Loading...
HomeMy WebLinkAbout85130_Bryan Perry_20220308 l'ile4.L ICAMA H DREDGE & FILL -g-'4,S No 85130 ABCD GENERAL PERMIT :IQ4 7-o3I PreDate ous revio Sitrl P permitissued [[New n Modification ❑Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC n Rules attached. ❑ General Permit Rules available at the following link:www.deq.nc.yov/CAMArules Applicant Name Authorized Agent Address_ Project Location(County): • City State ZIP Street Address/State Road/Lot#(s) • . Phone#(_) Email Subdivision City ZIP Affected I I CW ❑EW I I PTA ❑ES I i PTS Adj.Wtr.Body (nat/man/unk) AEC(s): 7 OEA [7 IHA 7 UW ❑SPIMA fl PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale:, - ) Shoreline Length ' Access Length �' L. ������ Pier(dock)length / } _ III II Fixed Platform(s) ■ IHIHh ::;::::orm5 . ti I-N,' II 1101 III MEI Total Platform area t j HIIHIIIIIHIIIIIIIII Groin length/# I IIII Bulkhead/Riprap length -...._. iI �: _. ._.4 � �1 �� �■::. ■�■■ Avg distance offshore 1 • •.�. ' l ■�■■�■■�■■■■■■■ Breakwater/Sill Max distance/length ! iI .i. - �.. �'E� ,1" Basin,channel i 7 1 , I- ,._ ......... Cubic yards I I__._ IT Boat ramp ��� - .I 11E1111111 Boathouse/Boatlift tam i - I ■®MMINI■■.IIII■■■■■■■ Otheh Bulldozing _pi y 1 (�1' IIIMIWIIIIEEIIIIIIIIIMIIIIIIII SAV observed: yes no r ROM ,MINI . - 1 ', � 1 Moratorium: n/a yes no: 1PI �' Site Photos: yes no i-- '•;-,,- - - Riparian Waiver Attached: yes no..' ! : . 1 / 1 i ' r I i I ) i I A building permit/zoning permit may be required by: . Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules ❑See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature"Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 o°``°'s'",t,y ! CAMA 1 I DREDGE & FILL No 85130 ABC D permit Previous.'� Z ' '? GENERAL PERMIT —cc) 3�� Date previous permit issued New Modification _Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected CW EW n PTA ES I I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA I-I IHA I I UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length _ .. IIIIIIIi\ r Pier(dock)length I I .�•,�1111•�1 Fixed Platform(s) Floating Platform(s) / 11111111111111111111111111111111101111111111111111111MBEIMINIIIIIIIIIMIMEMIIIIIIIIIIIIIIIIIIIIII IMIIIIIIIIMEIIIIMIIIIMIIII M■_111111 Finger pier(s) - MEM! Total Platform area ® ••••••••••••���� Groin length/# ® ••••••••••_� Bulkhead/Riprap length 111=1111E1111111=UNIMMOM B distance offshore .III � Brea Max distance/length IME EIiEIII— Boat i ,. inallMn ramp . I ■ _111•1111 Boathouse/Boatlift BUIMIIMMMEIIIIIIIIIIIIIIIOMIMIIMIIIIIIIIIMMIMIINIIIIOI__NMI Beach Bulldozing ,j{': � ME ��� Other 1141146LINIIIMIMILIMII=MalmmosEM ` �PI �SAV observed: es no Moratorium: n/a yes no — Site Photos: yes no -.. ..._..___._._. .,_.. .. Riparian Waiver Attached: yes no A building permit/zoning permit may be required by: Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one) II See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check ft/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER a Governor MICHAEL S. REGAN secrerary Coastal Management BRAXTON DAVIS ENVIRONMENTAL 6uALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHOREUNE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the parry(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project, Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing& Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet landward)is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused(non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash:For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization:Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. s. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (Novem er yhrough//March 30) after completion of the bulkhead. • Pre-project site conditions: % S L� 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property '• indicating the location of the shoreline stabilization structure and any associated clearing,grading,and constr6ction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting ail of the above listed con 'tibns and verify that all information is complete and accurate. ////J Age t or ppli t Printed Name i rrnit'Officer's Signa ure ent or Applicant Signature Issue Date 4 CAMA GENERAL PERMIT q: g State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington square Mall Washington.NC 27889 252-946-b481 W1[mtnoron Office 1127 Card/nal Drive E..W8 ring on.NC 28405-38451 910-796.72`'5 Morehead Clty Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 • AGENT AP,l:TKOREZATlOM FOR CAE1RA PEWIT'APP OCAT OEM Name of Property Owner Requesting Permit: elya& sOt-n y Mailing Address: Phone Number: Email Address: I certify that I have authorized .acme✓ PAPA& /JAW 44/44 Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: fekhrS vac,/ at my property located at AO el 'ie.if, ,o 1 in &nniired ' County. • I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, .the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signs re �ryc.,, Peril Print or Type Name 0u-sh+J Title I I ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to (1r ya,n, Prrr,7 's (Name of Property Owner) ' property located at ! d I /1e are dr (Address, Lot, Block, Road, etc.) on 14:4-4 tr Caee"- , in 0rh / , N.C. • (Watbrbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above locatAh t X/lD I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) r J t) C 0 .s a%`qS P WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Propertyney Information) (Ad' lent Property Owner Information) iid Signature :n rf � �; sa tfture* /� ,•� � -� Print or Type Name Print or Type Name Mailing Address Mailing Address Cily/State/Zip City/State/Zip ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to I3,yw. (Name of Property Owner) property located at oa /tcvse dr (Address, Lot, Block, Road,�etc.) on on 4.t71�c tt, flnt Q , in rand/or Count • N.C. (Waterbody) (City/Town y) The applicant has described to me, as shown below, the development proposed at the above location ✓ I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) � r � 0 PICeeS /''dPdles fry,'I N:, WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adjacent Pro erty Owner Information) Signature Signature* SVrvla 1�. oncA• Ma/cbctuelr- Print or Type Name Print or Type Name f t (c (k) atalt I3r • M ing Address, r, Mailing Address (� fl,� yam!( NG c*S"1 1 City/State/Zip City/State/Zip