Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
79-18 Town of Kitty Hawk
Class Permit Number 79-18 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 d to The Town of Kitty Hawk et. al., PO Box 549, Kitty Hawk, NC 27949 iorizing development in Dare County at adj. to Kitty Hawk Bay, at 3789, 3793, 3797, & 3809 Moor Shore Rd., in Kitty Hawk as requested in the pemrittee's application dated 4/30/18, attached workolan drawine (1). dated "Revised 4/23/18 and Received DCM-EC 5/7/18" it, issued on July 31, 2018 , is subject to compliance with the application (where with the permit), all applicable regulations, special conditions and notes set forth below. Any violation rnis may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization — Offshore Sills The offshore sills shall be constructed in accordance with the alignment depicted in the workplan drawings. The alignment of each of the authorized offshore sills shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed immediately upon completion of construction. (See attached sheets for Additional Conditions) action may be appealed by the permittee or other >ns within twenty (20) days of the issuing date. permit must be accessible on -site to Department ;1 when the project is inspected for compliance. maintenance work or project modification not covered ier requires further Division approval. must cease when the permit expires on December 31, 2021 this permit, the State of North Carolina agrees that t is consistent with the North Carolina Coastal Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. BralfWn C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permitee i.of Kitty Hawk et al. Permit No. 79-18 Page 2 of 3 ADDITIONAL CONDITIONS The offshore sills shall be constructed with an equal gap between each sheathing board totaling at least two inch of open area for every two linear foot of offshore sill. The offshore sill sections shall have at least one, five foot minimum opening at every 100 feet. The offshore sill sections may be staggered and overlap as long as the five foot minimum separation between sections is maintained. Overlapping sections shall not overlap more than 10 feet. As indicated by way of "Note 1" on the attached workplan drawing, the offshore sills shall be set back a minimum of 15 feet from the riparian lines of the adjacent riparian properties that are not party to this application. Should any property that is listed in the application as being a party to this permit be sold prior to the commencement of the offshore sills, the permittee shall obtain a written agreement from the new owner waiving the minimum setback and submit it to the Division of Coastal Management prior to initiating construction of the offshore sills No backfill of the offshore sills or any other filling of wetlands, estuarine waters, public trust areas or high ground is authorized by this permit. The height of the permitted offshore sills shall not exceed six inches above the normal water level. The offshore sills shall be marked at 50 foot intervals with yellow reflectors extending at least three feet above the normal water level. The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction of the authorized offshore sills. The offshore sills shall be located in areas with no SAV coverage at the time of construction, to the greatest extent practicable. In accordance with commitments made by the permittee, upon completion of the offshore sills, the Estuarine Waters located between the offshore sills and the existing Coastal Wetlands shall be planted with native Coastal Wetland species, all expressly and specifically detailed in the attached narrative and workplan drawing. This Coastal Wetland planting area shall be monitored by the permittee, and the permittee shall be responsible for replanting if deemed necessary by the Division of Coastal Management (DCM), for a minimum period of 5 years after the first planting event, or until the DCM has notified the permittee in writing that the Coastal Wetland plantings have acclimatized or naturalized. Documentation of the monitoring results shall be provided annually to the DCM prior to December 31st ;of any year. If, after 5 years, the DCM determines the plantings have not acclimatized or naturalized, iemediation or removal of the planting area may be required. To comply with Conditions No. 11 and 12 of this permit, no Coastal Wetland plantings shall occur within 10 feet of any SAV species, during any individual planting event. Hawk et al. ADDITIONAL CONDITIONS General Permit No. 79-18 Page 3 of 3 No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable 'waters at or adjacent to the authorized work. The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 'This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management prior to project initiation. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. TE: This permit does not convey any rights, either in real estate or material. TE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2018-01081) issued 7/25/18. The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 18-0699. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: Town of Kitty Hawk, et.al c/0 Coastal Federation County: Dare LOCATION OF PROJECT: 3789, 3793, 3797, 3801, 3809 Moor Shore Road DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: May 7, 2018 FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Yvonne Carver � DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: Z44 I Date: o /l -7 // g B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400 (60/40 %) PUBLIC NOTICE REC'D: Advertise: 5/20118 END OF NOTICE DATE: Comments due: 06/9/18 ADJ. RIP. PROP NOTICES REC'D: DEED RECD: / APPLICATION ASSIGNED TO: 63AP44ce— ON: C) 75 DAY DEADLINE: 07/21/18 MAIL OUT DATE: Circulation: 05/18/18 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE 150 DAY DEADLINE: STATE DUE DATE: Comments due: 06/08/18 FED COMMENTS REC'D: DENY DRAFT ON AGENCY DATE OBJECTIONS: NOTES COMMENTS YES NO RETURNED Coastal Management -Regional Representative Coastal Management - LUP Consistency !.i Division of Community Assistance $ g Land Quality Section--DEMLR DWR/DWQ — Aquifer Protection DWR/DWQ - Storm Water // L DWR— PublicWaterSupply State Property Office 4 Division of Archives & History —Cultural Res. l S Division of Env. Health —Shellfish Sanitation S l Division of Highways --DOT lY Wildlife Resources Commission vl a Local Permit Office/Planning Dept. Icr� s30 $ J� RECEIVED DMF—DCM Fisheries Resource Specialist 5' g Corps of Engineers i ZS' (gj [�] Z S _Ovet MAY 40l 4(11 `$ /A r- Vw-oWM_MHD CI Coastal Management ENVIRONMENTAL QUALITY TO: Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management, Morehead City THROUGH: Frank Jennings, District Manager TA Northeastern District, Division of Coast I Management FROM: Yvonne Carver, Field Representative 5` DATE: May 30, 2018 ROY COOPER Governor MICHAEL S. REGAN N"Miary BRAXTON C. DAVIS Uireaor SUBJECT: Recommendations for Major Permit Application submitted on behalf of: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis; in partnership with The Coastal Federation Five property owners (the Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis) in partnership with The Coastal Federation, propose to construct approximately 625 linear feet of wooden/vinyl sills in the open water area of Kitty Hawk Bay, which is located west of the shoreline of Moor Shore Road in Kitty Hawk, Dare County. The purpose of this construction is to protect and stabilize the shoreline, as well as increase its resiliency by installing a living shoreline project. After the construction of the sills is complete, native vegetation (including Spartina cynosuroides and Juncus roemerianus) will be planted along the shoreline. The sills will be 3' wide, and will be placed an average distance of 54' from NWL and a maximum of 78' from NWL. The water depths at the location of the sills range from —0.62' to —1.33'. The sheets of the sills will have 2" gaps every 2' to allow for small marine life to pass through. Five-foot gaps will be between applicable sills for marine life passage and water circulation. The top of each sill will be an average of 6'I-81' above mean water level. No fill is proposed, and erosion control matting will be used during construction where necessary to cross wetland vegetation. Reflectors will be attached to the sills, positioned every 50 Ift., and 3' above NWL. The development proposal involves the Estuarine Waters (EW) and Public Trust Area (PTA) Areas of Environmental Concern (AECs). I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this proposal, and my findings are as follows: RECEIVED 'Nothing Compares lUN 0 4 2018 State of North Carolina I Environmental Quality I Coastal Management` M_M H D CITY 401 S. Griffin St , Ste 3001 Elisabeth City, NC 27909 252-264-39011252-331-2951 (faxl Recommendations for Major Permit Application submitted on behalf of: _ Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis; in partnership with The Coastal Federation May 30, 2018 Page 2 of 4 15A NCAC 07H .0203 MANAGEMENT OBJECTIVE OF THE ESTUARINE & OCEAN SYSTEM It is the objective of the Coastal Resources Commission to conserve and manage estuarine waters, coastal wetlands, public trust areas, and estuarine and public trust shorelines, as an interrelated group of AECs, so as to safeguard and perpetuate their biological, social, economic, and aesthetic values and to ensure that development occurring within these AECs is compatible with natural characteristics so as to minimize the likelihood of significant loss of private property and public resources. Furthermore, it is the objective of the Coastal Resources Commission to protect present common law and statutory public rights of access to the lands and waters of the coastal area. Consistent: The development proposal is consistent with the intent of this rule. 15A NCAC 07H .0205 COASTAL WETLANDS (c) Management Objective. It is the objective of the Coastal Resources Commission to conserve and manage coastal wetlands so as to safeguard and perpetuate their biological, social, economic and aesthetic values, and to coordinate and establish a management system capable of conserving and utilizing coastal wetlands as a natural resource necessary to the functioning of the entire estuarine system. (d) Use Standards. Suitable land uses are those consistent with the management objective in this Rule. First priority of use shall be allocated to the conservation of existing coastal wetlands. Secondary priority of coastal wetland use shall be given to those types of development activities that require water access and cannot function elsewhere. Unacceptable land uses include restaurants, businesses, residences, apartments, motels, hotels, trailer parks, parking lots, private roads, highways, and factories. Acceptable land uses include utility easements, fishing piers, docks, wildlife habitat management activities, and agricultural uses such as farming and forestry drainage as permitted under North Carolina's Dredge and Fill Law, G.S. 113-229, or applicable local, state, and federal laws. Consistent: The development proposal is consistent with the intent of this rule. 15A NCAC 07H.0206 ESTUARINE WATERS (c) Management Objective. To conserve and manage the important features of estuarine waters so as to safeguard and perpetuate their biological, social, aesthetic, and economic values; to coordinate and establish a management system capable of conserving and utilizing estuarine waters so as to maximize their benefits to man and the estuarine and ocean system. (d) Use Standards. Suitable land/water uses shall be those consistent with the management objectives in this Rule. Highest priority of use shall be allocated to the conservation of estuarine waters and their vital components. Second priority of estuarine waters use shall be given to those types of development activities that require water access and use which cannot function elsewhere such as simple access channels; structures to prevent erosion; navigation channels; boat docks, marinas, piers, wharfs, and mooring pilings. Consistent: The development proposal is consistent with the intent of this rule. Recommendations for Major Permit Application submitted on behalf of: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis; in partnership with The Coastal Federation May 30, 2018 Page 3 of 4 15A NCAC 07H .0207 PUBLIC TRUST AREAS (c) Management Objective. To protect public rights for navigation and recreation and to conserve and manage the public trust areas so as to safeguard and perpetuate their biological, economic and aesthetic value. (d) Use Standards. Acceptable uses shall be those consistent with the management objectives in Paragraph (c) of this Rule. In the absence of overriding public benefit, any use which jeopardizes the capability of the waters to be used by the public for navigation or other public trust rights which the public may be found to have in these areas shall not be allowed. The development of navigational channels or drainage ditches, the use of bulkheads to prevent erosion, and the building of piers, wharfs, or marinas are examples of uses that may be acceptable within public trust areas, provided that such uses shall not be detrimental to the public trust rights and the biological and physical functions of the estuary. Projects which would directly or indirectly block or impair existing navigation channels, increase shoreline erosion, deposit spoils below normal high water, cause adverse water circulation patterns, violate water quality standards, or cause degradation of shellfish waters are considered incompatible with the management policies of public trust areas. In every instance, the particular location, use, and design characteristics shall be in accord with the general use standards for coastal wetlands, estuarine waters, and public trust areas. Potentially inconsistent: • The placement of the proposed sills will be an average distance of 54' from NWL and a maximum distance of 78' from NWL. Four out of five properties involved in this proposal are privately owned. The fifth property owner, the Town of Kitty Hawk, is the only property that could be considered 'public'. However, this parcel is vacant land, covered in marsh grass, and is not designated as a public access area. The water depths at the location of the proposed sills were reported to be as low as --0.62' to as deep as—1.33'. During a site visit on May 15'h, the water depth next to the pier constructed by Vaughan Robinson measured approximately —1.5'. o Taking into account these factors, the construction of sills should not jeopardize public trust rights. 15A NCAC 07H .0208 USE STANDARDS (a) General Use Standards (1) Uses which are not water dependent shall not be permitted in coastal wetlands, estuarine waters, and public trust areas. Restaurants, residences, apartments, motels, hotels, trailer parks, private roads, factories, and parking lots are examples of uses that are not water dependent. Uses that are water dependent include: utility crossings, wind energy facilities, docks, wharves, boat ramps, dredging, bridges and bridge approaches, revetments, bulkheads, culverts, groins, navigational aids, mooring pilings, navigational channels, access channels and drainage ditches; RECEIVED Consistent: The development proposal is consistent with the intent of this rule. .IUN 042018 r,�;1,n-MHD CITY Recommendations for Major Per Application submitted on behalf of: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis; in partnership with The Coastal Federation May 30, 2018 Page 4 of 4 (2) Before being granted a permit, the CRC or local permitting authority shall find that the applicant has complied with the following standards: (A) The location, design, and need for development, as well as the construction activities involved shall be consistent with the management objective of the Estuarine and Ocean System AEC (Rule .0203 of this subchapter) and shall be sited and designed to avoid significant adverse impacts upon the productivity and biologic integrity of coastal wetlands, shellfish beds, submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning and nursery areas; (B) Development shall comply with state and federal water and air quality. (C) Development shall not cause irreversible damage to documented archaeological or historic resources as identified by the N.C. Department of Cultural resources; (D) Development shall not increase siltation; (E) Development shall not create stagnant water bodies; (F) Development shall be timed to avoid significant adverse impacts on life cycles of estuarine and ocean resources; and (G) Development shall not jeopardize the use of the waters for navigation or for other public trust rights in public trust areas including estuarine waters. (6) Beds of submerged aquatic vegetation (SAV) are those habitats in public trust and estuarine waters vegetated with one or more species of submergent vegetation. These vegetation beds occur in both subtidal and intertidal zones and may occur in isolated patches or cover extensive areas. In either case, the bed is defined by the Marine Fisheries Commission. Any rules relating to SAVs shall not apply to non -development control activities authorized by the Aquatic Weed Control Act of 1991 (G.S. 113A-220 et seq.). Potentially inconsistent: • The proposed installation of sills will aid in the stabilization of the estuarine shoreline, and the planting of natural vegetation along the shoreline —creating additional saltmarsh--will be beneficial to the Fisheries Management and Essential Fish Habitat. • However, results from a 2016 SAV survey showed patchy, abundant beds of SAV with 68 quadrats containing SAV and an average cover of 25.3%. Although the sheet pile sill configuration was created to minimize the footprint of the structure and minimize the impacts to SAV, there appears to be a couple of sills proposed in a higher percentage of SAV (ref to submitted plat -)sill in front of Wells parcel and Sullivan parcel). Based on my review of the applicable subsections of the North Carolina Administrative Code, the permit application and plans for the construction of wooden/vinyl sills in the open water area of Kitty Hawk Bay, I would recommend a Major Permit be issued to the applicants, with notation that the sills be placed in those areas with a lower percentage of SAV coverage. RECEIVED M AY 2 5 2018 Coastal Management ENVIRONMENTAL QUALITY MP SECTION MHD May 18, 2018 MEMORANDUM ROY COOPER Gwcmer MICHAEL S. REGAN s—rery BRAXTON C. DAVIS Dtraefar TO: Clif Whitfield, Environmental Engineer DWR—Public Water Supply Section, WaRO . FROM: Doug.Huggett, Major Permits Coordinator. c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant:. Project Location: Proposed Project: Town of Kitty Hawk, et.al c/o NC Coastal Federation RECEIVED MAY 2 3 2018 378% 3793, 3793, 3801, 3809 Moor Shore Road; Dare County, Construct approximately 625 Ift of wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/08M to 400 Commerce Avenne, Morehead City, NC 28557 (fax:. 252447-3330). If you have any questions regarding the proposed project, please. contact Yvonne Carver at (252) 264-3901. When.appropriate,.in-depth comments.with supporting data *requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �- ,I r l DATE 5" a01 , I Nothing Compares -k?'.. . .,... Stata ofNortlt CsroWie�&nvnmwmiml QualflY�Coastat Ma,Iagement . 401 s. orifrm st, Ste 3001 ElizabaW City, NC 27909. . 252.26439011252-331+2951 [tail' Bodnar, Gregg From: Thorpe, Roger Sent: Tuesday, May 29, 2018 2:11 PM To: Bodnar, Gregg Subject: CAMA Major - Town of Kitty Hawk 625 Ift of vinyl sills Moor Shore Road, Dare County Gregg The subject project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger. thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 C... -�-''° othing Compares..--. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Coastal Management ENVIRONMENTAL OUALITV May 18, 2018 MEMORANDUM TO: MAY Z 2 2018 Shellfish Sanitation E Recreational Water Quality Section Shannon Jenkins Environmental Health— Shellfish Sanitation ROY COOPER G,a,cmor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation 3797 Project Location: 3789, 3793, 3.795, 3801, 3809 Moor Shore Road, Dare County Proposed Project: Construct approximately 6251ft of wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/08/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. / This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNEDDATE -r (Z amr v) J-e�K(,IrlS RECEIVED - '-^Nothing Compares — . MAY 2 9 2018 State of North Carolina I Envinou rental Quality i Coastal Management 401 S. Griffin St., Ste 300 J Elizabeth City, NC 27909 252-264-3901 1 252-331-2951 [fax] DCM-M H D CITY 05/25/2018 10:24 2523314739 NCDOT PAGE 01/01 Coastal Management F.NVIRONNENTAL QUALITY May 18, 2018 ROY COOPER Gmmnr MICHAEL S. REGAN y;rrctary BRAXTON C. DAVIS )Ni do' MEMORANDUM TO: David B. Harris, Roadside Erosion. Control & Vegetation Management Engineer, NCDOT Roadside Environmental Unit FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar., Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMAlDREDGE & FTLL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation Project Location: 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed Project: Construct approximately 62518 of wooden/viny) sills to protect and restore the shoreline. Please indicate below your agency's position. or viewpoint on the proposed project and return this form. by 06/08/18 to 400 Commerce Ayenura Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in.. depth comments with supporting data are requested. REPLY: 6,#*� This agency has no objection to the project as proposed. This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached SIGNED A DATE �: "Nothing Compares..-�.,. Swc ofWroh Carlin I envimlm,anlal Onnlity I Coastal MamAc l 401 S. (Maio SL. Ste 3001 E7iraberh City. NC 27M 252.2fa.39011252.131.2951 [Mal Coastal Management ENVIRONMENTAL QUALITY May 18, 2018 MEMORANDUM TO: Ben Alexander, Local Permit Officer Town of Kitty Hawk ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dimctor FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management RECEIVED SUBJECT: CAMA/DREDGE & FILL Permit Application Review MAY 31 2018 Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation DCM-MHD CITY Project Location: 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed Project: Construct approximately 6251ft of wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/08/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNS AA DATE 3v- -^� Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951 [fax] IRECEIVED Coastal Management MAY 2 8 2D1D ENVIRONMENTAL QUALITY oCM-FlShenos WARO May 18, 2018 TO: Shane Staples, Fisheries Resource Specialist Division of Coastal Management, WaRO ROY COOPER Cmemor MICHAEL S. REGAN se—lmy BRAXTON C. DAVIS Dimcler FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation Proposed Project: Construct approximately 6251ft,6f Wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return'this form by 06/08/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments With supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED .� I� DATE 6�5� 8 -: -^Nothing Compares,,, State ofNonh Carolina i FAwa nRpltal Qaalily I Coastal M�epmeat 401 S. Grim St., Ste3601 Ph- eth Cfty, NC 27909 252.264-39011252-331-2951[faal Coastal Management ENVIRONMENTAL QUALITY May 18, 2018 MEMORANDUM TO: Charlan Owens, District Planner Division of Coastal Management ROY COOPER covemar MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation Project Location: 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed Project: Construct approximately 6251ft of wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/08/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached -'-'Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 401 S. Cmffin St., Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951 [fax] RECEIVED iUN 13 2018 DCM-MHD CITY Nl� Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coasta,Management FROM: Charlan 0wen19P, NE District Planner Division of Coastal Management ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director SUBJECT: Major Permit Request by the Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, and Harry and Eileen Meraklis to install 625 linear feet of 3 foot wide by up to 100 foot long wooden/vinyl sills in Kitty Hawk Bay; adjacent to their properties at 3789, 3793, 3797, 3801, and 3809 Moor Shore Road, in the Town of Kitty Hawk. DATE: June 7, 2018 Consistency Determination: The request is consistent with/not in conflict with the Town of Kitty Hawk 2004 Core Land Use Plan (LUP) certified by the CRC on June 17, 2005. Overview: The project area consists of 3.67 acres located in Kitty Hawk Bay, along approximately 590 linear feet of shoreline. Water depths in the project area range from .6 foot to 1.3 feet. Submerged Aquatic Vegetation (SAV) are located within the project area. The project area is within the AE (EL8) floodzone. There are five (5) riparian lots along the shoreline adjacent to the project area. The riparian lot between 3809 and 3801 Moor Shore Road is not included in the project, but otherwise the lots are contiguous. Each lot is bisected by Moor Shore Road, where the 50 foot wide right-of-way meanders from at the shoreline to approximately 133 feet landward. Existing site improvements consist of two (2) single-family houses located east of Moor Shore Road. Existing shoreline improvements consist of a pier/platform structure and approximately 80 linear feet of rip rap connected to a 30 foot long rip rap jetty. According to the applicant, the marsh and shoreline buffering the roadway have been slowly eroding, with higher rates of erosion occurring during storm events. Installation of 625 linear feet of 3 foot wide by up to 100 foot long wooden/vinyl sills is proposed. The sills will be placed an average distance of 54 feet from Normal Water Level (NWL) and a maximum distance of 78 feet from NWL. The top of each sill will be an average of 6 inches to 8 inches above NWL and will be marked with reflectors every 50 linear feet at 3 feet above NWL. The sheets of the sills will have 2 inch gaps every 2 feet to allow for marine life passage. There will be a minimum 5 foot gap between sills to allow for marine life passage and water circulation. Native marsh vegetation will be planted along the shoreline once the sills are installed. Nothing Compares State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909 252 264 3901 RECEIVED N 13 2018 DCM-MHD CITY North' Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 4 The waters of the Kitty Hawk Bay in this area are classified as SC and are closed to shellfish taking. There are no national register eligible or listed archeological sites within the project area. Anticipated Impacts resulting from this project are expected to include: the filling of 1,875 sq. ft. of Public Trust Area/Estuarine Waters AEC. Basis for Determination: The project area is located within Kitty Hawk Bay. The bay does not have a designation on the Town of Kitty Hawk Future Land Use Map (FLUM). The following LUP policies may be applicable to this request: Issue Area #5 Community Appearance: Policy #5b, page IX-10. "Kitty Hawk supports local identification, recognition, and protection of cultural and historical resources...." Issue Area #6 Currituck Sound Shoreline, Kitty Hawk Bay, and Albemarle Sound: Policy #6a, page IX-10. "Kitty Hawk will continue to adopt, enforce, and amend as necessary ordinances and procedures to regulate land use, development, and redevelopment along and adjacent to the Currituck Sound, Kitty Hawk Bay, and Albemarle Sound. The Town supports applicable State and Federal laws and regulations regarding building, land use, and development in areas of environmental concern." Policy #6b, page IX-10. "Kitty Hawk supports continued management of Currituck Sound, Kitty Hawk Bay, and Albemarle Sound shorelines to protect and preserve the natural resources of the water and shoreline, relying primarily on the CAMA permit program and the Areas of Environmental Concern (AEC) designated under the CAMA program." RECEIVED Nothing Compares qr, state of North Carolina I Environmental Quality l Coastal Management JUN 13 2018 Elizabeth City Office 1 401 South Griffin Street Suite 300 1 Elizabeth City, North Carolina 27909 2522643901 DCM-MHD CITY North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 3 of 4 Policy #6d, page IX-10. "Kitty Hawk supports the construction