HomeMy WebLinkAboutCBE_18-02_ DuneA
Joe Benson
Mayor
Steve Shuttleworth
Council Member
LeArm Pierce
Council Member
1/24/2018
Dune 1 HOA
1225 South Lake Park Blvd
Carolina Beach, NC 28428
LF q.�izvzz
CAR
Town of Carolina Beach
1121 N. Lake Park Blvd.
Carolina Beach, NC 28428
Tel: (910) 458-2999
Fax: (910) 458-2997
Exemption Number — CBE18-02
RE: EXEMPTED PROJECT (MINOR) — MAINTENANCE AND REPAIR
(15A NCAC 07K .0103)
PROJECT LOCATION/ADDRESS — 1225 South Lake Park Blvd
To Whom It May Concern:
Tom Bridges
Mayor Pro Tem
JoDan Garza
Council Member
Michael Cramer
Town Manager
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. After making a site inspection on
1/24/2018, 1 have determined that the activity you propose is exempt from needing a minor development permit as long
as it remains consistent with the drawing, photos, and materials list submitted on 1/24/2018, and meets the conditions
specified below. If your plans should change and your project will no longer meet these conditions, please contact me
before proceeding.
MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures may be repaired in a similar manner, size
and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of
the physical value of the existing structure and the following specific conditions.
1. Remove and replace cotton siding on dividing wall between units on rear deck.
2. No changes shall be made to the building footprint.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter.
Sincerely,
Miles Murphy, LPO
REC> ;vED
DCM WILMINGTON, NC
JAN 3 0 2018
Town of Carolina Beach
1121 North Lake Park Blvd.
Carolina Beach, NC 28428
Cc: Shaun Simpson
1225 South Lake Park Blvd Labor and Materials
Treated Plywood Siding
Treated 2x4s
Stainless steel nails
Latex Primer
Paint
Caulk
Total Projected Cost: $2500
^Tv1�at�til� CALI Cpt
t
�_.
* �.....e
�i��
t ...i� ;;
!`�` i ,�
.,,�
��y.. ..
y
0
e s
r
s�"�� � ��a kr c"ia'E � �= x �itiFs.»:. °1 bt_ L r �°S+�v '�,fi��.+; �k•� e=.
-� c i� ' `l �''��.��*.,°"' � 4S�yy�'�ye t�4s .
. `�"��§ • ,t?� ���` �� 3h �# t.,k^ Y, ,
,gyp