HomeMy WebLinkAbout85166B - Adkins, Jeff jel'74(4,triCAMA I-I DREDGE & FILL '72-g Na 85166 ABCD
GENERAL PERMIT zDA --O43(o D tPreeorevio us sit
p Perrriitissued
New ❑Modification n Complete Reissue n Partial Reissue
As authorized by the State/of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC /SD0 n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name 1 Authorized Agent
Address ''/`� Project Location(County):
City State ZIP - Street Address/State Road/Lot#(s)
Phone#(_)
Email Subdivision
City ZIP
Affected n CW 0 EW n PTA n ES n PTS Adj.Wtr.Body (nat/rrw ufk)
AEC(s): n OEA ❑IHA n UW ❑SPIMA I I PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length — — ._.._ -- - _ __...._.__.____ — _ —____ _ __
Pier(dock)length IA
Fixed Platform(s) i 1 If
r
Floating Platform(s) ; 1 j .. -
'k
1 I
Finger pier(s) �� 1 1
I I
t r t
Total Platform area I 1
Groin length/# i i tj 4 1
Bulkhead/Riprap length •-------------- — __ # _
Avgdistance offshore _- _j._.
I
Breakwater/Sill F 1 k I /
Max distance/length * , - } > •
i d \
Basiq,channel 1-,r' ' 1 i -0 `
c
Cubic yards [ ._ 4:-./ ....{ —
Boat ramp I ) r -
Boathouse/Boatlift _ ! ,1 i 1
Beach Bulldozingiif
{
Other 1_.. I i1
i
IM i., 1> j
SAV observed: yes no 1 4 '
Moratorium: n/a yes no- j j r
Site Photos: yes no — j i — t
Riparian Waiver Attached: yes no , 1 1 I ( I -' ! 1
A building permit/zoning permit may be required by:
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name - - Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
''u'''4• ECAMA DREDGE & FILL - NY 85166 ABCD
" � Previous permit
Z 2 GENERAL PERMIT ""'1'" 7 4 0,(4- Date previous permit issued
New 1 Modification I I Complete Reissue ( I Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC Rules attached. ( General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW ( I EW I I PTA ES I I PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): I l OEA I 1 IHA I I UW 7 SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
}
Access Length --�-- 1 ._
Pier(dock)length
Fixed Platform(s) j .TL
Floating Platform(s) I ; I
Finger pier(s) •
I
Total Platform area i _
Groin length/# r f
Bulkhead/Riprap length — { —__ ,
Avg distance offshore ----- 1 --.1----- ,_
i _
Breakwater/Sill I I ( .
Max distance/length I �.�
Basin,channel I ' f
•
Cubic yards i --— i —j--7 — . ,
Boat ramp I I1 -' - f A
Boathouse/Boatlift ) - II• i ,
Beach Bulldozing ?I I I I l
i .
Other :t
SAV observed: yes no '
Moratorium: n/a yes no •
I j
Site Photos: yes no .
Riparian Waiver Attached: yes no i •
A building permit/zoning permit may be required by:
n TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
a • Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL WAIT( Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(OCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project Is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
2. Impacts: Impacts to woody vegetation from clearing and filling in tone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward)is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused(non-channelized)flow of storm water runoff through the buffer.
a. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be
satisfactorily restored as described in condition 5 below,
4. Potential Overwash:For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by OCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization:Immediately post-construction,bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season(November 1 through March 30)after completion of the bulkhead.
• Pre-project site conditions: Y'
7. Project Drawing:The drawing on the CAMA General Permit is considered.the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is .mplete and accurate.
•
Agent o i�ntPrintedName Permit—titer's nature
/ I /72/
Agen r pplicant Signature Issue Date
CAMA GENERAL PERMIT d: V6 Lt(0
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.N0 27889 1 252-94 6-6481
Wilmington Office I 127 Cardinal Chive Eq.wlmt.•;en.NC 28405-38451 910-796-7215
Morehead Oty Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
era
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue,Governor James H.Gregson,Director Dee Freeman,Secretary
Date
Name of Property Owner Applying for Permit:
J - Adk: n5
• Mailing Address: J�
lls �yr0 Mr•
I certify that I have authorized(agent) to act on my . ,a
behalf,for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct(activity)
at(my property located at)
This certification is valid thru(date)
Property caner Signature Date
400 Commerce Avenue, Morehead City,North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net
An Equal Opportunity IAffirmative Action Employer—50%Recycled110%Post Consumer Paper
TR Prescott Marine Construction
545 Alligator Loop Rd.
Merritt, NC 28556
Ph. 252-670-0973—Fax 252-745-7135
' March 7, 2022
Mr. Don Eitner
209 Queen St.
Beaufort, NC 28516
Dear Mr. Eitner:
Your neighbor Mr.Jeff Adkins applied for a CAMA permit to install a dock and boatlift at 415
Dawn St in Merritt, NC. Unfortunately,CAMA denied our first application.Attached you will
find a new drawing which entails digging a boat basin, seawall and boatlift within their property
lines.Therefore,we must ask you to sign off on a new application.
