March 22, 2019
Town of Oak Island, Refinement State Permit No.1.18
c/o E.B. Pannkuk
Andrew Consulting Engineers, P.C.
3811 Peachtree Avenue, Suite 300
Wilmington, NC 28403
Dear Mr. Pannkuk:
This correspondence is with reference to the request you submitted to modify State Permit No.1-18, which
was originally issued to the Town of Oak Island on January 22, 2018 for the reconstruction of a public fishing
pier. This permit was modified on May 25, 2018 and August 4, 2018 to expand the ramp on the western side
of the pier house. State Permit No. 1-18 is due to expire on December 31, 2021.
The action proposed in your submittal consists of the addition of a 6 ft. landing to the beach access stairs (see
drawing SS101). The expansion would extend the stairs 6 ft. waterward, but according to the applicant will still
be landward of the First Line of Stable and Natural Vegetation (FLSNV) (see drawing SS401). The landing will
connect to the previously permitted stairs waterward of the pier house.
Upon review of the information provided, the Division of Coastal Management has determined that the proposed
action continues to be consistent with existing State rules and regulations and is in keeping with the original
purpose and intent of the permit. I hereby submit this Letter of Refinement authorizing the modification of State
Permit #1-18, as described in your request dated March 12, 2019 and associated drawings dated received on
March 21, 2019. By copy of this letter we are notifying the US Army Corps of Engineers and the Division of Water
Resources of our action. Please note this refinement does not alleviate the need to obtain any other local, state
or federal permits.
Sincerely,
Debra D. Wilson, District Manager
Enclosures
Tm/Dw
cc: Wilmington Files
Chad Coburn, DWR
Donna Coleman, LPO
Liz Hair, USACE
Georgette Scott, DEMLR
RECEIVED
MAR 2 6 2019
1i:M-MHD CITY
North Carolina Department of Environmental Quality Dtvlsion of Coastal Management
Wilmington Office I. 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
MacPherson, Tara
From: Everett Pannkuk <eb@andrewengineers.com>
Sent: Tuesday, March 12, 2019 7:25 PM
To: MacPherson, Tara
Subject: [External] Oak Island Pier
Attachments: 17006 - Oak Island Pier - Stair Extension.pdf
Tara,
A couple of items for Oak Island Pier:
1) TD Eure is working to complete pile installation this month. There is a bit of uncertainty with the weather. Can
we request an extension to pile driving operation in case weather does not cooperate?
2) The Oak Island Building Inspector has requested that TD Eure add a 6' landing to the pier stairs. This would push
the stairs out an additional 6' wateward.
Thank you,
EB
E.B. Pannkuk, P.E., SECB
LEED Accredited Professional
Andrew Consulting Engineers, P.C.
910.202.5555
eb(@andrewenizineers.com
I
«f<6rade
earp
RECEIVED
MAR 2 6 2019
DCM-MHD CITY
RECEIVED
MAR 2 6 2019
C1 PIER FRAMING PLAN
■�■�II■
I
■■III
li
■e
him
�
ii
�
low■r'
!Ia=
- - I MOW.
At TYPICAL PIER FRAMING DETAIL
B4 DECK SPACING DETAIL BB SECTION
MAR 21 2019
gW�
z
igg
FF MING
1011
RECEIVED
nma
MAR 26L
GENERAL SHEET NOTES
DCM-N►HD CITY
f"
.2
Extents of existing vegetation
O1 ZOE RAM ELEVATION _
'
a �
it f 1 Y Y V Y Y Y Y V f�00
Add a 6.1 landing in d
the stairs; moving
the bottom step 6'
waterward.
u
AI
s
RECEIVED
_ 1PI
MAR 2 1 2019
MD
Extents o existing vegetation �,
a"Al SIDE RAMP PLAN
11 M WILMINGTON, NC
LA 46C
Spears, Courtney
From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>
Sent: Thursday, March 21, 2019 3:28 PM
To: Spears, Courtney
Cc: MacPherson, Tara
Subject: RE: [External] Oak Island Pier - Beach Construction Extension
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Yes -sorry. Should have specified that we were ok with the change.
Thanks!
