Loading...
HomeMy WebLinkAbout57-18 Pollard, Michael & Vickieit Class NEW..i - ' Permit Number 57-18 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 F X Excavation and/or filling pursuant toNCGS 113-229 to Michael and Vickie Pollard 3386 Polly Jones Court, Rocky Mount, NC 27804 razing development in Beaufort Countyat adj. to Pamlico River, at 597 Duck Creek near Bath- as requested in the permittee's application dated 2/22/18; including attached all dated "Received DCM-WARD mit, issued on June 14, 2018 is subject to compliance with the application (where nt with the permit), all applicable regulations, special conditions and notes set forth below. Any violation terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization - Bulkhead The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. The bulkhead shall be constructed prior to any backfilling activities. (See attached sheets for Additional Conditions) us permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the ified persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. This permit must be accessible on -site to Department rsonnel when the project is inspected for compliance. Any; maintenance work or project modification not covered reunder requires further Division approval. cease when the permit expires on December 31, 2021 this permit, the State of North Carolina agrees that t is consistent with the North Carolina Coastal t Program. BraAdi C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee nd Vickie Pollard ADDITIONAL CONDITIONS Permit No. 57-18 Page 2 of 3 The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. The fill material shall be clean and free of any pollutants except in trace quantities. All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. =All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of-backfilling activities.- ._ _ Docking Facility This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether I oating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. .The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. This permit authorizes a maximum of 2 formalized boat slips. .The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. The authorized boathouse shall be single story, and shall not be designed to allow for second story use. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the €';:permitted activity without having it transferred to a third party. and Vickie Pollard ::. - Permit No. 5748 Page 3 of 3 ADDITIONAL CONDITIONS General This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. _ The U.S. Army Corps of Engineers authorized the project by way of Programmatic General - Permit 198000291 (Action ID SAW-2018-00924), issued 6/6/18.- - - The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 2018-0621. TE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in place at the time of such development. lTE: An application processing fee of $400 was received by DCM for this project. This fee alsc satisfied the Section 401 application processing fee requirements of the Division of Water Resources. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD i 1) APPLICANT: Michael & Vickie Pollard County: Beaufort LOCATION OF PROJECT: Off SR 1358 at 597 Duck Creek Rd on the north side of Pamlico River near Bath in Beaufort County North Carolina DATE APPLICATION RECEIVED COMPLETE BY FIELD: 5 April 2018 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Kelly Spivey DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400.00 (60/40) PUBLIC NOTICE REC'D: 5 May 2018 END OF NOTICE DATE: 25 May 2018 ADJ. RIP. PROP NOTICES REC'D: / DEED REC'D: APPLICATION ASSIGNED TO: <7r�tX1.t4� ON: S� C) 75 DAY DEADLINE: 19 June 2018 150 DAY DEADLINE: MAIL OUT DATE: STATE DUE DATE: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY Coastal Management Coastal Management Division of Commun Land Quality Section Division of Water Qu Storm Water Manages State Property Office -LUP Assistance rM" Division of Archives & History Division of Environmental Health Division of Highways Wildlife Resources Commission Local Permit Office Division of Marine Fisheries Irps of Engineers .w� DW DATE OBJECTION COMMENTS S: RETURNED I YES NO ti" IC u 20/8 —bfe2 Lb J—]—>- 7,e��- t �g zoos 16 ?d ()CM-M _ ..r __ _ .r .. . ,.. MEMORANDUM TO: Doug Huggett THROUGH: Jonathan Howell'! * FROM: Kelly Spivey DATE: 23 April 2018 SUBJECT: Michael & Vickie Pollard Beaufort County CAMA Major Permit Application Mr. & Mrs. Michael Pollard has submitted a Major CAMA and State Dredge and Fill permit application for development located off SR 1358 at 597 Duck Creek Rd. on the northern side of the Pamlico River near Bath in Beaufort County, North Carolina. The applicants propose to bulkhead and backfill f 100' of shoreline on the same alignment as the upstream and downstream bulkheads. This alignment will place the bulkhead on average t9' waterward and a maximum distance of±20' waterward of the Normal Water Level. The applicant also proposes to construct a 150' long X 5' wide pier with a 12' x 12' L-head platform. Additionally, the applicant proposes to construct a 14' x 28' (dripline) boathouse. A 8' x 12' uncovered Personal watercraft lift (PWC) will be located adjacent to the pier. I have reviewed the proposed project with regard to rules found in Subchapter 7H concerning development in a Public Trust Area, Coastal Shoreline and Estuarine Waters. It is staff recommendation that the proposed project appears consistent with 15A NCAC 07H .0208 as described below. This office feels the development is consistent with 15A NCAC 07H .0208(b)(7)(D)(ii) which states in part "the bulkhead alignment extends no further below approximate mean high water or normal water level than necessary to align with adjacent bulkheads". The proposed alignment will tie in with the corners of both the upstream and downstream bulkheads. Evidence exist of a previously existing bulkhead that is located mostly waterward of the proposed bulkhead alignment. The proposed alignment will not project any further waterward than the adjacent bulkheads. This office also feels the project is consistent with 15A NCAC .0208(b)(6) for piers and docking facilities. Staff recommend the permit be issued with standard conditions for both docking facilities and bulkheads. RECEIVED m p 0 8 Z018 ()CM-MHD CITY ip ;:. '" F.:,.�_. ., � i1.' v. .�� i-i �. 6i ... ., a �.. � .. 1 ) .'�t ., :1 1. v. .� ,. �� .. _ .. i ... `u ' � � ! � ' , I t .., .ii q ..vim B `F ROY COOPER Governor ('ixrsfa! fvliut('�tiiant•rrt �.:: :• R1, W4.` :LJ. 1.:,,:1i r: Y foe MEMORANDUM Mr. CliffWhitfield Public Water Supply Section NCDENR WARO MICHA.EL S. REGAN Secretmy BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: CAMA Application Review APPLICANT: Michael & Vickie Pollard PROJECT LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishing pier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23 May 201 a. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the incorporated. See attached. This office objects to the comments. 1 Signed proposed project only if the recommended changes are proposed project for reasons described in the attached Date _ _ w 61J ,;ytle� 1�ia. S R:l OCSR61CLMna Emimnmvtil Qaliry CoaW %faNCMJtmI 5W%vuhim.wn Sia t%loll. Rilhin1mr.SC--W :5: 9a664Sl E C E RifE MAY 7 201B KAP SECTION MHD i:uusrcri �bRrnt+cjruirn. MEMORANDUM TO: Mr. Shane Staples Division of Coastal Management 943 Washington Sq. Mall FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: CAMA Application Review APPLICANT: Michael & Vickie Pollard RECOVEL? MY 0 11019 MM•rlahorl% YVAM ROY COOPER Governor MICHAEL S. BEGAN Secretary BRAXTON C. DAVIS Director Respond to Greg Bodnar Morehead City Office PROJECT, LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishing pier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23 May 2018.. Please contact Kelly Spivey at 252-948-3953, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. t/This office has no comment on the proposed project. RECEIVE® MAY 8 2018 This office approves of the incorporated. See attached. This office objects to the proposed project only if the recommended changes are proposed project for reasons described in the attached Date Suu o:\nth CuG�na Entitormerta{Q:a:in• Cattil\IxuSnnmt 9i31\'uhirSton SQav� \hl1 lPathinSton, SC 2%559 :::9S66SS1 MAY 7 2018 MP SECTION MHD SAP SECTION MHD Bodnar, Gregg From: Thorpe, Roger Sent: Wednesday, May 09, 2018 9:01 AM To: Bodnar, Gregg Subject: CAMA Major - Michael & Vickie Pollard Replace existing Pier - Bath, NC Beaufort County Gregg The subject project will not require a State Stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 {: Nothing Compares,-,, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER Governor MICHAELS. RFGAN Secreliny ;RAY 0 BRAXTON C.DAVIS Director 6RANDUM"�*-,,��O-"(C-,?,q omo,� MEMORANDUM !