of properly permitted estuarine bulkheads. It is the policy of Kitty Hawk to support State rules regarding bulkheading. Alternative uses such as sills and marsh plantings and other more environmentally friendly erosion control measures will be welcomed and preferred to bulkheading when conditions are favorable to such use." Issue Area #12 Natural Hazard Areas: Policy #12a, page IX-15. "... The Town supports applicable State and Federal laws and regulations regarding land uses and development in areas of environmental concern." Policy #12b, page IX-15. "Kitty Hawk supports CAMA regulations as applicable..." Policy #12e, page IX-15. "Kitty Hawk supports State and Federal policies that regulate the location and intensity of development in State designated areas of environmental concern." Policy #12g, page IX-15. "Kitty Hawk will allow development and redevelopment within special flood hazard areas subject to the provisions and requirements of the National Flood Insurance Program, CAMA regulations, and the Town's zoning ordinance." Policy #12j, page IX-16. "Kitty Hawk will take actions locally and in conjunction with NCDOT and adjacent jurisdictions to improve traffic safety and drainage to mitigate the impact of localized flooding and seek alternative methods of hazard avoidance." RECEIVED Nothing Compares. JUN 13 2018 State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street. Suite 300 1 Elizabeth City. North Carolina 27909 2522643901 DCM-MHD CITY North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 4 of 4 Issue Area #25 Water Quality: Policy #25b, page IX-25. "Kitty Hawk will continue to promote the protection and improvement of water quality by adopting, enforcing, and amending as necessary ordinances and procedures to regulate land use, development, and redevelopment as appropriate in natural hazard areas and areas of environmental concern. The Town supports applicable State and Federal laws and regulations regarding building, land uses, and development in areas of environmental concern." Policy #25h, page IX-26. "Kitty Hawk will ensure that land use and development regulations are consistent with the proper management of water resources and applicable State and Federal development regulations." Nothing Compares RECEIVED JUN 1 11 State of North Carolina 1 Environmental Quality I Coastal Management ��/ Elizabeth City Office 1 40I South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909 D/+\■_MHD CI 1 252 264 3901 CM RECEIVED JUN 8 2018 Coastal Management ENVIRONMENTAL AUALIM IMP SECTION P4 HD May 18, 2018 MEMORANDUM ROY'COOPER GevemBr MICHAEL S.'REGAN sa"WON BRAXTON C. DAVIS D;reclor TO: Lee Padrick, Division of Community Assistance FROM: Doug Huggett,'Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC CoastalTederation Project Location: 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed. Project: Construct approximately 6251ft of wooden/vinyl sills to protect and restore the shoreline. Please' indicate below, your agency's position,or viewpoint on, the proposed project and return this form by 06/08/18 to 400 Commerce Avenue Morehead City NC 28557 'fax: 252 247 33301. If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED , DATE &/ - f' AT "'Nothing Compares,,, Stato ofNolth Camlina I Environmental Quality I Coo tal Management 401 S. Grimm St., Ste 300 i Elizabeth City, NC 27909 252-264-39011252-331-2951 [fax] 0 Bodnar, Gregg From: Natalie Garrett <natalie@coastales.com> Sent: Wednesday, June 06, 2018 9:33 AM To: Carver, Yvonne Cc: Bodnar, Gregg; michellec@nccoast.org Subject: [External] Re: Moor Shore project Just to confirm, I also see 4/23/18. Natalie Garrett, ASLA Coastal Engineering & Surveying, Inc. 4425 North Croatan Highway Kitty Hawk, NC 27916 Ph: 252-261-4151 Important Notice: The content of this email is intended only for use by the individual or entity to whom it is addressed. If you have received this email by mistake, please advise the sender and delete the message and attachments Immediately. This email, including attachments, may contain confidential, sensitive, legally privileged and/or copyright information. From: Natalie Garrett <natalie@coastales.com> Date: Tuesday, June 5, 2018 at 10:48 AM To: Yvonne Carver <yvonne.carver@ncdenr.gov> Cc: "Bodnar, Gregg" <gregg.bodnar@ncdenr.gov>, Michelle Clower <michellec@nccoast.org> Subject: Re: Moor Shore project Thank you Yvonne, I'm currently out of the office and will verify tomorrow as well. Best, Natalie On Jun 5, 2018, at 10:32 AM, Carver, Yvonne <yvonne.carver(a@ncdenr.gov> wrote: Good morning, With the use of a magnifying glass ... it appears to be 04/23/2018. V(l mw 3. eQ/uwA Field Representative & District LPO Coordinator Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 232 252-331-2951 (fax) Yvonne. carver(a)ncdenr.gov 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 <image002.png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. htti)s://deci.nc.gov/about/divisions/coasta1-management/ From: Bodnar, Gregg Sent: Tuesday, June 05, 2018 10:24 AM To: michellec@nccoast.org; natalie@coastales.com Cc: Carver, Yvonne <yvonne.carverCla ncdenr.gov> Subject: Moor Shore project Morning all, I was just reviewing the project and just wanted to verify the date of the revised workplan. My copy and the small print makes it very difficult to read. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg. Bodnar(a)ncdenr.aov 400 Commerce Ave Morehead City, NC 28557 <image003.png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CoastalManagement ENVIRONMENTAL QUALITY May 25, 2018 MEMORANDUM TO: Clif Whitfield, Environmental Engineer DWR— Public Water Supply Section, WaRO ROY COOPER Gave"'. MICHAEL S. REGAN Sumtary BRAXTON C. DAVIS Direalor FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application Review Applicant:' Mark & Diane Duarte RECEIVED JUN 041618 Project Location: 221 Windward Drive, Pasquotank County Proposed Project: Replace a failing bulkhead that is leaning out into a man-made canal. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/15/18 to 400 Commerce Avenue Morehead City: NC 28557 (fax: 252-247-3330). If you have any questions, regarding the proposed project, please contact Lynn Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency ,objects to the project for reasons described in the attached comments. SIGNED C4 ° !✓�'✓`� DATE -"Nothing Compares-N. Stele ofM6 CwoHm I Eniw==W Q=%I CoasW Management 401 S. Griffin St, Ste 3001 M affi City, NC 27909 252-264-39011252-331.2951 [fax] PECEIVEDMCOGNR@YJ{i .ROY COOPER cA..x. MAY 23 2018 MICHAEL S. REGAN sm.rev wuM qumar ne¢mu BRAXTON C. DAVIS gperslioaa ap[ti;i; hyn�, CoosratManag.crit )Vash gs-poaw.6p-.3 unwoxxexru au.vrr `/ 6 �O(e`j7 May 18, 2018 ® MEMORANDUM TO: Anthony Scarbraugh,DWR- Water Quality -401,WaRG LUFROM: Doug Huggett, Major Permits Coordinator N c/o Gregg Bodnar, Assistant Major Permits Coordinator ® Division of Coastal Management LU {�"q' SUBJECT: CAMAIDREDGE & FILL Permit Application Review LU Applicant: Town of Kitty Hawk, etul clo NC Coastal Federation p� Project Location:. 3789, 3793, 3993, 3801, 3809 Moor Shorn Road, Dare County �s (L Proposed Project: Construct approximately 6251ft ofwooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06108/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). if you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: Thiwgcncy has no objection to the project as proposed. /This agency has no comment on the proposed project. _'This agency approves of the project. only if the recommended changes are incorporated. See attached. _This agency objects to the project- for reasons described in the attached SIGNED.z DATE 6 ZZh.. �i"Nothing Compares.,.. ROY COOPER � Gnveinor MICHA'EL S. REGAN yp tierreiary RECEIVED BRAXTON C. DAVIS .. � Dire<1ar Coastaf Management z. 1$. n5,2j.D ENVIRONMENTAL QUALITY I JUN 1 3 ' 2018 4 May 18,2018 �o,2p212223 MP SECTION MHC �1�� MEMORANDUM M AY2016 TO: Maria Tripp. (Dunn a pr NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator /68 Z 9 5'l c/o. Gregg B dnar, Assistant'Major,'Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitt Iy Hawk,.et.A1 c/o NC Coastal Federation Project Location:,' 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed, Project: Construct approximately 6251ftof wooden/vinyl sills to protect and;restore the shoreline' Please indicate below your, agency's position or viewpoint on the proposed project and return this, form by-06/08A8 to 400 Commerce Avenue; Morehead City, NC 28557 (fax: 252-247 3330). If you have any question di the: pro posed_ project, please contact Yvonne Carver. at (252) M4-3901. When appropriate,in-depth comments with supporting data are requested. REPLY:, This agency has no objectionao the projectas proposed. i _I'his agency has no corrimerit.on the proposed project. This agency approves of the project: only if the recommended changes are incorporated! See attached. I This agency objects to the project: for reasons described in the, attached comments. j SIGNED a� AA e_ 1 J J DATE (;,-1 f�i S %'Nothing Compares SW. ofNonh Carolina I Environmental Quality I Coastal Management 401'S. Ckifn St., Ste 3001 Mirabeth City, NC 27909 252-264-3901,I M-331-2951' [faxj Coastal Management ENVIRONNENTAL OUA W May 18, 2018 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project1ocation: Received:.. 06/04/2018 State Historic Preservation Office Ror COOPER' Renee Gledhill -Early NC Department of Cultural Resources MICHAEL S. REGAN BRAXTON C.IDAVIS ER 18-1229 Due -- 6/,12/18 A��/�• S 6- $ Doug Huggett,'Major PermiwCoordinator c/o Gregg Podnar, Assistant Major Permits Coordinator Division of Coastal Mariagernent CAMA/DREDGE'& FILL Permit Application Review Towel of Kitty Hawk, et.al c/o.NC Coastal Federation 3789;`3793; 3793;.380% 3809 Mggr,Shore Road,-Darc.County Prop osed,Project: Construct approximately 6254R of wooden/vinyI sills to protect'and:restore; the'shoreline. Please indicate below, your agency's,position or viewpoint on the and return this If you have .any,quesiions regarding the propose _;;pro1ect, please contact Yvonne Carver at 264=3901. When appropriatc,,in-depth comments with supporting data are requested. REPLY: This agency has -no objection to the project as proposed. This agency has no comment -on the proposed project. This agency approvesof the project only if the.recommended changes are, incorporated. See attached. .This .agency objects to, the project.for reasons desc irbeik in the attached comments. SIGNED DATE RECEIVED JUN 1 8 2018 —!Nothing Compares , slaleofNonh Cmlim I Fmira cftw QWily Kassel 14=9imcm 401 S. Glifrrn SI., Ste 300 1Plimbmh City, NC27M 232.264-39DI 1252-331-2951 If=] JUN 0 6'2018 MP SECTION MHD N, - Water Resources ^ Frivironmenlal Quality NOT A CAMA PERMIT June 11, 2018 Town of Kitty Hawk Attn: Mr. Andy Stewart, Town Manager PO Box 549 Kitty Hawk, NC 27949 ROY COOPER Covernor MICHAEL S. REGAN Secrernry S. JAY ZIMMERMAN Direclor DWR # 18-0699 DARE County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Town of Kitty Hawk — Moor Shore Road Living Shoreline Dear Mr. Stewart: You have our approval for the impacts listed below for the purpose described in your application dated May 18, 2018 and received by the Division of Water Resources (Division) on May 22, 2018. These impacts are covered by the attached Water Quality General Certification Number 4144 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)) Type of Impact Amount Approved Amount Reduced Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water OW-1 (Fill from Marsh Sills) 0.04 (acres) 0 (acres) Sheet: LS-100 2. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4144. [15A NCAC 02B .0507(c)] Continuing Compliance State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Once 943 Washington Square Mall, Washington, North Carolina 27889 252-946.6491 TO W N, OF. KITTY HAWK DW Rg18-0699 401:A.PP.ROVAL Page 2<of 3 3. Turbidity Standard The Permittee,shall adhere specially to 15A NCAC;02B .0220 Tidal Salt Water.Quality for Class SC Waters (3,)(g) pH: shall be normal for waters in the area; which generallyshall range between 6l8'and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving watershall.not exceed 25 NTU; if turbidity exceeds this. level due to natural background conditions, the existing tuebiditylevelshall not be increased. 115A NCAC 02B .022011. Other Conditions 4. This approval and its conditions,, are final and binding,unless contested. [G.S.143-215.5] These Certifications can be contested as provided in Articles 1and 4 of General Statute 150Bby filing a. written petition for an administrative hearing to the .Off ice of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at hito://www.ncoah.com/ or by calling the°OAH Clerk's Office at(919) 431-3000 for information. Within sixty, (60) calendar days of receipt of:this notice, a petition must be fled with'the OAH. A petition is considered filed .whenthe original and one.(1) copy.along with any applicable OAH filing fee. -is received in the OAH during normal office hours (Monday through Friday'between 8:00am and 5=prn, excluding. official state holidays). The petition may be faxed to the OAH at (919)431-3100, provided the originaiand one copyofthe,petition along with any applicable OAH filing fee is received by the OAH within five.(5) businegs days following the' faxed transmission. Mailing address for the OAH: If sending via US.PostaLService Office of Administrative Hearings 6714 Mail Service:Center Raleigh,, NC 27699-6714. If sending via delivery service: (UPS, FedEX, etc.): Office.of Administrative Hearings 1711 New Hope.Chur-&Road Raleigh, NC 27609=6285 One (1) Copy of the petition must also be served to,DEQ: William I'Jane,_6eneral Counsel Department of Enviironmental:Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Rules:, Please contact Anthony Scarbraugh at 252-948-3924 or antlonv.scarbraueh@ncdenr.eov If you have any questions or concerns. TOWN OF KITTY HAWK, DWRU 18-0699 401APPROVAL Page 3 of 3 Sincerely, l't-it Robert Tankard, Assistan Regional Supervisor Water quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4144 Certification of Completion cc: 'Gregg Bodnar, DCM Morehead City Office (via email) Yvonne Carver, DCM Elizabeth City (via email) Josh Pelletier, USACE Washington Regulatory Field Office (via email) Laserfiche File Michele Clower, NC Coastal Federation (via email: michelle@nccoast.org) Natalie Garrett, Coastal. Engineering & Surveying, Inc: (via email: natalie@coastales.com) Tom_- =- tia we¢ws " ni .ml w..la�od vu�mrouw :•,emw ma nw w. oo+,m Im �>rXn �Lml ! o� k5it"k, tn y- pydl a ..I agP/JILYATE MAL :GEND $ sw�sx )onnns v Received MAY. - T 2913 DCM-EC iJmuL ium outau I an PRM�L T2 TI � T3 9 rE YE t w ,w 4"9 `� u..0 ti ILPny rvo Jl«u' Y GRAPHIC SCALE ( IN FEET I 1 inch = .90 It. ;Mz;2En.ED aromental anagemen commission NDres: livision of Water Resources 1. mores Ir qmw, mrx; t� (o 111 20 /Y ?(nut ff. PRELIMINARY T NOTFORUSEFOR CONSMUCnom 4� ,NOS ORRECOROATION y Tl.l. / KITTY HAWK TIO\`a� ND'e' BAY +x°':„ vgopo � (m) T8f `J a X MG M qAP JETTY A NOTE T5 T7,�: g",�-"> — rl '— DIDDEq�5ttlf6—' TgOF&ItlCPROPEIIt EOTWC 1 1 —zu—. — oBµ 12 :pn iB1 M 6L E9i \ EX9mI0 TI6 ip06. I lYe'PSiI 1PU51¢S t IMBEY. fAY q l �0.&yM Me "A I u 1! y 9 6 n, "q ' O KI110.111 1WIf LWU aCpe� V N�r�.. Coastal Management ENVIRONMENTAL QUALITY May 18, 2018 MEMORANDUM TO: Tim Walton, Director State Property Office MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dmcm. RECEIVED MAY 21 2018 DOA STATE PROPERTY OFFICE FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Kitty Hawk, et.al c/o NC Coastal Federation Project Location: 3789, 3793, 3793, 3801, 3809 Moor Shore Road, Dare County Proposed Project: Construct approximately 6251ft of wooden/vinyl sills to protect and restore the shoreline. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/08/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Yvonne Carver at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. IOWII �I REPLY: This icy has no objection to the project as proposed. ✓✓ pp T� his agency has no comment on the proposed project. ri This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. 4 &KDATE 0. � RECEIVED —'No in Compares le of North Carolina I avironmenW Quality I Coastal ManagemIII ent J U N 18 2018 401 S. Cmiffin St., Ste 3001 Elizabeth City, NC 27909 252-264-3901 1 252-331-2951 [fax) DCM-MHD CITY July 25, 2018 Regulatory Division Action ID No. SAW-2018-01081 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of the Town of Kitty Hawk construct approximately 625 linear feet long by 3 feet wide of wooden/vinyl sills an average of 54 feet waterward of the normal water level with appropriate gaps for fish passage, in Kitty Hawk Bay, adjacent to Moor Shore Road, in Kitty Hawk, Dare County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris, will not be used. 6. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 8. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 9. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 10. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 11. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the pennittee's discovery of the violation. Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office, Regulatory Division, telephone (910) 251-4605. Sincerely, Josh Pelletier Regulatory Project Manager Copies Furnished: Mr. Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rhode National Marine Fisheries Service Habitat Conservation Service 101 Pivers Island Road Beaufort, North Carolina 28516 Mr. Jeffrey Garnett Wetlands and Marine Regulatory Section Water Protection Division -Region IV U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Frank Jennings, District Manager Elizabeth City Field Office North Carolina Division of Coastal Management DCM Coordinator: al7i`P Permit #: 79 \MAILING DISTRIBUTION SHEET Agents DCM Field Offices / ��W Elizabeth City I rO/f tL 1�I (wit�reovi work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) / Nsh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT= Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: / ' Renee Gledhill -Earley Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARD) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: / Shannon Jenkins State Property: / Tim Walton DEMLR/DWR: s� Karen Higgins Washington: / Anthony Scarbraugh-401 ` / Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New Hanover) Georgette Scott - Stormwater Wildlife Resources: Fax is n ution: Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARD),jm ( CDOT on Travis Wilson t 1�.� -Tow,, ;:� Intlexank-r�K��lyhu, Permittee #: Agent# �' Coastal Management ENVIRONMENTAL QUALITY Town of Kitty Hawk c/o Andy Stewart PO Box 549 Kitty Hawk, NC 27949 Dear Sir or Madam: August 1, 2018 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150E with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure ncerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 Received DCM MP-1 APPLICATION for Major Development Permit Dcnn-�c (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Town of Kitty Hawk Moor Shore Road Living Shoreline Applicant 1: First Name MI Lost Name Andy Stewart` *Town Manager for the Town of Kitty Hawk Applicant 2: First Name MI Last Name Hadditional applicants, please attach an additional page(s) with names listed. See attached information. Mailing Address PO Box City 549 Kitty Hawk TtCe ZIP Country Phone No. FAX No. 27949 Dare 252 - 261 - 3552 ext. - - Street Address (if different from above) City Stale ZIP 101 Veterans Memorial Dr. Kitty Hawk NC 27949- Email andy.stewart@kittyhawktown.net 2. Agent/Contractor Information Business Name North Carolina Coastal Federation in parnership with Coastal Engineering & Surveying, Inc. Agent/ Contractor 1: First Name MI Last Name Michelle Clower Agent/ Contractor 2: First Name MI Last Name Natalie Garrett Mailing Address PO Box City Stale CF=P.O. Box 276 wane NC CE&S =P.O. Box 1125 Kitty Hawk ZIP CF = 27981 Phone No. 1 CF Phone No. 2 CEBS CE&S = 27949 252 - 473 - 1607 ext. 252 - 261 - 4151 ext. FAX No. Contractor # PLS#L-3241 & PE 014071 (Coastal Engineering & Surveying, Inc.) Street Address (if different from above) City wanchese State ZIP 27981 CF = 637 Harbor Rd. CE & S = 4425 North Croatan Hwy Kitty Hawk NC -27949 Email michellec@nccoast.org (North Carolina Coastal Federation), natalie@coastales.com (Coastal Engineering & Surveying, Inc.) <Form continues on back> RECEIVED 252-808.2808 .. 1.888-4RCOAST .. www.nccoastalmanagemen t.net DCM-MHD CITY Form DCM MP-1 (Page 2 of 4) APPLICATION•for' Major Development Permit 3 Protect Location "> County (can be multiple) Street Address State Rd. # Dare Moor Shore Rd. 1216 Subdivision Name City State Zip (None) & Keeper's Hill - Sections 1 & 2 Kitty Hawk NC 27949 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I I See attached Information. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Kitty Hawk Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑x Natural ❑Manmade ❑Unknown Albemarle Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city, limit the proposed ❑x Yes ❑No work falls within. Town of Kitty Hawk 4.- Site Description a. Total length of shoreline on the tract (ft.) - b. Size of entire tract (sq.ft.) -600, 159,500 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or See attached Addition Information to Supplement Application. NWL (normal water leveo (If many lot sizes, please attach additional page with a list) 0-5 ft. ❑NHW or ®NWL e. Vegetation on tract Native trees, wetland grasses and shrubs in addition to grassed lawns (see attached narrative). f. Man-made features and uses now on tract The tract consists of Moor Shore Road, privately owned houses, one dock and rip -rap to the Southern -most end. Moor Shore Road serves as access to houses in western Kitty Hawk, is an emegency access route when HWY 168 is flooded and houses annual marathons. The road also provides access to a public walking and biking path South of the tract. The dock Is privately owned. g. Identify and describe the existing land uses adacen to the proposed project site. Immedially North of the tract is vacant wetlands connecting to private residences. Immediately to the South of the tract consists of private residences and a publicly owned walking and biking path. The gapped section in the middle of the tract, owned by Vaughan and Hannah Robinson is a residential. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) BR-1 (Beach Residential 1) []Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑x No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) Received APPLICATION for �,;AI - 7 2010 Major Development Permit m. (i) Are there wetlands on the site? DC ®Yes [:]No (ii) Are there coastal wetlands on the site? �! ❑x Yes ONO (III) If yes to either (1) or (ii) above, has a delineation been conducted? ❑Yes [ENO (Attach documentation, if available) n. Describe existing wastewater treatment facilities. For Lots 21, 22 = septic o. Describe existing drinking water supply source. For Lots 21, 22 = Town of Kitty Hawk water system p. Describe existing stone water management or treatment systems. Grassed swales 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial MPublic/Governmenl ®Private/Communily b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of the project is to stabilize the shoreline at Moor Shore Rd. and increase its resiliency by installing a living shoreline project. This project will be a benefit to the ecosystem by creating fisheries habitat and protection. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The breakwaters will be installed with water jet and hand tools and a long reach excavator if necessary, although not expected. Equipment will be stored on adjacent properties. See attached narrative for additional information. d. list all development activities you propose. Construction of wooden/vinyl sill and the planting of native grasses, see attached narrative. e. Are the proposed activities maintenance of an existing project, new work, or both? New work. f. What is the approximate total disturbed land area resulting from the proposed project? ®Sq.Ft or ❑Acres Approximately 2,000 sq. R. submerged water disturbance (area of sill) with an approximate 1,500 sq. ft. staging area. g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? Existing public access will be maintained. h. Describe location and type of existing and proposed discharges to waters of the state. There are no proposed discharges resulting from this project. 1. Will wastewater or stormwater be discharged into a wetland? Elves ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED MAY 2 12018 252-808-2808 -. 1.888.4RCOAST .. www.nccoastaimanagement.net DC Ho CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6 AddW6hX'Informahon In addition to this completed application form .(MA the following items below, if applicable, -must be submitted in order for the application ' package to be complete. Items (a)`=(f)'aie always applicable to anyrriajordevelopment;application. ,Please consult•the application: instiuction'b'ooklet on'how to• properly prepare the required Hems below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with stale application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. NamePhone No (Seeattacherformatlon)- - Address Name Phone No. Address "Name - - - 'Phone No .;) Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. General Permit 62499, Permittee Name: Harry Meraklis, Issued 2/11114 General Permit 59841, Pennittee Name: NCDOT, Issued 5114/12 General Permit 13766, Permidee Name: NCDOT, Issued 3/17195 NOT INCLUDED: General Permit 68634, Permitee Name: Vaughan & Hannah Robinson Issued: 2115/13 h. Signed consultant or agent authorization form, if applicable. I. Welland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanBont and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further cel ify that the infor at on provided in this application is truthful to the1 best of my knowledge. Date Print Name Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts Received ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information DCM-EC 252-808-2808 :: 1.688-411COAST :: www.nccoastaimanagement.net MOOR SHORE LIVING SHORELINE Received WY - 7 2018 ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION DCM-EC Moor Shore Road Co -Applicant List in Addition to the Town of Kitty Hawk parcel stnum stname subdivision firstn lastn EMAIL 1 18226219 3789 MOOR SHORE KEEPERS HILL SEC 2 LLC ROEBUCK PROPERTIES It dray@ftr-law.com 2 18226220 3793 MOOR SHORE KEEPERS HILL SEC 2 AMYD WELLS amvdwellsCalcharter.net 3 18226221 3797 MOOR SHORE KEEPERS HILL SEC 2 CHARLES VJR SULLIVAN csullivan1252Cdemail.com 4 18226222 3801 MOOR SHORE KEEPERS HILL SEC 2 HARRYI MERAKLIS harrvmeraklisld¢mail.com Continued with same numbering as above: firsts lastn Mailing Address 1 LLC ROEBUCK PROPERTIES II 1816 Rivershore Rd. Elizabeth City, NC 27909 2 AMYD WELLS 3749 Herbert Perry Rd. Kitty Hawk, NC 27949 3 CHARLES V JR SULLIVAN 3797 Moor Shore Rd. Kitty Hawk, NC 27949 4 HARRY J MERAKLIS 3801 Moor Shore Rd. Kitty Hawk, NC 27949 RECEIVED MAY 21 2018 DCM-MHD CITY n MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION Site Characteristics: Size of Property: Roebuck: 3789 Moor Shore Road: 21,000 sq. ft. Wells: 3793 Moor Shore Road: 22,500 sq. ft. Sullivan: 3797 Moor Shore Road: 25,500 sq. ft. Meraklis: 3801 Moor Shore Road: 28,500 sq. ft. Robinson: 3825 Dory Court:.26,000 sq. ft. (not included in total) Town of Kitty Hawk: 3809 Moor Shore Road: 62,000 sq. ft. TOTAL: 159,500 sq. ft. Length of Waterfront Roebuck: Approx. 114 li. ft. Wells: Approx. 45 li. ft. Sullivan: Approx. 54.5 li. ft. Meraklis: Approx. 53 li. ft. Robinson: Approx. 40 li. ft. (not included in total) Town of Kitty Hawk: Approx. 325 li. Ft. TOTAL: Approx. 591.5 li. ft. Distance to Structure Meraklis: 277' Sullivan: 247' MOOR SHORE LIVING SHORELINE Received i4m' Y - i 2013 ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION DCM-EC RECEIVED MAY 21 2018 DCM-MHD CITY iv o✓x U .SJ3 YYJ�: ian Ai; iv chu U 093 Image US Geaiogsal Sonci Mmpry Cnm'22N99i N9J�AITN i ?t�C,000,Iu sar[h Received MOOR SHORE LIVING SHORELINE 61AY - 7 2010 ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION DCM-EC RECEIVED MAY 21 2018 DCM-MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION Received WY - 7 2010 MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION DCM-EC RECEIVED MAY 21 2018 DCM-MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPPLEMENT APPLICATION Adjacent Riparian Landowners 1. Lucille S. Stokes Address: 408 Beacon Dr., Kitty Hawk, NC 27949 2. Vaughan S Hannah Robinson Address: 423 West Bridge Lane, Nags Head, NC 27959 3. Forbes, F. Everette Trustees & Forbes, Fay R. Address: 4090 Caplock Court, Middleburg, FL 32068 Received Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) DCM-EC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWQ stabilization Length ipprox. 