Loading...
HomeMy WebLinkAboutCBE_18-07_ 12Joe Benson Mayor Steve Shuttleworth Council Member LeAnn Pierce Council Member 3/14/2018 12 North Carolina Beach Avenue Carolina Beach, 28428 L'F U-� ZbZZ 1 Tom Bridges "v Mayor Pro Tem Town of Carolina Beach 1121 N. Lake Park Blvd. Carolina Beach, NC 28428 Tel: (910) 458-2999 Fax: (910) 458-2997 Exemption Number—CBE18-07 RE: EXEMPTED PROJECT (MINOR) — MAINTENANCE AND REPAIR (15A NCAC 07K .0103) JoDan Garza Council Member Michael Cramer Town Manager PROJECT LOCATION/ADDRESS — 12 North Carolina Beach Avenue To Whom It May Concern: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 3/14/2018, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with the plans and materials list submitted on 3/14/2018, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the physical value of the existing structure and the following specific conditions. 1. Install pier footings, posts, and beams to support roof system. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. No changes shall be made to the building footprint. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Miles Murphy, LPO Town of Carolina Beach 1121 North Lake Park Blvd. Carolina Beach, NC 28428 Cc: Shaun Simpson RECEIVED MAR 14 2018 DCM WILMINGTON, NC 12 North Carolina Beach Avenue Labor and Materials See Next Page for Materials Breakdown Total Project Cost: $27,807.00 12 Carolina Beach Avenue, North Steel materials: $14,000 Lumber & Fasteners: $1,830 Concrete & Rebar: $750 Dig & Pour Footings: $800 Set Beams/Post/Install additional supports: $6,800 Total Labor & Materials: $24,180 Markup: $3,627 Total Project Price: $27,807 WAM kip-M hr ug z'Xj 11, PROPOSED SHELL FLOOR PLAN PROPOSED SHELL FACILITY FOR CB BOARDWALK BUILDING 12 CAROLINA BEACH AVE NORTH .AROL.INA BEACH. NORTH CAROLINA PROPOSED SHELL FLOOR PLAN PROPOSED SHELL FACILITY FOR- C8 BOARDWALK BUILDING .... ....... . ....... ...... 12 CAROLINA BEACH AVE NORTH ------ CA .-i ROLINA BEACH, NORTH C, f.- - g £ti'a• €�bz.. I its -i'{� ", � a Rddtx i $g3�� g 1014 { �! d g Y afar ; jell% Q Q = Is jT i l )if l IY fi A 7 SB�4 j� ie4 b I da I I -- , I i I rwww , I I- - III. I h I it i �i 7 Ill gil €� 9 � 9 •! R _ ._.._ I Y � xR Ry�eL l6 T pia 3 E' RSq of Z (� CHRIS HOLMES, P.E. 12 Carolina Beach Ave. N. S1 ' ` Carolina Haach, North Caroline 1 v 8 ASSOCIATES, INC. 57250leander Drive (Oleander Oaks) - Suite F4 Wilminglon-N.C.28403 """`•"�• 9tfuclurall'ins PhoRe(910)796.9988 Fax(91(l)798.9989 officegholmespe.com '-^'• B.W.R. "' OJ.09.1B «'^"" M.W..W. :. �'. A STEM C.ULUMN DETAILS 57.0 5c uz, . i F3=- ww�deawari ! v !I i , .ew..m e.....nww sr wwv,. as m.rN ., L_ CEILING FRAMING PLAN • scnLF-iw = rQ' (SHOWING PROPOS®nno EtUMNO FIRST IETSE WALA