HomeMy WebLinkAbout62-18 VoidedDebora Boyce
Discovery Diving Co., Inc.
414 Orange Street
Beaufort, NC 28516
May 17, 2013
To Whom It May Concern:
I hereby authorize Kathy Vinson, AICP of Coastal Planning Services, Inc. and John
Freshwater, PE of Crystal Coast Engineering, PA to represent me and apply for CAMA
permits to develop my property located at 414 Orange Street, Beaufort, North Carolina
(Discovery Diving Co., Inc.). This authorization extends to all permits and authorizations
required by local, state, and federal agencies that may be required as part of the
permitting process.
I also authorize release of information related to the project site to Ms. Vinson and Mr.
Freshwater, including boundary surveys, topographic maps, and results of wetland
delineation and soil permeability tests.
If you have questions or need additional information, please contact me at 252-728-2265.
Sincerely, Ce G )A'l 4 /,
Debora Boyce
We have updated the permit application to state that the marina is in the National
Registered Historic District. The State Historic Preservation Office (SHPO) is a major
CAMA review agency and routinely reviews all major CAMA applications. We
appreciate your bringing the historic district status of the property to our attention as
additional comments may be forthcoming from SHPO.
• We understand that once the project is permitted and built the owner will be required to
provide an as -built survey showing that the proposed additional slips do not extend over
the Town's approved Pier Head Line.
DCM has reviewed the application and project plans that were submitted in February. Staff
requested some minor changes and clarifications to the proposal, which we anticipate submitting
this week. If the changes are acceptable, it is our understanding that DCM will then circulate the
proposal to the Town of Beaufort and other state and federal review agencies.
Thanks again for your assistance and guidance. Please let me know if you have questions or need
additional information. We look forward to working with you on this project.
Sincerely,
Kathy B. Vinson, AICP
cc: Debora Boyce
Heather Styron, DCM
RECEIVED
MAR 2 2 ma
DCM- MHD CITY
2
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827
Morehead City, NC 28557
kbvinson&ec.rr.com
March 21, 2018
Ms. Heather Styron
NC Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Re: Debora Boyce
Discovery Diving Marina
Major Permit Application
Dear Heather:
The following revisions to the major
Expansion Project are enclo�ed:
• Project narrative
• MP-1 Application
• MP-2 Excavation and .11
• One set of project plans.
The green card receipts from the
included. Also included is a copy
regarding his preliminary review
Office 252.354.4916
Fax 252.247.5875
Mobile 252.240.9297
for the Discovery Diving Marina
mail notifications to the adjacent riparian property owners are
tter responding to Mr. Kyle Garner of the Town of Beaufort
Thank you for your assistance with this project. Please call me at 252-240-9297 if you have questions or
need additional information.
Sincerely,
Kathy B. Vinson, AICP
Enclosures
RECEIVED
MAR 2 2 2018
()CIA. MtJD CITY
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc.
Debora Boyce
Beaufort, INC
Carteret County
Introduction
Owner Debora Boyce proposes to expand Discovery Diving Marina by extending the existing
pier and constructing 16 additional boat slips with associated platforms, finger piers, and tie
pilings. The project includes maintenance dredging of the boat basin and placement of riprap
to reinforce and cover an existing bulkhead. The proposed increase in pier length will extend
the waterward end of the pier to the Town of Beaufort's official pier head line for the south
shore of Town Creek. Discovery Diving Marina provides wet slip dockage, with diving charters
and a diving school also operating at the site. Debora Boyce is the owner and operator of
Discovery Diving Company, Inc.
Site Description
Discovery Diving Marina is an existing 37-slip commercial marina located along the southern
shoreline of Town Creek at 414 Orange Street, Beaufort, North Carolina. The project site
consists of two parcels totaling 30,797 square feet, with 240' of shoreline. The highground
portion of the property contains a two-story office building and parking area. Vegetation on the
tract includes trees, landscape vegetation, and coastal marsh.
The site topography is relatively flat, with an approximate elevation of+10' above NHW/MHW.
Existing low water depths range from -0.00' NLW/MLW to greater than -7.00' NLW/MLW, as
shown on Sheet 3 of the project plans. Low water depths were provided by surveyor Tim
Newcomb and confirmed at a normal low tide on April 13, 2016 at approximately 9:15 AM by
David Newsom, PE. Additional low water depths needed for the dredging portion of the project
were obtained and added to the topographical map at that time.
The waters of Town Creek adjacent the project site are classified as SC by the Environmental
Management Commission. The waters are closed to the harvesting of shellfish.
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
March 20, 2018
RECEIVED
MAR 2 2 2018
Page 1
DCM- MHD CITY
An existing failing wooden bulkhead measuring 240 linear feet located along the shoreline is in
need of repair. Platforms are connected to the bulkhead on either side of the main dock. The
existing 10' wide dock extends 220', turns at right angles for 25', then turns left and extends
another 99' into Town Creek. A total of 32 existing boat slips are located along the main dock,
with five additional slips located along an existing platform at the shoreline. Sheet 1 of the
project plans shows the existing marina and project site.
The Town of Beaufort zones the project site as B-W Business Waterfront. As a result of changes
to the Town's zoning ordinance in November 2013, a Special Use Permit may be required to
build the project. As part of the Special Use review process an existing and proposed parking
plan and other required information will be provided to the Town. While the property is not
located within a designated Town of Beaufort Historic District the marina site is within the
National Registered Historic District. The site is served by municipal water and sewer systems.
Commercial uses are located to the west of the site, with a mix of commercial and residential to
the east. The adjacent riparian property owner to the west is Beaufort Partners, U-C. The Town
of Beaufort (Pine Street) is the adjacent riparian property owner to the east.
The riparian corridor for the project site was previously determined with assistance from
Division of Coastal Management DCM) staff. It is based on an April 24, 1992 survey by Powell
Surveying Company and guidance from DCM attached to amended Major Permit #72-92 that
reflected a May 18, 1995 settlement agreement.
Town Creek is approximately 1050' wide at the project site. A federal channel is located in
Town Creek north of the marina. The Town of Beaufort has established an official pier head line
along the south shore of Town Creek that allows for pier construction beyond the previously
established pier head line.
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application RECEIVED
March 20, 2018 Page 2
MAR 2 2 2018
DCM- MHD CITY
Project Description
The owner proposes to extend the existing 10' wide main dock an additional 82'. The new T-
platform, finger piers, and tie pilings to be located at the end of the dock extension will extend
an additional 63' for a total docking facility extension of 145', measured to the outermost
proposed tie piling.
The new pier section will be 10' wide, consistent with the width of the existing pier. The 10'
width is needed to safely maneuver carts used to load and unload diving gear onto boats
docked at the marina, as well as accommodate other simultaneous boating uses at the site.
The docking facility extension will include 16 new boat slips (slips 19-34 as shown on Sheet 2 of
project plans) to accommodate a total of 53 boats at the marina (37 existing plus 16 new boat
slips).
The slip layout along the existing dock will be slightly reconfigured. Existing slips 1-11 on the
west side, as shown on Sheet 1 of project plans, will be reconfigured to accommodate 13 slips
(slips 1-13 on Sheet 2). New finger piers, platforms, and tie pilings are included. Ten existing
slips (23-32) on the east side will be reconfigured to accommodate 8 slips (41-48 as shown on
Sheet 2).
The dock extension will result in the outermost component (tie piling) being located at the
Town of Beaufort Harbor Line and 87.2' from the Federal Harbor Line. The marina expansion
will result in the marina extending a total of 462' over open water, measured from NHW.
Two new platforms are proposed. A T-platform at the waterward end of the dock extension will
measure 10' x 148'. A smaller platform measuring 10' in length with an irregular width of 15' to
28' is proposed adjacent the existing section of dock.
