This letter of authorization is in reference to your 27 March 2019 email requesting a
modification of work authorized under Major CAMA/Dredge and Fill Permit No. 115-18 issued to you
on 11 July 2018 for redevelopment of a former commercial fishhouse property located at 785 Pantego
Street in the Town of Belhaven at the head of Battalina Creek in Beaufort County, North Carolina.
Major CAMA/Dredge and Fill permit no. 115-18 authorized a marina with 13 slips, a boat maintenance
yard with travel lift slip, wash down pad and a boat ramp. The permit also authorized the widening of
two canals, excavation of a travel lift slip and excavation of the channel in Battalina Creek and
bulkheading along the project site shoreline.
Your request is to modify Major CAMA/Dredge and Fill Permit No. 115-18 to excavate an
additional ±900 ft2 of uplands for the purpose of reducing the amount of bulkhead construction by
more than 100 linear feet. This additional upland excavation will convert uplands to open water and
will require the finger piers adjacent the travel lift slip on both sides to be extended over newly created
open water 3' x 54', in a landward direction and the 6' wide dock that was landward of a proposed
bulkhead accessing slips 12 and 13 will now be over open water for a distance of ±48'. These
aforementioned changes are hereby authorized.
Your modified plat dated 2 April 2019 illustrating the authorized changes will become a part
of the permit file and construction should be accomplished accordingly. Thank you for your time and
cooperation in this matter. If you have any questions, please do not hesitate to contact me in the
Washington Regional Office at (252) 948-3851.
Sincerely,
44�
Jonathan Howell, District Manager
Division of Coastal Management
Washington Regional Office
Cc: Steve Trowell - Coastal Management Representative, DCM
Gregg Bodnar - Assistant Major Permit Coordinator, DCM
DECEIVED
APR 15 2019
bCM �1NDC17-y
North Carolina Department of Environmental Quality I Division of Coastal Management
Washington Office 1 943 Washington Square Mall I Washington. North Carolina 27889
252.946,6481
� S
'44 )s
� 7 I
-Z (J7
J
Cc Q
LL
proposed travel lift bay
IF
2 c _ }
avcl U[t i•�7� s,�i_i- stisu
OM
iroRoc�
+4.0'
u
To: 'Trowell, Steve';'steve.trowell@ncmail.net
Subject: RE: attention
From: Toby Tetterton <tobin@gotricounty.com>
Sent: Wednesday, March 20, 2019 3:59 PM
To: 'Trowell, Steve' <steve.trowell@ncdenr.gov>; 'steve.trowell@ncmail.net' <steve.trowell@ncmail.net>
Subject: attention
Attention
Steve Trowell
This is a request for a modification of permit # 115-18.
Requesting:
• Relocation of Bulkhead proximally 75 ft, this would be additional of Est 400 cubic yards
of excavation to the left and right of travel lift
• Extending Cat Walk the total length of the travel lift, left and right
• By making this change, it will allow us to subtract overa 100 feet of bulkhead from our
project and allow better use of the property
7o6y 7etferfon
TJ's MARINE CONSTRUCTION LLC
PO Box 125
Pantego NC 27860
252-943-6677
252-943-3949 fax
t
M.Myd ctry
FILE
T.J.'s Land Development LLC
P. O. Box 125
Pantego, N.C. 27860
252-943-6677 Office
252-943-3949 Fax
email: tobin@gotricounty.com
April 9, 2019
Mr. Steve J. Trowell
Coastal Management Representative
NC Division of Coastal Management
943 Washington Square Mall
Washington, NC 27889
Dear Mr. Trowell:
ADDENDUM #2 TO LETTER DATED MARCH 28, 2019
Proposing to continue replacement of Bulkhead towards Pamlico Street. This would be
an additional 200' of Bulkhead to be placed as close to exiting wall as possible.
See attached drawing
RECEIVED
APR 15 2019
DCM-WARD RECEIVED
APR 18 [019
DCM-MHD CITY
I
936'
proposed pump out station 4
proposed boat ramp
20' x 35'
�enmve old Temp
` ...
