HomeMy WebLinkAbout120-18 Renewal 2021 Warren, Donaldr_.
Permit Class,
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Donald Warren et al., 6500 Carmel Trail, Wilmington, NC 28411
Permit Number
120-18
Authorizing development in New Hanover County at adj. to Howe Creek, at 6418 Providence
Point Rd., in Wilmington , as requested in the permittee's application dated letter dated 11/22/2021.
This permit, issued on December 6, 2021 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
oe suoject to tines, imprisonment or civil action; or may cause the permit to oe null ana Vora.
I) This renewal shall be attached to Permit No. 120-18, which was issued to the permittee on 10/30/18,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
2018-1002.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2018-01452.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31.2023
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Z_/Ao
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
. `DCM Coordinator:
Lvt k�
Permit #: 120 — 18
MAILING DISTRIBUTION SHEET
Permittee:7�(k Wo,cre.1 e� w� �0 5X 6(.OAJ _rC04 I L.OVAL43�hn 1A Z&tf l/
Agents
DCM Field Offices
Elizabeth City Washington (with revised work plan drawings)
Morehead City ��° (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington: Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property:
DEMLR/D W R:
Renee Gledhill -Earley at Environmental.Review@ncdcr.gov
Heidi Cox (WIRO)
Anne Deaton
David Harris
Shannon Jenkins / Sharon Gupton
Tim Walton / Mike Moser
Sheri Montalvo / Shelton Sullivan
Clif Whitfield (WARD)
Washington: Anthony Scarbraugh-401
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: aob�rMairs — 401 (Carteret, Onslow, Pender, Brunswick, New Hanover)
Holley S, j )4' 5?
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources:
Natural Heritage Program
LPO:
Maria Dunn (WARD)
Rodney Butler
(NCDOT) Travis Wilson
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: Choose a district Major Permit Staff Choose Staff
Applicant
Name: Warren Donald Request Date: 11/22/2021
Last F'trsr
Received in Office: 11 /22/2021
Project
Address: 6418 Providence Point Rd.
StreetAddress
CAMA Permit
No.: 120-18
Agent's Name:
Wilmington 28411
City ZIP Code
Permit Expiration Date: 12/31 /2021
Payment $ 100.00
YES NO
District Manager/Field Rep Approve? (Initial Appropriate Box) 11/1 ❑
DWR Project USACE Action
No: 2018-1002 ID No.: SAW-2018-01452
s 00
Has substantial
YES
NO
If Yes,
development occurred?
❑�
❑
Explain: The outer step-down and kayak lift have not been
constructed. All other
permitted components are complete.
YES NO
Recommend to Renew? FV1 ❑
If Not Approved, provide
Justification:
Staff
CA
Date: 1\ '1rt I dam"
North Carolina Department of Environmental Quality I Division of Coastal Management
Washington Office 1943 Washington Square Mall I Washington. North Carolina 27889 1 252.946.6481
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 1 910.796.7215
Morehead City Office 1 400 Commerce Avenue I Morehead City. North Carolina 285571 252.808.2808
Elks, Katharine B
From: Donald <donald49@bellsouth.net>
Sent: Monday, November 22, 2021 11:08 AM
To: Elks, Katharine B
Subject: [External] CAMA Permit 120-18, 6418 Providence Point Rd, Wilmington NC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.<mailto:report. spa m@nc.gov>
Katherine,
Per our conversation we wish to extend our CAMA permit for another year.
Reasons: Construction is not complete per the original submitted design. The lower deck at the end of the pier and ramp
down to it are still required. Also the kayak lift still needs to be placed.
I will drop a check for $100 by your office this week.
Thanks for your help with this project.
Donald Warren
Sent from Donald's iPhone
Joshua 24:14-15
RECE]VED
Nov 2 2 2021
OCM WILMINGTON, NC
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
_ Excavation and/or filling pursuant to NCGS 113-229
Permit Number
120-18
Issued to Donald Warren et al., 6500 Carmel Trail, Wilmington, NC 28411
Authorizing development in New Hanover County at adj. to Howe Creek, at 6418 Providence
Point Rd., in Wilmington , as requested in the permittee's application dated 7/10/18 (MP-1), 9/5/18 (MP4), incl. att.
workplan drawings (4), Sheet 1-2of 5 dated Revised 7/6/18, Sheet 3of 5 dated Revised 9/1/18, Sheet 5of 5 dated Revised 9/5/18.
This permit, issued on October 30, 2018 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
)r tnese terms may be supiect to tines, unprlsonment or civil action; or may cause the permit to be null and void.
Shared Docking Facility
1) The shared docking facility services the following properties: 6500 Carmel Trail, 6504 Carmel Trail,
6418 Providence Point Rd., and 6408 Providence Point Rd., all in Wilmington.
2) This permit authorizes only the access piers, main pier, steps, platforms and stepdown, and other
structures and uses located in or over the water that are expressly and specifically set forth in the
permit application. No other structure, whether floating or stationary, shall become a permanent part
of this shared docking facility without permit modification. No non -water dependent uses of
structures shall be conducted on, in or over Public Trust waters without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2021
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Br ton C. Davis, Director
visi�ogn�of Coastal Management
This permit and its conditions hiP AJ FEU�ed.
i)CT 3 0 018
DCM WILMINGTON, NC
Signature of Permittee
Warren et al. Permit No. 120-18
Page 2 of 3
ADDITIONAL CONDITIONS
4) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not
exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as
measured from the bottom of the decking.
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) This permit authorizes a maximum of 3 formalized boat slips.
7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
8) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with
NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or
excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat
propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure.
9) Should any of the lots identified in Condition No. 1 of this permit be sold prior to the initiation of
construction of the docking facility, the permittee(s) shall obtain a written agreement from the new
owner(s) agreeing to add their names to this permit and submit it to the Division of Coastal Management
prior to initiating construction of the docking facility.
General
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
l 1) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
12) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800056 (Action ID SAW-2018-01452).
NOTE: The N.C. Division of Water Resources authorized the proposed proje4tbXyy�General Water
Quality Certification 4144 and assigned the project DWR Project No.
0 C T ' 0 2018
DCM WILMINGTON, NC
Warren et al.
ADDITIONAL CONDITIONS
Permit No.120-18
Page 3 of 3
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The pemrittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: An application processing fee of $250 was received by DCM for this project.
RECEIVED
OCT 3 0 2018
a
N
�
v
�
o
r
p,
v
0
0
m
a
0
n
s
a
ro
0
T
(D
0
o
m
Z
a
p
xrb
m
0
p
ro
w
v
F
O
0
O1
p
,
V
0
Z
00
1
O
O
Z
as OO
o
O
CL
Z
N
D
ti
O
OpC
r
1
'C
r
N
a
O
3
_.
r
o0
3•
A
7
0
H
O
n
r
to
�c
m
A