HomeMy WebLinkAbout98-18 Wilkinson Family TrustPermit Cl4s
NEW
Permit Number
98-18
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
V C r M t
for
RECEIVED
AUG 2 9 2018
DCM-MHD CITY
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Wilkinson Family Trust, 1301 Douglas Drive, Sanford, NC 27330
Authorizing development in Pender County adi.to Topsail Sound, at 101 Bland Alley, in
Surf City as requested in the permittee's application dated 6/6/18 (MP-1) and dated revised
6/25/18 (MP-2), including attached workplan drawings (3)1-2 of 3 dated 6/13/18 and 3 of 3 dated revised 6/25/18.
This permit, issued on August 24, 2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
7e suoiect to lines, imprisonment or civn action; or may cause me permit to oe nuu son voia.
Excavation & Spoil Disposal
1) The area of excavation shall not exceed the area depicted on the attached workplan drawings.
2) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of
excavation exceed the depth of connecting waters.
3) No excavation or filling of any vegetated wetlands is authorized by this permit.
4) The temporary placement or double handling of excavated or fill materials within waters or vegetated
wetlands is not authorized.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2021
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
"n e- !4 "
(V— Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Wilkinson Family Trust Permit No. 99 18-
Page 2 of 3
ADDITIONAL CONDITIONS
5) All excavated materials shall be confined above normal high water level and landward of regularly or
irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids
into any marsh or surrounding waters.
6) No spoil material shall be placed within 30 feet of the normal high water line.
7) The disposal area shall be properly graded and provided a ground cover sufficient to restrain erosion
within 30 working days of project completion.
8) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the
beginning of any dredge activities.
9) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all
requirements therein. The guidelines can be found at littp://www.fws. og v/nc-
eshnammal/manatee guidelines.pdf.
Maintenance Clause
10) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any
future maintenance work, as authorized by this permit, and such notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the
area to be used for spoil disposal, and the estimated amount of material to be removed. The
location, design and holding capacity of the spoil disposal site shall be approved by a representative
of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revision and the permittee's signature shown anew on the original plan.
General
11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
Wilkinsoh Family Trust Permit No. 98-18
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project via Programmatic General
Permit 291, Action ID No. SAW-2018-01400, which was issued 8/23/18.
NOTE: The N.C. Division of Water Resources authorized the proposed project via GC 4144 and
assigned DWR Project No. DWR-2018-0948, which was issued 8/22/18.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
RECEIVED
AUG 2 9 2018
DCM-MHD CITY
0�v
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 26403-1343
August 28, 2018
Regulatory Division
Action ID No. SAW-2018-01400 and State Permit No. 98-18
General Permit No. 198000291
%Wilkinson Family Trust
c/o: Mr. David H. Wilkinson
1301 Douglas Drive
Sanford, North Carolina 27330
Dear Mr. Wilkinson:
E-mail: dwilkinson(a)wilkinsoncars.com
Reference your application for a Department of the Army permit to conduct dredging within waters
adjacent to Topsail Sound, at 101 Bland Alley, in Surf City, Pender County, North Carolina. Coordinates
are: 34.396773 N,-77.592072 W.
Your proposal has been reviewed and found to be consistent with the provisions and objectives of
the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive
authorization from the State of North Carolina. Therefore, you may commence construction activity in
strict accordance with applicable State authorization, attached Federal special conditions, and the
approved plan. Failure to comply with the State authorization or conditions of the Federal permit could
result in civil and/or administrative penalties.
If any change in your work is required because of unforeseen or altered conditions or for any other
reason, plans revised to show the change must be sent promptly to this office and the North Carolina
Division of Coastal Management prior to performing any such change or alteration. Such action is
necessary as revised plans must be reviewed and the authorization modified. Your Department of the
Army permit will expire on December 31, 2021.
Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory
Branch, telephone 910-251-4049. RECEIVED
Sincerely,
Zyi�a SEP 0 7 2018
Leg DCM-MHD CITY
Reguulatlat ory Project Manager
Enclosures: RECEIVED
CAMA permit
GP 291permit with additional special conditions AUG 3 1 2018
Plans
Manatee Guidelines DCM WILMINGTON, NC
Electronic Copy Furnished (w/enclosures):
Mr. David Gardner
720 Channel Boulevard
Topsail Beach, North Carolina 28445
vondakav72�,gmail.com
Electronic Copies Furnished (w/o enclosures):
Mr. Fritz Rohde/Ms. Twyla Cheatwood
NOAA-National Marine Fisheries Service
Habitat Conservation Division
Dr. Pace Wilber
NOAA-National Marine Fisheries Service
Habitat Conservation Division
Mr. Doug Huggett
Division of Coastal Management
North Carolina Department of Environmental Quality
Ms. Karen Higgins
Division of Water Resources
North Carolina Department of Environmental Quality
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
BOSN3/Mr. Scott McAloon/Mr. Matt Creelman
United States Coast Guard
Sector North Carolina Waterways Management
Mr. Robb Mairs
Division of Water Resources
North Carolina Department of Environmental Quality
Ms. Courtney Spears
Division of Coastal Management
North Carolina Department of Environmental Quality
2
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
98-18
RECEIVED
AUG 2 ; 2018
for Deli_ tu„ t�
Major Development in an Area of Environmental Conarri"t rt. Ne^'.
pursuant to NCOS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Wilkinson Family Trust,1301 Dou rlas Drive, Sanford. NC 27330
Authorizing development in Pender County adi. to Topsail Sound- at 101 Bland Alley, in
Surf City as requested in the permittee's application dated G6/18 (MP-1) and dated revised
6/25/18 (MP-2), including attached workplan drawings (3) 1-2 of 3 dated 6/13/18 and 3 of 3 dated revised 6/25/18
'This permit, issued on Aueust 24.2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
no suulect to lines, imprisonment or civtt action,, or may cause the permit to be null and void.
Excavation & Suoil Disnosal
I) The area of excavation shall not exceed the area depicted on the attached workplan drawings.
2) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of
excavation exceed the depth of connecting waters.
3) No excavation or filling of any vegetated wetlands is authorized by this permit.
4) The temporary placement or double handling of excavated or fill materials within waters or vegetated
wetlands is not authorized.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
Personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requites further Division approval.
All work must cease when the permit expires on
December 31, 2021
In issuing this permit, the State ofNanh Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accRE CEIVED
AUG 31-2m
RECEIVED Ti:Millnitf Krinift6,01
SEP 0 7 2018
DCM-MHD CITY
Wilkinson Family Trust Permit No, 98-18
Page 2 of 3
ADDITIONAL CONDITIONS
5) All excavated materials shall be confined above normal high water level and landward of regularly or
irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids
into any marsh or surrounding waters.
6) No spoil material shall be placed within 30 feet of the normal high water line.
7) The disposal area shall be properly graded and provided a ground cover sufficient to restrain erosion
within 30 working days of project completion.
8) The spoil area shall be inspected and approved by the Division. of Coastal Management prior to the
beginning of any dredge activities.
9) In order to further protect the*endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all
requirements therein. The guidelines can be found at Lt1p://www.fws,gov/nc-
es/mammal/manatea; guidelines.pddf,
Maintenance Clause
10) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any
future maintenance work, as authorized by this permit, and such notification shall include:
A. The number of the original permit,
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the
area to be used for spoil disposal, and the estimated amount of material to be removed. The
location, design and holding capacity of the spoil disposal site shall be approved by a representative
of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revision and the permittee's signature'shown anew on the original plan.
General
11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest. '
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The pemrittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
Willcinson Family Trust Permit No. 98-18
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the peed to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project via Programmatic General
Permit 291, Action lD No. SAW-2018-01400, which was issued 8/23/18.
NOTE: The N.C. Division of Water Resources authorized the proposed project via OC 4144 and
assigned DWR Project No. DWR-2018-0948, which was issued 8/22118.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
RECEIVED
SEP 0 7 2018
C6A-MHD
AUG 31 20
DCM WILMINGTO4 NC
DEPARTMENT OF THE ARMY
Wilmington District, Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
http://www.saw.usace.army.m it/Miss ions/RegulatoryPerm itProizram.aspxx
General Permit No.
198000291
Name of Permittee:
General Public
Effective Date:
January 01, 2017
Expiration Date:
December 31, 2021
DEPARTMENT OF THE ARMY
GENERAL PERMIT
A general permit to do work in or affecting navigable waters of the United States and waters of
the United States, upon recommendation of the Chief of Engineers, pursuant to Section 10 of the
Rivers and Harbors Act of March 3, 1899 (U.S.C. 403), and Section 404 of the Clean Water Act
(33 U.S.C. 1344), is hereby issued by authority of the Secretary of the Army by
District Engineer
U.S. Army Engineer District, Wilmington
Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
TO AUTHORIZE THOSE CONSTRUCTION ACTIVITIES IN THE 20 COASTAL
COUNTIES RECEIVING PRIOR APPROVAL FROM THE STATE OF NORTH CAROLINA
IN THE FORM OF A COASTAL AREA MANAGEMENT ACT (CAMA) PERMIT, AND/OR
A STATE DREDGE AND FILL PERMIT, AND IF REQUIRED, A WATER QUALITY
CERTIFICATION, THAT ARE OTHERWISE NOT ELIGIBLE FOR FEDERAL
AUTHORIZATION IN THE FORM OF A NATIONWIDE PERMIT OR ANOTHER
REGIONAL GENERAL PERMIT.
Operating Procedures
a. Applications for joint state and federal authorization under this programmatic general
permit will be accepted through the North Carolina Division of Coastal Management (NCDCM).
Receipt of a complete application by the NCDCM will initiate the State's field review that will
include a site visit and preparation of a Field Investigation Report and a state Bio-Report. The
NCDCM will forward a copy of the complete application, its Field Investigation Report and its
Bio-Report, to the appropriate Corps of Engineers field office, thereby initiating federal review of
1
the project. The Corps, upon receipt of an application, will immediately assign an action
identification number, acknowledge receipt thereof, and examine the application to assure that it
can be processed pursuant to this programmatic general permit. The applicant and the NCDCM
will be furnished written notification of the Corps' determination. Notification to the applicant
will include a brief description of the administrative process.
b. For those proposals that may result in a discharge into waters of the United States,
including wetlands, the North Carolina Division of Water Resources (NCDWR) and the
applicant will be informed regarding the applicant's need to obtain a Water Quality Certification
in accordance with section 401 of the Clean Water Act.
c. If, at any time, the Corps determines that a proposed activity is eligible for
authorization under another regional general permit (RGP) or a nationwide permit (NWP), this
procedure may be terminated and the activity authorized pursuant to the terms and conditions of
the appropriate RGP or NWP.
d. The permit review process conducted by the NCDCM is a public process involving
publication of public notices in local newspapers, public hearings, and various public appeal
procedures. The Corps may issue a separate public notice for a specific proposal if it is deemed
necessary for compliance with appropriate laws, regulation and guidance.
e. This general permit does not, in any way, alter established procedures or
responsibilities, as required by federal laws, memoranda of agreements (MOA's) or
administrative regulations, with respect to the Corps' coordination with appropriate review
agencies. The applicant will continue to have the opportunity to rebut any objections to a
proposal.
f. The Corps will provide copies of the application and plans, the NCDCM's Field
Investigation Report, and the state Bio-Report, to the U.S. Fish and Wildlife Service (USFWS),
the National Marine Fisheries Service (NMFS) the U.S. Environmental Protection Agency
(EPA), and any other federal agency that the Corps determines to be a necessary review agency
(collectively, the "Federal Agencies"). Receipt of this material will initiate the Federal Agencies'
review. The Federal Agencies will be allowed sufficient time, normally thirty (30) days, to
provide the Corps with their comments and recommendations, including any proposed permit
special conditions and recommendations of denial. The Corps may grant extensions of time for
Federal Agency review if justified by unusual circumstances. If an extension is granted that RECEIVED
would substantially delay an NCDCM decision, the application may be removed from this
general permit process.
SEP 0 7 P018
g. The Corps will receive and review all Federal Agency comments as well as any
applicant rebuttal. Provided all Federal Agencies and the Corps are in agreement, the CorpsDwilM"MHD CITY
prepare a coordinated federal position incorporating all Federal Agency comments, including
proposed permit special conditions and any recommendations for denial. The CorRLVtIVED
AUG 31 '�18
DCM WILMINGTON, NC
typically furnish this coordinated federal position to the NCDCM within 45 days of its receipt of
the complete application, and copies of the Field Investigation Report and Bio-Report.
h. If the Corps does not concur with a Federal Agency's comments or recommendations,
the Corps will contact the Federal Agency and advise it of the Corps' position. Attempts to
resolve the issue may include initiating the referral procedures outlined by current memoranda of
agreement (MOA's) between the Department of the Army and the agency. No coordinated
federal position will be furnished to the NCDCM until and unless the Corps receives written
agreement from the Federal Agency that all issues have been resolved to the satisfaction of that
agency.
i. If any of the recommendations and/or conditions included in the coordinated federal
position are unacceptable to the NCDCM, the NCDCM will contact the Corps within ten (10)
days of receipt of the coordinated federal position and attempt to resolve the conflict. If
resolution of the conflict involves changes to the conditions or recommendations provided by the
Federal Agencies, the provisions of paragraphs g. and h. (above) will apply. If the conflict is
resolved to the satisfaction of the Corps and any affected Federal Agency, the NCDCM permit
will be issued and the authority of this general permit will apply.
j. If a Federal Agency conflict is not resolved within the time necessary for a decision by
the NCDCM, the NCDCM may proceed, independently, to conclude the state action without
inclusion of the federal position. In such case, the applicant and the NCDCM will be notified
immediately, in writing, that the state permit does not satisfy the federal permit requirements and
that the proposal in question may not proceed without federal authorization.
k. If the coordinated federal position is not in conflict with state agencies' positions, law,
regulation, or policy, and is acceptable to the NCDCM, a state permit will be developed by the
NCDCM fully incorporating the state and federal positions. The NCDCM will furnish copies of
the final permit to the applicant and the Corps. The NCDWR will furnish a copy of the Section
401 Water Quality Certification, if required, to the applicant and the Corps. The Corps will not
confirm the authorization of a proposed project under this General Permit until the issuance of
the NCDCM permit and, if required, the Section 401 Water Quality Certification.
