Loading...
HomeMy WebLinkAbout25-22 Oversized PlansABBREVIATIONS & AND ® AT NUMBER 0 DIAMETER A/E ARCHITECT/ENGINEER AB ANCHOR BOLT ACI AMERICAN CONCRETE INSTITUTE ADD'L ADDITIONAL AHU AIR HANDLING UNIT AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION ALT ALTERNATE ARCH ARCHITECTURAL ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS ASTM AMERICAN SOCIETY FOR TESTING MATERIALS AWS AMERICAN WELDING SOCIETY B BOTTOM BAL BALANCE BLDG BUILDING BLKG BLOCKING BM BEAM BOT BOTTOM BP BASE PLATE BRIG BEARING BSMT BASEMENT BTWN BETWEEN C— COLUMN MARK CANT CANTILEVER CIP CAST IN PLACE CJ CONTROL JOINT CL CENTER LINE CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS D DEPTH DET DETAIL DIA DIAMETER DIAG DIAGONAL DN DOWN DWG DRAWING EXIST. (E) EXISTING EA EACH EE EACH END EF EACH FACE EJ EXPANSION JOINT EL ELEVATION ELECT ELECTRICAL ELEV ELEVATOR EQ EQUAL EW EACH WAY EXIST EXISTING EXP EXPANSION EXT EXTERIOR F— FOOTING MARK FD FLOOR DRAIN FDN FOUNDATION FIN FINISH FL FULL LENGTH FLR FLOOR FTG FOOTING FS FOOTING STEP FV FIELD VERIFY GA GAGE, GAUGE GALV GALVANIZED GB GRADE BEAM HK HOOK HORIZ HORIZONTAL HP HIGH POINT HVAC HEATING — VENTILATION — AIR CONDITIONING IBC INTERNATIONAL BUILDING CODE ID INSIDE DIAMETER IF INSIDE FACE IJ ISOLATION JOINT INT INTERIOR C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A Not For Construction - For Review 05.13.19 REVISIONS JT KSI LE LLH LLV LP MATL MAX MECH MEZZ MFR MIN MISC NN IC NTS OC OD OF OPNG OPP P— PL PSF QTY R RD RE REF REINF REQ'D REV RO RTU SCHED SECT SIM SJI SL SOG SPEC SQ SS STD STL STRUCT T T&B T/ THRU TYP UNO VERT VIF W W— W/ W/0 WP WWF ISSUED FOR PERMIT NOT FOR CONSTRUCTION JOINT KIPS PER SQUARE INCH LEFT END LONG LEG HORIZONTAL LONG LEG VERTICAL LOW POINT MATERIAL MAXIMUM MECHANICAL MEZZANINE MANUFACTURER MINIMUM MISCELLANEOUS NEW NOT IN CONTRACT NOT TO SCALE ON CENTER OUTSIDE DIAMETER OUTSIDE FACE OPENING OPPOSITE PIER MARK PLATE POUNDS PER SQUARE FOOT QUANTITY RADIUS ROOF DRAIN RIGHT END REFERENCE REINFORCE(D), (ING), (MENT) REQUIRED REVISION ROUGH OPENING ROOF TOP UNIT SCHEDULE SECTION SIMILAR STEEL JOIST INSTITUTE SLOPE SLAB ON GRADE SPECIFICATION SQUARE STAINLESS STEEL STANDARD STEEL STRUCTURAL TOP TOP AND BOTTOM TOP OF THROUGH TYPICAL UNLESS NOTED OTHERWISE VERTICAL VERIFY IN FIELD WIDTH WALL MARK WITH WITHOUT WORKING POINT WELDED WIRE FABRIC 10.08.2020 SYMBOLS AS ABBREVIATIONS h PERPENDICULAR CENTER LINE % PERCENT R- PROPERTY LINE x DEGREE(S) OF ANGULAR MEASURE ft FOOT < LESS THAN & AND > GREATER THAN L ANGLE S GREATER THAN OR EQUAL TO 0 DIAMETER # POUND(S) / DIVIDE BY, PER @ AT x MULTIPLY BY, BY = EQUAL +/— OR t PLUS OR MINUS DIRECTION OF VIEW DENOTES SIMILAR SECTION S,I„� CONDITION TAG SECTION NUMBER S10 SHEET DRAWN DIRECTION OF VIEW; ELEVATION NUMBER ELEVATION S7022 TAG SHEET DRAWN DRAWING VIEW NUMBER DENOTES SIMILAR CONDITION TITLE View Name DETAIL S DETAIL NUMBER 1 S1/8" = 1'-OI+�- SCALE DRAWN CALLOUT S,o SHEET DRAWN SHEET DRAWN MATERIAL SYMBOLS CONCRETE 1=III=11 E""'" GROUT DELTA GRAPHIC LEGEND/ DESCRIPTION A NEW OR REVISED GRAPHICAL INFORMATION Lid A GRAPHICAL INFORMATION PREVIOUSLY ISSUED z i, SHOULD BE ON DRAWINGS CURRENTLY (NOTE: NO CLOUDS INDICATED) SUB SHEET NUMBERING SYSTEM DISCIPLINE DESIGNATOR SHEET DESIGNATOR � S1.0 STRUCTURAL SET ORGANIZATION CO SERIES —SYMBOLS. NOTES AND LIVE LOAD DIAGRAMS SO SERIES —STRUCTURAL PLANS & SECTIONS DRAWING INDEX CO LEGENDS &ABBREVIATIONS S0.1 STRUCTURAL NOTES S0.2 STATEMENT OF SPECIAL INSPECTIONS S1.0 DEMOLITION PLAN S2.0 NEW WORK PLAN S3.0 DEMOLITION SECTIONS &DETAILS S3.1 NEW SECTIONS &DETAILS S3.2 RCP PENETRATION SECTION &DETAILS S3.3 CULVERT PLAN &SECTIONS (ADD ALT #3) PROJECT WORK SCOPE 1. REMOVE EXISTING DETERIORATED TIMBER GUARDRAILS (APPROX. 401 t LF TOTAL) 2. ROUTE &FILL CRACKS IN ROADWAY SLAB —SEE NOTE ON S0.1 (ALLOWANCES OF 300 LF) 3. FILL VOIDS IN RIPRAP ALONG SIDES UNDER ROADWAY SLAB (ALLOWANCE OF 12 CY). 4. INSTALL NEW VINYL SHEET PILE CUTOFF WALLS AND STONE BACKFlLL — APPROX. 810t LF TOTAL. 5. INSTALL CONCRETE COLLAR FOR RCP PIPE PENETRATIONS THRU VINYL WALL. 6. INSTALL NEW TIMBER GUARDRAILS (APPROX. 401 LF TOTAL). 7. ADD ALTERNATE #1: INSTALL TIMBER GUARDRAIL ALONG ONE EDGE OF ROADWAY (APPROX. 1,879t SF). 8. ADD ALTERNATE #2: COAT TOP OF DECK SLAB WITH A MIGRATING CORROSION INHIBITOR &COAT WITH A TRAFFIC COATING (APPROX. 5,987t SF) 9. ADD ALTERNATE #3: INSTALL NEW BOX CULVERT. HAWKS BILL DRIVE EMBANKMENT ROADWAY DESIGNED JRT DRAWN SKS CHECKED JRT PROJ. ENGR. JRT PATH FILE NAME REPAIRS City of Wilmington Wilmington, NC Contract No: S6-1015.1 CALL#2 City Manager City Engineer Sterling B. Cheatham David E. Cowell, P.E. Q k wave 40 �P LMINGT O Development Services . Engineering Division P.O. Bo-, I q10 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 UAIL 10.08.2020 PROJECT NUMBER S6-1015.1 CALL#2 VICINITY PLAN GggaY `7ir V d4 � Q areY z a cS. P �3 qh $� hO4Se o s Ate' e e S 45- Rq, 7 60 ea AcT <'P m `t Ai , �— r-r-1 Greenvll Al Rd A • nv a �a 4,r etr erpG ' C S* �w Shelly /��p�QaQ3 P4r• EOh Seagate q(q �! o ��' �ShO^P M D^ T y (UNINC ° ct � aW ShrnrV� 00 z cri 3 cv a b Menheln Pt. 3 N W S s Hawks Bill Drive bride the 30 yn � g roject Site P(L s �tOre J�N°\\d e e I/S1.0 Swee z m f d Hollyberr 1 W � Hawks