Sixteen (16) new finger piers are proposed. Five (5) of the finger piers will be located along the
proposed T-platform of the dock extension, each measuring 4' x 30'. Eleven (11) new finger
piers to accommodate smaller boats will measure 4' x 25', including nine (9) along the existing
dock and two (2) on the proposed dock extension.
The marina currently contains 52 tie pilings. Eighteen (18) of the existing pilings will remain,
with 51 additional proposed pilings resulting in a total of 69 pilings.
Discovery Divine Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
RECEIVED
March 20, 2018 MAR 2 2 2018 Page 3
DCM- MHD CITY
All components of the dock expansion will be located 18' from the western riparian corridor
boundary and 16' from the riparian corridor to the east. The marina will be located a minimum
of 45' from the Beaufort Partners, LLC marina located immediately to the west of the project.
The expanded dock will be located a minimum of 68' from the adjacent docking facility to the
east owned by Barney and Martha McLaughlin (identified on project plans as Lo'R Deck South
at Town Creek). Existing water depths at the waterward end of the expanded structure
measure -3.5' NLW. Proposed water depths at the waterward end will measure -6" NLW.
As previously stated, the proposed dock extension will be 87.2' from the Federal Harbor Line.
The location of the proposed dock expansion in proximity to riparian corridors and adjacent
docking facilities is shown on Sheet 2 of the project plans.
Existing shaded impacts at the project site total 5,574 square feet. Proposed shaded impacts
from the project will total 9,865 square feet.
The owner proposes to perform maintenance dredging as shown on Sheet 3 of project plans to
achieve a depth of -6' NLW/MLW. The boat basin will measure an average length of 480' and
average width of 180'. A total of 4,075 cubic yards of mud and sandy material will be excavated.
The area proposed for dredging measures 73,380 square feet.
The location of the spoil disposal site is not known at this time. The disposal site will be
determined by the dredging contractor at a future date and submitted to the Division of Coastal
Management for approval prior to beginning dredging.
To promote flushing, the basin will be dredged to the depth of connecting waters (-6'
NLW/MLW). Flushing of the boat basin is further promoted by its open water location. Dredging
will not occur within 9.8' of an area of coastal marsh adjacent the shoreline along the east side
of the property. No highground areas are proposed for excavation.
The existing bulkhead is deteriorating, often breached by high tides, and in need of
reinforcement. To extend its life expectancy the project includes extra shoreline stabilization
measures. The existing bulkhead will be bolstered by placement of riprap along and covering
approximately 180' of the structure. Rock will be placed an average distance of 10' waterward
of the bulkhead, with a maximum distance of 12'. Approximately 935 square feet of rock will be
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
March 20, 2018 RECEIVED Page 4
MAR 2 2 2018
DCM- MHD CITY
placed below NHW/MHW. Approximately 1,970 square feet of rock will be placed above
NHW/MHW. The riprap slope will be 3H: 1V and no steeper. Granite rock, NCDOT Class II riprap
is recommended.
Construction Methods
Dock construction will employ conventional marine construction techniques. In areas with
adequate water depths marine construction will use barge mounted equipment with either pile
driving or agitation capability. In other areas construction will occur from the landward side.
Riprap placement will occur from land by use of long -arm excavator equipment.
Excavation will utilize a barge mounted excavator. Dredged material will be offloaded into
dump trucks and trucked offsite. Spoils will be disposed at a site to be selected by the dredging
contractor and approved by the Division of Coastal Management prior to beginning dredging.
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
March 20, 2018 MAR 2 2 Z018 Page 5
DCM- MH® CITY
4-TVIV1181LIJAM
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable
a. (1) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
®Commercial ❑PublictGovemment ❑Private/Community ®Yes ❑No
c. (i) Dock(s) and/or pier(s)
(if) Number one - extension of existing dock
(iii) Length 82'
(iv) Width 10'
(v) Floating []Yes ®No
e. (i) Are Platforms included? ®Yes ❑No
If yes:
(ii) Number 2 new
(iii) Length 10710'
(iv) Width 1487 irregular: 28' on north. 16 on south
(v) Floating []Yes ®No
Note: Roofed areas are calculated from driphrie dimensions.
g. (i) Number of slips proposed
16 additional slips for a total of 53 slips.
(ii) Number of slips existing
37
i. Check the proposed type of siting:
❑ Land cut and access channel
®Open water; dredging for basin and/or channel
[]Open water; no dredging required
[]Other; please describe:
k. Typical boat length: 20' to 45'
m. (i) Will the facility have tie pilings?
®Yes []No
(ii) If yes number of tie pilings?
18 of 52 pilings to remain, plus 51 new pilings for a total of
d. (i) Are Finger Piers included? ®Yes []No
If yes:
(ii) Number 16 new
(iii) Length * = 30', f mfi6i—
(iv) Width 4'
(v) Floating ❑Yes ®No
I. (i) Are Boatlifts included? ❑Yes ®No
If yes:
(ii) Number n/a
(iii) Length n/a
(iv) Width n/a
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 16 new slips for
total of 53.
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of twat ramps:
❑ Other, please describe:
I. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Mixed Noes.
I. (i) Will the facility be open to the general public?
®Yes ONO
2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable
252-808.2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06
Form DCM MPA (structures, Page 2 of a)
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
\a/1b+ �Toilets for patrons; Number: ,
p t5 i []Showers
Qt �a ❑ Boatholding tank pumpout; Give type and location:
Nr Q`\b. Describe treatment type and disposal location for all sanitary wastewater.
17 Pump -out, Town of Beaufort sewer
Location:
c. Describe the disposal of solid waste, fish offal and trash.
Trash cans/dumpster.
d. How will overboard discharge of sewage from boats be controlled?
Discovery Diving Marina prohibits overboard discharge of sewage.
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
Two existing signs are located midway of dock. Signs face in opposite directions.
(ii) Give the location and number of "Pumpout Available" signs proposed.
Two existing signs are located midway of dock. Signs face in opposite directions.
I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
n/a
g. Where will residue from vessel maintenance be disposed of?
n/a
h. Give the number of channel markers and "No Wake" signs proposed. 16 signs located adiacent existing docks.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
n/a
j. What will be the marina policy on overnight and live -aboard dockage?
Marina allows overnight and live -aboard dockage.
k. Describe design measures that promote boat basin flushing?
Areas to be dredged will not be deeper than connecting waters.
I. If this project is an expansion of an existing marina, what types of services are currently provided?
Dockage, wet slips only.
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes SNo
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes SNo
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
SCW 0 ❑SAV SSB 0
❑WL _ []None
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06
Form DCM MP-4 (Structures, Page 3 of 4)
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
n/a
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from ddpline dimensions.
4. GROIN (e.g., wood, sheetpfle, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(ill) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
a. Is the structure(s):
❑Commercial ❑PubliclGovernment ❑Private/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
18' on west, Won east.
®This section not applicable
Number
d. Description of buoy (color, inscription, size, anchor, etc.)
b. Proximity of structure(s) to adjacent docking facilities.
45' on west, 68' on east
Note: For buoy or moodng piling, use am of swing including length
of vessel.
c. Width of water body d. Water depth at watenvard end of structure at NLW or NWL
1050' existing: -3.5' NLW. proposed: -6' NLW
e. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
n/a
8. OTHER ®This section not applicable
252-808-2808 :: 1-888.4RCOAST :: vvvvw.nccoastatmanauement.net revised: 12/27/06
Form OCM MP-4 (structures, Page 4 of 4)
a. Give complete description:
February 7, 2018
Discovery Diving Marina Expansion
Discovery Diving Co., Inc./Debora Boyce
plirant Name 7�
Y a S Ap
plidant Sign6ke
252-808-2808::1-888-4RCOAST ww mccoastalmana4ement.net revised: 12127106
COASTAL PLANNING SERVICES, INC.