1. If the NCDCM permit or Section 401 Water Quality Certification is denied, the
applicant will be informed that federal authorization is denied without prejudice.
in. No work may proceed under this general permit until the Wilmington District
Engineer or his representative provides written verification that the procedures and conditions of
the general permit have been satisfied.
n. The NCDCM and the Corps will monitor all permitted work and periodically inspect
projects for compliance with permit conditions and applicable state and federal regulations. If
any violation of the NCDCM permit is discovered which would also constitute a violation of the
federal position, both the NCDCM and the Corps, in accordance with their respective regulations
and policies, may take enforcement action.
o. This general permit will not be used to authorize an activity when the Wilmington
District Engineer determines that the proposed activity would significantly affect the quality of
the human environment and therefore require preparation of an Environmental Impact Statement
(EIS).
General Conditions
a. Authorized structures located on or adjacent to Federally authorized waterways will be
constructed in accordance with the latest setback criteria established by the Wilmington District
Engineer. You may review the setback policy at
http:Hww,A.saw.usace.army.mii/Missions/Navigation/Setbacks.aspx. This general permit does
not authorize the construction of hardened or permanently fixed structures within the Federally
Authorized Channel Setback, unless the activity is approved by the Corps. The permittee must
obtain approval from the Corps prior to the construction of any structures within the Federally
Authorized Channel Setback.
b. Except as authorized by this general permit or any Corps approved modification to this
general permit, no excavation, fill or mechanized land -clearing activities shall take place, at any
time in the construction or maintenance of this project, within waters or wetlands. This permit
does not authorize temporary placement or double handling of excavated or fill material within
waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill
activities connected with this project.
c. Authorization under this general permit does not obviate the need to obtain other
federal, state, or local authorizations.
d. All work authorized by this general permit must comply with the terms and conditions
of the applicable Clean Water Act Section 401 Water Quality Certification for this general permit
issued by the North Carolina Division of Water Resources.
e. The permittee shall employ all sedimentation and erosion control measures necessary
to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include, but is not limited to, the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally, the project must remain in
full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter I I3A Article 4).
f. The activities authorized by this general permit must not interfere with the public's
right to free navigation on all navigable waters of the United States. No attempt will be made by
RECEIVED RECEIVED
AUG 31 2018
SEP 0 7 2018
DCM-MHD CITY OCM WILMINGTON, NC
the permittee to prevent the full and free use by the public of all navigable waters at or adjacent
to the authorized work for a reason other than safety.
g. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or if,
in the opinion of the Secretary of the Army or his/her authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps , to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United States. No claim
shall be made against the United States on account of any such removal or alteration.
h. The permittee, upon receipt of a notice of revocation of the permit for the verified
individual activity, may apply for an individual permit, or will, without expense to the United
States and in such time and manner as the Secretary of the Army or his/her authorized
representative may direct, restore the affected water of the United States to its former conditions.
i. This General Permit does not authorize any activity that would conflict with a federal
project's congressionally authorized purposes, established limitations or restrictions, or limit an
agency's ability to conduct necessary operation and maintenance functions. Per Section 14 of the
Rivers and Harbors Act of 1899, as amended (33 U.S.C. 408), no project that has the potential to
take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move,
injure, or obstruct a federally constructed work or project, including, but not limited to, levees,
dams, jettys, navigation channels, borrow areas, dredged material disposal sites, flood control
projects, etc., shall be permitted unless the project has been reviewed and approved bythe
appropriate Corps approval authority.
j. The permittee shall obtain a Consent to Cross Government Easement from the
Wilmington District's Land Use Coordinator prior to any crossing of the Corps easement and/or
prior to commencing construction of any structures, authorized dredging or other work within the
right-of-way of, or in proximity to, a federally designated disposal area. The Land Use
Coordinator may be contacted at: CESAW-OP-N, 69 Darlington Avenue, Wilmington, North
Carolina 28403-1343, email: SAW Web-NAVgusace.army.mil.
k. The permittee will allow the Wilmington District Engineer or his/her representative to
inspect the authorized activity at any time deemed necessary to assure that the activity is being
performed or maintained in strict accordance with the Special and General Conditions of this
permit.
1. This general permit does not grant any property rights or exclusive privileges.
m. This general permit does not authorize any injury to the property or rights of others.
n. This general permit does not authorize the interference with any existing or proposed
federal project.
o. In issuing this general permit, the Federal Government does not assume any liability
for the following:
(1) Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
(2) Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
(3) Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this general permit.
(4) Design or construction deficiencies associated with the permitted work.
(5) Damage claims associated with any future modification, suspension, or
revocation of this general permit.
p. Authorization provided by this general permit may be modified, suspended or revoked
in whole or in part if the Wilmington District Engineer, acting for the Secretary of the Army,
determines that such action would be in the best public interest. The term of this general permit
shall be five (5) years unless subject to modification, suspension or revocation. Any
modification, suspension or revocation of this authorization will not be the basis for any claim
for damages against the United States Government.
q. No activity may occur in a component of the National Wild and Scenic Rivers System,
or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with
direct management responsibility for such river, has determined in writing that the proposed
activity will not adversely affect the Wild and Scenic designation or study status. Information on
Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency
responsible for the designated Wild and Scenic River or "study river" (e.g., National Park
Service, U.S. Forest Service, etc.)
r. This general permit does not authorize any activity within, or directly affecting, a
marine sanctuary established by the Secretary of Commerce under authority of Section 302 of the
Marine Protection, Research and Sanctuaries Act of 1972, unless the applicant provides the
Corps with a certification from the Secretary of Commerce that the proposed activity is
consistent with the purposes of Title III of the Marine Protection, Research and Sanctuaries Act.
Information on marine sanctuaries may be obtained at http://sanctuaries.noaa.eov/#MN.
RECEIVED
RECEIVED AUG 31 N0,8
SEP 0 7 Z018 DCM WILMINGTON, NC
DCM-MHD CITY
Permittees may not begin work until they provide the Corps with a written certification from the
Department of Commerce.
s. In cases where the Wilmington District Engineer determines that the activity may
affect properties listed, or eligible for listing, in the National Register of Historic Places and its
codified regulations, the National Historic Preservation Amendment Acts of 1980 and 1992, the
Abandoned Shipwreck Act of 1987 and the Native American Graves Protection and Repatriation
Act, the activity is not authorized, until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied. Permittees may not begin work until notified by
the Corps that the requirements of the NHPA have been satisfied and that the activity is
authorized.
t. If you discover any previously unknown historic, cultural or archeological remains and
artifacts while accomplishing the activity authorized by this general permit, you must
immediately notify the Wilmington District Engineer of what you have found, and to the
maximum extent practicable, avoid construction activities that may affect the remains and
artifacts until the required coordination has been completed. The Wilmington District Engineer
will initiate the Federal, tribal and state coordination required to determine if the items or
remains warrant a recovery effort or if the site is eligible for listing in the National Register of "
Historic Places.
u. No activity is authorized under this general permit which is likely to directly or.
indirectly jeopardize the continued existence of a threatened or endangered species or a species
proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or
which will directly or indirectly destroy or adversely modify the critical habitat of such species.
No activity is authorized under any NWP which "may affect' a listed species or critical habitat,
unless Section 7 consultation addressing the effects of the proposed activity has been completed.
Information on threatened and endangered species and their critical habitat can be obtained
directly from the Corps field offices, the USFWS field offices or at the following web addresses:
http://www.fws.gov/orhitp://www.fws.gov/ipac orhttp://www.noaa.gov/fisheries.html.
Permittees may not begin work until notified by the Corps that the requirements of the
Endangered Species Act have been satisfied and that the activity is authorized.
v. If the permittee discovers or observes any live, damaged, injured or dead individual of
an endangered or threatened species during construction, the permittee shall immediately notify
the Wilmington District Engineer so that required coordination can be initiated with the U.S.
Fish and Wildlife Service and/or National Marine Fisheries Service.
w. Permittees are advised that development activities in or near a floodway may be
subject to the National Flood Insurance Program that prohibits any development, including fill,
within a floodway that results in any increase in base flood elevations. This general permit does
not authorize any activity prohibited by the National Flood Insurance Program.
x. The permittee must install and maintain, at his/her expense, any signal lights and
signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized
facilities. For further information, the permittee should contact Coast Guard Sector North
Carolina at (910) 772-2191 or email Coast Guard Fifth District at cgd5waterwa s a,usce.mil.
y. If the display of lights and signals on the authorized structure is not otherwise
provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be
installed and maintained by and at the expense of the permittee.
z. It is possible that an authorized structure may be damaged by wavewash from passing
vessels. The issuance of this general permit does not relieve the permittee from taking all proper
steps to ensure the integrity of the permitted structure and the safety of moored boats. The
permittee will not hold the United States liable for any such damage.
aa. Structures and their attendant utilities, authorized by this general permit, located on
lands subject to an easement in favor of the United States for the operation, maintenance,
improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW), will be removed
at the expense of the permittee, in the event that, in the judgment of the Corps acting on behalf
of the United States, the lands are needed at any time for any purpose within the scope of the
easement. Permanent buildings will not be constructed within the easement.
bb. The permittee must maintain any structure or work authorized by this general permit
in good condition and in conformance with the terms and conditions of this general permit. The
Permittee is not relieved of this requirement if the Permittee abandons the structure or work.
Transfer in fee simple of the work authorized by this general permit will automatically transfer
this general permit to the property's new owner, with all of the rights and responsibilities
enumerated herein. The permittee must inform any subsequent owner of all activities undertaken
under the authority of this general permit and provide the subsequent owner with a copy of the
terms and conditions of this general permit.
cc. At his/her sole discretion, any time during the processing cycle, the Wilmington
District Engineer may determine that this general permit will not be applicable to a specific
proposal. In such case, the procedures for processing an individual permit in accordance with 33
CFR 325 will be available.
dd. Except as authorized by this general permit or any Corps approved modification to
this general permit, all fill material placed in waters or wetlands shall be generated from an
upland source and will be clean and free of any pollutants except in trace quantities.
ee. Except as authorized by this general permit or any Corps approved modification to
this general permit, all excavated material will be disposed of in approved upland disposal areas.
ff. Activities which have commenced (i.e., are under construction) or are under contract
RECEIVED
RECEIVED AUG 31 2018
SEP 0 7 2018 n" „,.. ---ON. NC
DCM-MHD CITY
to commence in reliance upon this generalpermit will remain authorized provided the activity is
completed within twelve months of the date of the general permit's expiration, modification, or
revocation. Activities completed under the authorization of this general permit that were in
effect at the time the activity was completed continue to be authorized, by the general permit
BY AUTHORITY OF. THE. SECRETARY OF THE ARMY.
FOR THE COMMANDER:
Scott McLendon.
Chief, Regulaiory Division
'I IFilmington.District
to
�_ xrfoo ou xv.�. i
„n k
8 99 b6C
� � �g3g3g3g3g3g3� 3cg5ggdq fpp�„
9��F Y.SmE S�a
NV 300 011 NV I i V
i
All
—
19
P
.f 1 PygiIN I ed5l � i
s Iboaa , � R
♦ R�5a
i dp 'sa`Y1
I
I '
4IN
I I � i clad°R
I I�
RECEIVED
qa_
xY
FXR
N 3N52
1 3Y 3NOi
0
yak! ON nos 11 VS d0(.
Lie ,R
mk
Qom§
ggUz g'66
a�� 5 LL6F2
o l �.
J 4
111118'alaw
p:55nf5»35i
lig .
sedass�
p,�G 317018
WII M�NGtON; NC
z�
z
0
F-
0
z
J
LZ
0
0
n
-)CM-MHD CITY
-.1�'T'�'�mp
m
MY PPrwp
LW got
EL
-0
to � Wara& 4^4 P. 571
-lea
Awla
ok Vi
9'l 46i
POROCK'
4,13&ft zK-
In't A. Ag
61!
S &
UR)Y
E:)
NWRIEE,
A L WAUACEaxxr, cc
A101
I A16 In,
IL
JUN# $W18
RAPRIC C)EIVED"
1*0� IDMKINILMINOT N. NO 0
Channel Se.E"Lx.GW • �'
ed�r onn,1 UP
FiJnnne(
Sheer{- 3 of 3
c1 Ck -P—
�-zs-I1/' rcvls�
OVA' A I� NLw GNAW
drsdgc {vat-pfr.ri f NtW — — — — — — — — — — — —
J L LOT 6
LOCATION OF MEASUREMENTS BY OWNER: GREEN PATH, LLC
2 STY. VINYL C/O MS. LAURIE CHAN
3 DAY AVERAGE MEASUREMENTS ON 'PILINGS 1131 TIMOTHY RD.
39" AT HIGH WATER I W/ ENCLOSED DUNN, NC 28334
"' ® ?1LOW WATER - EXISTING I G OUND FLOOR D.B. 4641, P. 182
Propose to dredge ap ox BOAT LIFT TRAVERSE STORAGE & STAIRS M.B. 22, P. 37 1(
24 inches of spoil. _6 13'xl3' LINE 3.9'X7.8' WOODEN
7.5'
Leav !I- of t low w ter APPROX. AC PAD
dredgin / e �i I WETLANDS CP 34'39'49" E 217.28'
LINE 212 00' EIP 175.12'
-,�-- '
8'f 20' 26.2' N WOOD 107.40
f 3' STEPS
10' N
Cj A 6' 6\510' i m t N 7-9' M 8'
CONC.
m ttl 6 1I �I O � WOOD
v n z EXISTING ; WOOD ;N o'i 1 a DECK DRIVE
o m FLOATING DOCK ( WALK o I v 0.
