oR IN ni*-JVK pays I r R-P-IcartL1t) R6ivtrflr� S'' N R1P-9Pf/&1A) 6R In1CORORPTE IAI r ftlj FM✓d PEWIT' AfPLI C )l TIO&) y a d oleo @OC�®�'P�ODODCE'RQ'COfOGR`p J.P 7 e 4 ovbV l � � t NWI_ t P IL APPr0`R►rnl�TFSC" III` 100 I, John Harris, agree to: 1. Remove the 18 pilings associated with the construction of a pedestrian/boat ramp, or incorporate this proposed development within a major permit application associated with a request for a dock and/or small boat launching platform; 2. Remove the 2 pilings associated with the construction of a proposed dock, or incorporate this proposed development within a major permit application; 3. Remove all riprap groin material placed in excess of the limitations of General Permit 40262A, or incorporate this proposed development within a major permit application, providing the site specific conditions that would justify groin structures of these lengths. 4. Remove the approximately 50 bulkhead pilings that have established a bulkhead alignment that is approximately an average of 33 feet beyond Normal Water Level. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-39011 FAX: 252.264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer— 30% Recycled by Fiber Weight I agree to complete this restoration to the satisfaction of the Division of Coastal Management by September 30, 2005, or provide an explanation for non-compliance and a reasonable request for time extension. SIGNATURE: DATE: It is the policy of the Coastal Resources Commission to levy a minimum civil assessment $500.00 and higher against all violations of this type depending upon the damage to the resources. If restoration is not undertaken or satisfactorily completed, a substantially higher civil assessment will be levied and an injunction sought to require restoration. DCM ENFORCEMENT TRACKING REPORT Field Rep. j cy C � _. Iss er Violation Base No, 0 5-_I/ k —, A B C D LPO (�,�( �,{ � T\ �� / 7 f91U 0 y}�T li�A/ Violated Permit No. (M applicable) GAP t-i G 2 L2 lit LPJ l/' e;- Yes /(Co Violation Description Was activity permittable? Initial Discovery Date / 0 Discovery Method TALEP/iOAIL-` Cifryipl-fiL Violation Description Information M Prior Violptions in same AEC: Yes / N07aS oN Respondent Name(s) UMNI. p _ v��—---^• y�^- Address_ pl7 '3DX /03J- City 11L� ��'/,fin State mC Zip 279s1 Phone Fax # Email Violation Type: Project Type: Authorizations Required: Site Visits Respondent Site Visits Respondent' nNo Permit ❑ PrivatelCommunity Major CAMA Minor D&F Present U � Present ❑ Permit Condition GGovt.(Public Q _ ❑ ❑ Expired Permit (__U_Com �❑ srcia�� ❑ General a ❑ ❑ Inconsistent w/ Rules Violation Location and Site Description Rover File Project Location: County WE J,. Shoreline Length 907 Street Address/ State Road/ Lot #(s) SAM Not Sure (@5 No �1(,�9 7U L I� Sandbags: Not Sure Yes -C� 1 PNA: Yes ® Adjacent Subdivision, U� ORW: Yes (D Adjacent --__ �l ZIP--)— City (�/ Crit. Hab. Yes Phone# (—). RiverBasin_-1�rsJ(Ir&VbC Photos (3 No MLIG() SL/I/ND (alhhnan_LuakW_ Waiver Required v No Adj.WtnBody� Wtr. Body q� 4l C/� Sf1 L/A/� In DWQ Buffer Area Yes Closest Maj. Specify DWQ Buffer If applicable: Specify Restoration Extension Granted Yes No NOV Date 3 11 0 Initial Req, Comp. Date Restoration Letter CNOV Date _ Date Comp. Observed __--- Acceptance Date Penalty Assessment ! 7.1.0409 Ref. Recomm. Assess. DCM Assess. Sent to Respondent Date _____ App./Permit Fee " -n 6 V s —� $ Penalty is Rcvd by DCM Date -----=------ s -- Willful/Intent. I�- Assessment Extended Yes No -- j J)0c4z 16 Continuing Is — s [ZAAtP 100 Other — —_ - I $ — I $ --- 3„ t&" t&0 --- =- Total------- Formal Assessments, Appeals and Reductioni Date Long Form Submitted Date Formal CPA Submitted Final Assessment Assessment Appealed Yes No ❑ Penalty modified Attorney General's Office for Injunction or Formal Collection Date sent to AG, ❑ Respondant not responsive to penalty/NOV ❑ Injunction to complete restoration Date Collection Let. Sent Date Demand Let. Sent violation Activities and Impacts AECs Affected: Wetlands Impacted? Yes /® If yes, which types: CW PTA ES PTS OEA • HHF' IH SA 1R TY SC SP IF 4 SS SC SP IF BF 04 PWS: FC: Restoration Required by the Respondent Ye / No Dimensions in excess of permit/ unauthorized activities Dimensions to restore Final dimensions allowed Actually restored Development Activities l Prt S E— OW of eaml _ f s F— SA v 0 s sp 001-1caQw PI YZ !!n Olin Habitat Description i 91 i �• — I /. B 1 f!