HomeMy WebLinkAboutNH_17-50_ Nickerson (2)New Hanover County r' 17.50
Local Government CAMA Permit Number
MINOR DEVELOPMENT am molliewm&&
PERMIT
Coastal Management
ENVIRONMENTAL OUA07Y
as authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission for development in an area of environmental
concern pursuant to Section 113A-118 of the General Statutes "Coastal Area Management"
Issued to Rand Nickerson, authorizing development in the Estuarine Shoreline (AEC) at 317 Bradley Creek Point Road in
Wilmington, New Hanover County, as requested in the permittee's application, dated December 1, 2017. This permit,
issued on December 13, 2017, is subject to compliance with the application and site drawing (where consistent with the
permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: construction of an elevator, addition, pool and deck and associated landscaping,
(1) All proposed development and associated construction must be done in accordance with the permitted work plat
drawings(s) dated received on December 1, 2017.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal
regulations, applicable local ordinances and FEMA Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require a re-
evaluation and modification of this permit.
(4) A copy of this permit shall be posted or available on site. Contact this office at (910) 789-7116 for a final
inspection at completion of work.
(Additional Permit Conditions on Page 2)
This permit must be on the project site and accessible to the permit officer when
the project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must ease when this permit expires on:
December 31, 2020
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management,
Linda E. Painter
CAMA LOCAL PERMIT OFFICIAL
230 Government Center Drive, Suite 110
Wilmington, NC 28403
PERMITTEE
(Signature required if conditions above apply to permit)
,4.vl iNIL.IV il NC
0 E C 1 4 2017
Name: Rand Nickerson
Minor Permit # 17-50
Date: December 13, 2017
Page 2
(5) The amount of impervious surface shall not exceed 30% of the lot area within 75 feet of Normal High Water
(Estuarine Shoreline Area of Environmental Concern), in this case, 30 sq. ft. of new impervious is authorized.
(6) Unless specifically allowed in 15A NCAC 07H. 0209(d)(10), and shown on the permitted plan drawing, all
development/constnxtion shall be located a distance of 3C feet landward of Normal High Water. No portion of the
roof overhang shall encroach into the 30 ft. buffer.
(7) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must
be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area
has been properly stabilized with a vegetative cover.
(8) Any proposed for grading within the 30' buffer from the Normal High Water must be contoured to prevent additional
stormwater runoff to the adjacent marsh. This area shall be immediately vegetatively stabilized, and must remain in
a vegetated state.
(9) All other disturbed areas shall be vegetatively stabilized (planted and mulched) within 14 days of construction
completion.
SIGNATURE:
PERMITTEE
DATE:
J2,
,f,'RJAINGTON, NC
DEC 14 2017
U
z
LocaliryN e&� Pcrrrn Number L10
(ke:ut H,-uartt — L'stuarm Shoreline_ ORW Shoreline Public Trust Shorelino Other
(Far official ase only)
GENERAL iNFOR"W ti
�ECEiVEi) w 0
> o
0
t z
UTii>EiI Pt X�7SL:i N..nY RIi ANg1:iREIt,Ih:llYllA/t udWB rtianniny, may require pcnnita other th m the C'AIt1A i
Ali= awlopnmu' tsarni:, itwladiag, but Pat; rmitoi It: Ili -Ain# Rater Well, Scpite'rnnk (or other itanhary W ntc
h\ailttaru systm^ 13VIXag, rkellicai, "kimliint, HCatint; and Air C:anilitiotting. Insufetren.mA Energy Converses am VIA
Car-rmisice, Sand Meta, Sef,n_rA t: rw,I, Suh,6vis' �Ift �e Park Approval. Highway Contioution. and j
oth as. C iuC4 wick you: Ler:ti, Isom yfAijOjsr(k' sN 1
SlATRMENTOPOH•'VRSHIP:
LAND OWNER
-��h••-i��AILIyNG ADDRESS ' I f, :;te uu [eteiga..E, ua uppksaat Wr :t C vkt-slmir:er deielopm-am fnmit testing +tither the owner of propcny in an AL'.0or.t
_!��tr i►'x 1L ' `�C K LV. _ _ .-.-_-------_ - - 'ems" r aerthrxix-sl L: act :il an ag.,•u for purTkim of spp ly'ng tw a CAMA mirror detcbpmrm pennh, cornf)• that thz pvtwtn
j�-y� �y �+ 1iss.,J es 1a,iJmrr.r ca ;Fis:IPJAC,stiO Itcc a signifit t ink:rN m the real pivpaty d(•ccribled (burin. This iracieet can be
Addrexx :Q 1 •,V p t/ _ .5�.i 1 ' ` t kzo _u we;.:t6.d:vc iih_.k um)
City VO I LMl 1/t4-(:jT(7bL State I I �._ _ Yip 2 hole T ��� _ i �(��� �� u _,:: c' Wticr :tr r »pa,:fit' .'.":dc is :a�ad in isms n' L` E
Enuiil 14 y`� b\,k_,_.:��ot-i__ _ oQ�t� do t, �� • �� tlC�'.iYlSt�P4(1%� L.vi Fes: sit �rJLI..`_'t Fwke _ bt the County Rcgixhy of rkcv6t.
