HomeMy WebLinkAbout85169_Michael Drewery_20220405 .40("N❑CAMA I 1 DREDGE & FILL 12xG No 85169 A (- ;; C D
t 1 GENERAL PERMIT ID#1-04c1 I Previous permit
Date previous permit issued
n New ❑Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC ❑ Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMAruIe
Applicant Name Authorized Agent
Address Project Location(County):
City State • ZIP Street Address/State Road/Lot#(s)
Phone#(_)
Email Subdivision
City ZIP
Affected n CW EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA ❑IHA n UW ❑SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/po
Type of Project/Activity
(Scale: -)
Shoreline Length
Access Length f .
j - i
I ;
Pier(dock)length 1
i , , __ �,, _ '�(
Fixed Platform(s)
1 f-. I /C �-- i `
r—
Floating Platform(s) I 1 ! 1 I
— ._ _ + }
Finger pier(s) a f I
:
Total Platform area I
Groin length/# v —I
'
Bulkhead/Riprap length -- f < c
Avg distance offshore i ;( _...... r /.,' fi iy.....__.''_rl. �.. ........___.
Breakwater/Sill 1` � I
Max distance/length 7'� (C.:( ( F ^�
Basin,channel ��, �> 1i
� { ��l{ ( �
Cubic yards
Boat ram .10> . — — %
P .
Boathouse/Boatlift I
Beach Bulldozing I v -PO
Other -1 ,
__ -
1 t
SAV observed: yes no j 1,•\
Moratorium: n/a yes no � ' i I i 1; I I . .
Site Photos: yes no ,
Riparian Waiver Attached: yes no , ; ' I I i 1
A building permit/zoning permit may be required by: '-
Li TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
nSee note on back regarding River Basin rules
111 See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
°�°``°''''�f ` -,'�CAMA 11 DREDGE & FILL ` No. 85169 A 6 c D
GENERAL PERMIT "l-)4 -70 Previous permit
Date previous permit issued
New I Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC ^ Rules attached. I I General Permit Rules available at the following link:www.dea.nc.gov/CAMArules
Applicant Name Authorized Agent - -
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
Ciry ZIP
Affected u CW ! I EW PTA I I ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): I I OEA IHA UW I I SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale:
Shoreline Length
Access Length — -i -- — — —
Pier(dock)length • I j $
} Ni.t
Fixed Platform(s) I '
i
-----_......._.._ .... -i- _..�.__....
Floating Platform(s) •
..
_
Finger pier(s) i —�
— -
Total Platform area i
Groin length/# I i I lI
Bulkhead/Riprap length I —
Avg distance offshore -. .._. �.,,_. _ .......__._. i. . .._.-..__. .._.._. _,,._.._.._.---
Breakwater/Sill I -
Max distance/length '
Basin,channel (. ' •
Cubic yards i - _..._........-..._.._.;- i
__. —
Boat ramp I I
Boathouse/Boatlift { /
Beach Bulldozing I '- I
Other
I j { a .
SAV observed: yes no L
Moratorium: n/a yes no r
Site Photos: yes no
Riparian Waiver Attached: yes no ,
A building permit/zoning permit may be required by:
I TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
_ i I See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check 4/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
- ROY COOPER-4� ' Governor
MICHAEL S. REGAN
scaercry
Coastal Management - BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
• BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed ygur project pro_posal and has deterniinedthat th_e projectas.proposedcampliewith the_aforeinentioned. - _. ....-_ _
regulations. ,
Those activities covered by your Coastal Area Managemeht Act(CAMA)permit have received Buffer Authorization
- provided-the projectis-constructed'bra mannerthat co>Zihues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may the property subjectp p rty owner and the party (contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 perday-per violation.__
. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 St landward)shall be minimized to
what must be impacted for the sound installation.of the shoreline stabilization project. Unnecessary clearing and
• . filling in the buffer is a violation of the riparian bUffer rules. •
•
z Clearing&Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet
landward)is allowed provided that it is re-vegetated immediately and ZoneL is not compromised,which includes _
maintaining diffused (non-channelized)flow of storm water runoff through the buffer. •
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
• satisfactorily restored as described in condition 5 below. .
a. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction,bare soils must bestabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first l
subsequent planting season (November 1//through March 3Q)aftq-completionof the bulkhead.
• Pre-project site conditions: �Yn fit'r/ e i l/6e"J,t •
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed co " ' s a that all
information is co lete and accurate.