4' WOOD 12 26.0'
0 6.5'xi4' WITH z 22.00'zEISWALK 173.37' 8.2' 101.48'
'0 5'x10' RAMP CP
O° WOOD N 34'32'21" W 199.61'
.<< o 30' FROM APPROX—I DECK
HIGH
V) TTOAAPPROX, WATERLINE I�APPROX. MEAN HIGH E
Fc n MEAN LOW WATERLINE WATERLINE
c-
w
~ < LOT 4 BLAND -SHORES D.
17T O STEPHEN C. WALLACE `� AND WIFE MARGARET W. WALLACE
LC
Z Q JO
2525 DELANEY RD. I 62
n LOT 3-OCEANBREEZE WILMINGTON, NC 28403 RECEIVED CI
D.B. 1997, P. 240
M.B. 35. P. 67 Qlir D:I
JON o s 2
JOHN `` Pl�RCE = Att:CIhTEs P`n. M'
+oa .;awsav Bow. DA .NtlMLLE noes« a
a.,or,E wo-aeaem O�IE: "Y ie, 201e '
sum i - so' r.e. ssz v. u
DCM VVILMING - N
GRAPERC scus v,z50' -
UhffedStates'D rP#Itm o te
_
FISH -.,N.D 'Wn-D XM SEkvjc-E
_
3i"7 2-6-
4dqighjjq#kCk *7 0726
GMICLMM ITORAVOIDDING EWPACTRTO, THEWEST MDM:AAM
the -flo;t m, -listed da watee, ls�a Federally
endangered aquapcmammal protected under �jdapgewe&SpecesArt of1973, as amended (16 US.C..
Protection Act of'1312,asamcnad (16U.S :C 1461 efse_Q.. qb6:
manatee is also listed ea-en*gqredunderthe'N6rIh Carolina 'Endangered' .Species Actcif'1967-9ATtiA,
-25.q,f of the, General' Statuf6s),. Me. US_Ff&and:VVjldM Service,
Federal agency responsible for th& piotectidal and idedvery' of the West: M" 'mad*e *40 the
provisions of the EndiffigOUd Species Act.
,Adultmanqtecvayerage 10fbeffang and weigh-about-2,200pounds;, although gome MWduals have661i
recorded atlengthsrgreaferthan I-Ifectahel weighing as much,a,3,' 500 pounds. Manatees are -oOMOnly-
foundLinfies14 lagoons, estuaries; Fa&
inland rivers of varying S-al - �'-�e&etnes_. 'Manatees. spend I janich Of their tune , underwater or, partly
-
init 'merged', making their elb ftnft 110-, detect; egen in "PW'Wqrwhile the manaiws poncipal
stronghold iri, the i1nited, States is Flarida.,fbp species! is c seasonal linhabliant of'North.
Toprefect -manatebesIn North CarOlhf,% the Sexvfge's kalctgU Fuld 000-has1prepared e on
Pr- cpgio ary
,measures f6t
general': oppstragoon, aciiiities: in Vafqrsz used b , zthc:spqq19s-' `,Implementation qfthese
PplculeotafiO�
i4easures-VM_aUqw 1q-'watqr pnqjqcP-WNct do not re ' bIastlngtb;prweedmithout adverse impacts,,to.
I 1 11 . qa
wq qs_-� 4-qddjtqqq, on ofthese guidelines as conservation:measures ift a_BloI6gicaIAis6emdht
or,11iological Pyaluation,--or as pad ofthe daterminaliou, of ilnpictson the madate6:irt bri�eb*irohmental
document prepared pursuant to the will exp6difo.the S.QfwkO'srav .
6f,the, -document finfthe. fifffflnx&f,of regiiiremenfs -liddO S661161V! of J3hda"d,4,c6jcpA
I ,project :managerififbfu allpers-on-'riel, asgticutdo and/or cofitractof, VII *14 140 project -that
manatees may be =present in the: pr*cf area;, and' -the need, tD'aVdij any, IIZM� Wlh,690, endaugarpek
ivaiiimals. mid ftcp"
of.the_spedes. and their -h
construction persoitriel wi q
ly, submerged in shallow water::' All
observing y?aterrejqted.acffv!iicsJbr
coustraohon personnel that there are civil, and
herifft" WaSAIng.; or Wbg mapatqqs,which .90, protected under the Marine,
3. If a manatee Is seen within 100 yards of the active construction and/or dredging operation or vessel
movement, all appropriate precautions will be implemented to ensure protection of the manatee. These
precautions will include the immediate shutdown of moving equipment if a manatee comes within 50 feet
of the operational area of the equipment Activities will not resume until the manatee has departed the
project area on its own volition (r.e., it may not be herded or harassed from the area).
4. Any collision with and/or injury to a manatee will be reported immediately. The report must be made
to the U.S. Fish and Wildlife Service (ph. 919-856-4520), the National Marine Fisheries Service (ph. 252-
728-8762), and the North Carolina Wildlife Resources Commission (ph. 252-448-1546).
5. A sign will be posted in all vessels associated with the project where it is clearly visible to the vessel'
operator. The sign should state:
CAUi'ION. The endangered manatee may occur in these waters during the warmer months,
primarily from June through October. Idle speed is required if operating this vessel in shallow
water during these months. All equipment must be shut down if a manatee comes within 50 feet
of the vessel or operating equipment. A collision with and/or injury to the manatee must be
reported immediately to the U.S. Fish and Wildlife Service (919-8564520), the National Marine
Fisheries Service (252-728-8762), and the North Carolina Wildlife Resources Commission (252-
448-1546).
6. The contractor will maintain a log detailing sightings, collisions, and/or injuries to manatees during
project activities. Upon completion of the action, the project manager will prepare a report which
summarizes all information on manatees encountered and submit the report to the Service's Raleigh Field
Office,
7. All vessels associated with the construction project will operate at "no wake/Idle" speeds at all times
while in water where the draft of the vessel provides less than a four foot clearance from the bottom. All
vessels will follow routes of deep water whenever possible.
8. If siltation barriers must be placed in shallow water, these barriers will be: (a) made of material in
which manatees cannot become entangled; (b) secured in a manner that they cannot break free and
entangle manatees; and, (c) regularly monitored to ensure that manatees have not become entangled.
Barriers will be placed in a manner to allow manatees entry to or exit from essential habitat.
Prepared by (rev. 02/2017):
U.S. Fish and Wildlife Service
Raleigh Field Office
Post Office Box 33726
Raleigh, North Carolina 276363726
919/656-4520
RECEIVED
SEP 0 7 2018
RECEIVED DCArI_MRD CITY
AUG 31 2018
DCM WILMINGTON, NC
1?Igut 1. whale hods eftlie WesYSzidlan xandYe > Ua visz6le r cle r°; ar, bolh,"die dark and'
u�aticly vvaYers of coastal North ,Card 'laud ally noMO413t s9e9 grip a sm4 gat# of `the ''head. m ie Yfte
;manafee Ta19ea IY9 h03t`''iq blet'1-., ,
a
M
Iliushaiioriused with �Ye p�tattasl¢n o�the forth Camltna , Ya%r ' seam o aYura cceitcesi
gmuce: chdx.M..Ic.. I987w Etid6gotd4, TbMgo#Aartt ,I Y� 1 arras of o fit Gacolina. Pact h A lr
avaluation oflhe ni lbftzis Mcam, at' Pa ers of the.l arth Cargi ,Biologtcal. Sm-.m 1997 3„IrT04
CartiHna SfaYe 112usetfai,4flalati5Yal5�Clehce9 _i2a�eIg6, �1C ,pp..52.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Wilkinson Family Trust c/o Doug Wilkinson
2. LOCATION OF PROJECT SITE: 101 Bland Alley, adjacent to Topsail Sound, in Surf City,
Pender County.
Photo Index — 2006: 25-6585, N-15
State Plane Coordinates - Lat: 34°23'48.11"N Long: 77°35'26.95"W
3. INVESTIGATION TYPE: CAMA/D&F
4. INVESTIGATIVE
Dates of Site Visit — 6/20/18
Was Applicant Present —No
5. PROCESSING PROCEDURE: Application Received Complete — 6/25/18
Office - Wilmington
6. SITE DESCRIPTION:
(A)
(B)
(C)
(D)
(E)
Local Land Use Plan — Town of Surf City
Land Classification from LUP — Developed / Conservation
AEC(s) Involved: EW, PT, ES
Water Dependent: Yes
Intended Use: Private
Wastewater Treatment: Existing — Septic System
Planned - None
(F) Type of Structures: Existing — Residential home, pier and docking facility.
Planned — Dredge an access channel boat basin around an existing
docking facility.
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
HABITAT DESCRIPTION: [AREA]
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
1,556 sq. ft.
(Open water
+/- 172 cu.yds.)
(C) Other — High ground
(D) Total Area Disturbed: Potential to disturb up to 4,156 sq. ft. (<1 acre)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: Yes
8. PROJECT SUMMARY: The applicant proposes to excavate an access channel and boat basin
around/beneath an existing docking facility.
RECEIVED
JUL 0 3 2018
DCM-MHD CITY
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
1) APPLICANT: Wilkinson Family Trust COUNTY: Pender
PROJECT NAME: Channel & Basin Excavation
LOCATION OF PROJECT:101 Bland Alley, adjacent to Topsail Sound, in Surf City
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 6-25-18
FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: n/a
CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: n/a
FIELD REPRESENTATIVE: Jason Dull
DISTRICT MANAGER REVIEW:
B) DATE RECEIVED BY MAJOR PERMITS UNIT:
PUBLIC NOTICE REC'D: 7-4-18
ADJ. RIP. PROP NOTICES REC'D:
APPLICATION ASSIGNED TO:
C) 75 DAY DEADLINE: q
MAIL OUT DATE: 6-29-18
FEDERAL DUE DATE: I�
PERMIT FINAL ACTION: ISSUE � Z I DENY
RECEIVED
JUL 0 3 2018
OCM-MH p C!T y
DISTRICT OFFICE: WILMINGTON
FEE REC'D: $400 / #13200
END OF NOTICE DATE: 7-25-18
DEED REC'D:
ON:
150 DAY DEADLINE:
STATE DUE DATE: 7-25-18
FED COMMENTS REC'D:
DRAFT ON
AGENCY
J wit
DATE
COMMENTS
RETURNED
OBJECTION
S:
YES NO
NOTES
Division of Community Assistance
Division of Coastal Management-LUP Consistency
I v
7�
SI 1/L 1
Public Water Section (DWR)
r2.1 102
V
Land Quality Section (DEMLR)
Jul 196
VV
Division of Water Resources - 401 Section
J 22
l
s
See L 6l
State Property Office
q
M 11(6
�(
Division of Archives & History
Division of Marine Fisheries - Shellfish Section
��
X
Division of Highways (NCDOT)
Wildlife Resources Commission
1(
Local Permit O cer
r Archae l
Division of Marine Fisheries - DCM
Corps of Engineers - Regulatory Branch
(2 Z� l�
Zf� 201 fb _ D1400
MEMORANDUM
To: Courtney Spears
From: Michael Christenbury, Wilmington District Planner
Subject: Consistency Determination — Wilkinson Family T t, Surf City
Date: August 1, 2018
Consistency Determination:
l P-- ,Plan Update.. ,
This project appears to be consistent with the Town of Surf City Land Use
The applicant proposes to excavate an access channel and boat basin around and beneath
an existing docking facility. The project is located at Bland Alley, adjacent to Topsail
Sound, in the Town of Surf City.
I have reviewed this proposal for consistency with the Town of Surf City CAMA Land
Use Plan and offer the following comments.
The general area of the project is classified as Conservation. Waters at the project site are
classified as SA and are open to the harvesting of shellfish. The area is not a Primary
Nursery Area. Areas of Environmental Concern (AEC's) are EW, PT, and ES.
Surf City allows development in Conservation classified AECs, which are consistent with
the State's minimum use standards. The Surf City Land Use Plan contains some policies,
which exceed the State's minimum use standards. However, none of these policies
appear to be applicable to this project.
This project appears to be consistent with the Town of Surf City Land Use Plan
Update
Cc: FILE
Recommendations for State Permit — Wilkinson Family Trust c/o Doug Wilkinson
The proposed excavation of an access channel and boat basin around an existing docking facility appears
to be CONSISTENT with15 NCAC 07H.0208 (b)(1) and (2).
Based on this determination, it is recommended that a permit be issued. This office has no objections to
the proposed project provided it is consistent with all other state and federal permitting requirements. Any
permit issued should also include all applicable dredging conditions.
RECEIVED
JUL 0 3 2018
DCM-MHD CITY
Coastal Management
ENVIRONMENTAL QUALITY
June 29, 2018
TO: Mark Zeigler
Division of Community Assistance
Wilmington Regional Office
ROY COOPER
Govemor
MICHAEL S. REGAN
See,era,y
BRAXTON DAVIS
rnre'te,
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.saears aC2ncdenr.aov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: XThis agency has no objection to the project as proposed.