As the adjacent riparian property owner to the aforementioned project, I am required to notify
you of the development in order to give you the opportunity to comment on the project. Please
review the attached permit application and drawings.
Should you have any objections to this proposal,please send your written comments to Brad
Connell NCDEQ Coastal Management 400 Commerce Ave. Morehead City, NC 28557 within 30
days of your receipt of this notice.Such comments will be considered by the Department in reaching
a final decision on the application. No comment within 30 days of your receipt of this notice will be
considered as no objection.If you have any questions on this project, please call me at 252-670-0973.
If you have no objections,please return the signed form to the address above as soon as possible.You
may also email it to trprescottmarine@gmail.com or text to 252-670-1284.
If you have any future marine construction needs,we will be happy to discuss them with you.
We apologize for the inconvenience.We thank you for your cooperation in this matter.
Sincerely,
Terry Prescott-Owner
TR Prescott Marine Construction,LLC
Enc. (2)
Jeff *k(K,ws
Hs- Biera OR
b 4,i A/6
- ail S Davvj St
ZST 6viK11'4
LZ 3°' O ° 3 /'
6�� > Boa l
U Lint
I
p.. .„„ul,+ . ."?2,),,, ,-,. s ijap-,`,w,-i tv F,.h,;szw; ,s rn�n.m,•,,VS i w_rc".e'..F yr y vir.Pw,:v -mci; 'e E -M1i- X`°Serr:4.1-TIC-:!---14-aWel 4
N.C.DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL- RETURN RECEIPT REQUESTED or HAND DELIVERY
(fop portion to be completed by owner or their agent)
Name of Property Owner \'7e!leg 1 C- IkA-6 { 1
Address of Property, 4 L 5i/t��c\)o- n Si--. J kex rt G7- bpi c
MaTing Address of Owner t t c t�' "ra -Pc. 1 l IAAft , AU c pi 'm ,1
Owner's email: 71tR(1t�(Yt90 )r ut( Owners Phone# ( � rY�/O �J5 J
Agent's Na : 1 Name: Agent Phonee:
—Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacentto the above referenced property.The individual applying for this
permit has deserted to me,as shown on the attached drawing,the development they are proposing.A
descd or drawing,with dimensions,must be provided with this letter.
I DO NOT have objections to this proposaL I DO have objections to this proposal.
if you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM)in writing within 10 days of receipt of this notice Correspondence should be
maned to 943 Washington Square Mall, Waa&iugrwr,NC 27881 DCM representatives can also be
contacted at(252)946.6481.No response is considered the same as no objection if you have been
notified by Certified Marl
WAIVER SECTION
I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater, use,lift,or
groin must be set back a minimum distance of 15'fro y area of riparian a mess waived by me
(this does not apply to bulkheads or riprap ts). you ' to waive setback,you must sign
the appropriate blank below.)
I DO wish to waive some/all of the setback
A parlor Property Owner
-OR-
I do not wish towaivethe15'setback requirement(me"taltheblank)
Signature of Adjacent Riparian Property Owner.
Typed/Printed name of ARPO:
Marring Address of ARPO:
ARPO's email: ARPO's Phone& .
Date: 'Waiver is valid for up to one year from ARPO's Signature:
Revised May 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPAR{ANRN RECEOWNER IPT NOTIFICATION/WAIVER
orIOHAD DELIVERRM
CERTIFIED MAIL RE U REQ
• (Top portion to be completed by owner or their agent)
Name of:: z
rtywner.
s � 'e 1/1.-5
v . Cr
Address : . �, �
Mailing Address of Owner: I f <' (' 9 h ' 'r • '--- ' p�� G
p
` SQL- `tamer's Phone#
Owner's email: A' A S�
Agent's Name: ----
Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Pro aert�r Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
escri lion or drawin with dimensions must b ovided with this letter.
I DO NOT have objections to this proposal_
I DO have objections to this proposal.
ff you have objections to what is being proposed, you must notify the H.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed a at 52s94&6on 81Square ponse is considered the same all, Washington, NC 27889. s representatives
objectionifyou have been
contacted at(25 )
notified by Certified Mall.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings, boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area po wane these access unack arialess waiv you ed by men
(this does not apply to bulkheads or riprap revetments).(Ifyou
the appropriate blank below.)
