Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EX10-22 Topsail Reef HOA
ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director March 3, 2022 Topsail Reef HOA 2174-2264 New River Inlet Road North Topsail Beach, NC 28445 NORTH CAROLINA Environmental Quality Exemption Number — EX 10-22 RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S. 113.103(5)(B)(5) and [15A NCAC 7K.0103(a)] Renewed Former Exemption 18.21 PROJECT ADDRESS - 2174.2264 New River Inlet Road AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC Dear HOA Resident: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on January 31, 2022, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on June 28, 2021, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [G.S.113.103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development under the conditions and in the circumstances set out in G.S. 11 3A-1 03(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions. 1. The project consists of the repair of The Oceanward Decks, as shown on the attached drawing and materials list. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. No expansions or enlargements of any kind are authorized by this permit. All work must occur in the original footprint. 4. No other work is authorized by this exemption letter. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Curt Weychert NC Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Offlce 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 ACIHiH CN07JN4 aw��a:T-e..+m+uwm 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director March 3, 2022 Topsail Reef HOA 2174-2264 New River Inlet Road North Topsail Beach, NC 28445 NORTH CAROLINA EnvironmentarQuaitty Exemption Number— EX 10-22 RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S.113.103(5)(B)(5) and [15A NCAC 7K.0103(a)] Renewed Former Exemption 18.21 PROJECT ADDRESS - 2174.2264 New River Inlet Road AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC Dear HOA Resident: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on January 31, 2022,1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on June 28, 2021, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [G.S. 11 3.103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development under the conditions and in the circumstances set out in G.S. 11 3A-1 03(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions. 1. The project consists of the repair of The Oceanward Decks, as shown on the attached drawing and materials list. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. No expansions or enlargements of any kind are authorized by this permit. All work must occur in the original footprint. 4. No other work is authorized by this exemption letter. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Curt Weychert NC Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 North Carolina Department of Environmental Quality I Division of Coastal Management J/ Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 rvoran c=nairve /v 252.808.2808 148-20 A REPLACEMENT COST ESTIMATE 19 TOPSAIL REEF 2174-2264 NEW RIVER INLET ROAD NORTH TOPSAIL BEACH, NC 28445 PREPARED FOR: TOPSAIL REEF HOA UNIT 131, BUILDING 4 2224 NEW RIVER INLET DRIVE NORTH TOPSAIL BEACH, NC 28445 R. EARL JONES, MAI, SRA REALTY SERVICES OF EASTERN CAROLINA, INC. 2313 GRACE AVENUE POST OFFICE BOX 15069 NEW BERN, NC 28561-5069 RECEIVED JUN 10 2021 DCM-MHD CITY REALTY SERVICES OF EASTERN CAROLINA, INC. R. Earl Jones, MAI, SRA Appraisers, Consultants and Brokers earl.jones@realtyservicesec.com wwwr alto ervi c com Post Office Box 15069 (28561-5069) 2313 Grace Avenue New Bern, NC 28562 Topsail Reef HOA Unit 131, Building 4 2224 New River Inlet Drive North Topsail Beach, INC 28445 RE: Replacement Cost Estimate Specific Improvements of Topsail Reef Dear Client: (252) 633-6484, Ext. 226 Cell (252) 675-9150 June 8, 2020 In accordance with your request for professional valuation services, I have prepared the attached report for the above -referenced property. This report is for the exclusive use of the addressee. The consultant is not responsible for unauthorized use of this report. This purpose of this report is to estimate the insurable replacement cost of the improvements present on the subject property as of the effective date of value, June 3, 2020. The depth of discussions contained in this report is specific to the needs of the client and the intended use. The consultant is not responsible for unauthorized use of this report. It is noted that the estimated replacement costs presented in this report are not a market value opinion of a specific parcel of real estate nor should the values