Kathy B Vinson, AICP
ComprehensiveILLanadtUse lanning and Development Assistance
P.O. Box 821 252.354.491E
Morehead City, C 28557 i2.247.5875
k vin on a n.co 252.240.9297
February 7, 2018�
Ms. Heather Styron
NC Division of Co 1 omen
400 Commerce Av ue
Morehead City, N 2855 n C
Re: Debora B I1/at.
Discovip M " a Ea
Major Pe it App yy��tion
Dear Heather:
Debora Boyce, Dis ry Divm Com
marina located at 4 4 UkganS
et B'
extension of the ma donstnpilings. The placem nt o reins
application and proj ct plans are enclose
Discovery Diving Co pany, Inc. check;
also enclosed. The ad
cent riparian neig
return receipts ill be
ubmitted to you a
required large-f at
c ies once your re
Thank you for your
sis ce with this pi
additional informatio
I 1 k forward to c
Sincerely,
CR' 'j z
Kathy B. Vinson, AICP
Enclosures
ansion of an existing
nce dredging,
finger piers, and tie
Copies of the permit
application fee is
A mail. Green card
ovide the additional
tions or need
1�
io
RECEIVED
FEB 0 7 ZD18
DCM- MHD CITY
Major CAMA Permit Application
Discovery Diving Marina Expansion
Beaufort, North Carolina
February 7, 2018
Proposed by: Prepared by:
Debora S. Boyce Coastal Planning Services, Inc.
Discovery Diving Company, Inc. P.O. Box 827
414 Orange Street Morehead City, North Carolina 28557
Beaufort, North Carolina 28516 Telephone 252-240-9297
coastalplanningservices@gmail.com
RECEIVED
FEB 0 7 2018
DCM- MHD CITY
Debora S. Boyce
Discovery Diving Company, Inc.
Discovery Diving Marina Expansion
Carteret County, North Carolina
Major CAMA Permit Application
Contents
Application Documents
DCM MP — 1 Application
DCM MP-2 Excavation and Fill
DCM MP-4Structures
Project Narrative
Introduction
Site Description
Project Description
Construction Methods
Authorized Agent Letter
Property Title
Notice to Adjacent Riparian Property Owners
Project Plans
Sheet 1 Existing Conditions
Sheet 2 Proposed Conditions
Sheet Proposed Dredging
Sheet 4 Sections
IN MP-1
APPLICATION for
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
Discovery Diving Company, Inc.
Discovery Diving Marina Expansion
Applicant 1: First Name
MI
Last Name
Debora
S.
Boyce
Applicant 2: First Name
MI
Last Name
n/a
We
We
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
State
414 Orange Street
Beaufort
NC
ZIP Country
Phone No.
FAX No.
28516 USA
252-728-2265 ext.
252-728-2581
Street Address (if different from above)
City
State
ZIP
n/a
n/a
n/a
n/a-
Email
dive@disooverydiving.com
2. Agent/Contractor Information
Business Name
Coastal Planning Services, Inc.
Agent/ Contractor 1: First Name
MI
Last Name
Kathy
B.
Vinson
Agent/ Contractor 2: First Name
MI
Last Name
n/a
We
n/a
Mailing Address
PO Box
City
State
827
Morehead City
NC
ZIP
Phone No. 1
Phone No. 2
28557
252-240-9297 ext.
252-354-4916 ext.
FAX No.
Contractor #
252 247 5875
We
Street Address (if different from above)
City
State
ZIP
We
N/A
n/a
We -
Email
kbvinson@ec.rr.crom
<Form continues on back>
252.808-2808 .. 1-888-4RCOAST .. www. nccoa sta lmanagement. net
Form DCM MP-1 (Page 2 of 5)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Carteret
414 Orange Street
n/a
Subdivision Name
City
State
Zip
n/a
Beaufort
NC
28516 -
Phone No.
Lot No.(s) (d many, attach additional page with list)
252 - 728 - 2265 ext.
n/a,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak
Town Creek
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Newport River
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city, limit the proposed
®Yes ❑No
work falls within.
Town of Beaufort
4. Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
240'
30,797
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
27,399, 3,398,
NWL (normal waterleve()
(If many lot sizes, please attach additional page with a list)
10, ®NHW or ❑NWL
e.
Vegetation on tract
Trees, landscape vegetation, coastal marsh.
f.
Man-made features and uses now on tract
Existing marina and associated commercial building and parking area.
g.
Identify and describe the existing land uses adiacent to the proposed project site.
Commercial to the west, residential and commercial to the east.
h.
How does local government zone the tract?
I. Is the proposed project consistent with the applicable zoning?
B-W Business Waterfront
(Attach zoning compliance certificate, ff applicable)
®Yes ❑No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA
If yes, by whom? n/a
I.
Is the proposed project located in a National Registered Historic District or does ft involve a []Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
in. (1) Are there wetlands on the site? ®Yes []No
(11) Are there coastal wetlands on the site? ®Yes []No
(III) If yes to either (i) or (ii) above, has a delineation been conducted? [--]Yes ®No
(Attach documentation, if available)
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
Form DCM MP-1 (Page 3 of 5)
APPLICATION for
Major Development Permit
n. Describe existing wastewater treatment facilities.
Central sewer (Town of Beaufort).
o. Describe existing drinking water supply source.
Central water (Town of Beaufort).
p. Describe existing storm water management or treatment systems.
None.
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? NCommercial ❑Public/Govemment
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The project will provide commercial docking space and water access for customers of Discovery Diving Marina.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
One barge with platform and pile driving equipment will be used for dock installation. Dredging will be accomplished by a
"bucket to barge" system, using a backhoe and dump truck. Barge will be stored in deep water in Town Creek, with the truck
stored on high ground.
d. List all development activities you propose.
Marina expansion to include maintenance dredging, dock extension, construction of 16 additional slips and associated
platforms, new finger piers and tie pilings, and placement of riprap to reinforce and cover existing bulkhead.
e. Are the proposed activities maintenance of an existing project, new work, or both? Both
f. What is the approximate total disturbed land area resulting from the proposed project? maximum of 2500 sf for rock overlay of
existing bulkhead NSq.Ft
or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area NYes ❑No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Stormwater sheet flow into Town Creek.
1. Will wastewater or stornwater be discharged into a wetland? []Yes NNo ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No NNA
j. Is there any mitigation proposed? []Yes NNo ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
Form DCM MP-1 (Page 4 of 5)
APPLICATION for
Major Development Permit
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by oertified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Town of Beaufort
Phone No. 252-728-2141
Address 701 Front Street, Beaufort, NC 28516
Name Beaufort Partners, LLC
Phone No.
Address P.O. Box 14165, New Bern, NC 28561
Name
Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
CAMA 72-92 issued to Discovery Diving, Inc. on 12/3/92, renewed on 1/19/96, modified on 1126198.
CAMA 2-83 issued to Discovery Diving, Inc. on 1/17/83, modified on 2121/83.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
1 7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _February 7, 2018 Print Name _Kathy B. Vinson, agent
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
252-808-2808 .. 1-888-4RCOAST .. www.necoastalmanagement.net
Form DCM MP-1 (Page 5 of 5)
APPLICATION for
Major Development Permit
®DCM MP-4 Structures Information
252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
?; Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
stabilization
Length
n/a
We
480' average
n/a
rile
n/a
n/a
Width
n/a
n/a
180' average
n/a
n/a
We
n/a
Avg. Existing
n/a
rile
0'to-7' NLW
n/a
NA
NA
n/a
Depth
Final Project
n/a
rile
-6'to-7' NLW
n/a
NA
NA
rile
Depth
1. EXCAVATION
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
4075
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SIB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(h) Describe the purpose of the excavation in these areas:
n/a
2. DISPOSAL OF EXCAVATED MATERIAL
a. Location of disposal area.