625 li. Width approx. 3' Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION pThis section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated, cubic yards. c. (1) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL []None (it) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes []No ❑NA []Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. []CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? []Yes []No ❑NA (if) If yes, how much water area is affected? RECEIVED MAY 21 2018 ncm-noun CITY 252-808-2808 :: 1-111884RCOAST :: www.nccoastalmanagement.net revised: 12/26106 Form ®CM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINESTABILIZATION.❑this sectionnotapp6cabie, - ' (tf devefoprrient is a`wood groin, fuse it. -4 =Structures) - a. Tvoe of shoreline stabilization: b. Length: -625 fi. IL madmum. contenglent upon adjecent property owner approval ❑Bulkhead ❑Riprap ®Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL: 54' e. Type of stabilization material: Vinyl and wood sill & native marsh grass plantings. g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap _ Breakwater/Sill see MR4 Other_ i. Source of fill material. No proposed fill. Width: -3' d. Maximum distance waterward of NHW or NWL: 78' f. (i) Has there been shoreline erosion during preceding 12 months? [@Yes []No ❑NA (ii) If yes, state amount of erosion and source of erosion amount Information. Approximately .75' / year h. Type of fill material. No proposed fill. 4s OTHER FILL'ACTIVITIES. ®This section not applicable-' ,-(ExcludingShorelineStabrhzation) `x a. (1) Will fill material be brought to the site? LJYes LJNo If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill a. How will excavated or fill material be kept on site and erosion controlled? No fill Erosion control matting will be in place during construction. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Dump truck, small bulldozers, possibly a long reach excavator, manual labor, small boat for hauling equipment, wetland matting. C. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project [EYes ❑No ❑NA site? ❑Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Rpflprtors will he attached to vinyllwondpd sill,'' alfove NWI with wood and reflectors, stationed every 50 li. ft. See attached narrative for details. Date - Ceived 7 Applicant Name MAY 2010�O/� Project Name ! �Applicant Signature 252-808.280E :: 1.888-4RCOAST :: w .nccoastalmanapement.net revised: 12/26/06 Received Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) MAY - 7 201.8 DCM-EC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commerdal ❑PublidGovemment ❑Private/Community c. (1) Dock(s) and/or pier(s) III) Number (iii) Length IN) Width (v) Floating ❑Yes []No e. (i) Are Platforms included? ❑Yes []No If yes: (it) Number — (iii) Length IN) Width (v) Floating []Yes []No Note: Rooted areas am calculated from dripline dimensions. g. (i) Number of slips proposed (it) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel []Open water; no dredging required ❑Other; please describe: k. Typical boat length: _ m. (i) Will the facility have tie pilings? ❑Yes []No (ii) If yes number of fie pilings? ®This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ❑No d. (!)Are Finger Piers included? []Yes [--]No If yes: (it) Number (iii) Length (iv) Width (v) Floating []Yes []No f. (1) Are Boatlifts included? []Yes ❑No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('wet slips") only, number of slips: — ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: — ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). I. (1) Will the facility be open to the general public? []Yes []No RECEIVED MAY 21 Z018 252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net / 6 Form DCM MP-4 (Structures, Page 2 of 4) 2 DOCKING FACILITY/MARINA'ORERATIONS. ®This section not applicable, a. Check each of the following sanitary facilities that will be Included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. Location: ❑ Showers ❑ Boalholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (it) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? r h. Give the number of channel markers and "No Wake" signs proposed. _ I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-688-4RCOAST :: w .nccoastalmanagement.net revised: 12/27/06 Received Form DCM MP-4 (Structures, Page 3 of 4) i.laY - 7 2018 m. Is the marinaidocking facility proposed within a primary or secondary nursery area? p p /'� ❑Yes []NoU�( EC n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts). ®This section not applicable a. (1) Is the boathouse struclure(s): []Commercial ❑Public/Govemment ❑Private/Community (ii) Number (III) Length _ (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (III) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑This section not applicable a. Length 625 li. ft. maximum, contengient upon adjacent b. Average distance from NHW, NWL, or wetlands property owner approval 54' c. Maximum distance beyond NHW, NWL or wetlands 78' 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, ff present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalrnanaaement.net revised: 12/27/06 DCM-MHD CITY Form ®CM MP-4 (Structures, Page 4 of 4) 7: GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. South = 0' 15' depending on owner approval North = 0'-15' pprnpnrlicular to Pxicting pier, aligned with chorpline, depet Mir ig or I owl tei appi oval. Note: For buoy or mooring piling, use arc of swing Including length see attached information of vessel. c. Width of water body d. Water depth at waterward end of structure at NLW or NWL See attached information. 0.5' -1.25' e. (1) Will navigational aids be required as a result of the project? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. Wooden poles with reflectors attached to breakwaters/sills extending T above structure / NWL, every 50'. a. Give complete description: Please see attached plans, narrative and additional information. A, l' Applicant Signature Received MA 1 7 - 2010 DCM-EC 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Carver, Yvonne From: Carver, Yvonne Sent: Tuesday, April 03, 2018 10:25 AM To: michellec (michellec@nccoast.org); 'Natalie Garrett' Subject: Moor Shore Rd - new pier construction by Robinson Attachments: Robinson, Moor Shore Rd, Kitty Hawk (1)JPG; Robinson, Moor Shore Rd, Kitty Hawk (2)JPG Good morning to you both, Just wanted to confirm that I did a drive-thru on Moor Shore Road last week (3/28/18), and confirmed that the Robinsons have started the construction of their pier adjacent (to the right of) Meraklis' pier. As you will note by the attached photos, they have just started installing the pilings. According to the permit Ron Renald issued on 02/06/18, the walkway through the wetlands will be approximately 140x4, the pier over water will be 90x4 with a 30x8 L-head platform, and 2 mooring pilings adjacent the L-head. Thought you may need this information for when the Moor Shore Road project plat was updated. *lQww 2. eaweu Field Representative & District LPO Coordinator Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 232 252-331-2951 (fax) vvonne. carverCc�Dncdenr. oov 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 fc. Nothing Compares- _ RECEIVED Email correspondence to and from this address is subject to the MAY 2 1 North Carolina Public Records Law and may be disclosed to third parties. 2018 https:Hdeq.nc.gov/about/divisions/coastal-management/ 'DCM'MFID CITY A-itii 'y,jcl��l4 6ebuGk 1"�GKK(rS Application Review Checklist I4 Letter A S7 pj 7 72f 8 �. Placard Comment - VIA Applicant I�wv << l�i� 'w�� el 4/ Pub A S7&Comment q / ,./ / /%' Computer A t 75 i-7/ Agent (/'t(G��(/ f row 4_1�1' Field Rep. `�Vf7N Physical Address 3789.3793 3797.3&71 3 � 6c?.;,r-S4rqe RCI. 411y f�^svC AECs Habitat S Development T F/ , Designations �7C e o wj Buffer ,L, ,. Aiparian N ficatio ? Green� / Card? Signed orm? NoLObj Waive 15' nYor:OA� �vlGt'�� �rbeS�Cutr{g �{ 564 )K No Water ei,7,2(PM, )l Mgha r¢ ST/Via Deed? v Dependent �CS Raparian rights 4+ok' 15 1 11 PH or From Property line 46,AS0,7 lS` 6K 5�d¢S 1/4width? W1/4- Navigation/ Channel Proximity Residential Commercial FTzcalculations 8ft'or27ft' N/A PTA Concerns? ISSUES OF NOTE OSj�rGrrii-w 1Uwt S ate w/ff' hivkes �N�erlyr w� �rw Q��s n�nbr f7rsk�or, Sfa�ey � �. / rAalc� ho� �4v_ i7�� \e_4ec so �Ite&4— r�%S setMo.C� 't(ag'( �r 6iO4g f / ' 5; Oe, i��nbir del' Worr Roder (�hlJ - rpr ktA eoey ' r ck, ;'((:s B41-Su�orti' , 1 /7 5W,,1r?;te,f No- fy, - -ion ( -(Co ytT',�^S�) 7&';awt awl. qoA -D,621-1,33`CP nfc�c. ?eT (4orr5 e So' @ 3'0,6,v d 3 y., (n0lyoh'vc� ` k'f �/ �y^ �/ 1I� �•'�1/r/ yam.. JIA S� `if G�rj I�/Wh I�CIN 1ri'�Nt C�l%/�Y Yam•, 1�' V3/� (MCR�/1T I NJ�c�e� 'W6 se8\m6v\�* (flum VPl`4' It) , MP MP2 MP3 M14 MP5 Major Development Excavation/Fill Applicant V; Address Permit Checklist u Permit # County Physical Location including II /fr WaterbodvDes criotion rd` 1CI1M1/ Haw4 1d!a 0 1.9789 V,71.S.97g1.99a fMC9 Ili MP Forms Dates Drawings # Drawings & Dates Development Types Including Conditions and Notes ill,? 9`,"Cr 4-� leprO DWR 401 Certification # Permit Fee `( 1 it Rei W4,�r ,4/14 ^rn VIIII�S� I�"1/�0"19 USACESAW # Ad itiona[ Comments On Back [r Bodnar, Gregg From: Carver, Yvonne Sent: Monday, February 19, 2018 11:15 AM To: Bodnar, Gregg Subject: FIN: Re: Follow up on documents/application submitted for Moor Shore Road Living Shoreline Hey Gregg, To keep you in the loop, I wanted to share the last email/correspondence with you regarding the Kitty Hawk Moor Shore Living Shoreline project. They've hit a snag regarding ownership and/or Power of Attorney for one of the properties for one of the applicants included in the sills proposal. Because of this issue, their application will remain incomplete (i.e. they can't complete/update the supplemental pages to DCM-MP1—and this could potentially change a name on the workplan drawing). Will move on to the next projects. *at uie D. ewuw 6 Field Representative & District LPO Coordinator Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 232 252-331-2951 (fax) vvonne. carver(o.ncdenr. oov 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 r Nothing Compares� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties, https:Hdeq.nc.gov/about/divisions/coastal-management/ From: Michelle Clower [mailto:michellec@nccoast.org] Sent: Friday, February 16, 20181:57 PM To: Carver, Yvonne <yvonne.carver@ncdenr.gov> Cc: Natalie Garrett <natalie@coastales.com> Subject: [External] Re: Follow up on documents/application submitted for Moor Shore Road Living Shoreline Hi Yvonne and Natalie, Thanks for the review and emails. Natalie and I also just spoke on the phone and came to consensus on your other feedback. ' On MP-1, pg. 4, g. you were not able to list previous permits for work on the project tract(s). I was able to locatelconfirm 3 General Permits (GPs) that were issued to NCDOT (2 for riprap) and Meraklis (I. for pier structure) 1 ' With your permission, I will insert that information on the latest copy of the application and initial. Yes, thank you. Please do add into the application. ' Additional Information to Supplement Application I do not show where I've received an updated copy of the Supplement yet. Wanted to verify that with you. The copy I have dated 01/11/18 (see attached) needed update(s), [i.e. Page 2 — please make corrections as noted for property owners' names/project addresses; also include the current mailing address for each co -applicant, as the project address and mailing address may differ]. I am still working to resolve the Stokes -Wright ownership issue and am waiting for finalized documentation before updating the Supplement. I will send as soon as the issue is resolved. ' Susann Stokes Wright ' Have you verified ownership and/or obtained updated Agent Authorization Form? I am currently working with Ms. Wright to resolve this issue. Unfortunately, some official documentation was lost and we are working with an attorney friend of the Coastal Federation to resolve the issue as soon as possible. I will keep you up to date on progress. Thanks, Yvonne and have a good weekend. Best, Michelle North Carolina Coastal Federation Woddag Togetherfor a Healthy [oast Michelle Clower Coastal Specialist 252.473.1607 (o) PO Box 276 637 Harbor Road Wanchese, NC 27981 www.nccoast.or2 )<)))"> H))'> )<)))'> Permit Class NEW Pe * ber XX-18 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit I� for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavatio and/or filling pursuant to NCGS 113-229 Q' Issued to The Town of Kitty Hawk, PO Box 549 Kitty Hawk, NC 27949 Authorizing development in Dare County at adi. to Kitty Hawk Bay. at 3789, 3793, 3797, 3801 & 3809 Moor Shore Rd., in Kitty Hawk , as requested in the permittee's application dated 4/30/18, including attached workplan drawingy(1) dated "Revised 4/23/18 and Received DCM-EC 5/7/18". This permit, issued on Me 2 18 , is subject to compliance with the application (where consistent with the permi 11 a lic regulations, special conditions and notes set forth below. Any violation 11 LL1GaG 1G1111J 11MV VI JLLVJVV\ 1V 1 VJ, .... auuvaaa — -- ra, tea..-..- + 1. Shoreline Stabilization — Offshore Sills 1) The offshore sills shall be constructed in accordance with the alignment depicted in the workplan drawings. f Q ac�H O-f 2) The alignment of the authorized offshore sills shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. 3) If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed immediately upon completion of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 in issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of 1JW ana me Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Town of Kitty Hawk RerrnitNo. XX-18 (page 2 of 3 ADDITIONAL CONDITIONS 4) The offshore sills shall be constructed with an equal gap between each sheathing board totaling at least two inch of open area for every two linear foot of breakwater. The breakwater shall have at least one, five foot minimum opening at every 100 feet. The breakwater sections may be staggered and overlap as long as the five foot minimum separation between sections is maintained. Overlapping sections shall not overlap more than 10 feet. 'v c �J+rdy i* 5) The o shore sills are located in Public Trust Area that includes adjoining riparian properties that are m i ent. The offshore sills shall be setback from these ad' Wing pro y lines and the riparian access dividing line, as depicted in ttached workplan drawin .Forth joining riparian properties nclude portions of the au zed offshore sills, the setback waived by written agreeme of the adjoining riparian o or when adjoining — riparian o ers are co -applicant Sh any riparian property con rig a portion of the offshore sills be sol rior to the commenceme f the offshore sills, the perri a shall obtain a written agreement fro a new owner wail a minimum setback and sub ' to the Division of Coastal Management prior to initiating construction of the offshore sills. 6) No backfill of the offshore sills or any other filling of wetlands, estuarine waters, public trust areas or high ground is authorized by this permit. 7) The height of the permitted offshore sills shall not exceed six inches above the normal water level. 8) The offshore sills shall have at least one, five foot opening at every 100 feet. The offshore sill sections may be staggered and overlap as long as the five foot separation between sections is maintained. 9) The offshore sills shall be marked at 50 foot intervals with yellow reflectors extending at least three feet above the normal water level. 10) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction of the authorized offshore sills. The offshore sills shall be located in areas with no SAV coverage at the time of construction, to the greatest extent practicable. 11) In accordance with commitments made by the permittee, upon completion of the offshore sills, the . Estuarine Waters located between the offshore sills and the existing Coastal Wetlands shall be planted with native Coastal Wetland species, all expressly and specifically detailed in the attached narrative and workplan drawing. This Coastal Wetland planting area shall be monitored by the permittee, and the permittee shall be responsible for replanting if deemed necessary by the Division of Coastal Management (DCM), for a minimum period of 5 years after the first planting event, or until the DCM has notified the permittee in writing that the Coastal Wetland plantings have acclimatized or naturalized. Documentation of the monitoring results shall be provided annually to the DCM prior to December 31 st of any year. If, after 5 years, the DCM determines the plantings have not acclimatized or naturalized, mediation or removal of the planting area mail belrpquired. 12) To comply with Conditions No. 0 and 11 f this permit, no CoLtal Wetland plantings shall occur within 10 feet of any SAV specie , g any individual planting event< Town of Kitty Hawk ADDITIONAL CONDITIONS General Permit No. XX-18 Page 3 of 3 13) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 14) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 15) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 16) In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: This permit does not convey any rights, either in real estate or material. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2 �,_ 88;) issued 4%17/18. 206-Olca( 7(25'�/8 NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 18-0699. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc satisfied the Section 401 application processing fee requirements of the Division of Water Resources. As indicated by way of "Note 1" on the attached workplan drawings. The offshore sills shall be set back a min of 15' from the riparian lines of the adjacent riparian properties that are not a party to this application. Should any property that is listed in the application as being a party to this permit be sold prior to............... Bodnar, Gregg From: Bodnar, Gregg Sent: Friday, April 13, 2018 4A3 PM To: Carver, Yvonne; Huggett, Doug Subject: RE: Major permit question(s) related to pending Kitty Hawk Moor Shore project My thoughts are in red. Doug I wanted to see if my comments below were feasible. I can update you on the project when you have time to talk. Gregg From: Carver, Yvonne Sent: Friday, April 13, 2018 4:15 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: Major permit question(s) related to pending Kitty Hawk Moor Shore project Good Friday afternoon Gregg, I have had a couple of questions regarding details involving the Kitty Hawk Moor Shore Living Shoreline major permit application. Wanted to send these to you to 'ponder' and let me know your opinion(s): Moor Shore Living Shoreline major application has been incomplete/on hold since the initial incomplete letter of O1/19/18. o Proof of Property ownership for one of the co -applicants has caused more delay than Coastal Federation had anticipated... Supplemental pages to MP-1, agent authorization, deed, plats ... are all hinged to correct name(s) involved for one of the properties. o New pier now under construction in the project area (adjacent to one of the co -applicants). Here are the questions that Natalie with Coastal Engineering has asked: • IF the ownership of one property continues to hang up the process, they want to know if they could 'modify' the permit later to add that property owner and their property to the living shoreline proposal? I've seen a lot of modification requests in the past, but they have always been related to changes in the work proposed. FYI, this does not have anything to do with a contract to purchase. Current 'owner' listed on Dare County Tax records is deceased (09/27/2010); property is NOT under an estate name; daughter has been paying taxes on property, but never had property transferred into her name. I've heard several times that she is 'working on it'...i.e. legal matters. Would any other legal documentation proving the daughter is the legal owner of the property suffice? (i.e. Will) At the time of Coastal Fed's initial application, there was one pier in the project area, and is shown on the plat. However, a GP was issued for a pier for one of the riparian property owners in the project area. Currently all that has been 'constructed' are the pilings through high ground/wetlands.... nothing has been built in the water yet. Ron and I had both agreed that if the pier was complete, it would have to be drawn in on the plat. Coastal Engineering is asking if they should show the pier on the pending revised plat (perhaps as 'pier in progress').... or should this be left off entirely if it is not complete by the time they get the application updated? Since the plans need to be updated for the above issue, then I see no harm in at least providing a dashed outline of the pier noting "pier in progress as of printing". The pier is in the middle of the LS alignment and the 15' riparian setback is indicated. Also of note is the riparian neighbor to the south is objecting to the proposal. Your opinion/comments will be greatly appreciated. Have a great weekend! Field Representative & District LPO Coordinator Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 232 252-331-2951 (fax) vvonne.carve r(a) ncdenr.gov 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 0. -5%'Nothlnq Compares. — Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. httos://deg. nc.aov/about/divisions/coastal-management/ DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis 2. LOCATION OF PROJECT SITE: 3789, 3793, 3797, 3801, and 3809 Moor Shore Road, Kitty Hawk, Dare Co.; Kitty Hawk Bay; Photo Index — 2006: 185-7222 (012, P12-13) Latitude: 360 3'34.74"N Longitude: 75041'52.51 "W Latitude: 360 3'35.18"N Longitude: 75041'52.59"W Latitude: 360 3'35.46"N Longitude: 75041'53.37"W Latitude: 360 3'35.72"N Longitude: 75041'53.84"W Latitude: 360 3'36.52"N Longitude: 75041'55.85"W 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— 1) 03/09/16, Ron Renaldi; 2) 01/17/18 & 05/15/18, Y. Carver Was Applicant Present —1) Yes -Agents; 2) No 5. PROCESSING PROCEDURE: Application Received Complete - 05/07/18 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Town of Kitty Hawk Land Classification From LUP — BR-1: Low Density Beach Residential (B) AEC(s) Involved: Estuarine Waters and Public Trust Area (C) Water Dependent: Yes (D) Intended Use: Public and Private (E) Wastewater Treatment: Existing — N/A Planned — N/A (F) Type of Structures: Existing — Riprap, docks, pilings along shoreline / West of Moor Shore Road; Single-family Residences East of the road Planned — Wooden/Vinyl Sills (G) Estimated Annual Rate of Erosion: .75'/year Source - Applicant 7. HABITAT DESCRIPTION: [AREA] DRFDGFD FILLED OTHER (A) Vegetated Wetland N/A N/A N/A (B) Non -Vegetated Wetlands N/A N/A N/A (C) EW, PTA N/A 1,875 sq. ft. N/A (D) Total Area Disturbed: 1,875 sq (E) Primary Nursery Area: N/A (F) Water Classification: SC ft. (0.04 acres) Open: Closed RECEIVED MAY 21 2018 DCM-MHD CITY Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis Field Investigation Report Page 2 8. PROJECT SUMMARY: Construction of off -shore wooden/vinyl sills and planting of native marsh grass. Proiect Settin The proposed development site is a 159,500-square foot open water area of the Kitty Hawk Bay located west of Moor Shore Road in Kitty Hawk, Dare County. The proposed area has a total of 7 parcels of land, of which 4 privately owned properties and 1 Town -owned property will participate in a living shoreline project. Their combined shoreline is approximately 590 linear feet (Ift) in length. The project site consists of a soft, sandy bottom and has water depths that range from -0.06 to -1.33 feet. The northwestern section of the project area is comprised of Big Cordgrass (Spartina cynosuroides), Smooth Cordgrass (Spartina alternif/ora) and Black Needlerush (Juncus roemerianus). Moving south along the shoreline, there are 2 existing pier/platform structures with tie pilings, which are owned by property owners Robinson and Meraklis. Near the Robinson pier other vegetation included the Swamp Willow, which is commonly known as the coastal plain willow (Salix caroliniana), and Arrow -arum (Peltandra virginica). The Meraklis pier connects to an area of upland, grassy lawn. Continuing south along the shoreline there is a sandy beach with trees/shrubs, including Red bay (Persea borbonia), Red maple tree (Acer rubrum), and Marsh elder (Iva frutescens). At the southern end of the project area there is a section of riprap revetment/jetty and a strand of the common reed (Phragmites australis). East of the project area is SR 1216 (Moor Shore Road) and private residences. The Wright Brothers Multi -Use Path, which is a mixed -use walk and bike path, is located south of Moor Shore Road and connects to a CAMA access area at 3613 Windgrass Circle, Kitty Hawk. The waters of the Kitty Hawk Bay are classified as SC (Aquatic Life, Secondary Recreation, Salt Water) by the Division of Environmental Management and are closed to shellfish taking. The descriptive boundary for the project area is designated as Joint Waters and is in the Pasquotank River Basin. In the fall of 2016, an SAV survey was conducted by staff of The Coastal Federation and Coastal Engineering. The SAVs noted were Eurasian milfoil (Myriophyllum spicatum), widgeon grass and redhead grass. It was reported that most of the SAVs were located further offshore, in slightly deeper waters from the project area; however, results from the survey showed abundant beds of SAV with 68 quadrats containing SAV and an average cover of 25.3%. A scoping meeting was held on March 13, 2017 at the Washington Regional Office to review preliminary plans of the proposed wooden/vinyl sill project with representatives of State and Federal review agencies. Because of concerns raised about the impact of the project to SAVs, it was recommended that an alternative analysis be prepared to include wave energy modeling and comparison between vertical structures and rock -based type specific to the project site. Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis Field Investigation Report Page 3 There was also concern in regard to usurpation of public waters and access through property currently owned by the Town of Kitty Hawk. A shoreline study was prepared by Jeff Hanson of WaveForce Technologies in August 2017, a copy of which is included with the Project Narrative. It was reported that SAV near the pier at the time of the study was a mix of milfoil and pond weed (Potamogeton). A sheetpile sill versus a rock sill was recommended to reduce the footprint of the marsh sill to minimize the impact(s) to any SAVs in the project area. There are no National Register Eligible or Listed Archaeological Sites within the project's area. Development Proposal The Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis, in partnership with The Coastal Federation, propose to construct approximately 625 Ift of wooden/vinyl sills in order to protect and restore the shoreline. The sills will be 3' wide, and will be placed an average distance of 54' from NWL and a maximum of 78' from NWL. The water depths at the location of the sills range from -0.62' to-1.33'. The sheets of the sills will have 2" gaps every 2' to allow for small marine life to pass through. Five- foot gaps will be between applicable sills for marine life passage and water circulation. The top of each sill will be an average of 6"-8" above mean water level. No fill is proposed, and erosion control matting will be used during construction where necessary to cross wetland vegetation. Reflectors will be attached to the sills, positioned every 50 Ift., and 3' above NWL. After the sills are in place, Spartina cynosuroides, Juncus roemerianus, and other native vegetation will be planted along the shoreline. Anticipated Impacts Construction of the sills will result in the filling of 1,875 sq. ft. of Estuarine Waters and Public Trust Areas. Increased turbidity will occur at the project site on a temporary basis. Submitted by: Yvonne B. Carver RECEIVED Date: 05/15/18 MAY 21 2018 DCM-MHD CITY Received Mar - 7 20118 Moor Shore Road Kitty Hawk, NC DCM-EC Living Shoreline Dare County, North Carolina Proiect Narrative Applicant: North Carolina Coastal Federation In partnership with local residents, the Town of Kitty Hawk, N.C. Department of Transportation, Dare County Soil and Water Conservation District and Coastal Engineering & Surveying, Inc. Prepared By: The North Carolina Coastal Federation 637 Harbor Rd. Wanchese, NC 27981 R Coastal Engineering & Surveying, Inc. 4425 North Croatan Hwy. April, 2018 RECEIVED MAY 21 2018 DCM-MHD CITY Received MAY - 7 2018 Introduction and Project Need DCM-EC Coastal ecosystems and communities are increasingly at risk from sea -level rise (SLR) and strong storms. North American coasts are expected to experience increasing SLR and storm -surge flooding (Romero- Lankao et al. 2014) and coastal habitats, such as marshes and reefs, are increasingly recognized for their intrinsic capacity to improve coastal resilience in addition to other important ecosystem services (Arkema et al. 2013). The North Carolina coast, with its extensive 2.1 million acre estuarine system —the second largest in the continental U.S. — is on the frontlines of these challenges. Estuarine fringing marsh shorelines are being walled off and degraded by vertical bulkheads and other hard stabilization measures. Each year in North Carolina, many more bulkheads are constructed along estuarine shorelines than living shorelines. As of 2013, records show that 125 living shorelines, compared to 9,962 bulkheads (or more than 600 miles), have been installed (Puckett, N.C. Coastal Reserve and National Estuarine Research Reserve, personal comm.). Living shorelines use a variety of structural and organic materials, including wetland plants, to prevent erosion and stabilize the shoreline. Living shorelines stabilize estuarine shorelines while maintaining the connectedness of upland and intertidal habitats, thereby preserving natural ecological processes and providing valuable and increasingly scarce marsh and nursery habitat. Saltmarsh is designated as Essential Fish Habitat (EFH) for red drum and three species of harvested penaeid shrimps. This habitat benefits a mosaic of threatened/endangered species, managed species and other commercially and recreationally valuable species, including speckled trout, flounder, sheepshead, spot, croaker, forage fish and crustaceans via offering foraging and refuge habitats. Four species managed under the federal Magnuson -Stevens Fisheries Conservation and Management Act and state Fisheries Management Plans (FMPs) will directly benefit from the living shoreline restoration proposed: red drum (Sciaenops ocellatus), brown shrimp (Farfantepenaeus aztecus), pink shrimp (Farfantepenoeus duorarum), and white shrimp (Litopenaeus setiferus). The red drum is also designated as North Carolina's state saltwater fish. In addition to the fisheries and habitat benefits of the proposed living shoreline at Moor Shore Road, four coastal property owners and one town property will benefit from shoreline protection and restoration through this project. Over the past year the landowners, federation and engineers from Coastal Engineering & Surveying, Inc. have worked to develop a project design for approximately 625 linear feet of Moor Shore Road with the intent of stabilizing the shoreline and protecting this state owned road. The design calls for an offshore sill paired with native marsh grass plantings. Moor Shore Road, or SR 1216, is located along Kitty Hawk Bay in Dare County, North Carolina. Moor Shore Road is an important community access point, state owned road and an emergency access route. Over the past fifteen years, the marsh and shoreline buffering the road have been slowly eroding away, with higher rates of erosion occurring during storm events (as reported by the landowners and observed in aerial imagery). This state maintained road connects residents living along Kitty Hawk Bay to U5158 Highway and, is an important and critical emergency access when the oceanfront is flooded. The road also serves as a mixed -use walk and bike path connecting to Tateway Park (a CAMA access point) and houses many local marathons, bringing tourists, residents, local attention and revenue to the area. The sidewalk extension of Moor Shore Road is a necessary link of Bay Drive to the South and Kitty Hawk to the North and acts as an emergency ingress and egress access to the Dare County Outer Ban�DgWEp MAY 21 2018 DCM-MHD CITY Received PAY - 7 291i3 severe weather. The stretches of marsh along Moor Shore Rd. are very narrow in some places, aCM-EC eroded to a point where the road, and N.C. Department of Transportation's (NCDOT) right of way is threatened. As a result, the proposed stretch of shoreline (Figure 1) has lost approximately 0.5 acres of natural salt marsh as observed in aerial imagery between 2002 and 2015. A living shoreline project along this stretch of shoreline will reestablish lost salt marsh while stabilizing the shoreline and protecting the existing infrastructure while producing minimal impacts to the surrounding ecosystem. Figure 1. A vicinity map of the proposed project with red line indicating the length of shoreline to be protected by the living shoreline. Due to the community uses, ecosystem impacts and need this area shows, the federation has worked over the past year to form partnerships with stakeholders to design and fund the implementation of a living shoreline project. This has resulted in NCDOT, Dare County Soil and Water Conservation District as well as the town of Kitty Hawk recognizing the immediate need for this project. These stakeholders, in partnership, recognize that the proposed structure, as described below, is of benefit to the public. As such, all of the stakeholders have agreed to provide funding to implement this project. The Town has appropriated funds through its annual budget; NCDOT has provided funding through a reimbursement agreement with the town; Soil and Water has provided a grant through their Community Conservation and Assistance Program; and the federation proposes to provide funds through a cost share grant from the National Oceanic and Atmospheric Administration to assist landowners with implementing living shoreline projects. RECEIVED MAY 21 2018 DCM-MHD CITY Existing Conditions The proposed area consists of seven separate parcels of land including four privately owned properties and one town owned property (Figure 1). The length of their combined shorelines is approximately 590 linear feet. One property has a dock and pier and portions (approximately 100 feet) of the shoreline have rip rap that was placed by NCDOTto stabilize a section of shoreline that eroded and threatened their right of way easement. The upland portion of the property is comprised of a Sport_ino cynuseroides marsh transitioning to maintained lawn and some sand and shrubby upland vegetation. There are pockets of Phragmites spp_.r _ x .-_... to the southernmost and northernmost ends of the proposed area. The wetland area contains isolated clumps and some contiguous stands of black needlerush (Juncus roemerionus). The waters off shore are classified as special secondary fish habitat and are prohibited shellfishing waters An SAV survey was conducted in fall 2016 by the federation and Coastal Engineering. A total of 16 transects were run along the length of the shoreline, out 50 feet from the shore. Every ten feet along the transect species and percent cover, using the Braun Blanquet cover classifications, were recorded. A total of 96 quadrats were monitored. Results from the survey showed patchy yet abundant beds of SAV with 68 quadrats containing SAV and average cover of 25.3 percent. Dominant SAV in uded Eurasian, milfol, widgeon grass and red head grass Most SAV was located "further off shore, inslightly deeper u waters The sill is sited to minimize impacts=to SAV whilerestoring degraded marsh habitat. A scoping meeting was held with permitting agencies in March 2017 to review the preliminary,design and to determine' steps moving forward. Army Corps of Engineers representatives stated that the project could go through their 291 process. National Marine Fisheries were concerned with impacts to SAV and requested a more thorough look into the design that will create the least impact to SAV. National Marine Fisheries also requested an energy analysis and wind rose to justify the need of sill placement in areas with SAV. They stated they would prefer to have a 10 ft. buffer around any high - density SAV areas. Resulting from the scoping meeting, Dr. Jeff Hanson, former researcher at U.S. Army Corps of Engineers and current owner of Waveforce Technologies, was hired to conduct a site suitability study for the project. The results of his study and analysis are included as Attachment A. It was determined that the hydrodynamic assessment requested by National Marine Fisheries at the scoping meeting would cost an additional $20,000 and would serve as a financial road block to the project. Instead, a comparison analysis between Moor Shore Road and Bay Cliff Community, a site with a vertical sill living shoreline having similar fetch, energy regime and facing direction, was conducted. This analysis allowed Dr. Hanson to determine the impact of the sill structure to the surrounding habitat (regional scour and disturbance) and the design suitability for Moor Shore Road. The.tnain findings of the study conclude that Moor Shore Road is in need of protection to prevent further loss of its shoreline. The study recommends a less aggressive form of erosion control than bulkheading. Instead, it was recommended that a marsh sill with vegetative will work. A sheet pile sill configuration was suggested to minimize the footprint of the structure, thereby minimizing the impacts to SAV. The report also concluded that the sill at Baycliff had minimal localized impacts due to scour around the sill pilings. Similar, minimal scour at Moor Shore could be expected. Proposed Work Proposed work requiring DCM CAMA Major permits includes the construction of an offshore low -profile wooden/vinyl sill in segments as long as 100 linear feet, positioned parallel to the shore . The sill will be placed on average 54 feet from shore. The project partners worked to place the sill so that it protected the shoreline while minimizing any impacts to SAV (Figure 2). The slope of the shoreline is gradual enough that it lends itself to planting marsh grasses without the need to bring in fill. Some minor regrading may be needed. Once the sill is in place, Juncus roemarianus will be planted along the shoreline with Sporting cynuseroides and other native vegetation. Alternative Design Considerations Length of the Sill Originally, the sill was proposed to be 100' long and protect one landowner's property. However, given the landscape of the proposed project it was determined that a single landowner taking action on their 100' shoreline would set off a cascade of events resulting in uncoordinated shoreline protection measures being installed along the whole stretch of shore. Instead, the engineer and landowners decided to come together and consider the entirety of the shoreline of Kitty Hawk Bay and Moor Shore Rd. After careful consideration and discussion the partners decided to restore the shoreline and protect it with a living shoreline. This design supports their values of supporting a natural environment, maintaining public access and increasing fisheries habitat. In addition, they saw examples of projects where increased erosion occurred on properties adjacent to shoreline stabilization projects when it wasn't done in a coordinated fashion, so it was in their best interest to work collaboratively. For these reasons, the landowners came together and expanded their shoreline stabilization project from a 100' single property project to a comprehensive, 625' community living shoreline project. Vertical v. Granite Sill The partners also considered an off shore sill constructed of granite instead of the vertical sill. It was determined that a rock sill would not work at this site because it is too shallow to bring the material in via barge and the contractors would not be able to easily work from shore to deploy the material. Also, the footprint of the rock structure would have a larger impact on the soft bottom and SAV habitat in the vicinity. A rock sill would require a 6 to 13 foot wide base to be structurally sound, whereas a vertical sill will require a 3 foot wide base. Furthermore, the design selection was supported by the results of Dr. Jeff Hanson's study which stated that an off -shore vertical sill coupled with the planting of native marsh grasses as the preferred shoreline stabilization technique. The vertical sill was the preferred option over a rock sill to minimize the impact and footprint of the structure while providing the necessary shoreline protection. Received RECEIVED MY - 7 20"3 MAY 21 2018 DMEC DCM-MHD CITY _� ®•"��'��• •,�^"'°" a GRAPIRC SCALE + '! (fie.t- { �t 3 libT15 .2 1 i ,ma uv e r i3S y f : g : 'LT✓1 i f e K t G> ".. u-•� f PNEL169NAR s, T12 S � .mmcv •, � t i i woem� KITTYIWFK TIO �qi a ! x; E 1•' S BAY7 pp� T2 "^® v�� 'IA!9 16 tea. 1 u -» - t if w3.m2.L "ID'+^' T B' � ® •ync `t i ZVI Figure 2. A site plan of the proposed shoreline. Avoidance and Minimization 1) If steps are not taken to proactively protect and restore the shore with a living shoreline, erosion at the site will continue and the landowners will eventually take action to harden the shoreline. By installing a living shoreline at the site existing marsh will be protected and the shoreline will be stabilized from erosion events 2) Approximately 0.5 acres of new fringing marsh will be restored 3) Project and agency partners will be assured that the shoreline will not be hardened by either bulkheads or revetments, which would result in the loss of existing fringing marsh or mean that the existing fringing marsh had eroded away. 4) Shallow water habitats will be maintained and SAV will continue to persist both in front of and behind the sill as shown in the comparative site in Dr. Jeff Hanson's study as well as at other living shoreline projects including nearby Jockey's Ridge State Park where SAV has successfully established behind the sill. Off -Shore Sill Construction Approximately 625 linear feet of shore -parallel low profile off shore wooden/vinyl sills will be constructed 54' on average from shore. The distance off shore was carefully considered in order to place the sill in areas where there is no SAV. Where SAV cannot be avoided, the design was modified to minimize impacts while still providing shoreline protection and enhancement. The breaker sills will be constructed of treated pilings and whalers and vinyl paneling. Pilings will be driven into the sediment not more than 10 deep', with vinyl paneling driven not more than 8' in the ground. The pilings will be spaced at roughly 5' intervals center to center. The of vinyl sheets will have 2" gaps every 2' in length to allow for small marine life passage. The top of the sill will extend on average 6"-8" above the mean water level (Figure 3). In order to allow for marine life passage and water circulation a 5' gap between one sill and the next will be provided at an interval of 1 every 90-100' in an overlapping placement. In addition, wooden piles with reflective tape, extending a minimum of 3' above mean water, will be placed along the sill at 50' intervals. The sheet piles will be driven into location with a vibratory hammer. Construction materials will be taken to the field by the main road and taken from there to the water by hand, small boat or by long reaching backhoes or excavators to the water, thus minimally impacting the shoreline. In areas in where a long reaching backhoe must sit on top of existing marsh stands, matting will be used to minimize impacts. The construction process will follow NCDOT's minimum criteria checklist process and follow their standardized specifications. TYPICAL SILL/BREAKWATER SECTION SCALE: N. T& SEE PLANS FOR DISTANCE (V AVE TYP.) R:rLECTOR AT JUNCUS '1ROEMERIANUS) PLANTED W`H SMOOTH COROGRASS I RY (SPARTINA ALTERNAFLORA) MATH -HE INTERTIDAL ZCNE enow MHW (TYP) •s IP.AYE. CREST OF SILL BOTTOM HFY. PRELIMINARY NOT FOR USE FOR CONSTRUCTION OR RECORDATION Figure 3. Preliminary drawing of the proposed off -shore low -profile sill. This figure is to serve as an example of an offshore sill and the proposed sill will be constructed of either wood or vinyl. RECEIVED Received MAY 212018 NLAY - Z 2078 DCM-MHD CITY DCM_EC Monitoring and Maintenance As part of the grant requirements, monitoring will be conducted by the University of North Carolina Institute of Marine Sciences and the North Carolina Coastal Federation. Monitoring will include percent vegetation cover, topography, footprint and morphology of sill. The monitoring will be conducted before construction occurs and will continue annually until three years after implementation. Long-term maintenance of the structure will be assumed as a town responsibility. The town is assuming the sill as part of their infrastructure. The town has required a formal easement from the landowners to ensure access for maintenance purposes. Received Attachment A Pages to Follow MaY - 7 ?P" g DCM-EC RECEIVED MAY 21 2018 DCM-MHD CITY WaVeForce technotogies MOOR SHORE DRIVE SHORELINE STUDY Project Report Submitted to: Coastal Engineering and Surveying, Inc. Submitted by: Jeff Hanson, PhD., WaveForce Technologies LLC Updated: August 1, 2017 RECEIVED MAY 21 2018 Received MAY - 7 20118 DCM-EC DCM-MHD CITY BACKGROUND North Carolina has dynamic estuarine shorelines that often experience erosional degradation. Land is lost by episodic storms, boat wakes, and tidal currents near inlets. These effects are enhanced by a rising sea level. It is important to strike a balance between the need to provide public protection from these coastal hazards and the need to maintain the integrity of the natural system. This is especially important in fragile estuarine environments that provide essential nesting and feeding habitats for aquatic plants and animals, including most species of local commercial importance. Because of this continuing problem, North Carolina allows several options for shoreline stabilization. Shoreline stabilization is defined as the use of engineered structures, vegetation, or land management practices to protect a shoreline from further or future erosion. Although the most commonly used method is a bulkhead, this is often the most detrimental to the environment and can result in significant damage to the local ecosystem. Other methods, such as vegetation, oyster reefs, or marsh sills, have been shown to improve local habitat rather than degrade it. An excellent overview of available options is provided by the NC state division of Environmental quality: http://dec[.nC.gov/about/divisions/coastal- management/coastal-management-estuarine-shorelines/stabilization/stabilization-options . STUDY OBJECTIVES The purpose of this study is to make recommendations on a proposed shore protection project along Moor Shore Road or SR 1216, located along Kitty Hawk Bay in Dare County, North Carolina (Figure 1). Shoreline areas adjacent to both privately- and town -owned properties are included. The coastline configuration, expected wave climate, and desired recreational uses are evaluated to provide guidance on selecting appropriate shoreline stabilization plans for the. Moor Shore site. SITE DESCRIPTION The proposed project will protect property along Moor Shore Road. This state-owned road is an important community and emergency access route. Moor Shore Road connects residents living along Kitty Hawk Bay to US 158 Highway, thus providing critical emergency access when the oceanfront is flooded. The road also serves .as a mixed -use walk and bike path connectingto Tateway Park (a CAMA access point) which supports many local bicycle events and marathons, thus bringing tourists, residents, local attention and revenue to the area. The sidewalk extension of Moor Shore Road is a necessary link of Bay Drive to the South and Kitty Hawk Road to the North. This extension acts as an emergency route for Dare County during severe weather. ra Figure 1. Kitty Hawk Bay Project Setting Ufa eForce technologies Although the site appears to be in a protected area in the back of Kitty Hawk Bay, the marsh and shoreline buffering the Moor Shore Road site has exhibited significant erosion for many years. Project area detail appears in Figure 2. The shoreline contained within the yellow box is the focus area for this project. The red arrows indicate high -erosion areas that directly impact Moor Shore Road. The letters A-D show the general location depicted in photos A-D in Figure 3. Moving along the shoreline from northwest to southeast, the initial section is comprised mostly of big cordgrass (Sportino cynosuroides) with tuffs of black needlerush (Juncus roemeranus) offshore (Photo A), leading over to a sandy beach with a private pier (Photos B and C) followed by a riparian riprap revetment (Photos C and D), which terminates in a stand of the common reed Phragmites australis (Photo D). The submerged aquatic vegetation near the pier appears to be a mix of milfoil (Myriophyllum sp.) and pond weed (Potamogeton sp.). See Figure 4 for additional detail on the vegetative components. Figure 2. Moor Shore Road project location. Arrows show high erosion areas. Letters A-D refer to photos in Figure 3. RECEIVED Received mn Y -'7 MAY 21 Z018 DCM-EC DCM-MHD CITY Figure 3. Moor Shore Road project area photos. Letters A-D refer to locations on Figure 2. Figure 4. Site vegetation: (a) southeast end Phragmites sp., (b) northwest end Sportina sp., and (c) submerged Myriophyllum sp. and Potamogeton sp. 4 BAYCLIFF LIVING SHORELINE CASE STUDY As a case study for living shorelines in Outer Banks environment, we look at a protection structure that was constructed in 2010 for the BayCliff community on Colington Island, Kill Devil Hills, NC. BayCliff is only 4 miles away from the Moor Shore Road site and with a similar southwest wind exposure (Figure 5). Prior to construction, BayCliff experienced extensive coastal erosion with loss of both personal- and community -owned real estate property. The shoreline was virtually riddled with fallen trees resulting from the storm impacts. Construction of a series of 12 vinyl sheetpile offshore breakwaters, or marsh sills, along with vegetative replanting, has effectively stopped additional erosion with no additional loss of trees while substantially increasing the area of established marsh and submerged aquatic vegetation (SAV) habitat (Figure 6). Figure 5. Vicinity of Boycliff to Moor Shore Road Received RECEIVED 5 MAY 21 Z018 DCM-EC DCM-MHD CITY J Figure 6. Aerial view of BayCliff marsh sill structures. Example photos of the BayCliff installation appear in Figure 7. Note planted black needlerush (Juncus roemeranus) marsh grass has been expanding out to meet the sill. Furthermore, the calming effect that the sill has on the wavefield is immediately apparent. It is remarkable that this project survived a direct hit by Hurricane Irene in 2011 with zero damage to the structures, while all the neighboring piers were essentially destroyed. Subsequently the structures have weathered several additional hurricanes and storms including Hermine and Matthew during 2016. To date, the structures have required no maintenance or repairs. It should be noted, however, that a few BayCliff homeowners opted not to have the marsh sills installed in front of their properties. These gaps in protection still experience a significant amount of erosion and tree loss. 0 Figure 7. Sheetpile sill with vegetative planting at BoyCliff community: (a) View during low water levels, (b) Sill tripping waves during storm event Received RECEIVED MAY 21 2018 DCM-MHD CITY DCM-EC BayCliff Survey Results To determine the impact of the BayCliff sills on the local shoreline, including the establishment of marsh habitat, a series cross -shore bathymetric surveys were performed. Each transect measured the water depth as a function of distance from the shoreline. Furthermore, of extent of marsh grasses along each transect was noted. Results in Figure 8 compare water elevation profiles across the closest sill depicted in the Figure 7 photos, and an area directly adjacent to this without any sill structure to protect the shoreline. It is immediately apparent that, compared to the no -sill transect, the shoreline has stabilized shoreward of the Sill structure, with little evidence of wave scour. Furthermore, the seaward extent of the marsh is substantially greater behind the sill than in the unprotected area, as the no sill transect depicts an erosional scarp with a 2-foot drop off around 20 feet from the shoreline. 1.00 0.50 0.00 C -0.50 r ti -100 r✓ -L50 -L00 -2.50 -3,00 BayCliff Shoreline Profiles 0 20 40 60 80 100 120 140 Distance Iftl Harsh 11 Marsh 160 Figure 8. Comparative cross -shore transects at BayCliff Community from May 2017, showing positive impact of sills on shoreline enhancement and Marsh habitat. The mean waterline is at Depth = 0 and intersects the shore at Distance = 0. Gap Effects As indicated, a few of the BayCliff residents opted not to invest in a shoreline protection structure. To demonstrate the erosive effects of such gaps, we conducted a bathymetric and photographic survey of the largest gap area in the BayCliff community. The site of these surveys is depicted in Figure 9. Note that that there are large erosional cusps in the shoreline behind the gap. The results from three cross - shore bathymetric surveys (North, Gap, and South locations on Figure 9) appear in Figure 10. In each survey, the water depth was measured as well as the presence or absence of marsh and SAV habitat. The survey results show that although there is substantially more buildup of bottom material around the gap, it is completely devoid of either marsh or SAV habitat. Results of the shoreline photographic survey in the region are depicted in Figure 11. Here is it clear that the shorelines behind the sills support established marsh habitat while the shorelines in the gap region are clearly eroding. The ongoing loss of living trees remains a problem in this area. What is likely happening here, as depicted by the yellow arrows In Figure 9, is that the gap area forms a rip current during storms which effectively transports eroded beach material offshore. A significant advantage of the marsh sills is the effective trapping of any eroded material so that the sediment stays close to the shoreline. F] Figure 9. Satellite image showing BayCliff shoreline where two property owners left a gap in the coastal protection structure. See text for further description. 