Liz
-----Original Message -----
From: Spears, Courtney [mailto:courtney.spears@ncdenr.gov]
Sent: Thursday, March 21, 2019 2:57 PM
To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>
Cc: MacPherson, Tara <tara.macpherson@ncdenr.gov>
Subject: [Non-DoD Source] FW: [External] Oak Island Pier - Beach Construction Extension
Is USACE ok with the stair landing extension/change as well?
Courtney Spears
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
910 796 7426 office
courtney.spears@ncdenr.gov
127 Cardinal Drive Ext.
RECEIVED
MAR 2 6 2019
DCM-MHD CITY
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: MacPherson, Tara
Sent: Thursday, March 21, 2019 1:36 PM
To: Spears, Courtney <courtney.spears@ncdenr.gov>
Subject: FW: [External] Oak Island Pier - Beach Construction Extension
I just got this email with a new drawing
Tara MacPherson
Field Specialist
NC Division of Coastal Management
Department of Environmental Quality
910 796-7425 office
910 395-3964 fax
tara.macpherson@ncdenr.gov <mailto:tara.macpherson@ncdenr.gov>
127 Cardinal Drive Ext
Wilmington, NC 28405
2
.,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Everett Pannkuk <eb@andrewengineers.com <mailto:eb@andrewengineers.com> >
Sent: Thursday, March 21, 2019 1:25 PM
To: MacPherson, Tara <tara.macpherson@ncdenr.gov <mailto:tara.macpherson@ncdenr.gov>>
Subject: RE: [External] Oak Island Pier - Beach Construction Extension
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov <mailto:report.spam@nc.gov>
Tara,
They would like to be able to load material onto the pier at the top of the ramp - appx 120' waterward of the stairs.
The stair landing will be complete before the moratorium begins.
Thank you,
EB
E.B. Pannkuk, P.E., SECB
LEED Accredited Professional
Andrew Consulting Engineers, P.C.
RECEIVED
MAR 2 6 2019
DCM-MHD CITY
910.202.5555
eb@andrewengineers.com <mailto:eb@andrewengineers.com>
From: MacPherson, Tara <tara.macpherson@ncdenr.gov <mailto:tara.macpherson@ncdenr.gov> >
Sent: Thursday, March 21, 2019 9:12 AM
To: Everett Pannkuk <eb@andrewengineers.com <mailto:eb@andrewengineers.com>>
Subject: RE: [External] Oak Island Pier - Beach Construction Extension
Hi EB, The travel lane is 15' wide, but how long is it or how much overall area would be impacted during April?
As far as the addition of the 6' landing, I think we can do a refinement, but construction would need to be done within
the moratorium or any extensions if granted. Can you refence where the the First Line of Stable Vegetation is on the
stair extension drawings?
Thanks,
Tara
Tara MacPherson
Field Specialist
NC Division of Coastal Management
Department of Environmental Quality
910 796-7425 office
910 395-3964 fax
tara.macpherson@ncdenr.gov<mailto:tara.macpherson@ncdenr.gov>
127 Cardinal Drive Ext
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Everett Pannkuk <eb@andrewengineers.com <mailto:eb@andrewengineers.com> >
Sent: Tuesday, March 19, 2019 5:04 PM
To: MacPherson, Tara <tara.macpherson@ncdenr.gov <mailto:tara.macpherson@ncdenr.gov> >
Subject: [External] Oak Island Pier - Beach Construction Extension
Importance: High
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov <mailto:report.spam@nc.gov>
Tara,
Oak Island would like to find out if they can extend their permit to allow access to the beach after April 1. Access would
be limited to a lift traveling along a marked 15' wide lane. The town's turtle patrol would check the area daily before
any construction activity is allowed.
Thank you,
EB
E.B. Pannkuk, P.E., SECB
RECEIVED
MAR 2 6 2019
DCM-MHD CITY
LEED Accredited Professional
Andrew Consulting Engineers, P.C.
3811 Peachtree Avenue, Suite 300
Wilmington, NC 28403
910.202.5555 / 910.202.5558 fax
Blockedwww.Andrewengineers.com <BlockedhttP://www.andrewengineers.com/>
eb@andrewengineers.com <mailto:eb@andrewengineers.com>