Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
29-22 Collier, Betty
Permit Class NEW Permit Number 29-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission �ern�it for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Betty M. Collier, 2730 Blithe Dr., Chester, VA 23831 Authorizing development in Currituck County at adi. to Albemarle Sound. at 288 Griggs ia§-requested in the p�rmittee's application dated-1 2fi/3i— - including attached workplan drawings (2) Sheet 1 of 2 dated "Rev 12/2/21" and Sheet 2 of 2 dated 11/22/21. This permit, issued on March 16, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )t these terms may be subject to tines, tmpnsonment or civil action; or may cause ire permn ro ce nuu ana voia. Shoreline Stabilization — Bulkhead and Rip Ran 1) The bulkhead and rip rap shall be constructed in accordancewith the alignment depicted on the attached workplan drawings. _ 2) No open water shall be excavated or tilled, even temporarily, outside of the approved bulkhead alignment. 3) The alignment of the authorized bulkhead and rip rap shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. pr - far- Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Betty M. Collier ADDITIONAL CONDITIONS Permit No. 29-22 Page 2 of 3 4) The rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite, marl, or broken concrete with no exposed rebar. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. 5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 6) The bulkhead shall be constructed prior to any backfilling activities. 7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. waterward of -the -approved -al' 9) The fill material shall be clean and free of any pollutants except in trace quantities. 10) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 11) No backfill material is to be placed within 30 feet. of the normal water level, except that which will be used to backfill the area behind the permitted bulkhead. 12) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. Sedimentation and Erosion Control 13) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 15) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 17) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Betty M. Collier Permit No. 29-22 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE:. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2022-00133). NOTE: • The N.C. Division of Water resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2021-1855. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water ---------&uendentwdvities-are-not authorizedwithin 30 feet-ofthe-normal-waterlevel. - NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. DCM Coordinator: �DO�Il1f`�� Permit #: MAILING DISTRIBUTION SHEET Permittee: ??& C I (, of 2730 31 i lte- air- e"4, JA 2-38 S I Agents: DCM Field Offices Elizabeth City 06L.tl— V-, Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) A&sh Pelletier (Bootie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) —Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: 11 Renee Gledhill -Earley at Environmental.Review@ncder.g v Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Chris Pullinger — 401 Tina Martin - 401 Clif Whitfield (WARD) Jimmy Harrison Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Holley Snider —401(Pender,Brunswick, New Hanover) John Perry — 401 (Onslow, Carteret) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARO) Natural Heritage Program Rodney Butler �, LPO: (NCDOT) Travis Wilson U DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Betty Collier PROJECTNAME: Shoreline Stabilization COUNTY: Carritack LOCATION OF PROJECT: 289 Griggs Acers Drive, Point Harbor DATE APPLICATION RECEIVED COMPLETE BY FIELD: 12-17-21 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No FIELD REPRESENTATIVE: Robert C/orby STRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: / �T// Date I d f 1 t /d.l DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $400 (60140) # III D APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 12-29-21 ADJ. RIP. PROP NOTICES REC'D: C) 75 DAY DEADLINE: 3-2-22 EMAIL OUT DATE: 12-22-;YW PERMIT FINAL ACTION: ISSUE DENY RECEIVED END OF NOTICE DATE:1-18-22 DEC 22 2021 DEED REC'D: Yes 150 DAY DEADLINE: 5'((r 1; DCM-MHD CITY STATE DUE DATE: 1-12-22 AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM - Field Rep l q td 7A DCM- LUPConsistency Determination $5-I ZL C Si Local Permit Officer Corps of Engineers- Regulatory Branch 2-1t 12.2- Zo 2,2. -00111 DWR-401 Section DWR- Public Water Supply t �jtj DEMLR-Stormwater I Y C DEMLR - Sod and Erosion DOA - State Property Office Wildlife Resources Commission t'tLl?ii K DMF - Shellfish Section t Z L DMF- Habitat& Enhancement 'tL�Li DNCR - Archives & History t to 2L 1= DNCR -Natural Heritage Program NCDOT NC Dept of Commerce 7,IZL < ROY COOPER Governor MICHAEL S. REGAN secrerary BRAXTON C. DAVIS Director TO: THROUGH FROM: DATE: SUBJECT: NORTH CAROLINA Environmental Quality MEMORANDUM Gregg Bodnar, Assistant Major Permits Coordinator Ron Renaldi, District Manager R6 (Z Robert Corbett, Field Representative R( aG December 17, 2021 Betty Collier Major Permit The applicant proposes to construct a bulkhead a maximum distance of 26' waterward of normal water level (NWL) and install riprap on the waterward side. The project site is located at 288 Griggs Acers Drive, Point Harbor, Currituck County, and is adjacent to the Albemarle Sound. The development proposal involves the Public Trust Area (PTA), Estuarine Waters (EW), and Estuarine Shoreline (ES) Areas of Environmental Concern (AEC's). I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this project and my findings are as follows: 15A NCAC 07H.0208 Use Standards Paragraph (a) addresses General Use Standards, and sub -paragraph (1) precludes uses that are not water dependent within the EW and PTA and lists uses that may be considered water dependent. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(A) states that the location, design, and need for development, as well as the construction activities involved shall be consistent with the management objective of the Estuarine and Ocean System AEC and shall be sited and designed to avoid significant adverse impacts upon the productivity and biologic integrity of coastal wetlands, shellfish beds, -RECEIVED t. Q�� DEC 22 2021 North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1401 South Griffin SLreet. Suite 3011 Elizabeth City. North Carolina 27909 i )(�M-MHD CITY Y Gregg Bodnar, Assistant Major Permits Coordinator Betty Collier Major Permit Recommendations December 17, 2021 Page 2 submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning and nursery areas. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(B) states that development shall comply with state and federal water and air quality standards. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(C) states that development shall not cause irreversible damage to documented archaeological or historic resources as identified by the N.C. Department of Cultural Resources. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(D) states that development shall not increase siltation. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(E) states that development shall not create stagnant water bodies. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(F) states that development shall be timed to avoid significant adverse impacts on life cycles of estuarine and ocean resources. Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(G) states that development shall not jeopardize the use of the waters for r.CE-11; } navigation or for other public trust rights in public trust areas including estuarine waters. Consistent: The proposed development is consistent with the intent of this rule. DEC 22 2021 Paragraph (b) addresses Specific Use Standards. Of these, subparagraphs (7) Bulkheads peAQM-MHD CITY to this project, and those subparagraphs not listed are not applicable to this project. Paragraph (7) Bulkheads Subparagraph (7)(A) states, "Bulkhead alignment, for the purpose of shoreline stabilization, shall approximate the location of normal high water or normal water level." Inconsistent: The proposed bulkhead alignment averages t15.5' waterward of NWl.. The previous bulkhead on the lot was breached in early 2020. The applicant is only proposing to relocate the new bulkhead in the alignment of the previous bulkhead. The proposed bulkhead alignment will tie into the existing bulkhead on the south eastern corner of the lot and will align with the exiting riprap located at the north west corner. (See Sub -paragraph 7D.) .. a Gregg Bodnar, Assistant Major Permits Coordinator Betty Collier Major Permit. Recommendations December 17, 2021 Page 3 Subparagraph (7)(B) states, "Bulkheads shall be constructed landward of coastal wetlands in order to avoid significant adverse impacts to the resources." Consistent: The proposed development is consistent with the intent of this rule. Subparagraph (7)(C) states, "Bulkhead backfill material shall be obtained from an upland source approved by the Division of Coastal Management pursuant to this Section, or if the bulkhead is a pan of a permitted project involving excavation from a non -upland source, the material so obtained may be contained behind the bulkhead." Consistent: The applicants have indicated that clean fill will be used. Subparagraph (7)(D) states, "Bulkheads shall be permitted below normal high water or normal water level only when the following standards are met: (i) the property to be bulkheaded has an identifiable erosion problem, whether it results from natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep grade bank, which will cause the applicant unreasonable hardship under the other provisions of this Rule; Consistent: The proposed development is consistent with the intent of this rule. (ii) the bulkhead alignment extends no further below normal high water or normal water level than necessary to allow recovery of the area eroded in the year prior to the date of application, to align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the unusual geographic or geologic features; Consistent: The proposed development is consistent with the intent of this rule. (iii) the bulkhead alignment will not adversely impact public trust rights or the property of adjacent riparian owners; Consistent: The proposed development is consistent with the intent of this rule. (iv) the need for a bulkhead below normal high water or normal water level is documented by the Division of Coastal Management; Consistent: The proposed development is documented in a Field Investigation Report. RECEIVED (v) the property to be bulkheaded is in a nonoceanfront area. DEC 22 2021 Consistent: The proposed development is consistent with the intent of this rule. DCM-MHD CITY Based on my review of the applicable subsections of the North Carolina Administrative Code, the permit application and plans, I recommend a permit be issued to Betty Collier for the development as proposed. ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December22, 2021 NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEO - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier04-f6-33) grQgg.bo(inai-@nctienr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 42r 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233) when appropriate, in-depth comments with supporting data is requested. REPLY: ✓ This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINTNAME AGENCY�1rIL� SIGNATL RE-::�_ 1 DATE 1 ZI Za/z I RECEN1 FED JAN 3 2022 SLIP SECTION MHD y, North Carolina Department of Environmental Quality l Division of Coastal Management Elizabeth City Dfpee 1401 South Griffin Street, Suite 3001 Elizabeth City. North Carolina 27909 252.26,13901 From: Thoroe. Rooer To: Bodnar. Greco Subject: CAMA Major - Betty Collier Bulkhead - Currituck County Date: Tuesday, December 28, 20218:38:56 AM Gregg The subject project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROrCOOPER ELIZ ABETAI&91S0t Secmtgry B94MKIM , Y19 ulruqv� Decernbef,1121.2021 NOW—RARD FROM; Gregg Elddhaf, Assistbrit-Maj.0 Pehnits.-Coordthator 400Commerce ;Av&:,Morehead City, NC26557 Fa% 252>2473330 (CoOrlerV446.33) sURJr=CT: CAMAIDrodde A Fill Applicabob Review Appil6kint, aet4F callier Project Locatton: 286. Gfiggs. A0ers,. Drive, Point Harborin Currifuck Prcpdsed Proleft: Sh.org.line stabilization Pteqelndlcate befow yoWr agency's :posJ.lTon,or viewppintgn the proposed project and return at.thdaddrestabjavo..byJadiiary:l7,2021, tifyoubsovdany questions regardingthe proposed project, contact Robert Oorbett(252-264-3901,.ext-03) When appropriate; in,depth,00mmahfk*ith:.iupOdrti0p,[d6tEi,is reqUested., "Additional comments may, be, Ottac This wal4ency haFS:hbc'ornrneht-.on the Tb.ls.agenqy:,aPOf.q.va§ Of thk'project: are Incorporated, $60attadftetl- Project for t60sonsddsofibed Irf the -9.ttacbed AGENCY�Wpl& SIGNATURE nldy-d& DATE A changes: RECEIVED jAN 3 2022 G T t biabethdity-oVe.1 tOlSott'hGrlfAnStme%SuRel . 00 1 Mmb9JhCltWNorthcDmIWa2T9D9 ra DE-Q$ Ir 2522643?01 ROY COOPER GalTrnar ELIZABETH S. BISER Secretary BRAXTON DAVIS Dfreclor December 22, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax:252-247-3330 (Courier04-16.33) QM SUBJECT: SUBJECT: CAMA/Dredge &Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext 233) when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may he attached" X_ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated, See attached. This agency objects to the project for reasons described in the attached comments. PRINTNAME Lee Padrick AGENCY NC>�Com/m�erce SIGNATURE —/oy Y%{� iw— DATE 1-3-2 DEQ�� fi��iJH.:anam,� R,E- EIEED JAN 4 2022 €OP SECTION WID NorthCarol?na Dcparlmmlot Envlronmenml Quality I Division of Coastal Management Elizabeth City Office 1401South Griffin Street Suite 3001 Elizabeth City. North Carolina 27909 2SL2643901 a — IL -POY OOOPER ELIZABIMISASEP, si� BRA3ftON DAY , IS Deomber.22,;2021 MEMORAND FROM 130,gg Badho, As$IsWn(Maf6r Permits Coordinator NCOEQ 4bb'Obftiihdr,d.e:Aye ;i,Mcli6heiid City) NC - 286V 17az,252JW4530 (46W& 0446-13) 4IM90. ddin.09- SUB!EdT-, CAAMIDredge $. Pill Applibation Review Applica4t: Betty Collier Project.1-odation.. 288'GrI 0%.Ari.3it.0rt,voPOintHarboritiCt((titubk Frcoio6ed Project: Shoreline sttitli2 atl9n Pledge)'indlcote below your ag,eppy's position, or viewpoint n the proposed project and return this fdnn ci Bodnar atithe .address above by JOndbry-.'12, 2091. If haveany questions regardinTthe: proposed project; contact Robert Corbeft 3),W.hen appropriate, in-depth com"meints.with supporting data is requested.. RFPLYi ThisAgericy, has n.9-90JL-etion to the projectas proposed. 4X46iofibl comments, maybe This-agency.has nacdrnrrt ton the proposed prdjed Thisage Plyappr fi '. 00, of the• project only: ff, the lsd6rnmen ppr ded chenpa are lbcbrpo ' rate& See�aljached. T i - objects to the project for reo h $.a.gency 0 1600 ... Sons:desdribed lqfhe ettlaphed Y, PRINT NAME �S AGENCY jj Cb 6EV — b cti. RECEIVED SIGNATUR DATE J A N 5 2022 NIP SECTION MFID NorthCmftnaf)epartn toft:nvfmnmnta[Qnitty I DWIslonof Coastal Management DEQ20 . E"dhCltyOfftce I 40fSouthGrlMnStreet.Stdte3,OO I E"th City, NcrthCaftllmM�9.sa2 .� 2522643001 3 L ROY COOPER Governor ELIZABETH S. 81SER Secretary BRAXTON DAVIS Director NORTH CAROLINA Environmental Quality C -WEIED MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator JAN 5 2022 Division of Coastal Management FROM: Charlan Owen116P, NE District Planner �` P %" "C 1TION PIRA' Division of Col Management . SUBJECT: Major Permit Request by Betty Collier to install 100 linear feet of vinyl bulkhead and a 10 foot wide by 100 foot long section of riprap on the Albemarle Sound; at 288 Griggs Acres Drive, in the Point Harbor community, Currituck County. DATE: January 4, 2022 Consistency Determination: The request is consistent with/not in conflict with the Currituck County 2006 Core Land Use Plan (LUP) certified by the CRC on May 18, 2007 as amended through December 7, 2021. Overview: The .57 acre subject property has approximately 100 linear feet of shoreline along the Albemarle Sound. Water depths near the shoreline range from -.5 foot to -2 feet and average - 1.5 feet. Vegetation consists of yard grasses and trees. Site elevation is approximately 10 feet above Normal Water Level (NWL). The site is located primarily outside of a floodzone, with shoreline located in the AE floodzone. A single-family house is located on the site. Existing shoreline improvements consist of a failing bulkhead and two (2) remnant groins/return walls, one at each property line. The bulkhead failed between July 2019 and February 2020, resulting in erosion, with the bulkhead alignment being located 20 feet waterward of NWL. Since erosion occurred within the previous year, CAMA General Permit 78713A was issued in November 2020 to allow for construction of a new bulkhead in the same alignment. The bulkhead was not constructed and it has now been over a year since the bulkhead failed. Installation of 100 linearfeet of vinyl bulkhead and a 10 foot wide by 100 foot long section of riprap is proposed. The bulkhead will be located along the same alignment and tie into the existing remnant groins/return walls at the property lines. Given the erosion that has occurred, the bulkhead will be located a maximum distance of 26 feet and an average distance of 15.5 feet waterward of NWL. Backfill material will be obtained from a clean upland source. Riprap