1 OS 0 x -0.5 t -1 0 -2 -2.5 0 BayCliff Shoreline Profiles - Gap Effect 20 40 60 Distance (ft) —North Sill x North Marsh O North SAV —Gap —South Sill % South Marsh O South SAV SO 100 120 Figure 10. Comparative cross -shore transects at BayCliff Community from June 2017, showing negative impact of a gap in the shoreline protection structure on Marsh and SAV habitat. The mean waterline is of Depth = 0 and intersects the shore at Distance = 0. RECEIVED Received r:] MAY - 7 20°3 MAY 21 2018 DCM-MHD CITY DCM-EC �9aa9� qu 1 r (fp Gty �-�3q � ��nnnz. _�^� '•d A1ty�� IY.t 'vs 1 u v ey Y LOCAL WIND, WAVE AND WATER LEVEL CLIMATE Essential to any soundside project design is a full understanding of the expected wind, wave and water level climate for the site. Although there are limited wind and wave data for the exact project location, the US Army Corps of Engineers Field Research Facility (USACE FRF) in Duck, NC has been measuring conditions in Currituck Sound at comparable sites to the north. Computer simulations are used to turn the USACE regional data into site -specific wave predictions. For water level extremes, USGS has maintained regional measurement stations, capturing the most significant storm events in recent history. Furthermore, USACE has assisted the Federal Emergency Management Agency (FEMA) in a 100-yearstorm surge study of the region. These observational and model data sets are used to help determine if a living shoreline structure is likely to be successful in the Moor Shore Road environment. As a baseline, we will compare conditions at the Moor Shore road project site with those at the BayCliff community project, just 4 miles away from Moor Shore Road and with a similar southwest exposure (Figure 5). Regional Bathymetry Knowledge of regional bathymetry is essential for modeling of the local wave climate as well as determination of optimal shoreline protection structures. The bathymetric profile in Kitty Hawk Bay is perfect for supporting a living shoreline installation. As shown by the navigational chart of Figure 12, the bottom surrounding the project site is 2-4 ft depth just off the shoreline gently sloping to average depths of 4-5 feet. A 6-9 ft depth channel runs offshore of the site and is marked by navigational aids "4" and "6" on the chart. Received NAY - 7 20;0 DMEC PECEjvED MAY 212018 11 DCM,MNO CITY Legend o USGS - HWM - Irene 0 USGS - Water Level S USACE - Waves 0 0.5 1 2 Mies Na0anal Ocean Service- Nautiml Chart 12204 u Pmjecami: NAD 83 CcanLnate System NC State Plane Zm a 3200 u' a Units: U.S. Feel Figure 12. Regional nautical chart showing water depths in feet. The chart also depicts locations of USGS and USACE data sets and High -Water Marks (HWMs) described in the text. 12 Wind and Waves USACE Measurements The USACE FRF has maintained a 35-year record of wind and wave observations off the coastal research pier in Duck, North Carolina. Although the ocean -side wave measurements are of no relevance to this project, their 35-year wind history nicely captures the expected wind climate for the region. This is best visualized through a wind rose, appearing in Figure 13. The wind rose provides a histogram of wind speed occurrence (%) as a function of wind direction. The FRF wind observations depict a strongly bi-modal wind direction distribution for the region. The strongest winds are from winter and spring storms, with winds primarily from the north and northeast. Kitty Hawk Bay is well protected from these events and generally experiences lower than normal water levels as northeast winds push water away from southwest -facing shorelines. The remainder of observed wind events are from the southwest, which is a typical summer wind pattern resulting from flow around the offshore Bermuda High. Southwest winds are typically in the 0-25 mph range, however can peak to hurricane strength when tropical storms pass over the region. Wave forcing in this direction has a direct impact on the Kitty Hawk Bay site and is the primary cause of the erosional problems noted above. mph 65 50 ao RECEIVED 25 12 o MAY 21 2018 DC"-MHD CITy Figure 13. Regional wind rose from US Army Corps of Engineers research pier in Duck, NC. Wind directions reported in the 'From North' convention. 13 Received W) - 7 29:8 DCM-EC In addition to measurements at the USACE pier, a series of five instrument platforms have been installed by USACE to form both cross -shore and alongshore .arrays in Currituck Sound (htto://www.frf.usace.army.mil/ckSound/csa.htmi ), which is just to the north of the Moor Shore road test site. The most relevant station for this study is station CSA01, as depicted on Figure 12 (Green Dot). This station has been operational since March 2016. A 14-month histogram of wave heights from USACE FRF Station CSA01 appears in Figure 14. Note that this period includes two notable storms; extra -tropical storm Hermine occurring on September 3, 2016 and Hurricane Matthew on October 9, 2016. The mean wave heights for this site are only 0.8 ft with an extreme wave height of 4.7 ft recorded during Hurricane Matthew. Note that due to the small geographic area of the sound, it can generally be assumed that winds and waves are directly aligned except as impacted by refraction around the shallow edges off the shoreline. 0000 USACE CSA-01 (March 2016 - May 201 7000 6000 N Ol 5000 U u U 0 4000 W O W E 3000 D z 2000 1000 0' 0.1 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Wave Height Feet Figure 14. Observed 14-month wave height distribution at USACE station CSA01 14 Wave Energy Study As we have a successful living shoreline project protecting the nearby BayCliff community, the question to ask is how similar is the wave climate at these two sites? Can we expect a comparable level of performance in Kitty Hawk Bay? It can be assumed that both sites experience similar wind forcing, being geographically separated by only 4 miles. To address this issue, we turn to a shallow -water fetch -limited wave calculation (Coastal Engineering Research Center, 1984). It is important to use a shallow waterwave model due to the shoaling depths encountered near the project sites. As Figure 15 reveals, the depths leading into the Moor Shore project site are shallower over a greater distance than those at BayCliff. Furthermore, a fetch -limited calculation is required as the southwest wind forcing distances are limited by the width of the sounds. Computed fetches and mean water depths for each site are provided in Table 1. Note that the intercoastal waterway channel is too far from the project sites to influence the wave climate, and thus was not included in the mean depth computation. Using these parameters as input to the wave model, predicted significant wave heights for a variety of southwest wind conditions appear in Figure 16. Table 1. Project Site Southwest Wind Fetch and Mean Water Depths Project Fetch (mi) Mean Depth (ft) Moor Shore 9 5.8 BayCliff 7 7.2 a •q �f` ,y'• a ' � y Figure 15. Southwest wind fetch chart 15 RECEIVED MAY 21 2018 DCM-MHD CITY Received -? 7"IT DCM-EC S.o 4.5 4.0 5 3.5 m = 3.0 w 7 2.5 nb 2.0 y 1.5 1.0 0.5 Predicted Wave Heights 0 20 40 60 80 100 Wind Speed (kt) --e- Kitty Hawk Bay a BayCliff Figure 16. Wave height predictions during southwest winds at Kitty Hawk Bay and Baycliff project sites The wave prediction results clearly show that, for southwest wind speeds greater than 20 kt, the wave heights impacting BayCliff are higherthan those in Kitty Hawk Bay. As wind speed increases, the difference in wave heights between the two project sites becomes larger. Hence it can be concluded that there is generally less wave energy at the Kitty Hawk Bay project site over the expected range of conditions. Water Levels Although the living shoreline structures are not designed to protect property during extreme high-water level conditions such as can occur during a hurricane, we include such information here to support the planning process. We provide two types of data; (1) observations of water levels during significant storms of record during recent history, and (2) results of a FEMA coastal storm surge modeling study for the region. Note that all water levels are referenced to the North American Vertical Datum of 1988 (NAVD 88). Hurricane Extremes The two recent storms of record for the soundside region are Hurricanes Irene (August 2011) and Matthew (October 2016). Both had a major impact on the Outer Banks; however, Irene was by far the most devastating for soundside properties in our region of interest. The US Geological Survey (USGS) has routinely collected high water mark information after these storms, and more recently has started recording water level time series at key locations during these events. Two high-water marks were EC collected from Hurricane Irene directly at the Moor Shore Project site (red dots in Figure 12). The observed water levels at this site were 6.9- and 7.1-ft. This can be compared to the time series of water levels collected during Hurricane Matthew at the mouth of Colington Harbor (Yellow dot in Figure 12) and depicted in Figure 17. The results show that Matthew brought a maximum water level of 3.19 ft and a maximum unfiltered (with waves) elevation of 4.5 ft at this location. During these elevated hurricane conditions, the waves pass over the top of the shore protection structures, thus reducing the effect of the structures in blocking wave energy from reaching the shoreline. This helps explain why the shore protection structures appear to do so well in surviving hurricanes, while nearby piers are destroyed. " �anN Yna�[Yr�mn �I USGS science for a changing world • rY..�u�Yu�aru<Y..Ym Storm Tide Water Eleiratim. Latitude: 36.0119 Longitude:.75.7268 STN Ste ID: NCDAN12666 Barometric fT tme. Latitude: 35.9300 LoNibide:.75.5958 STN Site ID: NCDA1t00009 C C e 200 Y 0.01. '20.0 Oct406.1016 oa-07.2016 Oct-08-2016 Oct-09-2016 Oct-10-2016 Oct-11-2016 Oct-12-2016 00:00 00:00 woo 00:00 W:W 0000 00:00 Timezone: D5IEa6tem Figure 17. Hurricane Matthew (October 2016) Measurements from USGS Colington Harbor Station (Yellow dot on Figure 12 chart). NC Storm Surge Study The North Carolina Floodplain Mapping Program conducted an extensive study to update the coastal storm surge elevations within North Carolina coastal waters (http://www.ncfloodmaps.com/). The study provides updated coastal storm surge stillwater elevations and serves as the basis for new coastal hazard analyses and updated Flood Insurance Rate Maps. The study utilized the Advanced CIRCulation Model for Oceanic, Coastal and Estuarine Waters (ADCIRC) coupled with two-dimensional wave models to calculate the combined effects of surge and wind -induced waves. A key product resulting from the NC study are expected 100-year flood levels along the NC coast. Results for the Kitty Hawk Bay study area appear in Figure 18. Note that flood levels of approximately 3.9 feet can be expected to occur approximately once in any given 100-year period. Any co -existing wave activR�yi{Leived RECEIVED GG11�� 17 po - 7 2918 MAY 21 2018 DCM-MHD CITY DCM-EC be on top of these elevated water levels. As previously indicated, the recent storm of record for this region is Hurricane Irene from August 2011, which had measured high water marks (storm surge and waves) of approximately 7 ft at this location. yw•., FEMA tddyr elidvater. eWmdom am fiom FEMA Rion N Storm Stage Study. May fa referenced 10 tlw N American Oahe of 19n NoM ra a Stata F1arm mae 32M Legend FEMA 100yr o SWEL NAVD88 Feet ■ 0 0.125 0.25 0.5 we Miles e Figure 18. Computed 100-year Still Water Elevations (SWEL) in feet for the Kitty Hawk Bay project area. 18 SITE RECOMMENDATIONS Based on our review of existing shoreline configurations and the expected wind, wave and water level climate, we determine that the proposed Moor Shore Road project site in Kitty Hawk Bay is in critical need of a shore protection structure to prevent further loss of shoreline. Specific recommendations appear in the following section. Shore Protection Options North Carolina allows for a variety of shore protection options, from passive vegetative planting to aggressive bulkhead solutions. As the Kitty Hawk Bay shoreline is somewhat protected by a semi -enclosed bay with mostly shallow water, a less aggressive form of protection is warranted. Hence, we recommend a marsh sill configuration coupled with vegetative restoration. These structures are ideal for preventing further erosion in low energy areas while promoting habitat rejuvenation. A marsh sill is a shore -parallel structure that is designed to protect existing or newly planted wetland vegetation. It can be constructed of rock, rubble, or a wood or wood/vinyl (sheetpile) structure. It is placed just offshore of existing marsh to reduce shoreline erosion. If there is insufficient marsh on the site, the sill is placed just offshore of where marsh would naturally occur and is subsequently planted. The basic configuration of a sheetpile sill is depicted in Figure 19. As rock and rubble has (1) a larger footprint, and (2) the tendency to become redistributed during storms, the sheetpile configuration has less impact on SAV habitat and is more permanent and desirable. Received W % - 7 20)0 DCM-EC Figure 19. Sheetpile sill configuration (side view) The marsh sill works by dissipating incoming wave energy to reduce sediment transport and resulting erosion. This allows marsh to become better established shoreward of the sill. Once established, the marsh grasses further dissipate incoming wave energy. Marsh vegetation also increases the ecosystem habitat and provides food for organisms such as algae and seaweeds, finfish and shellfish, mammals and shorebirds. This stabilization method can be permitted through a LAMA Major or General Permit. A complete list of the CAMA requirements for sheetpile sills appears as APPENDIX A. RECEIVED 19 MAY 212018 DCM-MHD CITY Further support for this type of structure comes from the successful use of a sheetpile vinyl sill at the BayCliff community, just 4 miles from the Moor Shore Road project site. As demonstrated, BayCliff receives more wave energy than is expected at Moor Shore Road and the BayCliff Sill project has fully stabilized the shoreline and expanded the marsh habitat. Project Recommendations Our recommendations for the Moor Shore Road soundside protection project are to construct a series of overlapping sheetpile sills. The sills should be placed approximately parallel to the shoreline, no more than 20 feet seaward of the normal high-water mark. As there is insufficient marsh grass along this shoreline to further reduce wave action and erosion, the region behind the sills should be planted with a mix of appropriate native emergent vegetation to blend with existing marsh grasses adjacent to the project. Examples include cordgrass (Spartina sp)., rice cutgrass (Leerzio oryzoides), and black needlerush (Juncus roemeranus). These plantings should be planned for late spring as the lowest wave energy for the region occurs in early to mid -summer. References Coastal Engineering Research Center (1984). 5 hore Protection Manual, Eqns. 3-39 and 3-40, U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg Mississippi. 20 APPENDIX A. NORTH CAROLINA SHEETPILE SILL CONDITIONS (a) The sill shall be positioned no more than 20 feet waterward of the normal high water or normal water level or 20 feet waterward of the waterward edge of existing wetlands at any point along its alignment. For narrow waterbodies (canals, creeks, etc.) the sill alignment shall not be positioned offshore more than one sixth (1/6) the width of the waterbody. (b) Sills authorized under this General Permit shall be allowed only in waters that average less than three feet in depth along the proposed alignment as measured from the normal high water or normal water level. (c) Where the Division of Coastal Management staff determine that insufficient wetland habitat exists along the permittee's shoreline to provide adequate shoreline stabilization, the permittee shall be required to plant appropriate wetland species landward of the sill structure as directed by the Division of Coastal Management staff. (d) Construction authorized by this general permit shall be limited to a maximum length of 500 feet. (e) The sill shall be constructed with an equal gap between each sheathing board totaling at least one inch of open area every linear foot of sill. The sill shall have at least one five-foot opening at every 100 feet. The sill sections shall be staggered and overlap as long as the five-foot separation between sections is maintained. Overlapping sections shall not overlap more than 10 feet. (f) The height of the sill shall not exceed six inches above normal high water or the normal water level. (g) Offshore sill sections shall be set back 15 feet from the riparian access dividing line. The line of division of riparian access shall be established.by drawing a line along the channel or deep water in front of the property, then drawing a line perpendicular to the line of the channel so that it intersects with the shore at the point the upland property line meets the water's edge. The setback may be waived by written agreement of the adjacent riparian owner(s) orwhen the two adjoining riparian owners are co -applicants. Should the adjacent property be sold before construction of the sill begins, the applicant shall obtain a written agreement with the new owner waiving the minimum setback and submit it to the Division of Coastal Management prior to initiating any construction of the sill. (h) Sills shall be marked at 50-foot intervals with yellow reflectors extending at least three feet above mean high water. (i) No back -Fill of the sill or any other fill of wetlands, estuarine waters, public trust areas, or high ground is authorized by this general permit. 0) No excavation of the shallow water bottom, any wetlands, or high ground is authorized by this general permit. (k) The sill shall be constructed of vinyl or steel sheet pile, formed concrete, timber, or other suitable equivalent materials approved by the Division of Coastal Management. RECEIVED Received 21 MAY 21 ZA l;ar -7 2913 DCM-wo CITY DMEC (1) Perpendicular sections, return walls, or sections that would enclose estuarine waters or public trust areas shall not be allowed under this permit. (m) The permittee will maintain the sill in good condition and in conformance with the terms and conditions of this permit or the remaining sill structure shall be removed within 90 days of notification from the Division of Coastal Management. 22 l' �0 6: 1923 P: 277 Dee Id: 6324606 W10712013 03 2a P11 Raulot •: 13-2020 03 aPala M .Al Varaoltla neAOno-6nilh, Rngixbrn.1 pods CD97 T\' Y" � REAL ESTATE DARE h 1 COUNTY 1 , TRANSFER TAX FMI LA C,( LT ' — CAROLINA GENERAL WARRANTY DEED LTN407-13 \V $4,850.00 Revenue Stamps S Tax Lot No. Parcel Identifier No. 018226222 Verified by County on the _ day of by Mail after recording to Casey & Ragaller, P.O% 28. Nags Head, NC 27959 This instrument was prepared by Starkey Sharp , A(lkhsey at Law Brief Description for the index I Lot 22, Ke 0" Hill, Section Two GRANTOR Stephen J. Rekas and wife, Debra F. Rekas 3801 Moor Shore Road Kitty Hawk, NC 27949 GRANTEE J. Meraktis and wife, V. Meraklis Miner Street ester, PA 19382 C� The designation Grantor and Grantee as used herein shall include said parties, their { successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context.1 WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the O of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simpic, a t certain lot or parcel of land situated in the Town of Kitty Hawk, Altan[ic Township, Dare County, North Carolina and more part cuiarly described u follows: ECEIVED See attached Exhibit A MAY 21 2018 DCA•MHD C,TM J If Checked, the property includes the primary residence of at least one of the 0 tors. (NC GS § 105-317.2) �jA This instrument prepared by Starkey Sharp, a licensed North Carolina attorney. Delinquent taxes, if an�a be paid by the closing attorney to the county tax collector upon disbursement of closing proceeds 6324606 a' 1923 P: 277 page I of 3 3/7/13 3:28 M 1IIINN'A1011VIChFdr4iU.EYO�,NJhLIY1RIF�L4k+r IN'd 11111 Received ov - 7 201.3 DCM-EC Book 1923 Page 277-0001 0 1' n�. The property hereine described was acquired by Grantor by instrument recorded in Book 1868, Page 271 . A map showing the abo"scribed property is recorded in Plat Cabinet B, Slide 399 TO HAVE AND TO HOLLQM, aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. lj_ And the Grantor covenants with Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketabl Bee and clear of al I encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons who e except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions; Easements and restrictions of record, if any, in Dare County Registry. IN WITNESS WHEREOF, the Grantor has hto set his hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized offrcer®y authority of its Board of Directors, the day and year lost above written. J �An/sY T.a�n.e� (SEAL) Stephen J. Rekas O.V t-ie �' (SEAL) V Debra F. Rekas O (SEAL) (SEAL) STATE OF NORTH CAROLINA COUNTY 01 ARE I the undersigned Notary Public for the State and County aforesaid, do hereby certify that`$Igp{ren t. Rekas and Debra F. Rekas personally appeared before me this day and acknowledge due execution of gmn��inaWmen[. Witness my hand and official seal this 20 day of February, 2013. �� My Commission Expires: ✓,C."' 722015 Notary Public RHODF', O 0(NRY '• �qRE C0�3� 63246v006 arB:: 19233 P: 277 Ptya�gety2�,�off/3 a3B/7/11,33 W3:'`2a PM mill 111'ill. 14Ii1T11r1ML.1laWIMIR.1111,�tl•rI4IN Book 1923 Page 277-0002 Exhibit A �0 \A'%KIC, Parcel L All that certain lot known Lot 22 of the subdivision known as Keeper's Hill, Section Two, as shown on a map prepared by Triangle Engineering Services, lndiyihich map is duly recorded in Plat Cabinet B at Slide 399 of Dare County Registry. O Parcel 11: n A certain parcel of land in Ad n'G�Township in the Town of Kitty Hawk in Dare County, North Carolina adjacent to Section Two of the Keeper's Hill Subdivision an (O,)crlbed es follows: Beginning at a point located in the no, astern right-of-way of Moor Shore Road, a 45 foot state right-of-way, which point of beginning marks the intersection with t right-of-way of the dividing line between Lots 21 and 22 of Section Two of the subdivision known as Keeper's Hill, same being shown in Plat Cabinet B at Slide 399 of the Dare County Registry and running from the point of beginning a course of South 27 deg. 95 min. 00 sec. West a distance of 47.20 feet and crossing the Tight -of -way of Moor Shore Road to a point; thence continuing a course of Soutlw deg. 05 min. 00 sec. West a distance of 156.45 feet to a point an the high water line of the Kitty Hawk Bay; thence fuming and nor,along the high water line of Kitty Hawk Bay a course of North 59 deg. 30 min. 05 see. West a distance of 53.59 feet to a pointy th mming and running North 22 deg. 27 min. 52 sec. East a distance of 157.10 feet to a point in the southern right-of-way of Moor SOad; thence continuing a course of North 22 deg. 27 min. 52 sec. West a distance of 44.934 feet to a point in the northern right-of-w nor Shore Road, said point marking the comer of Lot 22 of Section Two of the Keeper's Hill Subdivision as rcRercd to above; , 5e turning and following the northern right-of-way line along the curve to the right when proceeding in a southeasterly direction, Sal having an arc length of 70.44 feet and a radius of 146.84 feel to the point of beginning. i sn� Saving and excepting however from the property herein abd; k dlscribed that portion of property lying within the rightof-way of Moor Shore Road, a 45 foot right-of-way.�( The property herein above described being adjacent to Lot 22 ofiglion Two of the Keeper's Hill Subdivision and located immediately oppositee such lot on the other side of Moor Shorc RdQ and running to the shoreline of Kitty Hawk Bay and being Sometimes identified as Lot 22A. �X Received IRN I � 1 Lr9P DCM-EC 6324Ba6 B: 1923 P: 277 Pape 3 of 3 3/7/13 3 28 PM Ill I'�Ph+Pii 4i�Ch�'Cl�ii E4i1N�C14tiSiMlliutilN"! milli 16 0 Y V RECENED MAY 21 Z0I% DGM-MHD CITY Book 1923 Paqe 277-0003 O` FIlW Book 1541 RMW tap DoR ta. 612"22 � `' "4 a120N 10.30R11 eao Coo DEED BARBARA M CRRv, REGISTER � MME R.atR1 a'. 10'S6T K Eaolu T. RC $0. 00 DRRE CO, RC \(k[te� I i alzzzn D IIIII IIIII IIII III�III IIIII IIIII IIIII III IIIII IIII IIII Ai.�.v.�e1JIM^1^� 01f141]006 10. 39M NO. 1 TI+ b— (Space Above for Recorder's Use) -No Title Examination has 649 performed by this preparing attorney N NORTH CAROLINA Prepared By: Michael A. Colombo, Attorney File: Colombo. Kitchm, Dunn & Ball, LLP 1698 E. Arlington Blvd., Greenville, NC 27858 DEED DARECOUNTY 6 THIS DEED made and red into this 1st day of August, 2003, by and between J. SAMUEL ROEBUCK and wife, CAROLE SYMO OEBUCK, of Pasquotank County, North Carolina, Grantors; and ROEBUCK PROPERTIES If, allorth Caroliolimitedliabilitycompany whose mailing address is 1816Rivershore Road Elizabeth City, North Carolina, 27909,.i_`te>>e; WI TrNESSETH: That Grantors for and in consideration considerations to them in hand paid by the Grantee, the rke1 and sold and by these presents do hereby bargain, sell, and g simple, those certain tracts or parcels of land lying and being County, North Carolina, and being more particularly descrit sum of TEN DOLLARS ($10.00) and other valuable pt of which is hereby acknowledged, have bargained �vey unto Grantee, its successors and assigns, in fee iNe Town of Kitty Hawk, Atlantic Township, Date Tract 0ne: Being all of Lot 10 of the subdivision known as Keeper's Hill, Section One, map or plat thereof made by Professionaand Services, Inc., and recorded in the Office of the Register of Deeds of Dare'01hunty, North Carolina, in Plat Cabinet B, Slide 170 and 171. This is the sarn ����..QQperry described in deed dated November 9,1983 from Foreman, Roebuck, & Sharp to J.S. Roebuck recorded in Deed Book 358, at Page 554 of the otmty Registry. This property is further identified by the Dare County TIiinDepartment as Parcel No. 018226-010 and PIN No. 987507.67-6653. FtEcENEd` Received MAY 212018 MAY - 7 N18 DCM-NIMD CITY D C M-E C Book 1541 Page 149-0001 . 4 Deed, Page 2 Illllllllllllllllilillllllllllllll 11111111111111111 IN 0 : 2 of 30:88W �j. Tract Two: Being Lot 19 of the subdivision known as Keeper's Hill, Section Two, as shown on a map prepared by Triangle Engineering Services, Inc., O which map is duly recorded in Plat CabinetB, Slide 399, Dare County Registry. This is the same property described In deed dated December 9, 1988 from Foreman, Roebuck, Sma11 & Sharp to J.S. Roebuck recorded in Deed Book 603, nat Page 390 of the Dare County Registry. This property is further identified by �he Dare County Tax Department as Parcel No. 018226.219 with PIN No. W511-56-9838. TO IAND TO HOLD the foregoing described tracts or parcels of land and all privileges and appurtenances thereun((((((JJJJJJt l,e'�longing or in anywise appertaining unto the said Grantee, its successors and assigns, in fee simple forever. Y And Grant o for themselves, their heirs, executors and administrators, covenant to and with the Grantee, its successors and 1 s that they are seized in fee of said premises and have the right to make this conveyance in fee simple; tha[`tha same is free and clear of all encumbrances whatsoever except for restrictive covenants, if any, of record in the Dare County Registry, highway or road rights of way, any easements of record in the Dare County Registry, any and&l zoning regulations of the Town of Kitty Hawk, County of Dare, State of North Carolina, ad valorem taxes subsequent to the year 2002, and any and all deeds of trust of record secured by such property; and that they will foreveP Krrant and defend the title to the same against the lawful claims of all persons whomsoever. �V\1 IN TESTIMONY W HEREOthe said Grantors have hereunto set theirhands and seals this the day and year first above written. 0�,'. /£ G/ (SEAL) T, SAN= ROEBUCK O�j�) _._ I"d,�l 7""OLE SYMONS ROEB CK d O Book 1541 Page 149-0002 Deed, Page 3 illlllfllllllllliflifillJillliml 11Hilllilillll''�z22 0' 10.399M 6. STAT�'E)OF NORTH CAROLINA YkN COUNT P 0, �. � ' a Notary Public in and for the aforesaid County and State do hereby certify J. SAMUEL ROEBUCK per nally appeared before me this day and acknowledged the due execution of the IeAegoing instrument. t! 46. • . • •"Iptmy hand and Notary Seal this the day ot'� , ZOpEC TA STATE OF NORTH CAROLINA COUNTY OF Ppf� 1,0 Ka Notary Public in and for the aforesaid County and State do hereby certifythat ARO SYMO SRO K,Personallyappearedbeforemethisdayandacknowledgedthe h`J#a C•i • � f`the foregoing instmmen[. Iv.. � C ••c•� ••;'Wiffess my hand and Notary Seal�i3 the day o +, U- , 200 ?.,.. n Pub !16 ,136kifi i"d Expires: . 0ssuY... NORTH CAROLINA DARE COUNTY The foregoing certificate(s) of O Notary(ies) Public Ware certified to bd correct. This instrulneem and this to are duly registered at the date and time and in the book and page shown on the first page hereof. Register gDeeds for Dare County RECEIVED MAY 21 2018 DCM-MHD CITY Received !NwY -1 791 DCM-EC Book 1541 Page 149-0003 s P 0 v r r 6247962 B: 1780 P: 461 Papa 1 of 3 9/30/06 3:52 PM X� mill Vi0c�,Irtl�hhwL'4�6�,�411NiW.����►+id�lh REAL ESTATE DOe Id: 6247962 C`d31fITY y h TRANSFER TAX B: 1760 P: 461 pa�aiPt R, 0"337 �y 09J3012008 03 82 PM NCExclsa Tax d: $1220.00 CO"'DW DEED Barbara M. Gray, Raaialar el Deeds Dare CO, Bar SPACE ABOVE THIS LAND T ER NUMBER: 3049-008 1%LAND T SF FEE: $6,100.00 EXCISE TAX: 20.00 PARCEL NUMB • 018226221 Prepared by: E.Crouse Gray, Jr., A Lic sed North Carolina Attorney Delinquent Taxes, if ally, to be paid by the closing attorney to the County T 6oliector upon disbursement of closingproceeds. \110 GRAY & LLOYD, L.L.P. 3120 North Croatan Highway, *.'101 Kill Devil Hills, North Carolina 204$ My File No. 8084-002 NORTH CAROLINA DATA Return to: Linda McCown McCown & McCown PO Box 729 Manteo, NC 27954 Received NIA -7 2010 DARE COUNTY 6 DCM-EC 0 THIS DEED made this the 30 day 0 September, 2008, by and between Sandra Meyer Laughlin, unmarried, Grantor, and Charles V. guivan, Jr. &wife, Lisa Sullivan, of 1252 Hedgesville Road, Martinsburg, WV 25403, Grantee: The designation Grantor and Grantee as used ein shall include said parties, their heirs, and successors and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETJV'.x THAT the Grantor, for a valuable consideration paid b Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, "gain, sell and convey, unto the Grantee in fee simple, all that certain lot or parcel of land situ4od in the Town of Kitty Hawk, Atlantic Township, Dare County, North Carolina, and more partict(8rly described as follows: RECEIVED See attached Exhibit A, for Legal Description. Q� MAY 212018 16 ook 178b (rage 461-0001 6247962 6: 1780 P: 461 Page 2 of 3 9/30/08 3:52 PM mill hY+iPG� lh��l;h�'6'Ir�'L�rG4tLl4�f �,�+� ww9h 11111 The property hereinabove described was acquired by Grantor by instrument recorded in Book 1356, Page 453, Dare County Public Registry. � TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and ,e*purtenances thereto belonging to the Grantee in fee simple. ,And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee Sirr�pl�, has the right to convey the same in fee simple; that title is marketable and free and clear of all e mbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. TitlOD the property hereinabove described is subject to the following exceptions: 0 1. Exc on is taken to 2008 ad valorem taxes. 