AUTIiORSI7ZEDt�AGEN7
Ai4lroas � � l'_`.!�_I�j��'j,Q R
Ciry lKm�l3 1Y Stale ._KL __._. Zip jl'huac 1L� _t:�L77.V---
LOCATION OM PROJECT: (AddrNsa, street na.n..,ad/tir direclitms to site: numv of the ad;acau �vi4.chor!y.i
DESCRIPTION OF PROJECT`. (List all propoeed raustrixiior, end land disturbance.) 15lSdf\LSd�SI!'.d f )
NON W n tits„ 1. DQ P oo L- -fl
SiZE OF LOT/PARCEL:� square feet
PROPOSED USE: Residential (Single laniily (�Mult6family (] 1 Cortina illilndustrial Other ❑
COMPLETE EITHER (1) OR (2) BELOW (Caaiaa yvur Local Permit Ojiicirljyaa are nail can wblrlr AEC appilec
to your properly):
(1) OCEAN HAZARD ABCs: TOTAL. FLOOR AREA OF PROPOSED STRUCTURE: oquaw feet (in;!udcs
air conditioned living space, packing devoted ulatw pound level- ion -conditioner) space cltvaicd above g oLimi level oat
excluding non -load -bearing attic spec.)
(2) COASTAL SHORELINE AECs: SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVI(PUS OR BUICi
UPON SllRFAC1iS:8,Isquare feot (includcr the arar of the foundation ornll builditrgs, drsvaways, ca.:.reS do,:ks,
concrete or masonry patios. Mc. that art: within (he applitahlc AEC. Atlacb your calculations with the pn*6cet drawing.)
STATE STORMWATER MANAGEMENT PrKmin Isla; project located in an area.,ubjert tp a 3txn:
Su mnater MansFemeni Permit issued by the NC Division of Energy. Mincm) and Land Remiuu•:iex (DMVILRY!
YES NO t,
Iryea, list the torn) built upon are:Jimperviuus surface allrnved for your lot or parecl. ---- square fccL
_-. c au•Ysr by viaera ,!. 'snitertartce. Applicant is an heir W t!x esuac ut __ _
probwe wua in
- -- Couniv.
sr: h us Sir itrUt sunset or lease, explain beiow .ii use is sopume Ac et A ammich to this applicakun.
ti(S7EF:C.,113(1\ Cr• f.DJA(XNT RIPARIAN PROPERTY OWNERS:
.t 1001, ia0^o that tie: klilon'a ; perst+os out ewnm of pt•r pertki adjoining; this prop". I affirut that I have 1(k ail
ACi L'AL M1Y}TSa E tc sees i.i t:inn concerranS my latent to develip Cass property and snappily fora CAMA permit.
t� (``Nam) t��sy� �.1i��y-►• n�Y,n ✓f ./(Address) l' �•�
())_F-,s2�T5"�Ge_.!'J.i2V.ft .�t�4?f.IJ•C.�i�.__. � i �>�%�i.�.�--��a2�,y� �K._.F.R'*vJ
AC:KN0W u•ET)GXRtX SS:
1, the' u'nlcrsiyaeJ :: k tool dye that fire land owucr is ammo ilia'. Ilse propused developmon( ix planned for an ama which
sn:y e'e L.moplibic to amnion nnd•'or flooding. I iwKnowlodgo that (ire Lard Penuit Officer has explained to me the panicu-
lar hswrd pm(iiem; associated ,viih thin I: t. This exptanaiion was accompanied by recommendations conceining stuhilizn-
! iin and Au.xipnatf.ig r'mlmrqucs.