be construed as the contributing market value of the specific improvement. The costs of the individual improvements are an estimate of replacement cost only. No other value opinion has been provided. This information is provided for insurance purposes only. No borrower or owner of the property should rely on this estimate for loan purposes. Further, the consultant accepts no liability to any borrower or owner. Such parties are advised to consult insurance or construction professionals. This general estimate for the owner is as of the effective date; the consultant cannot predict changing costs of labor and materials or the effect of changed building codes and governmental regulations, or otherwise guarantee the estimate or figures in this form. As you are aware, the subject property consists of specific improvements located on the Topsail Reef Homeowners Association common area. The improvements are used by the residents of Topsail Reef. These improvements vary in size, age, construction materials and location. The attached report bases the replacement cost new on a nationally recognized cost reporting service. The assumptions and limitations of the cost estimates are outlined on page 5 of this report. Queens Grant Recreation Association June 8, 2020 Page 2 I trust the attached report meets the intended use of this assignment. Thank you for your business. CONSULTANT: R. Earl Jonek RECEIVE JUN 10 ivi L)CM-MHD CITY INTRODUCTION: The subject property is identified as the eight three-story residential condominium buildings identified as Topsail Reef located at 2174-2264 New River Inlet Road in North Topsail Beach, North Carolina. The subject property also includes two laundry/restroom buildings and one garage/storage maintenance shop. SCOPE OF WORK: This Consulting Report will show the subject's insurable value. This is not market value of a specific parcel of real estate and as such, this report is not intended to comply with the reporting requirements set forth under the Uniform Standards of Professional Appraisal Practice (USPAP). Cost is an estimate of fact, not an opinion; therefore, an appraisal of the subject has not been performed. The report includes discussions of the reasoning and analyses used in the insurable value estimation process used to develop the consultant's opinion of replacement cost. This consulting assignment concerns itself with the replacement cost new of the improvements only, as of the date of inspection. This involves the following steps: Identification of the subject property; Understanding the intended use of the consulting report; Interior and exterior inspection of the subject improvements including measuring and documentation; Applying the appropriate methodology — in this case a replacement cost new analysis; and • Preparation of a report identifying the subject and showing the valuation methodology. Supporting documentation concerning the data, reasoning, and analyses is retained in the consultant's file. The depth of discussion contained in this report is specific to the needs of the client and for the intended use stated below. CLIENT: CONSULTANT: Topsail Reef HOA R. Earl Jones SUBJECT: Eight 30-unit Condominium Buildings — Topsail Reef Two Laundry/Restroom Buildings (452 SF Each) One Garage/Storage Maintenance Building (732 SF) OWNER OF RECORD: Various individuals of each condo RECEIVED JUN 10 2021 4 OCM-MHD CITY The following considerations were also given in this analysis: The replacement cost presented represents the total cost of building the structures in the same design, square footage, general materials, and location as are currently present. All values were derived from the Marshall and Swift Valuation Service ("MVS"). While the MVS manual is considered a very reliable source, construction costs can vary greatly based on the quality of construction and construction materials used. When possible, the MVS manual is crossed referenced with local sources to aid in the determination of the reliability of the cost figures provided. DEFINITION OF INSURABLE VALUE: The following two definitions of insurable value are considered: Insurable Value is a type of value for insurance purposes. The estimated replacement cost, at current prices as of the effective date of valuation, of a substitute for the building being valued, using modern materials and current standards, design, and layout for insurance coverage purposes guaranteeing that damaged property is replaced with new property (i.e., depreciation is not deducted). Land value is not included in the insurable value and items such as underground piping and below -grade foundations are typically