Bill Drive Embankment Roadway Repairs LOCATION MAPS & NOTES RECEIVED DEC 0 3 Z021 4111D CITY RECEIVED �Ove.rsize drawing: G.ity of `JVilmingto 6424 Hawksbill. Drive NOV . $ 2021 LAMA Major Permit Application + em iled to you on 11/30/21 ' DCM WILMINGTON, NC CRISER TROUTMAN TANNER SCALE CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC AS SHOWN 3809 Peachtree Ave., Suite 102 Wilmington, NC 28403 910.397.29Ph. 910.397.2971 Fax SHEET www.cttengineering.com Firm License Number: F-0113 CO of #8238.00 STRUCTURAL NOTES GENERAL 1. DESIGN LIVE LOAD: UNKNOWN 2. CONTRACTOR SHALL VISIT THE JOB SITE, PRIOR TO BIDDING PROJECT. ANY QUANTITIES SHOWN ARE ESTIMATED AND ARE FOR CONTRACTOR'S GENERAL INFORMATION ONLY. 3. CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK. 4. CONTRACTOR SHALL PROVIDE A TEMPORARY CONSTRUCTION ENTRANCE/EXIT FROM ALL ACCESS ROADS TO SITE WHERE INTERSECTING WITH PUBLIC ROADWAY(S). 5. CONTRACTOR SHALL FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS FOR REPAIRS TO EXISTING CONSTRUCTION TO SATISFY HIMSELF AS TO EXISTING CONDITIONS, RELATIONSHIP BETWEEN STRUCTURES WITH RESPECT TO WATER ELEVATIONS & ACCESS LOCATIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER/ENGINEER. PRIOR TO CONSTRUCTION COMMENCING. 6. A BENCH MARK AND BASE LINE IS PROVIDED BY THE OWNER. CONTRACTOR SHALL ESTABLISH BENCH MARKS AS REQUIRED BY HIS SURVEYOR, BASED ON EXISTING SPOT ELEVATIONS. 7. CONTRACTOR IS CAUTIONED TO TAKE EXTREME CARE WHEN WORKING AROUND EXISTING STRUCTURES. 8. CONTRACTOR SHALL ADHERE TO ALL OSHA REGULATIONS AND CONDITIONS OF ALL PERMITS. 9. CONTRACTOR SHALL LIMIT THE AMOUNT OF DISTURBANCE ADJACENT TO THE WORK. 10. ALL ITEMS TO BE REMOVED OR REPLACED SHALL BE DISPOSED OF OFF -SITE. 11. ANY DAMAGE DONE DURING CONSTRUCTION TO EXISTING SIDEWALKS, STREETS, BUILDING, ETC. SHALL BE REPAIRED BY THE CONTRACTOR. 12. CONTRACTOR SHALL OBTAIN ALL BUILDING PERMITS REQUIRED OR NECESSARY TO PROVIDE CONSTRUCTION OF THE PROJECT. 13. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ANY WORK, WHICH HE CONSIDERS OUT OF THE WORK SCOPE, PRIOR TO BEGINNING THE WORK. 14. PROTECT ADJACENT MATERIALS AND SURFACES TO REMAIN FREE FROM DAMAGE. REPAIR OR REPLACE DAMAGED ITEMS REQUIRED FOR PROJECT COMPLETION AT NO COST TO OWNER. 15. PROTECT NEIGHBORING PROPERTIES DURING PROJECT. 16. MAINTAIN PUBLIC ACCESS OF RIGHT OF WAY AND SIDEWALKS UNLESS PERMITS STATING OTHERWISE ARE GRANTED. MAINTAIN SAFETY RAILS OR OTHER PROTECTION FROM HAZARDS INCLUDING FALLING AT SITE AND FALLING OBJECTS. 17. THE HAWKS BILL DRIVE CAUSEWAY WILL HAVE TRAFFIC DETOURED DURING THE PROJECT.M 18. THE CONTRACTOR SHALL PROVIDE ADEQUATE BRACING, SHORING, AND PROTECTION DURING CONSTRUCTION AND IS RESPONSIBLE FOR ANY FAILURES AND DAMAGES DUE TO THE LACK OF SUCH. 19. ITEMS TO BE REMOVED AND REINSTALLED BY THE CONTRACTOR SHALL BE ADEQUATELY PROTECTED, ADEQUATELY STORED, AND THOROUGHLY CLEANED BY THE CONTRACTOR PRIOR TO REINSTALLATION. 20. CONTRACTOR SHALL INSTALL MATTING ON ONE SIDE OF THE CAUSEWAY FOR USE IN MATTING OUT FOR EQUIPMENT. EQUIPMENT USED ON THE EXISTING ROADWAY SLAB SHALL BE LIMITED IN WEIGHT TO AN EQUIVALENT AASHTO H15 LOAD AND BE RUBBER TIRED. 21. THE CONTRACTOR IS LIMITED TO AVAILABLE LAYDOWN/STOCKPILE AREAS ON THE PROJECT SITE. 22. CONTRACTOR SHALL CONTRACT WITH AN INDEPENDENT TESTING LABORATORY (ITL) TO PROVIDE VIBRATION MONITORING OF EXISTING CAUSEWAY DURING INSTALLATION OF SHEET PILES. SHOULD THE VIBRATION LEVEL EXCEED THE ITL'S RECOMMENDED THRESHOLD LEVEL, THE CONTRACTOR SHALL BE REQUESTED TO STOP AND/OR MODIFY HIS OPERATIONS TO REDUCE THE VIBRATION LEVEL. A REASONABLE STAND-BY TIME FOR ADJUSTMENTS AND DECISIONS SHALL BE INCLUDED IN THE CONTRACTOR'S CONTRACT PRICE. PRECAST CONCRETE BOX CULVERT (DELEGATED DESIGN): (ADD ALTERNATE #3) 1. BOX CULVERT SHALL BE DESIGNED IN ACCORDANCE WITH AASHTO BRIDGE DESIGN SPECIFICATIONS & NCDOT STANDARDS. 2. BOX CULVERT SHALL BE A 6'x4' (NOMINAL) TYPE I SPLIT BOX CULVERT. A. PROVIDE A MINIMUM WATERWAY AREA OF 21.86 SF. B. TOP SLAB SHALL BE DESIGNED WITH A 3/4" DROP KEYWAY. 3. APPLICABLE DESIGN DOCUMENTS (CURRENT EDITIONS): A. AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS. B. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE. 4. PRECAST CULVERT SHALL BE DESIGNED FOR AASHTO HS-20 AND HL-93 TRUCK LIVE LOAD SURCHARGE WITH IMPACT PER AASHTO LRFD SPEC. 5. MINIMUM CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS: 5,000 PSI (MIN), NORMAL WEIGHT. 6. PROVIDE A PRECAST CONCRETE MIX DESIGN CONTAINING A CORROSION INHIBITING ADMIXTURE AT A MINIMUM DOSAGE RATE OF 4.5 GAL/CY, MEETING ASTM C494; SIKA CNI OR EQUIVALENT. 7. REINFORCEMENT: ASTM A615, GRADE 60 (DEFORMED), EPDXY COATED PER ASTM A775 WITH LESS THAN 27. DAMAGED COATING IN EACH 12-INCH BAR LENGTH. 8. PROVIDE ACI MINIMUM CLEAR CONCRETE COVER ON REINFORCING. 9. JOINT SEALANT SHALL CONSIST OF ONE OF THE FOLLOWING OR PRECASTERS STANDARD EQUIVALENT JOINT SEALANT: A. CS-102 CONSEAL BUTYL RUBBER SEALANT (OR EQUIV.) I.A.W. ASTM C990 FED. SS-S-210. B. CS-212 CONSEAL EXTERIOR JOINT WRAP (OR EQUIV.) I.A.W. ASTM C877 AND ASTM C990. 