The location of the spoils disposal area is not known. A pre -
approved site will be determined at a future date by the
dredging contractor. No dredging will occur until the spoil
disposal sight is approved.
C. (i) Do you claim title to disposal area?
Dyes ❑No ®NA
(11) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
n/a
❑This section not applicable
Mud and sandy material
d. High -ground excavation in cubic yards.
0
❑This section not applicable
uimensions or aisposai area.
A disposal area measuring 200' x 200' x 3'10" with sloped
sides is anticipated.
d. (i) Will a disposal area be available for future maintenance?
❑Yes ®No DNA
III) If yes, where?
n/a
f. (i) Does the disposal include any area in the water?
❑Yes ®No ❑NA
(ii) If yes, how much water area is affected?
n/a
252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanagement.net revised: 12/26/06
Y Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ❑This section not applicable
(If development is a wood groin, use MP14 — Structures)
a. Type of shoreline stabilization: b. Length: 180'
[]Bulkhead ®Riprap ❑Breakwater/Sill ❑Other:
c. Average distance waterward of NHW or NWL: 10'
e. Type of stabilization material:
Granite rock, NCDOT Class II riprap.
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill _ Riprap 935
Breakwater/Sill_ Other_
I. Source of fill material.
Washed granite rock will be brought onsite by contractor.
Width: 12'
d. Maximum distance waterward of NHW or NWL: 12'
f. (i) Has there been shoreline erosion during preceding 12
months?
[]Yes ®No ❑NA
Ill) If yes, state amount of erosion and source of erosion amount
information.
n/a
In. Type
Rock
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
III) Describe the purpose of the fill in these areas:
15. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What tvpe of construction eauipment will be used (e.a.. draoline.
controlled?
Excavated material will be trucked offsite.
c. (i) Will navigational aids be required as a result of the project? d.
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
n/a
backhoe, or hydraulic dredge)?
Bucket to barge system utilizing backhoe, barge, and dump truck.
(i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
n/a
February 7, 2018 op
plicant Name
Discovery Diving Marina Expansion
Project Name
Discovery Diving Company, Inc./Debora Boyce
0. �/ 1.1nn , np
pli6ant Signa e
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12126/06
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc.
Debora Boyce
Beaufort, NC
Carteret County
Introduction
Owner Debora Boyce proposes to expand Discovery Diving Marina by extending the existing
pier and constructing 16 additional boat slips with associated platforms, finger piers, and tie
pilings. The project includes maintenance dredging of the boat basin and placement of riprap
to reinforce and cover an existing bulkhead. The proposed increase in pier length will extend
the waterward end of the pier to the Town of Beaufort's official pier head line for the south
shore of Town Creek. Discovery Diving Marina provides wet slip dockage, with diving charters
and a diving school also operating at the site. Debora Boyce is the owner and operator of
Discovery Diving Company, Inc.
Site Description
Discovery Diving Marina is an existing 37-slip commercial marina located along the southern
shoreline of Town Creek at 414 Orange Street, Beaufort, North Carolina. The project site
consists of two parcels totaling 30,797 square feet, with 240' of shoreline. The highground
portion of the property contains a two-story office building and parking area. Vegetation on the
tract includes trees, landscape vegetation, and coastal marsh.
The site topography is relatively flat, with an approximate elevation of +10' above NHW/MHW.
Existing low water depths range from -0.00' NLW/MLW to greater than -7.00' NLW/MLW, as
shown on Sheet 3 of the project plans. Low water depths were originally provided by surveyor
Tim Newcomb and confirmed at a normal low tide on April 13, 2016 at approximately 9:15 AM
by David Newsom, PE. Additional low water depths needed for the dredging portion of the
project were obtained and added to the topographical map at that time.
The waters of Town Creek adjacent the project site are classified as SC by the Environmental
Management Commission. The waters are closed to the harvesting of shellfish.
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
February 7, 2018 Page 1
An existing wooden bulkhead measuring 240 linear feet is located along the shoreline.
Platforms are connected to the bulkhead on either side of the main dock. The existing 10' wide
dock extends 220', turns at right angles for 25', then turns left and extends another 99' into
Town Creek. A total of 32 existing boat slips are located along the main dock, with five
additional slips located along an existing platform at the shoreline. Sheet 1 of the project plans
shows the existing marina and project site.
The Town of Beaufort zones the project site as B-W Business Waterfront. The property is not
located within a designated Town of Beaufort Historic District. The site is served by municipal
water and sewer systems.
Commercial uses are located to the west of the site, with a mix of commercial and residential to
the east. The adjacent riparian property owner to the west is Beaufort Partners, LLC. The Town
of Beaufort (Pine Street) is the adjacent riparian property owner to the east.
The riparian corridor for the project site was previously determined with assistance from
Division of Coastal Management DCM) staff. It is based on an April 24, 1992 survey by Powell
Surveying Company and guidance from DCM attached to amended Major Permit #72-92 that
reflected a May 18, 1995 settlement agreement.
Town Creek is approximately 1050' wide at the project site. A federal channel is located in
Town Creek north of the marina. The Town of Beaufort has established an official pier head line
along the south shore of Town Creek that allows for pier construction beyond the previously
established pier head line.
Project Description
The owner proposes to extend the 10' wide main dock an additional 82'. The new pier section
will be 10' wide, consistent with the width of the existing pier. The 10' width is needed to safely
maneuver carts used to load and unload diving gear onto boats docked at the marina, as well as
accommodate other simultaneous boating uses at the site.
The new T-platform, finger piers, and tie pilings to be located at the end of the dock extension
will extend an additional 63' for a total docking facility extension of 145', measured to the
outermost proposed tie piling. The dock extension will include 16 new boat slips to
accommodate a total of 53 boats at the marina (37 existing plus 16 new boat slips). The slip
layout along the existing dock will be slightly reconfigured and will include new finger piers,
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
February 7, 2018
Page 2
platforms, and tie pilings. The dock extension will result in the outermost component (tie piling)
being located at the Town of Beaufort Harbor Line and 87.2' from the Federal Harbor Line. The
marina expansion will result in the marina extending a total of 462' over open water, measured
from NHW.
Two new platforms are proposed. A T-platform at the waterward end of the dock extension will
measure 10' x 148'. A smaller platform measuring 10' in length with an irregular width of 15' to
28' is proposed adjacent the existing section of dock.
Sixteen (16) new finger piers are proposed. Five (5) of the finger piers will be located along the
proposed T-platform of the dock extension, each measuring 4' x 30'. Eleven (11) new finger
piers to accommodate smaller boats will measure 4' x 25', including nine (9) along the existing
dock and two (2) on the proposed dock extension.
The marina currently contains 52 tie pilings. Eighteen (18) of the existing pilings will remain,
with 51 additional proposed pilings resulting in a total of 69 pilings.
All components of the dock expansion will be located 18' from the western riparian corridor
boundary and 16' from the riparian corridor to the east. The marina will be located a minimum
of 45' from the Beaufort Partners, LLC marina located immediately to the west of the project.
The expanded dock will be located a minimum of 68' from the adjacent docking facility to the
east owned by Barney and Martha McLaughlin (identified on project plans as Lo'R Deck South
at Town Creek). Existing water depths at the waterward end of the expanded structure
measure -3.5' NLW. Proposed water depths at the waterward end will measure -6" NLW.