�', Q1 r, , octiov? 0101?1; offil- (TO: Mr., Antho4'Scalrbraugh DWR Water Quality Programs�., 943 Washington Regional Office FROM: 'G*Ireg' boih'ar Maj&Permits ProcessingCoordinator, Cbasial.Manag6mcnt,Division 466bo'miimerce Avenue Morehead City NC 28557 DATE: 02 May 201,8 SUBJECT: CA—MAAppllcation)ieVl4w APPLICANT: Michael & Vickie Pollard I �,o (" 2 I Respond toGreg 'Bodnar Morehead City Office PROJECT ]LOCATIOM, Project site is located SR 1358 At 5,91 Duck Creek Rd on north side of.Pamlico River near rBath'nBe I giniort c6untyNorth Carolina ,i- PROPOSED 'PROJECTS Applicant proposes "to 'replace and .eiistin gfishing pier an&lihk form: Please indicaWbelow your position or viewpoint on'the proposed project and return -this form by 23 May 2018. Plea'so,contact Kelly 1 Spivey at 252-948-3853, if you have any questions regarding the pro'p*6sed project. When appropflate;in depth comments with supporting datal,are. requesteil. REPLY This office -has-rio: objection to the project�n proposed. IxThis officehas no comment on the proposed project. Signed This office approves.of t,he,proposed prcject 'only if the recommended changes are ttach6d. — to the proposed project for reasons described in the attached Oate V/ r -�,Nothing Cornpares;-�.ti. $ Litt o:\trth cam Una I En%ircnqx"Al Qireaty JewtulMinasumt 9,43 Wathing ton$ q,x, Mall I t Water Resources Environmental Quality NOT A CAMA PERMIT June 8, 2018 RECEIVED ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULLPEPPER Interim Director DWR # 18-0621 BEAUFORT County Michael and Vickie Pollard JUN 1 1 2018 3386 Polly Jones Court Rocky Mount, NC 27804 PIP M' �+ Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS MICHAEL AND VICKIE POLLARD RESIDENCE —597 DUCK CREEK RD, WASHINGTON Dear Mr. and Mrs. Pollard: You have our approval for the Impacts listed below for the purpose described in your application dated May 2, 2018 and received by the Division of Water Resources (Division) on May 8, 2018. These impacts are covered by the attached Water Quality General Certification 4144 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)) Type of Impact Amount Approved Amount Reduced Plan location/ (units) (units) Reference Permanent Temporary Attached Open Waters OW-1 (Bulkhead Fill) 0.02(acres) 0 (acres) Figures 1 of 5 and 5 of 5 OW-2 (Pier and L-Head Shading) 0.02 (acres) 0 (acres) Figure 3 of 5 OW-3 (Shading from Boathouse) 0.01(acres) 0 (acres) OW-4 (Shading from PWC lift) 0 (acres) "96 ft2" 0 (acres) 2. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certifications) 4144. [15A NCAC 02B .0507(c)] State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 MICHAEL AND 'VICKIE-POLLARD DWR# 18-0621 401APPROVAL Page,2 of Continuing Compliance 3. Turbiditv Standard The P.ermittee shall adhere specially to 15A NCAC 02B:.0220 Tidal Salt Water Quality for Class SB Waters (3)(g) pH: shallbe normal fo. r waters In the area, which' generally shall range between 6.8 and$:5 except+that swamp; waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU;'ifturbidity exceeds this level dueto natural background c6nditions,'th6 existing turbidity level shall not be -increased. [15A NCACO2B .0220] Other Conditions 4. The applicant and/or authorized :agent. shall ,provide a completed Certificate of Completion form to the Division within thirty (30),days of project. completion (available at http://pbrtal.ncdenr.ore/web/wa/swn/w's/401/`certsandpermits/apply/forms). [iM NCAC 021-1 .0506(b)(5)1 5. ThWapproval and. its conditions are final and binding unless contested, [G.S: 143-2i&5]. These Certifications can be contested as provided in Articles,3 and 4 of General Statute 150B.by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days. of receipt of this notice, a.petition must be filed with the OAH.. A,petition isxonsidered'filed when the original and one (1) copy along with any appllcable OAH filing, fee is received in the OAH during normal office hours (Monday through Friday between,8':00am and 5:00pm,.excluding official state holidays). The petition maybe faxed tothe OAH at (919) 431-3100, provided the original and one.copyofthe petition along with any applicable OAH 'filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc:): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy"of the petition must also be served to DEQ: 4 M® William F. Lane, General Counsel Department of Environmental Quality �H�N) 1] 120��18 1601 Mail Service, Center Raleigh, NC 276994601 n MP SECTION MH® MICHAEL AND VICKIUOLLARU DWRO.18,0021 401 APPROVAL Page of,3 Ihis,letter cornpletes'thereview of the Divisioft under section 401 of the Clean Water Act., Please contact Anthony Scarbraugh at2527 948-3924 or,anthony.scarbraugh(o)ncdenr.gov if you, hqve,any queWOns, or concerns. Siddenely' It Rolbirt Tonkai RegionalSupervisor Water Quality Regional Operations Section DhiisidFi of Water Resources, NCDEQ Enclosdr6s. GC 4144 Certification .of Complption cc: Gregg Bodnar, DCM Mofeheacl.City Office -(via email) Kelly Spivey, PCM WaRQ.(v . ia4moll) Raleigh Bland, USACE WaSh,iington'Regulatory Field !,OffIce-(vWemail) Samir Dunipoe,,DEMLR WaRO Laser.fiche, File A�"W JUN 1 1 2018 MP SECTION MHD AP P R!O. V E North CarolinaJEWronm . Managernerit OomrriW DiVislon of WOW Resou F1 R im kv Ai*,q RECEIVED JUN 1 1 2018 ^^.rffnkj "1410 0* -n c. k,,1%rkNOj'J Sys Bar SAY 8 e,;&t,6A rAPR, 0 6 1018 .1 c 0 k e cp V, M 0 z p pap, l i ve r N mO dL 41, o a 0 , !Y' 1 1 PWC L,-ei c�a� /Noose po `Q APPROVED Nort Carolina Environmental- Managafnent' Commission DMsion of War Resource§ Date C_.r 201 K Pe; r I�r�c✓l iti S Permit# Vickie Polo nrrl S ] (?us k er4c%6- cn 1! WIFSh r'KJ an Ivic y. o m ,Wlfvl . r, tw- rmw"LPY f / —.,A& W > E Oro Lu Q A CD EOZ m 0)= CT o =,F7 <z IL5 12: M CD a l(L -5'el 9 -�P, t4r7L4/ 1;( IQP/ i, tm IdY7 Me I I Nnr GUA1332N Vj Coastal ,`.?a»npearirnt aunIJ v v. TO: MEMORANDUM Mr. Lee Padrick Division of Community Assistance ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: " CAMA Application Review APPLICANT: Michael'& Vickie Pollard. PROJECT LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath, in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishingpier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23' May 2018. Please contact Kelly Spivey at' 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in.depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office,has no comment on, .the proposed project. This office approves of the incorporate& See attached. This office objects to the comments. Signed proposed project -only if the recommended changes are proposed project for reasons described in the attached Date '5-- `/ g' ='Nothing Compares'."-,.,,_ 5 u:e of ::ts C�xt�iN; 8a.iianrur.A.Q:iin�,' Car:tii \lara5ms±nt 943 wxlh rzlon 5 peas \UZI a tt'aihia,�tCn,::G :TM 252 qx@ 6:S f Io Coastal Manogement ENVIRONMENTAL OUALITV ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM M AY -7�.13 ��. TO: Mr. Shannon Jenkins 3helffish Sanitation NCDENR WaterQuali c Division of Environmental Health FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: CAMA Application Review APPLICANT: Michael & Vickie Pollard PROJECT LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishing pier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23 May 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Stsmd� 'JLI'l, I C J. Date S fop- ShMAW skins RECEIVED !`/Nothing Compares`, :.Na>rxR�c.aRa eR.iee 031Q.ahy cmul"U.4. 1 MAY 10 2018 5M3Wwhwgm3Raur%hn 0.'aghmEen.NC:'889 _3:9a66a8: DCM-MHD CITY ,. ,: . .. „.',: - Q �Y .l � ��.� :'IG1` f +?'i: n.9J f i. �.' �. .f :'/�. • � . .. .