lroposed fill
RECEIVE `
APR 15 2
DCM W� ro
00
Son
b/ ( 36" above grade)
( edge of culvert) 68
38 o
S 0q U
oP' 1 p9.46� EX.RRI - 3' sQ
.... � ..24- above grade)
T,, 73°07'30"E
21.55' (tie only �'':,•........1If�
of
�55 Cap �
Bodnar, Gregg
From:
Trowell, Steve
Sent:
Monday, April 01, 2019 3:54 PM
To:
Toby Tetterton
Cc:
Howell, Jonathan; Staples, Shane; Bodnar, Gregg
Subject:
Request for moratorium relief for excavation activities authorized by Major
CAMA/Dredge and Fill permit no. 115-18
Mr. Tetterton:
This email confirms receipt of your 28 March 2019 letter and Addendum to the aforementioned letter requesting
temporary relief to condition number 1 of Major CAMA/Dredge and Fill permit no.115-18. Condition number 1 states in
part " no excavation or filling within open water areas shall be permitted between April 1 and September 30 of any year
without prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies." I
have discussed this request with Mr. Shane Staples, Habitat Specialist with the Division of Marine Fisheries, and have
confirmed two weeks relief to the excavation and filling moratorium. You may currently continue to undertake the
authorized excavation activities of open water areas until 15 April 2019. This is a one- time temporary relief to
excavation and filling activities within the April 1 to September 30 moratorium. Please continue to coordinate any
future need to excavate or fill open water areas with DCM staff per condition no. 1.
Steve Trowell
Coastal Management Representative
Washington Regional Office
(252) 948-3854
To: 'Trowell. Steve' ''steve-trowel)@ncmail.nee
Subject: RE: attention
From: Toby Tetterton <tobin@gotricounty.com>
Sent: Wednesday, March 20, 2019 3:59 PM
To: 'Trowell, Steve' <steve.trowell@ncdenr.gov>; 'steve.trowell@ncmail.net' <steve.trowelI@ncmail.net>
Subject: attention
Attention
Steve Trowell
This is a request for a modification of permit # 115-18.
Requesting:
• Relocation of Bulkhead proximally 75 ft, this would be additional of Est 400 cubic yards
of excavation to the left and right of travel lift
• Extending Cat Walk the total length of the travel lift, left and right
• By making this change, it will allow us to subtract overa 100 feet of bulkhead from our
project and allow better use of the property
706Y 7efferfm
TJ's MARINE CONSTRUCTION LLC
PO Box 125
Pantego NC 27860
252-943-6677
252-943-3949 fax
Rom„_
FO
OR 1
DOM
ry
Bodnar, Gregg''��OQ
From: Trowell, Steve
Sent: Monday, April 01, 2019 3:54 PM
To: Toby Tetterton
Cc: Howell, Jonathan; Staples, Shane; Bodnar, Gregg
Subject: Request for moratorium relieffor:excavation activities authorized by Major
CAMA/Dredge and Fill permit no. 115-18_ .
Mr. Tetterton:
This email confirms receipt of your 28 March 2019 letter and Addendum to the aforementioned letter requesting
temporary relief to condition number 1 of Major CAMA/Dredge and Fill permit no. 115-18. Condition number 1 states in
part " no excavation or filling within open water areas shall be permitted between April 1 and September 30 of any year
without prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies." I
have discussed this request with Mr. Shane Staples, Habitat Specialist with the Division of Marine Fisheries, and have
confirmed two weeks relief to the excavation and filling moratorium. Y.ou may currently continue to undertake the
authorized -excavation activities: of open:water areas,until 1S April 2019:.'This is a one- time temporary relief to
excavation and filling activities within the April 1.to September 30 moratorium. Please continue to coordinate any
future need to excavate or fill open water areas with DCM staff per condition no. 1.
Steve Trowell
Coastal Management Representative
Washington Regional Office
(252) 948-3854
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
File Note:
NORTH CAROLINA
Environmental Quality
FROM: Gregg Bodnar, DCM Assistant Major Permit Coordinator
SUBJECT: TJs Land Development #115-18
DATE: 3/21/19
Below is a listing of determinations for future permit application context.
Spoil deposition within the 50 foot Tar -Pam buffer.
o Though not noted in the bio report the workplans do indicate that the site is existing
impervious. DWR exemption verified.
Potential for new dredging determination within Battalina Creek
o Discussed with Doug and the due to the location and historic use of the area DCM would
consider the dredging maintenance. DMF agreed.
• Proposed Marina
o Quarter Width was not addressed concerning the rail system's dolphins. After a
discussion with Steve Trowell on 9/27/18 he believes that the dolphins are not to scale
on the scaled drawings. Spoke to Joe Lassiter (Agent) and he believes the same and is
OK with meeting the''/<width. Permit was conditioned accordingly (Condition No. 17).
o The mooring pilings (18) were not addressed in the bio report, but each one along
Baker's Canal is in line with the finger pier alignment and satisfies the % width.
• DWR
Requested a marina operations plan in the 8/20/18 hold for additional information. The
permit was conditioned accordingly (Condition No. 29).