excluded as well. Comment - Traditionally, the value of an asset or assets covered by an insurance policy has been known as the insurable value, even though the amount is more accurately an indication of cost. The maximum reimbursement for direct physical damage or loss of property is limited to the amount shown on the contract. This value is often controlled by state law and varies from state -to -state. The objective of an insurance policy is to return the insured party to the same position occupied prior to the loss. Insurable value may be based on the replacement or reproduction cost of physical items that are subject to loss from hazards. Land value is not included in the insurable value and items such as underground piping and below -grade foundations are typically excluded as well. When asked to provide insurable value, a consultant must identify and report the definition used and ensure that the analysis and conclusions are consistent with that definition. Consultants provide this value to clients needing to know the replacement cost of the combustible portions of the subject property. Essentially, this is everything above -grade level that might be destroyed in a "total loss" event. Typically, real property consultants provide the replacement cost new of the building, but not site improvements and make an adjustment for those portions of the subject that might not have to be replaced such as utility connections/laterals. Depending on the age of the improvements and the type of foundation/flooring, this may or may not include the slab and footings. Consideration has not been made for demolition in the event of a total loss nor has any consideration been given to a provision for increased cost of compliance. Both items were discussed with the client and it is understood that these considerations are factored into the insurance policy. Also included are entitlement and re -design costs, particularly in the event that substantial time has passed since the subject was built. The consultant also considers other soft costs associated with the building process. CLIENT AND "INTENDED USER": The "Intended User" of this report is the client, Topsail Reef Homeowners Association. The client's insurance agency is also considered an intended user and this report may also be relied upon by their insurance agent to determine the proper amount of insurance coverage for the subject property. No other intended user or intended use has been identified as of the effective date of value. EFFECTIVE DATE: June 3 ,2020, which is also the date of inspection. IDENTIFICATION OF THE PROPERTY: The subject property is identified as eight 30- unit residential condominium buildings (22,080 SF per building), two laundry/restroom buildings (452 SF each) and one frame garage/maintenance shop building (732 SF). Reference is here made to a copy of the tax aerial sketch, site plan sketch, flor plan sketch, and building sketch included on the following five pages. -I�i1: L pp 9q :')CM-rjr HD CITY +E'CEIVED JUN 10 2021 [ACM-MHD CITY RECcIVEL) SUN 10 2021 DCM-MHD CITY II sY r1. 4 �ypi4 V MM� 0 RECEIVED JUN 10 2021 DCM-MHD CITY 88df40m,2 14 c,1r BOdfOOm-1 WX14' iN] Living Room I, 1111 ealcofly c1 It R ECEIVEC) !UN 10 2021 !uA M#kxl 4i\ ,t�Py T 'MM uaurNu6a.�W;M+ra9�n WfTiaE �=}arerf SA¢•«�.usxsa u +b�'. t�+:x�.ex�+wwr,:a FH ••ru wamM g.v. iiWt di4, D.aY�.j.&4 amp !"iD+rzaas t�s bN �M+ 11 RECEIVED JJN 10 20 DCM,MHC- CITY Topsail Reef Condominium Buildings: The Topsail Reef Condominiums consist of eight, three-story frame condominium buildings containing 30 units each. Each building is composed of 24 one -bedroom units containing approximately 616 square feet and 8 two -bedroom condominium units containing 912 square feet, for a gross living area of 22,080 square feet. Each building also has common areas including decks and stairwells. The basic physical construction of the condominium buildings is summarized as follows: Identification Topsail Reef Condominiums 2174-2264 New River Inlet Road North Topsail Beach, NC Foundation Driven pilings Floor Wood floor joists Frame Wood stud frame Exterior Wall Finish Vinyl shingles Entry Doors Flush wood doors; glass/vinyl storm doors Sliding glass vinyl clad doors Windows Double hung, vinyl clad wood Roof (style, construction, cover) Flat roof; wood rafters/truss; rubber membrane roof Floor Cover Vinyl; some carpet Interior Wall Finish Drywall; sprayed ceiling Interior Doors Wood panel — core doors Plumbing 1 BR Units — 1 Bath 2 BR Units — 2 Baths HVAC Central HVAC Electrical/Lighting Thru-wall air conditioning unit; electric baseboard strip heat Appliances ROH; Refrigerator 12 I)C=ref