�}S7aLL a ffc IILG5 0 1) f (2EFsHel,ZEE Closing Payment Received Date Case Closed Hams Violation 05-11A Subject: Harris Violation 05-11A From: Roy Brownlow <Roy. Brownlow@ncmail. net> Date: Wed, 07 Sep 2005 14:32:29 -0400 To: Ted Sampson <Ted.Sampson@ncmail.net> CC: John Cece <John. Cece@ncmail. net> BCC: Ted Tyndall <Ted.Tyndall@ncmail.net> Ted: Hope you and staff are doing well. I've just reviewed John Cece's NOV 05-11A issued to John Harris. I want to be sure that I understand what's going on with the restoration/compliance request. I know we don't issue after -the -fact permits and need clarification on this one. Could you or John call or e-mail me and please clarify for my own self -edification what we are requesting in this case? On most typical cases, if the unauthorized development could have been permitted, we allow the structures/development to remain. Otherwise, if inconsistent with the rules, it must be restored and/or brought into compliance. In violations where we are unsure (in this case?) if we could have permitted the development, we normally issue the cease and desist (restoration pending template) and hold off requesting restoration until we consult with the other resource agencies. Then we have them apply for a permit to finish the rest of the development, which might be the case here from what I am gathering. But I want to be sure so I would appreciate further information on this case. Thanks for your assistance, Roy 1 of 1 9/7/2005 2:34 PM Re: Harris Violation 05-11A Subject: Re: Harris Violation 05-11A From: Ted Sampson <Ted.Sampson@ncmail.net> Date: Wed, 07 Sep 2005 1&52:34 -0400 To: Roy Brownlow <Roy.Brownlow@ncmail.net> CC: John Cece <John.Cece@ncmail.net> Roy, This is a rather convoluted case, and it involved a Dennis Hawthorn last minute action. The applicant had submitted a major permit application for pretty much what they have begun to build at this location. Dennis kept it around for a long time, approximately 74 days, and then convinced the consultant to withdraw the application. At that time, he issued a GP to build a bulkhead forward of coastal wetlands (which Ted T. has made a decision that he does not wish to claim and require restoration, given the Dennis situation and the fact that COE will not claim them because they lack hydric soils), construct two groins and a pier. John Cece checked on the activity that he saw taking place and asked to see their permit. The GP was by that time expired, and the bulkhead alignment went out in a "V" from the north and south boundary lines, contrary to the straight alignment that Dennis had depicted on the GP. However, Dennis had not staked the alignment, but rather allowed the consultant to stake the alignment and then indicated verbally that he concurred with the alignment that the consultant had staked. This alignment was way out there, 15 to 30 feet beyond the actual NWL. One groin was built way beyond, about 50' past what the GP allowed and both groins were higher than a GP would allow. The pier was being constructed in a position that was not authorized. However, both the groins and the pier could be allowed under a major permit. When John, Frank, and I met with Joe Lassiter of Quible, to indicate that they would be getting a NOV and that restoration would be required because of the bulkhead forward of the wetlands and way beyond NWL, he requested that he be allowed to resubmit the Major Permit that he felt they were hoodwinked into withdrawing by Dennis. I indicated to him that this would be irregular in that we do not allow after the fact permitting, but that I would put his request forward to Ted Tyndall when I spoke with him. Ted T. was adamant that the bulkhead would have to be removed, but that he would be willing to listen to Joe's arguments, given the situation. Subsequently, Ted T. and Joe talked, and you conveyed to us that Ted T. had agreed to requiring the limited restoration on the points where he felt a major permit would not authorize, and to leave the other issues in abeyance until such time as the major permit was reveiwed. Roy, I have not reviewed the file on this, and am just giving the story to you by memory, so my measurements and recall may be a little off. If you want a real blow-by-blow, give John Cece a call and he can provide the precise details. Best regards, Ted S. Roy Brownlow wrote: Ted: Hope you and staff are doing well. I've just reviewed John Cece's NOV 05-11A issued to John Harris. I want to be sure that I understand what's going on with the restoration/compliance request. I know we don't issue after -the -fact permits and need clarification on this one. Could you or John call or e-mail me and please clarify for my own 1 of 2 9/8/2005 8:52 AM Re: Harris Violation 05-11A self -edification what we are requesting in this case? On most typical cases, if the unauthorized development could have been permitted, we allow the structures/development to remain. Otherwise, if inconsistent with the rules, it must be restored and/or brought into compliance. In violations where we are