will be installed immediately waterward of the bulkhead. North Carolina Department of Environmental Quality l Division of Coastal Management Elizabeth City Office 1401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909 252.2643901 North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 4 The waters of the Albemarle Sound in this area are classified as SC and Coastal Waters and are closed to shellfish taking. No submerged aquatic vegetation was observed growing at the project site. Based on available information, there appear to be no archaeological sites on or near the property. Anticipated impacts resulting from this project are expected to include: the filling of 2,550 sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC) and 2,450 sq. ft. of High Ground within the Estuarine Shoreline AEC. Basis for Determination: The property is designated as "Limited Service" on the Currituck County Future Land Use Map (FLUM); with Areas of Environmental Concern (AECs) also designated as "Conservation Areas" as indicated on Page 11-1. The property is also located in the "Point Harbor" sub area. As indicated on Page 11-1, the purpose of the Conservation designation is to provide for the long- term management and protection of significant, limited, or irreplaceable areas. Proper management is needed to conserve the natural, cultural, recreational, scenic or biologically productive values of these areas. The designation is applied to areas that should not be developed at all (preserved), or if developed, done so in a very limited manner characterized by careful planning and' cautious attention to the conservation of environmental features. As indicated on Page 11-2, the standards of the Conservation class shall be applied in accordance with the site specific information made available during special studies and/or the land development process. Definitions of key words are provided on page 9-2. These words include "Encourage: to favor or foster", "Should: Ought to, if no valid reason not to", and "Support: to shore up, may imply financial support". Land Use Plan policies address the use of vegetated buffers to reduce pollutants and protect water quality. - In this case, bulkhead will help protect water quality by reducing soil erosion and sedimentation. The following LUP policies may be applicable to this request: JAN 5 2022 Land Use Compatibility: MP SECTION MUM Policy ES4, Pages 9-5 and 9-6. "In approving new developments, Currituck County shall support the retention or creation of vegetated buffer area along the ESTUARINE SHORELINES as a simple, effective and low-cost means of preventing pollutants from entering estuarine waters. Exceptions to this requirement may include developments North Carolina Department of Environmental Quality I Division of Coastal Management y'J/p Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Eltrabeth City, North Carolina 27909 N.FIXfNYkINA !� 252264.3901 North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 3 of 4 involving pre-existing man-made features such as hardened shorelines, ditches, and canals... The County also supports CAMA use standards for all COASTAL SHORELINES, whether estuarine or otherwise." Policy ES5, Page 9-6. "Uses allowed in ESTUARINE WATERS must be water dependant (public access, docks, piers, erosion control, and other CAMA-approved uses) and must not interfere with the proper function, cleanliness, salinity, and circulation of the resource..." Natural Hazards: Policy NH 1, Page 9-16. "The County recognizes the risks to life and property that exist within SPECIAL FLOOD HAZARD AREAS (i.e. areas having a 1% chance of flooding in any year) that may be inundated during major storm events. The County will continue taking measures to mitigate these risks and will avoid taking any action in these areas that materially increases risks to life and property." Policy NH2, Page 9-16. "The County shall require development and redevelopment within SPECIAL FLOOD HAZARD AREAS to meet the standards of the National Flood Insurance Program and the County's Flood Damage Prevention Ordinance..." Policy NH 8, Page 9-16. "Currituck County encourages owners of PROPERTIES ALONG ESTUARINE SHORELINES to employ the least hardened approach to shoreline stabilization (i. e. marsh grass favored over riprap favored over bulkhead, etc.) provided that reasonable access is available to install the technology available." Water Quality: Policy WQ 3, Page 9-17. "Currituck County supports policies, plans and actions that help protect the water quality of the county's estuarine system by preventing SOIL EROSION AND SEDIMENTATION, and by controlling the quantity and quality of STORMWATER RUNOFF entering the estuary." ECEEIVED ® r ��� North Carolina Department of Environmental Quality I Division of Coastal Man'dt*t 5 2022 Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 .vrm�riaana 2522643901 MP SECTION AMHD , North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 4 of 4 Policy WQ 4, Page 9-17. "RUNOFF AND DRAINAGE from development, forestry and agricultural activities shall be of a quality and quantity as near to natural conditions as possible. Post - development runoff shall not exceed pre -development volumes." Policy WQ 5, Page 9-17. "Development that preserves the NATURAL FEATURES OF THE SITE, including existing topography and significant existing vegetation, shall be encouraged..." Policy WQ 6, Page 9-17. "Currituck County supports the retention or preservation of VEGETATED BUFFERS along the edge of drainage ways, streams, and other components of the estuarine system as an effective, low cost means of protecting water quality." Local Countywide Concerns: Policy HP4, Page 9-20. "The DESTRUCTION OF SIGNIFICANT ARCHITECTURAL, HISTORIC RESOURCES, AND ARCHAEOLOGICAL RESOURCES in the planning area shall be discouraged." vE- D JAN 5 2022 M? SECTION [Yj-ED North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1401 South Griffin Street, Suite :3001 Elizabeth City, North Carolina 27909 w wnrww It 25226,43901 I ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December 22, 2021 NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) greee bodnarr)a ncdenr.eov SUBJECT: CAMA/Dredge &Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greav Bodnarat the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233) when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** V This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Christa Sanderford AGENCY NCDMF - Shellfish Sanitation and Recreational Water Quality SIGNATURE afor Shannon Jenkins DATE 1/6/2022 ECEVED J A N 7 2022 PAP SECTION RAHD North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth. City, North Carolina 27909 :a.:.Wf I \ #0 0�' 252.264,3901 ROY COOPER Governor ELIZABETH S. BISER. Secretary BRAXTON DAVIS Director C. '�L►. I z. z.8.03 December22, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-96-33) _0dNI:(ancdenr.nov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return ttas form to Gregg Sodnarat the address above by January'1P, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext: 233) when appropriate, in-depth comments with supporting data is requested. Y: has no objection to the comments maybe attat This agency has no comment on the proposed project. _ This -agency -approves of the project only if the recommended changes are incorporated. See attached. _ This agency objects to the project for reasons describedin the attached comments. PRINTNAM AGENCY 7 -11ZC SIGNATURE DATE JAN 1 2 2022 p SECTION U41 �D North Carolina Department of Environmental Quality I Division of Coastal Management Ellzobeth City office 1 401 South Griffin Street; Suite 300 1 Elizabeth City,: North Carolina 27909 252.2643901 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December22, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax:252-247-3330 (Courier04-16-33) gregg.bodnar@ucdcnr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233) when appropriate, in-depth comments with supporting data is requested, REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" x This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME James Harrison AGENCY NCDMF SIGNATURE 19Mn.Asif%.rrr^IcrJ-tt, tl ECIE VED DATE 12 January 2022 JAN 1 2 2022 MP SECTION WIHD �p North Carolina Department of Environmental Quality I Division of Coastal Management ®� J/ Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909 2522643901 Received: 01/05/2022 l.