2. Exce is taken to any easements and restrictions of record. INWITNE4WHEREOF, the Grantor has hereunto set her hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors, the day and year first above written. �0 ����___ _ (SEAL) Sandra Meyer Laughlin STATE OF N ' J k CITY/COUNTY OF 0 I, rJ Ct Notary Public of the State aforesaid, certify that Sandra Meyer Laughlin personally appeared b fore me this day and acknowledged the execution of the foregoing instrument. O Witness my hand and official stamp art1 this the ay of 008. (seal) Vr KVVl14Gn Notary RdAc CurtRuck County State of North CoroNla My Comftdon ExpIfes Oct 6, 2MB d 0 Book 1780 Page 461-0002 EXHIBIT A LEGAL DESCRIPTION 6247962 8: 1780 P: 461 Page 3 of 3 9/30/05 3:52 PM TRA&4:: All that c�rtain lot known as Lot 21 of the subdivision known as Keeper's Hill, Section 2, as shown on a t6p prepared by Triangle Engineering Services, Inc., which map is duly recorded in Plat Cabinet 110at Slide 399, of the Dare County Public Registry. �l. TRACT II:� Beginning at a point s�e�FYtt the Southwestern margin of the right of way line of Moor Shore Road (present right of way width 45 feet), said point of beginning lying South 77 deg. 05 min. 00 sec. West, a distance of 42.20 feet from an existing iron pipe set in the Southwestern margin of Lot 21, Section 2, of Keeper's HAas shown and delineated on plat of Keeper's Hill recorded in Plat Cabinet B, Slide 399, Dare 0 tty Public Registry; thence from said point of beginning proceeding in a generally Soubastwardly direction, along and with the Southwestern margin of the right of way line of Moor Sh" Road, a distance of 36.9 feet to a point; thence South 21 deg- 06 min. 47 sec. East, continuing alQitg and with the Southwestern margin of the right of way line of Moor Shore Road, a distance of 3?.32 feet to a point, a comer; thence leaving the Southwestern margin of the right of vQ+ line of Moor Shore Road and proceeding South 29 deg. 17 min. 35 sec. West, a distance of l417 feet to a point in the Northeastern shoreline of Kitty Hawk Bay, a corner; thence South 65 de §54.69 min 10 sec. West, along and with the Northeastern shoreline of Kitty Hawk Bay, a distance feet to a point, a comer; thence leaving Kitty Hawk Bay and proceeding North 77 deg. 05 q&. 00 sec. East, a distance of 156.45 feet to a point in the Southwestern margin of the right of wayQf Moor Shore Road, this being the point and place of beginning. (Z The above -described tracts I and II being the same ds shown and delineated on that certain map or plat entitled "Survey for Edward A. O'Neal", ed August 4, 1998 by Eastern Development Services, a copy of which map or plat is ignated and recorded in Deed Book 1201, at Page 641, of the Dare County Public Registry, And by reference incorporated herein and made a part of this instrument for a more complete description of the lands hereby conveyed. 0, Received RECEIVED hiAY 212018 �� DMEC DCM-MHD CI1Y d 0 (--pook 1780 Page 461-0003 i ( C� DARE COUNTY LT e REAL ESTATE TRANSFER TAX TAX DEED Recorded: 03/17/2017 01:21,09 PM BY: Tori Midgett Vanzolla McMunan, Register of Deeds Dare Co mly, NC Fee Amt $26.00 NC Excise Tax: $170.00 BOOK 2156 PAGE 787 (4) 700036399 11 IIIIDrlillimil111111 This instrumprepared by Robert B. Hobbs, Jr., a licensed North Carolina Attorney Delinquent to �p( if any, to be paid by the closing attorney to the county tax collector upon disbursement of closing proceeds D3848-7 Return to Robert B. Hobbs, Jr., Hornthal, Riley, Ellis & Maland, LLP, 2502 S. Croatan Highway, Nags Hea4CJC 27949 Excise Tax: $1 00 Tax Parcel: 018228220 - Transfer Tax: $85 LT Number 821-17 `fi North Carolina, Dare Count' THIS GENERAL WAR R0(YfJTY DEED made this 15 day of Marcb , 20_Oy and between GRANTOR MILDRED F. FOREMAN, Mailing address: 3749 Herbert Perry Road, Kitty Hawk, NC 27949 GRANTEE AMY D. WELLS Mailing address: 3749 Herbert Perry Road, Kitty Hawk, NC 27949 W ITNE1(4ETH: That the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has given, granted, bargained, sold, and conveyed, and by these presents does hereby give, grant, bargairtokell, and convey unto said Grantee, Grantee's heirs, successors, administrators and as nswn, all of that certain piece, parcel, or tract of land situate, lying and being in the of Kitty Hawk, Atlantic Township, Dare County, State of North Carolina, and g more particularly described as follows: \m (continued on the following pa" 10 % MAY 212018 D CA&MHD C/7-V Received MAY - 7 2T9 DMEC Book 2156 Page 787 See Attached Exhibit A `fi XII�I Being a portion of the property conveyed to W.C. Foreman by deeds l-1' recorded in Book 544, Page 548, Book 603, Page 383 and Book 603. Page 0 686, Dare County Registry. YQ� W.C. Foreman died on June 4, 1992 in Norfolk, VA, devising the subject property to Grantor under his wil, which is filed in Estate File 92-E-114 in the Dare County 1lerk's Office. IQA�([erence is made to Power of Attorney from Mildred F. Foreman to Amy D. W ae recorded in Book 1998, Page 640, Dare County Registry. All oo ortion of the property herein conveyed _includes or X does not include the p aarry residence of a Grantor. TO HAVI AND TO HOLD the above described lands and premises, together with all appurtenances thereunto belonging, or in anywise appertaining, unto the Grantee, Grantee's heirs, successors, administrators, and assigns forever. AND THE SAIRANTOR COVENANTS to and with said Grantee, Grantee's heirs, successors, ad i&trators, and assigns, that Grantor is lawfully seized in fee simple of said lands and Rp@rnises, and have full right and power to convey the same to the Grantee in fee simple, tpd that said lands and premises are free from any and all encumbrances, except as siiPforth herein, and that the Grantor will warrant and defend the title against the lawful claflts of all persons whomsoever, with the exception of the following: Ad valorem taxes fc�Ahe year 2017 and subsequent years, easements and restrictions of record, and any lcpl, county, state, or federal laws, ordinances, or regulations relating to zoning, en0onment, subdivision, occupancy, use, construction, or development of the subject property. O P� O (continued on the following pahel Book 2156 Page 788 6 IN WITNESS WHEREOF, the Grantor has duly executed this instrument, this the O day and year first above written. XA� XAN GRANTOR: Y' (SEAL) Mill�*. dF.�F. Fore an 11\\\\ BY\1\\YJ,U\\-,,XA i,&> -��� (SEAL) A)hy D. Wells, Attorne ' -Fact STATE OIF� ,,O..yy (COUNTY) (CITY) OF Dois- I certifyttypt the following person(s) personally appeared before me this day, each acknowle ing tome that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Amy D. Wells, attorney -in -fact for Mildred F. Foreman. Witness my he and seal this l5 day of Morrl.. , 20 17 . KRI=County, Affix Notary Seal Inside This Box F:IUSERSWristlne1D3e46-7 Seller docs.wpd 022217.1041 Signf�^ Typed or printed name of Notary Public My commission expires:�-e � }� (11 0 RFCE/Veo MAY 212018 D�M,MND Ci1'Y Received yaY - y 721'q DCM-EC Book 2156 Page 789 EXHIBIT A O PARCEL ONE: Being Lot No. 20 of the subdivision known as 'Keeper's Hill, Section Two; as shown on a map prepared by Triangle Engineering Services, Inc., which map is duly recorded in Plat Cabinet B, Slide 399, Dare County Registry P� PARCEL TWO: A certain parcel of land located in Atlantic Township in the Town of Kitty Hawk in _pyre County, North Carolina in the vicinity of the Keeper's Hill, Section Two, division and described as follows: BqqnIng at a point located in the eastern right-of-way of Moor Shore Road, a 45 right-of-way, which point of beginning is identified as the common comer bettyNo ts 19 and 20 of Keepers Hill, Section Two, a subdivision shown on a plat rad in Plat Cabinet B at Slide 399 of the Dare County Registry and suchon comer being at the intersection with the right-of-way of Moor Shor; running thence from the point of beginning a course of South 51 deg. 28 min. 42 sec. West a distance of 104.62 feet, crossing the right-of-way of Moor Shore Road, to a point located at the high water line of the Kitty Hawk Bay; thence running&rth 68 deg. 50 min. 06 sec. West a distance of 41.11 feet to a point; thence tum,!hg and running North 29 deg 17 min. 35 sec. East a distance of 168.37 feet and crossing the right-of-way of Moor Shore Road to a point at the common comer betVVan Lots 20 and 21 of Keeper's Hill, Section Two; thence turning and followings eastern right-of-way of Moor Shore Road a course of South 21 deg. 06 min.\41sec. East a distance of 62.61 feet to a point; thence continuing along the rigkttaof-way and following the curvature thereof an arc distance of 41.06 feet, sslfl'curve having a radius of 1672.54 feet to the point or place of beginning. Q� Saving and excepting however fr m the property hereinabove described that portion of property lying withinrightof-way of Moor Shore Road, a 45 foot right-of-way. C� Parcel Two being adjacent to Lot NogO of Section Two of the Keeper's Hill Subdivision and being sometimes ide ad as Lot 20A. Being a portion of the property conveyedfy�W. C. Foreman by deeds recorded in Book 544, Page 548, Book 603, Page 38$and Book 603, Page 686, Dare County Registry. W. C. Foreman died on June 4, 1992 in Norfolk&, devising the subject property to Grantor under his will, which is filed 04�state File 92-E-114 in the Dare County Clerk's Office. 0 Reference is made to Power of Attorney from Mildre ;'Foreman to Amy D. Wells recorded in Book 1998, Page 640, Dare County Zgistry. F: USERMiC inc\D3848-7 Exhibit A.wpd Y% Book 2156 Page 789a Filed aeek: 1749 Page: 331 Doo Id: 6231229 11119/2007 03:44PM RweiPt e: 198323 Doc Co&: DEED BARBARA M GRAY, REGISTER OF DEEDS DARE CO, NC 1 II11 11 II 6231228 ��J IIII�II1III�IIIII IIIIIII I�I �I�I��I IIII�III'II�I IIIII II Pa91912007 03. 44P Received MAY - 7 2010 Land Transfer $ .00 v of gift D C M E `� Land Transfer No. /�� 7 Excise Tax : $.00 — Exe V I No Title Examination Perfor44or Requested Recording Time, Book and Page Tax Lot No. C ' Parcel Identifier No. 987511575038 Verified by County on the _ day of 12007 by Mail after recording to Robert L. OuttdoPost Office Box 1027, Kitty Hawk, NC 27949 This instrument was prepared by Robert L. Oaten, Attorney at Law Brief Description for the index I Webtem line of Keeper's Hill, Section 4, Ki awk RLO NORTH CAROL; PENERAL WARRANTY DEED THIS DEED made this the 10" day of November, 2007. GRANTOR 0 GRANTEE Bill -Mar Properties, LLC, a North Carolina limited liability El Town of Kitty Hawk RECEIVED company, a one half undivided interest; and Veterans Memorial Drive Box 549 J. S. Roebuck and wife, Carole S. Roebuck, a one half iio Hawk, NC 27949 MAY 21 Z62 undivided interest; as Tenants in Common DCM-MHD CITY Enter in appropriate block for each party: name, address, and, if appropriate, character of entity, e.g., corporation or partnership. f a The designation Grantor and Grantee as used herein shall include said parties, the$I—firs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. W IT NESSETH, that the Grantor, for a valuable consideration paid by the Grantee, tht r ipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee s e, all that certain lot or parcel of land situated in the Town of Kitty Hawk, Dare County, North Carolina and more particularly d el, as follows: See Exhibit "A" attached hereto d 0 C`Book 1749 Page 331-0001 Illll 1111111111111111111111111 l E111111111111I l 62% 92207 03:44P Tl"�Rroperty hereinabove described was acquired by Grantor by instrument recorded in 1661 at Page 462. A n pF jhowing the above described property is recorded in Map Book Page _. TO HA D TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee K, tee simple. And the G a t r covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, NWt title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawf�oclaims of all persons whomsoever except for the exceptions hereinafter stated. Title to the propeY4jAereinabove described is subject to the following exceptions: Easements and restrictions of record, if any, in the Dare County Registry. IN WITNESS WH)aOF, the Grantor has hereunto set his hand and seal, or if corporate, has caused this instrument to be signed in its corporat0ame by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors, the day and ekk first above written. YA BILL -MAR PROPERTIES, LLC (Corporate Name) �✓\ B f Linda ridge a er By: ` ' President By:�t Willi . Small, Member ATTEST: ff C By: .8 al , ember Secretary (Corporate Seal) By. M Ld 1 $ir"� STAlff, 1 arg et _.t S/mfa , Member . roebuck c dulle d0AJ e Y' Genie `M Roebuck CMOs State of North Carolina County of Pasquotank I, the undersigned, a NotarTdPublic of the County and State aforesaid, certify that Linda S. Etheridge, member of Bill-M9 Properties, LLC, a North Carolina limited liability company, personally appeared before m"is day and acknowledged the execution of the foregoing instrument as her act and deed anthethe act and deed of the limited liability company. Witness my hand and notarial stamp eal this the �rday of November, 2007. My commission expires: k 2 3lllllh�ww l 1 t Nota Public ,1,4 A rL M cJP t a r State of North Carolina County of Pasquotank 6 I, the undersigned, a Notary Public of the Couno and State aforesaid, certify that William F. Small, member of Bill -Mar Properties, LLC, a0orth Carolina limited liability company, personally appeared before me this day and ackra�iedged the execution of the foregoing instrument as his act and deed and as the act and deed ofxhe limited liability company. Witness my hand and notarial stamp or seal this the `�Cy of November, 2007. My commission expires: 1 C Nota Public Cyri r- rr, 6p616 O ()Book 1749 Page 331-0002 1111III IIII� IIIII I��IIII I'I IIIIIII IIIII III I�II� Illl llll 6I 9n0V 03:44P G �} State of North Carolina, County of Pasquotank. 1, the undersigned, a Notary Public of the County and State aforesaid, certify that Jeffrey R. Small, member of Bill -Mar Properties, LLC, a North Carolina limited liability company, personally appeared before me this day and acknowledged the execution of the foregoing instrument as his act and deed and as the act and deed of the limited liability company. r UOc:: Witness my hand and notarial stamp or seal this the day of November, 2007. My commission expires:j{d, No Public Cyn4rc M S� e a <16 ` J• 1 State of North Carolina, County of Pasquotank. '•y,� the undersigned a Notary Public of the County and State aforesaid, certify that Margaret Di sV :SI4s'� Atl•5� �";' 1, rneml3T of Bill -Mar Properties, LLC, a North Carolina limited liability company, ;f.. • , - Y� �nally appeared before me this day and acknowledged the execution of the foregoing 4{ 7• 4' ; 110,` . ent as her act and deed and as the act and deed of the limited liability company. ° Witness my hand and notarial stamp or seal this the / day of November, 2007. My COMA -ion expires: ✓✓� NigPbhc ey. .. State of North Caro4ounty of Pasquotank. �a- { I, the undersigned,a Nay Public of the County and State aforesaid, certify that J. S. Roebuck UAl. $�'' and wife, Garsis 11 Roebuck, personally appeared before me this day and acknowledged the ±AUI�; c; • execution of the foregoing ut9me nt. Witness my hand and notarial s or seal this the /S day of November, 2007. 'vEp " ;at REcE i My commission expires:4ZD t 21 o Public CV, ,a rr SP<.v MAY 2018 � DCM-MHD CITY Received uo DCM-EC The foregoing Certificate(s) of is/are certified to be correct. This instrument and this certificate are duly registered at the date and J& and in the Book and Page shown on the first page hereof. 0(13ook 1749 Page 331-0003 IIIIIIIIIilllllilllollIE1111111111111Hill III 11 Pzs9?2 07 03:44P Exhibit "A" �O Parcel One `fi �eginning at an iron pin, said iron pin being located in the northwestern boundary of Lot A, as shown in Book 971 at Page 551 of the Dare County Public Registry, with the them margin of the right-of-way of Moor Shore Road, said point of beginning being 22 deg. 27 min. 52 sec. East 52.13 feet to an iron rod and thence South 32 deg. 28 m: \_315 sec. East 577.42 feet to a PK nail in the center line of Beacon Drive; thence from said point of beginning South 22 deg. 27 min. 52 sec. West 100 feet to an iron rod, said iron roaring along a tie line North 89 deg. 21 min. 58 sec. West 314 feet to an iron rod located i0he southern boundary of the One -Rite Development property as described in Book 971 Qt age 551 of the Dare County Public Registry; thence continuing South 22 deg. 27 min sec. West 40 feet to a point in the high water mark of Kitty Hawk Bay; thence follovfyAg the meanders of the Kitty Hawk Bay in a generally westerly direction to a point, said po' being in the intersection of the southern boundary of the One -Rite Development pr n rgy as described in Book 971 at Page 551 of the Dare County Public Registry and being South 38 deg. 40 min. 40 sec. East 92 feet from an iron rod located in the intersection of the southern boundary of the One -Rite Development property as described in Book 971 at Page 551 of the Dare County Public Registry with the southern margin of the right -of -of Moor Shore Road; thence from said point North 38 deg. 40 min. 40 sec. East 17 feet an iron rod, said iron rod being along a tie line South 89 deg. 21 min. 58 sec. East 314 f,�p an iron rod located in the southeastern boundary of the property herein conveyed �` ` e northwestern boundary of Lot 27A, as described in Book 971 at Page 551 of the pe County Public Registry; thence North 38 deg. 40 min. 40 sec. East 75 feet to an iron rTI , said iron rod being in the southern margin of the right- of-way of Moor Shore Road; the South 64 deg. 00 min. 23 sec. East 10.13 feet to an iron rod; thence along a curve, said44 ve having a radius of 222.87 feet, a length of 178.72 feet a chord of 173.97 feet aWa bearing of South 86 deg. 58 min. 47 East to an iron rod; thence North 70 deg. 02 min. 49 sec. East 120.62 feet to an iron pin; thence along a curve, said curve having a radi 101.84 feet, a length of 9.54 feet, a chord of 9.53 feet and a bearing of North 72 deg. ,rein. 46 East to the point and place of beginning. lI The same being all of Parcel One as shown ori'kt map or plat entitled "Survey for Town of Kitty Hawk — Bill -Mar Properties- Kitty Hawk Atlantic Township — Dare County — North Carolina" prepared by B.I.L.D. Surveyors �d dated the 23`s day of October, 2007. d O (hook 1749 Page 331-0004 III�II I�I�I (IIII I�I'�II II� II�I�I� Il�ll II� �I��I IIII IIII 1111/1917 0:44P Parcel Two Vl(\ X"(` Beginning at an iron pin, said iron pin being in the intersection of the northern line of Lot Nc29, Keeper's Hill, Section 4, as shown in Plat Cabinet B at Slide 282 of the Dare County blic Registry with the western boundary of Lot 14, Woodard Acres, as shown in Plat cylfbjnet A at Slide 307 of the Dare County Public Registry, said point of beginning also be the southeastern comer of the now or formerly One -Rite Development property as d6scribed in Book 971 at Page 551 of the Dare County Public Registry; thence from said po6 of beginning South 28 deg. 00 min. 20 sec. East 193.32 feet to an iron pin; thence S&th 22 deg. 27 min. 52 sec. West 97.68 feet to a point in the northern margin of the right-(�+'ay of Moor Shore Road said point being South 32 deg. 28 min. 36 sec. East 577.42 feet a PK nail in the center line of Beacon Drive; thence from said point along the norther gm of the right-of-way of Moor Shore Road, along a curve, said curve having a radiu 6.84 feet, a length of 45.40 feet, a chord of 45.22 feet and a bearing of North 78 deg. 5 n 18 sec. East to an iron pin; thence continuing along the northern margin of the right -if -way of Moor Shore Road South 70 deg. 02 min. 49 sec. West 120.62 feet to an iron rod; thence continuing along the northern margin of the right -of way of Moor Shore RoaA along a curve, said curve having a radiusl77,87 feet, a length of 142.64 feet, a chord GP138.85 feet and a bearing of South 86 deg. 58 min. 47 sec. East to an iron rod, said iron i�l being in the southern boundary of the One -Rite Development property as described in BQ 971 at Page 555 of the Dare County Public Registry; thence North 38 deg. 40 mi see. East 388.77 feet to the point and place of beginning. The same being all of Parcel Tas shown on that map or plat entitled "Survey for Town of Kitty Hawk — Bill -Mar ernes- Kitty Hawk — Atlantic Township — Dare County — North Carolina" prepar6py B.I.L.D. Surveyors and dated the 23rd day of October, 2007 1 Received ww ; - 7 2118 DCM-EC G �O FtECE1VED �. MAV 21�p1� 1 d r,,Book 1749 Page 331-0005 December 22, 2017 North Carolina Coastal Federation 637 Harbor Rd. Wanchese, NC 27981 RE: Moor Shore Road Living Shoreline Project To Whom It May Concern: Received RECEIVED DCM-EC JAN 2 5 2018 h'IP SECTION MHD This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering 6 Surveying, Inc., acting as Ms. Susanne Wright's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3770 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation gems I have no objection to the project as described. dV<c O I have objection(s) to the project as described. ,../ L✓f ice- CO/�CCiln met %•N1 ��.N GAC,%- WAIVER SECTION 42A 01CIAL2 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15 from my area of riparian access unless waived by me. (If you wish to waive the setback, you must Initial the appropriate blank below.) do wish to waive the 15' setback requirement. 1 do not wish to waive the 15' setback requirement. 5L 0 _. /,22 -/0" Print Name Signature of Adjacent Property Ovrrter Date /DO /%a r,(�. L,9r /�'� �� /G%n �+ /VC .2 6 !- 3 87 di Mailing Address and'or Email Address 2 7 9 y� Phone Number December 22, 2017 North Carolina Coastal Federation 637 Harbor Rd. Received Wanchese, NC 27981 RE: Moor Shore Road Living Shoreline Project DCM-EC To Whom It May Concern: This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as Ms. Susanne Wright's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3770 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. Ifty of the application and project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Glower Coastal Specialist North Carolina Coastal Federation I have no objection to the project as described. I have objection(s) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the to blank below.) eivjFo I do wish to waive the 15' setback requirement. Print Name Signature of Adjacent Property Owner Mailing Address and/or Email Address I do not wish to waive the 1 Y469ci requirement. OCM�UNt) CCUUIT4' Date Phone Number i � Certified Fee Return Receipt Fee 1 (Endorsement Required) % 5 I Restricted Delivery Fee 7 (Endorsement Required) 1 Tote; Postage & 1— I $ / Postmark Here PS Form 3800. August 2006 See Reverse for Instructions Implete items 1, 2, and 3. Also complete m 4 if Restricted Delivery is desired. int your name and address on the reverse that we can return the card to you. tech this card to the back of the mailpiece, on the front if space permits. title Addressed to: A,y o � w Aitd\,& V vt/v o �DtS�nPiv 1.t� -'A ntG 2�°14°1 X (Domesticru ra OFFICIAL USE a It l Postage m Certeled Fee ra O Return Receipt Fee (Endorsement Required) Posen" . He _. C3 Restricted Delivery Fee r 3 (Endorsement Required) Total Postage &Fees $ 7.5 / S sent To [/ r ? " O Sbeet No..; ____ M1 ox wPO Boz Ab. Ciry Sfafe, ZIP+4 )U. August 2uc ❑ Agent by (P ' red Name) I Date of Delivery T.w 1—ct—tg D. Is delivery ress different from Rem 1? U Ye: If YES, enter delive dress below: ❑ No m 0 ra .. m un OFFICIAL USE ra Postage a ) q U a Certified Fee 3 3 C3 Return Receipt Fee 2 % Postmark Hera � (Endorsement Required) Restricted Delivery Fee C3 (Endorsement Required) ra t37 Total Postage & FeeFees;$ 70 O ? sent To rq C3b*W'I p w-------- - - -----'----------------------------------- M1 or PO Bar No. 1fsta mIRW-_-_-.--_______________________..__.-..-____-.-_--__------ PS roan 31 August 2006 See Reverse for Instructions ■ Complete items 1, 2, and S. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Va\M�AVGVI ahha�f Izo�tni�Yi y23 W tT+ Zv,Ac k 3. Service Type` I N d�j ❑ Certified Made ❑ Priority Mail Express'" ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ collect on Delivery 4 Restricted Delivery? (Extre Fee) ❑ Yes A. Sign tut ❑ Agent x (/I � U Addle B. jiecd�v Ant Name) I O} D%t D. Is delivery address different from Hem t ❑Yesaddress different from Item`t / ❑Tes If YES, enter delivery address below: 0 No Received 3. Service Type ❑ Certified Mail ❑ Registered :Merchandise ❑ Insured Mail ❑ Collect on Deliv 4. Restricted Delivery? (Extra Fee) ❑ Yes vt- Number 2. Article Number 7014 510 0001 8845 1810 Transfer from service label) 7014 0510 0001 8845 1834 (Transfer from service iabtT_— -- Domestic Return Receipt PS Form 3811, July 2013 Domestic Return Receipt Form 3811, July 2013 _ A113 0HIN-W400 81OZ 16 Ati (33AI3032i ruDomestic MirM M1 Iff "fiPt C-TA L. U E 7CordW Mail Fee $3.4` 04E1 Ir ' 02 laes& Fees 0r se, reenedMl . � ❑RealmP dw,a—ww, t iJ.�JL� G 0 ❑Ream R.V lae IcO t ❑CMMea Mal Peeakba DWl i Trn-Lill Postmark Here p pManskaawrePegana t ai nn ❑ oewr 9lpnaue R.mbaa o.Ywy . o Postage $2.115 N 04/30/201S 1 Postage and Iff.5 ru $ Sent to %'w'�'----------- ---- rKa�"Sri•6tbxIn:.---iC!{!r? --A, nl tj--------------------------------------------r�q s ���� 1 ---- o QE,ARS t be s9gaod Mai Ld tilc'f0E/40 0 50'Z$ ae ao r 7 d p t Arpj aalh"ceb unlauBS nnPyp °rail t Py"cab w"�aels uaw❑ O MrMrtaod t Awao WY le�b Irw reww�p O n -IL : f�a�Nrv) Iale„e a.wep O t Vd Paw W. wm.up 0 Z17 iwaa. aae,P.ay sea sao .Te �$ ru 3�S5�'^a �JIWIPaYPaO -0 Er a W o . . --------------- l _' U 'F p- T•Z H� SZ',$y .ea,we a. w stozro�/ti+ sa•Z$ .� o __—t AwIROPer �b � � wo bw 0 —• P°" IRA �.�--- FIiNIeO pewYWab P%IaMa1❑ w"W❑ o O lonwir Rl �areaeb l�rJ �• l{,ampm0 lala�bwp 'd C3 M yeaaaeaa) sate R S ru ZO UP 8#0 Cr Ln e Ir 9 Add a tracking number 0 70173040000028896256 0 Delivered: NAGS HEAD, NC 27959 on R010;4soo May 8, 2018 at 9:39 am .............. ............................................ _................. ........... .............................................. .................................................. _.................................................. 0 70162710000009474721 Delivered: T�t,� /Fvcre+ ROCKVILLE, VA23146 on May 24, 2018 at 1:24 pm ........................................................................................................................................................................................................................................................ ej70173040000028896232 Available for Pickup: WANCHESE, NC 27981 on G L 6SJune 2, 2018 at 9:48 am ✓�� x x x 0 UPDATED 6151201610:12 AM AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Roebuck Prooerties li. Llc. Mailing Address: Phone Number: Email Address: Coastal Engineering & Surveying in partnership with I certify that I have authorized the North Carolina Coastal Federation Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: The building of a living shoreline composed of an off shore sheet -pile sill and the planting of native marsh grasses. at my property located at 3789 Moor Shore, Kitty Hawk, NC 27949 , in Dare County. 