v; . The laundry room/restroom buildings are located between Buildings 2 and 3 and Buildings 6 and 7. Each building contains 452 square feet composed of approximately 252 square feet containing two 3-fixture restrooms and 200 square feet designed, constructed and utilized for washers and dryers. The garage/storage maintenance shop measures 24' x 305, containing 732 square feet. The basic physical construction of this improvement consists of a reinforced concrete slab floor, wood stud frame walls covered with wood siding, and composition shingles on the roof. ESTIMATE OF THE REPLACEMENT COST -IN -PLACE OF THE IMPROVEMENTS: The insurable value or replacement cost estimate is essentially everything above grade level that might be destroyed in a "total loss" event. Typically, consultants provide the replacement cost new of the building but not the site improvements, and make an adjustment for those portions of the subject that might not have to be replaced such as utility connections/laterals. Depending on the age of the improvements and the type of foundation/flooring, this may or may not include the columns, slab and footings. Consideration is also made for demolition in the event of a total loss. Also included are entitlement and re -design costs, particularly in the event that substantial time has passed since the subject was built. The consultant also considers other soft costs associated with the building process. This valuation method derives a value by estimating the current cost to construct a replacement cost for the existing structure as if it were brand new.' Consideration for depreciation (Physical, Functional, and External) is not warranted in this analysis. I have researched the Marshall & Swift Valuation Service Cost manual. DIRECT AND INDIRECT COSTS: Direct costs include material and labor costs, contractor's overhead and profit for the general contractor and sub -contractors. In addition, indirect costs include architectural fees and entitlement costs up to the point of obtaining a new building permit. DIRECT COSTS: In order to gain a proper understanding and knowledge of the cost new of the improvements, the Marshall Valuation Service (' MVS") published by Marshall and Swift, Inc. of Los Angeles, California, has been used. Generally, this information substantiates the information obtained from the contractors and builders, which is retained in our database. I Reproduction is an exact replica of the subject, while a replacement is a building of similar utility, but not necessarily identical. I have chosen the latter because of the wind codes and because a reproduction cost would require a quantity survey, Ivlsl) beyond the scope or need for this assignment. 13 UN 10 2021 DCM-MHD CITY The base calculator cost applicable to the subject property is taken from the cost manual and adjusted for local and area factors to arrive at the adjusted cost per square foot. Please note that base calculator cost as per the MVS is an average of final costs including architect's fees and contractor's overhead and profit, sales taxes, permit fees and insurance during construction. Interest on interim construction financing is also included, but not financing costs, real estate taxes, or broker's commissions. BASE COSTS — MARSHALL VALUATION SERVICE: The MVS reference and improvement quality is referenced in the individual cost estimates of the improvements. Add -on items such as built in office space, attached carports or additional features are considered on a price -per -square -foot -basis. Lump sum additions are made when necessary. INDIRECT COSTS: Indirect Costs associated with this property include contractor overhead (general and administrative costs), property taxes, legal and insurance costs, local development fees and contingencies, and miscellaneous costs. Research into these costs reflects an average allowance of 5-to-15% of the total direct costs. Given the lack of data from the market to extract this figure, I have estimated this based on my experience in the surrounding eastern North Carolina markets. For this project, I have estimated that this line item should be 15% of direct costs. This variance is based on the scope of the replacement of the improvement. (Larger jobs tend to benefit from economies of scale, whereas the opposite is true for smaller jobs.) ENTREPRENEURIAL PROFIT: Entrepreneurial profit is not realized in an insurable value estimate. DEPRECIATION: There are three sources of depreciation that may or may not be curable: both curable and incurable physical depreciation, curable and incurable functional depreciation, and external obsolescence. In this