• ii� is (f. .. � ../'f .. .. ,u -:r ••/ i.I. �� .t io ,• I. � i'i i .• •4 .. }.. it .� .i:f.. ..:. fi.lr i ,. •, ;LI •.� �.. •:`t .• � 'Jbf` � ••tl I' .: iP .d?'�1 r Jt. ,. �'1, '. n, ..• .. .. .'I" � gal ... � l'f i �i f_. .. �. • _ �r�• Cp ask7l ''t far? tzijvigi6wm.r-•..IA, MIAt t1V TO: NOMA MAY 1 1 2018 Tam=* MV, R Mis, MatiaDmin NC Wildlife Resources Commission FROM: Greg Bodnar MajorPermits Processing Coordinator. C9astal,Management'Divisioln 400 Cormner6e Avenue Morehead City NC " 28551 DATE: 02 May, 2018 SUBJECT- CAMA.Appli c'Atio n Review APPLICANT: Michael &Vickie Pollard PROJECT LOCATION: Project site is located -SR.1358 at'597 Din I - - near, Bath in Beaufort County North -Carolina ROY COOPER Governor 1MCHAEL &REGAN Secrelqry I BRA' XTPN,C.'DAVIS Director RespondtoGreg Bodnar Morehead City Office PROPOSED PROJECT: Applicant proposes to replaceand existing fishing pier and platform. Please indicate below PlIelm contact Kelly REPLY River the, proposed project and,retum, thisl form by 23 May2018, I have any questions regarding the proposed project. When This office has noobjectionto the project as proposed. This office has no comment on the proposed project: This office approves of, the proposed projectonly, if the recommended changesare ,incorporated. Secattached. This, office "objects, to the proposed pro' jof fort reasons described in the attached e_ comments. Signed Date 1-01 %S,-_ wl Coil U!, %1ArA;M*nt XC 2,SS; ROY COOPER Governor N`rp. RECEIVE® MICHAEL S. REGAN Secretary Coostol Management MAY 0 4 2018 ENVIRONMENTAL OVALITY BRAXTON C. DAVIS DOA Director STATE PROPERTY MEMORANDUM OFFICE TO: Mr. Tim Walton Director State Property Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: CAMA Application Review APPLICANT: Michael & Vickie Pollard PROJECT LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishing pier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23 May 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. /1E'c5id��`t IPLY 2 Signed This ce has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the incorporated. See attached. This office objects to the proposed project only if the recommended changes are proposed project for reasons described in the attached Date � ✓111 'Nothing Cornpai (1s Sn of\aEt Cardw Enail M&IQ»liN CmW.%1amj.lnh+t 94S \Cnhigtm Sams>pil R'nhlnEron,SC :"S99 25294664SI RECEIVED MAY 11 2018 DCM-MHD CITY Coastal Management ENVIRONMENTAL OUALITY MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Ms. Rachel Love-Adrick District Planner Division of Coastal Management FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 02 May 2018 SUBJECT: CAMA Application Review APPLICANT: Michael & Vickie Pollard PROJECT LOCATION: Project site is located SR 1358 at 597 Duck Creek Rd on north side of Pamlico River near Bath in Beaufort County North Carolina PROPOSED PROJECT: Applicant proposes to replace and existing fishing pier and platform. Please indicate below your position or viewpoint on the proposed project and return this form by 23 May 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has o comment on the proposed project. %E CtlYh4� f This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached eis cI 'J� Signe Date J { 1 5I �" 18 --"Nothing Compares RECENED $u 0f\alm CM&M Enhl WAIQaa6b.Cauca:>(ar�ler..er.� 943Wwbi%w Saw*\40 WLshinS NC:7889 MAY 04 2018 25,WUSI 0CM-MHD CITY :y Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner �/Ji Division of Coastal Management j'� SUBJECT: Major Permit Request by Michael & Vickie Pollard DATE: May 15, 2018 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Consistency Determination: The request is consistent with/not in conflict the Beaufort County Joint Land Use Plan 2006 Update certified by the CRC on January 13, 2010, provided that the land development and land use activities comply with the requirements of the Tar -Pamlico Buffer Rule, unless located in the exempted or allowed areas (see policy 2.1.5), and that development meets the Beaufort County. Flood Damage Prevention Ordinance (see policy 2.2.3). Overview: The project site consists of a 0.34-acre lot with approximately 100' of linear shoreline adjacent to the Pamlico River. The site is located at 597 Duck Creek Rd, near Bath, in Beaufort County, North Carolina. Existing site improvements include a bulkhead, single-family residence, and on -site septic system. The 46' of the existing bulkhead have been damaged, 55' remain. The site is vegetated with lawn grasses, ornamental shrubs, loblolly pines and various hardwoods. The applicant is proposing to replace 100'of the damaged bulkhead landward of the existing bulkhead, this new alignment will align the bulkhead with the upstream and downstream bulkheads. The applicant is also proposing to construct a 150' ling x 5' wide pier with a 12' x 12' L-head platform, a 14' x 28' dripline) boathouse, and a 8x 12' uncovered Personal Watercraft Lift (PWC) adjacent to the pier. The total number of boat slips for this project will be two (2). AECs involved include: Estuarine Waters and Coastal Shoreline. The project is located within in Tar - Pamlico River Basin and is subject to the Tar -Pamlico Buffer Rule. The Pamlico River at this site is classified as SB/NSW. The site is a not a Primary Nursery Area, and is not open to shellfishing. No Submerged Aquatic Vegetation (SAV) was observed onsite. A reportof archaeological/cultural resources was not provided. The site is located in an AE (EL9) Special Flood Hazard Area according to the Beaufort County FIRM (Map # 37206622J). Anticipated impacts resulting from this project are expected to include: bulkhead backfill will fill ± 900 ft2 and the other proposed construction will shade ± 1,382 ft2 of river bottom. Nothing Compares,,. _ State of Noah Carolina I Environmental Quality I Coasml Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-28081252-247-3330(fn) North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 2 Basis for Determination: The project is subject to the Beaufort County Joint Land Use Plan 2006 Update. The counties Future Land Use Map (FLUM) classifies the site as Agricultural -Forestry -Rural Housing (land), Conservation I (Estuarine Waters AEC and water protected by Tar -Pam Buffer), and Conservation II (Coastal Shoreline AEC and 100-year flood plain). The following LUP policies may be applicable to this request: 2.1 Conservation I 2.1.3 Only development and land/water use activities that are consistent with the use standards for coastal wetlands, estuarine waters, and public trust areas (15A NCAC 07H .0208) are allowed in this classification. Permitted extractive uses in the Aurora area will continue. 2.1.5 Unless in the exempted or allowed, land development and land use activities must comply with the requirements of the Tar -Pamlico Buffer Rule (15A NCAC 02B .0259). 2.2 Conservation II 2.2.2 Only development that is consistent with the use standards for the estuarine shoreline AEC and the public trust shoreline AEC (15A NCAC 07H.0209(d)) is allowed. 2.2.3 Development in any flood hazard zone delineated on a Beaufort County FIRM or in an area that is subject to storm inundation as illustrated on Beaufort County storm surge maps must meet the location and construction requirements of the Beaufort County Flood Damage Prevention Ordinance. -5:>"Alothmg Compares,,, - State of North Carolina I Environmental Quality I Coastal Management 400 Commence Avenue I Morehead City, NC 28557 252-808-2808 1252-247-3330 (fax) ENVtR0mm2mTA%,�QUAUW -May4-20.18 .'MEMORANDUM TO: I ". I FROM: SUBJECT: Applicant:. OrojeettocAtion' 4 Rec'eived: 05111/2018 .State Uistoric.Presefv,ation Mice k0Y,CciQIiER- vwlv-m'� RECEIVED MAY 2 5 2018 MP SECTION MHD MICHAEL S.RFGAN .Wli,-Y BRAXTON _P. DAVIS mrcww. ER 184111. Due Renqc:Gledh'i.11-,Early.. NC Department ofCultural!Resourccs A Doug,Huggett,L Major Fermi-616oi)dinatior. clo.Gregg Bodnar, Assistant Major F'Canit§.Coorldinator Division of Coastal., MariaAcment CAMA.Perffiit,Applicatibn;R&yiq'w -,Mark and AniiaYrena .121 S. Dogwood Trail, Dare County Proposed Project: Construct abulkhead, 6xcEivate-atw6-sli . p . basin, dredge within a rnafi=mblda -canal-,,c6fistruct A, boatho I use,a,n,d pier ,,AiihihAe,basin.and'in§t,ail'a, woo_'den+ boiwwalk aro, Cmd',.the. basin;. kiwe indicate belqw'yok 'form by 05/25/18464Wl I have inyquestions Ifyou 3901. Whea aopr6prialc, I - REPL4Y:, This agencyhqs'no objedtionlothe p'r'qj'cc't as'.0rciposed: —Xillis agency has no,comment on:t,49ptbposed 'project. This agency, approves .cf.the,project'only if the recoinmendeochanges; arc incorporated: Sec.attac4e.d; This. agency objects to, the project for reasons described in the ,attache& comments. 