As previously stated, the proposed dock extension will be 87.2' from the Federal Harbor Line.
The location of the proposed dock expansion in proximity to riparian corridors and adjacent
docking facilities is shown on Sheet 2 of the project plans.
Existing shaded impacts at the project site total 5,574 square feet. Proposed shaded impacts
from the project will total 9,865 square feet.
The owner proposes to perform maintenance dredging as shown on Sheet 3 of project plans to
achieve a depth of -6' NLW/MLW. The boat basin will measure an average length of 480' and
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
February 7, 2018 Page 3
average width of 180'. A total of 4,075 cubic yards of mud and sandy material will be excavated.
The area proposed for dredging measures 73,380 square feet.
The location of the spoil disposal site is not known at this time. The disposal site will be
determined by the dredging contractor at a future date and submitted to the Division of Coastal
Management for approval prior to beginning dredging.
To promote flushing, the basin will be dredged to the depth of connecting waters (-6'
NLW/MLW). Flushing of the boat basin is further promoted by its open water location. Dredging
will not occur within 9.8' of an area of coastal marsh adjacent the shoreline along the east side
of the property. No highground areas are proposed for excavation.
The existing shoreline stabilization (bulkhead) at the site is in need of reinforcement. The
project includes placement of riprap for a distance of 180' to bolster and cover the existing
bulkhead. Rock will be placed an average distance of 10' waterward of the bulkhead, with a
maximum distance of 12'. Approximately 935 square feet of rock will be placed below
NHW/MHW. Approximately 1,970 square feet of rock will be placed above NHW/MHW. The
riprap slope will be 3H: 1V and no steeper. Granite rock, NCDOT Class II riprap is recommended.
Construction Methods
Dock construction will employ conventional marine construction techniques. In areas with
adequate water depths marine construction will use barge mounted equipment with either pile
driving or agitation capability. In other areas construction will occur from the landward side.
Riprap placement will occur from land by use of long -arm excavator equipment.
Excavation will utilize a barge mounted excavator. Dredged material will be offloaded into
dump trucks and trucked offsite. Spoils will be disposed at a site to be selected by the dredging
contractor and approved by the Division of Coastal Management prior to beginning dredging.
Discovery Diving Marina Expansion Project
Discovery Diving Company, Inc. / Debora Boyce
Major CAMA Permit Application
February 7,2018
Page 4
COASTAL PLANNING SERVICES, INC
Kathy B. Vinson, MCP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827
Morehead City, NC 28557
February 7, 2018
Mr. Joseph E. Thomas, Manager
Beaufort Partners, LLC
P.O. Box 14165
New Bern, NC 28561
Re: Major CAMA Permit Application
Debora Boyce
Discovery Diving Company, Inc.
Dear Mr. Thomas:
Office 252.354.4916
Fax 252.247.5875
Debora Boyce has retained Coastal Planning Services, Inc. to provide CAMA permitting assistance for expansion of
Discovery Diving Marina located at 414 Orange Street, Beaufort, North Carolina. The project includes maintenance
dredging, extension of the main dock, and construction of 16 additional slips with associated platforms, finger piers,
and tie pilings. The placement of riprap to reinforce and cover an existing bulkhead is also proposed.
A Major CAMA (Coastal Area Management Act) permit will be required to build the project. CAMA requires that
adjacent riparian property owners be notified by certified mail of the proposed work and that an opportunity be
provided to the neighbors to comment or object to the proposal. As the owner of adjacent riparian property we are
notifying you of the proposed plans.
Enclosed with this letter are copies of the permit application and plats. If you have objections or comments
regarding the proposal, please write or call the Division of Coastal Management ment (DCM) within 30 days of i
this notice. You may reach DCM at the following address and phone number:
Ms. Heather Styron
NC Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Telephone: 252-808-2808
No action on your part is required if you have no comments or objections. No response is considered the same as no
objection. Please feel free to contact me at 252-240-9297 if you have questions or need additional information
regarding the project.
Sincerely,
0'. zj '\
Kathy B. Vinson, AICP
Enclosures
COASTAL PLANNING SERVICES, INC
Kathy B. Vinson, .MCI'
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827 Office 252.354.4916
Morehead City, NC 28557 Fax 252.247.5875
February 7, 2018
Mr. John Day, Manager
Town of Beaufort
701 Front Street
Beaufort, NC 28516
Re: Major CAMA Permit Application
Debora Boyce
Discovery Diving Company, Inc.
Dear Mr. Day:
Coastal Planning Services, Inc. is providing CAMA permitting assistance to Debora Boyce for expansion of
Discovery Diving Marina located at 414 Orange Street, Beaufort, North Carolina. The project includes maintenance
dredging, extension of the main dock, and construction of 16 additional slips with associated platforms, finger piers,
and tie pilings. The placement ofriprap to reinforce and cover an existing bulkhead is also proposed.
A Major CAMA (Coastal Area Management Act) permit will be required to build the project. CAMA requires that
adjacent riparian property owners be notified by certified mail of the proposed work and that an opportunity be
provided to the neighbors to comment or object to the proposal. As the owner of adjacent riparian property we are
notifying you of the proposed plans.
Enclosed with this letter are copies of the permit application and plats. If you have objections or comments
regarding the proposal please write or call the Division of Coastal Management (DCM) within 30 days of receipt of
this notice. You may reach DCM at the following address and phone number.
Ms. Heather Styron
NC Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Telephone: 252-808-2808
No action on your part is required if you have no comments or objections. No response is considered the same as no
objection. Please feel free to contact me at 252-240-9297 if you have questions or need additional information
regarding the project.
Sincerely,
Kathy
Enclosures
Re: Debora Boyce Discovery Dive Shop dock expansion submittal
Subject: Re: Debora Boyce Discovery Dive Shop dock expansion submittal
From: Brad Connell <Brad.Connell@ncmail.net>
Date: Fri, 23 May 2008 16:11:30 -0400
To: A T <athomasemail@yahoo.com>
Mr. Thomas,
I have notified my supervisor of your intent to review the old Discovery Dive permit (ammended in
1995) per our phone conversation five minutes ago. If I can be of any further assistance, please do not
hesitate to contact me.
,J
I U D uZ c1 rLw, L44&�—Q
A T wrote:
Brad,
We are the adjac ;d with
your office for a r in
reference to this ;(also
sent you a hard
I can be reaches
Regards,
Allen Thomas
Beaufort Partners LLC
Brad Connell <Brad.Connell@ncmail.net>
Coastal Management Field Representative
NC Department of Environment & Natural Resources
Division of Coastal Management
1 of 1 5/23/2008 4:11 PM
f
MAJOR APPLICATION TRACKING SHEET
APPLICANT: -DIS W l C
LOCATION:
FIELD REP:}Y�(1Q ` I COUNTY:
DATE RECV'D IN OFFICE: 10 DAYS DEADLINE:
DISTRICT MANAGER REC: FIELD REP. RECV'D:
CHECK CORRECT? BLUELINES CORRECT?
