Loading...
HomeMy WebLinkAbout64-18 Oversized Plans8.0 7 7 .8 FLOOD ZONE "AE ELEV.=10' " FLOOD ZONE " VE ELEV.=12' " J� N:345739.24 6•8 R� S� E:2563951.43 7.3 �. 7.0 Gt. O 16 8.0 + 9.0 / \ 6. C,, Stormwater Runoff from the adjoining neighborhood rooftops, streets, etc. impact the Ward Shore Park shoreline stability. 6.2 Mitigation measures to address stormwater include leaving the failing bulkhead *19 to decay in place, planting high marsh to the maximum extent allowable and ° planting other resilient native vegetation throughout the site. 10A* 5.5 Leaving the bulkhead will also minimize construction land disturbance, as well �19 4.9 _0. as slow (decrease the erosion potential of) the runoff. The bulkhead may be modified (openings created) to more evenly distribute runoff as flow patterns N:345731.00 5.3 become apparent. In addition, the failing bulkhead will provide some Interim E:2564154.84 WOOD FENCE level of stability during the marsh establishment period. 3.8-}- TE / + 6.1 4.9 8.2 5.8 .:' 6.9 + 6.0 \ \ 5.6 4.8 4.2 8 3.+ 5.7 4.1 \ VICINITY MAP ; +6.1 \ 5.6 / .:: NOT TO SCALE 4.0 N/F ca OA- KirbyL. Everette Jr. ���� r..• +5.3 h� -}-5.2 A�`F 5.1 / 3.3 DB 4202, PG 856 ::..,5,9ti�• 5.3 EDGEWATER HEIGHTS 4.4 1q. N/F /� +4.7 \ 2 O C.MAURICE ]OHNSON �C / +3.0 DB.3432, PG.905 4.6+ l +4.7 4.7 Y/ 4.0 `OQa� `; 1-` 15.2 G _VVV 4.0 / .7 GRASS 5.2 4.2 4.3 MANHOLE / -i 4.1 RIMZZ "'A 0 • v: +4.4 ®4.6 •}- 4.5 1 4.9 4 4 v / 6 +3.3 WOOD FENCE " + \ 4, WOOD POST AND 11.80 Q 69 / ROPE FENCE c S -i- 3.2 -1- 2.8 3.9 / 3.8 -I- ni WOOD 8.7 3.8 WOOD -{-3.7 11• 3.5 STRUCTURE .' 8.5 ;.r.::? :...' .."..:. 4.4 + DECK o w CONCRETE 2.6 4.1 4.3 1162 STRUCTURE ♦ \ / 3.7 < F- / SITE TBM / z = SEAWALL o c 4.3 3.8 6' 4'2 N:345685.36 Fill Edge Support Structure 1 2.3 3.9 n Q x 4 2H:1V to Top of fill. + + 4'6+ } 4.0 ♦ \ E:2564045.33 / 3.7 q Contain / Protect fill with 1.9 ELEVATYON:3.06' BARNES TRACT 3 GRASS PET WASTE 4 0 -�-A / M.B.67 PG.2 o / HIGH WATER LINE granite stone over woven 3.9 3 8 SULLIVAN TRACT \RECEPTACLE ' � + + M.B.67, PG.2 Z •- geotextile.. -F 3.6 \ 3.7 + 3.4 + 3.2 + 3.0 2,1 2 2 2.1 1.2 1.0 "� 4.4 -4� 2 4.0 3.6 / 3.5 WARD SHORE PARK \ 1.910 \ 1.7 " Sill top / CrestJ' 0.8 t 4.3 + 3 SIGN NLW Elev. = 3 & 3•+ +3.5 \ / WOOD POST ROPE FENCED +3'1 GRASS 1 0.4 0.3 / \ 3 ft width (Typ) 3,9 3 2 +3.5 -}-3.2 High Marsh ExYsrYNG \ 0.2 + + PP/LP +3.3 Spartina paten,, and Juncus roemerianus GRASS LINE31 0.0\ -01 2 4.2 Fill washouts an. r cu „_,.-- :.,�� w " �` N ... � 3.4 \ e I d grade as proposed {see Outer (Southern) Edge of section), plant Per NCCF & to Max. extent \ r �'' 1`- �r w,w 3.4 2.9 allowable per Town Bulkhead (& Edge Support 1 -1 Contour \ '� 11'`' �. m r top elevation at intersection / -}- f Per NAVD 88/ 3 '-- -�- �' ,..,- with Bulkhead) = 2.07 ft 0. �3 5 3.2 0,7 \ Datum,,, _, .. w.., NHW Fill Contour <'� NLW �„ �- „ - (NHW) NL 3' R:� s r` w 2.6 . Pro osed to western - , - , i . ... - w extent of sand fill. 1 4 ..,, . , ,. N. •w . , , ,. .- . „ . '. , . '. ,,: rn ±,••ate i I ver ANY , °°.. . ,,,. , .. •. .. , . ... Outer (Southe )... .