'SIGNED. 'DATE 6P 9, ..It? U ­�f'Nolhtlnq Compares. quwof Nmh cmoliml Fllifltw "ily I Coaa WORM= 401s, Qillln SL:Slc'30()JWizaWh City, N027909 I 252-264-39011252-33f 2051 lfhxl ' NO 71. 4,2010 U.b 2ECIIO14 WHD YiVe. HECEIAED ti Bodnar, Gregg From: Bland, Raleigh W CIV CESAW CESAD (US)<Raleigh.W.Bland@usace.army.mil> Sent: Wednesday, June 06, 2018 3:54 PM To: Bodnar, Gregg Subject: [External] RE: Michael and Vickie Pollard CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<maiIto: repo rt.spam@nc.gov> SAW 2018-00924 PGP 198000291 Your Date Thanks! -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Wednesday, June 6, 2018 2:30 PM To: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Subject: [Non-DoD Source] Michael and Vickie Pollard Hey Raleigh, Coming up on my 75 and wanted to check in on this one in Beaufort County. Thanks and hope all is well, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg.Bodnar@ncdenr.gov <mailto:Gregg.Bodnar@ncdenr.gov> 400 Commerce Ave Morehead City, NC 28557 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. DCM Coordinator:_.._l AR Permit #: -:MAIIINGDISTRIBUTION SHlET--;� DCM Aeld Offices Elizabeth City (with revised work plan drawings) Morehead City Washingtore# -4ly5� e� yr Wilmington US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLRIDWR: Aaleigh Bland (Beaufort, Camden,*Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier.(Bertie, Currituck, Dare, Gates; Pamlico, Pasquotank, Washington) Tom Steffan (NC POT- Beaufort; Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECitylWashington District) Tyler Crumbley (Brunswick, Now Hanover) Lii Hair (Carteret, Onslow, Pander) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Ponder) ,/Renee Gledhill -Earley -1 Heidi Cox (WIRO) / Clif Whitfield (WARO) + / Shane Staples Curt Weychert David Harris i Shannon Jenkins z Tim Walton i Karen Higgins Kristy'Lynn Carpenter (NO DOT -All Projects) Washington: -Anthony Scarbraugh-401 r Roger Thorpe-Stormwater Garoy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wihnington: Robb Mairs — 401(Carteret; Onslow, Ponder, New Hanover) Chad Coburn — 401(Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401(NCDOT-Bru swick New Hanover, Onslow, Ponder) Wildlife Resources: Maria Dunn (WARO) LPO: Fax Distribution: Petmittee #: Agent# DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT h 1. APPLICANT'S NAME: Michael Pollard & Vickie Pollard 2. LOCATION OF PROJECT SITE: off SR 1358 at 597 Duck Creek Rd. on the northern side of the Pamlico River near Bath in Beaufort County, North Carolina Photo Index - 2006: 102-8773; D-10 2000: 102-1289; V 15 35°27'28" North 76052'41" West 3. INVESTIGATION TYPE: CAMA , State Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —18 April 2018 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — 5 April 2018 Office - Washington 6. SffE DESCRIPTION: (A) Local Land Use Plan - Land Classification From LUP —Conservation (water) (B) AEC(s) Involved: EW, CS (C) Water Dependent: YES (D) Intended Use: Private (E) Wastewater Treatment: Existing — on -site septic system Planned — n/a (F) Type of Structures: Existing - Bulkhead, single-family dwelling Planned - Replace bulkhead, construct pier, platform, boathouse (G) Estimated Annual Rate of Erosion: +/- 1.0' Source — applicant, google earth HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands ±900 ft2 f1,382 ft2 shaded (B) Non -Vegetated Wetlands (bulkhead River bottom backfill (C) Other Highground (D) Total Area Disturbed: t0.05 acres (+2,282 sq. ft.) (E) Primary Nursery Area: No (F) Water Classification: SB-NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to construct pier, platform, personal watercraft lift, boathouse and replace bulkhead. RECENEO MAY OS2018 DCM-MHD CITY l � . ... _ __ .._ .. ..- __ ;1 � � - -' � .� _. . � .. i �; r,r.' �i i�,� � ,.... .. 1... �1 '� .._ ... � ' y' �1.�, 11 � J':� .�l.. � 1.�; .i. li r � ir. � � J- 'rl � �, �,' y�� `.A .�� � '> r Michael and Vickie Pollard Beaufort County Project setting The project site is located off SR 1358 at 597 Duck Creek Rd. on the northern side of the Pamlico River near Bath in Beaufort County, North Carolina. Mr. & Mrs. Michael Pollard recently purchased this property. The project site totals 0.34-acres with an elevation of approximately 5' above Normal Water Level (NWL). The lot has approximately 100 linear feet of shoreline. Historically, there has been a bulkhead on the property. Approximately 55' of the bulkhead remains on the western portion of the lot while the remaining 46' has been destroyed by numerous storms. The alignment of the bulkhead is evident but only remnants remain along the eastern half of the lot and the structure has virtually been destroyed by natural elements and is no longer serving as shoreline stabilization. Since the time the bulkhead was damaged the shoreline has experienced severe erosion. The average erosion escarpment is t9' landward of the previous bulkhead. Man-made features on the lot consist of a house, septic system and remnants ofthe bulkhead. The lot is mostly vegetated with lawn grasses, ornamental shrubs, loblolly pines and various hardwoods. The existing septic system will be replaced 50' landward of the current Normal Water Level (MWL). Both adjacent properties on the downstream (east) side and upstream (west) side are previously developed lots with bulkheaded shorelines. The upstream property has a 200' long pier with a T-head platform. The Pamlico River is classified as SB NSW by the Environmental Management Commission at the project site. The Pamlico River is Coastal Waters and is not open to shell fishing. No Submerged Aquatic Vegetation was observed during the on -site visit The property is subject to the Tar -Pamlico River Basin Buffer Rules enforced by the N.C. Division of Water Resources. Project description The applicant proposes to replace the damaged 100' bulkhead landward of the previously existing bulkhead. This new alignment will be along the same alignment as the upstream and downstream bulkheads. The proposed bulkhead will tie into the adjacent bulkhead comers on both adjacent lots. This alignment will place the bulkhead on average t9' water ward and a maximum distance of±20' waterward of the normal water level. The applicant also proposes to construct a 150' long X 5' wide pier with a 12' x 12' L-head platform. Additionally, the applicant proposes to construct a 14' x 28' (dripline) boathouse. A 8' x 12' uncovered Personal watercraft lift (PWC) will be located adjacent to the pier. The final number of defined slips for this pier will be two. The proposed pier will terminate in approximately 4.0' deep water, will not interfere with any traditional navigation channels and doesn't exceed one quarter width of the Pamlico River. The pier will be not be located within the 15' setback of the riparian line. Anticipated impacts The construction of the bulkhead and installation of backfill as proposed will result in the filling of approximately 900 ft' of River bottom. The project will result in localized turbidity as a result of the construction of the bulkhead and installation of the pier pilings. The construction of the pier, platform, PWC lift and boathouse will result in the construction of 536 ft' of platform and total shading impacts of 1,382 ft'. Kelly Spivey —18 April 2018 RECEIVED MAY 0 8 Zola DCM-MHD CITY .... I � I 1 :f. I I SUl-. - I: I' . ,�. .. � .I � � 1 i' �. ' �i:L ... ' _. .r .f �l'ir ..r _ I .. .. ' ' n � . l a • � • ... � I •[ • . .. � r.. 4� • ��• ( � . .� � f � .. .. .. � a. 1 ..... 1. ..a • I J. � i �. ...: �y ' 7 Coastal Management ENVIRONMENTAL QUALITY June 14, 2018 Michael &Vickie Pollard 3386 Polly Jones Court Rocky Mount, NC 27804 Dear Sir & Madam: ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director TO a K The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. cere�ly, /,'u.