Agent or Applicant rented am ices ature
; _;!�-._: /1/rrlt�'� urn- / S�a-c -
gent or Applicant Sigma . — -,k Issue Date '
CAMA GENERAL PERMIT ft: FS i & f- . , •
Site of North Carolina I Environmental Quality l Coastal Masa gement
Washington Office 1943 Washington Square Mail Washington.NC 27e891252146-6481
Wilmington Office I 127 Cardinal Drive Est.`^n.Lndngt on NC 28405 3845 I e•IO-796-125
Morehead Clry Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
4, _
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT)
CERTIFIED MAIL, RETURN RECEIPT REQUESTED or HAND DELIVERED
_ Z/7() iz7
Date
C�fl,tits Vnft
Name of Adjacent Rip ran Property Owner
age a Frase s-t
Address
C ar/41wrs MD ZO87/
City;State Zip
To Whom It May Concern:
This correspondence-� is to notify you as a riparian property owner that I am applying for a CAMA Minor permit to
j
-Rip /iApp ai Sinon �i ei[ -Pi, (, tbt/ / (Oo4-h>
on my property at ?6% poi-4 ?T_
in }1/„I I i r o / County,which is adjacent to your property. A copy of the application and project
drawing is attached/enclosed for your review.
If you have no objections to the proposed activity,please mark the appropriate statement below and return to me as soon
as possible. If no comments are received within 10 days of receipt of this notice,it will be considered that you have no
comments or objections regarding this project.
If you have objections or comments,please mark the appropriate statement below and send your correspondence to:
(LOCAL PERMIT OFFICER,NAME OF LOCAL GOVERNMENT,MAILING ADDRESS CITY, STATE,ZIP CODE)
If you have any questions about the project,please do not hesitate to contact me at my address/number listed below,or
contact(LOCAL PERMIT OFFICER) at(PHONE NUMBER),or by email at: (LPO EMAIL).
Sincerely,
/"tic LQe_ ( Ttzwzrci 10S% — z39— z6or
Property Owner's Name V Telephone Number
Address City State Zip
I have no objection to the project described in this correspondence.
I have objection(s)to the project described in this correspondence.
Adjacent Riparian Signature Date
Print or Type Name Telephone Number
Address City State Zip
Revised July 2021
_s
n.
AUTHORIZATION FOR CAMA PERMIT
DATE ZrZ6 -ZZ
• I HAVE BEEN ASKED TO REPRESENT THE PROPERTY OWNER ,
AS THE AUTHORIZED AGENT/ CONTRACTOR
CAMA REQUIRES I NOTIFY ADJACENT PROPERTY OWNERS
AS PART OF THE PERMIT PROCESS..I HAVE ENCLOSED A
MAP SHOWING THE REQUESTED PROJECT AS WELL AS A
SIGN OFF SHEET/WHERE YOUR SIGNATURE IS NEEDED
PLEASE FIND A STAMPED ENVELOPE FOR RETURN TO
TURNAGE CONSTRUCTION &TRUCKING INC
2373 NC HWY 304
BAYBORO NC 28515
THANK YOU IN ADVANCE FOR YOUR PROMPT ATTENTION
DUSTIN TURNAGE
252-229-4688
PLEASE CALL WITH ANY QUESTIONS YOU MAY HAVE
PROPERTY OWNER INFORMATION
/v44rhae C TD)-(Lorkv Soy - 739 7-6 OS'
u U
�---- CreeI:
_?rcnaced / ae ' al z, 7np
+ 7 " n AS a
1
h
1� M I h Ae.( brewer] U
UAMLS Q .1L /i �nN 1�UPoUtg,U
339 Po) DP " 3')rPori- bz
•
1 I u
,,, ?or!.!. pm)e_
u IJ
,�---- C Y ze
Oat _?ropused / ze / OP ei jaw
It
r �f � 1a(Y.lI � AI, !�
i Y
li Mechae.( bre.t,00: ti
IDAti 7
UflMLS GSC.v 36i fp- orl' pg l/ UNo�•iN
339 Por-l' // 3 r/r Porf DZ ,/J
PLY trH
ErowNJ Crew SuSUiwjror
:1
N.C. DIVISION OF COASTAL MANAGEMENT
.
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION (MINOR PERMIT)
CERTIFIED MAIL, RETURN RECEIPT REQUESTED or HAND DELIVERED
Z
Date
7oJ)0va/J
ame of Adjacent Riparian Property Owner
t-1noq I-kicrwr' AiitAdow
Address
rgrte..Avs6nw / ,ve. ZnybG
City, State Zip
To Whom It May Concern:
This correspondence is to notify you as a riparian property owner that I am applying for a CAMA Minor permit to
Rip 7Ap rho r,'J,kit° 4r e1-Dr/� (U ioI--
on my property at 3 G ) po --k
in ?Ankh c r, County,which is adjacent to your property. A copy of the application and project
drawing is attached/enclosed for your review.