case, because the insurable value for the subject is being estimated, no depreciation is charged. RECONCILIATION OF COSTS: The following table summarizes the calculations based on the preceding assumptions for the subject's market value using the Replacement Cost Approach. Topsail Reef Section 12 Page 16 Class D Quality Good Typical Life 50 Actual Age NIA Effective Age N/A REL N/A Topsail Reef 3.0 Story 2174-2264 New River Inlet Road Wood Frame North Topsail Beach, NC Res Multifamily/Condo Units Base Square Foot Cost $76.50 Square Foot Refinements Heating And Cooling 0.00 Elevator Deduction 0.00 Miscellaneous (Pilings) 5.00 Total $81.50 Height And Size Refinements Number Of Stories Multiplier 1.000 Height Per Story Multiplier 1.000 Floor Area/Perimeter Multiplier 1.032 Combined Height and Size Multiplier 1.032 Final Calculations Refined Square Foot Cost $84.11 Current Cost Multiplier 1.03 Local Multiplier 0.92 Final Square Foot Cost $79.70 Area (Sq Ft) GLA 22,080 Area X Final Square Foot Cost $1,759,792 Lump Sums: Decks/Stairs/Common Area $100,000 Appliances $72,000 Replacement Cost New $1,931,792 Add: Indirect/Soft Cost (15%) $289,769 Total Replacement Cost RECEIVED $2.221,561 ROUND TO: $2,222.000 JUN 10 2021 Number of Buildings 8 Total Building Replacement Cost DCM-MHG CITY! $17,776.000 15 Topsail Reef 2174-2264 New River Inlet Road North Topsail Beach, NC Base Square Foot Cost Square Foot Refinements Section 13 12 Page 25 35 Class D D Quality Average Average Typical Life 50 50 Actual Age N/A WA Effective Age N/A N/A REL N/A WA 1.0 Story 1.0 Story Wood Frame Wood Frame Laundry/Restrooms Garage/Storage $82.00 $29,25 Heating And Cooling 0.00 0.00 Elevator Deduction 0.00 0.00 Miscellaneous 0.00 0.00 Total $82.00 $29.25 Height And Size Refinements Number Of Stories Multiplier 1.000 1.000 Height Per Story Multiplier 1.000 1.000 Floor Area/Perimeter Multiplier 1.566 1.150 Combined Height and Size Multiplier 1.566 1.150 Final Calculations Refined Square Foot Cost $128.41 $33.64 Current Cost Multiplier 1.01 1.03 Local Multiplier 0.92 0.92 Final Square Foot Cost $119.32 $31.87 Area (Sq Ft) GLA 452 732 Area X Final Square Foot Cost $53,933 $23,332 Lump Sums: None $0 $0 Replacement Cost New $53,933. $23,332 Add: IndirectlSoft Cost (15%) $8,090 $3,500 Total Replacement Cost $62,023 $26.832 ROUND TO: $62.000 $27,000 Number of Buildings 2 1 Total Building Replacement Cost $124,000 $27,00 �ECEIVED 16 JUN 10 2021 CCM-MHD CITY ASSUMPTIONS AND LIMITING CONDITIONS This Consulting may not include full discussions of the data, reasoning, and analysis that were used in the process to develop the consultant's opinion of value. Supporting documentation concerning the data, reasoning and analyses is retained in the consultant's file. The information contained in this report is specific to the needs of the client and for the intended use stated in this report. The consultant is not responsible for unauthorized use of this report. • No responsibility is assumed for the legal description provided or for matters pertaining to legal or title considerations. Title to the property is assumed to be good and marketable unless otherwise stated. • Responsible ownership and competent property management are assumed. • The information furnished by others is believed to be reliable, but no warranty is given for its accuracy. • All engineering studies are assumed to be correct. The plot plans and illustrative material in this report are included only to help the reader visualize the property. • It is assumed that there are no hidden or unapparent conditions of the property, subsoil, or structures that render it more or less valuable. No responsibility is assumed for such conditions or for obtaining the engineering studies that may be required to discover them. • It is assumed that the property is in full compliance with all applicable federal, state, and local environmental regulations and laws unless the lack of compliance is stated, described, and considered in the report. • It is assumed that the property conforms to all applicable zoning and use regulations and restrictions unless a non -conformity has been identified, described, and considered in the report. • It is assumed that all required licenses, certificates of occupancy, consents, and other legislative or administrative authority from any local, state, or national government or private entity or organization have been or can be obtained or renewed for any use on which the opinion contained in this report is based. RECEIVED JUN 10 2021 17 DCM-MHC- CITY Unless otherwise stated in this report, the existence of hazardous materials, which may or may not be present on