I funiumtom xr-ity that I am autltari;ad to iwant, and tk) in tut Bcntt, p urnission to Division of Cnasull ManoLemmt stale
Ate Loa:! I'Lmit Officer anus their agents to ente on the of mooned lamts io connection with evaluating information
Tu aed (n )his PCmil :r. ' C f
f /
This the day of�� . 20
Larxlowncl o Pei horised . : t as hi er agent for purpose of filing a CAMA permit application — -
71tir sWisalltra bmAMdesr general bi*"toliwo (this farm). a sire dranYnb ric deseribrd on the bark of this applivedon, !lee
ownerxlilp siarement, the Ovean Hazard ABC NWice u•lislim nixvs40: a cbcck far S/00.00 rain/a payable 14 the iacalNI-, aril
ar;v bl%nnatioa as stay be provided orally br ilic applicant. 71m dctafic gflhv iyip/icar;..0 nr ,Mxrr/Arvt by tkerr snunti•.r am
incorporated w0hout irfmivoce In aav penal/ whma ich t• be ismavl. Deviallwi from the rr detaila WN/ r rdtute a rioluflos ql
ra(I p rrnir, i:.i•)r- ar deivioping 1n an AEC a nkout permit is mWert to cie11, vilalbtal and adminisimlity arli+in.
SITE DRAWING/APPLICATION Camicus'r
Pleas mnke :cure wsur titc dru%ing nwivaius the 64k,yi op iaiurr is,r. squired Ibr a CAMA rn:r a; &i,,3k pntent nerrmt.
The Local Permit (?Rica K it! help wt:, if tc iaea:ed,
PHYSICAL DIMENSIONS
Zr� Label hiphvra): rig! t-ut aajs
WIM loc l seibnel. I;r,"
Lub l uav and all stiuet, cs and an, C,v,•p% cE• e1Hlj r.bWtg -m- pngxn)
l.ahel Adjacent %v1ai: htniy
PHYSICAL CItARA CTERNMCS
•,Z— Draw• and I411 normal high wavx :in_ (or. tAY LPO for assistariccl
_10 _ Daiv Imition of Mt -situ wastewater system
If yrnt will be working in the uncan huanl 14,ai:
Maty and lab.! ditae ri gcs (include tpol olcvaliwn)
1Tv,, ;ad label we n'Ju;w
Identify and lucute 1fsi etas cif sialik, v-a"ifliun (cs atao 1.?O for ataikinnee)
f)ron and label on mxi sotbaa:1 ra: mormet I.PO fir atsistanat)
Draw and label uiNgrt!I;'ricel fea+wix. (optional)
]f vuu willyc wnrkhty in u vwRh,l rir.+it-'.3r , arch
_✓ Show the roof w cdnarg us a rk:ttcal lens "rrtrrS tls attnc:Lrc
oDrun• ace! label ctAEC
_,)C F,rrw and label rh vrxianitl iirntt (co."ct LPO fir aeaiatanec)
_y[ Dmw and label the 30-four c fT.r
DEVELOPMENT PLANS
--4, Din "' and Iabol all ptuposed stnicrucs
_ V thaw and Jabal areas that will he dis!.irbed enr1 x;v.dsea{i:d
Not s to of ps7iuR and depth to he pin.t iu yneunJ
and lobo) a1i seas to be pared i:r rrav�JJ
how all arms to be disturbed
Slow !!Aids aping
NOTE, TO APPLICANT
Have you:
am iplocii all blanks andbr indicated if n,r applicable
notified and listed adjacent property mvncrs.'
• included your site drawing?
• signal and tkttal the application!
