Loading...
HomeMy WebLinkAbout86-18 Letter of Refinement 2022ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director Permit Refinement State Permit No. 86-18 NORTH CAROLINA Environmental Quality April 11, 2022 Town of Carolina Beach c% Paula Kempton- Send via email to paula.kempton@carolinabeach.org 1121 N. Lake Park Blvd. Carolina Beach, NC 28428 Dear Ms. Kempton, This correspondence is with reference to the request you submitted on April 7, 2022, to modify State Permit No. 86.16, which authorized the excavation and renovation of the western portion of the existing Carolina Beach municipal marina, including the replacement and relocation of the existing docking facility. A Major Modification was issued on February 24, 2022, for new sidewalks, the replacement of the existing bulkhead, the reconfiguration and excavation of the existing docking facility on the southern and eastern side of the existing municipal marina for a total of 34 formalized slips. The permit is due to expire on December 31, 2025 The action proposed in your request is to relocate an existing authorized slip and install two temporary pilings within an existing marina as depicted in your email and drawing (dated as received by DCM 4/7/2022). The authorized slip is currently located on the southern side of the basin where the authorized bulkhead work Is taking place. The submittal states the authorized slip currently houses the Island Cruiser, which is very active with passengers and school trips, and to alleviate any conflicts with construction, the Island Cruiser would be moved to the east side of the basin and to safely moor the Island Cruiser two temporary tie -pilings are needed. The tie - pilings would be located in an area usurped by the authorized east -side marina renovation and would be removed following completion of the south side bulkhead work adjacent to the originally authorized slip. No change in formalized slip count or encroachment into the USACE channel setback is proposed. Upon reviewing the information provided, the Division of Coastal Management has determined that the proposed action is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of the permit. This Letter of Refinement authorizes the modification of State Permit No. 86-18 as described in your email and drawing dated received Thursday April 7, 2022. Please note this refinement does not alleviate the need to obtain any other local, state or federal permits. If you have any questions concerning the above or If I can be of any other assistance, please advise. Sincerely, Tara MacPherson Wilmington District Manager Cc: MHC Files, DCM DWR USACE North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington office 1127 Cardinal Drive Extension I wllmington, North Carolina 28405 910.796.7215 Hall, Bryan L From: Paula Kempton <paula.kempton@carolinabeach.org> Sent: Thursday, April 7, 2022 2:55 PM To: Hall, Bryan L Cc: Ben Meister; Parvin, Ed; Hardison, Jeremy; Larry Denning; Mark Weiss; Parvin, Ed Subject: [External] Temporary Pylons Attachments: Marina East Side Pile Locations.png CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bryan, Thank you again for meeting us out at the marina on Tuesday. It was very nice to meet you. The town is making every effort to work with the boat captains in order to accommodate them during the construction phase of the project as much as permittable and we are trying to alleviate any impediments that can be addressed in assisting them regarding the moving of the boats from the slips. The Island Cruiser Boat is one our longest boats and is currently very active with passengers/school trips. We are making every attempt to allow him to keep operating through the process and one alternative is to move him to the west side wile the contractor works on the south side. This would require approval for two pylons to be temporarily placed approximately 40 feet from walkway to the pier line on the west side pier. The two pylons would be removed before the completion of the construction project. I have attached a map for your review. Would you please review the map and let me know if there are any issues with this specific activity and/or if it would be allowable by CAMA through a permit process. Thank you, Paula Paula Kempton Project Manager Paula. kempton(@carolinabeach.ore www.ca rolina beach.ore Tel:910-458-2978 Cel: 910-508-4440 Fax: 910-458-2997 a 0'1 lucl DCM WILMINGTON, NC n