I DO wish to waive some/all of the 15 setback
Sig ature f Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank) -
0'�-
Signature of Adjacent Riparian Property Owner: L�
Typed!Printed name of ARPO: hi
Mailing Address of ARPO: I S�� ' n
ud
ARPO's email: SJ L t 6°t'f 01 PO Phone#: o o�'(Q 1 14 S
Date: 1 t'3-0- 1 j _'waiver is valid for up to one year from ARPO's Signature*
Revised May 2021
Type: CONSOLIDATED REAL PROPERTY
NO EXCISE Recorded:12/30/2020 12:00:24 PM
TAX PAID Fee Amt• $26.00 Page 1 of 3
Revenue Tax: $0.00
Pamlico, NC
Lynn H.Lewis Register of Deeds
BK 673 PG 395 - 397
•
Prepared by/Return to: Sara L. Delamar,Delamar&Delamar,PLLC, Attorneys at Law,
P.O. Box 411,Bayboro,N.C. 28515
N.C.Excise Tax- $0.00
NORTH CAROLINA
DEED OF CORRECTION
PAMLICO COUNTY
This deed of correction,made and entered into this 30th day of December, 2020,by and
between Levie G.Heath and wife,Betty McCoy Heath, hereinafter referred to as"Grantor";
and Jeffrey P.Adkins and wife,Jamie G.Adkins,hereinafter referred to as"Grantee".
Grantor's mailing address is 425 Willis Road, Cove City,NC 28523. Grantee's mailing address
is 115 Bird Drive,Dunn,NC 28334.
WITNESSETH:
Whereas, by deed recorded in Book 672,Page 256,Pamlico County Registry, Grantor
conveyed certain property to Grantee;
And,whereas said deed contained errors in the legal description;
And,whereas,by this Deed of Correction, Grantor intends to correct said errors;
Now,therefore, Grantor, for and in consideration of valuable consideration paid to
Grantor,the receipt of which is hereby acknowledged, does grant,bargain, sell and convey unto
the Grantee in fee simple all that certain tract or parcel of land lying and being in Number Two
(2)Township,Pamlico County,North Carolina, and more particularly described as follows:
Beginning at an existing iron pipe set in the western margin of South Dawn Street, being the
southeastern corner of that property shown as"Levie G.Heath, Betty M. Heath D/B/546,PG.
385" on the survey map dated May 21,2010, prepared by Matthews Surveying,PLLC,entitled
"SURVEY FOR LEVIE G. HEATH,BETTY M. HEATH"which survey map is attached to the deed
recorded in Book 551, Page 551,Pamlico County Registry and is incorporated herein by
reference (hereinafter"the survey map"); running thence in a northerly directly along the
western margin of South Dawn Street to an access road shown on said survey map as
"ACCESS ROAD,"running thence in a westerly direction,along the dotted line shown on the
survey map, 108 feet along the southern margin of said road to the northeastern corner of
submitted electronically by "Delamar & Delamar, PLLC"
in compliance with North carolina statutes governing recordable documents
and the terms of the submitter agreement with the Pamlico county Register of Deeds.
Book:673 Page:395 Pagel of 3
that property owned now or formerly by Thomas Medlin,as described in Book 394, Page 819,
Pamlico County Registry(being Parcel L091-69); running thence,in a southerly direction,
along the dotted line shown on the survey map,124 feet to a canal;running thence in an
easterly direction along said canal to an iron pipe set in the southwestern corner of that 0.08
acre tract shown on the survey map; running thence N 36°50' 13" E 119.28 feet to an existing
iron pipe,the point and place of BEGINNING, and being all of that.08 acre tract and that tract
shown as"Levie G. Heath, Betty M. Heath, D.B.546,Page 385,"on the survey map, and being
all of Parcel L091-76.
The property described above was acquired by Grantor by instrument recorded in Book
546,Page 385, and Book 551,Page 551,Pamlico County Registry.
To have and hold the aforesaid tract or parcel of land and all privileges thereunto
belonging in fee simple forever.
And Grantor covenants with Grantee that Grantor is seized of the premises in fee simple,
has the right to convey the same in fee simple,that title is marketable and free and clear of all
encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all
persons whomsoever, except for the exceptions hereinafter stated. ,
Title to the property described above is subject to ad valorem taxes for the current year
(prorated through the date of closing);utility easements and unviolated restrictive covenants
that do not materially affect the value of the Property.
The designation Grantor and Grantee as used herein shall include the parties hereto, their
heirs, successors, assigns and legal and/or personal representatives.
In Testimony Whereof, said Grantors have hereunto set their hands and seals,the day and
year first written above.