�•nck)xcd the $100.00 roc:
ecNnpleted an AEC Harani holier, if aeccisvn ? itdusn he siy�ited by the properly mner)
FOR STAFF USE
Site Norco Posted _ Final Inspection _— Fee ltar ivea! -----
Site inspections
Date of Actium Issued Exempted Detgod .ppcel t,>rAdlhri (20 days rinm pczran annul! _.
APPLICATION FOR
�• y'
C�AMA M�Ii�NOR
Coostathfanagement DEVELOPMENT
ELOy��`�ENr
ENVIRONMENTAL QUALITY PERMIT
to 1974, the NOrtil Chrmllun General Assvnibly bashed the Coastal Amu Nlituagetntat Act
(CAh9A) mud vet the stage for guiding de%tlupmont in fragile and praduOlve Arens that
border fire starc'c sounds and oceanfront. Aiani! Milt requiring special care by those who
build and dLyelup, the General Assurab)y dlrceted the Coastal Resources Cakdarastoii
#('RC) to Implement %*rtr regulations that arinlraiac the burden on the applicant.
'this application for a minor dcrelopment period under CAAI A is pArt of the
Commissions effort on meet Ike spirit znd )meat of the Geaerul Assulobly. It has been
designed to be aralghtfam and And requlre no more tone or effort rbaa neimmsory from
%he Appikont. Plsust go over thit, fuldor With the local Permit Officer (LPO) for the
fucality in which t oa plan to build to he eerlain Ibat yogi understand what information lie
or she nnats before ,yea apply.
L•nder CANIA regulations, the minor pertNt is to be issued within 25 days anev a
vumplrte upplicatioa k In hand. Oheo Iris time is ocrdal it the project is %iinple,'1'he
process generally takes about le days. You can speed the approval process by mating
Certain that your application Is cornpleir and signed, that your drawing meets The
rpeclfications given insido and that your application fee is attached.
Other penolls are sometimes required for development in the coastal area While these
are not CAhIA-related, we urge sou In check with the lAeat Pcruill Officer to determine
which of these you may need. A list Is included an page two of this fobler.
We appreciate your cooperation with the North CaraUnA Coaatat Management Program
And your williagaelit to build In a way that pnrects the resources ofourbeautifui and
Productive ewau.
z Coastal Resources Commission
(7 * ""On 0'40 �sl Mn[s gcm.u[
z A rn
Z \ 1
CD
2C, q
G) o
00
f
Z O -'
f C: -�
nCM Fnnn FI11952-20I S ItcvisW Z
4
RECEIVED
AGENT AUTHORIZATION FOR CAMA PgRMIT APPUCATION
DEC 1 2017
-�f- ( 9-'t�-b
NEW HANOVM0010IMPerty Owner Requesting Pem',Ii:
PLANNING & ZONING
Mailing Address:
Phone Number:
Email Address: i4A
I certify that' have au hofizc-d--
Agent Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits
necessary for the fdltcwr! f proposed development: AM
at my prouuar;y located at
i ttrrrhermor& ceady that ! am authorized to gram. and do in fact grant permission to
Dwision of Coas!,at Managemerrr staff, the i_oaai i'e,rmrt Officer and .heir agents to er►ter
on the aforementioned lands in connection with evaluating information related to this
pertrrit application.
Frwtty ptiplr lr0madon:
Pei. It or Typ r? Name
ThIle
Date
it�rs +�astitcalirrit is valid thrxx,glr �21_.!�_� r EC' I V E C
DCN1 WILMINGTON, NC
DEC 0 4 2017
12KERSTING
ARCHITECTURE
November 20, 2017
Katherine Stafford
401 Bradley Creek Point Rd
Wilmington, NC 28405
To whom It may concern:
Certified Mail
Return Receipt Requested
,DECEIVED
I�EC 1 2017
NEW HANOVER COUNTY
PLANNING & ZONING
This letter is to inform you that Mr. Rand and Mrs. Carrie Nickerson have applied for a CAMA Minor
Permit for new addltlon construction at 317 Bradley Creek Point Road (see attached drawing for full
description). As an adjacent property owner, per CAMA regulations, I have enclosed a copy of the
permit application and project site plan as notification of the proposed project.
