HomeMy WebLinkAboutCBE_18-07_ 12Joe Benson
Mayor
Steve Shuttleworth
Council Member
LeAnn Pierce
Council Member
3/14/2018
12 North Carolina Beach Avenue
Carolina Beach, 28428
L'F U-� ZbZZ
1 Tom Bridges
"v Mayor Pro Tem
Town of Carolina Beach
1121 N. Lake Park Blvd.
Carolina Beach, NC 28428
Tel: (910) 458-2999
Fax: (910) 458-2997
Exemption Number—CBE18-07
RE: EXEMPTED PROJECT (MINOR) — MAINTENANCE AND REPAIR
(15A NCAC 07K .0103)
JoDan Garza
Council Member
Michael Cramer
Town Manager
PROJECT LOCATION/ADDRESS — 12 North Carolina Beach Avenue
To Whom It May Concern:
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. After making a site inspection on
3/14/2018, 1 have determined that the activity you propose is exempt from needing a minor development permit as long
as it remains consistent with the plans and materials list submitted on 3/14/2018, and meets the conditions specified
below. If your plans should change and your project will no longer meet these conditions, please contact me before
proceeding.
MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures may be repaired in a similar manner, size
and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of
the physical value of the existing structure and the following specific conditions.
1. Install pier footings, posts, and beams to support roof system.
2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building
Code standards.
3. No changes shall be made to the building footprint.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter.
Sincerely,
Miles Murphy, LPO
Town of Carolina Beach
1121 North Lake Park Blvd.
Carolina Beach, NC 28428
Cc: Shaun Simpson
RECEIVED
MAR 14 2018
DCM WILMINGTON, NC
12 North Carolina Beach Avenue Labor and Materials
See Next Page for Materials Breakdown
Total Project Cost: $27,807.00
12 Carolina Beach Avenue, North
Steel materials: $14,000
Lumber & Fasteners: $1,830
Concrete & Rebar: $750
Dig & Pour Footings: $800
Set Beams/Post/Install additional supports: $6,800
Total Labor & Materials: $24,180
Markup: $3,627
Total Project Price: $27,807
WAM
kip-M
hr
ug
z'Xj 11,
PROPOSED SHELL FLOOR PLAN
PROPOSED SHELL FACILITY FOR
CB BOARDWALK BUILDING
12 CAROLINA BEACH AVE NORTH .AROL.INA BEACH. NORTH CAROLINA
PROPOSED SHELL FLOOR PLAN
PROPOSED SHELL FACILITY FOR-
C8 BOARDWALK BUILDING
.... ....... . ....... ......
12 CAROLINA BEACH AVE NORTH ------
CA .-i
ROLINA BEACH, NORTH C, f.- -
g £ti'a•
€�bz..
I its
-i'{� ", � a
Rddtx i $g3�� g 1014 { �! d
g Y afar ; jell% Q
Q
=
Is
jT
i
l
)if l
IY
fi
A
7 SB�4
j�
ie4
b
I
da
I I --
,
I i I rwww
, I I- -
III.
I h I
it i
�i
7
Ill
gil
€� 9 � 9 •!
R
_ ._.._
I Y �
xR Ry�eL
l6 T pia 3
E' RSq of
Z
(� CHRIS HOLMES, P.E. 12 Carolina Beach Ave. N.
S1 ' ` Carolina Haach, North Caroline
1 v 8 ASSOCIATES, INC.
57250leander Drive (Oleander Oaks) - Suite F4 Wilminglon-N.C.28403 """`•"�• 9tfuclurall'ins
PhoRe(910)796.9988 Fax(91(l)798.9989 officegholmespe.com '-^'• B.W.R. "' OJ.09.1B «'^"" M.W..W. :. �'.
A STEM C.ULUMN DETAILS
57.0 5c uz, .
i
F3=- ww�deawari
! v
!I
i
,
.ew..m e.....nww
sr wwv,. as m.rN .,
L_
CEILING FRAMING PLAN • scnLF-iw = rQ'
(SHOWING PROPOS®nno EtUMNO FIRST IETSE WALA