Loading...
HomeMy WebLinkAboutCBE_18-03_ SurfsideU-14 ZUZ?_ Joe Benson Mayor Steve Shuttleworth Council Member LeAnn Pierce Council Member 3/2/2018 Surfside Motel 234 North Carolina Beach Avenue Carolina Beach, 28428 t "t o Town of Carolina Beach 1121 N. Lake Park Blvd. Carolina Beach, NC 28428 Tel: (910) 458-2999 Fax: (910) 458-2997 3 s o n s +� � , _ , , ` Tom Bridges �f-i'Yw Mayor Pro Tem Exemption Number—CBE18-03 RE: EXEMPTED PROJECT (MINOR) — MAINTENANCE AND REPAIR (15A NCAC 07K .0103) JoDan Garza Council Member Michael Cramer Town Manager PROJECT LOCATION/ADDRESS — 234 North Carolina Beach Avenue To Whom It May Concern: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 3/2/2018, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with the photos and materials list submitted on 3/2/2018, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the physical value of the existing structure and the following specific conditions. 1. Stabilize portions of exterior decking along with general upkeep, repairs, and painting. 2. No changes shall be made to the building footprint. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Miles Murphy, LPO Town of Carolina Beach 1121 North Lake Park Blvd. Carolina Beach, NC 28428 Cc: Shaun Simpson VVILMINGTON, NC MAR 0 2 2018 234 North Carolina Beach Avenue Labor and Materials See next page for materials breakdown Total Projected Cost: $11,500 w.. r � _i .{� ��� =� � � _ � ' � ' ___— t I ��_ � t _ _ t �iilll�lIIIII