(Not. to.f I /ea �,- 4 , Ed a of Bulkhead , x n marsh), , 9- �w, -.2.0? tVHW ft from NHW ., 25ft o � �O3.07 f / Fill r •2 N ` .� Contou � CROSS 25ft � ; -... �' _. -,:, ., .. ° .� .. � : 1. l _- ��• FROM NHW ,t ,...,' .. , .��� � .. Low Marsh 1 N , � T O :o' LIMIT WITHIN r..1.. 4 r. 3.. \ \,, S artina alterriifloca 30ft from NHW (P ) �• ..' Low Mar C RIPARIAN 1• f , 'Proposed Fflt & Plantin -' P 9 Sand Fill. artin2`a K \ (Sp Iterniflara SETBACK I 1 NHW` MT ,. ./ to L . , Extent Limit -Proposed,Fill &,Pianttn ; �f � 2m, �• ul B s „ �_�. ,�9 �; , . NNW to, MT M �,, � , i \ J � SII DP � Fr T , 1 .,- 2 Contour x � M 1.3 ..: �. n 1T ^ L 'Max. •. 1•' 104 i' Per NAVD 88 ' N Datum o �,,, \ �,., �' w ,Sill Mtn o.z , , 10 Max. _ ..«„+' t •. •,.�. ,�-ate°k - a� • r�.,.c� i r� � . ' , a A '--F / y 77, 7 __ _ . r ,f'y i "ire .11- L 4 < sl S Q f .f - w : � rY. Fill Edge Support Structure2„- 7 \, Coe- 2H:1V to Top of fill -• "��`_b�� _�-,-� o� \ - Contain / Protect fill witi granite stone over woven geotextile.. w•0 5 Mtn \ 5ft Minimum opening (toe to toe)-m WOOD between aligned sill sections. 10ft DOCK Maximum sill overlap (toe to toe) offset sections. Typical Both (2) south facing sill openings Sand Fill/Marsh Substrate x -1.7 • Coarse (to minimize transport by wave action) Sill • 300-900# Clean Rough Angular Granite Stone • Median grain diameter of 0.6 mm (+/-0.25 mm) Evenly distribute smaller stone sizes internally < 5 percent passing the number 200 sieve Selectively place larger stones at Toe and on 22' < 10 percent passing the number 100 sieve exterior *Varies w/ a PH ranging from 3.7 to 7.9 . Crest Elevation 3ft NLW (unless noted otherwise) E Location Modify side slopes as needed in accordance with Consult the North Carolina Coastal Federation (NCCF) Combination/Mixture Spartina patens depth to maintain minimum 12ft bottom width for additional substrate and planting guidance a and (Resources, amendments, materials, fertilizer, etc.) o Juncus roemerianus X -1.6 X -1.6 Sill(s) shall be marked at 50-foot intervals with yellow reflectors extending at least three (3) feet above mean high water level. Cn (Planting to vary per NCCF & Town) 0 10 20 30 40 50 -a , P� w , ) i j I 1.5 Rise per I 3' 1.25 Rise per b idT.�- ,s� pggp'' j((}}, orizontal "...� `•� .,,.x,<�c�.,.�.:.-.v '.s.�,'', s3.> tz. a`, 2 H �� � 2 Horizontal - 4, i Proposed Low Marsh (Spartina a terniffora o o Normal High Water NHW -2.07 y Mid Mean Tide Level MTL N 1.04 f Proposed Clean Sand Fill 1f?:;t .to::' (H: V 1_. _. ._,. _ P 2.0� 1 . Followingconstruction and stabilization (H V} o 0 0 Veri Suitability) o 0 0 0 0 o Vertical Datum ( fY - 4 < Normal Low Water NL - •sh W 0 bll t„ n 'II for low marsh establish 4 `°� ��.