Comments:
DEED? YES NO
RIPARIAN SIGNATURE GREEN CARDS? YES NO
ADDITIONAL INFO FIELD REP REQUESTED FROM APPLICANT
19 R." TbYtG —
• LEER. !OF C0n54NT
DATE REQUESTED: -----PLATE RECV'D:
R Major Permit Fee Schedule
,
DCM %
DWQ %
Development Type
Fee
(14300160143510009316256253)
(2430016024351000952341)
I. Private, non-commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas:
$250
100% ($250)
0% ($0)
It. Public or commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas:
$400
100% ($400)
0% ($0)
III. For development that involves
the filling and/or excavation of up
to t acre of wetlands and/or open
water areas, determine if A.B. C.
or D below applies:
III(A). Private, non-commercial
development, if General Water
Quality Certification No. 3490
(See attached) can be applied:
$250
100% ($250)
0% ($0)
III(B). Public or commercial
development, if General Water
Quality Certification No. 3490
(See attached) can be applied:
$400
100% ($400)
0% ($0)
III(C). If General Water Quality
Certification No. 3490 (see
attached) could be applied, but
DCM staff determined that
additional review and written
DWQ concurrence is needed
because of concerns related to
water quality or aquatic lire:
$400
60% ($240)
40% ($160)
III(D), If General Water Quality
Certification No. 3490 (see
atla pit le
400
60% ($240)
40% ($160)
IV. Development that involves the
filling and/or excavation of more
1$475LM.
than one acre of wetlands and/or
open water areas:
285)
40%($190)
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827 Office 252.354.4916
Morehead City, NC 28557 Cell 252.240.9297
April 23, 2008
Mr. Brad Connell
NC Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Re: Major Permit Application
Discovery Diving Company, Inc.
Debora Boyce
414 Orange Street
Beaufort, NC 28516
Dear Brad:
lyre
060
pg!!4 2008
Moreheau .Icy j)cMM
Enclosed is the Major CAMA permit application for expansion of Discovery Diving Marina and new and
maintenance dredging associated with the marina. Also enclosed is one copy of the project plans for your
review. Certified mail return receipts from notification to the adjacent riparian neighbors will be provided
as soon as they are returned by the Post Office.
Thank you for your assistance with this project. Please call me at 252-240-9297 if you have questions or
need additional information. I look forward to working with you on this project.
Sincerely,
Kathy B. Vinson, AICP
Enclosure(s)
IN Mr-1
APPLICATION for
Major Development Permit
(lost MVIM d 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
WJ
Discovery Diving Company, Inc.
Discovery Diving Marina Expansi
Applicant 1: First Name
MI
Last Name
ArK 2 4 2W8
Debora
S.
Boyce
Applicant 2: First Name
MI
Last Name
Orah®ad
n/a
n/a
n/a
City ,Q
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
State
414 Orange Street
Beaufort
NC
ZIP Country
Phone No.
FAX No.
28516 USA
252-728-2265 ext.
252-728-2581
Street Address (if different horn above)
City
State
ZIP
n/a
n/a
n/a
n/a-
Email
dive@discoverydiving.com
2. Agent/Contractor lnformadon
Business Name
Coastal Planning Services, Inc.
bent/ Contractor 1: First Name
MI
Last Name
Kathy
B.
Vinson
Agent/ Contractor 2: First Name
MI
Last Name
n/a
n/a
n/a
Mailing Address
PO Box
City
State
827
Morehead City
NC
ZIP
Phone No. 1
Phone No. 2
28557
252-240-9297 ext.
252 - 354-4916 ext.
FAX No.
Contractor 0
252 247 5875
n/a
Street Address (d different from above)
City
State
ZIP
n/a
N/A
n/a
n/a -
Email
kbvinson@ec.rr.com
<Form continues on back>
"M N
Form DCM MP-1 (Page 2 of 5)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. if
Carteret
414 Orange Street
n/a
Subdivision Name
City
State
Zip
n/a
Beaufort
NC
28516 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
252 - 728 - 2265 ext.
n/a,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak
Town Creek
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Newport River
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ONO
work falls within.
Town of Beaufort
4. Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
240'
30,797
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
27,399, 3,398,
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
10, ®NHW or
e.
Vegetation on tract i 1 j
Trees and landscape vegetation. °
4
APR 2 4 2U08
f.
Man-made features and uses now on tract
Existing marina and associated commercial building and parking areas. Morehead uty UCM
g.
Identify and describe the existing land uses adiaceM to the proposed project site.
Commercial to the west, residential to the east.
In.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
B-3
(Attach zoning compliance certificate, If applicable)
®Yes []No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? Yes ONO
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. 0Yes, 0No UNA
If yes, by whom? n/a
I.
Is the proposed project located in a National Registered Historic District or does ft involve a OYes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
m. (i) Are there wetlands on the site? Yes ONO
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(III) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ®No
(Attach documentah'on, if available)
Form DCM MP-1 (Page 3 of 5)
APPLICATION for
Major Development Permit
n. Describe existing wastewater treatment faciTties.
Central sewer (Town of Beaufort).
o. Describe existing drinking water supply source.
Central water (Town of Beaufort).
p. Describe existing storm water management or treatment systems.
None.
S. Activities and Impacts
a. Will the project be for commercial, public, or private use? OCommercial Public/Government
❑Private/Communky
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The project wig provide commercial docking space and water access for customers of Discovery Diving Marina.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Barge with platform and pile driving equipment will be used for dock installation. Dredging will be accomplished by "bucket to
barge." Equipment will be stored on Town Creek.
Spoils to be hauled offsite.
d. List all development activities you propose.
Marina expansion to include 8 additional slips and associated dock, platforms, finger piers,tie;r
maintenance dredging.
APR 2 4 200$
e. Are the proposed activities maintenance of an existing project, new work, or both? Both
Moreh(a-
f. What is the approximate total disturbed land area resulting from the proposed project? 0 ❑Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use o»
h. Describe location and type of existing and proposed discharges to waters of the state.
Stonnwater sheet flow into Town Creek.
I. Will wastewater or stomnwater be discharged into a wetland? 0Yes ONo EINA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
j. Is there any mitigation proposed? Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Fortn continues on back>
& Additionallnfonnation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application
'instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
M
Form DCM MP-1 (Page 4 of 5)
APPLICATION for
Major Development Permit
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Donald B. and Lillie Wesley, Jr.
Phone No.
Address 310 Pine Street, Beaufort, NC 28516
Name Beaufort Partners, LLC
Phone No.
Address P.O. Box 14165, New Bern, NC 28561
Name
Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pe 1
CAMA 72-92 MM issued to Discovery Diving, Inc. Expired on 12/31/97. �ii.�.•
CAMA 2-83M issued to Discovery Diving, Inc. Expired on 12/31/86.
APR 2 4 Z''A8
Moreheaa (J-jxy
h. Signed consultant or agent authorization forth, If applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
1 7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _April 23, 2008 Print Name _Kathy B. Vinson
Signature v�
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
pDCM MP-3 Upland Development
®DCM MP-4 Structures Information
Form DCM MP-1 (Page 5 of 5) APPLICATION for
Major Development Permit
1Fccr
. "VI
APR 2 4 2 M8
Morehead City ucm
PROJECT DESCRIPTION
Discovery Diving Company, Inc.
Debora Boyce
414 Orange Street
Beaufort, NC
Carteret County
r� I V� ^ - - - -,
Ar- < , ,.,j
Morehiodu lsliy ,j.,pv
The proposed project consists of expansion of the Discovery Diving Marina and
associated dredging (new and maintenance). The existing 37-slip commercial marina,
owned by Debora Boyce, is located at 414 Orange Street, Beaufort, North Carolina.
Located adjacent Town Creek, the marina provides wet slip dockage only, with no other
marina services provided. Diving charters and a diving school are also operated at the
site.
The riparian corridor for the project site was determined with assistance from Division of
Coastal Management staff. It is based on a 4/24/1992 survey by Powell Surveying
Company and guidance from the Division of Coastal Management attached to amended
Major Permit #72-92 that reflected a 5/18/1995 settlement agreement. All existing and
proposed structures are located a minimum of 15' from the riparian corridor. New and
existing structures are Iocated outside of the boundary and setback lines provided by the
US Army Corps of Engineers for the Town Creek Harbor of Refuge.