the property, was not observed by the consultant. The consultant has no knowledge of the existence of such materials on or in the property. The consultant, however, is not qualified to detect such substances. The presence of substances such as asbestos, urea -formaldehyde foam insulation, and other potentially hazardous materials may affect the replacement cost of the property. The cost estimated is predicated on the assumption that there is no such material on or in the property that would cause a loss in value. No responsibility is assumed for such conditions or for any expertise or engineering knowledge required to discover them. The intended user is urged to retain an expert in this field, if desired. • Possession of this report, or a copy thereof, does not carry with it the right of publication. • The consultant is not required to give further consultation or testimony or to be in attendance in court with reference to the property in question unless arrangements have been previously made. • Neither all nor any part of the contents of this report (especially any conclusions as to value, the identity of the consultant, or the firm with which the consultant is connected) shall be disseminated to the public through advertising, public relations, news, sales, or other media without the prior written consent and approval of the consultant. • Any proposed improvements are assumed to have been completed unless otherwise stipulated so any construction is assumed to conform with building plans reference in the report. When no legal description or survey was furnished, the consultant used the county tax plat to ascertain the physical dimensions and acreage of the property. Should a survey prove this information to be inaccurate, it may be necessary for the value to be adjusted. • Any opinions of value provided in the report apply to the entire property, and any proration or division of the total into fractional interest will invalidate the opinion of value, unless such proration or division of interest has been set forth in the report. RECEIVED JUN 10 2021 18 DCM-MMG CITY ARC2020 The Americans with Disabilities Act (ADA) became effective January 26, 1992. The consultant has not made a specific compliance survey or analysis of the property to determine whether or not it is in conformity with the various detailed requirements of ADA. It is possible that a compliance survey of the property and a detailed analysis of the requirements of the ADA would reveal that the property is not in compliance with one or more of the requirements of the act. If so, this fact could have a negative impact upon the value of the property. R. EarLJok RECEIVE? JUN 10 i;_I 19 ACM-MHD CIP" EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY INTERIOR- UNIT 159, BUILDING 5 (1 BR UNIT) UNIT 159, BUILDING 5 RECEIVED SUN 10 20%1 DCM-MAID CITY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY INTERIOR - UNIT 159, BUILDING 5 INTERIOR - UNIT 160, BUILDING 5 (2 BR UNIT) RECEIVE ,SUN 10 2-1vi EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY UNIT 160, BUILDING 5 RECENE0 UNIT 160, BUILDING 5 i1UN 10 2, 1DCM-MHD CITY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY UNIT 160, BUILDING 5 UNIT 160, BUILDING 5 EXHIBIT A PHOTOGRAPHS oSUBJECT PROPERTY INTERIOR - LA UNDO � EE y zj a k INTERIOR - RE pRO oM RECSVEo Oct MHD CI EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY EXTERIOR - LAUNDRYIRESTROOM GARAGE/STORAGE MAINTENANCE BUILDING RECEIVED 0CM-MHG CIT" EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY BUILDING 1 - 2264 NEW RIVER INLET ROAD 'RE7CE1VED BUILDING 2 - 2250 NEW RIVER INLET ROAD JuN 10 2021 DAM-MHD 0; TV EXHIBIT A PHOTOGRAPHS OF A&Ec PROPERTY . �.©. a y« BUILDING 3 - 2240 NEW RIVER INLET ROAD BUILDING 4-224 NEW RIVER INLET ROAD RECEIVED d§Ia2a OCR MHD CITY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY BUILDING 5 - 2210 NEW RIVER INLET ROAD BUILDING 6 - NEW RIVER INLET ROAD 'EcEIV D i2 DCM-MHI) C,TY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY LAUNDRY/RESTROOM BUILDING BUILDING 7 - 2182 NEW RIVER INLET ROAD RECEIVED DCA4A4HD CITY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY BUILDING 8 - 2174 NEW RIVER INLET ROAD OCEANFRONT VIEW DcliA-MHD C iry EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY OCEANFRONT VIEW - BUILDING 1 OCEANFRONT VIEWcl�, " J!liN 10 ? I?I DDM-MHD CITY EXHIBIT A PHOTOGRAPHS OF SUBJECT PROPERTY OCEANFRONT VIEW - BUILDING 1 RECEIVED JUN 10 DCM-MHD CITY QUALIFICATIONS OF APPRAISER R. Earl Jones, MAI, SRA Realty Services of Eastern Carolina, Inc. 2313 Grace Avenue New Bern, NC 28562 252 633-6484, Ext. 226 earl.jones@realtyservicesec.com Experience