If you have no objections to the proposed work, there is no action required. However, if you wish to file
written comments or objections, you may submit them to:
Inspections Department
New Hanover County Administration Annex
Attn: Christine Bouffard, New Hanover County CAMA LPO
230 Market Place Drive, Suite 110
Wilmington, NC 28403
Sincerely,
To1F y R Kee�v�.
Toby R Keeton (agent for the owner)
CERTIFIED MAIL nECEIPT
_n
m
v_ , i,
�.,
C,I Rourn f1ocuipi F` n
p ,
tr
n 11 JvUl 2017
,a tf u0
0
[ .F
ECIVED
DCM WILMINGTON, NC
Located at THE SWITCHYARD 4022 Market Street P.0 Box 1rtC 2403 Wilmington, NC 26405 U 4 2017
www kerst1ngarch itecture.com
910 763. 1348
KERSTING
ARCHITECTURE
November 20, 2017
Stephen Oiab
311 Bradley Creek Point Rd
Wilmington, NC 28403
Certified Mail
Return Receipt Requested
RECEIVD
DEC 1 2017
To whom it may concern: NEW HANOVER COUNTY
PLANNING & ZONING
This letter is to inform you that Mr. Rand and Mrs. Carrie Nickerson have applied for a CAMA Minor
Permit for new addltion construction at 317 Bradley Creek Point Road (see attached drawing for full
description). As an adjacent property owner, per CAMA regulations, I have enclosed a copy of the
permit application and project site plan as notification of the proposed project.
If you have no objections to the proposed work, there is no action required. However, if you wish to file
written comments or objections, you may submit them to:
Inspections Department
New Hanover County Administration Annex
Attn: Christine Bouffard, New Hanover County CAMA LPO
230 Market Place Drive, Suite 110
Wilmington, NC 28403
Sincerely,
Toby R Kph.
Toby R Keeton (agent for the owner)
m
r-
SPUN 11F
V1., a^ii
s'r-max
ir
co
z o
6 SEC` "IVED
DCNi WILMINGTON, NC
Located at THE SWITCHYARD 4022 Market Street DEC 0 4 2017
P.O. Box 12403 Wilmington, NC 28405
www kerstingarchitecture cam
910 L 763 1348
GENERAL NOTES
9f[*( ra ut vti
U.
mpr
n[ (�x_o.1 xu utaaox
nr[� (mµ�rn nrtR�xR� a piFAa.
w�t(Y Pn m a wtvam ./ t[�a . lR
t vaM m a Wm 9 m �d x�¢ou5rc Bxn
eE 5/1" �xxtEp v�nmi nrn�ru w�Ix m
r o� ,rauimrs
LEGEND
- xar w.oae ru..e xrue wu
ce Dort ma'Im �iYnuwZs .vo rutuxES
FLOOD VENT CALCULATIONH
,V[NT [puAR[ INCN AR[A[
(iGNGCE ME/.. 50! 4
) e.ta•
Sxts- xExt� m. N.
xIUUFl ► t SM
�01 GROUND FLOOR PLAN
U
Z
C� z
o
GV
LM
M
FF$
�aF
i, -______�o
is
I
`i r C 0 4 9017
K E R S T I N G NICKERSON RESIDENCE
rreARCHITECTURE PoNi
(31
ri1di010'ittl! YUe1MIM. xC ]Dql I/li (/i FFi s ..ui�tY ij,®K
16.16 IST FLOOR PLAN
1� I
REC-71VED
DCM WILMINGTON, NC
DEC 0 4 2017
D K E R S T I N G NICKERSON RESIDENCE
\ ARCHITECTURE
�.r�Yx �riyw en ■.r wr �i� c ..a oE..x, o« mi f ��jJ:F�. a�g
� YhiMII wrxciw, xc zuw ••• n.30.� (/N���/p(� � � � � N,
QQ i mntaur Nuwcr oeex oax xo.x e
isle IND FLOOR KM
----��—`r.,---
�
[n �ev.rva9 nme M+mvU — —
B�BY_
o; EAST ELEVATION
O_
v
o