unsure (in this case?) if we could have permitted the development, we normally issue the cease and desist (restoration pending template) and hold off requesting restoration until we consult with the other resource agencies. Then we have them apply for a permit to finish the rest of the development, which might be the case here from what I am gathering. But I want to be sure so I would appreciate further information on this case. Thanks for your assistance, Roy 2 of 2 9/8/2005 8:52 AM 08-Sep-05 NC DIVISION OF COASTAL MANAGEMENT ENFORCEMENT RECORD CASE STATUS' -- CASE NUMBER LAST NAME FIRST NAME BUSINESS NAME: 05-11A 1HARRIS JOHN IWAVES VILLAGE, LLC CASE IS CLOSED Previous Violations in Same AEC NOV DATE CLOSURE DATE Elapsed Days AFFULIATION SECTOR ❑ for Similar Activities 8/31/2005 r 1 PROPERTYOWNE COMMERCIAL MAILING ADDRESS CITY STATE ZIP CODE PHONE NUMBER POB 1839 NAGS HEAD NC 27959- F_ PROPERTY ADDRESS COMMUNITY WATERBODY NEAREST ROAD 24474 NO 12 IWAVES I PAMLICO SOUND NC 12 DISTRICT OFFICE COUNTY DCM REPRESENTATIVE LPO CONTACT ECDO DARE ICECE �— AFFECTED AEC(S) CW J.. EW J PTA VIES ❑ PTS j VIOLATION TYPE i MAJOR CAMA plus DREDGE AND FILL OEA HHFA IHA PWS NCRA NATURE OF VIOLATION AEC DESCRIPTION Unauthorized major development and violation of the State's dredge and fill law by excavation of the estuarine shoreline, installing pilings for the construction of a boat ramp and dock, and beginning construction on a bulkhead that is inconsistent with the alignment authorized under expired State Permit GP 40262-A in addition to installing riprap groin structures with dimensions in excess of those authorized under expired State Permit GP 40262-A, within the EW, PTA, and ES AECs adjacent to the Pamlico Sound. - RESTORATION STATUS------- i J RESTORATION NOT REQUIRED - CONTRACTOR i RESTORATION NOT REQUIRED - PERMITTABLE DEVELOPMENT l RESTORATION NOT REQUIRED - FURTHER IMPACTS j RESTORATION PENDING RESTORATION REQUEST DATE COMPLETION DATE 9/30/2005 RESTORATION EXTENDED RESTORE DATE ❑ DEADLINE EXTENDED REFERRED TO AG'S OFFICE -COLLECTION REFERRED TO AG'S OFFICE - INJUNCTION ASSESSMENT DATE PENALTY AMOUNT COLLECTION DATE AMOUNT COLLECTED - PENALTY STATUS ❑ PENALTY ISSUED PENALTY NOT ISSUED WILLFUL INTENTIONAL PENALTY (MIN. OR DOUBLED) —1 CNOV ISSUED ❑ CONRACTOR'S FIRST OFFENSE SETTLED, AGREED UPON, OR STIPULATED PENALTY �PENALTY APPEALED _ .....___. _.....__.._ _..___... _. UNCOLLECTIBLE PENALTY-' FORMAL CPA ISSUED Violations Involving Adversely Impacted Resources AMOUNT OF ADVERSELY DISTURBED AREA (SO. FT.) AMOUNT OF RESTORED AREA (SO. FT) NOTES North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY of STATE Corporations •Corporations Home *Important Notice 'Corporate Forms/Fees *Corporations FAQ *Tobacco Manufacturers •Dissolution Reports •Non -Profit Reports *Verify Certification *Online Annual Reports Links *Secretary Of State Home •Register for E-Procurement *Dept. of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries *Annual Reports 1997 OCorporations 1997 00ther Legislation Search *By Corporate Name •For New Corporation *By Registered Agent Online Orders *Start An Order *New Payment Procedures Contact Us •Corporations Division •Secretary of State's web site Print •Printable Page PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 9/8/2005 Click here to: View Document Filings I no- Print apre-populated Annual Report Form I File an Annual Report Corporation Names Name Name Type NC Waves Village, LLC Legal Limited Liability Company Information SOSID: 0737777 FID: Status: Current -Active Date Formed: 8/6/2004 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address: Principal Mailing Address: Harris, John West Lake Drive, Unit K Kill Devil Hills NC 27948 P.O. Box 1839 Nags Head NC 27959 West Lake Drive, Unit K Kill Devil Hills NC 27948 P.O. Box 1839 Nags Head NC 27959 For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. Type of Project/ Activity (Scale: /1, �� ) Pier (dock) length Finger pler(s) i I �! Groin length •: '� ' /� 1,---�---, .' f - ' JF-� , .. T= number Bulkhead/ Rlpmp length _-- mu distance offshore Basin. channel cubic yards {III Boat runprp Boathouse/ Boadlft �- - Beach Bulldotng Other I Shoreline Length--� - _ 1�_ SAY. not sure yea W-. _ 7 Sandbags: not sure yes—L ti-J-- Moratntum: irya yes no--�_ —T __� Photos: yes r,o_f--_--4 _. .. L ©� waiver Attached: - A building permR may be required by: Notes/ Special Conditions Tv—i.til hF" __J f J / I• , —!•d ,�, I I , I I L I l� IL 1 _ y_^i -_• - IT, ❑ See note on back regarding River Basin rules. .L .. T��n li•s1P ! �! Agent or plkar,t Printed Name Pcrtnk Officer's Sgratnre Sigm "Please read compliancestatement onback ofpermit% Expiration Date Aoollotlan Feefsl I_ I lL Local Plamingjurisdlcclon Rover He Name