EXHIBIT B • Joined Realty Services of Eastern Carolina, Inc. in 1983 • Employed with Jones Appraisal Service in New Bern, NC from 1977-1983 • Primary Areas of Practice: Commercial, Income -Producing, and Development Properties Recent Real Estate Training • USPAP Update Course 2020-2021, Brightpath Education Services, 2020 • Condemnation Appraising: Principles & Applications, Appraisal Institute, 2018 • Online Business Practices and Ethics, Appraisal Institute, 2018 • NC Department of Transportation Appraisal Principles and Procedures, NCDOT, 2017 • The Complexities of Appraising Rural Properties, NCDOT, 2017 • "Can you Support that Adjustment?', 2016 • Fundamentals —Real Property/Personal Property & Intangible Assets, Appraisal Institute, 2012 • 2012 Real Estate Valuation Conference: Retrench/Recovery?, Appraisal Institute, 2012 • Appraisal Review, 2006 • Subdivision Valuation, 2006 • Real Estate Finance, Value and Investment Performance, 2005 • Yellow Book — Uniform Appraisal Standards for Federal Land Acquisition, 2006 • Investment Analysis Course VI, University of North Carolina, 1985 Education • East Carolina University, Greenville, North Carolina, 1977 Bachelor of Science in Business Administration, Concentration in Real Estate Licensure • NC Certified General Real Estate Appraiser, A246 • NC Real Estate Broker Professional Affiliations Appraisal Institute Member, MAI, 1986 Appraisal Institute Residential Member, SRA, 1982 Former President, NC Chapter of the Appraisal Institute, 1999 RECE)VEC JUN 10 ?DZ: ')CM-MHD CITY REC,E ED J'JiN 10 20,21 DCM-MHD CITY rC1 Kyle Contracting, Inc. A personal hands on approach is our specialty! 211 W. Main St. Beulaville, NC 28518 www.kylecontracting.com DATE June 28, 2021 Phone 252-521-1585 email: kylecontracting@gmaikcom Quote # 3223 Job Quote For: Topsail Reef Comments or special instructions: Deck Kenovation Quote valid until: July 3, 2021 Prepared by: Brian Jones Description I AMOUNT Demo and Rebuild Decks, and replace structural support as per engineered plans. 240 Decks I $ 1,912,315.00 TOTAL I $ 1,912,315.00 I Add -On Items I AMOUNT Any questions with this quote, please contact by above information. THANK YOU TOTAL I$ RECEIVED JOIN 28 Mi ]KC1/ Kyle Contracting, Inc. A personal hands on approach is our specialtyl 211 W. Main St. Beulaville, NC 28518 DATE March 25, 2020 Phone252-521-0745 / 521-1585 Fsa252-568-3980 Quote# 199 email: kylecontracting@gmail.com 'Aww.kvlecontractino cam Customer ED Job Quote For: Phone: Topsail Reef Quote valid until: May 9, 2020 Prepared by: Hugh 2196 New River Inlet Rd North Topsail Beach, NC 28460 Comments or special instructions: Price quote includes all materials and labor, clean up and haul away debris. deck removal and replacment according to provided plans. * Building Permits are not included in this quote. TOTAL I S If you have any questions concerning this quote, please contact by above information. THANK YOU FOR YOUR BUSINESSI 1,587,483.00 1,587,483.00 NY rHF ,' COMP INC. ENGINEERING AND DESIGN 708 Abner Phillips Road Warsaw, NC 28398 Phone (910) 293-2770 Fax (910) 293-2766 January 13, 2020 Mr. Clay Thomas Topsail Reef Board of Directors 2224 New River Inlet Road North Topsail Beach, NC 28460 Subject: Engineering Services Review of Ocean Decks Topsail Reef Facilities Mr. Thomas: RECEIVED JUN 07 2021 DCM-MHD CITY On January 9, 20201 met with Topsail Reef staff Will Longest for the purpose of evaluating the ocean side decks. Josh Outlaw from my office was also present to assist with this review. Our scope of work for the day was to review each of the decks to determine which decks could be repaired and which decks could be replaced. The intent was to review each deck individually and make a separate determination on each deck. As we began this process to review every deck it became clear that all decks needed repairing in some manner. Every deck needs new hardware including bolts, nails, screws, hangers, etc. Many of the posts on the decks lack adequate connections to tie them to the adjoining decks. Many of the decks lack adequately sized girders and/or joists. Reference is made to our previous review and report dated July 26, 2018 which included a review of the decks. In this report under Recommendations, we state "Based upon the existing conditions, it would appear the most appropriate action would be to replace these decks completely. They are un-level, railings are unsafe, flashing is in poor condition, framing is non- typical, fasteners are corroded, bolts are corroded, missing or insufficient, and .support posts are not adequately bolted together. " Unfortunately, our conclusions today are