`*Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED / r 411( 7E -e4 S Lr DATED 7! z-/ j S
RECEIVED
JUL 0 2 2018
State of North Carolina I Environmental Quality I Coastal Management MP SECTION WI
127 Cardinal Drive Ext., Wilmington, NC 28405 RO
910-796-7215
41
Coastal Management
ENVIRONMENTAL QUALITY
June 29. 2018
TO:
Heidi Cox
Regional Engineering Supervisor
Public Water Supply-WiRO
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
Dtrecror
�,�lsio 2
W;RO nof�vale9?0/8
Pubnc�yar�esuapes
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.spears(aa),ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED J ( DATED
RECEIVED
DCM WILMINGTON, NC
jUL 12 2018
State of North Carolina I Environmental Qaalily I Coastal Management
127 Cardinal Drive Ex1., Wilmington, NC 28405
910-796-7215
Coastal Management
ENVIRONMENTAL QUALITY
ROY COOPER
Governor
MICHAEiL S. REGAN
.Secretary
BRAXTON DAVIS
Dvecvor
June 29, 2018 AIL
TO: Dan Sams �
District Manager-DEMLR Br
Wilmington Regional Office
ti.
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.spears(a-).ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED �Y,� DATED 000 10 -vtE
RECEIVED
JUL 10 . ,J ;
State of North Carolina i Environmental Quality I Coastal Management
121 Cardinal Drive E.t, Wilmington, NC 28405 DCM WILMINGTON, NC
910-796-7215
aAkC
A
DwuSign Envelope ID: BEB16F4C-DBDC40CF-8A34-D40FAC6648IA
RAY COOPER
Goemnor
NCHAEL S. REGAN
5fawary
LINDA CULPEPPER
natrta D&wt r
NORTH CAROLINA
argil aird *w ty
August 22, 2018
DWR Project 4 2019-0948
PenderCounty
Douglas H. Wilkinson
1301 Douglas Drive
Sanford, NC 27330
Subject Property:
Wilkinson Family Trust —Surf City
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Wilkinson,
You have our approval, in accordance with the attached conditions and those listed below, to excavate
an access channel and boat basin around and beneath an existing private docking facility as described in
your application received by the N.C. Division of Water Resources (DWR) on July 6, 2018. After
reviewing your application, we have decided that the impacts are covered by General Water Quality
Certification Number 4144 (GC4144).
This Certification allows you to use the Regional General Permit 291 when issued by the US Army Corps
of Engineers and the LAMA Major Permit when issued by the Division of Coastal Management. In addition,
you should obtain or otherwise comply with any other required federal, state or local permits before you
go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge,
and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This
Certification can also be found on line at:
http://Portal.ncdenr.orpJweb/wci/swp/ws/401/certsandpermits.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is
sold, the new owner must be given a copy of this Certification and approval letter and is thereby
responsible for complying with all conditions. If total fills for this project (now or in the future) exceed
Q RECEIVED
`r�i_ -• AUG 2 2 2018
North Carolina Department of Environmental Quality Division of Water Resources
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 DCM WILMINGTON, NO
Phone: 910-796-7215\ Internet: www.dea.nc.aov
DocuSign Envelope ID: BEB16F4C-D8DC-00CF-8A34-D40FAC66431 B
one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described
in 15A NCAC 21-1.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If you
change your project, you must notify the Division and you may be required to submit a new
application package with the appropriate fee. If the property is sold, the new owner must be given a
copy of this approval letter and General Certification and is responsible for complying with all
conditions. Any new owner must notify the Division and request the Certification be issued in their
name (15A NCAC 02H .0501 and .0502).
2. Any final construction plans for this project must include or reference the application and plans
approved by the Division under this authorization letter and certification. The applicant will also be
required to evaluate all acquired permits to assure that they are consistent and all relative impacts are
accounted for and shown on the construction plans. [15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506
(4)] The applicant shall require his contractors (and/or agents) to comply with all of the terms of this
Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification.
3. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in
15 A NCAC 2B .0220. Appropriate sediment and erosion control practices must be used to meet this
standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity
issues arise at 910.796.7215
4. This General Certification shall expire on the same day as the expiration date of the
corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a
specific project shall remain in effect for the life of the project, regardless of the expiration of this
Certification.
S. The permittee shall require its contractors and/or agents to comply with the terms of this
permit in the construction and maintenance of this project, and shall provide each of its contractors
and/or agents associated with the construction or maintenance of this project a copy of this
certification. A copy of this certification including all conditions shall be available at the project site
during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H
.0506 (b)(2) and (c)(2)]
6. Continuing Compliance:
The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent
with State water quality standards (including any requirements resulting from compliance with 303(d) of
the Clean Water Act), and any other appropriate requirements of State and Federal law. If th€ivision
CEIVED
AUG 2 2 d18
OCM WILMINGTON, NC
North Carolina Department of Environmental Quality I Division of Water Resources
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.dea.nc.gov
DocuSign Envelope ID: BEB16F4C-DBDC-40CF-8A34-D40FAC66431B
determines that such standards or laws are not being met, including failure to sustain a designated or
achieved use, or that State or Federal law is being violated, or that further conditions are necessary to
assure compliance, than the Division may reevaluate and modify this General Water Quality
Certification. [15A NCAC 02H .0507(d)]
7. All mechanized equipment operated near surface waters or wetlands will be regularly inspected
and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids
or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the
permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8
am to 5 pm at the Wilmington Regional Office at 910.796.7215 and after hours and on weekends call
(800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil
Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B
.0200 (3)(f), and G5143 Article 21A].
B. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of
a waterbody or wetlands to prevent contamination by fuel and oils. 115A NCAC 02H .0506 (b)(3) and
(c)(3) and 15A NCAC 02B .0200 (3)(f)].
9. This certification grants permission to the director, an authorized representative of the Director,
or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business
hours 15A NCAC 02H.0502(e).
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a
completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina
Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project
completion. The certification of completion is available at:
http://i)orta I. ncdenr.ore/web/wa/swp/ws/401/certsandperm its/apply/forms).
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to
conduct impacts to waters as depicted in your application and as authorized by this Certification shall
expire upon expiration of the 404 or CAMA Permit.
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a
written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as
OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition
is considered filed when the original and one (1) copy along with any applicable OAH filing fee is
RECEIVED
AUG 2 2 2018
DCM WILMIN
North Carolina Department of Environmental Quality' Division of Water Resources G I OIV, (yQ
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.deci.nc.gov
r 7
DocuSign Envelope ID: BEB16F4C-D6DC-40CF-6A34-D40FAC66431B
received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm,
excluding official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the
petition along with any applicable OAH filing fee is received by the OAH within five (5) business days
following the faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS, Fed Ex,
etc):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, NC 27699-6714 Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DEQ:
Bill Lane, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Resources under Section 401 of the Clean
Water Act. If you have any questions, please telephone Robb Mairs in the DWR Wilmington Regional
Office at 910.796.7215 or Robb. Mairs0ricdenr.gov.
Sincerely,
For EDocu8lpnsd by:
T,T"'m:idr.,
7F141E BBF 56 .,
Morelia Sanchez Ing, ctIng Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Enclosures: GC4144
Liz Hair - USACE Wilmington Regulatory Field Office -Electronic Copy
Courtney Spears— NCDCM Wilmington Office
DWR 401 & Buffer Permitting Branch file-LF
David Gardner -Agent-Electronic Copy
WiRO
RECEIVED
AUG 2 2 2018
'CM WILMINGTON, NC
North Carolina Department of Environmental Quality Division of Water Resources
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.dea.nc.aov
kjkj-e(,
Coastal Management
ENVIRONMENTAL QUALITY
June 29, 2018
TO:
Tim Walton
Dept of Administration
State Property Office
RECEIVED
JUL 03 2018
DOA
STATE PROPERTY
OFFICE
ROY COOPER
Gnvernnr
MICHAEL S. REGAN
Secrelnry
BRAXTON DAVIS
Direclor
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.spears(a).ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
,�Q�')d
REPLY: This agency has no objection to the project as proposed.
� u (, I** Itional comments may be attached**
CAM/
OPy� cr>?55 �' This agency has no comment on the proposed project.
V-a This agency approves of the project only if the recommended changes
Cyr, ad are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATED
RECEIVED
DCM VOLMINGi ON, NC
State of North Carolina I Environmental Quality I Coastal Management j l l I 0 y I
127 Cardinal Dave Et , Wilmington, NC 28405
910-796-7215
OMu
Received: 07/06/2018
Coastal Management
ENVIRONMENTAL OVAIrtY
State Historic Preservation Office ROY COOPER
(k..r
MICHAEL S. REGAN
.Iw, m. n
ER 18-1565 BRAXTON DAVIS
lhwahw
June 29, 2018 Due -- 7/23/18
TO Renee Gledhill -Early 4151CO
Dept of Cultural Resources A-h
Archives & History 7-20-10
FROM Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext_ Wilm . NC 28405 courtnev.soears(Wncdenr.00v
Fax 395-3964 (Courier 04-16-33)
SUBJECT CAMA / Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City. Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project. contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested
REPLY: This agency has no objection to the project as proposed
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated See attached.
This agency objects to the project for reasons described in the attached
comments
SIGNED �`^ ` li.fi�[_ DATED a 3 !S
RECEIVED
JUL 2 4 2018
Male Rf wnh CadqurmvaxneMd ()wMq;l'mRal�Waaemai DCM WILMINGTON, NC
127 CwduW 1MnE 1,1 . Wdmasim, W' 7240
R101W 215 JUL 0 5 2010
Coastal Management
ENVIRONMENTAL QUALITY
June 29, 2018
TO:
Shannon Jenkins
NC DMF
Shellfish Sanitation Section
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
ntrector
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.soears(a)_ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNE DATED I
siloVic RECEIVED
JUL 0 5 2018
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext, Wilmington, NC 28405 ►VIP SECTION WIRO
910-796-7215
Coastal Management
ENVIRONMENTAL QUALITY
June 29, 2018
TO:
David Harris
NC DOT
Roadside Environmental Unit
ROY COOPER
Gnrr,run
1� p MICHAEL S. REGAN
JUL 1 1 C�18 k-lrclary
BRAXTON DAVIS
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 Courtney.spears@ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Swears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: V This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments. �� 1
SIGNED
DATED T ZJ — ?,v I4
RECEIVED
JUL 2 0 2018
State of Nmh Carolina I En"rommnial Quality I Coastal Management
127 Cardinal DnYe E.L, Wilinin8hon, NC 28405 DCM WILMINGTON, NC
910-7964215
jAR6
Coastal Management
June 29, 2018
TO:
c•�a a .�2.03 ir\ JUL2018
IL
RECEIVED
Nobilat
Maria Dunn NC Wildlife Resources Commission
For WiRO
ROY COOPER
Govan,
MICHAEL S. REGAN
Secm,ary
BRAXTON DAVIS
Dwan,
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.spears(cDncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pander County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 201& If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATED -18 wlt
RECEIVED
JUL 19
State of North Carolina 1 Gviron nW Quality Coa W Management
127 Cardinal Drive Ext., W ilmtnblon, NC 29405
910-7967215 DCM WILMINGTON, NC
Coastal Management
ENVIRONMENTAL QUALITY
June 29, 2018
TO:
Curt Weychert
Fisheries Resource Specialist
MHC-DCM
ROY COOPER
G,nvrnnr
MIC14AEL S. REGAN
Semi ..3
BRAXTON DAVIS
D,mlar
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 courtnev.spears(d.ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Wilkinson Family Trust
Project Location: 101 Bland Alley, adjacent to Topsail Sound, in Surf City, Pender County
Proposed Project: to excavate an access channel and boat basin associated with an
existing docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by July 25, 2018. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED
RECEIVED
JUL 17 2018
DATED �-JOA
State of Noah Carolina 1 4110*1N(ym unt
127 Cardinal Dnw Ext , Wilmington, NC 284,
�Yl
910-796-7215
RECEIVED
JUL 0 3 201E
DCM-MHD CITY
Spears, Courtney
From:
Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>
Sent:
Friday, July 13, 2018 5:21 PM
To:
Spears, Courtney
Cc:
MacPherson, Tara; Dail, Jason
Subject:
(External] project review status
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
Good afternoon everyone,
This email is to notify you that we have received the applications and will be processing these projects as follows:
Corps Action ID: SAW-2018-01400
Project Name: Wilkinson Family Trust/ 101 Bland Alley
County: Pender
GP 291: I'll get the notice to federal agencies out next week
Corps Action ID: SAW-2018-01331
Project Name: Bald Head Island Conservancy/Oyster Sills
County: Brunswick
NWP 18
Corps Action ID: SAW-2018-01329
Project Name: William Waddell/ bulkhead repair
County: Brunswick
GP 80
Hope y'all have a good weekend!
Liz Hair
Regulatory Project Manager
Wilmington District
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
Sarah.e.hair@usace.army.mil
910-251-4049
Spears, Courtne
From:
Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>
Sent:
Thursday, July 19, 2018 5:40 PM
To:
Arnette, Justin R CIV USARMY CESAW (US); Spears, Courtney; Huggett, Doug; ethan
coble; fritz; HORTON, J TODD CIV USARMY CESAW (US); kathryn_matthews@fws.gov;
leigh mann; matt creelman; DCR - Environmental_Review; Owens, Jennifer L CIV
USARMY CESAW (US); pace wilbur, pete benjamin; scott.d.mcaloon; Bowers, Todd; Twyla
Cheatwood; John; Dail, Jason
Cc:
Greer, Emily C CIV USARMY CESAW (US)
Subject:
[External] CAMA Major/GP 291/ SAW-2018-01400/Wilkinson dredge/Surf City
Attachments:
SAW-2018-01400_Wilkinson_Bland Alley_dredge_ePN-signed.pcif; app and
bioreport.pdf; plans_highlighted.pdf, GoogleEarth Placemark.kmz
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
All:
Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management
(NCDCM) has forwarded to our office a copy of the LAMA permit application, Field Investigation Report and Bio Report
for the subject project. The attached notice requests federal agency comments on this project by August 18, 2018.