If you have no objections to the proposed activity,please mark the appropriate statement below and return to me as soon
as possible. If no comments are received within 10 days of receipt of this notice,it will be considered that you have no
comments or objections regarding this project.
If you have objections or comments,please mark the appropriate statement below and send your correspondence to:
(LOCAL PERMIT OFFICER,NAME OF LOCAL GOVERNMENT,MAILING ADDRESS CITY, STATE,ZIP CODE)
If you have any questions about the project,please do not hesitate to contact me at my address/number listed below, or
contact(LOCAL PERMIT OFFICER)at(PHONE NUMBER), or by email at: (LPO EMAIL).
Sincerely,
/LJ!CAAtI 1)itwzrl.J pot) 7?Q - Z6OC
Property Owner's Name,/ Telephone Number
Address City State Zip
✓ I have no objection to the project described in this correspondence.
I have objection(s)to the project described in this correspondence.
j
/djacent Riparian Signature Date
ai , cJ 00n0Y A 33 6 `jog 3 O
Print or Type Name Telephone Number
Address City State Zip
Revised July 2021
AUTHORIZATION FOR CAMA PERMIT
DATE 276 )rz
I HAVE BEEN ASKED TO REPRESENT THE PROPERTY OWNER
AS THE AUTHORIZED AGENT/ CONTRACTOR
CAMA REQUIRES I NOTIFY ADJACENT PROPERTY OWNERS
AS PART OF THE PERMIT PROCESS..I HAVE ENCLOSED A
MAP SHOWING THE REQUESTED PROJECT AS WELL AS A
SIGN OFF SHEET/WHERE YOUR SIGNATURE IS NEEDED
PLEASE FIND A STAMPED ENVELOPE FOR RETURN TO
TURNAGE CONSTRUCTION & TRUCKING INC
2373 NC HWY 304
BAYBORO NC 28515
THANK YOU IN ADVANCE FOR YOUR PROMPT ATTENTION
DUSTIN TURNAGE
252-229-4688
PLEASE CALL WITH ANY QUESTIONS YOU MAY HAVE
PROPERTY OWNER INFORMATION
M►c ,( brth,ker� ?dy- Z30 - Z60s_
-)nfad fco
it fl • }
r, 21q frog/ _SC! ,, JCL trod b ��
rv�n�nr,C Nca� -}4ad 19� �-)s n sew,n
11 Ci{a�1�a� I 11
11
duZ d/Z (9 , $2 I gag 1/210-1d,
_ as 4) .
ff 11
2'47122,6 ?AM Yahoo Mail-Re:permit
Re: permit
From: Mike Drewery(mike.drewery@gmail.com)
To: turnageconst@yahoo.com
Date: Wednesday, February 16, 2022, 05:16 PM EST
I approve and confirm my address is 8286 Christian Ridge Drive, Mechanicsville, Virginia 23111. My phone number is
804.239.2605 if there are any questions or concerns regarding this permit.
Thanks
Mike Drewery
Mike.drewery-@gmail.com
On Wed, Feb 16, 2022, 4:49 PM Turnage Construction <turnageconst@yahoo.com>wrote:
Good Afternoon Mike ,
As discussed attached you will find the Agent Authorization Form , this form signed by you allows me to act on
your behalf to finalize the permitting and meetings with cama agents to start your project , simply sign and email
this form back to me and/or a return email to this email stating your info and allowance of me acting on your
behalf will suffice.
Thanks Dustin Turnage
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: MCAALI Dititutlii
Mailing Address: fi tf•6 (fir ,w Fit,. mg.
Phone Number: Fog- Z'9- Z6oC
Email Address: n1i/Ct., drowtr j @SMAII. (one
I certify that I have authorized T)u f1i,) /Urn/A2L /�r.UAgc
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: 70 Beppw&
n-P Jtiort j,Ne.
at my property located at 761 Pnr-t hi-me
in ipaiAhr n County.
l furthermore certify'that 1 am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signature
Print or Type Name
Title
Date
This certification is valid through / I
11
Ott I<
- - , ��
_?rOPO!Cd / Z8 / o.( Ap
11_ MiChALI brewv-y it
UflMeS 014t, 361 pork D " 3� �UNoUHN
33 4 Port Dr " 5—Porf11 bz "
?Or-i- Prot