the same. We understand that the Board would like to provide repairs to the decks when possible rather than replace the entire deck. In order to accomplish this, all of the deficiencies would need to be corrected. We feel this would be very labor intensive and would require major construction management. On May 13, 2019 we provided a detailed review and design of how these decks should be rebuilt. If the HOA would like to repair the decks, then this design should be your guide. New fasteners for all connections would be required, code compliant joists size and spacing would be required, the girders should be sized as shown on the plans and all pilings/posts should be lined up and provide a continuous line of connection from the ground to the roof. If a posts is replaced it should be in accordance with the plan. If the deck can be repaired, then the existing 6x6 posts may be left in place. Every deck we reviewed needs various repairs. Based on the total amount of work required and WIMn M InORKWy Do mcnsklMkEnglnced,XTonil RWl kEvaluation doc the construction management needed, we believe that in the best interest of public safety, all decks should be replaced. If you have any questions related to this review and recommendations, please do not hesitate to contact me. Our goal as well as yours is to insure the safety of the public as related to these decks. Sincerely, /d. M. Floyd ams, P:6. Engineer 0V1% Mdemecol\dMOg PMyDocuments\2020\F.ngincermg\Topoil RceFDeck Eveluetiondoc �,' .•p4Ur �'� 110 #=e% 12273 '�rgOYD �'��•`�' arias• a,•e: JUN 07 .1'1 (iyo px+p6µ_ mnowrv/..wr sug7wowll N�nO av/wtr�Y /p.'oYy wercbe(o�bl..d auL4ae(owlwwa Y aLR/KO C[LL/:- B64YL MWpJNRL'MvamM �.�n w Y N V}/+*T aid {V 01' Optl /�PldrsW'LPoL aj =vt la rYwNw+ xoLaW an oxxelnxlON9 9N'4o�9I/s+-.L 4VnN Ea3 Ea J' ZJtVp� tl[tlQY a' "P87MMI iaMN.MeN 987E w.n3etZ 133N7IY9d01 aoawee x€� C >e 3 ig gJim y 8 y d E yg 5 e a yppy S g 2^E'.PaS e8 E88 W $ �€Od Sfie��eFa e o m€�Saaaaaanaa�a��o Ngg ii`�, Ne i LL 'g M R 01 � gggggg o \E p_ g C m W be v w yG U O 0 M 0 0 0 0 00 C' ,..: lazes DW-1a.w..wm oe¢ailovl+souz'nelo/u.iw�a ouaAenouetl M�eU 6/i///fRro'ftftt�'--_ B86LL eyovp Vwx'MeaxM wv wwwwreo[ .amo+A m if Zi n .. ,�w wum® �„ ?wfi 3d mie➢t` 'H�9.elpe.•g "iy�➢nm9�ep@`iN xomn axrex/n�x/nx� w. JLmvd oo OMWvaY •u DN `4>wBflKuv147bN ,a 9 . I w 6 �h� s� � I I, N ft Fo 8gg� FV i Jl Dem 2®� N p7 20111 Ashley Ford From: Alicia Dipzinski <alicia.dipzins1ki02@gmaiI.com> Sent: Monday, August 10, 2020 3:02 PM To: Topsail Reef HOA Subject: Re: FW: Alicia, Rebuilding the following stacks only Building Number of Stacks 1 2 3 4 5 6 7 8 For a total of 20 stacks. This would Cost To rebuild all of the Beach Side decks $408,000 This is based upon current pricing of the lumber. Brian Jones Kyle Contracting Inc. 8 2 3 1 4 0 2 0 $1,305,600 IJUN a'7 252-521-1585 1 Dcm-w' - Kyle Contracting, Inc. A personal hands on approach is our specialty! 211 W. Main St. Beulaville, NC 28518 www.kylecontracting.com DATE June 28, 2021 Phone252-521-1585 email: kylecontracting@gmail.com Quote# 3223 Job Quote For: Topsail Reef Comments or special instructions: Quote valid until July 3, 2021 Prepared by: Brian Jones Deck tcenovanon rroJect Description AMOUNT Demo and Rebuild Decks, and replace structural support as per engineered plans. 240 Decks $ 1,912,315.00 I TOTAL I $ 1,912,315.00 I Add -On Items I AMOUNT Any questions with this quote, please contact by above information. TOTAL I $ _ THANK YOU RECEIVED JUN 10 ?n DCM-MHtj CITY Weychert Curtis R From: Susan Meyer <smeyer68@yahoo.com> Sent: Monday, June 28, 2021 8:04 AM To: Weychert, Curtis R Subject: [External] Fw: Decks at Topsail Reef CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Mr. Weychert, 'More information about decks at Topsail Reef from the builder. Thank you, Susan Meyer Sent from Yahoo Mail on Android ---- Forwarded Message ---- From: "Brian Jones" <jonesthebuilder@gmail.com> To: "Susan Meyer" <smeyer68@yahoo.com> Sent: Fri, Jun 25, 2021 at 9:42 AM Subject: Re: Decks at Topsail Reef Good Morning, At current Prices 24 Stacks would run $565,200. If there are more or less just add or subtract $23550 per stack. The Equipment we would like to be able to run on the beach is a Rubber tire Extendable Boom Forklift. I have included a photo of one. We would have other equipment at the sides of the buildings such as Boom lifts and possibly a crain. If you need any more information please don't hesitate to ask. Below is my personal phone number. Sincerely, Brian Jones Kyle Contracting Inc. 252-521-1585 DECEIVED On Thu, Jun 24, 2021 at 3:18 PM Susan Meyer <smever68@vahoo.com> wrote: J 'I � 2021 Hi DCM-MHD CITY