9. CURE ALL PRECAST CONCRETE BY PRECASTERS STANDARD CURING METHODS IN ACCORDANCE WITH ACI 308. C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A Not For Construction -r'F(o� r Review 05.13.19 RNS1011 J ISSUED FOR PERMIT NOT FOR CONSTRUCTION 10.08.2020 DESIGNED JRT DRAWN SKS CHECKED JRT PROJ. ENGR. JRT TIMBER: 1. WOOD MATERIAL: GUARDRAIL TIMBERS: NO 1 DENSE, SD-19 S.Y. PINE, S2E OR ROUGH, PRESSURE TREATED WITH 2.5 LB/CF CCA PER AWPA C2 & C18. STRINGERS & KING PILES: NO 2, SD-19 S.Y. PINE, S4S/S2E PRESSURE TREATED WITH 2.5 LB/CF CCA PER AWPA C2 & C18. DECKING, POSTS & RAILING: NO 1 SELECT KD-19 S.Y. PINE, S4S, PRESSURE TREATED WITH CAQ. 2. COAT ALL FIELD CUTS AND HOLES IN PILES WITH COPPER NAPTHENATE IN ACCORDANCE WITH AWPA M4. 3. ALL HARDWARE (BOLTS, ANGLES, ETC.) SHALL BE HOT -DIP GALVANIZED. 4. BELOW THE DECKING, USE 3/4"0 & LARGER BOLTS AND USE CUT WASHERS OR WO OGEE WASHERS UNDER ALL BOLT HEADS AND NUTS SHOWN. USE ACCORDING TO GOOD CARPENTRY PRACTICE & 2012 NC STATE BUILDING CODE. 5. SCREWS FOR ATTACHING TIMBER DECKING TO STRINGERS/JOISTS SHALL BE #12 X 316 STAINLESS STEEL WOOD SCREWS WITH STAR DRIVE HEADS. ALIGN SCREW HEADS ALONG LENGTH OF DECK. 6. DRILL UNDERSIZED HOLES FOR BOLTS/NAILS IN SMALL MEMBERS AS NECESSARY TO PREVENT SPLITTING. 7. PRE -DRILL HOLES FOR LAG BOLTS SAME SIZE AS BOLT THREAD ROOT SECTION. 8. PROVIDE EASED EDGES FOR ALL DECKING, CURBS AND POSTS. SITE & EROSION CONTROL 1. CONTRACTOR IS RESPONSIBLE FOR AND SHALL UTILIZE BEST MANAGEMENT PRACTICES FOR TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES WHILE CONSTRUCTION IS IN PROGRESS. 2. CONTRACTOR SHALL INSTALL SILT FENCING AROUND HIGHGROUND PROJECT LOCATIONS AND A TURBIDITY CURTAIN ALONG ADJACENT WATER LOCATIONS. 3. NO EXCAVATED OR DEMOLISHED MATERIAL SHALL BE PLACED IN ANY STREAM, CREEK, DITCH OR DRAINAGE -WAY. 4. CONTRACTOR IS RESPONSIBLE FOR LAYDOWN AND STOCKPILE AREAS (TO ARRANGE AND INSURE COMPLIANCE WITH LOCAL AND STATE REGULATIONS). 5. CONTRACTOR SHALL CONTROL ANY SILT/WATER RUNOFF, WHICH MAY BE GENERATED DURING PROJECT, AND PREVENT IT FROM RUNNING OFF INTO WETLANDS, CREEKS, DITCHES, ETC. DRAINAGE AND STABILIZATION/SEPARATION FABRICS: 1. DRAINAGE GEOTEXTILE FABRIC SHALL BE WOVEN FABRIC OF POLYPROPYLENE, MONO -FILAMENT GEOTEXTILE, MANUFACTURED FOR SUBSURFACE DRAINAGE APPLICATIONS. DRAINAGE GEOTEXTILE SHALL BE GEOTEX 117F AS MANUFACTURED BY PROPEX OR APPROVED EQUIVALENT. A. GRAB TENSILE STRENGTH: 370 x 225 LBS/IN ASTM D4632 B. GRAB ELONGATION: 20 x 15 %; ASTM D4632 C. APPARENT OPENING SIZE: NO. 20 US STD. SIEVE; ASTM D 4751. D. PERMITTIVITY: 1.5 PER SECOND-1, MIN; ASTM D 4491. E. UV STABILITY: 90% AFTER 500 HOURS OF EXPOSURE; ASTM D 4355. F. MINIMUM WEIGHT: 8 OZ/SY G. FLOW RATE: 200 GAL./MIN./SF. H. PERCENT OPENING AREA: 17%. 2. STABILIZATION/SEPARATION FABRIC SHALL CONSIST OF ONE OF THE FOLLOWING: A. US 250 WOVEN GOETEXTILE BY US FABRICS, INC. B. WINFAB 315W WOVEN INDUSTRIAL FABIC STABILIZATION/SEPARATION FABRIC BULKHEAD WALL: 1. BULKHEAD DESIGNED FOR HORIZONTAL EARTH LOADS AND ANTICIPATED HYDROSTATIC LOADS WITH NO PROVISIONS FOR MOORING LOADS. 2. BULKHEAD SOIL CHARACTERISTIC WERE DERIVED FROM EXPERIENCE WITH SIMILAR COASTAL SOIL CONDITIONS AND FROM THE GEOTECHNICAL REPORT, ENTITLED "GEOTECHNICAL ENGINEERING REPORT - HAWKS BILL DRIVE CAUSEWAY" DATED MAY 1, 2018 BY ECS CAROLINAS, LLP (ECS PROJECT #22.26592). 3. SOIL GENERALLY CONSISTS OF A NON -HOMOGENEOUS MATERIAL OF VERY LOOSE TO LOOSE, SILTY AND CLEAN SAND WITH POSSIBLE ORIGANICS AND RIPRAP IN UPPER LAYERS. 4. BACKFILL BETWEEN NEW SHEET PILE WALL AND EXISTING CAUSEWAY WITH #57 STONE FILL, WITH SEPARATION FABRIC ALONG BOTTOM SURFACES. 5. CONTRACTOR SHALL ANTICIPATE SOME POSSIBLE ROOTS, BURIED RIPRAP AND OTHER DEBRIS DURING INSTALLATION OF SHEET PILES AND SHALL MAKE PROVISIONS WHEN ENCOUNTERED. SHEET PILES MAY REQUIRE MANDRELS TO BE USED WHEN DRIVING. CONTRACTOR MAY PREFER TO FABRIC A METAL SHEET PILE MANDREL FORMED TO MATCH THE SHEET PILING USED AND TO ASSIST IN DRIVING. VINYL SHEET PILE: 1. VINYL SHEET PILING SHALL BE INTERLOCKING SHEET PILING, UV INHIBITED, IMPACT MODIFIED, WEATHERABLE RIGID POLYVINYL CHLORIDE WITH A 50 YEAR LIMITED WARRANTY. 2. PROVIDE MINIMUM EMBEDMENT DEPTH AS NOTED. 3. PROVIDE SHEET PILES MEETING ALL OF THE FOLLOWING MINIMUM PHYSICAL PROPERTIES: A. ALLOWABLE LONG-TERM BENDING MOMENT:6,507 FT-LBS/LF B. MOMENT OF INERTIA: 122 IN4/LF C. SECTION MODULUS (Z): 24.4 IN3/LF D. THICKNESS WEB/FLANGE: 0.385" E. SECTION DEPTH: 10.0" F. MODULUS OF ELASTICITY: 208,000 PSI 4. SHEET PILES SHALL BE INSTALLED BY VIBRATORY HAMMER OR IMPACT HAMMER TO REACH MINIMUM PENETRATION DEPTHS. SHOULD OBSTRUCTIONS BE ENCOUNTERED, SHEET PILE SHALL BE EXTRACTED & SOIL EXCAVATED OR BROKEN UP AS REQUIRED TO REMOVE OBSTRUCTION. PILE INSTALLATION MAY RESUME ONCE OBSTRUCTION IS REMOVED. 5. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR CUT-OFF OR INSTALL SHORTER SHEET PILES WITHOUT WRITTEN AUTHORIZATION FROM THE ENGINEER. 6. CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO ENSURE THAT SHEET PILES ARE DRIVEN PLUMB. SHEET PILING SHALL NOT BE DRIVEN MORE THAN 1-INCH PER FOOT OUT OF PLUMB IN THE PLAN OF THE WALL NOR MORE THAN 1/16-INCH PER FOOT "OUT" OF PLUMB PERPENDICULAR TO THE PLANE OF THE WALL, NOR MORE THAN 1/4-INCH PER FOOT "IN" OF PLUMB PERPENDICULAR TO THE VERTICAL PLANE OF THE WALL. 7. PILES DRIVEN OUT OF INTERLOCK WITH ADJACENT PILES (WHICH CANNOT BE EXTRACTED & RE -INSTALLED) OR OTHERWISE DAMAGED, SHALL BE REMOVED AND REPLACED BY NEW SHEET PILES AT THE CONTRACTOR'S EXPENSE. CONCRETE: 1. REINFORCED CONCRETE WORK SHALL CONFORM TO THE LATEST EDITION OF ACI. 2. CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS: 3,000 PSI (SIDEWALK) ADD ALTERNATE #2 DECK COATINGS 3. REINFORCING STEEL: ASTM A615, GRADE 60. 