~ State Historic Preservation Office ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December22, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality ER 22-0009 Due: 1/13/2022 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier04-16-33) grggg bodnaE(0)ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233) when appropriate, in-depth comments with supporting data is requested. This agency has no objection to the project as proposed. "*Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Renee Gledhill -Earley AGENCY State Historic Preservation Office SIGNATURE " DAiv 19,1 JAN 2 0 2022 [Wr P SECTION NNe sM North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City office 1 401 South Griffin Street, Suite 300 I Elizabeth City, North Carolina 27909 252.264.3901 February 2, 2022 Regulatory Division ORM ID No. SAW 2022-00133 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: y%LD FEE re"-? SECTION MHD Reference the application of Betty M. Collier for a Department of the Army permit to replace and reconstruct an existing bulkhead and place rock riprap material, on property located at 288 Griggs Acres Drive, adjacent to the Albemarle Sound, in Point Harbor, Currituck County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 3. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 4. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 5. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 6. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 7. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 8. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Field Office, Regulatory Division, telephone (910) 251-4564. Sincerely, �"-(344, SPwe, Raleigh Bland, S.P.W.S. Regulatory Project Manager b h�taP'E -FEB 1 2022 : 'a 4. Copies Furnished: N.C. Division of Water Quality, Wetlands Unit 2321 Crabtree Blvd, Parkview Building Raleigh, North Carolina 27604 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Ms. Twyla Cheatwood National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Mr. Ronald J. Mikulak, Chief Wetlands Regulatory Section Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Ron Renaldi, District Manager Elizabeth City Regional Office North Carolina Division of Coastal Management 1367 US 17 South Elizabeth City, North Carolina 27909 F E B 1 2022 RI a' S.VECMON RP`77" ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Betty Collier 2730 Blithe Drive Chester, VA 23831 NORTH CAROLINA &wkvnmental Quality March 10, 2022 RECEIVED MAR 1 1 2022 FLIP SECTION 10,1lD DWR # 2021-1855 V1 Currituck County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS 288 Griggs Acres Drive - Shoreline Stabilization. Dear Ms. Collier: You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on December 22, 2021. These impacts are covered by the attached Water Quality General Certification Number 4175 and the conditions listed below. This certification is associated with the use of Regional General Permit Number 291 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) CAMA Major, Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved, provided that all the other specific and general conditions of the Certification are met No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)1] Type of Impact Amount Approved Amount Approved Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water - Fill OW -1 0.05 (acres) 0 (areas) Plan Sheets The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4175. [15A NCAC 02B.0507(c)] D_E QJ� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1943 Washington Square Mail I Washington, North Carolina 27889 252.946.6481 '* -. Continuing Compliance 3. During construction of the proposed project, fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(01 4. The permittee shall report to the Washington Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided Within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. S. This approval and their conditions are final and binding unless contested. [G.S.143-215.51 Conditions: These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at hnp://www.ncoah.com / or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Mondaythrough Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition alongwith any applicable OAH filing fee is received bythe OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: lfsending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 lfsending via delivery service (UPS, Fed Ex, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 RZECEVELD MAR 1 1 2022 P P SECTION MHD QJY North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889 iroaiv cu+anvn m.u�mmmm,\-Op� - 252.946.6481 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Tina Martin at 252-948-3844 or tina.martin(@ncdenr.gov if you have any questions or concerns. Enclosures: GC 4175 Certification of Completion cc: Gregg Bodnar - CAMA Robert Corbett - CAMA Laserfiche/DWR file copy Sincerely, P14W TA-# k ul Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ EMED= MAR 1 1 2022 �u �- a'IN NqFD North Carolina Department of Environmental Quality I -Division of Water Resources Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889 iuw�amum� /`� 252.946.6481 lo'I'lool REMNANT GROIN PILES/SHEATHWG TO REMAIN G RETURN RIPRAP --PROPOSZO NEW k RJPRAPI 1 758tAEC UNDRY PREOCONST�- IF t 1H n ,� I BACKFlLL / BEL($ NWL 1600 SFt g r 0 E C - 3 202 DOCM PROPERTY OF: 8 and K. LLC 1230 RIVER ROAD CHARLOTTSMLLE. VA 2: I N I a SOIL DRIVE I I a, 0 A ROPERTY OR ETTY COLLIER 'RECEIVED1B 2730 BLITHE DR. CHESTER VA 23B3 ! MAR 1 1 022 Ml g I RETURN PROPERTY OF: / VINSON HOLDINGS, LLC 528 ANCHOR CT KILL DEVIL HILLS, NO 2794E Ij `--REMNANT GROIN PILES/SHEATHING rf TO REMAIN �1 \ 'i pr�TMYn\y PROPOSED.A <�=w.m �,� 288 GRIGGS ACRES DR. POINT HARBOR, NC 27964 BETTY COLLIER GRAPHIC SCALE -ae +e x eo ( W r T ) a 1.— so m �a � iA•14U!/f�09 P1n1#AfiauNeTer++ ' lUBXhN PaaYP' PevNff PAI -gsr- )$f.<11�56] TL-<ftbSlc qr- �4T! NiITMll.W. 9:)d0 � r ROY COOPER Govenor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director Betty Collier wtnuck@gmail.com Dear Ms. Collier, NORTH CAROLINA Environmental Quality March 2, 2022 This letter is in reference to the application submitted for a Coastal Area Management Act Major Permit to undertake development activities to construct a new bulkhead with rip rap, in Currituck County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make May 16, 2022 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-515-5416) or e-mail (gregg.bodnar@ncdenr.gov). Cc: DCM Elizabeth City 9 Reg Z.-. F 9 � I Sincerely, m Gregory W. Bodnar Assistant Major Permits Coordinator North Carolina Department of Environmental Qualtty I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead Clty, North Carolina 28557 252.8082808 From: Bodnar. Greaa To: wtnuck(aomail.com Cc: Corbett. Robert W: Godfrey. Ella M Subject: CAMA Application extension Date: Wednesday, March 2, 2022 7:58:00 AM Attachments: BettvCollier EXT.odf Morning Ms. Collier, Please see above for the extension for Ms. Collier. At this time I am still waiting on comments from DWR 401. Once those comments are in I should be able to make a final decision shortly thereafter. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality (252) 515-5416 (NEW OFFICE NUMBER) G reeg.Bod na rCancden r.gov Email Correspondence to and from this address is hubject to the North Carolina Public Records Law and may be disclosed to third parties. ICU MP-1 APPLICATION for Major Development Permit DEC 14 2021 (last revised I2127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name O Applicant 2: First Name MI Last Name If additional applicents, please attach an additional page(s) with names dated. Mailing Address PO Box city state L � C)A SA-1 ' V 0-- ZIP Country Phone No. FAX No. 38'vl I LOA ®c>+ 1`F't3 S'11W - - Street Address (if different from above) City State ZIP gAcy-e-sqqS�19ro� Email VV 2. AgentlContractorinformation Business Name L Agent/ CoAtractor 1: First Name MI Last Name c V 1 e,-. Agent/ Contractor 2: First Neme MI Last Name Mailing Address Po Box City State ZIP Phone No. 1 Phone No. 2 Cl 263A - 491 9 i%2. ext. Xa -489 - 9051 axl. FAX No. Contractor p Street Address (if different from above) City State ZIP 113 '.x, Ic Qwt ll'so;.1 Email <Form continues on back> RECEIVED 252.-808-2808 ,. 1-888-An Crr P.:,� .. WWW.,r.DEC 222021 DCM—MHD CITY Form DCM MP-1 (Page 2 of 4) r APPLICATION for Major Development Permit DEC 1 4 2021 3. Project Location County (can be multiple) Street Address ( ' jj -few —EC State Rd. # I's oaf ` Subdivision Name city State Zip Sbl 1 I 11 1�1 4- 44- C I A-i%q Phone NJ Lot No.(s) (if many, attach addNonal page with list) rip �1 25Ka -1 r1 -85(Q` exL t2 . , a. In which NC river basin is the project located? It. Name of body of water nearest to proposed project c. Is the wets ody Identified In (b) above, natural a manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown /t 1 e. Is proposed work within city limits or planning jurisdiction? f. If atpplicable, list the planning jurisdictionorcity limit the proposed %,Yes ❑No work falls within. /� Cua/r;�ur...1L--Q u.