° °�.,. .:... :....., ... o f sill and fill F �. � ) _\ 8:1 H: V fill sloe w appropriate EXISTING RIVER BOTTOM, o ( ) P ( / ' tl Waterward Sill Toe sand fill landward of bulkhead in areas, / material has washed out thru wood m /� �` Reinforcement ° \` Woven Geotextile into river. Cover/protect upland fill O Select for marine environment ' ;' eect , ble Jute .from erosion with biodegradable � g °°_ /° high strength and appropriate , Erosion Control Cloth or other suitabley, equivalent opening(s) size. rolled erosion control product RECP z Size & Provide protective bedding �. Transplant nursery grown low and high Y ¢ �- \ r between x ' �� u_ stone layer geote tale marsh plants as available between late �� �� ` � �' �� / and silly April and the end of May. 16' Following especially low marsh plant Max. establishment (full coverage), grade 8:1 (H: V) slope behind remainder of bulkhead and similarly plant additional high marsh. Note: Plant establishment and Section A -A (Typical / Similar all Locations) Scale 1" = 5' coverage may require multiple growing seasons and supplemental plantings. Fill Edge Support Structure 3 2H: IV to Top of fill. Contain / Protect rill with granite X -16 stone over woven geotextile. x -1.6 A WHITE OAK RIVER 0 5' Min. -1 X -1.7 GRAPHIC SCALE 0 10 20 30 ( IN FEET ) 1 inch = 10 ft. PROPOSED CONDITIONS X -1.5 CAMA Planning and Permit Assistance by: COASTAL PLANNING SERVICES, INC, Kathy B. Vinson, AICP Comprehensive Land Use Planning and Development Assistance P.O. Box 827 Office 252.354.4916 Morehead City, NC 28557 Fax 252.247.5875 Ward Shore Park Topographic Survey Provided by: SURVEYONQs iC®MPAW 624-4 W. CORBETT AVE. SWANSBORO, NC 28584 (910) 325-8324 + 3.1 -I- 2.7 2.6 3.9 2.7+ 2.6+3.9 .... / �\0.5 i \ X -1.2 ti , 30ft from NHW NO \€ \ 5' Min. \ ` �--- 5ft Min. Width ' \ \ Drop Down \ 611above Sand \ Fill-1.5 �--- -1.23` \ NLW \ \ \ °c \ x -1.7 \ d\ \ CAMA Major Permit Application Drawing NOT FOR CONSTRUCTION LEGEND: D.B. PG. = DEED BOOK, PAGE M.B. 11G. = MAP BOOK, PAGE NAD �; NORTH AMERICAN DATUM R/W :. RIGHT-OF-WAY E.I.P. = EXISTING IRON PIPE E.I.S. = EXISTING IRON STAKE CONCRETE MONUMENT • "X" IN CONCRETE WOOD POST AND ROPE FENCE TRASH RECEPTACLE - -- - FLOOD ;BONE LINES CONCRETE + 3.1 &/OR x -1.6 EXISTING NLW ELEVATION - -1.23 - - - EXISTING NLW CONTOUR 1� PROPOSED NLW ELEVATION } PROPOSED NLW CONTOUR NCCF = North Carolina Coastal Federation E' Sand Fill 9�N- Granite Stone /Rock REVISIONS 1 /11 /18 per CPSI 1 /17/18 per Town & CPSI 3 17 2018 per DCM Q L �.� o kD Coo C: vi C Ln o Co un _ •� W N M cn LU U , z M a n. N = rnz"N E 10 O 4-J 0mX*k U s_ 3 z UJ cn <Zz W Z �: w .76 C LL oo 4-J a7 V o -' E �_ uiu O onto _ > uJ rMZZ U> o0 o? C �Cnm W z in o (n f0 > a rL V f --4 . � r-1 ��O � O VJ U V O r--•i O CCf w O O O H � Monitorina (minimum recommendations) Perform project inspections regularly and following storm periods of high water and wave action. Evaluate (including/not limited to): • Displacement of stones • Settling • Scour/Erosion U) 0+ U • Vegetation (especially marsh inventory) • The Town bulkhead deterioration • The adjacent property owners' existing bulkheads and shorelines. (Future actions may include extending the sill landward establishing a protective revetment.) Expediently address deficiencies SCALE: As Noted Sill effectiveness will be diminished as sea level rise reduces the structure's freeboard. It may be possible to (easily) modify crest elevations and sill widths to DATE: 11 /2/2017 PROJECT:17-029 reduce resultant problems. DRAWN BY: JRF SHEET 2 of 2