Ms. Boyce proposes to add 8 new slips, for a total of 45 slips. To accommodate the
additional slips, project plans include extending the existing pier and adding two
platforms, two finger piers, and additional tie pilings.
An irregularly shaped platform (15' long on west, 6' long on east, and 42' wide) is
proposed for construction at the end of the existing pier. An 82' x 10' extension of the
existing 10' wide pier would then be constructed. The 10' width of the new pier section is
needed to safely maneuver carts used to load and unload diving gear onto boats docked at
the marina, as well as to safely accommodate other simultaneous uses of boats at the site.
A T-platform (10' x 100') would be constructed at the end of the pier extension. Two
finger piers (24' x 2') and 14 tie pilings would be placed between the two platforms as
shown on project plans to create the additional 8 slips. The platform and finger piers are
needed to safely access large boats commonly docked at the marina from the side, rather
than from the bow or stern.
Maintenance and new dredging is also proposed. Proposed excavation area 1, as shown
on project plans, is irregularly shaped and measures 97' in length increasing to 110' and
83' wide increasing to 95' in width. This area is located adjacent an existing bulkhead
and involves maintenance dredging of 680 cubic yards of mud and sandy material.
Average existing water depths in area 1 equal - 2' NLW. Final project depths of -4' NLW
are proposed. §� 3IVE .
R
APR 2 4 2008
Moreheao Uty Lj.;m
Proposed excavation area 2 is the northernmost area and involves both new and
maintenance dredging. Dredging in this area will provide access to the new slips, as well
as improved access from the harbor to existing slips. Area 2 measures 158' in length
increasing to 184' and 180' in width and involves dredging of 2548 cubic yards of mud
and sandy material. Average existing water depths in area 2 equal -3' NLW. Final
project depths of -6' NLW are proposed.
Areas to be dredged will not be deeper than connecting waters to promote adequate water
circulation. Dredging in area 2 is designed to allow adequate maneuvering room around
the new slips, as well as adequate water depths in the location of the new slips.
Maintenance dredging in area 1 is designed to restore water depths from previous
dredging.
APR 2 4 2008
Morehead Uny L)cM
Page 1 of 1
Prapared Sy: D. David 5629, Rck, Assist � 7,4
P. 0. Box 629, Raleigh, N.0STATE OF NORTH CAROLINA APR 2008
TIC iM Ty IDGM
COUNTY OF CAR'fEltl;'P
I'iI1S QUITCLAtM DEED, made this the day ut
1996, by the STATE OF NORTH CAROLINA, party of the first Dart
DIMORAII S. BOYCE, party of the second part; /-//,%/ �'r i��•7[
W 1 T N E S SETH: 4
WHEREAS, the Department of Administration has approved
execut.iun of this instrument; and
WHEREAS, the Council of State at a meeting held in the
'r
(,I Rnlr.igh, North Carolina, on the 2nd day of April,
approved this conveyance and directed execution of
instrument;
NOW, THEREFORE, Grantor, in consideration of the zum of
HUNDRED AND 1401100 ($100.00) DOLLARS, and other good and valt
consideration paid by the party of the second part to the f
of. the first part, the receipt of which is hereby acknowlec
has given, granted, quitclaimed and released, and by these
sents does hereby bargain, sell, quitclaim and release untc
party of Cho second part, her successors and ahsigns, nll 1,1
right, title or interest in and to that certain tract or p:
of land situate, lying and being in the Township of Beaul
County of Carteret, North Carolina, and more particu.
dl?serihed as follows:
4/3/2008
r
ty�A1 TifI rn-'
rv.fr;it .
Page I of 1
APR 2 4 2008�
-2- Morehead City UCM
Frim a point set in the eastern right of way
of Orange Street, said point being located, N
39-15 E, 292.59 feet from where the eastern
right of way of Oran,& Street would intersect
with the northern right of way of Cedar
Street if same were extended; continuing
thence along the eastern right of way of
Orange Street if same were extended and run-
ning N 39-15 E, 57.77 feet to the POINT AND
PLACE OF BEGINNING. From said beginning
point running N 77-17-20 W: 67.07 feet to a
point; running thence N 39-15 E, 24.03 feet
to the highwater mark of Town Creek; running
thence along the highwater mark of 'Town
Creek, S 78-38-15 E, 59.89 feet to a point
set in the bulkhead; continuing thence along
said bulkhead, N 15-51-05 E, 4.58 feet to a
point in the bulkhead; running along said
bulkhead S 74-19-35 E, 79.29 feet to a point
in the bulkhoad; continuing thence with said
bulkhead aluttg the highwater mark of
TownCreek S 70-22-20 E, 63.71 feet to an
existing iron pipe in the rip rap along the
highwater mark of Town Creek; running thence
S 39-15 W, along said rip rap 9.66 feet to a
point in the northeast corner of the Debbie
Boyce property; running thence N 69-42-25 W,
52.50 feet to a point; continuing N 78-51-40
W, 50.64 feet to a point; running thence S
83-45 W 42.62 feet to a point, the POINT AND
PLACE OF BEGINNING.
Being all that property as shown on survey
for Debbie Boyce, Discovery Diving, dated
November 14, 1990, amended March 16, 1995.
TO HAVE AND TO HOLD the aforesaid tract or parcel of
and all privileges thereunto belonging, to DEBORAH S. BOYC
said part.y of the second part, her successors; and assigns
and discharged from all right, title, claim or interest
said party of the first part, or any one claiming by, thro
under it.
RnnK _/� PAGECa
4/3/2008
Page I of I
-J-
IN TESTIMONY WHEREOF', the State of North Carolina has c.
this instrument to be executed in its name by JAMES n. HUNT,
Governor, attested by JANICE If. FAULKNER, Secretary of State
the Great Seal of the State of North Carolina hereto a£fixe,
virtue of the power and authority aforesaid.
STATE SORT ARnr.INA
C,overnor
/ se.0 Syr r
APR 2 4 2008
APPROVED AS TO FORM: Morehead city ucm
MICHAEL F. EASLEY
Attorney General
By —
D. David S einboc
Assistant Attorney General
4/3/2008
Page 1 of 1
L'� t . .K��yry.�,%�
t rye.!
M
-4- W 2 4 2008
STATE OF NORTH CAROLINA
Morehead 614 @OM
COUNTY OF WAKE / 1 --
i a Notary l
in allot for a County and State aforesaid, do hereby certifl
.JANICE li. FAULKNER, Secretary of State of North Car(
personally came before me this day and acknowledged that s
st,!cretary of State of North Carolina, and that by authoritj
given and as the act of the State, the foregoing instrumei
signed in its name by JAMES B. HUNT, JR., Governor of the
,.I North Carolina, sealed with the Great SMl of t.hu Stti
Nm•th Carolina, and attested by herself as Secretary of St.;
Not't.h Carolina.
IN WITNESS WHEREOF, I have hereunto set my hand and No
t\f>jFRKrdy the day of
-r oTARY:
'P
U B 1- 1C
Notary Public
y, jlµp4sion Expires:
NORTH CARnt INA, CART_R j�,yy�►7, e ''
is The fe) cernp Coto b(! co' ot.
centre) cerliliad to bo co'
This inmrum nt was pro.
rcrislr,,Uo nd recorded In oHic in
a� Pa '
lhdzy p1fa(,�f= jgLs[�.at O'cbclr_,L
/ Sharon Piner M.
