Loading...
HomeMy WebLinkAbout115-18 Letter of Authorization 4/12/20191 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Us Land Development LLC Mr. Tobin Tetterton P.O. Box 125 Pantego, North Carolina 27860 Dear Mr. Tetterton: NORTH CAROLINA Environmental Quality 12 April 2019 This letter of authorization is in reference to your 27 March 2019 email requesting a modification of work authorized under Major CAMA/Dredge and Fill Permit No. 115-18 issued to you on 11 July 2018 for redevelopment of a former commercial fishhouse property located at 785 Pantego Street in the Town of Belhaven at the head of Battalina Creek in Beaufort County, North Carolina. Major CAMA/Dredge and Fill permit no. 115-18 authorized a marina with 13 slips, a boat maintenance yard with travel lift slip, wash down pad and a boat ramp. The permit also authorized the widening of two canals, excavation of a travel lift slip and excavation of the channel in Battalina Creek and bulkheading along the project site shoreline. Your request is to modify Major CAMA/Dredge and Fill Permit No. 115-18 to excavate an additional ±900 ft2 of uplands for the purpose of reducing the amount of bulkhead construction by more than 100 linear feet. This additional upland excavation will convert uplands to open water and will require the finger piers adjacent the travel lift slip on both sides to be extended over newly created open water 3' x 54', in a landward direction and the 6' wide dock that was landward of a proposed bulkhead accessing slips 12 and 13 will now be over open water for a distance of ±48'. These aforementioned changes are hereby authorized. Your modified plat dated 2 April 2019 illustrating the authorized changes will become a part of the permit file and construction should be accomplished accordingly. Thank you for your time and cooperation in this matter. If you have any questions, please do not hesitate to contact me in the Washington Regional Office at (252) 948-3851. Sincerely, 44� Jonathan Howell, District Manager Division of Coastal Management Washington Regional Office Cc: Steve Trowell - Coastal Management Representative, DCM Gregg Bodnar - Assistant Major Permit Coordinator, DCM DECEIVED APR 15 2019 bCM �1NDC17-y North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington. North Carolina 27889 252.946,6481 � S '44 )s � 7 I -Z (J7 J Cc Q LL proposed travel lift bay IF 2 c _ } avcl U[t i•�7� s,�i_i- stisu OM iroRoc� +4.0' u To: 'Trowell, Steve';'steve.trowell@ncmail.net Subject: RE: attention From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, March 20, 2019 3:59 PM To: 'Trowell, Steve' <steve.trowell@ncdenr.gov>; 'steve.trowell@ncmail.net' <steve.trowell@ncmail.net> Subject: attention Attention Steve Trowell This is a request for a modification of permit # 115-18. Requesting: • Relocation of Bulkhead proximally 75 ft, this would be additional of Est 400 cubic yards of excavation to the left and right of travel lift • Extending Cat Walk the total length of the travel lift, left and right • By making this change, it will allow us to subtract overa 100 feet of bulkhead from our project and allow better use of the property 7o6y 7etferfon TJ's MARINE CONSTRUCTION LLC PO Box 125 Pantego NC 27860 252-943-6677 252-943-3949 fax t M.Myd ctry FILE T.J.'s Land Development LLC P. O. Box 125 Pantego, N.C. 27860 252-943-6677 Office 252-943-3949 Fax email: tobin@gotricounty.com April 9, 2019 Mr. Steve J. Trowell Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 Dear Mr. Trowell: ADDENDUM #2 TO LETTER DATED MARCH 28, 2019 Proposing to continue replacement of Bulkhead towards Pamlico Street. This would be an additional 200' of Bulkhead to be placed as close to exiting wall as possible. See attached drawing RECEIVED APR 15 2019 DCM-WARD RECEIVED APR 18 [019 DCM-MHD CITY I 936' proposed pump out station 4 proposed boat ramp 20' x 35' �enmve old Temp ` ... lroposed fill RECEIVE ` APR 15 2 DCM W� ro 00 Son b/ ( 36" above grade) ( edge of culvert) 68 38 o S 0q U oP' 1 p9.46� EX.RRI - 3' sQ .... � ..24- above grade) T,, 73°07'30"E 21.55' (tie only �'':,•........1If� of �55 Cap � Bodnar, Gregg From: Trowell, Steve Sent: Monday, April 01, 2019 3:54 PM To: Toby Tetterton Cc: Howell, Jonathan; Staples, Shane; Bodnar, Gregg Subject: Request for moratorium relief for excavation activities authorized by Major CAMA/Dredge and Fill permit no. 115-18 Mr. Tetterton: This email confirms receipt of your 28 March 2019 