1. COAT TOP AND SIDE SLAB SURFACES WITH A SURFACE APPLIED MIGRATING CORROSION INHIBITOR AND A VEHICULAR TRAFFIC COATING SYSTEM. 4. MINIMUM CLEAR CONCRETE COVER ON REINFORCING: 2. POWER WASH EXISTING EXPOSED CONCRETE SURFACES TO REMOVE ALL SURFACE IMPURITIES, CONTAMINATES, SAND, OIL, CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3 INCHES SALT AND OTHER DELETERIOUS MATERIALS. CONCRETE EXPOSED TO EARTH AND WEATHER: 2 INCHES (UNO). 3. COAT EXPOSED CONCRETE SURFACES WITH A SURFACE APPLIED, MIGRATING CORROSION INHIBITING IMPREGNATION COATING. 5. DOWELS AND CONTINUOUS REINFORCING SHALL HAVE A MINIMUM LAP OF 42 BAR DIAMETERS BUT NOT LESS THAN 12 4. PROVIDE MIGRATING CORROSION INHIBITING COATING PRODUCT BY ONE OF THE FOLLOWING MANUFACTURERS, WHICH SHALL INCHES. BE COMPATIBLE WITH THE TRAFFIC COATING SYSTEM: A. BASF CORPORATION; MASTERPROTECT 8020CI 6. PROVIDE AIR ENTRAINMENT OF 4 TO 6 PERCENT. MAXIMUM SLUMP: 4" - 6"; W/C (MAX.) = 0.45 B. CORTEC CORPORATION; MCI 7. CONCRETE FINISH: BROOM FINISH, LINO. SEE PLANS. C. SIKA CORPORATION; FERROGARD 908 8. CURING COMPOUND: ANSI/ASTM C309, TYPE 1, CLASS A. 5. COAT EXPOSED CONCRETE SURFACES WITH A TRAFFIC COATING SYSTEM. A. TRAFFIC COATING SYSTEM SHALL CONSIST OF A SINGLE COMPONENT OR TWO -COMPONENT, AROMATIC, MOISTURE CURED, ELASTOMERIC POLYURETHANE, TRAFFIC -BEARING COATING SYSTEM (BASE, INTERMEDIATE AND TOP COATS). B. PRIME AND APPLY BASE COAT: 32 MILS WET (23 MILS DFT) AND AS RECOMMENDED BY MRF. C. INTERMEDIATE TOP COAT: 20 MILS WET (16 MILS DFT) AND AS RECOMMENDED BY MRF. D. TOP TRAFFIC BEARING WEAR COAT: 18 TO 20 MILS WET (14 TO 16 MILS DFT) WITH ANTI-SKID AGGREGATE, BACKROLLED AND AS RECOMMENDED BY MFR. E. FOLLOW MANUFACTURER'S WRITTEN RECOMMENDATIONS FOR CURE TIME BETWEEN COATINGS. F. COLOR: AS SELECTED BY CITY FROM MFR'S STANDARD COLORS G. WARRANTY: 10 YEAR CONCRETE CRACK REPAIRS: 1. VEE-NOTCH ROUTE EXISTING CRACKS UP TO 1" IN WIDTH TO A DEPTH OF 3/4" AND GRAVITY FILL WITH A TWO -COMPONENT, 100% SOLIDS, MOISTURE -TOLERANT, LOW -VISCOSITY, HIGH -STRENGTH, MULTI -PURPOSE, EPDXY RESIN ADHESIVE. 2. RESIN SHALL CONFORM TO ASTM C-881, TYPES I, II AND IV, GRADE-1, CLASS C AND SHALL BE SIKA CORPORATION - SIKADUR 35 HI -MOD LV OR EQUIVALENT. 3. IF THE TRAFFIC COATING (ADD ALTERNATE #2) IS SELECTED BY THE CITY, THEN IN LIEU OF ROUTING AND FILLING CRACKS LESS THAN OR EQUAL TO 1/16" IN WIDTH, APPLY A DETAIL COAT OF THE TRAFFIC COATING SYSTEM'S POLYURETHANE BASE AT 32 WET MILS X 4" WIDE, CENTERED OVER THE CRACK AND ALLOWED TO BECOME TACK FREE PRIOR TO OVER COATING WITH THE TRAFFIC COATING SYSTEM. PATH FILE NAME W,,LMINGTO Development Services • Engineering Division P.O. Box 1810 • 305 Chestiut Street • Wilmington, NC 28401 • (910) 341-7807 10.08.2020 PROJECT NUMBER S6-1015.1 CALL#2 Hawks Bill Drive Embankment Roadway Repairs STRUCTURAL NOTES CRISER TROUTMAN TANNER CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC 3809 Peachtree Ave., Suite 102 Wilmington, NC 28403 910.397.2929 Ph. 910.397.2971 Fax www.cttengineering.com Firm License Number: F-0113 #8238.00 NOV 18 )0-Lf ) OCM WILMINGTON SCALE AS SHOWN SHEET SO. I of 9 SPECIAL INSPECTIONS Statement of Special Inspections Project: Hawks Bill Drive Embankment Roadway Repairs Location: Hawks Bill Drive Causeway, Wilmington, NC Owner's Representative: Mr. Matthew Hypes Owner's Address: City of Wilmington 305 Chestnut Street Wilmington, NC 28401 Architect of Record: N/A Structural Engineer of Record: Jeffrey R. Troutman, PE This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the Special Inspection requirements of the 2009 North Carolina State Building Code. It includes a Schedule of Special Inspection Services applicable to this project as well as the name of the Special Inspector and the identity of other approved agencies intended to be retained for conducting these inspections. The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the Code Enforcement Official, Structural Engineer and Architect of Record. Discovered discrepancies shall be brought to the immediate attention of the Contractor for correction. If such discrepancies are not corrected, the discrepancies shall be brought to the attention of the Code Enforcement Official, Structural Engineer and Architect of Record. The Special Inspections program does not relieve the Contractor of his or her responsibilities. Interim reports shall be submitted to the State Construction Office, Owner, Structural Engineer and Architect of Record. Interim Report Frequency: Monthly A Final Report of Special Inspections documenting completion of all required Special Inspections and correction of any discrepancies should be submitted prior to issuance of a Certificate of Use and Occupancy. Job Site safety and means and methods of construction are solely the responsibility of the Contractor. Statement of Special Inspections