--% 4. Site Description a. Total length of shoreline on the tract (R.) b. Size of entire tract (sq.R.) IUD 2 -C+' c. Size of individual lot(s) !. d. Approximate elevation of tract above NHW (nomral high water) or C NWL (normal waterlevel) 0 f (If many lot sizes, please attach additional page with a list) ❑NHW or gNWL ± 10 e. Vegetation on tract I. Man-made features and uses now on tract -dam: ly c�we..11•..g rY'P.mno�,1'} bu�►kh�-c� Single g. Identify and describe the existing land uses aJacent to the proposed project site. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? o V t `es (Attagh zoning compliance certificate, if applicable) es ❑No DNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Dyes SAO k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. Dyes ❑No alk If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Dyes ❑No National Register listed or eligible property? <Form continues on next page> RECEIVED 252-808.211e8 .. 1-888-4RCCIAST .. www.nccoastalmanagement.nntn EC 22 2021 DCM-MHD CITY Form DCM MP-1 (Page 3 of 4) FFw APPLICATION for Major Development Permit DEC 1 4 2921 m. Q) Are there wetlands on the site? Oyes bAo (It) Are there coastal wetlands on the site? Ls 1.14 t �"' 17. 1 Dyes 5�40 (III) If yes to either (i) or (ii) above, has a delineation been conducted? Dyes ❑No (Attach documentation, If available) n. Describe e4stirg wastewater treatment facilities. T 4• ;V0-ir' Se +,-r, SySt- - o. Describe existing ddnking water supply source. weA I p. Describe exsting storm water mane oment or treatment systems r' [N 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ' J �v-i v a'[ ❑Commercial ❑PubiidGovemment &OrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. �i7 �t'vV 1 dG row SYto/ C � w ��i'Ot'1 0.GVl� S S �o � cf) �• F a; teal I'hi.l tchzr�d c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it Is to be stored. Sma.\\ excAVaiur r tYacic L c\�v- 1 t��lav�Gl yav� Gi.rel� d. List all development activities you propose. 1 ,j., �.Jll}}Li'b-LP� C-On SAY, hvl -i �0.CILE; _L � � � }0.C eM-e-A+ e. Are the proposed activities maintenance of an existing project, new work, or both? _ N ew I. What is the approximate total disturbed land area resulting from the proposed project' Fa ,Ft or []Acres 5, 000 g. Will the proposed project encroach on any public easement, public accessway or other area Oyes Nto []NA that the public has established use of? It. Describe location and type of existing and proposed discharges to waters of the state. I. Will wastewater or stormwater be discharged Into a wetland? []Yes o ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ❑NA j. Is there any mitigation proposed? []Yes QKo ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED zsz-aoa-zeoe :: 1-8ee-4RCOAST :: www.nccoastatmanagotnont•uot DEC 22 2021 DCM-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addli fonal Information In addition to this completedapplicabon form, (MP-1) the following Iterms below, If applicable, must be submitted In order for the application package to be complete. items (a) — M am always applicable to any mgjordevalopment application. Please consult the application instruction booklet on how to property prepare the required hems below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that Is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the dead (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Cheek or money order made payable to MR. P 400 -a I. Allot of the names and complete addressee Of [tie adjacent waterfront (riparian) landowners and signed ratum receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days In which Is submit comments on the proposed pmject to this Division of Coastal Management. Name In on .nG Phone No. Address g28 Apt A Ja+ I iU OGJiI I+-J sthlG 219'�Q .252 489-9051 Name 8 d K �� Phone No. Address 123E &Vi W, ChArin{tsyI* IJt. JA 224E I 114A 981'R'l3 I Name phone No. Address g. A list of Previous state or federal permits Issued for work on th project tract Include permit numbers, pernttee, and Issuing states. GMhA &? 4$1ISA (06AIK COMFItfi40 h. signed consultant a agent authorization form. If applicable. - 1. Wetland dellnestlon, If necessary. A J. A signed AEC hazard notice for projects in oceanfront and Intel areas. (Must be &Wed by property owner) r4 A k. A statementof compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 140), t necessary. If the project Involves expenditu of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Palley Ad. A 1 7. CerWeatfon and Permission to Enter on Land I understand met any permit Issued in response to this application wit allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify 7 that the information provided in this application, is thful to the best of my knowledge. Data l t�a(— Print Name "l I /N•I , 9 Signature �'" �_/ , '-'• a "� ....4 •....,tt...t Please indicate application attachments pertaining to your proposed project. 2021 ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts 0 E C 3 ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information J t'���C t RECEIVED ,,^.Sw-N il0.2gas rr 9-LFa•Q 14 C,0Aa'r r: tvww.nccoas4altnaragomant.net DEC 22 2021 DCM-MHD CITY Form DCM MP-2 EXCAVATION and FILL 1. DEC i 4 2021 (Except for bridges and culverts) DC11 ./1 f: 1 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length Width Avg. Existing Depth NA NA Final Project Depth NA NA 1. EXCAVATION Z�fl`hfs section not applicable a. Amount of material to be excavated from below NM or NWL In b. Type of material to be excavated. cubic yards. C. (i) Does the area to be excavated Include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None (it) Descdbe fie purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (I) Do you claim title to disposal area? ❑Yes ❑No ❑NA (it) If no, attach a letter granting permission from the owner d. High -ground excavation In cubic yards. section not applicable b. Dimensions of disposal area. d. (1) Will a disposal area be available for future maintenance? []Yes []No []NA (11) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh I. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None (il) Describe the purpose of disposal in these areas: (I) Does the disposal include any area in the water? ❑Yes [--]No ❑NA (II) If yes, how much water area is affected? RECEIVED DEC 22 2021 252.000-2008 :: 9.888•411COAST :: www,nccoastalmn9nffe{pmrt.nek - i 12G100 Form )ACM MP-?. (excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION (If development is a wood groin, use Ml — Structures) a. Type of Shorelin�s/tatelllzaaon: b. Q♦Sulkhead Lyei�prep ❑Breakwater/Bill ❑other. C. Average distance waterward of NHW oll d. ., �'r e. Type of stabilization material: r 1. Vl� f� 5)1!1 .4 Fi11!- g. Number of square feet of fill to be placed below water level. h. Bulkhead backfill l5$.0 Riprap 1000 Breakwater/Sill _ other _ I. Source of fill material. uplar-,d rrir� DEC EV IPIAIlction not applicable r,. Width: ro D '%Ii -- DEC 14 2021 Maximum distance walerward of NHW or O (I) Has there beer shoreline erosion during preceding 12 mo99ths? ?es ❑No ❑NA (h) If yes, state amount of erosion and source of erosion amount Information. V �sual olas3rt.�c,h a-. +measuvrmcrr+ �' Type of fill material. �� Yak' caku�l dr''"`^"` f ° E elnosb-t in �Gtb G Glatas � Sena 4. OTHER FILL ACTIVITIES ll section not applicable (Excluding Shoreline Stabilization) a. (I) WIII fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlandsimarsh ill If yes, submerged equate vegetation (SAV), shell bottom (SB), or III) Amount of material to be placed In the water _ other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. (III) Dimensions of fill area _ ❑CW ❑SAV _ ❑SB . (iv) Purpose of fill ❑WL ❑None (it) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? r c. (1) Will navigqonal aids be required as a result of the project? d. (I) Will wetlands be gassed gcjaossed in transporting equipment to project ❑Yes pNo ❑NA site? []Yes(!71'io []NA (it) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Date Applicant Name RECEIVED Project Name Applicant at '/ j'� OEC 22 2021 1Q k't � l l t cr DCM-MHD CITY 2.52.808.2808 :: 1-880.4RCOAs'r :: www.gcvoast. Inranagemout.not revised: 12126106 r 44r W - 24' YAX 8- CAP BOARD 8' CALV.BOLT FAC A TO WALE O.O.m I BLOCK O EACH BOLT -.-.- - - I FrAMAWAVIA GRAPHIC SCALE ( w rs 10 ) s mesa — so sc N SECTION A o R <�yQo�N 288 GRIGGS ACRES DR., POINT HARBOR NC 27964 `<9 BETTY COLLIER A WV -PIE m COIN. I r i:..... i+'4...v 0 Ec Q6 I ft 14 2021 r fi2v v T� T WE W'i 1 t 0 0 m m � m m 0 in Y yp O\Q �N f 1 i C tIETURN RIPRAP I RETURN REINANT GRM PRE4/9E i"m TO REMAIN ♦ i NEW BULKHEjD '♦ --- 0. COASTAL SNOREUIff '��B�IFFER BEFORE CONST./ i i ! 