•
Book:673 Page:395 Page 2 of 3
d .c (SEAL) a ` P7WEAL)
BettyM es Heath
If marked or initialed,the property includes the primary ruaidcnco of at louet ono of the
Grantors,otherwise,note as N/A, (per NC GS § 105-317.2)
Pamlico County,North Carolina
I certify that the followingperson(s)personally appeared before me this day,acknowledging to
me that he or she voluntarily signed the foregoing document for the purpose stated therein and in
the capacity indicated: Levie G. Heath, and wife Betty McCoy Heath.
Date: 12'30 •'ZoZU �„,,,q,auH11111 ,,�/,
•
Official Signature of Notary �1 I
Notary Public \� its,,o iU i
Notary Public Printed Name
Notary Seal or Stamp Must
Appear In Above Box
My commission expires: q ", - Z b'2-S
Boot 673 Page:395 Page 3 of 3
Vaughan, Kent D
From: Harrison, James A
Sent: Wednesday, March 23, 2022 11:45 AM
To: Vaughan, Kent D
Subject: Re: maintenance dredging
That works for me. Thanks Kent!
Jimmy Harrison
habitat and Enhancement Section
NC Division of Marine Fisheries
james.harrison@ncdenr.sov
252-9+8-3835 (office)
757-272-525o (Mobile)
, C.A
J.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Sent:Wednesday, March 23, 2022 11:43
To: Harrison,James A<James.Harrison@ncdenr.gov>
Subject: RE: maintenance dredging
Perfect.Thanks I will note moratorium time frame on permit.
From: Harrison,James A
Sent:Wednesday, March 23, 2022 11:42 AM
To:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Subject: Re: maintenance dredging
That method works for me and shouldn't require any additional measures, especially if they're able to get it done
before the moratorium starts. If they do need to work into April, I'd just need to know how long into April they
need to work and how much material still needs to be dredged. Overall though, I'm fine with what they're
proposing.
Jimmy Harrison
habitat and Enhancement Section
NC Division of Marine risheries
1
james.harrison@ncdenr.gov
252-99-8-5855 (Office)
757-272-5250 (Mobile)
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Sent:Wednesday, March 23, 2022 11:31
To: Harrison,James A<James.Harrison@ncdenr.gov>
Subject: RE: maintenance dredging
We are gonna install a silt boom across the opening of the basin. We will leave a threshold of soil between the
basin and the waterway as we dig out part of the basin. Then we will install the 'bulkhead around the basin. The
dirt excavated out of the basin will be placed 50ft away from the water to insure no runoff seeps in. Once the
depth of 3ft and the wall is installed we will break the threshold to allow water to flow into the basin.
Trent Prescott
Terry Prescott
TR Prescott Marine Construction LLC
252-670-0973
252-745-7135
From: Harrison,James A
Sent:Wednesday, March 23, 2022 11:27 AM
To:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Subject: Re: maintenance dredging
I didn't see the proposed method for the work. But if they're able to get it done before the moratorium starts up,
that should alleviate my concerns for the boat basin.
,Jimmy Harrison
habitat and Enhancement Section
NC Division of Marine Fisheries
james.harrison@ncdenr.gov
252-91-8-5855 (Office)
757-272-525o (Mobile)
2
,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Sent: Wednesday, March 23, 2022 10:25
To: Harrison,James A<James.Harrison@ncdenr.gov>
Subject: RE: maintenance dredging
Did you see proposed method for boat basin from the contractor? He is wanting to get this done prior to the
moratorium if possible.
From: Harrison,James A
Sent:Wednesday, March 23, 2022 10:21 AM
To:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Subject: Re: maintenance dredging
Hey Kent,
Since it's not a designated habitat area a moratorium may not be needed, but would really depend on how much
material needs to be removed. If they're able to install a turbidity curtain at the mouth of the canal while the
dredging is going on, that would be my primary recommendation over a moratorium. Hope this helps and let me
know if there's anything else you need on this one. Thanks!
Jimmy
Jimmy Harrison
habitat and Enhancement Section
NC Division of Marine fisheries
james.harrison@ncdenr.gov
252-9+8-5855 (office)
757-272-3230 (Mobile)
tH C4ao
04:
3 f b
9p `
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may he disclosed to third parties.
From:Vaughan, Kent D<kent.vaughan@ncdenr.gov>
Sent:Wednesday, March 23, 2022 09:39
3
To: Harrison,James A<James.HarrisonPncdenr.gov>
Subject: maintenance dredging
1038 Chinchilla Dr. Bayboro
Hurricane Boatyard needs to do a maintenance dredging in the canal. Will this fall under the same April-Sept.
moratorium? I'm thinking not since it not a PNA.
Kent Vaughanhe
252 946-6481 office
252 948 3853 direct office
Kent.vaughan@ncdenr.gov
943 Washington Square Mall
Washington, North Carolina 27889
''Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
4