� ouglie; V. Hu get O� Major Permits Manager N.C. Division of Coastal Management Enclosure State of North Carolina I Environmental Qualtty I Coastal Management Morehead City office 1 400 Commerce Avenue I Morehead ay, NC 28557 252 808 2808 DO MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Na NA Applicant 1: First Name MI Last Name Michael W Pollard Applicant 2: First Name MI Last Name Vickie B Pollard If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State 3386 Polly Jones Court Rocky Mount NC ZIP Country Phone No. FAX No. 27804 USA 252.883-6115 ext. Street Address (d different from above) City State ZIP Email bejoni@aol.com and timbermikepollard@aol.com 2. Agent/Contliactor information Business Name Na AgenU Contractor 1: First Name MI Last Name NA NA Agent/ Contractor 2: First Name MI Last Name NA NA Mailing Address PO Box City State NA ZIP Phone No. 1 Phone No. 2 NA- ext. NA- ext. FAX No. Contractor # NA Street Address (N different from above) City State ZIP NA Email RECEIVEDA Vests, a tipp% APR 0 5 2018 <Form continues on k4 -. UnND DCM-WAR® 252.808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Mayor Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort 597 Duck Creek Road SR 1368 Subdivision Name City State Zlp NA Washington NC 27889- Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 937 - 2051 ext. NA, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar -Pam River Basin Pamlico River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade ❑Unknown Pamlico River e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. NA 4. Site Description a. Total length of shoreline on the tract (8.) b. Size of entire tract (sq.ft.) 100 feet .34 acre /it W O c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NA, I NWL (normal waterlevel) (If many lot sizes, please attach additional page with a list) 5 feet ❑NHW or ®NWL e. Vegetation on tract pine, sweet gum, holly, bay bushes, grass I. Man-made features and uses now on tract house, septic tank, well, partial bulkhead, residential lot g. Identify and describe the existing land uses adjacent to the proposed project site. vacant residental lots h. How does local government zone the tract! i. Is the proposed project consistent with the applicable zoning? NA (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ONo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No DNA National Register listed or eligible property? <Fonn continues on next e> RECEIVED APR 0 5 2018 252-808-2808 :: 1.888-4RCOAST :: www.r0bd'astal ma na gement. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (1ii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. There is a septic system on site. A repair permit has been issued. o. Describe existing drinking water supply source. There is a well on site. p. Describe existing storm water management or treatment systems. Surface runoff 5. ActivNies and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This will be a private vacation cottage (not for rent) utilizing access to the Pamlico River for water activdes which indude swimming and boating. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Ordinary fill and bulkhead equipment. Some may be stored, temporarily, at the road side of the site. d. List all development activities you propose. Back fill, bulkhead, pier e. Are the proposed activities maintenance of an existing project, new work, or both? both I. What is the approximate total disturbed land area resulting from the proposed project? 3,000 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No ®NA that the public has established use of? It. Describe location and Type of existing and proposed discharges to waters of the state. NA 1. Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No ®NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ®NA J. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. vf-V vkr.v <Form continues on back> MPS 252-808-2808 :: 1.888.4RCOAST :: www I) ti APR 05 2018 stalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (p are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Mrs. Vicki 0. Dotson Phone No. 252-923-4040 Address 620 Duck Creek Rd., Washington, NC 27889 Name Robert Lewis Jones Phone No. 252-975.5846 Address 620 Duck Creek Rd., Washington NC 27889 (mailing address 115 South Reed Dr., Washington, NC 2889) Name Charles H. Bateman, Jr. and Sallie Bateman Gough Phone No. Charles - 252-946-3951 Address 587 Duck Creek Rd., Washington, NC 27889 (mailing address 200 Forest Heights Rd., Washington, NC 27889) g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Septic Repair Permit issues 11-13-2017 file number 246181-1 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, it necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. I I3A 1-10), If necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. CertlBcatlon and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date February 22, 2018 Print Name Michael P/ollDardVickie Pollard Signature /f�/JW+•'�(�/k/�V — V ``v Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development REC�`- RECEIVED ®DCM MP-4 Structures Information MpV p%10 APR 05 2018 -.%An 0 - - 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length NA NA NA NA NA NA NA Width NA NA NA NA NA NA NA Avg. Existing NA NA NA NA NA NA NA Depth Final Project NA NA NA NA NA NA NA Depth a. Amount of material to be excavated from below NHW or NWL in cubic yards. NA C. (i) Does the area to be excavated include coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None III) Describe the purpose of the excavation in these areas: NA ®This section not applicable b. Type of material to be excavated. NA d. High -ground excavation in cubic yards. NA 12. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. area. area. c. (1) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ONo ❑NA (it) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh I. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? RSCE1vEC 0 t a 2016 DCM.MNp C�S� RECEIVED APR 0 5 2018 DCM-WARD 252-808.2808 :: 1.888-4RCOAST :: www.neeoastalmanagement.net revised: 12r 26%06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Lenath: 100 feet ®Bulkhead ❑Riprap ❑Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL: +1- 9.0 feet e. Type of stabilization material: wood and vinyl bulkhead g. Number �76ac of square feet of fill to be placed below water level. Bulkheatl kfill m .ft. Riprap Breakwater/Sill Other i. Source of fill material. contractor - St. Claire Trucking sand pit Width: 2 feet d. Maximum distance waterward of NHW or NWL: 20 feet f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes []No ❑NA III) If yes, state amount of erosion and source of erosion amount information. +I- 1 foot, Google Earth aerial photography h. Type of fill material. sand 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes El No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or III) Amount of material to be placed in the water other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (III) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? bulkhead dump truck, backhoe c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No ❑NA III) If yes, explain what type and how they will be implemented. (it) If yes, explain steps that will be taken to avoid or minimize environmental impacts. February 22, 2018 Michael Pollard Vickie Pollard Dale Applicant Name NA M ylA Jt �(1 ROOM Project Name Applicant Signature ED RECEIVED aECV�\J � a TO APR 05 22018 MAy 252-808-2808:: 1.888-4RCOAST:: www.nccoastaimanaeementnet C DCMeV mf4o�06 DGM300 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community []This section not applicable b. (i) Will the facility be open to the general public? [:]Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes ®No III) Number 1 If yes: (III) Length 150 feet (ii) Number IN) Width 5 feet (III) Length (v) Floating ❑Yes ®No (iv) Width (v) Floating ❑Yes []Noe. (i) Are Platforms included? ®Yes ❑No f. (i) Are Boatlifts included? ®Yes []No If yes: If yes: (ii) Number 1 (ii) Number 1 (iii) Length 12 feet (iii) Length 12 feet (iv) Width 12 feet (iv) Width 8feet (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 El Dockage, fuel, and marine supplies [I Dockage ("wet slips") only, number of slips: El Dry storage; number of boats: El Boat ramp(s); number of boat ramps: E Other, please describe: 1 Boathouse i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required [:]Other; please describe: k. Typical boat length: 24 m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? NA j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). runabout I. (1) Will the facility be open to the general public? E]Yes ON REC�`v�O IVED MPS ��'p% APR 0 5 2018 252-808-2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (1) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of"Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the manna policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently\py�d? RECEIVED m. Is the marina/docking facility proposed within a primary or secondary nursery are4p( a 1�C`.