letter and Addendum to the aforementioned letter requesting temporary relief to condition number 1 of Major CAMA/Dredge and Fill permit no.115-18. Condition number 1 states in part " no excavation or filling within open water areas shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies." I have discussed this request with Mr. Shane Staples, Habitat Specialist with the Division of Marine Fisheries, and have confirmed two weeks relief to the excavation and filling moratorium. You may currently continue to undertake the authorized excavation activities of open water areas until 15 April 2019. This is a one- time temporary relief to excavation and filling activities within the April 1 to September 30 moratorium. Please continue to coordinate any future need to excavate or fill open water areas with DCM staff per condition no. 1. Steve Trowell Coastal Management Representative Washington Regional Office (252) 948-3854 To: 'Trowell. Steve' ''steve-trowel)@ncmail.nee Subject: RE: attention From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, March 20, 2019 3:59 PM To: 'Trowell, Steve' <steve.trowell@ncdenr.gov>; 'steve.trowell@ncmail.net' <steve.trowelI@ncmail.net> Subject: attention Attention Steve Trowell This is a request for a modification of permit # 115-18. Requesting: • Relocation of Bulkhead proximally 75 ft, this would be additional of Est 400 cubic yards of excavation to the left and right of travel lift • Extending Cat Walk the total length of the travel lift, left and right • By making this change, it will allow us to subtract overa 100 feet of bulkhead from our project and allow better use of the property 706Y 7efferfm TJ's MARINE CONSTRUCTION LLC PO Box 125 Pantego NC 27860 252-943-6677 252-943-3949 fax Rom„_ FO OR 1 DOM ry Bodnar, Gregg''��OQ From: Trowell, Steve Sent: Monday, April 01, 2019 3:54 PM To: Toby Tetterton Cc: Howell, Jonathan; Staples, Shane; Bodnar, Gregg Subject: Request for moratorium relieffor:excavation activities authorized by Major CAMA/Dredge and Fill permit no. 115-18_ . Mr. Tetterton: This email confirms receipt of your 28 March 2019 letter and Addendum to the aforementioned letter requesting temporary relief to condition number 1 of Major CAMA/Dredge and Fill permit no. 115-18. Condition number 1 states in part " no excavation or filling within open water areas shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies." I have discussed this request with Mr. Shane Staples, Habitat Specialist with the Division of Marine Fisheries, and have confirmed two weeks relief to the excavation and filling moratorium. Y.ou may currently continue to undertake the authorized -excavation activities: of open:water areas,until 1S April 2019:.'This is a one- time temporary relief to excavation and filling activities within the April 1.to September 30 moratorium. Please continue to coordinate any future need to excavate or fill open water areas with DCM staff per condition no. 1. Steve Trowell Coastal Management Representative Washington Regional Office (252) 948-3854 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director File Note: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, DCM Assistant Major Permit Coordinator SUBJECT: TJs Land Development #115-18 DATE: 3/21/19 Below is a listing of determinations for future permit application context. Spoil deposition within the 50 foot Tar -Pam buffer. o Though not noted in the bio report the workplans do indicate that the site is existing impervious. DWR exemption verified. Potential for new dredging determination within Battalina Creek o Discussed with Doug and the due to the location and historic use of the area DCM would consider the dredging maintenance. DMF agreed. • Proposed Marina o Quarter Width was not addressed concerning the rail system's dolphins. After a discussion with Steve Trowell on 9/27/18 he believes that the dolphins are not to scale on the scaled drawings. Spoke to Joe Lassiter (Agent) and he believes the same and is OK with meeting the''/<width. Permit was conditioned accordingly (Condition No. 17). o The mooring pilings (18) were not addressed in the bio report, but each one along Baker's Canal is in line with the finger pier alignment and satisfies the % width. • DWR Requested a marina operations plan in the 8/20/18 hold for additional information. The permit was conditioned accordingly (Condition No. 29). North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808