Prepared by (Structural Engineer of Record): R. Troutai�Ln, PE or .2018 Siadatt&X 4 Date er's Authorization Accepted by NHCCE : Signature Date Signature C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A Not For Construction - For Review 05.13.19 RESIONS ISSUED FOR PERMIT NOT FOR CONSTRUCTION Date 10.08.2020 Schedule of Special Inspection Services The following sheets comprise the required schedule of special inspections for this project. The construction divisions which require special inspections for this project are as follows. ❑ Structural Steel ® Special Foundations (Piles or Piers) ❑ Cold -Formed Steel Framing ❑ Wall PanelsNeneer ❑ Cast -in -Place Concrete ❑ Sprayed Fire Resistant Material ❑ Masonry ❑ Exterior Insulation & Finish System ❑ Wood Construction ❑ Smoke Control ❑ Soils ❑ Seismic Requirements ❑ Fire Rated Penetrations Ins 3ection Agents Qualifications Address 1. Special Inspector SI ECS Carolinas, LLP 7211 Ogden Business Park Suite 201 Wilmington, NC 28411 2. Structural Engineer of SER 3809 Peachtree Avenue, Ste 102 Record Wilmington, NC 28403 Criser Troutman Tanner Consulting Engineers 3. Testing Laboratory ITL ECS Carolinas, LLP 7211 Ogden Business Park Suite 201 Wilmington, NC 28411 4. Other G-TECH 2, GE, SE, S-EIT ECS Carolinas, LLP 7211 Ogden Business Park Suite 201 Wilmin on, NC 28411 Note: The inspection and testing agent shall be engaged by the Owner's Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Code Enforcement Official, prior to commencing work. Seismic Design Category: C Basic Wind Speed: 135 MPH Wind Exposure Category: C DESIGNED JRT DRAWN SKS CHECKED JRT PROD. ENGR. JRT PATH FILE NAME Qualifications of Inspectors and Agents of Special inspectors The qualifications of all personnel performing Special Inspection activities are subject to the approval of the Building Official. The credentials of all Inspectors and testing technicians shall be provided, if requested. When the Structural Engineer of Record deems it appropriate that the individual performing a stipulated test or inspection have a specific certification or license as indicated below, such designation shall appear below on the Schedule of Special Inspections. The Special Inspector (SI) shall be a licensed Professional Engineer with a minimum of 3 years of experience as a Special Inspector. 1. SE - Structural Engineer: a licensed PE or SE specializing in the design of building structures. 2. GE - Geotechnical Engineer: a licensed PE specializing in soil mechanics and foundations. 3. S-El - Structural Engineer -In -Training: a graduate engineer who has passed the Fundamentals of Engineering examination with experience in the design of building structures and working under the supervision of a licensed structural PE or SE. 4. G-El - Geotechnical Engineer -in -Training: a graduate engineer who has passed the Fundamentals of Engineering examination with experience in soil mechanics and foundations and working under the supervision of a licensed geotechnical PE or SE. 5. G-TECH1 - Geotechnical Technician 1: an experienced technician with National Institute for Certification in Engineering Technologies: Level 2 — Soils Certification. 6. G-TECH2 - Geotechnical Technician 1: an experienced technician with National Institute for Certification in Engineering Technologies: Level 2 — Geotechnical Engineering. GT ON Development Services • Engineering Division P.O. Box 1810 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 10.08.2020 S6-1015.1 CALL42 Schedule of Special Inspection Services Special Foundations Item Qualifications Scope 1. Sheet Pile SI, G-TECH 2, . Periodic inspection of installation of 75% of all piles Installation GE, SE, S-El . Verify testing agency's record of all pile tip elevations and cutoff elevations. Confirm installation method complies with contract documents • Periodic inspection of anchorage/connection details to pile caps and walers to confirm compliance with contract documents • Periodic review of Contractor's report of top and tip elevation of each sheet pile relative to a permanent reference • Periodic visual inspection vertical and horizontal alignment. Hawks Bill Drive Embankment Roadway Repairs SPECIAL INSPECTIONS CRISER TROUTMAN TANNER NOV 18 2021 CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC 3809 Peachtree Ave., Suite 102 Wilmington, NC 28403 910.397.2929 Ph. 910.397.2971 Fax www.cttenoneering.com Firm License Number: F-0113 #8238.00 SCALE AS SHOWN SHEET SO,2 of 9 I / / / I / / I � i f / WHEEL ESTATES INC. / / WHEEL, EST TES INC. WHEEL, ESTATES IN / / PID: R0631-003-017-000 PID: R06313-003-015-0 0 N""_ PID: R06313-003-012-000 / / x `~ 6301 TOWLES DRIVE / 6301 TO ES DRIVE 6340 TOWLES DRIVE `�`� ' / ps5 �,�// //••,, ^^ I WILMINGTON, NC 28409 WILMI GTON, NC 28409 fly 1-y �"`i WILMINGTON, NC 2$409 c6 N // FIELD LOCATION OF EXISTING % VEGETATION LINE 1 / EXISTING 8" PVC WATER LINE O / / / yq0 0�0 2 Xos '� • k yx x22o x232 x2�2` ` �x2� X 2 x 2 39 x 7 r/J x 212 x 2 3 i CfL• 6 x 2 2a x 2 3g x 2•`�5 50 x 2 52 ',k %s 65 Fr x x x zs x 2�2 83 �6A X x `g0 4O x y? 2.55 3 x 11 0 x 4 6A 2'lO 'G • i /rr a k n x 3• -- x X x x2 0• P X 75' AEC x ♦ ♦ / m ® o e �r ♦ EDGE OF EASEMENT ��� r ll♦ r • ♦ • • o x ,03 � x � �5, - 0 0 x 6 ..r..c]+fnA ♦ • ♦ ♦ • m ®® x p6, x 2'1 1 x \X - SS X 30' BUFFER `�� _-°66 aj4 INSTALL TURBIDITY BARRIER `s5 x '�r° f 5*9 5� r ♦ • • ♦ ' r _��� A ` ` ` • EXIST. INV. -0.57 �2 22, TURTLE HALL HOME OWNERS AS OC ;��Ss CURTAIN {TYPE II) PRIOR 2 y x X I x ;� `x x R06313-001-019-000 D OK x 2 x EXISTING 6 PVC WATER LINE 9- / d 6,, ` • L,� ♦ TO DEMOLITION x EDGE OF EASEMENT 561 LET W Q f d a ♦ e SPEED IT 26' LIM SIGN O 1 ,��e w �' d e d � a 6? 