The applicant proposes to perform dredging within waters directly adjacent to an existing private docking facility at 101
Bland Alley, in Surf City, Pender County, North Carolina. Coordinates in Decimal Degrees are: 34.39671 N-77.59208 W.
According to the application, existing water depths within the project area range from -V to -2' NLW. The dredging
proposal is to excavate by bucket to barge method, to a final depth of -6' NLW. Based on the information provided on
page 1 of the MP-2 form, approximately 230 cubic yards of material would be removed from an approximate 1,156
square foot area within the basin. A spoil disposal location has been identified as the Lewis Brothers Boatyard, at 405
Lewis Road, in Hampstead, NC. No SAV was observed in the project area.
The project is adjacent to the Corps Federal Channel.
Please see the attached NC DCM field investigation report, application, and plans for more detailed information
concerning the proposed project.
EFH:
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery
Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but is not
likely to adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management
Councils or the National Marine Fisheries Service.
The waters within the project area designated SA by the Division of Water Resources. Waters within the project area are
NOT designated as PNA by the NC Division of Marine Fisheries and are OPEN to the taking of shellfish.
ESA:
The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest
North Carolina Natural Heritage Database. Based on available information, the Corps has determined that the project
may affect but -is not likely toadversely affect the West Indian manatee. The use of the Manatee Guidelines will be
required as a condition of this proposed action.
The project will not affect any other species listed as threatened or endangered or their critical habitat formally
designated pursuant to the Endangered Species Act of 1973 (ESA) within the project area.
NHPA 106:
Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and
the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and
records and the latest published version of the National Register of Historic Places, the Corps has preliminarily
determined that the proposed project will have no effect on cultural resources and requests concurrence from the State
Historic Preservation Office.
Please contact me if you have any questions. Please provide comments as soon as you can or by August 18, 2018.
Liz Hair
Regulatory Project Manager
Wilmington District
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
Sarah.e.hair@usace.army.mil
910-251-4049
twc
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
August 23, 2018
Regulatory Division
Action ID No. SAW-2018-01400/Wilkinson/Bland Alley dredge
Mr. Doug Huggett
Division of Coastal Management
North Carolina Department of Environmental Quality
400 Commerce Avenue
Morehead City, North Carolina 28557-3421
Dear Mr. Huggett:
Reference the application of Mr. Douglas Wilkinson to conduct dredging within waters adjacent to
Topsail Sound, at 101 Bland Alley, in Surf City, Pender County, NC.
Specifically, the project consists of dredging proposal is to excavate by bucket to barge method, to
a final depth of -6' NLW. Approximately 230 cubic yards of material would be removed from an
approximate 1,156 square foot area within the basin. Existing water depths within the project area range
from -I'to -2' NLW. A spoil disposal location has been identified as the Lewis Brothers Boatyard, at
405 Lewis Road, in Hampstead, NC.
The Federal agencies have completed review of the proposal as presented by the application and
your field investigation report. We recommend that the following conditions be included in the
modification to the State authorization:
1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the
applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere
to all requirements therein. The guidelines can be found at http://www.fws. og v/nc-
es/mammal/manatee guidelines.pdf.
2. The permittee must install and maintain, at his expense, any signal lights and signals prescribed
by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further
information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-
2191. RECEIVED
3. All work authorized by this permit must be performed in strict compliar" tP61gubmitted
DCM WILMINGTON, NC
-2-
plans, which are a part of this permit. Any modification to these plans must be approved by the US
Army Corps of Engineers (USACE) prior to implementation.
4.Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -
clearing activities shall take place at any time in the construction or maintenance of this project, in such
a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the
reach of waters or wetlands.
5. Except as authorized by this permit or any USACE approved modification to this permit, no
excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or
maintenance of this project, within waters or wetlands. This permit does not authorize temporary
placement or double handling of excavated or fill material within waters or wetlands outside the
permitted area. This prohibition applies to all borrow and fill activities connected with this project.
6. All mechanized equipment will be regularly inspected and maintained to prevent contamination
of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of
a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to
the N.C. Division of Water Resources at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of
the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed.
7.Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be
generated from an upland source and will be clean and free of any pollutants except in trace quantities.
Metal products, organic materials (including debris from land clearing activities), or unsightly debris
will not be used.
8. If the permittee discovers any previously unknown historic or archeological remains while
accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who
will initiate the required coordination procedures.
9.The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide each of
its contractors and/or agents associated with the construction or maintenance of this project with a copy
of this permit. A copy of this permit, including all conditions, shall be available at the project site
during construction and maintenance of this project.
10. The permittee shall employ all sedimentation and erosion control measures necessary to
prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area.
This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate
devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate
stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all
aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter
-3-
113A Article 4).
11. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction -related discharge. Increases such that the
turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North
Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes
and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant.
12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration
before completion of the work will, without expense to the United States and in such time and manner
as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to
its pre -project condition.
13. Violations of these conditions or violations of Section 404 of the Clean Water Actor Section 10
of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of
Engineers within 24 hours of the permittee's discovery of the violation.
Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory
Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil.
Sincerely,
Liz Hair, Project Manager
Wilmington Regulatory Field Office
Electronic copy furnished:
Ms. Karen Higgins/Mr. Robb Mairs
North Carolina Department of Environmental Quality -Division of Water Resources
Mr. Pete Benjamin/Ms. John Ellis
U.S. Fish and Wildlife Service -Fish and Wildlife Enhancement
RECEIVED
Dr. Pace Wilber/Mr. Fritz Rohde/Ms. Twyla Cheatwood
National Marine Fisheries Service -Habitat Conservation Division AUG 2 3 2018
DCM WILMINGTON, NC
s
M
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist -Water Protection Division
Ms. Courtney Spears/Mr. Jason Dail
North Carolina Department of Environmental Quality -North Carolina Division of Coastal
Management
Wilkinson Family Trust c/o Doug Wilkinson
Page Two
9. PROJECT DESCRIPTION:
The subject property is located at 101 Bland Alley, adjacent to Banks Channel and Topsail Sound, in Surf
City, Pender County. To find the property from the Wilmington Regional Office, take Highway 17 North
from Wilmington approximately 20 miles and turn right on N.C. State Highway 210. Travel approximately
2.8 miles to the intersection of NC 210 and NC 50. Turn right onto NC 50/NC 210 and travel approximately
1.9 miles onto Topsail Island. Turn right onto S. Topsail Dr. NC 50 and travel approximately 3.32 miles
to Bland Drive and turn right. Travel approximately 0.10 miles along Bland Drive and bear right at the end
onto Bland Alley. The subject property will be located on the western side of the road at house number 101.
The applicant currently maintains a single-family residence on the property. Existing man-made features
include a residence, driveway, pier and floating dock. The high ground portion is elevated approximately
4' — 6' above the normal high water (NHW) level. Vegetation on the tract consists of lawn grasses and
ornamental landscaping. There is a narrow stand of Coastal and "404" type wetlands along the property's
western shoreline fronting Banks Channel. The stand of marsh averages approximately 15'-25' in width.
adjacent to the subject property. Predominant wetland species located in this area is Smooth Marsh
Cordgrass (Spartina alterniora) The property has approximately 50 linear feet of shoreline which is
naturally vegetated and stablized. Water depths (in the vicinity of the existing water dependent structures)
range from approximately -1.0' to -2.0', relative to normal low water (NLW). Presently, the owner(s)
maintains a private docking facility which is comprised of a 6' x 85' section of fixed walkway (which
extends from the house), a 10' x I F fixed platform, 6' x 14' floating dock and a 13' x 13' boatlift.
According to the application package, there are no alterations or additions to the existing docking facility.
Residential properties border the site to the north, south and east and Banks Channel/Topsail Sound to the
west. Based on existing documentation, there is a history of dredging along Banks Channel, within the
Corp of Engineer's channel setback and adjacent to the project area; however, there is no record of any
privately funded dredging events at the subject property.
The waters of Topsail Sound (adjacent to the project site) are classified as SA by the North Carolina
Division of Water Resources. They ARE NOT designated as a Primary Nursery Area (PNA) by the
North Carolina Division of Marine Fisheries, and they are OPEN to the harvest of shellfish. Based on visual
observations made by DCM staff during a site visit on 9/10/15, there does not appear to be any Submerged
Aquatic Vegetation (SAV) within the proposed dredged footprint.
PROPOSED PROJECT:
The applicant proposes to excavate an access channel and boat basin around/beneath an existing docking
facility which is located at 101 Bland Alley, in Surf City, Pender County.
Based on the site plan, the applicant would dredge an access channel and boat basin along the northern
riparian corridor. The dredge cut would begin just inshore of the existing boat lift and terminate just
waterward of the federal channel setback along Banks Channel. A rectangular area (approximately 30' x
17' x-4'NLW) would be dredged around the existing boatlift, which is located along the northern side of
the property, and on the northern side of the existing access pier. From there, the dredge footprint would
extend offshore from the existing boatlift, encompassing a 50' x 17' x -4 to -6' area beneath, and adjacent
to the existing floating dock. A small 14' x 14' x `4' area would be dredge around the perimeter of the
existing floating dock which is located along the center of the docking facility. RECEIVED
JUL 0 3 2018
DCM-MHD CITY
Wilkinson Family Trust c/o Doug Wilkinson
Page Three
The proposed dredge cut would tie into the -6' contour which is located just beyond the Corp's Federal
Channel Setback. Based on information presented in the application package and site plans, existing water
depths (beneath and around the existing docking facility) range from -1'-2' @ NLW, and the applicant is
proposing to dredge to a final depth of -6' @ NLW, resulting in the removal of approximately 172 cubic
yards of shallow bottom habitat.
As designed, the dredge footprint would be at least 30' away from any areas of Coastal Wetlands. In
addition, it appears the proposed project would not impact any areas of Submerged Aquatic Vegetation
(SAV), as SAY is non-existent in this area.
Dredging would be performed using a "bucket to barge" method, and once loaded onto the barge, the vessel
would transport and offload the material at Lewis Brothers Boat Yard, located along Lewis Road, in
Hampstead, NC. The disposal site is located approximately 1-1.5 miles from the project area. The disposal
site has been previously used for other spoil deposition project and according to the applicant, material
generated from this project would be disposed in the same area. The disposal area has been documented to
be void of any wetland vegetation.
10. ANTICIPATED IMPACTS:
The proposed dredging would disturb approximately 1,556 sq. ft. of shallow bottom area. Minor increases
in turbidity should be expected during the dredging event; however no long term adverse impacts are
anticipated. Spoil disposal would disturb up to 40,000 sq. ft. (1.0 acres) of high ground at Lewis Brothers
Boat Yard, in Hampstead, NC, approximately 2,000 feet from the normal high water line. The proposed
project would not exceed a final depth of -6' @ NLW and would taper off along the edge of the federally
maintained channel. Sedimentation and erosion control structures would be installed to prevent transport
of material off the property. As proposed, it appears that the dredging and disposal activities would not
impact coastal wetlands, SAVs or PNAs.
Submitted by: Jason Dail Date: June 28, 2018 Office: Wilmington
RECEIVED
JUL 0 3 2018
DCM-MHD CITY
PROJECT NARRATIVE
This permit request is for dredging approximately feet under a boat
lift and small area at the end of the dock located at 101 Bland Alley,
Surf City, NC 28445.
The removed material will be relocated to dry land located at
405 Lewis Rd., Hampstead, NC
Signed:
RECEIVED
IJL 032018
RECEIVED
JUN 0 82018
DCM-MHD CITY
DCM WILMINGTON, NC
DCM MP-1
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant Landowner Information
Business Name
Project Name (if applicable)
Applicant 1: First Name
MI
Last Name
Wilkinson Family Trust
Applicant 2: First Name
Douglas
MI
H
Last Name
Wilkinson
If additional applicants, please attach an additional pages) with names listed.
Mailing Address
1301 Douglas Dr
PO Box
City
Sanford
State
NC
ZIP
27330
Country
Lee
Phone No.
919-770-9380 ext.
FAX No.
919-774-3239
Street Address (If different from above)
City
State
ZIP
Email
dwilkinson@wilkinsoncars.com
2. AgentContractor Informadon
Business Name
Agent/ Contractor 1: First Name
David
MI
Last Name
Gardner
Agentl Contractor 2: First Name
MI
Last Name
Mailing Address
720 Channel Boulevard
PO Box
City
Topsail Beach
State
NC
ZIP ,
28445
Phone No. 1
910 - 545 - 3474 ext.
Phone No. 2
ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
vondakay72@gmail.com
RECE
IVED
<Form continues on back> JUN 0 8 2018 JUL 0 3 2018
V�IINGT D CITY
252-808-2808 .. 1-888-4RCOA�s wWW.nCCoas a men .nit
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address
State Rd. #
Pander 101 Bland Alley
Subdivision Name 0G20jh fom
City
State
Zip
Bland Drive (not Bland Terrace)
Surf City
INC
28445 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
919 - 770 - 9380 ext.
Lot 3 Oceanbreeze, Map Book 35 Page 51 ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
CFR
Topsail Sound
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Topsail Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
Surf City, INC
4. Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
50
10,851.70
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
.25 Acre, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
6 ®NHW or ❑NWL
e.
Vegetation on tract
Home Landscaping
I.
Man-made features and uses now on tract
Private Homer Pier dock
g.
Identify and describe the existing land uses adlacent to the proposed project site.
Private Homes
h.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Residential
(Attach zoning compliance certificate, if applicable)
ZYes ❑No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ZNo
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ZNA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ZNo ❑NA
National Register listed or eligible property?