1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature a go Le 5 - i)hc- b u,(( Print or Type Name J (e /oL lA_It 2 - Date This certification is valid through I I Received DCM-EC RECEIVED MAY 21 2018 DCM-MHD CITY Revised Mar. 2016 AGENT AUTHORIZATION FOR CA VIA PERMIT APPLICATION Name of Property Owner Requesting Permit: _Amy D. Wells Mailing Address: 3749 Harbert PprW Rd Kitty Hawk N • 27949, Phone Number: Email Address: Coastal Engineering & Surveying in partnership with I certify that I have authorized the North Carolina Coastal Federation Agent / Contractor ' to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: The building of a living choreli__ne composed of an off shore sheet -pile sill and the planting of riot ve marsh grasses. at my property located at _ 2g!�l Moor Shore Rd Kitty Hawk NC 27949 311SAW a/t1,/1} in Dare County. I furthermore certify that / am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Am WUU.s Print or Type Name Title q / 24 ! 6�1 Date This certification is valid through JAN 11 2 Revised Mar. 2016 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Town of Kitty Hawk Address:Mailing a u. • :.. 549 Kitty Hawk. INC 27949, Phone Number: cR5(2 -n?Co 1-35 502- Email Address: Coastal Engineering & Surveying in partnership with I certify that I have authorized the North Carolina Coastal Federation Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: The huildino of a livino shoreline composed of an off shore sheet -pile sill and the planting of native marsh grasses. at my property located at In Dare County. L.. 9rE"MM3ti17WMM A�Ni'�kL'�7 1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Received Signature Print or Type Name t .ti /41u n5u RECEIVED Title 3 1 r MAY 21 2o18 Date CCM-MHD CITY This certification is valid through I I Revised Mar. 2016 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Harry Meraklis Mailing Address Phone Number: Email Address: Coastal Engineering & Surveying in partnership with I certify that I have authorized the North Carolina Coastal Federation Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: The hulIding of n living shnrelinQ composed of an off shore sheet -pile sill and the planting of native marsh grasses. at my property located at 3801 Moor Shore Rd. Kitty Hawk, NC 27949 , in Dare County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Informati : Received ignature JAN I i i" 1 �ld/1,� ItiIE,PQI�US DMEC Print or Type Name d►.un,E2 Title j 0l a d Date This certification is valid through Revised Mar. 2016 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Charles V. Sullivan Jr. Mailing Address: 37W Moor Shorp Rd 0 Kitty Hawk. NC 27949, Phone Number: oucl? - 33 3 - .5 / 19 3 Email Address: CS044i✓AV /a6a 6 JfIA,/• Pow Coastal Engineering & Surveying in partnership with I certify that I have authorized the North Carolina Coastal Federation Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: The mjildinn of a living chnnreline composed of an off shore sheet -pile sill and the planting of native marsh grasses. at my property located at 3797 Moor Shore. Kitty Hawk, NC 27949 in Dare County. I furthermore certify that l am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Received k�Aa, ignature (21�4r/eS V 701.444,V J� DIME Print or Type Name 0wN ei� Title RECEIVED t atteo MAY 21 2018 DCM-MHD CITY This certification is valid through ! / Revised Mar. 2016 ^41 1 North Carolina Coastal Federation Working Together for a Healthy Coast Certified Mail — Return Receipt Requested April 30, 2018 Received Vaughan or Hannah Robinson 423 West Bridge Ln. ✓� Nags Head, NC 27959 DMEC Dear Mr. or Mrs. Robinson, The North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as Mr. Harry Merklis' and the Town of Kitty Hawk's agent for permitting purposes, is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, located at 3809 Moor Shore Rd. Kitty Hawk and at 3801 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina. The specifics of the proposed work are included in the enclosed application forms and drawings. As the adjacent property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Frank Jennings, 401 S. Griffin Street Suite 300, Elizabeth City, NC 27909, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. I you have any questions on this project please call me at 252-473-1607, or email me at michellec(o)nccoast org. Northeast Regional Office 637 Harbor Road, P.O. Box 276 Wanchese, NC 27981 252-473-1607 Sincerely, RECEIVED MAY 212018 C17y Michelle Clower Coastal Specialist North Carolina Coastal Federation Headquarters & Central Regional office 3609 N.C. 24 • Newport, NC 28570 252-393-8185 www.nccoast.org Southeast Regional Office 309 W. Salisbury Street Wrightsville Beach, NC 28480 910-509-2838 ro December22, 2017 North Carolina Coastal Federation 637 Harbor Rd Wanchese, NC 27981 Received RE: Moor Shore Road Living Shoreline Project )AN 11 K. ) To Whom It May Concern: DMEC This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's and Mr. Harry Meraklis' agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3809 Moor Shore Rd. Ki Hawk and on 3801 Moor Shore Rd Kitty Hawk, in Dare County, North Carolina, both of which are adjacent to your property. A Gopy;ofthe application and proiect tlrawi64(41s enclosed.for;your`revie If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If rio;comments are.received.within 30'dads df r'eceiat ofth� is' e, !twill be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely Michelle Clower Coastal Specialist North Carolina Coastal Federation I have no objection to the project as described. I have objection(s) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unlesswaived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. Print Name Signature of Adjacent Property Owner Mailing Address and/or Email Address Date Phone Number North Carolina Coastal Federation Working Together for a Healthy Coast Certified Mail — Return Receipt Requested April 30, 2018 Lucille Stokes 408 Beacon Dr. Kitty Hawk, NC 27949 To whom it might concern, The North Carolina Coastal Federation in partnership with coastal Engineering & Surveying, Inc., acting as Roebuck Properties 11, LLC's agent for permitting purposes, is applying for a CAMA Major permit to built a living shoreline consisting of an off -shore sheet -pile still, located at 3789 Moor Shore Rd. Kitty Hawk, in. Dare County, North Carolina. The specifics of the proposed work are included in the enclosed application forms and drawings. As the adjacent property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Frank Jennings, 401 S. Griffin Street Suite 300, Elizabeth City, INC 27909,-within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. Nc comment within 30 days of your receipt of this notice will be considered as no objection. I you have any questions on this project please call me at 252-473-1607, or email me at michellecCa)nccoast.ore. Received RECEIVED Sincerely, uay - MAY 21 2018 DMEC ')CM-MHD CITY Michelle Clower Coastal Specialist North Carolina Coastal Federation ortheast Regional Office Headquarters & Central Regional Office Southeast Regional Office 37 Harbor Road, P.O. Box 276 3609 N.C. 24 • Newport, NC 28570 309 W. Salisbury Street /anchese, NC 27981 252-393-8185 Wrightsville Beach, NC 28480 52-473-1607 www.nccoast.org 910-509-2838 W April 30, 2018 North Carolina Coastal Federation 637 Harbor Rd. Received Wanchese, NC 27981 P,day - 7 Rup RE: Moor Shore Road Living Shoreline Project DMEC To Whom It May Concern: This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as Roebuck Properties II, LLC's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3789 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation I have no objection to the project as described. I have objection(s) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. Print Name Signature of Adjacent Property Owner Mailing Address and/or Email Address I do not wish to waive the 15' setback requirement. Date Phone Number North Carolina Coastal Federation Working Together for a Healthy Coast June 6, 2018 N.C. Department of Environmental Quality N.C. Division of Coastal Management 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 Received DCM-EC Re: Moor Shore Road Living Shoreline CAMA Major permit application, Kitty Hawk, Dare County Field Representative: Yvonne Carver Dear Yvonne, Please find the enclosed returned package from Mr. Stokes in response to attempting to notify the adjacent property owner of the Moor Shore Road Living Shoreline project. Please do not hesitate to contact me at 252.473.1607 with any questions regarding the Moor Shore Road Living Shoreline LAMA Major permit application. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation RECEIVED JUN 13 2018 DC`vi-Non: CITY Northeast Regional Office Headquarters & Central Regional Office Southeast Regional Office 637 Harbor Road, R.O. Box 276 3609 N.C. 24 • Newport, NC 28570 309 W. Salisbury Street Wanchese, NC 27981 252-393-8185 Wrightsville Beach, NC 28480 252-473-1607 www.nccoast.org 910-509-2838 IIVIIIdIYIIRIII�gnIY9 ,o,,,o.o Poop......... NI SENDER: COMPLETE THIS SECTION ■ Complete Items 1, 2, and 3.. C ■ print your name and address on the revers9. so that We can return the card to you. I 1 Attach this card to the back of the mallplece, 'I, hron,the front If space permits'. 1..ArtI91e ACICMs e0 m: L�At�lk. ' S; Stav-et yo'b geiac.ovt �v. '. f �, IIIIIIIIII'III�IIIIIIIIIIIIIIIIIIIIIIII'lll�ll v 9590 9402 2667 6336 3010 65 1' 70173040 0000 2889 E 1 __ pS Form 3811, July 20T5 PSN 7530-02-000-9053 X19i 279495354-1N RETURN TO SENDER UNCLAIMED UNABLE TO FORWARD RETURN TO SENDER !llGill_.L.III.drIGIldillll1,111,1IIGtIIGdlllthll X.' ❑ Addresse 19 L 05J2.5/16 ❑Prlaity Melt Egnes;® 0 Re6agggtstered M:uO""' Ivory O gRiste d Mall Reahiated' nY OMeraharRidi�Iptfur oaime y O Slgnetpre 19nfl"2110nTM 1' .13 8[bnalare CpnFlnnatlan N "Restricted 0allvarr I Domestic Retum Recelpt f U• A�gSTAGE WANCHES E, NO APR 30 '1 a AMOUNT $8.25 R2305K142812.02 IIIi,Ikj{1,�Ijfil lll'llill�l 111111JGIillfl'l,illl�fitl w I r e• North Carolina Coastal Federation Working Together for a Healthy Coast Received Certified Mail — Return Receipt Requested AN 11 DCM-EC December 22, 2017 Betty and William Daner or current resident 2� „_" 1 1J 100 Dosher Ln. 7 1V Kitty Hawk, NC 27949 To whom it might concern, The North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as Ms. Susanne Wright's agent for permitting purposes, is applying for a CAMA Major permit to built a living shoreline consisting of an off -shore sheet -pile still, located at 3770 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina. The specifics of the proposed work are included in the enclosed application forms and drawings. As the adjacent property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Frank Jennings, 401 S. Griffin Street Suite 300, Elizabeth City, NC 27909, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. I you have any questions on this project please call me at 252-473-1607, or email me at michellec&Bnccoast.ore. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation Northeast Regional Office Headquarters & Central Regional Office Southeast Regional Office 537 Harbor Road, P.O. Box 276 3609 N.C. 24 • Newport, NC 28570 309 W. Salisbury Street Wanchese, NC 27981 - 252-393-8185 Wrightsville Beach, NC 28480 252-473-1607 www.nccoast.org 910-509-2838 f ft Carver, Yvonne From: Carver, Yvonne Sent Thursday, January 25, 2018 4:29 PM To: michellec (michellec@nccoast.org);'Natalie Garrett' Cc: Bodnar, Gregg; Jennings, Frank Subject Objection received from Daner re: Moor Shore Rd Living Shoreline Project Attachments: Daner, objection to Moor Shore Rd living shoreline, no waiver-01252018.pdf Our office received correspondence from Betty and William Daner today regarding the Moor Shore Road Living Shoreline Project proposed in Kitty Hawk. They are the riparian property owners next to the lot that is owned/marked as Lucille S. Stokes on the preliminary plat (also reference to property owner Susanne Wright in notification letter). The Daners have elected not to waive the 15' setback, and have also objected to the project. They have noted that they .are concerned that this project may cause erosion to our property." A copy of the correspondence is attached for your review and file(s). Respectfully, *wmw a eawet Field Representative & District LPO Coordinator Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 232 252-331-2951 (fax) vvonne.carver @ ncdenr.00v 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 RECEIVED � Nothing Compares MAYMAY 2 j 2018 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ')CM-MHD C17,y httPS:Hdeq.nc.gov/about/divisions/coastal-management/ December22, 2017 North Carolina Coastal Federation Received 637 Harbor Rd. _)AtS 5 Wanchese, NC 27981 DCM-EC RE: Moor Shore Road Living Shoreline Project To Whom It May Concern: This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as Ms. Susanne Wright's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, ill on roper located at 3770 Moor Shore Rd. KKKV Hawk, in Dare County, North Carolina, which is adjacent to your property. A copYof.the.aptilication and project drawing semis enclosed fonVour revie . If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. Ifno comments are received within 30.tl6s df receipt of this`ndtic` , it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 262.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Glower Coastal Specialist North Carolina Coastal Federation g19P I have no objection to the project as described. l.%t P I have objection(s) to the project as described. 4Ve Moiid 7 fe.,r WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. /3p-//) R. 1 „u -6. T)4r..er ? Print Name Signature of Adjacent Property Ov /oo la XZIA- L,yr� _ A16 14A&, A_I /VC Mailing Address and/or Email Address Z 7 9 y9 0- 1 do not wish to waive the 15' setback requirement. -22 -/ Date ,26 /- 387& Phone Number f North Carolina Coastal Federation owl Working Togetherfor a Healthy Coast Received Ja�vv 14, CCM-EC l4C. t)C p&V tV, „vt t)'�Vnj lasn dk CodN\"A kA,��v eA^- IZ'L� K"oy Wwvv Lttiv,7 Stigvc\ivLC CAMh viva. a.- k-(, �,., r AVy,\16s---t,c)VI p\l/J 1 "AfiW�-tA V-e,-kL V" VIZ CCAV�- iw�✓t "v N r) X.lM '� W t v" O W v.en- N 0 �i-i uC- I 'DnS 1q a e w ,^-. a•",."is-�1"�2� M,00V S L, ./ LivL", &A M,-v ma jN P\&mc -km —ytz 1� Northeast Regional Office 637 Harbor Road, P.O. Box 276 Wanchese, NC 27981 252-473-1607 W,,t 3ut VV-C w,t " �ued F --is . RECEIVED y o , MAY 21 2018 DCM-MHD CITY M�CML� >\lo� Gbw1��a Goddi-i( .�eae.�vti� Headquarters & Central Regional Office 3609 N.C. 24 • Newport, NC 28570 52-393-81 85 www.nccoast.org Southeast Regional Office 309 W. Salisbury Street Wrightsville Beach, NC 28480 910-509-2938 North Carolina Coastal Federation ® Working Together for a Healthy Coast Certified Mail - Return Receipt Requested April 30, 2018 Fay R. Forbes, F. Everett Trustees 4090 Caplock Ct. Middleburg, FL 32068 To whom it may concern, ?.(?rfC/) 4v K (4 P Received MAY - 7 7fl" DCM-EC The North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's agent for permitting purposes, is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile still, located at 3809 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina. The specifics of the proposed work are included in the enclosed application forms and drawings. As the adjacent property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Frank Jennings, 401 S. Griffin Street Suite 300, Elizabeth City, NC 27909, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. I you have any questions on this project please call me at 252-473-1607, or email me at michellecaaDnccoast.org. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation Northeast Regional Office Headquarters & Central Regional office 637 Harbor Road, P.O. Box 276 3609 N.C. 24 • Newpport, NC 28570 Wanchese, NC 27981 252-393-8185 252-473-1607 Ww .nccoast.org F'r RECEIVED MAY 21 2018 DCM-MHD CITY Southeast Regional office 309 W. Salisbury Street Wrightsville Beach, NC 28480 910-509-2838 April 30, 2018 North Carolina Coastal Federation 637 Harbor Rd. Wanchese, NC 27981 Received RE: Moor Shore Road Living Shoreline Project E s' - 9 2010 To Whom It May Concern: DMEC This correspondence is to notify you as a riparian property owner that the North Carolina Coastal. Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3809 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation I have no objection to the project as described. I have objection(s) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. Print Name Signature of Adjacent Property Owner Mailing Address and/or Email Address I do not wish to waive the 15' setback requirement. Date Phone Number North Carolina J Coastal Federation ® Working Togetherfor a Healthy Coast Received 4 20',' June 1, 2018 DCM-EC N.C. Department of Environmental Quality N.C. Division of Coastal Management 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 Re: Moor Shore Road Living Shoreline CAMA Major permit application, Kitty Hawk, Dare County Field Representative: Yvonne Carver Dear Yvonne, Please find the enclosed returned receipt from Mr. Forbes in response to receiving the adjacent property owner notification for the Moor Shore Road Living Shoreline project. Please do not hesitate to contact me at 252.473.1607 with any questions regarding the Moor Shore Road Living Shoreline CAMA Major permit application. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation RECEIVED JUN 13 HIS DCM-MHD CITY Northeast Regional Office Headquarters & Central Regional Office Southeast Regional Office 637 Harbor Road, P.O. Box 276 3609 N.C. 24 • Newport, NC 28570 309 W. Salisbury Street Wanchese, NC 27981 252-393-8185 Wrightsville Beach, NC 28480 252-473-1607 www.nccoast.org 910-509-2838 0 'f ._� cep`y► ,..ads >,.d Received Received Apd130, 2018 North Carolina Coastal Federation JUN - 4 2018 637 Harbor Rd. D C M-E C Wanchese, NC 27981 D C M-E C RE: Moor Shore Road Living Shoreline Project To Whom It May Concern: This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on roperty located at 3809 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. opy ofapplication and'project drawing(s) is enclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If no oommentf�_ H-WERMEWWRreceipt of this notice, it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Clower Coastal Specialist North Carolina Coastal Federation LEF I have no objection to the project as described. I have objections) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. Y'W I do not wish to waive the 15' setback requirement. F4 0 YO EV 8&6Tf FO R eE5 Print Name Signature of Adjacent Property Owner !? O, /.SOX / ;,9 R 0CA_'V! LLg5 VA 1.3/yCv Mailing Address and/or Email Address RES/DE.v7 ; // 99,t GSA-LNuT f-f/dL ,pit'/✓� 1ZOG�U/LLE� VA l3/46o &/i. Z/s,� Date (9d) 46,r-37,�? Phone Number RECEIVED JUN 13 2018 6M, /1- ; F/oyd_faY 31-1 6g141a;% coYvl DCM-MHD CITY North Carolina Coastal Federation Working Together for a Healthy Coast Certified Mail — Return Receipt Requested December 22, 2017 Fay R. Forbes, F. Everett Trustees 4090 Caplock Ct. Middleburg, FL32068 To whom it may concern, The North.Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's agent for permitting purposes, is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile still, located at 3809 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina. The specifics of the proposed work are included in the enclosed application forms and drawings. As the adjacent property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Frank Jennings, 401 S. Griffin Street Suite 300, Elizabeth City, NC 27909, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. I you have any questions on this project please call me at 252-473-1607, or email me at michellecPnccoast ore. Sincerely, RECEIVED Received MAY 21 2018 ,ara i V. j DCM-MHD CI Ty (� Michelle Clower N DMEC Coastal Specialist North Carolina Coastal Federation )rtheast Regional Office - Headquarters & Central Regional Office Southeast Regional Office 7 Harbor Road, P.O. Box 276 3609 N.C. 24 + Newport, NC 28570 309 W. Salisbury Street a-473-1,07 27981 252-393-8185 2-473-1607 www.nccoast.org Wrightsville Beach, NC 28480 910-509-2838 C9 December 22, r2017 North Carolina Coastal Federation 637 Harbor Rd. Received Wanchese, NC 27981 RE: Moor Shore Road Living Shoreline Project DMEC To Whom It May Concern: This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with Coastal Engineering & Surveying, Inc., acting as the Town of Kitty Hawk's agent for permitting purposes is applying for a CAMA Major permit to build a living shoreline consisting of an off -shore sheet -pile sill, on property located at 3809 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina, which is adjacent to your property. A" copy.of the applidation:and proiectdrawing(s)`i enclosed f6r,yo jul..mVievJ. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. if'no commenfsare received within 30'd6ys of receipt"of this:notia , it will be considered that you have no comments regarding this project. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at 252-264-3901. Sincerely, Michelle Glower Coastal Specialist North Carolina Coastal Federation I have no objection to the project as described. I have objection(s) to the project as described. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. Print Name Signature of Adjacent Property Owner Mailing Address and/or Email Address I do not wish to waive the 15' setback requirement. Date Phone Number } ep $ ( , « } (\ !§, Agent > «TO Addmssee 4, <? m w« � «»»yel y:� > GecG QoDNi-t2 North Carolina Coastal Federation 637 Harbor Rd. Wanchese, NC 27981 RE: Moor Shore Road Living Shoreline Project To Whom It May Concern: Received DCM-EC October 25, 2018 This correspondence is to notify you as a riparian property owner that the North Carolina Coastal Federation in partnership with the Town of Kitty Hawk received a CAMA Major permit to build a living shoreline, on property located at 3809 Moor Shore Rd. Kitty Hawk and on 3801 Moor Shore Rd. Kitty Hawk, in Dare County, North Carolina. These properties are adjacent to your property. A copy of the project drawing(s) is enclosed for your review. . To ensure the success of the project we'd like to construct the living shoreline structure and marsh grass plantings right up to your property line. If you agree, you can waive the 15' setback by initializing the appropriate line below. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: the North Carolina Coastal Federation at P.O. Box 276 Wanchese, NC 27981, as soon as possible. If you have questions about the project, please do not hesitate to contact me at 252.473.1607 or the Division of Coastal Management at252-264-3901. Sincerely,, �j Leslie Vegas w Coastal Specialist North Carolina Coastal Federation RECEIVED DEC 0 3 2018 DCM-MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I waive the 15' setback requirement. Fro �0 EA—:eETT 7'o!L(365 Print Name Signature of Adjacent Property Owner 34-4�3 CH62RY f4ILc [,5 COU2T Mailing Address and/or Email Address I do not waive the 15' setback requirement. 1110,71/ D to ( ) q&,�--37-�,7 Phone Number Ax }{ �j .r m;i .rIM't�. yer'� x•. 1 A Ol _ ` d \.n I ;- , rj ��a, _ .\?ham•. ,'�,y i ,: Flu ki- x. r � f 1; 11 1 i 1v. ' r y. ��� � •VYb J r+ .�tiup•.� 1 4zlmli / ❑ DREDGE • FILL r / �„�,Q�,--. fy 11.. -> wl� '8634 A) B C D ` GENERAL PERMIT �, � P�evieusPermlt# � f` ❑New ❑ModiOwtion LKComplete Reissue ❑Partial ReIssue Date previous permit issued ' of qs ghodzed by the State of North Carolina, Department of Environment and Natural Resources _ a. .ie Coastal Resources Commesion in an area of environmental concern pursuant w 15A NCAC f{ • `-�:! ® les atpzMd. Applicant Name li;. i, 1 { _ i , , i Project Location: County L. , Address - t.; „ L, Street Address/ State Road/ Lot #(s) j•; j ii,,, ,� L ., 7 City 1 —Stai ZIP 1' 'A Phone#-i,-+. ls'i t- E-Mall Authorized Agent 14Cw oEW XFrA JXES ❑PTS Affected AEC(s): OOEA ❑ HHF ❑ IH. ❑ UBA ❑ WA ❑Pi ORW: yes /('hn) PNA yes City .4} { 11..—I ZIP Phone # (_) RNer Benin {"ems„ { ,K Adj. Wtr. Body h: t t N... K ��•' �i9,(`manLunknl Closest Mal.Wtr: Body `.t„_."d MENEM ■■r■■■■■■■■■■■■■■■■■n■�IPI■■■11■■■► t ■►\■■■■■ ■w■w■■■■■■■■ww■■I�Ilrw�■w■■■■■■■■■■laa■■■■■■ ■r��urswr; a�■t+:�nw■■■■■■■■■a�wwr!■■�e;:a■■w■■w■w■■ w■■■©■■■■■■■■■■■■■■rraa■■■rm■■w■rr■■■■ra■la■■ ■■mQer.lwwwwrl■■■■■le■■ar■r�■w■waver■■■I■■■■■w■■■ ■■!■�,�.w■ww:wu■■u�;�■awewe�r+�w�w!ww.r■■►�rc■►� ■■■■rr■■■■■■■a■■���s■■■■■w■w�■w■raw■■aw■t,■■r L�!■w ei—iiEililr'GE�71�11itlilTltr�a,�e'!S■wR!■■i!!!!l�Il��Iw�1■■1�■ ■■■■w■■■■■■■■■■■■i 011■ ■■■wC` ■■■■let►.rn■ww■■■■■■■■��w■c�+re�elw:m■Qee®■■■■!;■ ■WEEMOw■ru ■■■■�tr�mr„m�.w■w■■■eor■■■■■■■■■■■■■■■■■■■rj■ ■■■■■■■■mot �s�!am®:.: �f!v■■■■■■■■■■■■■s■■w■n■ ■wow■■■■■n■■awl.-.rr��r■■■car7�ww■■■■■■■wrn ■ww■■■®www■r!■■n■■rr��■■■w■wn!�■w■'■■■■■■■u■ ■■■w■■■■■■w■■■■■■AI■■■■■■■■■■■■■■■■■w■■■■ w■■■w■■■■■■wn;srR=RlQI■■■■■■■■w■■■■w■■■■I/■■! EEO ■w■w■w■ww■■■■ran■■■■■■■■w■w■w■■■■■■■■�� MEN ■■■ww■w■■■■■■rlrr■■■■■■w■■w■w■w■■■NMMW r ■ --- Na:.: t�gena or Appnca c Parini Name PenkOeker's Pnrrced , — , t AMA / ] CREQGEA FILL e I d� aA �+ ,!-�� p C5 .d4R - cyv B C 1) SE. ERAC PERMIT Previous permit # �StNew I�McdlRcatiOh 'C7Complete Reissue ❑Partial Reissue - Date previous permit issued Rho"i pd by the Sate e(North,Carolin6, Department oYEnvironment and Natural -Resources ne-Coastal Resources Commissioh,ln an areaofemironmental concern pursuant to.ISA NCAC v. Fl,t�op ApPllcant Name VA ° - �j,Ili') 5,,,,> - Rules attached. Project Location: County 1l6iC i Address Nav 1,v 'K d a l�:,." Street Address/ State Road/ Lot #(s)3q,L5- 'City- { N r r,-,1 •State fit... ZIP.A l ri3'S _ >! ,; o \ a M,far shu., d t I ar 1 ( 1 2 ° a'I A PhoneA21--LI S' E-Mzll Subdivision k ce P ° r> u . 11 Authorized Agent '. - - city --I. 14" 11 :.,, i<. ZIP :A'1 r, •,' Affected: ��' •"IY{EW FA P7A DES ❑PTB Phone# (_) River Basin i AEC s:' DOEA DHHF ❑IH:. -❑UBA ❑WA Adl. Wtr. Body i, i : q., ,.,; K u.„ •e /u k 1 ❑ PWS: - _ j§t-/man ORW: dyes /® PNA yes. / - Closest Maj. W[r. Body ft A l bf w t e It 's o.. r , Type-oT ProjecU Ackivity �: ` - Ba rya (Scale: 1„- S v" ) I 1r♦RONE �lE11Q��1r�!�lq���wr'a��^,151���■■■■■■■■■■■�■■ ■■■■■■■■9!I■fL°ii■■■■�ii� ■■IiT1174311■■■■■■■■■■■ ■■■u■■■■■■■■■■■■■r�{�■■■■■■■■■■■■■■■■■■■ i®i®®iii:iiii� i■er■*� iMEMENNESEENiENEMA ■■■■■ NEE ■■■■■■■■r ■■■■■■■■■■■■■■■■■■r■ ®®ii®iiiiiiwiii:iejvWiE MEM:iiiiiEWMENEME n T+i AMA / ❑ DREDGE & FILLS < � NFRAL PERMIT Previous permit# e/ PNew Jrlodification Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC Rules attached. Applicant Name Act(,( M fcl K It S Address 18w mo0i- Shpre It City Key r_ —Sta- _StateNL ZIPc)�QM`1 Phone# 1o)-6at-tS141 Fax #(—) Authorized Agent Affected Cw SEW e'7PTA JES PTS A Affecte OEA ❑ HHF ElIH b UBA N/A ❑ PWs: ❑FC: -. T, ORW: yes h;jn' PNA yes /?fio1 Crit.Hab. yes / Type of Project/ Activity Groin length Project Location: County iir, r f Street Address/ State Road/ Lot #(s) 3801 M oc r $ 2 Subdivision 404>fa 8.1i (;�c {., City tits K ZIP a a q Phone # O River Basin 1 b n a ✓a c• ,<' Adj. Wtr. Body Y i i { µG > 'n c , / �az /man /unkn) Closest Maj. Wtr, Body (Scale: I -- 3 ,� ) Bulkhead/ Riprap length — avg distance offshore t---- max distance onshore - Z --T Basin, channel y . -�-_-_ _. L{--- � i cubic yards ---T —_ -. --i Boat ramp+_ — Boathouse/ Boadift I Beach Bulldozing Other Shoreline Length 3 SU SAV: not sure no Sandbags: not sure yes Moratorium: yes no * r...' - _ Photos: � no Waiver Attached: �9 no -L) CITY - A building permit may be required by: ❑ See note on back regarding River Basin rules. Notes/ Special Conditions y - rAlgent or Applicam Printed Name. Signature ".Please read compliance satementonbackofpermit " Appli Fps) Check# m• i#_ /y 4-II-aol+l Issuing Date FvirauonDate Local Plammngjurisdiction Rover File Name Pier for Harry Meraklis 3 801 Moor Shore Road Boat Slip Area 88' to MWL At Shoreline • RECEIVED MAY 21 2018 DCM-MHD CITY ■r_ MOORSHORE RD. (SR im) DARE COUN77 SHOULDER STABILIZATION Lucmu S. STOKES f408 BEACON DR. KIT77 HAWK , NC 27949 DB 1541 P 149 0.4 milx------- F— TO SR 1206 � lf) MOORSHORE RD. (SR 1216) Q cuesesroNE — TOBEP OED\ TOP OF BANK LUCILM S. STOKES 408 BEACON DR, KIT17 HAWK , NC 27949 DB 1069 P S72 NOTE: 35' OF PROPOSED RIP RAP 40' OF MAINT.& REPAIR a � ma I =Z CO 20(FT0 BEACON ST— �Zz — m v 2 ti ® EXIBTNO ClA98BBT0NE KITTY HAWK BAY N 30.000023 W-T6.5MBO NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY. CURRITUCK COUNTY QUAD: KITTY HAWK BASIN: PASQUOTANK PROJECT :SHORELINE STABILIZATION SCALE I"= 30' DRAWN: JGC 02.0E-2012 ., . � . � `� ^� y ` �� > � © ` d � � . . � �� �� ) � � � � � � � ,��_ �%'.�/ _�-iPTI'H..1'ST �5 "+YYT' ,S.qc- P^+3R"•�'A'�v-.6YG6"+-+V!Y•xs �v-•..f.y.�.•._ .