HomeMy WebLinkAbout10-18 Letter of RefinementN,
Coastal Management
ENVINONNENTAL QUALITY
February 23, 2019
Pea Landing, LLC
c/o Mr. Dean Spatholt
9973 Beach Drive
Calabash, NC 28467
Dear Mr. Spatholt:
ROY COOPER
Covenw
MICHAEL S. REGAN
seaerory
BRAXTON C. DAVIS
Director
RECEIVED
FEB 2 7 2018
DCM- MHD CITY
This is with reference to your request to modify State Permit No. 10-18, in order to allow
construction of the docking facility prior to issuance of an Easement from the Department of
Administration's State Property Office. The permit was issued on January 25, 2018 and will
expire on December 31, 2021. The action proposed is to modify Condition No. 25 of the permit,
which requires an Easement from the Department of Administration's State Property Office prior
to the construction of any new boat slips or other docking facilities under the permit.
In reviewing correspondence sent by the State Property Office on February 19, 2018, the
Division of Coastal Management has determined that the proposed action is consistent with
existing State rules and regulations and is in keeping with the original purpose and intent of the
permit. This Letter of Refinement hereby authorizes the modification of Condition No. 25 of
State Permit No. 10-18, subject to the following:
An Easement from the Department of Administration's State Property Office is required
under N.C.G.S. 146-12(e). The required easements shall be obtained, and a copy provided
to the Division of Coastal Management, prior to the occupancy of any new boat slips or
the docking facilities authorized under this permit.
Please note this refinement does not authorize any work not expressly described above, nor does
it eliminate the need to obtain any other additional state, federal or local permits, approvals or
authorizations that may be required. By copy of this letter we are also notifying the U. S. Army
Corps of Engineers of our action. If you have any questions concerning the above or if I can be
of any other assistance, please advise.
Sincerely,
"R v-- fl
ag
Doug Huggett
Major Permits Section Manager
cc: MHC Files/WiRO Files
State of North Carolina I Environmental OSualtty I Coastal Management
Wilmington Office 1 127 Cardfral Drive Extension I Wilmington. North Carolina 28405
9107967215
North Carolina
Department of Administration
State Property Office
February 19, 2018
TO: Doug Huggett
LAMA Major Permits
FROM: Joy Wayman
Real Property Agent
RE: Pea Landing, LLC —Submerged Land Easement
SPO file 30-EJ — CAMA Permit 10-18
Machelle Sanders
secretary
Tim Walton
Director
RECEIVED
FEB 2 7 2018
DCM- MHD CITY
The State Property Office is in the process of preparing and executing a submerged land easement to Pea Landing, LLC as
required by CAMA Permit 10-18 for the 14 slips located in the Calabash River at 9973 Beach Drive, Calabash, NC The
applicant has requested this letter in hope that their construction could begin on the pier prior to receipt of the
Submerged Land Easement from the State, with all work subject to receipt of a submerged land easement. I have
reviewed the file and see no problem with the application, the file has been forwarded to the Attorney General's Office
for review and preparation of the easement. This request was made in the interest of time, as I understand the
situation, the construction barge is on site. Please let me know if I can answer any questions or be of assistance.
Received
FEB 2 2 2018
State of North Carolina I State Property Office Dc - "
116 West Jones Street, Suite 4055 1 1321 Mail Service Ctr I Raleigh, NC 27699
919 807 4650 T