<Form continues on next page> JUN 0 8 2018
im 0 3 2018
_'N5Mh7�naem252.808-2808 .. 1-888-4R,,,; ent.net
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(III) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Surf City Sewer System for the Home
o. Describe existing drinking water supply source.
Surf City Water
p. Describe existing stone water management or treatment systems.
NA
5. Activities and Impacts
a.
Will the project be for commercial, public, or private use?
❑Commercial ❑PublictGovernment
®PrivatelCommunity
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
Dredge to Deepen by Approximately J4feet Under Boat Lift.
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Bucket Dredge? and Barge?
d.
List all development activities you propose.
None
e.
Are the proposed activities maintenance of an existing project, new work, or both?
Maintenance of Existing Boat Lifts
f.
What is the approximate total disturbed land area resulting from the proposed project?
40PQ0 ®Sq.Ft or ❑Acres
g.
Will the proposed project
encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established
use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
None
I.
Will wastewater or stormwater be discharged into a wetland?
[]Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
[]Yes []No ❑NA
j.
Is there any mitigation proposed?
[]Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
JUL 0 3 2018
JUN 0 8 2018
252-808.2808 :: '6-a .;RCOAST :: w.:... _:. ccoas talmanagement.net r C
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Dr. Steve Wallace Phone No. 910 343 0444
Address 2525 Delaney Ave. Wilmington, NC 28403
Name Green Path,LLC by Laurie Chancie Phone No. 910 590 6246
Address 1131 Timothy Rd. , Dunn, NC 28334
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization forth, if applicable.
I. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and fallow -up
monitoring of the project.
I further certi that the information provided in this application
-iis�truthful to the best of my knowledge.
Date — 20 Print Name b-_0,AcIAS t /a/So 0)
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development RECEIVED RECEIVED
❑DCM MP-4 Structures Information
JUL 0 3 2018 JUN 0 8 2018
Drlul_m14n CITY DCM WILMINGTON, NC
252-808-2808 .. 1-888-4RCOAST ., www.nccoastalmonagement.net
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet.
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWIL)
2
stabilization
Length
5C) a
307it r
Width
1-7
AAvvgg..lExisting
_Zf �/
_Lr
NA
NA
---t
Final Project
f
-g'
t NA
NA
Depth
1. EXCAVATION
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
Less than 100
c. (i) Does the area to be excavated include coastal wetlands/morsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB _
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
❑This section not applicable
Sandy Bottom
d. High -ground excavation in cubic yards.
12. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a. Location of disposal area.
Mark Lewis (Lewis Bros. Boatyard) 405 Lewis Rd.
Hampstead, NC
c. (i) Do you claim title to disposal area?
Elves ®No ❑NA
(ii) If no, attach a letter granting permission from the owner.
e. (1) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
Leveling ground
area.
d. (1) Will a disposal area be available for future maintenance?
❑Yes ®No ❑NA
(ill If yes, where?
f. (i) Does the disposal include any area in the water?
❑Yes ®No ❑NA
(it) If yes, how much water area is affected?
MM DECEIVED
JUN Is IN JUL 03 2018
DCMWILMINGTON, NDCM-MHD In TY
252.808-2808 :: 1.888-411 :: www.ncc6gistatrnanagement.net revised: 12/26106
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ®This section not applicable
(If development is a wood groin, use MP-4 — Structures)
a. Type or shoreline stabilization:
[]Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
c. Average distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater/Sill Other
I. Source of fill material.
D. Length:
Width:
d. Maximum distance waterward of NHW or NWL:
f. (1) Has there been shoreline erosion during preceding 12
months?
[]Yes []No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4. OTHER FILL ACTIVITIES SThis section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? UYes UNo
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
b. (1) Will fill material be placed in coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
III) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
Silk Fence Backhoe and barge
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(III If yes, explain what type and how they will be implemented.
Date
Project Name �—
d. (i) Will wetlands be crossed in transporting equipment to project
site? []Yes ®No []NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Applicant Name
Applicant natu
SiERIVED RECEIVED
JUL 0 3 2018 JUN 0 92019
252-808-2808::1.888-4RCOAST:: www.nceoa_stalmanag_ement.net DCM-MHD CITY DCM WILMIN(.jar ! 26106
►of3 (',-13-Is:da4-e'
sTE o^T^
9^[b,
- ]5 (Fl4➢I O[FNI 4Aw! Eg1615]
� >5
ISM - 1V
wsa swum ss - >w sr.
IL
L-------------------J
.T .
IM l
R
m
-ice
----
-
J. N,n.Eaw
N
e
!
—1't
�—
nIFo
EI E.I. MfN IT.
EY I . Nw M4
' is ro X W vas IIw a n !NE
MMEmrnnw rc TE maExM1 If1Ew ^s „NwuuEE...� w - mnuim SGMT
mrosm e. rcnu ssr<! w nE eRovs
No MAT TMOE .rs ro waaa.rnn A�PtH CIAO � :'c- - ^�(sl Isr
9qW. MYrlp (£ Mf09w R 11p --.f404fE ��
s i
si Pmci`,`,F
9E
_ IIFY lOR ME IIY'AIFD M 1�1EM FLO]D
mEs u sawl IOEw. r� naao mxcs
w�c aEII scam Raw fnn Nw nmro-voam.
Ev ux a. rws
z wrs s .NP . wr RE ^ � rac nn.
. N. u p 3 M 66�1.A0 1!
» ur.y T.ne.
x nasE Iers Rnc ra RR]1r Nm nawc¢ ar
vw nE Rwn ^vf�wN�c m an. rx.w Im T
1
I
I
I
I
I
SIIRwY CREOGNC KWT
SNO�G
LOT 3 OCEANBREEZE
TONNSIIIP,
i(PSAIL PENOER CQINtt, NC
ttW �t
IRY/fR'➢ Ew
OOUGLAS N7LKINSON
.I. awn.
..n
rREvmv er
RECEIVED JOHN
L PIERCE & ASSOCIATES. P.A.
{09 .pHH50N BLw. JACI(SCNNLLE. NC 2041
PNWE: Y10-1._8-9BM GATE: MAY 16. N119
SCALE: 1 5[1' F.B. 557, P. 25
JCR np18-19C09
J U N 0 8 2018
GRAPHIC SCALE
101 BLAND
d4iG1G WILMINGTON, NC
EYN�a'1L
F esheek L 05 3
to — 1;ECEIVED0.}�
JUL 0 3 2018
DCM-MHD CITY
'AWN Or MFAS(W4"IS BY ORNFR:
)AY A4£RAC£ MEASW40ENIS
AT WON WA PER
O LOW WAFER 0'T 0tOA7 1F7
LOT e
-,
Y.B. Ix. —A. 72
�46s: 1
I LOTS_ i
M.B. 22, P. 37
J � 1 `
W Esm+ENT —jg LOT 4 ; LOT 3 �
M.B. 22• P. 37 61F N.B. 22, P. 37 '1
f
LOT a PAIN, LLC
j < '
n
1r10TNY D. FAUIN CHAAL13 LOLAS POM
O.S. 169Z P. 131 1~ O.B. 1104 P. 35
#
1t
2 STY. 49fri
C//AQ NS. (AIM CHANOEY
r
ON PRA
11l1 TOOTHY RO+.
yy, F1'
4)
N.G. 33, P. 57. SL. 474 1: M.S. 35, P. 57, SL 474
1
0.6. 4e41, P. 162 LOT J
,w
f
TRAbERSE S ACE 4 STAO15
MA. 22, P. 37 10.631.70 S.F.
a
1
161E 1 , 3A7 70 WOODEN
Z ..-- L UNE =7
6
FLO TNG TOLD
noAr»1c DOCK- j wAtx
6.5'.14' MTN
5',IO• RAMP
WAN ryCH "Ox
TO AWAIMW
PPROR
MFAN LON wATFRL4W
�APPROX Y11 EMI fO0WATOKM
LOT 4 OLAND SHORES
SIEPHEN C. WALLACE
AND 1OFE MARGARET W. WALLACE
252S DELANEY RD.
wurlNlrDN, HC 29403
O,B. 1997, P. 240
Y.B. 35, P. 67
THIS IS TO CERTIFY THAT THIS MAP IS A TRUE
REPRESENTATION OF THE PROPERTY HEREON AS
COMPILED BY ACTUAL SURVEY OF THE PREMISES
AND THAT THERE ARE NO ENCROACNMENTS AOC
ING TO THE BEST OF MY KNOWLEOGE, EXCEPT A
SHOWN. THE RATIO OF PRECISION IS 1: iO.000M
P.L.S. L-2596
(0.25 AC.)
,
1„ w
r
----JOP S 343C30' E 105.14• E.K}h.- S 34.3T•23' E 62.9/•
— — � ��^ ° ^1A"- �soayea M%rron M — 1,
qpp 107.40
20.16'
1
1
1
tlFP3
... PORTION OF LOT 2
II Y.B. 3S, P. ST. SL 474
op
j
PORTION OF LOT 2 1
U.S. 356 P. 31, SL 474
/,��.,`l
V41E
5,461.72 S.F. (0.13 AC.)
�
aj�
jl
,
�
\
4.138.72 SF. (009 AC.) 1
101.46'
109.61'
2,4r
210-04 2
31YR
o+ Tog'1IF
N 3439.40' IN
— — - — --
PERMANENT- SURVEY DREDGING PERMIT
RMT-OF-MAY
M.D.2% P. SO SHOvmG
a& 751, P 42 LOTS BLAND S LOT 3. OCEANBREEZE
rArdw
e 4 TAUTEN C PENDER COUNTY, NC
CHAR tm N TOPSAIL TOWNSfiIP,
O.B. 4e26, P. I PREPARED FOR
M.B. 33• P. e)
DOUGLAS IM %UNSON
PREPARED BY
4ioHN L PIERCE & ASSOCIATES. P.A.
409 JOHNSON BLVD. JACKSONVILLE, NC 288541
PHONE: 910-346-98M DATE: R� �`[�e
��i SCALE T'= 50' F.B. 557, Z��
.,CApp' JOB #2018-19009 JUN 0 8 2018
ALECEIVED .� GRAPHIC SC
DCM WILMINGTON, NC
t:1ll i 36 o a 90 Too
?�gt)IS
V
III fSET pCM WILMINGTON, NC
1 inch = 50 !L
CkAAnelSefEucic I"=3
ed5e oFrhannel
erg, .cQN�
IM NLW �NdW
jr,
C24
CATION OF MEASUREMENTS BY OWNER: I
DAY AVERAGE MEASUREMENTS
" AT HIGH WATER - I
LOW WATEREXISTING
ose to dredge aox BOAT LIFT TRAVERSE
nches of spoil.,6 13'xl3' LINE
- h_ of t low_ w ter APPROX.
WETLANDS CP
dredgin pl e - I LINE 212.00'
8't
Q t0 w
6' 6.5' 10' 6, M M
z EXISTING WOOD i `OI
FLOATING DOCK ; WALK o v 1 (Co'
6.5'x14' WITH z 212.00'Z
5'x10' RAMP CIO _
30' FROM APPROX
MEAN HIGH WATERLIN TO APPROX. E
MEAN LOW WATERLINE
a11BYET ofFnGWc Prsllr
LOT 3 -OCEANBREEZE
uIN1.._SON—
DGUGm
:.^__VN 1. PIERCE h ASS^_C!k ��.A.
�a JOM„SBB BL . .Y.tic MUE, MB4 41
PHg : 910-30-a GAM MAY ,!, =5
SCAtE 1 - 50' F.B. %7. P. M
.ae aB,a-,aoaa
GRAPHIC SCALE 1"z5b'
SYl ee✓f 3 of 3
ro-13- (8 ' dOL+e,
ro,2s-It � rw'rs�
►ttCEIVED
JUL 0 3 2018
DCM-MHD CITY
LOT 6
GREEN PATH, LLC
2 STY. VINYL C/O MS. LAURIE CHAN
ON 'PILINGS 1131 TIMOTHY RD.
W/ ENCLOFSEDLOODUNN, NC 28334
STORAGE & STAIRS D.B. P. 182
M.B. 22, P. 37 it
3.9'X7.8' WOODEN 7 5'
AC PAD � \
I till 175.12'
1 20
O
N
7.9' `r
M
ai
`* 4' WOOD 12
IS WALK 173.37'
WOOD
DECK
1--,W\APPROX. MEAN HIGH
WATERLINE
I
1 34'39'49"
N
,h 8'
WOOD
DECK
8.2'
N 34
LOT 4 BLAND SHORES
STEPHEN C. WALLACE
AND WIFE MARGARET W.
WALLACE
2525 DELANEY RD.
WILMINGTON, NC 28403
RECEIVED
D.B. 1997, P. 240
M.B. 35, P. 67
JUN 0 82018
E 2�-
107.40'
WOOD
STEPS
CONC.
DRIVE
101.48'
21" W 199.61'
DCM WILMINGTON, NC
F
I,
D.
LC
JO
62
CF
D.I
M.
G II IIIIIIIINo SIII6111111111
Recorded: 01I11I20 6092921 AM
Fee Ant. S26.00 Page 1 of 2
Exdae Tax: 10,00
Pender Canty Norm Carolma
Sharon Lear Willoughby. Register of Deader
BK 4612 PG 2967 - 2968 (2)
NORTH CAROLINA GENERAL WARRANTY DEED
Excise Tax: S 0.00
Parcel Identifier No. 422348-7296-0000
Mail/Box to: Grantee
Prepared by: W. Woods Duster Doster. Post S i Iverman. FousheeJost & Patton. P.A., PO Box 1320 Sanford NC 27331
**WITHOUT OPINION ON TITLE**
Brief description for the Index: 101 Bland Alley
THIS DEED made this 1. � day pf December 2015, by and between
The Estate of Elisabeth S. Wilkinson,
Douglas H. Wilkinson, Jr., Executor
Address: Post Office Box 1088, Sanford, NC 27331
Wilkinson Family Trust Under Elisabeth S. Wilkinson Living
Trust Under Agreement Dated 5/18/99, as amended
Address: Post Office Box 1088, Sanford, NC 27331
The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include
singular, plural, masculine, feminine or neuter as required by context.
W ITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has
and by these presents does grant, bargain, sell and convey unto the Grantee, all that certain lot or parcel of land situated in the City of
Surf City, Topsail Township, Pender County, North Carolina and more particularly described as follows:
Being all of Lot 3, Oceanbreere (10,851.70 sq. R. — 0.25 acre) as shown on a map entitled "Final Plat Showing
Oceanbreeze" said map being recorded in Map Book 35, Page 51, Pender County Registry, reference to said map
being made for greater certainty of description.
Together with and subject to the rights, conditions, privileges and appurtenances described in that certain Deed of
Easement and Maintenance Agreement dated December 15, 1985 and recorded in Book 663, Page 14 of the Pender
County Registry and that certain Easement and Agreement dated June 1, 1989 and recorded in Book 736, Page 157
of the Pender County Registry.
Together with a private 5 foot pedestrian access easement to the Atlantic Ocean along the northern margin of that
tract deeded to Robert H.. Hilker by deed recorded in Book 1946, Page 60, Pender County Registry as shown in Map -
Book 35, Page 51 and Map Book 35, Page 57.
The property hereinabove described was acquired by Grantor by instrument recorded in Book 2058, Page 28, Pender County Registry.
IN HOUSE BOX - NO ENVELOPE V n
RECEIVED
RECEIVED
JUN 0 8 2018
JUL 0 3 2018
DCM-MHD CITY
DCM WILMINGTON, NC
BK 4612 PG 2968 DOC# 20006229
ak 4612
P9 2968
A map showing the above described property is recorded in Map Book 35, Page 51, Pander County Registry.
TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in
fee simple.
The property described in this deed does X— does not contain the principal residence of at least one of the Grantors.
And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in
fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the
lawful claims of all persons whomsoever, other than the following exceptions:
IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written.
The Estate
/ToffElisabeth
�S�. Wilkinson,
to r-X—,
By: �ouglas H. Wilkinson, Jr., Exa&tor
State of North Carolina - County of Lee
1, tnie-la it e L - 1 rating n a notary public o46--A County, North Carolina, do certify that on this �'K'I-day
omtrf -..,.b.e/ .2015, befom me personally appeared Douglas H Wilkinson Jr Executor ofThe Estate of Elisabeth S.
Wilkinson personally known to me or proved to me by satisfactory evidence to be the person(s) whose name (s) is/= signed on the
preceding or attached record, and acknowledged to me that helshe/they signed it voluntarily for its stated purpose.
YYNotilry Public
ic
My Commission Expires: 1.2..a s'
State of North Carolina - County of
a notary public of County, North Carolina, do certify that on this day
of 2015, before me personally appeared personally known to me or proved to me by
satisfactory evidence to be the person(s) whose owns (s) is/we signed on the preceding or attached record, and acknowledged to me
that he/she/they signed it voluntarily for its stated purpose.
Notary Public
My Commission Expires:
RECEIVED
JUL 0 3 2018
RECEIVED
JUN 0 8 2018
DCM-MHD CITY
DCM WILMINGTON, NC
00001
Package
00028 Express US Airbill
7 Pmm
Saela Lk
Namrrl. e T-
8133 8712 2851, 0215
4
Rrrt Ovemi
C Fe
wm6.�nawwl.lsgMv�m"'anr..am�m
.wMurm s.e.sv oiv.r v.wwe
� Fad&Priority 0vemipmMpm.n ❑ xmo eon r.�l.+�s+.aryn+�w
i
nbeiy",..+r,.rauwuan
0
r N
❑FedFx20ay
s..oneee.e�+emon:.�v W p
s.m,orr p.i..nxar.„v.u�
U
= 1
C �
❑
Fedft20ay W =
ea mw. —,
C
n.lu-r.ss.wmoon•
WaI a.w.r
ce o.e.�. reen
oJnan..Jee:.e
V
LiFedFx
Express Saver
m.eeoa..m
ar.a.vo.arenrmTarem.
Q 1X}
city 'W,41F(IRT) State lar' 5 Packaging -ow meam
�.F¢dFx Envelope' ❑ FadB:Pak' ❑ FedEu
2 Yeur Internal Billing Belerence Bo,
3 To �/ I '7 �( 6 Special Handling and Delivery Signature Options
Ncnl1ge'erKs ,,C /v ,^ F I phone �� lQ�'1 - ��� V ❑� Setur=elivsry
VL1 e-lJr' rm wreee,s.�e:oa..mem r.ar, m.rAro..=r.eucw.os....
Address
e o.. 'aiib. zrw oe.a eid'a°'rs'�bon Hold Saturday
fmfsmu 11
Address IIEWiRD ♦�Yb OYw
rmenoau.l..a
u..mu nn.ro,m. xaw ro..m.ao,...oem,.o�ono.mn o:wllemlppino.ea,a... rlmnmwm.rn nos
city �N ON,\Iaxi IlY` State L LP
11111111111111111I
0130890677
m
m
❑ bex
Tube ❑ 'c
Mer hit
Tube p
3
rvyePPN S.. to Fea45emee able. g
No Signature Required
❑ na.e+"•.v,.mo,n
— Oirect SignaWre
Someo...ireaMert
en.��olre.: �mawlr.
❑ wanw+o
W.vlinBa ignelu,eloEelrven
— maY SipnbroJrven
tly.plll..arllyrp•
=
0
Dasolhia dare
�Yiaar4.lEBrvaii..0'1y
shipment eomain goods?
a
Nc ElYties •nand
I
❑ �moompea.mon [IDrylca
`m
sn noa=I
rapuna Mp.4LMtM
_ —y
.wrvna.owd.eooa
a. n.vr.euls..iee e.
❑ Cargo Aircraft Only
7 Payment Bins
� errr.�,raw..a.amxo.e.ina �
- ❑
Sande
QP,.�os'e ❑ Padplem r' Th7rtl PaM �_ Cr(ejdrt�Card
ash/Check
.. _ R�B!ibifflJL�
onncoe a�
Tmal Packages Total WeighOff
M
M 0by15 � Mnb)IN � 0191LAISreE � APXRaIXe aP 91M
' Peel -and -Stick FedEx Express Package US Airbill
` 1. Complete front page of the airbill.
2. Retain "Sender's Copy" for your records.
3. Remove label backing.
a DJ14i 4. Adhere airbill to front of package.
Please 00 NOT remove "FedEx Copy."
:EL FROM THIS CORNER.
M
m
WT
M1 7Fftail Fee 'Sr�:?.4SuTicesBFeea(cnxkb,,eeceipt PadcoPrl C3erelpt( $ ••fit' Postmark
C3 Mall Reemcme �. Here
C3=,. Rew=eagnature Renbicted Deiiv,$$�r3 M4i�..[¢1V Q 8 MR
Ml Total Postage and Feee
C3 $ IIZA
M1SenC3 e_,r;rq M1 .ti , r�Af -Y dam.
U.S.
Postal
Service'"
CERTIFIED
MAIL®
RECEIPT
Domestic
Mail
Only
_
For delivery
information,
visit
our website
at www.usps.com".
�E11t"t!!P`
�1+"sTrErm+�
M1
r9
M1
1f1
C3
C3
C3
C3
C3
m
Ln
O
M1
ri
C3
M1
■ Complete items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
1. Article Addressed to:
1131 lirnc 4 e p�
IIIIIIIIII IIII IIIIIIIIIIIIII IT 1111111111111111
9590 9402 2848 7069 6199 94
2. Article Number Crmsfer from service /abate
7 0530 0000 5717 7309
Ps Form 3811, July 2015 PSN 7530-02-000-9053
I-
■ Complete items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
1. Article Addressed to:
Dpf• 54SJ-11 wH�44C-e
aS aS �kLau e� i��rz
11111111111111111111111111111111111111111111
9590 9402 2848 7069 6200 06
2. Article Number (Transfer from service labeg
7017 0530 0000 5717 7316
PS Form 3811, July 2015 PSN 7530-02-000-9053
A. sign/agora
X Aln// 1.' //IOt, q Agent
B. Re faived by (Printed Name)
D. Is delivery address different from Rem 1? U Yell
If YES, enter delivery address below: ❑ No
RECEIVED
JUN 0 8 2018
3. IA�ILMINGTON ({��,((�°nry Mal Express®
❑ Adult Signature Ul n-
E
v
, gigistered Me
❑ 9tluR Signature Restricted Delivery ❑ Ragls[ered Mail Restricted
Ceriifed Mail® Delivery
❑ Certified Mal Restricted Delivery ❑ Retum Receipt for
w
❑ Collect on Delivery Merchandise
ry
❑ Collect on Delivery Restricted Delivery 0 Signature ConfinnationTM
o U
❑ Insured Mai ❑ Signature Confirmation
U Z
❑ Insured Mal Restricted Delivery Restricted Delivery
if
(over YsaDl
" 50
Domestic Return Receipt
a _E =
v 3 e
E
o;� o
v_
COMPLETE THIS SECTION ONDELIVERY
A. Signs
El Agent
Vl! Addresses
c =
B. ecei by ri N e) C. Da of Deli ery
'z
`o
D. Is delivery dress different from Rem 1? ❑ Yes
If YE 'TVII31 ass below: ❑ No
JUN 0 6 2018
O
a Ice ype
13
❑ Adult Signature
❑ Priorit y Mail Express®
C
❑ Ad t Signature Restricted Delivery
fed Mail®
❑ Registered Mailm
❑ Ragiatemd Mail Restricted
rt:
Cemged Mal Restricted Delivery
Delivery
❑Return Reoapt for
=
O
rn
❑ Collect on Delivery
Merchandise
v
W
❑ Collect on Delivery Restricted Delivery
❑ Signature ConfimnationTM
rya
n Insured Mail
❑ Signature COMrtnstion
n
C
0
dosed Mal Restricted! Delivery
'over$5001
Restricted Delivery
pg
Domestic Return Receipt
April 19, 2018
Mrs. Laurie Chancey
Dr. Steve Wallace
Dear Laurie and Steve,
As I have told you, I must remove some sand from under my boat lifts. The permitting application and
process is specific.
I plan to get David Gardner to bring his barge with a backhoe and remove some sand from under my lifts
and take the spoil to an approved site not on your property or mine.
I am told that I must send you certified mail with signed return receipts of notice of my plan and to
notify you that you have thirty days to submit comments or object. Comments could be sent to Mr.
Jason Dail at iason.dail@ncdenr.gov.
If you do not wish to comment or object, you need to do nothing except sign the receipt of this certified
letter.
Thank you for your co-operation and I apologize for this intrusion.
I look forward to a seeing you and your families this summer. Warm weather can't come too soon for
me!
CC.
NC Coastal Management
127 Cardinal Drive
Wilmington, NC 28405
Sincerely,
Doug Wilkinson
RECEIVED
JUL 0 3 2018
RECEIVED
AIN 082011
DCM-MHD CITY
DCM WILMINGTON, NO
&DaLQE�NT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to Wilkinson
ssFamily Trust (Doug Wilkinsoas's
101 Bland Alley 5urf(C1me otproperty Owner)
property located at y Y
Hanks Channel (Topsail Sound dress, Lsot, glpck, Read, tc.)
on P in f City, k en�er County, NC N.C.
(Waterbody) (City/Town andfor County)
The�t has described to me, as shown below, the development proposed at the above
iocatron
j I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(tndividual proposing development must rill in description below or attach a site drawing)
WAIVER SECTION
1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set ack a minimum distance of 15' from my area of riparian access unless waived by
n me. (If yo ish to waive the setback, you must initial the appropriate blank below.)
(7 1 do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement,
(Property Owner Information) (Adjacent Property Owner Information)
Signature
Do2alaa Wilkinson Steve Wallace, DDS MHS
Print or Type Name
Q'
Address p47lSlas Dr
Mailing
_ Ssnfo;cd NC 27330
City 91�770 9380
Telephone Numberlemad address
Dare
Periodontics/Implants
2525 Delaney Avenue
Wilmington, NC 28403
Telephone Number/emaff address
i—AA
Dare*
(Revised Ala 2014)
`Valid for one calendar year after signature'
RECEIVED RECEIVED
JUN 0 S 2018
DCM-MHD CITY DCM WILMINGTON, NC
01-24-'18 14:12 FROM- T-940 P0002/0003 F-844
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to Wilkinson Family Trust (Doug Wilkinsous's
p rty 101 Bland Allay (fame %properly owner)
pro a located at y , Surf ity,
(naaress, Lot, Block, RQad, egtc.)
on Banks Channel (Topsail Sound) in Surf City, Pender County, NC
(Waterbody) (City/TownN.C.
and/or County)
The applicant has described to me, as shown
Ttobelow, the development proposed at the above
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual XOposing development must rill in description below or attach a site drawing)
WAIVER SECTION
1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
-04G _ 1 do wish to waive the 15'setback requirement
t do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
Do las Wilkinson
Print or Type Name
19
Dr.
Mailing Address
Cky/Srete/ZI,,00
919 770 9380
Telephone Number/email addr08s
(Adjacent Property Owner Infomtation)
'Valid for one calendar year after signature" (Revised Aug. 2014)
RECEIVED RECEIVED
JUN 0 S 2018
DCM-MHD CITY DCM WILMINGTON, NC
Dail, Jason
From:
Sent:
To:
Subject:
Doug Wilkinson <dwilkinson@wilkinsoncars.com>
Wednesday, June 13, 2018 3:47 PM
Dail, Jason
[External] RE: CAMA Major permit application
Jason,
I consent and appreciate what you have done.
