Loading...
HomeMy WebLinkAboutCBE_18-01_ At It'sJoe Benson Mayor Steve Shuttleworth Council Member LeAnn Pierce Council Member 1/11/2018 At It's Best Property Management 115 S. Carolina Beach Ave Carolina Beach, NC 28428 Town of Carolina Beach 1121 N. Lake Park Blvd. Carolina Beach, NC 28428 Tel: (910) 458-2999 Fax: (910) 458-2997 Tom Bridges Mayor Pro Tem JoDan Garza Council Member Michael Cramer y�� w) Town Manager Tom" . Exemption Number — CBE18-01 RE: EXEMPTED PROJECT (MINOR) — MAINTENANCE AND REPAIR (15A NCAC 07K .0103) PROJECT LOCATION/ADDRESS — 115 S. Carolina Beach Ave To Whom It May Concern: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 1/11/2018, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on 1/11/2018, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the physical value of the existing structure and the following specific conditions. 1. Structural repair on exterior post. 2. No changes shall be made to the building footprint. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Miles Murphy, LPO AEG I V E D DOM WILMINGTON, NC JAN 1 6 2018 Town of Carolina Beach 1121 North Lake Park Blvd. Carolina Beach, NC 28428 Cc: Shaun Simpson 1115 S. Carolina Beach Ave Labor and Materials Foundation Concrete Treated Pine Cedar Boards Bevel Cedar Galvanize Aluminum Materials $1652.67 Labor $3,347.33 Total Projected Cost: $5000 11:47 AM Bluewater Structures, Inc. 11/30/17 Job Costs Detail Accrual Basis March through May 2017 Source Name Type Date Num Memo Account Class Amount At It's Best Broadwaik Condos Bame Ace Hardware Check 5/5/2017 8329 12016 5110 Job Related .. Material .. 147.94 Best Distributing Check 4/4/2017 draft foundation co... 5110 Job Related .. Material ... 462.24 Jason Ziegler Check 5/7/2017 8189 Invoice 4122... 5110 Job Related .. Subcontr.. 850.00 John Burns Check 5/11/2017 8316 Installing bac... 5110 Job Related _. Subcontr... 550.00 Lowe's Check 3/1/2017 draft Treated Pine,... 5110 • Job Related ... Material ... 341.83 Professional Builder... Bill 4/14/2017 284883 Cedar boards... 5110 Job Related ... Material ... 325.45 Professional Builder... Bill 4/20/2017 285402 bevel cedar 5110 Job Related ... Material ... 162.99 Professional Builder.. Bill 4/27/2017 286338 Galvanize All... 5110 Job Related ... Material ... 212.22 Satterfield SiteWrx, ... Check 4/2/2017 8268 clean and ha... --5110 Job Related ... Subcontr... 60.00 Total Broadwalk Condos 3,44122.E Total At It's Best TOTAL 3,112411- -� # 1 (52,47 61&.bor- $3,a17:3.3 —(, -I $ �00 ~ 4 Z 0 Page 1