Loading...
HomeMy WebLinkAboutEX06-22 Brown (4525 24th Ave.)ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director January 20, 2022 Alexander Brown 4525 241, Ave. North Topsail Beach, NC 28460 NORTH CAROLINA Environmental Quality Exemption Number— EX06-22 RE; EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S.113.103(5)(B)(5) and [15A NCAC 7K.0103(a)] PROJECT ADDRESS — 4525 24111 Ave., North Topsail Beach, Onslow County AREA OF ENVIRONMENTAL CONCERN — Estuarine Shoreline (ORW) AEC Dear Mr. Brown, I have reviewed the information submitted to this office in your inquiry concerning the necessary fling of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on January 10, 2022,1 have determined that the activity you propose is exempt from needing a minor development permit as long as it meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [G.S.113.103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development under the conditions and in the circumstances set out in G.S. 11 3A-1 03(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions. 1. The project consists of the repair of The front and back decks, as shown on the attached drawing and materials list. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. No expansions or enlargements of any kind are authorized by this permit. All work must occur in the original footprint. 4. No other work is authorized by this exemption letter. 5. The Permittee shall be responsible for obtaining any and all necessary authorizations, approvals, or zoning and building permits from the local government having jurisdiction (Town of North Topsail Beach and/or Onslow County) prior to commencing work. North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City office 1 400 Commerce Avenue I Moorehead Clty, North Carolina 28557 252.808.2808 This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, VA alu Curt Weychert INC Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Cc: Kate Winzler, Town of North Topsail Beach North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 1111122, 4:07 PM Onslow County Property Records Site Parcel ID: 007386 Map #: 809.41 Tax Year: 2021 Luc: Residential Class: Dwelling NBHD: SEAHAVEN SOUND SIDE BROWN ALEXANDER ROBERTSON JR & 4525 24TH AVE Year Main Section Total Card Exterior Wall Style Built Ground Floor Living Area Area 1 11-AluminumNinyl 63-Beach House 1978 896 896 Card 1 Stories 1 Exterior Wall 11-AluminumNinyl Style 63-Beach House Year Built 1978 Remodeled Year 1985 Effective Year 1995 Living Area 896 Bedrooms 3 Full Baths 1 Half Baths 0 Heating Fuel Type 2-Electric Heating System 1-Central Heat /AC Physical Condition A -AVERAGE Basement 1-None Unfinished Area Rec Room Area 0 Finished Basement Area 0 Fireplace Openings Fireplace Stacks PF Fireplace 0 Condo Level Condo Type Cando View Grade C-AVERAGE CDU AV -Average Market Adj Market Reason % Complete % Change Reason Cost & Design Desc Cost & Design % 5% Functional Deprec Functional Reason Economic Deprec Economic Reason % Good 77% RCNLD 104,960 ADJ RCNLD 104,960 Notes Replacement % Cost Complete 104,960 property.onslowcountync.gov/pYDatalets/PrintDatalet.aspx?pin=007386&gsp=RESIDENTIAL&taxyear=2021 &jur=067&ownseq=0&card=1 &roll=REAL... 7/7 1/4122, 6:21 PM Onslow County Property Records Site zun Property Addess 462524TH AVE Unit Case Unit # NBHD 3020- SEAHAVEN SOUND SIDE Class Dwelling Land Use Code 01 - Residential Living Units Mapping Acres .1837. CAMA Acres .1837 Location Fronting Zoning MHR-MHR Map # 80QA1 PIN Number 425615731009 Total Cards 1 Record Type R Legal Description 1.9 S1 B15 OLD SETTLERS BEACH Township 114 -STUMP SOUND City Code 26 -NORTH TOPSAIL BEACH Jurisdiction 1426 - STUMP SOUND NORTH TOPSAIL BEACH Plat Book-Page/Subd # 16.057 Fire District NT-NORTH TOPSAIL'. Owners BROWN ALEXANDER ROBERTSON JR& Owner 2 BROWN ROBERT RALPH & ANDREW BRUCE BROWN Customer ID 409619000 %Ownership 100 Nature of Ownership - Address C/O ANDREW BROWN 639 N OAK DR i HUNTERSVILLE, NC 28078 a Owner 1 ~^.......,�_s-,.- BROWN ALEXANDER ROBERTSON JR & Owner BROWN ROBERT RALPH &ANDREW BRUCE BROWN Mailing Address C/O ANDREW BROWN 639 N OAK OR HUNTERSVILLE NC 28078 Rem Area Man Building 99fi DECK-88:WOOD DECK 280 DECK -88:W00D DECK 224 property.Onslowcountync.gov/pt/Datalets/PrintDatalet.aspx?pin=007386&gsp=PROFILEALL&taxyear-2021 &jur=067&ownseq=D&card=l &roll=REAL&... 1 /1 I r iI I I , I ; 1 I i i I I i I 1 I , I I ' I ; r I Q' I� I I IF !: - - I i I r r I I I r 1 1 I T i I I I I I , ! I I I I 1 � I JOB ESTIMATE 47 CONSILLl lL LC CNTRVCTION SEA LEVEL CONSTRUCTION, LLC Attn: Andy Spoon 105 Shadow Ridge Road Hampstead, NC 28443 To: Andy Brown Property Location: 4525 24th. Ave. Nnrth Tnncail. NC 28460 (828) 443-0515 September 16, 20 Job Description and Estimate Mat/Labor Cost -Front deck replacement (30'x28') with treated handrails $7,708.06 -Tear down and dispose of exsisting 10'x28' deck and 4x4 landing for stairs -Exsisting stairs to be tied back to new upper landing -Install flashing to house and bolt a new 2x12 treated band to house using 5/8" galvinized hex bolts with nuts and washers -Install 3 new 6x6 treated post to support new deck frame -Frame a new 10'x28' deck to be attached to band at house and 6x6 post -Deck to be treated 2x12 bands and girders with treated 2x10 joist -Install new treated 10' 5/4 decking to new deck frame -Install new 6x6 handrail post to be bolted to new treated bands using 5/8" galvinized hex bolts with nuts and washers with no handrail section to span more than 8' -Install treated 2x4 top and bottom pickett support rail and treated 2x6 top cap between all handrail post -Install new treated 2x2 picketts at a spacing of 4" per NC Building Code -All deck framing and handrails to be install with stainless steel fastners -Back deck replacement (8'x28') $7,213.73 -Tear down and dispose of exsisting 10'x28' deck -Install flashing to house and bolt a new 2x12 treated band to house using 5/8" galvinized hex bolts with nuts and washers -Install 3 new 6x6 treated post to support new deck frame -Frame a new 10'x28' deck to be attached to band at house and 6x6 post -Deck to be treated 2x12 bands and girders with treated 2x10 joist -Install new treated 10' 5/4 decking to new deck frame -Install new 6x6 handrail post to be bolted to new treated bands using 5/8" galvinized hex bolts with nuts and washers with no handrail section to span more than 8' -Install treated 2x4 top and bottom pickett support rail and treated 2x6 top cap between all handrail post -Install new treated 2x2 picketts at a spacing of 4" per NC Building Code -All deck framing and handrails to be install with stainless steel fastners TOTAL ESTIMATED JOB COSTS $14,921.79 NOTE This contract is for completing the job as described above. It is based on an evaluation and does not include material price increases or additional labor and materials which may be required should unforeseen problems arise after the work has started. If problems or increases arise, both parties will agree in writing to the increases. Payment for materials is due upon delivery to property and payment for labor will be due when job is complete. Accepted Accepted Accepted Thank You For Your Business