�,..,, CAMA AND DREDGE AND FILL GENERAL' -v 10 PERMIT R+Y Tl� 137864 as authorized by the State of North Carolina Department of Environment,.Health, and Natural Resources and the C sta 2eso rces Commission in an area of environmental concern pursuant to 15A NCAC00 Applicant Name N C V EPAKfAEN 1 OF ( KAN5f Address . Po SO)( I gO5 City FLIlABET14 CJTV State Project Location (County, State Road, Water Body, etc.) DAR C Co Moog5Holet= RoAf) Numberq/9-33/- J/737 to tJ Type of Project Activity �t GR t m c, rrt orc rcc t �n c �c + XA a i w �117 ift .4GAJ r'S Wa TERtogRD bANk of AR oS/mod SCr4l-Ar+&H7' 41©A+G- /00 L,"ff4A, FPEOFr Or /t+ooRBNoFff CoAJ 7-He047,E1,g1D .#I/ )E�0405/0tJ - 91,4R/+/e SMALL Ater Err/=un NoErH et Sovnl of ALP« STAKAT7 _ MEWAI Fier (dock)length r■■■■■■MM■■ ■■■■■■■d■ I!l�a■■ ■■■■■ SEEM ■■■■■■■■■■■■■■■■■■ i Groin length ■■■■■■■■■■■■■®$i l�ii■■■ ■ ■■ ■■■■■■■■■■■■■!�l1�I111lJl�IA■ number- ■■■■■■■■■■■■■■■ilfiiii■i■■■■■ ■■■■■■■■■■■■■■■■■■WMITso OEM ■■■■■�■■■n■■■■■■■M■■■ ■ ■■■ SEES©■" &MMMO■ ! C t�■ Basin, channel dimensions ■■■�■■■■■■■■■■MME OEM ■ ■■��■■■■■■■■■ Boat ramp dimensions �N■ � ■� ■■■N■;■■N■■/!#SEES ■■■ SEES ■■ ■a Misr'-, This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any - violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to ttie permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2 adjaGam FipaFian 1aHd@WAeFSFfj�fRg--tiat"'.'EhOy'-'h2V6--n6 9�jce{19n5-i@'tftC$F6pb5C�a0efiC. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. r 3-1�7-R5 J/L-/-7-95 issuing date expiration date attachments 07, ` ' �700 application fee P✓"i/' t i ���` �'� fz �'�✓' NOT A f Ar-i or PP-0 iJ -,3 e �Y' --- - TR ec mP - rDFbze 1 CAWA 6-mge 59 lzl�o ylZs� Idol I e(AjuN TikxF— . PJT5 �e STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DAMES B. HUNT, JP- DIVISION OF HIGHWAYS GOVERNOR P O Box 1405 Elizabeth City, NC 27906 (919)331-4737 February 21,1995 SUBJECT: Certified Mail Return Receipt Requested for CAMA Permit - Dare County Dear Sirs, R. SAMUEL HUNT III SEcurmY -1A 0 1 IY95 DISTRICT 1 OFFICE This letter is to notify you, as an adjacent riparian landowner, of the NC Department of Transportation plans to construct a rip rap bulkhead, on the right of way, starting ±150' from the intersection of More Shore Road (SR 1216) and Beacon Street for 125' north along SR 1216. Attached please find a copy of the plans. Should you have no objections to this proposal, please check the statement below, sign and date, and return this letter to the above address. Should you have objections to this proposal, please send your written comments to: NC Division of Coastal Management 1367 US 17 South Elizabeth City, NC 27909 Written comments must be received within Ten U days of receipt of this notice. Failure to respond within Ten 10 days will be interpreted as no objections. If you have any questions or need addition information, please feel free to contact us at (919) 331-4737; Fax (919) 331-4739. Th Yo Allen Russ 1 Assistant District Engineer NCDOT I have no objections to the project as presently proposed and hereby waive that right of RFc',�'VFO objection as provided in General Statute 113-229. 44), 2 I have objections to the project as presently proposed and have enclosed comments. Q41 My I Z0/8 O c/TY �RipananLandownerSignature) (Date) is JAMES B. HUNT, JP, GovEtuvoR SUBJECT: A .�v Y`A 110, 79i ., STATE OF NORTH CAROLINA 4 i s ti ? r " :' DEPARTMENT OF TRANSPORTATION --- DIVISION OF HIGHWAYS R. SAMUEL HUNT III SECRFrARY P O Box 1405 Elizabeth City, NC 27906 (919) 331-4737 February 21,1995 Certified Mail Return Receipt Requested for CAIVLA Permit - Dare County Dear Joseph and Lucille Stokes, This letter is to notify you, as an adjacent riparian landowner, of the NC Department of Transportation plans to construct a rip rap bulkhead, on the right of way, starting ±150' from the intersection of More Shore Road (SR 1216) and Beacon Street for 125' north along SR 1216. Attached please find a copy of the plans. Should you have no objections to this proposal, please check the statement below, sign and date, and return this letter to the above address. Should you have objections to this proposal, please send your written comments to: NC Division of Coastal Management 1367 US 17 South Elizabeth City, NC 27909 Written comments must be received within Ten 10 days of receipt of this notice. Failure to respond within Ten 10 days will be interpreted as no objections. If you have any questions or need addition information, please feel free to contact us at (919) 331-4737, Fax (919) 331-4739. Thank You, Allen R sell Assistant District Engineer NCDOT V • I have no objections to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. _ I have objections to the project as presently proposed and have enclosed comments. Landowner Signature) (Date) •: ..,, �, I °� o � �. N � V. ..56L, 6� � yy.. «a...�.... f 7�., t y`� k:: �� �' t A � r j � O O I I 777 I w � r '. 0 0 � N N "� A � _ I i I 0 0 0 � � � m o c ,¢ � N N N 771177� 77, Aifs, �'! o ,N, " A j,"f: f 2018-01-17 RM N 2018-01-17 M 2018-01-17 2018-01-17 2018-01-17 0 2018-01-17 r^< -- rb 5 5 ' -L- . l-I ;k a I Coastal Management ENVIRONMENTAL QUALITY May 18, 2018 Michelle Clower North Carolina Coastal Federation 637 Harbor Road Wanchese, NC 27981 Dear Ms. Clower: ROY COOPER MICHAEL S. REGAN 11"C ", BRAXTON C. DAVIS JireCor RECEIVED v,v 21 2018 oCM-MHD CITY The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located 3789,3793,3797, 3801 and 3809 Moor Shore Road, Kitty Hawk in Dare County. It was received complete on May 7, 2018, and appears to be adequate for processing at this time. The projected deadline for making a decision is July 21, 2018. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from May 7, 2018, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. Not;ling Compare, - , State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 3001 Elimbeth City, NC 27909 252-264-39011252-331-2951 [fail NC Coastal Federation May 17, 2018 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Yvonne Carver, Field Representative, if you have any questions and or if you wish to receive a copy of her field report. Sincerely, l� Frank Jennings District Manager, Northeastern District NC Division of Coastal Management FJ/eg Enclosure cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City, NC Yvonne Carver, DCM, Elizabeth City, NC Andy Stewart, Town of Kitty Hawk Roebuck Properties II LLC Amy Wells Charles and Lisa Sullivan Harry and Eileen Meraklis CAMA PERMIT N < APPLIED FOR �mo ` PROJECT: Construct approximately 625 Ift of wooden/vinyl sills to protect and restore the shoreline COMMENTS ACCEPTED THROUGH June 9, 2018 APPLICANT. FOR MORE DETAILS CONTACT Town of Kitty Hawk, et.al THE LOCAL PERMIT OFFICER BELOW. c/o NC Coastal Federation Yvonne Carver Michelle Clower 401 S. Griffin Street, Suite 300 P.O. Box 1125 Elizabeth City, NC 27909 Kitty Hawk, NC 27949 252-264-3901 252-261-4151 Coastal Management ENVIRONMENTAL QUALITY EMAIL MEMORANDUM TO: Susan Simpson The Coastland Times Manteo, NC 27954 legals@thecoastlandtimes.net FROM: Ella Godfrey DATE: May 17, 2018 ROY COOPER Gnvernnr MICHAEL S. REGAN seererary BRAXTON C. DAVIS Dieaor SUBJECT: Public Notice: Moor Shore Road Living Shoreline Please publish the attached Notice in the Sunday, May 20, 2018 issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City Sarah Young, PIO, DCM, Raleigh Melissa Sebastian, Accounts Payable, DCM, Morehead City File - >% Nothing Compares--., State of North Camliaa ( Enviroamemel Quality I Cmml Management 401 S. Griffm St, Suite 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951(ful Ft�GS\\JED 11p\6 MPS 2 GIB DGM MND NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The NC Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 05/07/18. The Town of Kitty Hawk, et.al c/o Coastal Federation proposes to construct approximately 625 Ift of wooden/vinyl sills in order to protect and restore the shoreline located at 3789, 3793 ,3797, 3801, and 3809 Moor Shore Road in Dare County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264- 3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to June 9, 2018 publication, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Sunday, May 20, 2018 MAJOR PERMIT FEE MATRIX Applicant: Town of Kitty Hawk, Stokes, Roebuck Properties, Wells, Sullivan, Meraklis, Moor Shore Road Lh ine Shoreline Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (243001602 435100095 2341) I. Private, non-commercial ❑ development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B C or D below applies: III(A). Private, non - El commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: III(B). Public or commercial ❑ development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) III can be applied: III(C). If General Water ❑ Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) could RECEIVED be applied, but DCM staff determined that additional review and written DWQ MAY 21 2018 concurrence is needed because of concerns DCM-MHD CITY related to water quality or aquatic life: III(D). If General Water ® Quality Certification No. $400 60%($240) 40%($160) 4097 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: \ —This is a word processing form to be completed in Microsoft Word"" NC Division of Coastal Management Major Permit Application Computer Sheet (1110112012) Applicant: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen MerakBs; In partnership with The Coastal Federation Date: 05118118 Project Site County: Dare Staff: Yvonne B. Carver District: ®Elizabeth City [I Washington ❑Morehead City [I Wilmington Project Name: Moor Shore Road Living Shoreline Date of initial application submittal (EX., 1/82007): 181 application rec'd O1131118 Date application "received as complete" m the Field office (EX: 1/8/2007): New application rec'd 05107118 Permit Authorization: ❑CAMA ❑Dredge & Fi11 ®Both SITE DESCRIPTION/PERMIT INFORMATION PNA: [I Yes ®No Photos Taken: Yes ® No❑ Setback Required (riparian): ®Yes El No Critical Habitat: El Yes ®No ❑Not Sure 15 foot waiver obtained: El Yes ®No Hazard Notification Returned. - El Yes ®No SAV.-®Yes []No ❑Not Sure Shell Bottom: ❑Yes ®No []Not Sure TemporaryImpacts: ®Yes []No Sandbags: Yes ®No ❑ Not Sure Did the land use classification come from county LUP:❑Yes ®No Mitigation Required (optional): ❑Yes ®No Moratorium Conditions- ❑Yes ❑No ®NA Environmental Assessment Done: El Yes ❑No®NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) I ❑ Swamp Waters (SW) ❑ High Quality Waters (HOW) ❑ Outstanding Resource Waters (ORW) WETLANDS IMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemiflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis (SC) Bullrush or three square (Scirpus (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncus ❑ (SP) Salt/meadow grass (Sparlina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ 111(A) Private w/D&F up to 1 acre; 3490 ® III(D) Priv. public or comm w/D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ 111(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 Major development extension request - ❑ 11. Public or commerciallno dredge $100 and/or till - $400 L Private no dredge and/or /ill - $250 ❑ Ill(C) Priv. public or comm w /D&F to 1 RECEIVED acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808-2808 1-999-4RCoasT :: w .nccoastalmanagement.net D`+M_MR"1W. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Town of Kitty Hawk, Roebuck Properties II LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis, in partnership with The Coastal Federation Date: 05118118 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Sill 1 New Work® Replace 625 3 Maint ❑ ❑ Y ® N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint [I ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint[-] ❑Y❑N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint [I ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint❑ ❑Y❑N revised Nov. 2012 R ITC bivision of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant Town of Kitty Hawk, Roebuck Properties If LLC, Amy Wells, Charles and Lisa Sullivan, Harry and Eileen Meraklis; in partnership with The Coastal Federation Date: 05118118 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp im cts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Shallow bottom Dredge ❑ Fin ® Both ❑ Other ❑ 1875 1875 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Bath ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED MAY 21 NIB DCM-MHD CITY 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanaeement.net revised: Nov. 2012 Coastal Management ENVIRONMENTAL QUALITY January 19, 2018 Ms. Michelle Clower NC Coastal Federation P.O. Box 276 Wanchese, NC 27981 ROY COOPER Gowmor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dbector Re: Moor Shore Road Living Shoreline, Kitty Hawk, Dare County Applicants: Town of Kitty Hawk, Stokes/Wright, Roebuck, Wells, Sullivan, and Meraklis Dear Ms. Clower: The NC Division of Coastal Management hereby acknowledges receipt of the application submitted on January 11, 2018, for State approval for the development of the referenced project. An initial screening of the submittal package has been conducted as per 15A NCAC 07J.0203- .0204 (copy enclosed). This revealed certain deficiencies, which must be corrected before the application package can be accepted as complete. To assist you in expediting the permitting process as much as possible, I am notifying you of these deficiencies so that they can be quickly corrected to facilitate my detailed review. Because the deficiencies are easily correctable, I am not returning the entire application package. Please make the necessary changes and submit the appropriate documentation. With the retained copy of the application, I can commence the detailed review. Please understand that the subsequent detailed review may reveal additional areas where further information or documentation is required to demonstrate compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified of such issues separately. Our initial screening has identified the following deficiencies: 1. Information needs to be updated/corrected in the application: • It appears that the application forms submitted (DCM MP-1, MP-2, and MP-4) were photo copies. Please submit the original application forms. • Any reference(s) to Foreman as the owner of 3793 Moor Shore Road in the application/additional information to supplement application must be updated/corrected to reflect the name of Amy Wells versus Foreman. RECEWED �'� Nothing Compares - : JAN 2 9 2018 State of North Carolina I Enviroomeatal Quality I Coastal Management D A • /'a , 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 - 252-264-39011252-331-2951 [fax] Ms. Michelle Glower NC Coastal Federation January 19, 2018 Page 2 of 3 ■ Form DCM-MP-1: - Number 1. Applicant Name4 you listed "See attached information" under First Name. A representative's name for the Town of Kitty Hawk should be inserted in that bracket. Since you entered andy.stewart@iittyhawktown.net under Email, you should update the First and Last Name brackets with the name Andy Stewart, Town Manager for the Town of Kitty Hawk. 1. Please insert "See attached information" on the bracket where it mentions `If additional applicants...' 2. Additional Information to Supplement Application — Page 2 — please make corrections as noted for property owners' names/project addresses. a. You should also include the current mailing address for each co -applicant, as the project address and mailing address may differ. - Number 4c. Size of individual lot(s) ... change to note "See attached Additional Information to Supplement Application". 2. Adequate Work Plans or Drawings have not been submitted. Please address the following items: ■ Plats must be accurately drawn to scale and be no greater than I inch = 200 ft. - The original plat submitted on 01/11/2018 notes a Graphic Scale of 1 inch = 80 ft., with segments of 80-0, 0-40, etc. Our engineered scales go up to 1 inch = 60 ft., and the 1 inch = 40 ft. does not match up (i.e. the plat submitted is not to scale). Please update the plat to an engineered scale. - The plat submitted has colored sections included; when colored drawings are submitted, 26 copies must be provided. - The lot at 3793 Moor Shore Road was incorrectly listed as Mildred P. Foreman, D.B. 603, PG 386. The plat will need to be updated to reflect the correct/current ownership name and deed number (Amy D. Wells, D.B. 2156, PG 787). 3. A copy of a Deed or other Title Indicating Document must be provided for each applicant/property owner. ■ On the plat submitted, you noted the ownership and deed information for Lucille Stokes for Lot 18, and submitted the deed that is associated with that property on 408 Beach Drive. The section of land/marsh grass along the shoreline of Moor Shore Road that is owned by Lucille Stokes is listed as 3770 Moor Shore Road. Please submit a copy of the deed associated with that portion of land, which is noted as D.B. 1069, PG 0572 on Dare County tax records. ■ In cross checking the ownership/deed information against the plat submitted, I discovered that 3793 Moor Shore Road was incorrectly listed as Mildred P. Foreman, D.B. 603, PG 386. As noted above, the plat will need to be updated with the correct ownership name and deed numbers. I've attained an the deed for Amy D. Wells, D.B. 2156, PG 787 for our file fro tax records. JAN 2 9 2018 DCM- MHD 01TIf Ms. Michelle Clower NC Coastal Federation January 19, 2018 Page 3 of 3 4. Documents are required noting your authorization to act as agent for the applicant(s). ■ Susann S. (Stokes) Wright signed the agent authorization submitted for the property at 3770 Moor Shore. On the additional information/Co-Applicant List submitted, Susan Wright was noted as a Power of Attorney (POA). However, Ms. Wright did not sign as POA, but as Owner. Please provide documentation supporting Ms. Wright's POA or updated ownership (i.e. Lucille S. [Sawyer] Stokes passed away on September 27, 2010; has Susan Wright inherited this property, or is the property currently in the names of the heirs of Lucille Stokes and Ms. Wright is the POA of the property?). 5. To date, the following documentation of Notification of Riparian Property Owners has been provided (notation has been made of any pending items): ■ Received copy of letter to Fay Forbes, Everett Trustees and certified mail receipt; signed green card pending. ■ Received copy of letter, certified mail receipt, and signed green card for Vaughan and Hannah Robinson. ■ Received copy of letter to Betty and William Daner and certified mail receipt; signed green card pending. 6. Additional information required: In your application you note that the total disturbed land area and linear footage of breakwater/sills is contingent upon adjacent property owner waiver(s) received. Documentation of signed waivers will be required prior to permit issuance. To expedite our response to your permitting request, we will commence the detailed review of your application for a permit pending the receipt of the additional information requested above. However, the statutorily provided 75/150 days allowed for review cannot commence until such time as we have received a complete application package. Once your application has been accepted as complete, you will receive a separate notification letter. Please do not hesitate to contact me at our Elizabeth City office (252 264 3901) if you have any questions regarding this letter or the permitting process. Sincerely, Yvonne B. Carver Field Representative Division of Coastal Management Enclosure(s): 15A NCAC 07J.0203-.0204 Plat datedRECEIVED Document:: Additional nal Information to Supplement Application cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City JAN 2 9 2018 Frank Jennings, District Manager, DCM, Elizabeth City Natalie Garrett, Coastal Engineering & Surveying, Kitty Hawk DCM- MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION Received JAN 11 2C'3 Moor Shore Road Co -Applicant List in Addition to DCM-EC the Town of Kitty Hawk POWER OF parcel stnum stname subdivision_ firstn lastn ATTORNEY EMAIL Susanne 1 18226019 3770 MOOR SHORE SUBDIVISION - NONE LUCILLE S STOKES Wright sewwrightobxOgmall.com ROEBUCK 2 18226219 3789 MOOR SHORE KEEPERS HILL SEC LLC PROPERTIES II dray@ftr-law.com Amy D. 3 18226220 3793 MOOR SHORE KEEPERS HILL SEC AMYD WELLS Wells amvdwells0charter.net CHARLES V 4 18226221 3797 MOOR SHORE KEEPERS HILL SEC 2 1R SULLIVAN csu1l1van12529gmail.com 5 18226222 1 3801 MOOR SHORE KEEPERS HILL SEC HARRYJ MERAKLIS harrymeraklis@zmail.com RECEIVED JAN 2 9 2018 MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION Site Characteristics: Size of Property: Stokes: 408 Beacon Drive: 29,500 sq. ft + additional parcel 3770 Moor Shore Road: (sound front) 6,500 sq. ft. Roebuck: 3789 Moor Shore Road: 21,000 sq. ft. Foreman/Wells 3797 oor Shore Road: 22,500 sq. ft. Sullivan: 2797 Moor Shore Road: 25,500 sq. ft. — 3 9 7 Meraklis: 3801 Moor Shore Road: 28,500 sq. ft. �?— Robinson: 3825 Dory Court: 26,000 sq. ft. Town of Kitty Hawk: 3809 Moor Shore Road: 62,000 sq. ft. TOTAL: 221,500 sq. ft. Length of Waterfront Stokes: Approx. 240 lift. Roebuck: Approx. 114 li. ft. Forman/Wells: Approx. 45 li. ft. Sullivan: Approx. 54.5 li. ft. Meraklis: Approx. 53 li. ft. Robinson: Approx. 40 li. ft. Town of Kitty Hawk: Approx. 325 li. Ft. TOTAL: Approx. 871.5 li. ft. Distance to Structure Meraklis: 277' Sullivan: 247' Stokes: 200' RECEIVED JAN 2 9 2018 DCM- MHD CAT% MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION DCM-EC RECEIVED JAN 2 9 2018 DCM- MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION Moor Shore Road - Google Earth Image : 1993 Moor Shore Road - Google Earth Image 2017 RECEIVED JAN 2 9 2018 DCM- MHD CAT MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION RECOVED JAN 2 9 2018 Received , i; DCM- MHD CATY DCM-EC MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION RECEIVED JAN 2 9 2018 DCM- MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION RECEIVED JAN 2 9 2018 DCM- MHD CITY MOOR SHORE LIVING SHORELINE ADDITIONAL INFORMATION TO SUPLIMENT APPLICATION Adiacent Riparian Landowners 1. William E. & Betty B. Daner Address: 100 Dosher Lane, Kitty Hawk, NC 27949 2. Vaughan & Hannah Robinson Address: 423 West Bridge Lane, Nags Head, NC 27959 3. Forbes, F. Everette Trustees & Forbes, Fay R. Address: 4090 Caplock Court, Middleburg, FL 32068 RECEIVED JAN 2 9 Z018 DCM- MHD CITY DETAIL FOR PERT TTM PURPOSES ONLY _ w= wQCEN 0.0IXSJ a-md' t 1 /Iw1YL 94Er] 4C (a Am WFo) wNALFF wEAIm ro zs trA// 4- nNlia gars r "oc uP Ar Mmnaa t9w1 ,IB ow Ir vIAN V!W Tae wAlw PLpw (IYP) G' pAIZhA 1 12 NOi Ow 6xFAxwARA 1£MSslFR (Ll➢a tYHR Ba15 M0.ICARE wA1ER ' m T orrlNs am.{R w aR { .mt 8-1- �JLI1Y4- JL� �1L ILII IN-n.�Na4 DCW°O"°niw11 �' J,J�'iR2r I � � Tn. i l l l bECRON 6EVATM •r>m spur SILLIBREAMWAl1G2 DETAIL LEGEND: SAY LEGEND Q - SR SET IRON ROD M1£a<9MWY. t0/2e/le Y - EIR EI IFGNG IRO! ROD O - EIP E1t151WC IRON PIPE a - Iss yr O - CALC CALCULATED PT A - PN NAIL El 1sa yr 0 - WATER METER R/W -RIGHT OF WAY ECP - EDGE OF PAWMENT El yr (MV) - MAN YALW C C- MI7M61G M.B.Le MINIMUM BUILDING LINE 9 - PRE HYDRANT ® Av yr POTHER POLE y - APPIMIMATE MARSH GRASSES - - GAMA WE DS UNE lo> POTHER POE D- Guy WRE X WATER DEPTH -P- OVERH O POWER ONES LINE TAME LINE I LENGTH I BEARING 1-3 62.61 S 1 '4 n L41 120.62 S7G'02'4'W CURVE TABLE CURVE LENGTH RADIUS CHORD BEARING C2 4a72 25.00 41.37 '41' ' C3 119.88 767254 119.83 528'%'% C4 123.85 767254 123.B2 524'38Y(1 EE C5 41.06 1672.54 41.06 521'48'53"E C6 69.96 t%.84 61 N3C4,551'W C7 70.44 1%.84 69.76 N62T)9.31•N' C8 41.87 i%.84 47.73 N84D4'i8'W C9 45.40 /%.84 45.22 S78S4'18'W C10 14264 177.87 13385 7'20' C11 9228 737.50 92.22 56 'S1'20'E REFERENCES- M.B. 4. PG. 5 D.B. 971, PG ml 0.d 121.1, f5 500 0.B. 1923. PC OZ» P.0 N, SL 251 I, I7Ba PD 461 D.B. 1/24, M IV 0.6 m PC 316 O.B. 174% PG 331 Da IU1. PO f49 P.0 B, A. 391 1.1151171 PU.B. PG 462 .0 B, 'L 398 P.0 C SL 740 P.G B, SL A9 D.B. IIDS, PC 5W DA 1069, PC 5n P.0 C SL 74B DA 2158, PC MY MR. IM PC 4M D.1. 21 n. PG 31 SURWY, FILE 92460 BY COASTAL ENGINEERING 4 WRWYNC, INC. ENRII 'SURWY FM 10 D P. FIXWAN. LOT 20 R 20A nEEPDts HILL SECI CN 2. l a NUTTY HSURWY, n31 lrJ•t7aMVAt MONEEWNC R SJRVEYVINf- ENl1IlID,'gTT 7L LM1G51ER. LOI 2701W 0P MI♦ RILL YCllp1 HA'. SURWY DATE 1-7 1 INDEX SHEET LSIOO - CAMA PERMIT DRAY N • j Received 9-i20`:3 DCM-EC G� T1 T2 TYPICAL R"RREADD""'a`LAYOUT GRAPHIC SCALE 100' MAIL 80 0 40 60 160 10' MAX z Mn m seYr TYPICAL sILIJBREAKWATER SECTION ( IN FEET 5H0.M6PoI1 NlLwISN> Al rj 1 inch = 80 ft. L9a 74AmEVMWS) M110 WM 9U]M aMAAA 1 (� Ww 1f1lWLp1AI �M AL II1RAlIUK Ip4 / NOTES: 1. n ms n'storm TYPA'.V_ PRELIMINARY NOT FOR USE FOR CONSTRUCTION OR RECORDATION PROPOSED SILL (TY EM71NG RIP RM ANI RIP RAP JETT' TI�4 NOTE T3 L9 177 p T5 06 W Y KITTY HAWK BAY T10 + M T8T9 / T5 T7 F33p4•t /� Br SZr4s,w- R - -C3 _ 6EN C4 RT E CµC 18 18 11wvl c A SITARS > ROEM CK PR0" PC B;A 14 DLL 1541, PG 149 C O ` (' Oin72 Rom' mQ< M �$ d E)�SITIN/G \\ 7)E C 0 �T �T11 5' �M i. �1A / `ej�1,fZ/ MARSH Glom MARSH s Y E S77.42L = 2'36 �,. - E1 1 �S/o• EIR 7 a 50' POWER L3 \rh ..a . _ .., n can EASEMEIIT zo N MY D. WE115 DR. 2158, K. 787 M B, SL 399 Ot51TNG SFD JR 1 � 1. 1 � ' I It I FORBES. F EVERETT TRUSTEES FORBES, FAY R 1'1 D.B.I11I111814 PG1 'I.- I yyI 751 1 it i Z 6d byy _ If 14 €fN big, g9 pp_ u`ll( 4 ig IF J! -• /Ifni lyl Y WAMS 127 251 1 GRASS \D.B. Y Iu N/F RE TOM OF KITTY HANK D.B. 1749, PC 331 VACANT LAND a MAY 212018 ©cM4lHp CiTY 45.32'- N28 W20'W W p 62.DO � Re1 )GRANN7� y i� S N/. W DCHARPRIDGEON MAN R� SON PoD B 1753 PC 0470 D.B. M72, 398 N PG 31 PC B, SL PC. B, SL 398 Qy 0 LS-100 DETAIL FOR PFn►10RNG PURPOSES ONLY TYPICAL SILURREAI(WATER LAYOUT GRAPHIC SCALE 2•. D.e: _ _ _ IOW MAX 10' ... Tool ti to $0 0 40 80 160 WOWFN aaoa'A VI fix+ a� • _ "� o (. IN. MD) lLM1lFA IPEAim m u CG((TT r wIx W/,r INnAlaa .WF m A /1' 11Y¢A 60.E rNpr OpRj IY - (F'�� ruxvle4 rah Tv, FLON (rw) TYPICAL 61LL18REARWATER SECTION IN ,FEET J�V W RMOIEMR N.12 MT P{[f 10 tO" p J/Y rCIF 60.E MpylJyIE MA1ER 9£PANBPoxM6rY¢N9AvcTMI MBI OFP NS acaAL i inch so ft. pEi� 3 a" n19kx .r➢Nvs (.11RIIEnMuS) a.wlm vrN s,a01N waDrnAA qy YAM 1 E wIxr, At (9•rAmIA MfiRlMllrl.M1) vn mF mrtxnwt Nt M10(i IIWL r{`EIMrD( wui U (�-,1�6= �f' t I I�II�ALE A5F a W4 �w 0 PAT- 9 AL ww s su L1EYAIRN �' ( WAA¢ M u L I �E scEr nIE 1.1 Anon t^ 216C11011 hY ELEVAImR �v .to. SILLIBREAKWATERDETAIL Io1mM9Ev.. - - T16rGim � yM1W LEGEND. SAV LEGEND 0 - SIR SET IRON ROD OAT 9JRV , 10/28/19 0 - EIR EXISONC IRON ROD 0 -EIP EYLSRNC IRON PIPE c5� snv O -CALC CALCULATED PT A - PR RAIL ❑ ® - WATER METER R/W - PoGNT OF WAY EOP - EDGE OF PAVEMENT p-ssx vv El (MV) -.MAN W W LANE. MONUENT M.EU-- MINIMUM BUILDING LINE a.ss vv - FIRE HYDRANT RJISr - POWER POLE y - APPROMMATE HARSH GRASSES -. - CAMA WETLANDS LINE RDA POWER POLE } GUY SIRE X11491 WATER DEPTH -P- OVERHEAD POWER LINES UNE TABLE UHF; tFNGTII BEARING L.3 62.61 52)Y064 L41 120.62 S7OT)2'4 `W CURVE -TABLE CURVE LENOTH I RADIUS I -CHORD BEARING C2 48,721 25.001 4137 S864132' 119:86 1672 54 I19.83 S28'4646 C4 12385 16725E 123.82 4 - 19 C5 41.06 1672.5E 41.06 6148'57 C6 69.98 146.84 69.32 N34 51'W C7 70.44 146.54 69.76 N6 34"W CS 41.87 146.84- 41..7 N84U4'18'W C9 45.40 146.84 46.22 S781418•W CIO 147-64 17787 138.85 98 - '50• I T 92.28 737.5D 92.22 S6251Y20"E REFERENCES: Md 4, m S O.B. 971. PG Wt Im I= PG SOD' D$ I= PC 027> P.C. IL SL 251 D.B. 1780 PG 461 D.B. INN. PL 127 08 6al PG 336 D.B. 1749. P4 331 O.B. TS41. PG IQ P.C. S. S, 396 P.0 a. S. 171 D.B. 971. PG 551 DEL 373. PC 4B2 P.C. S. S. 39B P.0 C Si- m Rt, a. SL 399 O.B. 110% PG 609 D.& I069, PG 572 P.0 C S- NB m 2166, m >6> D.B I= PG 4>0 .. 2172. PG. 31 SURVEY, FILE S2460 9Y COASTAL 41aND RNG N SIR'VE:YM INC ONITTKEO."SAtM1EY FDR MADRLD P. FORMAN. LOT W E 20A KEEPERS HILL SECTIONL TOVN OF Pam 9ja Y: nALE sIRtWAWVAI BNONEE I,NG a WR1£YS. Nit.. Ernn[D; SURI r ff LAMCASTER. LO T 2)A IQ]PER6 NAL SECTION 4• OF q6K NAYM', suave" DATEUE'_7_I INDEXFM-- IT A N MAY -': 201:3 DMEC NOTES: 16 FO016 mr SY"m TIPRAL PRELIMINARY NOT FOR USE FOR CONSTRUCTION OR RECORDATION KITTY HAWK BAY �O T2 PROPOSED SILL (T' `1' 1 g EXSI DN RIP JETN " Q� T3 T4 NOTE �,. T5 o M1D2 ,M1P, T5 Y' WO�uE S. STOK s,1�`'1�',DI1� _D.B. 1009. PG. S72W 1D N/F WOLLE S. STOKES D.B. 373, PG 482 PC B. A 171 �IFG EXSITING T15 \j _ \2." I Ts ryas! v v s5 RVp \ M I•n F"-T3 R fB77�� _ ROBACI< PA" 1, U.0 U.B. 1541, PC149 PC S. SL 399 w L 3 7 Y I 0 20 N MY D. WEDS D.B. 2156, PG. 787 PC. B. S 399 it 1 � i - FORBFS, F LIERETT 7RUSiEFS d FORBES,- FAY R 09. MIL4 PG 8 1 1 A 3 Y\DJL A' 4 WILLIAMS A. t27 251 ,M GR SS s j TOWN OFNMM HAWK RcEIVEb D.B. 1749, PG 331 VACANT LAND MAY 212018 f)CfW MHo 'L _ lom 4532' � o O R N2 o .a 'D ar 2,0'20'W 6ZDO 0 2C>/F < 28 Z� YIAUGHAHANNAH B ROBINSON PR �°N Q I� D.B. PO. 31 70 a, S2. PC. S. SL 396 PG B. 5. 396 F l ¢ ' \-`