� APR p 5 Z018 ❑Yes ❑No VGMMH DCM-WARD 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimangggment.net revised: 12127/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ONo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL iqNone p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes 5dNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered ms) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ®Private/Community (ii) Number 1 (iii) Length 28 feet (iv) Width 14 feet Note: Roofed areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheetplle, etc. If a rock groin, use MP-2, Excavation and till.) ®This section not applicable a. (i) Number (it) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc ofthe swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) ;tSCEIvSD MPy o�10 .Lin C111 RECEIVED APR 0 5 2018 DCM-WARO 252-808-2808 :: 1.888.4RCOAST :: www.nccoastalonanauement.net revised: 12127/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines East +/_ 40 feet; West +/_ 33 feet Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 2.3 miles e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No ®NA (11) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. East -+/_ 150 feet; West +/_ 65 feet d. Water depth at waterward end of structure at NLW or NWL 4 feet NWL 8. OTHER ❑This section not applicable a. Give complete description: This request is for a pier, PWC lift, and boathouse for private residence. February 22, 2018 Date NA Project Name Michael Pollard Vickie Pollard AuMe r�� Applicant Signat6re RECEIVED APR 0 5 2018 DCM-WARD 252-808-2808 :: 11.888.411COAST :: wwwmccoastalmanaggement.net revised: 12I27i06 /0 /5 Sa:O o�ll prfclll pr�vecJaG /3enc l �iouSC = 3 3a 8" p 1 I 11 C. (J° Pon �e�� MorkN#j Sept%ems \ 10Hd \ ► �'\ y3` i proper�j/ PraPc''`y Of"t � � Chc,,,�is f1. %Safr�a�t .3 � Vick,' D�4.r.h ? x 41Ve SQIIy 8 6-o41h VED _1 IZN% APR 0 5 2018 IN EXrsf;�s Mpy O a pCPI►- � Vie kDCM�WA�RO M lie par'► �,la _/" 59? Oat 1afe�s�„r5 tor+ Yee. o�S Jun fy 29, ,20/9 S! oack N Creel( Jrivee4d4g / R,P2 / n m o m D N < o v a or"7 s Puy//?4 R,ve- Bo*beal Days -see . -on 11arfor S97 A k 4-e4 R4 Wa.S In5to^!W4 jP �� i lark N < ;�✓45 r n5 D11 , m 0 � 9 1)Co R Ver a�aI gort,s� _ — Li Proposes )3uJk�eaJ 0 o V N aC �CC W C G W Q � 6 V 0 1N0.fCr D«Plb Z// Petr Cross SBction /vI, k� a V,elsr'e pollar40 ns97 q,, h Crte v AS m D f rn Ji o v _ woe'Loe FulwuPl ry lr-ly "s, #,y,, 5 m t��'n -sasod°ad m m 0 m m v ,b -ImNeP V","7a'tVM -;"7unfs,a wnwIX1W IMJv J° _f'nt'1��t�� � nfs, p'-s.Gardn d -- UUVI dY7 Michael and Vickie Pollard 3386 Polly Jones Court Rocky Mount, NC 27804 Project narrative for: 597 Duck Creek Road Washington, NC 27889 We have purchased the property located at 597 Duck Creek Road, Washington, NC, which sits on the north side of the Pamlico River, for private use. It has a house on the property which is in disrepair. If the house can be repaired, we will proceed with that project. The bulkhead on the lot failed, and the shoreline is eroded. There is +/- 50 feet of existing bulkhead that will be removed. This erosion has compromised the bulkheads of the adjacent property to the east and west of our lot. We propose to rebuild the bulkhead landward of the existing bulkhead and tying directly into the bulkheads of the adjacent properties which will allow us to backfill. This will stabilize those bulkheads and stop the erosion. The bulkhead will be 4` 8" from the river bottom to match up with the height of the adjacent bulkheads. The NWL at the bulkheads is 2 feet. We will also be building a 150 foot pier which will have boathouse with a lift and a PWC lift. The pier will be less than the average length of the 2 adjacent piers. The NWL at the end of the pier is 4 feet. Michael and Vickie Pollard V�S 'SNS1D 10 0 g 2018 'DC**Ao CAN RECEIVED APR 05 2018 DCM-WARO Mike & Vickie Pollard, 597 Duck Creek Rd. Goose Creek State Park Cemp Leach ,_ o HawWns rr m Landing ® o P a m ! r, w NC 0 mi 1 2 Copyright O19e62004 Microsoft Corp. and/or its suppliers. All nghtsmsened. hftp:/A~ microsoe.corn/straeW O Copyright 2003 by Geographic Dab Technology, Inc. All rights reamed. C 2004 NAVtEO. All rights reserved. This dab includes informabon men with permission from Canadian aubrorieas O Her Majesty the Queen in Wght of Canada. l/ Alto aHNI-Waa BIN 8 0 XVA cu LO 0 f 0 U Z }} rn c o Y U � v o � � rn Q -o 06 � t J 0 ti �10 i RECEIVED APR 0 5 2018 DCM-WARD ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to N11C P_ and - i C k lc' PLl�l71f Li 's F(1 N of ro erty r) property located at 5� (Address, Lot, k, oad tc.) on�amli o Ril In N.C. aterbody) (City/Town and/or Couttty) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT Ond►v)dual proposing development must fill in description below or attach a site drawing) Proposal: Existing bulkhead will be removed, rebuilt, and backfill will be brought in to stabilize 597 Duck Creek Rd., Washington, NC 27889. This backfill will stabilize the property to the east and west of this property. We also propose to build a pier with boathouse and lift which will be attached to the new bulkhead. AIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived Im me. (if you wish to waive the setback, you must Initial the appropriate blank below.) (L1 e? I do wish to waive the 15' setback requirement. r N Lez I do not wish to waive the 15' setback requirement. i. IM 'Valid for one calendar year after signature` (Adjacent Property Owner r A/ 'JI iddress RECEIVED (Revised Aug. 2014) "A"Y 082018 uviA-MIiD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT l 1 hereby certify that I own property adjacent to �j P� Q i C iC t p(ll If]V1G� 's r� N ro Ry nar) a, property located at �(1 - . p (Address, Lot, /1 k, on LfY .� R1 U'�1i� , in E' ll(5 �, N.C. (Waterbody) (CitylTown andlor County) The applicant has described to me, as shown below, the development proposed at the above locatiop. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION ANDiOR DRAWING OF PROPOSED DEVELOPMENT Qndividual proposing development must fill in description below or attach a site drawing) Proposal: Existing bulkhead will be removed, rebuilt, and backfill will be brought in to stabilize 597 Duck Creek Rd., Washington, NC 27889. This backfill will stabilize the property to the east and west of this property. We also propose to build a pier with boathouse and lift which will be attached to the new bulkhead. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must Initial the appropriate blank below.) I do wish to waive the 15' setback requirement. 1 do not wish to waive the 15' setback requirement. (Property Owner Information) ►1 t ! ' P t t� . . � a Fa ITW I _!- a .►L ' .� 'Valid for one calendar year after signature (Adjacent 0 00 O D j N jr w o n `o C W Q 'F.CEIVED (Revlaed Aug. 2014) Y 0 8 Z018 oGm-NiHD CITY I hereby certify that 1 own property adjacent to WellY s `� N of o erty O r) property located at 5� a,7iaq [� (Address, Lot, k, oadyt�c.) on PA 4-ef , in _ �L1% I N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above locations V I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) Proposal: Existing bulkhead will be removed, rebuilt, and backfill will be brought in to stabilize 597 Duck Creek Rd., Washington, NC 27889. This backfill will stabilize the property to the east and west of this property. We also propose to build a pier with boathouse and lift which will be attached to the new bulkhead. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) f I do wish to waive the 15' setback requirement. ti 1 do not'wish to waive the 15' setback requirement. (Property Owner Information) iU�,.If• � t[� .� �� 1 r r •• � •• � [Vl�Cwi i *Valid for one calendar year after signature• 0 C a Q (Revisem4y OWS18 ,)GM-MHD CITY I ." NOT TO SCALE PAMLICO RIVER RECEIVED MAY 0 8 2018 Pmpmrsd with QUIkPIslPrG= by DCM-MHD CITY NC Division of Coastal Management 5 319 A<5)C n Cashier's Official Receipt Date: P> Ci Co Received From: � � � - ' NOGG-A/ZD $ Permit No.: /✓IAj'AtL ! 4, ✓A A D�cP10,b Check No.: 12102, Applicant's Name: A411,1 Ior-e—Z 2DLL�L� County Project Address: 422 214'L L /:a SrM Please retain receipt for your records as proof of payment for permit issued. r1_ Signature of Agent or Applicant: Date: Signature of Field Representative: Date: NoTl(04'$l7vA CALVIA PERMIT APPLIED FOR See - COMMENTS ACCEPTED THROUGH as, t�3 a0111 APPLICANT: Ri hae( 4 Vickie P Ilard --� 339to allu 3ones Court Rocku Mount NC, a-IT04 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: I�l—�— iv�u ��vesenta-1'�Je Ne t��v. tad C�a�t 1 MranoaEmed q43 Wash;natan /VloW VAa<V)ioG+nn N a'lu,;q 02 May 2018 Michael W. Pollard Vickie B. Pollard 3386 Polly Jones Court Rocky Mount NC 27804 Dear Mr. & Mrs. Pollard: ROY COOPER Governor MICHAEL S. REGAN see fwy BRAXTON C. DAVIS Dimaor The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1358 at 597 Duck Creek Rd. on the north side Pamlico River near Bath in Beaufort County, North Carolina It was received on 5 April 2018, and appears to be adequate for processing at this time. The projected deadline for making a decision is 19 June 2018. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Kelly Spivey, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3853 or via email at K 1, . jp 1 nc'l n _ _ ,- if you have any questions. If this agency does not render a permit decision within 70 days from 5 April 2018, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. P R -"'Nothinq Compares`" _ su"oi\arh Craw E."m Mal Qaaliny Cmanf Ua=1M t G` 943Wwhigron S9w:\!all WaihmrA,NC27889 `O 252 M 6481 Michael W. Pollard Vickie B. Pollard 02 May 2018 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. TSM'crely, Kelly Spivey Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator WARO Water Resources ENViRONV:N- Washington Daily News PO Box 1788 Washington, NC 27889 2 May 2018 Attention: Legal Advertising Department ROY COOPER Governor MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Director Please include the enclosed Notice of Filing in the Public Notice section of the 05 May 2018 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3820. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to: Thank you. ATTACHMENT Cc: File Melissa Sebastian NCDEQ COASTAL MANAGEMENT DIVISION 400 COMMERCE AVENUE MOREHEAD NC 28557 252-808-2808 ext 229 Sincerely, 1'^ U Keri Sparks, Administrative Assistant Division of Coastal Management -�"Nodttrtg Gotttpares�r,_ S=0r%'anhcWCh= En%%�aJa QoavH Cm.m\7amEm,mr 943Wuh�=Sq.\1all Riahmjmq NC21889 2529466481 J01 0 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. 113A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the Coastal Area Management Act (CAMA) was received on 5 April 2018. According to the said application submitted by Michael Pollard and Vickie Pollard, applicant proposes to construct a pier, platform, personal watercraft lift, boathouse and replace bulkhead at 597 Duck Creek Rd. off SR 1358 on the northern side of the Pamlico River new Bath in Beaufort County North Carolina. A copy of the entire application may be examined or copied at the office of Jonathan R. Howell, District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC, during normal business hours. Public comments received by 25 May 2017 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request. Kelly Spivey Field Representative Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27989 (252)948-3953 Please publish on: 5 May 2018 I, HOOD RICHARDSON, CERTIFY THAT UNDER MY DIRECTION AND I SUPERVISION THIS MAP WAS DRAWN FROM AN ACTUAL LAND SURVEY I USING DOCUMENTS OF RECORD AS SHOWN ON THIS MAP AND THAT REFERENCE: THE ERROR OF CLOSURE IS 1-10,000 AS CALCULATED BY LATITUDES D.B. 726,P.653 AND DEPARTURES, THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH TITLE 21, CHAPTER 56 SECTION .1600 OF THE NORTH CAROLINA D.B. 1061, P. 928 ADMINISTRATIVE CODE. NO DETERMINATION OTHER THAN,. AS JS SHOWN I ON THIS MAP HAS BEEN MAD ABOUT G.S.47 3Q, . - ,(-11) 'DASHED I I LIN I 0 NOT N A NOT URVEYED. •WITEV85 MY HAND, AND L T IS 9 AY OV 13:' I /A/ ViCOD L. RICHARDSON, P.L.S. L-2522 PI{D NALt�LC-5y = �� 1"0 p 0.5 THIS IS A SURVEY OF AN = =Ir L-2522 ' BURE EXISTING PARCEL OF LAND w I ,',,, MAGNETIC �����amunM �P¢,`,a `� 1 w D.B. 674, P. 726 z Io � BURIE 3 o m Ro I °i Ln N e CO co M %SO �K9 ? O I W J Z o 20°p13°p°op p�9s�� a o J ti Q o Q a _ J W Q Z 1.0 3 D J0.34 ACRE o I C� o OU Z j p Q 30.62• i. N c Q 20.00, S 13'00,00W S 13.00,°0 W o \ N� 11 Cy B` 462' BATFMA LEGEND: 4, \ O NEW 1/2" 0 IRON ROD 2 6 \ \ 0 FOUND IRON ROD IR FOUND IRON AXLE F '� 6`, v, • FOUND IRON PIPE 2� 0 POINT \ \ - _- _ HIGH WATER MARK \ \ 40 0 40 80 120 JPmyo' GRAPHIC SCALE - FEET \ W AS.oOTON \ 264rD BELHAVEN— PROPERTY OF: 264 MICHAEL POLLARD & A NOscM P 92 TO BATH- VICKIE POLLARD 4 LONG ACRE TOWNSHIP BEAUFORT COUNTY - h - Q� NORTH CAROLINA u SR 133q �' SCALE: 1 = 40' SURVEY DATE: NOVEMBER 21, 2017 N A A Gr SURVEYED BY: HOOD RICHARDSON, P.A. ENGINEERS -GEOLOGISTS -PLANNERS 110 WEST 2ND STREET PAMLICO RIVER WASHINGTON, N.C. 27889 PHONE: (252) 975-3472 17-01-199 GAM r 't191-1y FOR ' REGISTRATION REGISTER OF DEEDS Jennifer Leggett it6 gAORTCOUTL1ID REODBau , County, December82017�3:13 PM FORK 4S3 Book 94ge33117 ROT 94$D Land Records OffiD! nsca FEE: STAMP: $90.00 IIII II III I II II (I II IIII III II INSTRUMENT # 2017006435 INSiRANT # 201160M N U ``W' Co O PREPARED BY: MAYO & MAYO ATTORNEYS AT LAW 102 WEST 2ND STREET WASHINGTON. N C 2, B9 2 NORTH CAROLINA cS BEAUFORT COUNTY U THIS DEED, Made and entered into this the ff-- day of Q&i2017, by and between WILLIAM A. KONIGSMARK AND WIFE, DOROTHY D. KONIGSMARK, of PO Box 3073, Telluride, CO 81435, BILLY R. DARROW JR(UNMARRIED) of 1050 Tumlin Street, Atlanta, GA 30318, MARK A. COLLIE AND WIFE, CAROLINE D. COLLIE of 301 Christian Serivice Camp Road, Washington, NC 27889, hereinafter referred to as parties of the first part; to MICHAEL POLLARD AND WIFE, VICKIE POLLARD of hereinafter referred to as parties of the second part; V%L' C' 0� 0 derA oNe valuable V� Q consideration to them in hand paid by said parties of the second part, the receipt of which is hereby acknowledged, have bargained and sold and by these presents, do bargain, sell and convey unto the said parties of the second part, their heirs and assigns, the following parcels or tracts of land in Bath Township, Beaufort County, North Carolina, more particularly described as follows: W I T N E S S E T H: That the said parties of the first part in of the sum of Ten Dollars and other good and IT BEING THAT Parcel or Tract containing 0.34 acre as shown on survey dated November 21, 2017 entitled "Property of Michael Pollard and Vickie Pollard" prepared by Hood Richardson, PA attached hereto for a more complete and detailed description. The above described property IS or IS NOT the grantors primary residence. L� RECEIVED APR 0 5 2018 DCM-WARO v , d aA=- (SEAL) BILLY R. DARROW JR v � ZAZE. 0-F cv ri wC4c yy IL Rct"yy Public a-f = r t^e State a ` certify that BILLY R. DARROR JR personally appeared befor<_ day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. WITNESS my hand and Notarial Seal, this the day of December, 2017. //// Notary Public My Commission exp r -62G21 or''•k DAMES B SUBER Z/ , fl NOTARY PUBLIC, GEORGIA COBBCOUNTY My COm006110MhPifel JBn0ery 76,26M PC Hood Richardson, PA 1C-576> 110 West Second Street Washington, North Carolina 27889 (252)975-3472 January 24, 2018 TO: Michael Pollard 3386 Polly Jones Court Rocky Mount, N. C. 27804 FOR: Elevation Bench Marks for lot on Duck Creek Road fronting on the water, Beaufort County Elevation Nail in power pole (TEMC 20317) 6.3 feet above ground, Pole is at the northwest corner of the lot. 9.0 feet Nail in 18 inch pine tree 4.3 feet above ground. Tree is near the eastern property line in line with rear of the dwelling. 