Loading...
HomeMy WebLinkAbout57-18 Renewal 2022 Pollard, Michael & VickiePermit Class RENEWAL Permit Number 57-18 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission erMit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Michael and Vickie Pollard 3386 Polly Jones Court Rocky Mount NC 27804 Authorizing development in Beaufort County at adj. to Pamlico River, at 597 Duck Creek Road, near Bath as requested in the permittee's application dated letter dated 2/16/22. This permit, issued on February 24, 2022 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to tines, imprisonment or civu action; or may cause me penun w uc uuu �u .U.u. . 1) This Renewal shall be attached to Permit No. 57-18, which was issued to the permittee on 6/14/18, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2018-0621. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2018-00924. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. ' This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. r All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the chair of the Coastal Resources Commission. {z Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. lya O i Signature of Permittee DCM Coordinator: Permit #: MAILING DISTRIBUTION SHEET t?nl (cr I 3_ 8( DAD .Ate'n, 64. 4ky, 1r%vrf • 1C 278v� Agents: DCM Field Offices Elizabeth City Washington 0flit (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, yrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Chris Pullinger — 401 Tina Martin - 401 Clif Whitfield (WARD) Jimmy Harrison Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Holley Snider — 401 (Pender, Brunswick, New Hanover) John Perry — 401 (Onslow, Carteret) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Natural Heritage Program LPO: Maria Dunn (WARD) Rodney Butler (NCDOT) Travis Wilson NC Division of Coastal Management CAMA Major Permit Renewal Request District: WaRO Major Permit Staff Gregg Bodnar r Applicant Information Applicant Name: Pollard Michael and Vickie Request Date:2/16/2022 Lost First Project Address: 597 Duck Creek Bath 27808 Street Address City ZIP Code CAMA Permit Permit Expiration Payment No.: 57-18 Date: 12/31/2021 $ 100.00 1277 Agent's Name: District Manager/Field Rep Approve? (Initial YES NO Appropriate Box) Er- ❑ Other Information DWR USACE Action Project No: 2018-0621 ID No.: SAW-2018-00924 If Yes, Has substantial YES Explain Bulkhead and pier are complete boatlift and boathouse have not development occurred? 9" NO❑: been completed due to COVID/ Contractor issues Recommend to Renew? If Not Approved, provide Justification: YES NO E}`— ❑ R^. `ar'rEWE ate: F E B 1 8 2022 PAP SECTION MMD Request for Extension: Michael and Vickie Pollard Permit Number 57-18 1. Statement of intention to complete in a reasonable time We intend to complete the project as soon as possible. We are working to have the entire project completed by2023. 2. Statement of explanation for the need for extension Our project was to be completed in 2 stages. We completed the bulkhead and the pier. Then, we tried for 2 years to get a contractor to return to complete the boatlift/boathouse. We had several tell us they would be there on a day, but they never arrived to do the work. Then, the Covid-19 Pandemic hit, and it was impossible to get a contractor to come to do the work. Our last contractor was to complete the work by August 30, 2021, but he never came and stopped returning our calls. 3. Statement of no changes to original permit. There have been no changes to the original CAMA Major Permit since it was issued. 4. Notice of change of ownership The property has not been sold or deed conveyed to any other person. Michael and Vickie Pollard remain owners of the property. 5. Statement of project compliance The project complies with all conditions of the current permit. Vickie Pollard Date E-G WE F E B 1 8 2022 PAP SECTION WiD )1 RECEIVED F E B 1 8 2022 P SECTION PtghaD PCB•i,l 1 i,-a J , vP r --------r— <� 0 1 �i�t L76a�'y ou..�G J i.."V. A le li1L Po -mil , '.- s V f La . jo, 5 .......... p V FEB 1 8 2022 Permit Class Permit Number NEW 57-18 STATE OF NORTH CAROLING Department of Environmental Quality and Coastal Resources Commission 3P eel f t for 7K Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Michael and Vielde Pollard, 3386 Polly Jones Court Rocky Mount, NC 27804 Authorizing development in Beaufort County at adi. to Pamlico River. at 597 Duck Creek Road, near Bath , as requested in the permittee's application dated 2/22/19, including attached workman drawings (5) all dated "Received DCM-WARO 4/5/18". This permit, issued on June 14, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) The alignment of the authorized bulkhead shall be staked by the pemmittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. 3) The bulkhead shall be constructed prior to any backfilling activities. (See attached sbeets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Bra)C. Davis, Director Division of Coastal Management This permit and its condi�Of a79d V F E B 1 8 2022 Michael and Vicide Pollard Permit No. 57-18 Page 2 of 3 ADDITIONAL CONDITIONS 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The fill material shall be clean and free of any pollutants except in trace quantities. 6) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 7) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. 8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Doeldne Facility 9) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 10) The pemuttee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. 12) This permit authorizes a maximum of 2 formalized boat slips. 13) The boathouse shall not be completely enclosed or have side coverage more than one halfthe height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 14) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 15) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 16) The pernuttee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this require ei tl he ns the permitted activity without having it transferred to a third party. ll'"i ®� p9 , F E B 1 8 2022 NIP SECTION MIAD Michael and Vickie Pollard Permit No. 57-18 Page 3 of 3 ADDITIONAL CONDITIONS General 17) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291(Action ID SAW-2018-00924), issued 6/6/18. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 2018-0621. NOTE: Future development of the pernuttee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is fuither advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVED F E B 1 6 2022