Thank you!
Doug Wilkinson
Douglas Wilkinson
1301 Douglas Drive
Sanford, North Carolina 27330
dwilkinson@wilkinsoncars.com
Cell 919 770 9380
From: Dail, Jason [mailto:jason.dail@ncdenr.gov]
Sent: Wednesday, June 13, 2018 2:18 PM
To: Doug Wilkinson
Subject: CAMA Major permit application
Mr. Wilkinson,
As I mentioned by phone today, I have made a couple of minor adjustments to the MP-2 form as well as your site plans.
The additions, corrections or changes are as follows"
• MP-2 boat basin measurements were added as 50' length of basin and 17' width of basin with an existing depths
of -2.0' at normal low water, proposed to a depth of -6.0' at normal low water
• Sheet 1 of 3 was created and dated 6.13.18
• Sheet 2 of 3 was revised to include name, sheet number and date.
• Sheet 3 of 3 was revised to include the addition of a cross-section or profile view, basin limits were defined,
sheet number was created and dated. Also, name and scale were added.
If these changes are acceptable to you, please reply and consent to these changes and I will move forward. If not, please
note your changes and provide that information.
Thank you,
Jason
Jason Dail
Field Representative
NC Department of Environmental Quality
NC Division of Coastal Management
127 Cardinal Drive Ext.
RECEIVED
JUL 0 3 2018
DCM-MHD CITY
"CheNroletdillac I Buick I GN1C
June 6, 2018
Mr. Jason Dail
NC Department of Environmental Quality
NC Division of Coastal Management
127 Cardinal Drive Ext.
Wilmington, NC 28405
Dear Mr. Dail;
Thank you for seeing me last week regarding my application for a dredging permit
at Surf City.
Enclosed is what I hope is a completed package.
If further information is needed please email me or let me know and I will revise
the information.
Thank you for your assistance in this.
WILKINSON AUTOMOTIVE, INC.
CADILLAC CHEVROLE' PONTIAC BUICK GMC
POST OFFICE BOX 1088
SANFORD, NORTH CAROLINA 27330
DOUGLAS WILKINSON 919775.3421
DWILKINSON@WILKINSONCARS.COM CELL: 919.770.9380
Sincerely;
Do gu I' as Wilkinson
d
In
RECEIVED T.e-
v o m
JUN 0 8 2018 0 m
DCM WILMINGTON, NC
1301 Douglas Drive • P.O. Box 1088 • Sanford, NC 27331-1088 • 919-775-3421
www.wilkinsoncars.com • Fax 919-774-3239
ROY COOPER
Gnvrmnr
MICHAEL S. REGAN
krcnun
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL OUA4TV
Ctircwv
June 28, 2018
Wilkinson Family Trust
C/o Doug Wilkinson
1301 Douglas Drive
Sanford, NC 27330
Dear Mr. Wilkinson:
The Division of Coastal Management hereby acknowledges receipt of your application, for development
activities adjacent to the subject property located at 101 Bland Alley, adjacent to Topsail Sound, in Surf
City, Pender County. It was received as complete on June 25, 2018, and appears to be adequate for
processing at this time. The projected deadline for making a decision on your permit application is
September 8, 2018. An additional 75-day review period is provided by law when such time is necessary
to complete the review. If you have not been notified of a final action by the initial deadline stated above,
you should consider the review period extended. Under those circumstances, this letter will serve as your
notice of an extended review. However, an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from June 25, 2018, you may request a
meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of
your project. Such a meeting will be held within five working days from the receipt of your written
request and shall include the property owner, developer, and project designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the
property of your proposed development. You should post this notice at a conspicuous point along your
property where it can be observed from a public road. Some examples would be: Nailing the notice card
to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road
right-of-way where a private road would lead one into your property. Failure to post this notice could
result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be contacted by the
appropriate State or Federal agency. Please contact me if you have any questions and notify me in
writing if you wish to receive a copy of my field report and/or comments from reviewing agencies.
cerel�y�,
ason DdiI'
Field Representative
cc: W iRO — file
DCM, MHC
Liz Hair, USACE
Robb Mairs, DWR
Steve Padgett - Inspections, Town of Surf City RECEIVED
Sin of North Camtma , Enwonmenml QtWity I Cmoml Management JUL 03 Z O i 8
127 Cardinal Drive Em., Wdmingtm NC 28405
9197967215 DCM-MHD CITY
NOTI(01#176A
AMA PERMIT
APPLIED FOR
PROJECT:
To excavate an access channel and
u
f
Yatioi
Pen er oun
COMMENTS ACCEPTED THROUGH July 25, 2018 _
APPLICANT:
Agent: David Gardner (910) 545-3474
•- MORE DETAILS•
THE LOCAL PERMIT OFFICER : •
Cardinal127 . ..
01 Jason Dami, Field Representaflye
910-796-7221
June 1, 2018
To Whom It May Concern:
This is to certify that I own the property located at 405 Lewis Rd., Hampstead, NC.
This is to further certify that I give permission for David Gardner to dispose of less
than 100 cubic yards of material removed from beneath Douglas Wilkinson's boat
lift and around his dock located at 101 Bland Alley, Surf City, NC, onto the above
property.
Signed: 44-!(
Mark Lewis
//13-
Date: y 6
RECEIVED
RECEIVED
JUN 0 8 2018
DCM WILMINGTON, NC
JUL 0 3 2018
DCM-MHD CITY
1�
Coastal Management
ENVIRONMENTAL OVALITV
June 29, 2018
Advertising@starnewsonline.com
2 Pages
Star News
Legal Advertisement Section
Post Office Box 840
Wilmington, North Carolina 28402
Re: Major Public Notice for: Wilkinson Family Trust / Pender County
Hello Angie: Please publish the attached Notice in the Wednesday, July 4, 2018 issue.
ROY COOPER
Govemor
MICHAEL REGAN
ser,Etary
BRAXTON DAVIS
Director
The State Office of Budget & Management requires an original Affidavit of Publication prior to
payment for newspaper advertising.
Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of
Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by
credit card to the attention of Tanya Wright, (Ref acct # 796-7215).
Please email a copy of the credit card receipt to me.
Thank you for your assistance in this matter. If you should have any questions, please contact me
at our Wilmington office.
cc:
Sincerely,
Shaun K. Simpson
Permitting Support & Customer Assistance
Courtney Spears - WiRO
MHC files
Liz Hair- USACE
RECEIVED
State of NoM Caroline I Environmental Quality I Coastal Management JUL 0 3 2018
127 Cardinal Drive Ent., Wilmington, NC 28405
910-7%-7215 DCM-MHD CITY
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The Department of Environmental Quality hereby gives public notice as required by
NCGS 113A-119(b) that the following application was submitted for a development permit in an
Area of Environmental Concern as designated under the CAMA: On June 25. 2018, the
Wilkinson Family Trust proposed to excavate an access channel and area around an
existing docking facility at 101 Bland Alley, adjacent to Topsail Sound, in Surf City,
Pender County. A copy of the application can be examined or copied at the office of Jason Dail,
N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext.,
Wilmington, NC 28405, (910) 796-7221 during normal business hours.
Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400
Commerce Avenue, Morehead City, NC 28557-3421, prior to July 25, 2018 will be considered
in making the permit decision. Later comments will be accepted and considered up to the time
of permit decision. Project modification may occur based on review and comment by the public
and state and federal agencies. Notice of the permit decision in these matters will be provided
upon written request.
RECEIVED
State of North Carolina I Environmental Quality I Coastal Management JUL 0 3 2018
127 Cardinal Drive Ent., Wilmington, NC 29405
910-7967215 DCM-MHD CITY
NC Division of Coastal Management
Major Permit Application Computer Sheet
AEC: Topsail Sound
Fee: $400 #13200
CDAITS _ MHC cc
Applicant: Douglas Wilkinson
AgenttContractor: n/a
Project Site County: Ponder
Staff: Jason Dail
District: Wilmington
Project Name: WUkinson Slip Excavation
Rover File: n/a
River Basin:
Initial date of application submittal: 848-18
Date applicaton 'received as complete" in the Field office:
Permit Authorizafion: ❑ CAMA Dredge & Fill ❑Both
SITE DESCRIPTION/PERMIT INFORMATION
ORW: Yes 4No I PNA: Yes No
Photos Taken: Yes
Setback Required (riparian): Yes No
Critical Habitat: ❑Yes o Not Sure
15 foot waiver obtained: Yes allo
Hazard Notification Returned:
❑Yes ANO
SAV: ❑Yes ANo ❑Not Sure
Shell Bottom: Yes ❑No Not
Temporary Impacts: INyes ❑No
Sure
Sandbags: ❑Yes 4No ❑ Not Sure
Did the land use classification come
Mitigation Required (optional):
from county LUP, ,WYes ❑No
❑Yes Nlo
Moratorium Conditions:
Environmental Assessment Done:
Length of Shoreline:
$Yes ❑No ❑NA
❑Yes Po ❑NA
5l`-.Sy FT.
Shellfish Area Designation:
Project Description: (code)
Development Area: (code)
pe -or- Closed
P
<�j, 0 ef< -
SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4)
❑ Future Water Supply (FWS)
Nutrient Sensitive Waters (NSW)
I El Swamp Waters (SW)
High Quality Waters (HQW)
❑ Outstanding Resource Waters (ORW)
WETLANDS IMPACTED
❑ (404) Corp. of Engineers (Jurisdictional
❑ (LS) Sea lavender (Limonium sp.)
❑ (SS) Glasswort ( Salicomia sp.)
wetlands)
❑ (CJ) Saw grass (Cladium jamaicense)
❑ (SA) Salt marsh cordgrass (Spartina
❑ (SY) Salt reed grass (Spartina
altemifiora)
cynosuroides)
❑ (DS) Salt or spike grass (Distichlis
❑ (SC) Bullrush or three square (Scirpus
E F(M Cattail (fypha sp.)
spicata)
sp.)
El (JR) Black needlerush (Juncus
(SP) Salt/meadow grass (Spartina
roemedanus)
patens)
APPLICATION FEE
❑ No fee required - $0.00
❑ III(A) Private w/ D&F up to 1 acre; 3490
Ll III(D) Pdv. public or comm w/ D&F to 1
can be applied - $250
acre; 4144 can't be applied - $400
Minor Modification to a CAMA Major
❑ Major Modification to a CAMA Major
❑ IV Any development involving D&F of
permit - $100
permit - $250
more than 1 acre - $475
❑ Permit Transfer - $100
® III(B) Public or commercial w/ D&F to 1
Express Permit - $2000
acre; 4144 can be applied - $400
❑ Major development extension request -
❑ 11. Public or commercial/no dredge
RECEIVED
$100
and/or fill - $400
❑ I. Private no dredge and/or fill - $250
II(C) Priv. public or comm w /D&F to 1
JUL 0 3 2018
acre; 4144 can be applied; DCM needs
DWQ agreement - $400
WVnrl-lwI1V Vrr 1
Douglas Wilkinson
Date: 6-8-18
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found in your Activities code sheet
TYPE
REPLACE
Activity Name
Number
Choose
Choose
Dimension 1
Dimension 2
Dimension 3
Dimension 4
One
One
/
New WorkM
Replace
Sr
7
6
Maint ❑
❑ Y A N
New Work
Replace
'
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
.
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found
in your Habitat code sheet.
TOTAL Sq. Ft
FINAL Sq. Ft
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
ternimpacts)
impact amount)
temp impacts)
amount
DredgeA Fill ❑ Both ❑ Other ❑
O
Dredge ❑ Fi I Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
919.733-2293 :: 1-888-4RCOAST :: www.neeoastalmanaeement.net revised: 10/12/06
T
Project Name ) t.'(o
Ocki IXI
Development Type Fee 1 (14300160143510,30�,,�l62,v,'n-2b3)
Check No & Amount
1, Private. non-commercial development
that does not involve the filling or
exuvation of any wetlands or open water
adaas:
$250
100%($250)
0%($0)
11, Public or commercial development that
des not involve the filling or excavation
of any wetlands or open water areas
$400
100OK ($400)
0%($0)
III For development that involves the
filling and/or excavation of up to I acre of
wetlands and/or open water areas,
determine 4 A,8.C. or 0 below applies.
III(Alt Private, non-commercial
development. if General Water Quality
certification No. 4144 (See attached) can
be applied,
$250
100%($250)
0%($0)
III(B). Public or Commercial deveifirpment,
if General Water Quality Certification No,
4144 (See attached) an be applied:
$400
100% (WO)
0%,$01
III(C) If General Water Quality
certification No. 4144 (see attached)
could be applied, but DCM Staff
determined that additional review and
written OWD concurrence is npo9e8"�,
because of cancel ris rewe'dio w
b
quality of aquatic 11
$400
60% ($240)
40%($160)
III(D), If General Water Qualrii--
Certifiralton No. 4144 (see attached),
cannot de applied:
$400
60% ($2401)
40%($160)
IV, Development that involves the filling
J$475
arriVor excavation of more that) one acre
of wetlands and/of open water areas:
-60%($285)
40%($190)
Date
Date
Check From
Name of
Vendor
Check
Check
Permit
Rct. #
Received
Deposited
Permit Holder
Number
amount
Number/Comments
6/20/2018
Douglas Wilkinson, Jr.
Doug Wilkinson
BB&T
13200
$400.00
major fee, 101 Bland Alley,
JD rct. 6756
Surf City PNCo
SPLIT 60/40
Q
W
�
o
N
CrJ
U^
iJ
WI`
O
J
c=C
MQ
M
_
cGc
C
U
O