5 ♦ � 0 ,� 32 ' 1� 4. � ° ,6 Q d -a-dQ °_ ..d a 'd Q §' • • ♦ ► ♦ ♦ �• r • • ♦ / ` •?3x - �1 - _ .♦ r S _ J+J/ 4.5 , a ♦ r � ' c 3. L ho �a\• - w�iilFT.. � Z v� SPEED LIMIT SIGN o�No `69 G r 15 bull 5343 �M,lh N �65 aa �q�0 `• E 235 ENV ,5 � TEMPORARY TIMBER OR STEEL MATTING FOR CRANE & EQUIPMENT ACCESS; LAY OVER EXISTING VEGETATION , FOR DURATION OF PROJECT. SEE NOTE 15. C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A Not For Construction - For Review 05.13.19 RESIONS - 0 EDGE OF EASEMENT y29 x;6 x 2'° x o2 x psi ,, X �g3 MORGAN HOBSON S, JOY O PID: R06313-001-006-000 5601 MARSH BAY DRIVE WILMINGTON, NC 28409 ISSUED FOR PERMIT NOT FOR CONSTRUCTION NORTH 10.08.2020 x a - d l : G _ a 11 . d i ♦ . n lC _ _ -_ V_ -- 5, a a a -O LL. le- 6. a A _. - �. d 6 Q a dam° +5 , 3 .. d a Q , _ - , ` 5 'A'Q b;l a 6. d ° - Q d .. _ - Q d - a 5 d .54, 6� I- - ° 5: Q - d _ - - ad 'Q a fig\ y4\ d4 - .. - - 4/ d a _d W. � �.- d Q � .a9 6 d 33 r EXIST. INV. -0.72 _q�q 5� \ x AA 5 ', 2 • r e x s� 0.5 INSTALL TURBIDITY BARRIER 2�Os. z" Zb9 0 3 , , y� EXISTING 6" PVC WATER LINE 5 \ CURTAIN (TYPE II) PRIORx�, 32, i`''x i 3 TO DEMOLITION y 2. 5 a CJ.` x6, e�j, x k EDGE OF _65 b 400.95t .a EDGE OF EASEMENT x �j x 2 "° x �rQ J' x x 26° ,. x PG • PAVEMENT 1Tjj 5 x°69 x z.. 30' BUFFER 42 x 49 75' AEC ,55 \6` Sb 089 y J O.- 5- yy1 l{/ O lT� L- ab° xis x 2X 2,4 x MH \ - 5 3• V ybU y� x x TURTLE HALL HARBOUR OWNERS z5` • m PID: R06313-001-017-000 x`60 \ 5?1 C/) wm 1442 MILITARY CUTOFF ROAD WILMINGTON, NC 28403 2a2 x yes MARTIN, RICHARD L WINONA L �\ w yXs PID: R06313-001-007-000 \ x5 6424 HAWKBILL DRIVE 2,5 WILMINGTON, NC 28409 x I � PLAN - PHASE I - DEMOLITION 0' 20' 40' 60' 80' 100' 1 "=20' NOTES 1. SURVEY ELEVATION AS PROVIDED BY THE CITY OF WILMINGTON DATED MAY 2, 2018. SURVEY INFORMATION PROVIDED BY THE CITY OF WILMINGTON, SURVEYED WETLANDS PROVIDED BY PARAMOUNTE ENGINEERING, INC., DATED 07/02/2021. 2. ALL DISTANCES ARE HORIZONTAL DIMENSION. 3. AREAS DETERMINED BY COORDINATE COMPUTATION. 4. SUBJECT PROJECT IS LOCATED WITHIN A FEMA DESIGNATED FLOOD HAZARD AREA PER FIRM MAP 3720315600J DATED APRIL 3, 2006. 5. UNDERGROUND UTILITIES SHOWN AS LOCATED BY CAROLINA 811. 6. CONTOUR INTERVAL = 0.5' 7. GPS CERTIFICATION APPLIES TO CONTROL POINTS ONLY. ALL OTHER SURVEYING WAS PERFORMED BY GROUND METHODS. 8. OWNERS OF RECORD FROM NEW HANOVER COUNTY GIS. NO TITLE SEARCHES WERE PERFORMED BY THE SURVEYOR. 9. HORIZONTAL COORDINATE SYSTEM IS NAD '83 (2011). 10. VERTICAL DATUM IS NAVD 88 (GEOID 2012B). 11. 0.0 MLW DATUM = -2.56 NAVD88; MHW = +1.42 NAVD88 = +3.98 MLW (BASED ON WRIGHTSVILLE BEACH, NC STATION 8658163). 12. MLW: MEAN LOW WATER LINE MHW: MEAN HIGH WATER LINE 13. TOTAL CAUSEWAY ROAD LENGTH: 400.95t LF. 14. CONTRACTOR SHALL MAT DOWN ALONG THE SOUTHERN SIDE OF THE CAUSEWAY FOR CRANE AND EQUIPMENT ACCESS. A. CONTRACTOR SHALL SETUP OPERATIONS TO ALLOW AN EMERGENCY VEHICLE PASSAGE WITHIN 10 MINUTES OF NOTIFICATION. B. NO PEDESTRIAN TRAFFIC WILL BE ALLOWED TO CROSS BRIDGE DURING WORKING HOURS. C. CONTRACTOR SHALL ALLOW REGULAR VEHICLE TRAFFIC TO UTILIZE CAUSEWAY BEFORE 8 AM AND AFTER 6 PM AS WELL AS ALLOW USE FROM 12 PM TO 1 PM, MONDAY THRU SATURDAY. D. CONTRACTOR SHALL ENSURE CAUSEWAY IS OPEN AND CLEAR OF ALL DEBRIS, STORED ITEMS, ETC. DURING ALL OPEN HOURS. 15. IN THE EVENT OF ANTICIPATED FLOODING OR HURRICANE CONDITIONS, CONTRACTOR SHALL SECURE ALL MATS IN PLACE WITH GROUND ANCHORS AND/OR REMOVE MATS AND TEMPORARILY STORE ON HIGH GROUND. DESIGNED JRT DRAWN SKS CHECKED JRT IPROJ. ENGR. JRT PATH FILE NAME LMINGT ON Development Services • Engineering Division p.0. Box 1810 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 DATE 10.08.2020 PROJECT NUMBER S 6-1015.1 CALL#2 DEMOLITION SCHEDULE OI REMOVE APPROX. 400.95t (TOTAL) LF (FIELD VERIFY) OF EACH EXISTING TIMBER GUARDRAIL. EXISTING RCP CULVERT PIPE TO REMAIN - ADD CONCRETE COLLAR AT PENETRATION THRU NEW SHEET PILE. O ADD ALTERNATE #3 PERFORM PARTIAL DEMOLITION OF ROADWAY SLAB, REMOVAL (12' LONG x FULL WIDTH) OF RIP RAP, REMOVAL OF EXISTING 36"0 x 32.5' CONCRETE CULVERT & INSTALLATION OF NEW CONCRETE ROADWAY SURFACE WITH RE -INSTALLATION OF EXISTING BACKFILL.. CONCRETE DRIVE ------ 5------ EXIST. CONTOUR BULKHEAD 1.3 SPOT ELEVATIONS - NAVD88 DATUM SECTION 404 WETLANDS -0.07 ac COASTAL WETLANDS ^'0.20 ac MHw-- MEAN HIGH WATER LINE MLW-- MEAN LOW WATER LINE Hawks Bill Drive Embankment Roadway Repairs DEMOLITION PLAN & NOTES LEGEND SS SANITARY SEWER W WATER LINE 30' BUFFER - 75' AEC OFFSET caMa COASTAL WETLANDS WET 404 WETLANDS CRISER TROUTMAN TANNER SCALE CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC A �r �TTO`I�T AS H 3809 Peachtree Ave., Suite 102 Y� 1V Wilmington, NC 28403 910.397.297 Ph. SHEET 910.397.2971 Fax www.cttengineering.com Firm License Number: F-0113of S1.0 9 #8238.00 w WHEEL, ESTATES IN PID: R06313-003-015-0 0 6340 TOWLES DRIVE (j WILMINGTON, NC 2�409 p35 ,t 66 N N 1 � 1 � �2 c2 1 / / SECTION 404 WETLANDS J /• ) 75' AEC - 0 0 0 }7 �1 ' ss 30' BUFFER 5, --C _j 5.43 � 2 GVAI x 2 39 x x WHEEL, ESTATES INC. 1-1 WHEEL, EST TES INC. PID: R06313-003-012-000 / PID: R0631-003-017-000 x Z3a X 2°5 6301 TOWLES DRIVE / /' 6301 TO ES DRIVE 2 50 I WILMINGTON, NC 28409 WILMI GTON, NC 28409 O \ 5� FIELD LOCATION OF EXISTING � a3 � EXISTING 8 PVC WATER LINE VEGETATION LINE � / / 26Ar 257 I G • • ,. X / P X y2.7,,9 w\ ,x ' ' Y,03 vJ � • � l yX X 6 ya, x PG • i p / X X yX yo x'X 3p � k 6S zX COASTAL WETLANDS z z� X of 44 k x 50 i X e ,o3 S3.2 °70 'V o y2, 251. X `g2 X,6, 9 - A `g5 109 +NL S2.0 ° o°• INSTALL TURBIDITY BARRIER g, x / >l,- IqFrTit IN IfUlt VVLILAI'4U,) y' TURTLE HALL HOME OWNERS AS OC. EXISTING 6" PVC WATER LINE — i r w www '� -!�6001,12 CTION 404 WETLANDS r - MNG NP 6065�4 0 +fi+ / 0M� N'165gg8alk"giF �+ 5 ,5. COASTAL WETLANDS i 3 x o2 1 + 5 TEMPORARY TIMBER OR STEEL MATTING FOR CRANE Se EQUIPMENT ACCESS; LAY OVER EXISTING VEGETATION x p o = x FOR DURATION OF PROJECT. SEE NOTE 15. ♦ yX � a ae+ MORGAN HOBSON S, JOY O BRIDGE PID: R06313-001-006-000 SPEED 5601 MARSH BAY DRIVE LIMIT WILMINGTON, NC 28409 10 2" PIPES II II TYPICAL SIGN ELEVATION NOT TO SCALE LEGEND - <... CONCRETE DRIVE ------ 5------ EXIST. CONTOUR BULKHEAD ®1.3 SPOT ELEVATIONS — NAVD88 DATUM SECTION 404 WETLANDS 77N0.07 aC COASTAL WETLANDS —0.20 aC MHvb--- MEAN HIGH WATER LINE — — 30' BUFFER MLw--- MEAN LOW WATER LINE 75' AEC OFFSET ss— SANITARY SEWER CAMA COASTAL WETLANDS W WATER LINE WET 404 WETLANDS D Added Section 404 Wetlands 08.26.21 C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A Not For Construction - For Review 05.13.19 RNSIONS ISSUED FOR PERMIT NOT FOR CONSTRUCTION 'ice' ,L' WAS —� 'r -1. 11 1 • IIr 1 f :i1 —. ---. ------ � . , --- �..,,..---- OFF! _;- ' • - ����.. - � �•� ..--: -- _ — _- - ���. •--.- _a -`�--, � •�.._---._.___- .-: .`-'�.--.mar _. ._.:,�..--___"'_—� �J.M�i�,/��, r.,a,a-b.-.-�_, -—_-.---.----- -.---- � -� - •.'-_. V�i(-- 1�-cam.--_--___ 1 _-.�14...- - --._ ,,�► --- -- ..e.�---ter110 .-. - ,� ...a. ...,..:,.-ter:.- _"---�_.�"__'e'�,�..a-----._.. • -_ _ - a�.=. '�'�n�� is ., �.�� . �► .tip►- �� 11 0441 ../ ���------ I t all NO 6%,L i-• \. .. • '• � ' 1 11 11 111 dA'� PLAN - PHASE II - NEW WORK V7 1' 1 • = = ►•: ■ - - - - 1 PLAN - PHASE II NEW WORK W/ ADD ALT #3 CULVERT S2.0 1 »-0 10' 20' 30' 40' 50' 10' NORTH 10.08.2020 DESIGNED JRT DRAWN SKS CHECKED JRT PROJ. ENGR. JRT NOTES 1. SECTION 404 WETLANDS SURVEYED BY PARAMOUNTE ENGINEERING, INC., DATED 07/02/2021. 2. THIS PARCEL IS LOCATED IN ZONE AE 13.0 A SPECIAL FLOOD HAZARD AREA — AS SHOWN ON FEMA FLOOD MAP NO. 3720315600K BEARING AN EFFECTIVE DATE OF 8/28/2018. 3. SURVEY INFORMATION PROVIDED BY THE CITY OF WILMINGTON, SURVEYED WETLANDS PROVIDED BY PARAMOUNTE ENGINEERING, INC., DATED 07/02/2021. 4F WIL/y% L M I N G T O *8 A0 PATH * * Development Services • Engineering Division FlLE NAME 9 Z • Wilmington, NC 28401 • (910) 341-7807 P.O. Box 1810 305 Chestnut Street DATE 10.08.2020 PROJECT NUMBER S 6-1015.1 CALL#2 NEW WORK SCHEDULE O NEW VINYL CUTOFF WALL (SEE 1/S3.0) — APPROX. 810f LF (FIELD VERIFY LENGTH). AFTER INSTALLATION OF TURBIDITY BARRIER. ONEW TIMBER GUARDRAIL SYSTEM (SEE 1/S3.0) — APPROX. 805t LF (FIELD VERIFY LENGTH). OPROVIDE CONCRETE COLLAR DETAIL AT EXISTING RCP WALL PENETRATION — SEE SHEET S3.2 OCRACK REPAIRS TO DECK SLAB. O GROUT FILL LARGE VOIDS ALONG SIDES OF EXISTING RIPRAP BRIDGE PRIOR TO DRIVING SHEET PILES/STONES FILL — FIELD VERIFY. OTIMBER WALKWAY (ADD ALTERNATE #1) ODECK COATING (ADD ALTERNATE #2) O PROVIDE NEW PRECAST CULVERT BOX WITH CONCRETE HEADWALLS / APRONS (ADD ALT #3) — SEE SHEET S3.3 OINSTALL NEW SPEED LIMIT SIGNS — TYP OF 2 EA. CONTRACTOR SHALL INCLUDE IN HIS BID THE COST TO CONFIRM KNOWN AND ANY UNKNOWN UNDERGROUND UTILITIES ALONG BULKHEAD ALIGNMENT PRIOR TO INSTALLATION OF SHEET PILES. Know what's b@IOW. C811 before you dig. Hawks Bill Drive Embankment Roadway Repairs NEW PLAN & NOTES CRISER TROUTMAN TANNER SCALE CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC A �r �rTTOSIIhT AS SH 3809 Peachtree Ave., Suite 102 VV 1V Wilmington, NC 28403 910.397.29 910.397.2971 71 Faxax SHEET www.cttengineering•com Firm License Number: F-U13 S2.0 Of 9 #8238.00 C Issued For Permit - Not For Construction 10.08.20 B 1 Not For Construction - For Review 09.10.19 A Not For Construction - For Review 05.13.19 REVISIONS ISSUED FOR PERMIT NOT FOR CONSTRUCTION 10.08.2020 DESIGNED JRT DRAWN SKS CHECKED JRT PROD. ENGR. JRT PATH FILE NAME EXIST. (2) 1/2-0 CARRIAGE BOLTS EXIST. 1"0 SOLID STEEL RODS EXIST. C4 CHANNEL EXIST. 2x8 CONT. EXIST. (4) 2x8 CONT. EXIST. 8x8 x 12"f TIMBER BLOCKING ® 8'-0" O.C. EXIST. CONC. CAUSEWAY 15-0" 1'-6"f 12'-O"t CLEAR A -A S3.0 REMOVE EXIST. CURB/GUARDRAIL - SEE INSET A -A DEMO - INSET A -A EXIST. C4 CHANNELS 0 8'-0'°t O.C. (UNDER GUARDRAIL BLOCKING) EXIST. RIP RAP VOIDR SECTION - DEMOLITION OF EXISTING CAUSEWAY a@ RAILING SCALE: 1/2" =1'-0" ILTER N1� Sj F,%c. P F�OAMORENTS A pF THY �RT�OA` S NE N 11'P��� AN. OR P & H�R�ZO RY T \ @qRR E &`YpROpYL NTAI �AAINTAIR> pER N RE elulY N SOT. DETAIL - FLOATING TURBIDITY BARRIER CURTAIN SCALE: NOT TO SCALE WILIVIIN-- GTON Development Services • Engineering Division P.O. Box I S 10 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 OPTIONAL TURBIDITY BARRIER: TYPE 2 HEAVY DUTY FLOATING TURBIDITY BARRIER CAT. NO. FTB 225052 BY ACF ENVIRONMENTAL OR EQUIVALENT. 