75' !EC BOUNDRY ,4 i BEFORE CONST. , j ; ! i BACKFILL / NL 1800 SF3 2� I H ! —4ZELINANT CRON PILES/SHEATHING TO REMAIN t._ DEC - 3 2021 E�0M-AEC PROPERTY 05 6 and K. LLC 1230 RIVER ROAD CHARLOTTSVILLE, VA 22901 -------------- / I SOIL DRIVE I i I I I I PROPERTY OF: BETTY COWER I 2730 BLITHE DR. i CHESTER VA 2383 PROPERTY OF: VINSON HOLDINGS LLC 528 ANCHOR CT IOLL DEVIL HILLS, NC 27948 288 GRIGGS ACRES DR, POINT HARBOR, NC 27964 BETTY COLLIER GRAPHIC SCALE _af .f ao ( ar tsar ) DO {L P" DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Betty Collier 2. LOCATION OF PROJECT SITE: 288 Griggs Acers Drive, Point Harbor, Currituck County, adjacent to the Albemarle Sound. Latitude: 360 4'31.17"N Longitude: - 75048'12.81"W 3. INVESTIGATION TYPE: CAMA / Dredge & Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3-8-2020, 10-27-2020, 6-10-2021, 8-3-2021, and 12-1-2021 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received Complete — 12/17/2021 Office — Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Currituck County Land Classification from LUP - Limited Serves (B) AEC(s) Involved: Estuarine Waters (EW), Public Trust Area (PTA), and Estuarine Shoreline (ES) (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — Septic Planned — None (F) Type of Structures: Existing — Single Family Dwelling Planned - Bulkhead (G) Estimated Annual Rate of Erosion: Max of 20' when bulkhead was breached. 3' per year after. Source — On sight observations and google earth 7. HABITAT DESCRIPTION: (Area ftz) A AEC bellow NWL) 1,000 ft' (Ripra (C) Total Area Disturbed: 5'000ft 2 (D) Primary Nursery Area: No (E) Water Classification: SC Open to Shellfishing: No 8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead a maximum distance of 26' waterward of normal water level (NWL) and Riprap. RECEIVED DEC 22 2021 DCM-MHD CITY Betty Collier Field Investigation Report Page 2 Proiect Setting The project site is located at 288 Griggs Acers Drive, Point Harbor, Currituck County, and is adjacent to the Albemarle Sound. The lot is 24,829 ft2 (.57 acres) in size with an elevation of approximately 10' above NWL. Manmade features on the property consist of a single family dwelling and 2 remnant groins. The properties shoreline was recently hardened with a wooden bulkhead which failed between July of 2019 and February 2020 (Source: satellite imagery) most likely due to a storm event. (Most likely Hurricane Dorian September 2019). The breached bulkhead was first observed during a site visit on 3-8-2020 by DCM staff and at the time of the site visit the maximum distance waterward of the original bulkhead alignment to NWL was 20'. Because the erosion occurred within the previous year, per 15A NCAC 07H. 1105(a)(3), CAMA General Permit 78713A was issued on 11-4-2020 to construct a new bulkhead in the original alignment. Development authorized through this permit did not occur and it has now been longer than 1 year since the breach. According to the USDA's Natural Resources Conservation Service's Web Soil Survey, the soil on the property is made up of Conetoe loamy sand. Vegetation includes yard grasses and trees. No wetlands were observed. Based on available information, no archaeological sites are on or near this property. The adjacent riparian property to the northwest contains a single family dwelling with a riprap shoreline and a docking facility made up of a pier, platform, and a boatlift. The adjacent property to the southeast contains a single family dwelling, a bulkheaded shoreline and an aging pier with attached boatlift. The location of the proposed development is within the Albemarle Sound and is classified as Coastal waters by agreement with the Marine Fisheries Commission and Wildlife Resources Commission. The Division of Environmental Management's water quality classification for this area is SC and it is closed to shellfish taking. Water depths within the project site range from -0.5' to -2 and average -1.5'. Submerged aquatic vegetation, as per DMF's definition, was not observed in the proposed project location. Development Proposal To prevent further erosion and to protect the existing dwelling, the applicants propose to construct a 100' long vinyl bulkhead in the same alignment as the previous bulkhead which will tie into the adjacent bulkhead to the southeast and will connect to the remaining return wall on the northwest corner. This alignment will be the same as the previously breached bulkhead. This alignment will result in a maximum distance waterward of 26', and will average 155, as measured from normal water level. All backfill material will be from a clean upland source. In addition to the proposed bulkhead, the applicants propose to install riprap immediately waterward of the newly constructed bulkhead. This riprap will extend no more than 10' waterward of the proposed bulkhead. Anticipated Impacts • The construction of the bulkhead along the proposed alignment will result in the filling of t1,550 ft2 of the PTA and EW AEC and t2,450 ft2 of highground with clean fill from an upland source along 100' of the ES AEC. • The installation of the riprap will result in the filling of t1,000 ft2 of the PTA and EW AEC. Submitted by: Robert Corbett Date: 12/17/2021 RECEIVED DEC 22 2021 DCM-MHD CITY RUM auNI I INN Lin OMMLL 1116. 'i. M.RINf CO Mf 14V[IION CONSTRUCTION • CONSULTING - DESIGN PROJECT MANAGEMENT 113 BALLAST ROCK DR . POWELL S POINT. NORTH CAROLINA 27966 Pholm (252)4918562 - Fax (252)4968564 - wwwlynsmallconl Lft�Ps'�1?60 i, BEC-32021 Betty Collier Permit Narrative for proposed bulkhead at 288 Griggs Acres, Point Harbor, NC 27964. The proposed project will consist of 1 phase. The phase is as follows: Constructing a bulkhead beginning at the south property line of 288 Griggs Acres then ending at the north property line at 280 Griggs Acres Drive. The bulkhead will be constructed with interlocking vinyl sheathing on a pile and wale frame. The height of the bulkhead will be 6' along the shoreline. The bulkhead will begin at the corner of the existing return located at 288 Griggs Acres Drive. The bulkhead will continue in a north direction line with existing bulkhead at 292 Griggs Acres and then continue parallel to the remnants of existing timber bulkhead on 288 Griggs Acres then end by connecting to the existing bulkhead return located at neighbor to north 280 Griggs Acres. At the connection at 280 Griggs Acres rip rap will be removed then return will be installed and rip rap put back in place at 280 Griggs Acres property. Equipment to be used for the construction of bulkhead will be a land -based excavator. Backfill will be installed by dump truck and skid steer loader after bulkhead completion using clean fill from an upland source. Once all Backfill has been placed and graded, a seasonally appropriate grass will be spread. RECEIVED DEC 2 2 2021 DCM-MHD CITY All Soo) 260 PAGE 538 FILED '09 JUN 20 PPI 4 10 CHAR.LENE Y. DOWDY RECISTER OF DEEDS CURRITUCK COUNTY, N.C. ettpp W, Tmt, BnOi pIM Pt Tar fat NO... .. 10 ._.. Panel ldenlldw Ho, _........ .._ . . VedeN by ...... `.1 Ceo-tP nn the .... ._ day N .... to by.. ..... _..... _ ... ._. .. 21,11 after remedies to Mr{.... •key, 6MrP.,...Aktoriney_gt,.ball............ ...._._.... ._-..........._. ...._....:_.. ......... ..._PO bror 1027, Ritty ,Nark,NC 27949......, _..........._. _. _.._ Thim hetrumeot wse prepared by. @•. T.. Yi1elhen.r...¢[./btV ...... .__ .. ._ Brief dendpnon fn, the inn.. - NORTH CAROLINA TNfa BRtib wale thb -19th d.y nt May RAL WARRANTY DEED ..... . 19.09.., by end betwan DEC - 3 2921 DC`;MAE'C NY, _ JOHN H. ABBITT, JR. and wife, PHILLIP R. COLLIER and vita, ANNS A. AtiBTTTE7.'TY H. COLLIER 730 Blithe or1W } Cheater, Virginia 23031 MWI n."rgrYr M1Mtn Ix nrh pnlr: nwr, reed., ••d. N .11, herb, rM,Ntn a e-Mr:v rtrau,n•e •r prrtweNr. Tbo dwlleelion C..Mw end Grants. n.... J beret. -hall include cold parlire, tM1 `'Lido. euceeeamw Sad Amens. end .A.II Imlud- .Inrvl.r, plumoIt , meuli.o, minlnt orneuNr no r,rb1r.d by ...text. ' WITNBRSETH, that `fit Craw, for n r.lonble ....Ideralbor paid by Ue Cnnln.` enipt of wMeb la hereby'.