9.0 feet Floor of existing dwelling 7.3 feet The 1988 datum base flood elevation for this lot is 9.0 feet. These benchmarks are set in the 1988 datum. Consult the local building inspector for free board requirements. _Su/Q/.,i. �°.j�=: o > N 111///yyoyyy O t Uj CC U � Q (RECEIVED MAY 0 8 2018 DCM-MHD CITY IMPROVEMENT PERMIT For Office Use Only Page 1 of 2 ,.. Beaufort County Health Department RECEIVED 'CDP File Number 246181 - 1 3- - Environmental Health Section 6632481484 $ 220 North Market St. MAY O S 2018 County ID Number. Evaluated For. REPAIR Washington NC 27889 ppe�rry� MMHD CITY PERMIT VALID UNTIL: 1 1 / 13 / 2022 Phone: 252-946-6048 Fax: 252 9A62074 'NOTE TO INSPECTIONS DIVISION: Building Permits cannot be Issued with only an Improvement Perms. ❑ Fill Sheet OCA? Applicant: Michael Pollard Property Owner: Billy Russ Darrow, Jr. Address: 3386 Polly Jones Ct. Address: 2336 City: Rocky Mount City: Brookhaven State/Zip: NC 27804 State/Zip: GA 30319 Phone #: (252) 937-2051 Phone #: (404) 396-8866 Address597 Duck Creek Road property Location ✓f Site Information Road # Washington NC 27889 Subdivision: Phase: Lot: Township: Directions Structure: SINGLE FAMILY 264 east to Camp Leach Road, turn right on Duck Creek Road, 1st # of Bedrooms: 3 house on left off dirt road # of People: 6 'Water Supply: EXISTING WELL Initial System System Spectficatlons 'Site Classification: NIA Saprolite System? O Yes ® No Minimum Trench Depth: 1 $ Inches Design Flow: 3 6 0 Maximum Trench Depth: 1 $ Inches Soil Group: Fill Depth: Inches Soil Application Rate: Septic Tank: 1 0 0 0 Gallons 'System Classification/Description: TYPE II A. CONV SYSTEM (SINGLE-FAMILY OR 480 GPD OR Pump Required: O Yes ® No O May Be Required 'Proposed System: CONVENTIONAL Pump Tank: Gins Repair System Required: O Yes ® No O No, but has Available Space Repair System 4 Minimum Trench Depth: Its O 'Site Classification: [V Soil Application Rate: _ Maximum Trench Depth: 4ttohesQ At 'System Classification/Description: Fill Depth: Inches V Pump Required: O Yes O No O Maybe Required 'Proposed System: Pump Tank: Gallons No grading or construction activity is allowed in areas designated for system and repair without approval of Health Department. ate. •She Modifications 71 The Issuance of this permit by the Health Department In no way guarantees the Issuance of other permits. The permit holder is responsible for checking with appropriate governing bodies in meeting their requirements. ra 'Permh Conditions Pump, crush and backfill existing tank; Set new 1000gal septic tank, distribution box, all piping 4' and install 3 (3N 40') approved drainlines for repair, maintain setbacks; use soil cloth; An Authorization to Construct will be Issued upon approval of final site plan by BCHD The Department and Local Health Department may Impose conditions on the Issuance and may revoke the permits for failure of the system to satisfy the conditions, the rules, or this article. This permit Is subject to revocation If the site plan, plat, or Intended use changes (NCGS 130A-335 (f)). The person owning or controlling the system shell be responsible for assuring compliance with the laws, rubs, and permit conditions regarding system location, Installation, operation, maln anee onttortng, reporting, and repair (.1938(b)). 'Authorized State Agent: 2018 - Hager, Matthew s Date of Issue: 1 1 / 1 3 / a 0 1 7 xwn Owner/Applicant Signature: • "Site Plan/Drawjn attached." 0 Hand Drawing � Import Drawing I`ViAXOR PERI`VIi 1 T IFEE P\4[ATMX Ap2jeante "icxlAEL _P©LLA4¢Q Selection DevMoponent Type Gee DCM %f % (143001601 4351000931100095 2341) I. Private, non-commercial development that does not „ $250 ? 100% ($250)$0) involve the filling or excavation of any wetlands or open water areas: IL Public or commercial development that does not $400 100% ($400)$0) involve the filling or excavation of any wetlands . or open water areas: Major Modification to a $250 100% ($250) 00/o($0) CAMA Major permit III. r develoFo ro pmentrhat involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below, applies: 111(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3490 (See attached) can be applied: IIIO . Public o r commercial development, if General $400 ; 100% ($400) 00/0($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 ' 60% ($240) Qq,1q.($>lbJ�p 3900 (see attached) could ^��+�C vvtt be applied, but DCM staff determined that additional review and written DWQ MAY 0 8 2018 concurrence is needed because of concerns DCM-MHD CITY related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: h "'This is a word processing form to be completed in Microsoft Word — NC Division of Coastal Management Major Permit Application Computer Sheet (11/012012) Applicant M 1c 04C-L, Do Project Site County �EAu aF T staff:. KE t• l.y 'Sf-,-V E'r District Elizabeth JgWashington []Momhea LJ Wilmington Project Name: pier 1 Rover File: Date of initial application submittal (EX." 1/&2007): N e_i L Z�- r 201-4 Date application received as complete' in the Field office (E)C.• 1)312007): /V 4Z r ` 2A I Permit Authorization: CICAMA ElDredge & Fill 4BOM PNA: ❑Yes No Photos Taken: Yes ❑ Now Setback Required (dpadan): U Yes No Critical Habitat LJ Yes ❑No Not Sum 15 foot waiver obtained: 0 Yes 4No Hazard Notification Returned. []Yes [Vo SAV: Yes o ❑Not Sum Shell Bottom: Yes No ❑ Not Sum Temporary Impacts: Yes o Sandbags: Ye5ANo Not Sum Did the land use dassification come from countyLUP.AYes []No Mitigation Required (optional): ❑Yes ZNo Moratorium Conditions: Yes No ❑NA Environmental Assessment Done: El Yes []No — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) Nuhfent Sensitive Waters (NSW) Swamp Waters (SW) ❑ High Quality Waters (HQM ❑ Outstanding Resource Waters (ORM ❑ (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Ltmonium sp.) (SS) Glasswort (Saltcomta sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina 0 (Sr Salt reed grass (Sparana allemffiora) cynosumides) • (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or thme square (Scirpus 11 MY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Blade needlemsh (Juncus El (SP) SaWmeadow grass (Spartina roemenanus) patens) No fee required - $0.00 111(A) Private w/ D&F up to 1 acre; 3490 Ill(D) Priv. public or Comm w/ D&F to 1 can be applied - $250 acm; 3490 cant be applied - $400 ❑ Minor Modification to a CAMA Major Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer- $100 lll(B) Public or commercial w/D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - IL Public or commerdaYno dredge RECEIVED $100 andiorfill - $400 ❑ 1. Private no dredge and/or fill - $250 ❑ Ill(C) Priv. public or comm w iD&F to 1 acre; 3490 can be applied, DCM needs MAY 0 S 2018 DWQ agreement - $400 DCM-MFID U I Y .4% Applicant. [416t4ALCL Pe>I-LAX ID Date: 443/240/9' Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in yourAcdvides code sheet TYPE REPLACE -;. Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One New Work Replace / �l if NGHrAo Maint ❑ RYON 160 2 r New Work Replace Maint ❑ ❑ Y / S d r New WoAa Replace Maint ❑ ❑ Y N New Work Replace r Maint ❑ ❑ Y Pbly New Work Fkj Replace g Maint ❑ ❑ YA N % New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Lj Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint❑ ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N REGINVID New Work 0 Replace Maint ❑ ❑ Y ❑ N MAY 082018 pCM_MHD CITY revlmd 02115110 Mo Applicant.' M / Ga(�Z PO u-4-2, D Date: ;/, Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or fernimpacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or tamp kn FINAL Feet (Anticipated final disturbance. Excludes any restoration anoVor temp impact amount r Dredge ❑ Fill ❑ Both ❑ Other 09t�1 Dredge ❑• Fill ❑ Both ❑ Others ) � 3 tfZ F?' fZy2` Dredge ❑ Fflf;q Both ❑ Other ❑ �OC7 Dredge 0 Fill 0 Both C1 Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fip ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED MAY 082018 t)CM-MHD CITY