10.08.2020 ECT NUMBER S6-1015.1 CALL#2 Hawks Bill Drive SCALE Embankment RoadwayRepairs p CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC C FI! I S E R 3809 Peachtree Ave., Suite 102 DEMOLITION SECTIONS & DETAILS Wilmington, NC 28403 T R O U T M A N 910.397.2929 Ph. TANNER ,� 910.397.2971 .ctt n� eering.com Firm License Number: F-0113 #8238.00 SHEET S 3 O of 9 1 6 T r� iWAL S3.1 ADD ALT. #1 K 5 S3.1 TIMBER - M 0 I 15-0" 4'-0"t 1'-6"t 12'-0"t CLEAR 1'-6"t 4'-0"t 3 NEW P.T. DRESSED S3.1 TOE RAIL/CURB EXIST. C4 CHANNELS NEW #57 ( ' EXIST. 8" REINF. CONCRETE 0 8'-0"t O.C. (UNDER EX CAUSEWAY SLAB W/ REINF. NVI GUARDRAIL BLOCKING) PA STONE 1 1 0 6" O.C. E.W. AN I BACKFILL 1 !! I II 1� -1 31 I M �--- EXIST. RIP RAP NEW GROUTED, LOOSE, RIP RAP SUBBASE (LOOSE) SUBBASE NEW SEPARATION GEOTEXTILE FABRIC 2-1/2" WEEP HOLE (2.5" ABS JET FILTER #JF2.5ABS) DEVICE 4'-0"+/- O.C., INSTALLED ON WEB OF SHEET PILE WITH INVERT ® THE LESSER OF 12" ABOVE GRADE OR 12" ABOVE MLW. ATTACH WITH (4)#14 316 SSTL SELF-DRILLING/TAPPING SCREWS VINYL SHEET PILE BULKHEAD WALL x 14'-0" SECTION - NEW CONSTRUCTION AT EXISTING CAUSEWAY SLAB SCALE: 1/2" = V-0" 109.10.19 C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review A Not For Construction - For Review 05.13.19 RNSIONS ISSUED FOR PERMIT NOT FOR CONSTRUCTION 10.08.2020 DESIGNED JRT DRAWN SKS CHECKED JRT PROJ. ENGR. JRT PATH FILE NAME 0 3/4"0 H.D. GALV. TIMBER BOLTS W/ BOT. GALV. PLATE %"x4"x4" 1'-0" 6" 6" 6" 6" 1'-0" W/ WASHER & NUT (NP, 4 EA. AT SCUPPER BLOCK) 4"0 GALV. SPLIT RING SCUPPER BLOCK —\ BUTT SPLICE CURB TIMBER 0 6'-0" MIN. TO 16'-0" MAX. AS REQUIRED P.T. CURB RAIL CONT. ;- '�-- �I_ 1; II II Ll LI � -_ I! if !! i.l' II L EXIST. REINF. CONC. END SUPPORT INTERIOR SUPPORT CAUSEWAY - SEE 1/S3.1 INTERIOR SUPPORT ELEVATION - NEW BLOCK & TOE RAIL/CURB CONNECTION SCALE: 3/4" = V-0" 8" (NOM.) H.D. GALV. TIMBER BOLTS - SEE 2/S3.1 P.T. 8x8 CURB RAIL CONT. W/ RADIUSES (EASED) EDGES P.T. 6x8 x 4'-0" SCUPPER BLOCK ® 6'-0" O.C. EXIST. REINF. CONC. I CAUSEWAY H II EXIST. C4 CHANNEL SECTION - NEW TOE RAILING & CURB CONNECTION SCALE: V = V-0" WLMINGT ON Development Services • Engineering Division P.O. Box 1810 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 10.08.2020 PROJECT NUMBER S6-1015.1 CALL#2 CUSE 2x6 OR 2x8 DECK CAP TIMBERS (TREATED) W/ (2) #8 x 2-1/2" GALV. WOOD SCREWS AT EACH DECK BOARD END TO 4x6's-INSTALL BARK SIDE UP (CROWN DOWN) P.T. 4x6 CONTIN. ON INBOARD & OUTBOARD FACE OF SHEET PILE. SECURE EA. TO SHEET PILE W/ (2) 5/8"0 BOLTS 0 2'-3" O.C. DETAIL - TIMBER CAP SCALE: V = V-0" Hawks Bill Drive SCALE Embankment RoadwayRepairs p CRISER TROUTMAN TANNER CONSULTING ENGINEERS INC CRISER 3809 Peachtree Ave., Suite 102 NEW SECTIONS & DETAILS Wilmington, NC 28403 T R O U T M A N 910.397-2929 Ph. TANNER wwwct.397.2971 Fax te gneering om Firm License Number: F-0113 #8238.00 SHEET S3,1 of 9 n"+ EXISTING 8" REINF. CONCRETE CAUSEWAY SLAB W/ REINF. 0 6" O.C. E.W. T SLAB +5.3't a SEE SECTIO I #4 DOWELS x 1'-6" ® 12" O.C. W/ 6" MIN. EMBEDMENT W/ ADHESIVE ANCHOR SYSTEM 8" MIN. NEW #57 STONE GEOTECHNICAL SEPARATION FABRIC 10'-0" #4 DOWELS x 1'-6" 0 12" O.C. W/ 6" MIN. EMBEDMENT W/ ADHESIVE ANCHOR SYSTEM NEW 8" REINF. CONCRETE CAUSEWAY SLAB W/ #4 0 12" O.C. TOP & BOTT., E.W. X—NEW #57 STONE BACKAH EXISTING SUBGRADE C=f'TInN - CI AR 121=9PA112 eT RAY r111 UFRT /Ann AI T If'% OUMI-C. 11L - I -U EXISTING 8" REINF. CONCRETE CAUSEWAY SLAB W/ REINF. 0 6" O.C. E.W. EXISTING RIPRAP BASE EXISTING SUBGRADE NEW SEPARATION ' GEOTEXTILE FABRIC REINSTALLED RIPRAP/BACKFILL EXISTING SUBGRADE PRECAST REINF. CONCRETE HEADWALL (BY PRECAST VENDOR) PRECAST REINF. CONCRETE CULVERT (BY PRECAST VENDOR) — SEE 1 /S3.2 NORTH _MLW -- -- -- n n -- a iF -.:•* INV. —0.72 `. ;.'� II II li ��'� UPSTREAM 7 DOWNSTREAM APPROX. MUDLINE 11 II II I.': r APPROX. MUDLINE C Issued For Permit - Not For Construction 10.08.20 B Not For Construction - For Review 09.10.19 A For Construction -1-� or Review 05.13.19 :1! REVISIONS II II FABRIC VENDOR (TYPICAL) II II II EXISTING MUDLINE II II VINYL SHEET PILE III' n IIIIII II II BULKHEAD WALL (BEYOND) II II II II II II II II 11 H HH �� SECTION - NEW CONSTRUCTION AT NEW BOX CULVERT (ADD ALT #3 S3.3 % SCALE: 1/2" = 1'-7 ISSUED FOR PERMIT NOT FOR CONSTRUCTION 10.08.2020 DESIGNED JRT DRAWN SKS CHECKED JRT PROJ. ENGR. JRT PATH FILE NAME 3V 3a9 , it � � OA-7 I \NORTH WLMINGT ON Development Services • Engineering Division P.O. Box 1810 • 305 Chestnut Street • Wilmington, NC 28401 • (910) 341-7807 SCALE: 3/8" =1'-0" 10.08.2020 PROJECT NUMBER S6-1015.1 CALL#2 CAUSEWAY SLAB — SEE 1 /S3.2 — SEE 1 /S3.2 Hawks Bill Drive SCALE Embankment RoadwayRepairs p CRISER TROUTMAN TANNER CONSULTING ENGINEERS NC CRISER 3809 Peachtree Ave., Suite 102 PLAN & CULVERT SECTIONS (ADD ALT #3) Wilmington, NC 28403 TROUTMAN 910.397.297 Ph. TANNER 91ctten 2971 Fax m License F- m Firm License Number: F-0113 #8238.00 SHEET S3.3 of 9