� oelmowledred, he. a" by there pwenq de.n pant bnrrdn. hell read conrry unto the too In C. dmph, .11 Out i tortaln hd nr puree, of lord Ntn-IoJ In IM City of 1 oy r Branch. . Town.hts. .... CYrritwek.,,.. County. MntU [an,tnr rend more A+rtirnlrrly n.nerlbnl pe 411osa:� That certain property situated in Poplar Branch �wnshlp, Currituck County, designated as Lot Number Twelve (12) n Nat certain plat entitled 'T. G. Griggs, Point Harbor, POpl ranch Tornship, Currituck, by T. J. Jessup, Surveyor, it/18/52 and recorded in Hap Book 1, Page 95 in the Currituck County Rag ry, ' Said lot fronting 100 feet on Albemarle Bound and extending ek between parallel lines to a twenty 120) foot right of way a .. distance of 260 feet, more or lean, and being the Barre grope conveyed to John H. Abbitt, Jr. and Anne A. Abbitt, husband a by dead dated 25, 1905e RECEIVE D June of record in Book 2030 at pa 797, of the Currituck County Public Registry. There is also conveyed the right of egress and ingress in, over and upon that certain twenty foot DEC . .. (20) right of ray as shown on 22 2021 the afoieaaid map itenadietely contiguous to said property, together with riparian rights incident t0 meld lot. u»p7lwewHE,.RR j DCM—MHD CITY AafW1/► aATL Pan, eY. mar e,ur. rr,wnu wire` Pew, m, PrInVA try ('nrnr,9Nnt Prin4M, ln[. Book 260 Page 538 V 3 2021 BOOK 260 PAGE 539it Nl TheDmplyay h.wle.baw d.wrlMd was .wni,.a by Grantor by la.Wnmwt x..NN in ....Book ...7H3.._.eA9A...29.rr-. ^' o f,. the yl;erlluak County PUOlie R gl•trY.... .... .. .... _............ ...... .'• A & map [bevinV�ld1rAbrw elt JxeribN prop<rtf la erdN Bunk Im 1 _... _ pap 9,3 \.......... "' TO HAVE AND " HOLD the afar...ld lat or p..I rf lead .ad .11 vrlvll.ara aN ."..4nseeM tbv.M bd.Ma• M the G... to. In fM Nlopie. Ana the Grantor wVVMaAV with the Grantee. that Grantor 1. Mild of the premises in fh.lm,,le, he. the rl&ht to wnhP the ume In fee simPWRAt title is marketabb aid fro bad clearaf all tncombranm, and that Grantor will warrant and defend the title aatlM lawful clatms of all particle whem.serer social for the exception. hor.in.fter stated. TIIV to the pmDerlY heesh.bove de.eribd is wb7eet in an* fn11ew11M wcwllan.t wRn[t< xlle•m,. u• crurY aas. ,Y .41r, X. MrwaY ear h n. t4r u4e4.. MrY.n Mt +.n...1• 79 Mx• w•rMx. M �� Y,•uN MI,aM Nr of Nir••1 .,m4��t sm. OA• W n^ `. ......................... .................. .. i�.J .. ...... ........ -.... ......... y �e Ieel.x-••.Nn g N. ABBITT JR uuu j; x I^I IN ........ ............ ....................... �.l• -1[M41 I, ......................I.. .............................. .:-..............__-.-.--..-rwu.0 ANNH A. AHHI2T AfrYrr I A14N • V.YM....-N...... ..mrwx ltvnnv ]N4 ' • ' Tt�F i�+R'4 UlaiGa%R3NeMAe&. 4 KN M,Y r Ip pMW .N red,-.Y, N'{ly IMI CARMI,.NA.-e.Rv+LIr P•...lira. . e ' CS AJA. Nl (aA, Anna_A.-_Abe` ................ ............._......----............xsw.. an. Ixu.— wsw4. o uN W ,b x[ XX A. n.wr -.w, AL�.-.....roll.--. .._N•-t+-__-.., u.d9.. Y' •r snlWx..al,..: -l.l.. •5 �.4/.`te!•. tY4KAM• • ND•ill CA.•LIN& ......... .< W-!; • 1. a NratY Penb .f Y. CMW ..t WY 4w..Y. a Ail ......... .......................r �.. a� Nrlwlllt eN..eNx wr W. tlr Mt MYMIMr« W .. M Iu.1....:....... Mlrur M v ]w ........................................... ore���"©���eyyyHr"""���ba rMMWsm,\adagewia...W be nJ 1".. ene .. l•..11 as W Nrr-rIW. Y. exxMr Y.W ry.wr 14.M Y Y.yea u O ' � rnuxx..nu. ru ear remxN r,.l N< NINNt ei'enu., r.r am..M MIYYI .Yn _____ c __••_•_••_•_••••......•_•-_•_•_••• .•.,•.. I x.-L I.Y .�W x, .. .....I. l<. .... .. W.xnnwY. •nlrm...... . ... ... .. .............. ... ............... NwV eeaW .N <a. Fr. eNA Cx.rain t • A�. - ew.`......................... „ r. r the Marl.• e• rYiM. ri,: ,n. - ••nyryy YI-ILrxe'�r w� �rR.r rr. i ••Ylh/ - •"Its pa. M....n •iw I •• n.e w.Yry r rYY • � ue �`n51 nv ... -. .... •ml[i•a Or ntbt r0• .... ..gpDtV ._ ..•.... __ _______ .f • -• -.-..... ............ ... aV.VIMMNMbtrllW. N.C. Mr AMI. nrn Nw ] p VIa RIAn11gl, • P.Inhd by Camb9bM l'rlikn, arc. �'Ifll RECEIVED DEC 2 2 2021 DCM-MHD CITY Book 290 Pape 539 Lyn Small Inc. Marine Construction AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Betty Collier Mailing Address: 2730 Blithe Drive — Chester, VA 23831 f Phone Number: 804-748-5716 DEC - 3 2021 Email Address: wtnuck@gmail.com p I certify that I have authorized ___Lyn Small Inc Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: at my property located at 228 Griggs Acres Drive —Point Harbor, NC 27964 inCurrituck County. I furthermore certify that I am authorized to grant and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Befi-h �fli� Print or Type Name NAM - Title It / 11 / '0 This certification is valid through _10_/_1_I 2021_ Date This certification is valid through _3_131_/_2022_ RECEIVED DEC 2 2 2021 DCM-MHD CITY DATE: (2'(4- 1 NAME: - _ & d K I-L(✓ ADDRESS: IUD Ki V-V r "µk CITY: C6A046SV111,e, STAk21P 22901 DEC 1 7 2021 RE: PJPA111 CO�I12>� {PROJECT NAME} To Whom it May Concem: This cmespondence is to notify you as a riparian property owner that LAn 5 irn 0.1l (wit, io applying for Qnsert property owner name or company) a CAMA Major permit to. ;ns4ll too 11-near fit+0 - new bkIMeak on property located at CrriggS ACGts Priv&- Voirt+ HAr- Ne. X714q which is adjacent to your property. A copy of the application and project drawing(s) Is enclosed for your review If you have no objections to the proposed activity, please mark the appropriate statement below and return to: as soon as possible. name of responsible party} If no comments are received within 30 Joys of receipt of this notoo. it wilt be considered that you have no comments regarding this project If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Gtp St, Ste 3 ., 2t143901 Elizabeth City, NC 279M. If you haw questions about the project. please not hesitate to contact me et _9`ig(_ $66f� [rased phone number) or the Division of Coastal Management at 252- 01 . Sincerely, IPISERT NAME / ✓— I have no objection to the project as described, I have objections) to the project as described. WAIVER SECTION I understand that a plot, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by roe. (if you wish to waive the setback, you must Initial the appropriate blank below.) I do wish to waive the 15' setback requirement. 0304 1 f.,C ✓Yiq Print Noma I Signaturi5 of AAddjscent Property O+mar 12Y6 ';?Ilre✓Rol, r therl4ee'lohl"r VA ngo1 Mailing Address andfor Email Address �f"fr l r�..g � sl w i lty�l rhSa n, Co sit J 1 do not wish to waive the 15 setback requirement y2117 /2.1 Date Phone Number RECEIVED DEC 22 2021 DCM-MHD CITY NAME. V I VIS OVI i 104rt J 5 L�C ' I ADDRESS: qts Aylc ok 0. IGii Devi! N45 CITY: I II VtVi 1 Hi-o S ST N(� ZIP 219t{8 RE: To Whom It May Concern: DATE: l Ya�� CT-- 411A:,D DEC 1 7 2021 NFMP This correspondence is to notify you as a riparian property owner that 14n Srha(l 1 RG is applying for {Insert p perty owner name or company) a CAMA Major permit to I+15 f i b0 Lfrll&& bra% of hcw N Kktao(. ;insert project description} on property located at as% (; iM S kr45 N- 4 - p0 ink fJ G insert property address / county} which is adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: Lkrt Srrvtall (Vic. as soon as possible name of responsible party) If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffi ggt., S e 300., Elizabeth City, NC 27909, If you have questions about the project, please do not hesitate to contact me at (insert phone number) or the Division of Coastal Management at 252- 264-3901. Sincerely, K�,d�. R` b�„ Snd lam. INSERT NAME/ V 1 have no objection to the project as described. I have objection(s) to the project as described. I70W:1 V-;1$1111$1 I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. �0S ma Print Name Signature of Adjacent Prr�rty Owner S)-s Ae%�w n- vwi &A Wk Nr. 27igq� Mailing Address and/or EmaillAddress a51-kQ9.4o51 �FCEIVED Phone Number SEC 22 2021 DCM-MHD CITY MAJOR PERMIT FEE MATRIX Applicant: Betty Collier Selection Development Type Fee DCM % DWQ (14300 1601 4351000931625 6253) (24300 1602 435100095 2341) I. Private, noncommercial development that does not $250 1000% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Il. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands Oro an water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B. C, or D below applies: MIA). Private, non - El commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water ® Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or ECEIVED o en water areas: DEC 22 2021 DCM-MHD CITY NC Division of Coastal Management Cashier's Official Receipt 16178 A B C D Received From: LVN JMC Permit No.: AA?,,�- A M ��^ �5 Applicant's Name: _l EPA �,(` tr co U' P f Project Address: K Date: I 3 - 20 =l $ Check No.: S`�— / {` County: C—r-4f�L R�_ Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: �A _ Signature of Field Representative: Date: Date: RECEIVED DEC 22 2021 DCM-MHD CITY ROY COOPER Governor ELIZABETH S. BISER Secrerory BRAXTON DAVIS Director EMAIL MEMORANDUM NORTH CAROLINA Environmental Quality TO: Theresa Schneider The Coastland Times Manteo, NC 27954 legals(@Lhecoastlandtiines.com FROM: Ella Godfrey DATE: December 21. 2021 SUBJECT: Public Notice: Betty Collier Please publish the attached Notice in the Wednesday, December 29, 2021, issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send me the affidavit, an original copy of the published notice, and an original invoice. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth Citv office (252) 264-3901. Attachment cc: Jonathan Howell, Major Permits Coordinator, DCM, Morehead City Christy Simmons, PIO, DCM, Morehead City Ellie Davis, Accounts Payable, DCM, Morehead City File RECEIVED DEC 22 2021 DCM-MHD CITY D_EQ� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suae 3001 Elizabeth City, North Caroline 27909 _' 'r�^�',°�"•'^�`v\ � 252.264.3901 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The NC Department of Environmental Quality hereby gives public notice as required by li 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 12/17/21. Betty Collier proposes to construct a bulkhead and riprap, located at 288 Griggs Acers Drive, Point Harbor in Currituck County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, INC, 252-264-3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 01/19/22, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Wednesday, December 29, 2021 RECEIVED DEC 2 2 2021 DCM-MHD CITY North Carolina Department of Environmental Quality IDivision ofCoastalManagement ,./ Elizabeth City Office 1401 South Griffin Street, Sunte 3001 Elizabeth City, North Carolina 27909 «e * ��^^^^.�•�n••� / 252.264.3901 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December 21.2021 Betty M. Collier 2730 Blithe Drive Chester, VA 23831 Dear Ms. Collier: NORTH CAROLINA Environmental Quality The NC Division of Coastal Management hereby acknowledges receipt of your application submitted for State approval to construct a bulkhead and riprap, located at 288 Griggs Acres Road, Point Harbor in Currituck County. It was received complete December 17, 2021 and appears to be adequate for processing at this time. The projected deadline for making a decision is March 2, 2022. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from December 17, 2021, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point RECEIVED DEC 22 2021 DCM-MHD CITY D_E Q� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City office 1 401 South GriffinStreet, Suite 3001 Elizabeth City, North Carolina 27909 252.264.3901 Betty M. Collier December 21, 2021 Page 2 of 2 along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Robert Corbett, Field Representative, if you have any questions and or if you wish to receive a copy of his field report. Sincerely, Cry Ron Ren i District Manager, Northeastern District NC Division of Coastal Management 1�7[:T7 Enclosure cc: Jonathan Howell, Major Permits Coordinator, DCM, Morehead City, NC Sarah Loeffler, Field Representative, DCM Matthew Koplen, Lyn Small, Inc., Powells Point, NC RECEIVED DEC 22 2021 DCM-MHD CITY NOTI(910f] CAIVIA PERMIT APPLIED FOR PROJECT: Shoreline stabilization; construct a bulkhead and install riprap. COMMENTS ACCEPTED THROU6'" January 18, 2022 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Betty M. Collier Robert Corbett 2730 Blithe Drive 401 S. Griffin Street, Suite 300 Chester, VA 23831 Elizabeth City, NC 27909 804-748-5716 252-264-3901, ext. 233 N 0 —This is a word processing form to be completed in IV icrosoft Word — NC Division of Coastal Management Major Permit Application Computer Sheet (10/21/2019) Applicant Betty Collier Date.' 12/17=21 Project Site County: Cumituck Stall. Robed Corbett District NEfizabeth City Ellillashington []Morehead City ❑WMmington Project Name: Betty Collier Major Permit Rover File: Date of Initial application submittal (EX. 1/WO07): 12WO21 Data application 'received as complete"in the Field office (EX., 1/&2007): 121171=1 Permit Authorization: EICAMA 05nodge & Fill gBoth SITE DESCRIPTIONIPERMIT INFORMATION PNA: []Yes Joffe Photos Taken: Yes M No❑ Setback Required (riparian): []Yes No C1Ibcaf Habitat: ❑ Yes MNO Nol Sure 15 foot waiver obtained: Yes ZNo Hazard Notification Returned: ❑Yes ®No SAV: Yes No Nol Sure Shell Bottom: ❑Yes ®No ❑ Not Temporary Impacts: IffYes No —[]Yes Sure Sandbags: ®No D Not Sure Did the land use classification come from Mitigation Required (optional): county LUP: ®Yes ❑No ❑Yes ®No Moratodum Conditions: []Yes ❑No Environmental Assessment Done: ®NA ❑Yes ❑No®NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) El Future Water Supply (FWS) Nutrient Sensitive Waters (NSM Swamp Waters (SW) El High Quality Waters (HOW) EJ Outstanding Resource Waters (ORK9 WETLANDS IMPACTED (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.) (SS) Glasswod (Salicomis sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) El (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spertfna alteminora) cynosuroides) (DS) Salt or spike grass (Disfichlis (SC) Bullrush or three square (Scirpus El (TY) Cattail (Typhs sp.) spicata) SO (JR) Black needlerush (Juncus (SP) SalNmeadow grass (Spartma roemerianus) patens) APPLICATION FEE No fee required - $0.00 III(A) Private w/ D&F up to 1 acre; 9 111(D) Priv. public or comm w/ D&F to 1 3490 can be applied - $250 acre; 3490 can't be applied - $400 Minor Modification to a CAMA Major LJ Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 pemNt - $250 more than 1 acre - $475 Permit Transfer- $100 0 III(B) Public or commercial w/D&F to 1 C1 Express Permit - $2000 —ElMajor acre; 3490 can be applied - $400 development extension request - 11. Public or commerciaUno dredge $too and/orfill - $400 1. Private no dredge and/or fill - $250 Ll lll(C) Priv. public or comm w/D&F to 1 RECEIVED acre; 3490 can be applied; DCM needs DWQ agreement - $400 UU, L'G LUCI 252.808-2808 :: 1-8884RCOAST :: www.nccoastalmanaAement. net revised: Nov. 2012 DCM-MHD CITY NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant Betty Collier Date.12-17-2021 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 O Bulkhead(Not 1 New Work W Replace 100, 1' mhw Vinyl) Maint ❑ ® Y ❑ N Fill (Shoreline ] New Work Replace 100 15.5 Stabil. Below Maint ❑ ® Y ❑ N H2O Level Fill(Oeneral) 1 New Work ID Replace 24.5' 100' 10, Maint ❑ ®Y ❑ N Riptap(Not 1 New Work 0 Replace 10, 6' MH W) Maint ❑ ❑ Y ® N New Work Replace Maint ❑ ❑ Y ® N New Work 0 Replace Maint ❑ ❑ Y ® N New WotkMF Replace -- Maint ❑ ❑ Y ® N New Work 0 Replace Maint❑ ❑Y❑N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N Now Work 0 Replace Malnt ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y [IN New Work U Replace MeiM ❑ ❑ Y ❑ N New Wont 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint❑ ❑Y❑N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint❑ ❑Y❑N RECEIVED New Work U Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N revised Nov. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Betty Collier Date: 12-17-2021 Oescdbe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found In your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or tamp Impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration andror temp impact amount) TOTAL Feet (Applied for Disturbance total includes any anticipated restoration or tamp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration andror temp impact amount High Ground Dredge ❑ Fill ❑ Both ❑ Other ® 2450 2450 Shallow Bottom Dredge ❑ Fin ® Both ❑ Other ❑ 1550 1550 Shoreline Dredge ❑ Fill ® Both ❑ Other ❑ 100 100 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fig ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ FBI ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED DEC 22 2021 DCM-MHD CITY 252-808.2808 :: 1.888-4RCOAST :: www.necoastalmanagement.net revised: Nov. 2012 ROY COOPER Govenwr ELIZABETH S. BISER Seawary BRAXTON DAVIS Director December 22, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax:252-247-3330 (Courler04.16-33) eregg.bodnai-(@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Betty Collier Project Location: 288 Griggs Acers Drive, Point Harbor in Currituck Proposed Project: Shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greast Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233) when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE RECEIVED DEC 2 2 2021 DCM-MHD CITY D _EQ� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909 252764.3901 DCM Coordinator: Greg Bodnar Distributed Yes® No ❑ Applicant: Betty Collier Distribution Date:12/22/2021 AGENCY ECRO Community Development/LPO Debbie Lashomb DCM Planner Charlan Owens Eliz City USCOE: Josh Pelletier Community Assistance Lee Padrick (Beaufort, Carteret Craven, Eliz City, Pamlico, Washington) Cultural Resources Renee Gledhill -Earley Div. of Water Infrastructure (No tenser public Water Supply( Clif Whitfield Marine Fisheries James Harrison NC DOT David Harris Shannon Jenkins Shellfish Sanitation Sharon Gupton Mike Moser State Property Wanda Hillard DEMLR/DWR: Sheri Montalvo DEMLR Sediment & Erosion- Samir Dumpor Storm water - RogerThorpe DWR 401- Chris Pullinger WRC Maria Dunn (WANO) National Heritage Program Rodney Butler RECEIVED DEC 22 2021 DCM-MHD CITY Revised : 6/29/2018