L'p �f 1 Sister of Oe
AwiSb De
1 Pub
4/3/2008
Debbie Boyce
414 Orange Street
Beaufort, NC 28516
February 15, 2007
To Whom It May Concern:
1�1
APR 2 4 2008
Moreheaa City UGM
I hereby authorize Kathy Vinson, AICP and John Freshwater, PE to represent me and
apply for CAMA permits to develop my property located at 321 Orange Street, Beaufort,
North Carolina (Discovery Diving). This authorization extends to all permits and
authorizations required by local, state, and federal agencies that may be required as part
of the permitting process.
I also authorize release of information related to the project site to Ms. Vinson and Mr.
Freshwater, including boundary surveys, topographic maps, and results of wetland
delineation and soil permeability tests.
If you have questions or need additional information, please contact me at 252-728-2265.
Sin
✓e � 10-
ebbie Boyce V
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL
stabilization
Area 1 = 97'
_
increasing to
110,
Length
Area 2 =158'
n/a
n/a
n/a
Na
Na
increasing to
184'
Area 1 = 83'
Width
increasing to
n/a
n/a
rile
n/a
n/a
Area 2 = 189
Area 1 = 2'
Avg. Existing
NLW
Depth
Area 2 = 3'
Na
Na
NA
NA
Na
NLW
Area 1 = 4'
Final Project
NLW
Depth
Area 2 = 6'
Na
Na
NA
NA
Na
NLW
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
3228
C. (i) Does the area to be excavated include coastal wetlands/marsh
(CW) submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
n/a
❑This section not applicable
Mud and sandy material
d. High -ground excavation in cubic
APR 2 4 2008
Morehead City DCM
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section nor applicable I
a. Location or disposal area.
Spoils will be deposited at a pre -approved spoil disposal
site.
c. (i) Do you claim title to disposal area?
[]Yes []No ®NA
(ii) If no, attach a letter granting permission from the owner
Dimensions of disposal area.
Approximately 100' x 200' x 4.4'
d. (i) Will a disposal area be available for future maintenance?
❑Yes ®No ❑NA
(ii) If yes, where?
Na
Form DCM MP-2 (Excavation and Fill, Page 2 of 3)
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
n/a
f. (i) Does the disposal include any area in the water?
❑Yes ®No ❑NA
(11) If yes, how much water an:
n/ag' `� t
APR r 4 �208
3. SHORELINE STABILIZATION ®This section not applicable
(If development is a wood groin, use MP-4 — Structures)
a.
[]Bulkhead ❑Riprap ❑Bmakwater/Sill ❑Other:
c. Average distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill _ Riprap
Breakwater/Sill _ Other
i. Source of fill material.
Width:
d. Maximum distance waterward of NHW or NWL:
f. (i) Has there been shoreline erosion during preceding 12
months?
[]Yes ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
AL OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlandstmarsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(III) Dimensions of fill area
IN) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL []None
(ii) Describe the purpose of the fill in these areas:
15. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction eauipment will be used (e.o.. draoline.
controlled?
Excavated material will be trucked offsKe.
backhoe, or hydraulic dredge)?
Bucket to barge.
c. (i) Will nav' ational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project
❑Yes Mo ❑NA site? []Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize
n/a environmental impacts.
n/a
April 23, 2008
Discovery Diving Marina Expansion
Discovery Diving Company, Inc./Debora Boyce
plicant Name //�/ �� �g
is V n/vWyy o An
pplij um
Morehead City DCM
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable
a. (i) Is the docking facility/madna: b. (i) Will the facility be open to the general public?
OCommercal ❑PublicJGovemment ❑Private/Community ®Yes ❑No
c. (i) Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? OYes []No
(ii) Number 1
If yes:
(iii) Length82'
(ii) Number 2 I'IV�if V
(iv) Width 19
(iii) Length 24' 111"j'\��7epVV111'/111,,
(v)Floating []Yes ®No
(N)Width 2' APR 2 4 2008
(v) Floating []Yes ®No
e. (1) Are Platforms included? ®Yes ❑No
f. (i) Are Boatlifts included? ❑yIt� ONGQ{{�.�
If yes:
,,I �v
If yes: IYIQC811®aW City �C�
(ii) Number 2
(ii) Number n/a
(iii) Length 10'lrreauladv shaped 15' on west. 6' on east
(iii) Length We
(iv) Width 100742'
IN) Width n/a
(v) Floating ❑Yes ®No
Note: Roofed areas are calculated from ddpline dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided.
8 additional slips for a total of 45 slips.
❑ Full service, induding travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
❑ Dockage, fuel, and marine supplies
37
® Dockage ( wet slips") only, number of slips: 8 new slips for
total of 45.
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
i. Check the proposed type of siting:
❑ Land cut and access channel
®Open water; dredging for basin and/or channel
[]Open water; no dredging required
❑Other; please describe:
k. Typical boat length: 40' to 45'
m. (i) Will the facility have tie pilings?
®Yes [:]No
(ii) If yes number of be pilings?
14 additional tie additional tie pilings.
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Mixed types.
I. (1) Will the facility be open to the general public?
®Yes []No
2. DOCKING FACILITY/MARINA OPERATIONS 0This section not applicable
Form DCM MP-4 (Structures, Page 2 of 4)
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number. _; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
Pump -out, Town of Beaufort sewer I
����
R
c. Describe the disposal of solid waste, fish offal and trash. APR 2 4 Z008
Trash cans/dumpster.
Morehead City UGM
d. How will overboard discharge of sewage from boats be controlled?
Discovery Diving Marina contracts prohibit overboard discharge of sewage.
e. (I) Give the location and number of 'No Sewage Discharge' signs proposed.
Two existing signs are located midway of dock. Signs face in opposite directions.
(M Give the location and number of'Pumpout Available' signs proposed.
Two existing signs are located midway of dock. Signs face in opposite directions.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
n/a
g. Where will residue from vessel maintenance be disposed oil
n/a
h. Give the number of channel markers and 'No Wake' signs proposed. 16 existing signs located adjacent existing docks.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
n/a
j. What will be the marina policy on overnight and live -aboard dockage?
Marina allows overnight and live -aboard dockage.
k. Describe design measures that promote boat basin flushing?
Areas to be dredged will not be deeper than connecting waters.
1. If this project is an expansion of an existing marina, what types of services are currently provided?
Dockage, wet slips only.
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ®No
n. is the marmafdockmg facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
®CW 0 ❑SAV ®SB 0
❑WL — []None
Form DCM MP-4 (Structures, Page 3 of 4)
s
p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
Per the NC Division of Marine Fisheries, there are no shellfish leases in Town Creek.
3. BOATHOUSE (including covered fills) ljerrr e4appllpeb)e
a. 01 Is the boathouse structure(s):
❑Commercial ❑PubliGGovemment ❑Private/Community
n Number
(III) Length APR 2 4 Z008
(iv) Width �l� Note: Roofed areas are calculated from dnpline dimensions. Morehead City DC a
C GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable
a. () Number
(ii) Length
(iii) Width
15. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a.
c. Maximum distance beyond NHW, NWL or wetlands
a. Is the structure(s):
❑Commercial ❑PubliGGovemment ❑Pdvate/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
41' on west, 15' on east.
®This section not applicable
d. Description of buoy (color, inscription, size, anchor, etc.)
b. Proximity of structure(s) to adjacent docking facilities.
335' to east, 360' to west
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Wdtth of water body d.
Approximately 1050'
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
n/a
Water depth at waterward end of structure at NLW or NWL
Area 1 currently -2.0' NLW. proposed -4.0' NLW
Area 2 currently -3.T NLS. proposed -6.0' NLW
8. OTHER 0This section not applicable
Form DCM MP-4 (Structures, Page 4 of 4)
1
a. Give oomolete description:
April 23,2008
Date
Discovery Diving Marina Expansion
Project Name
Discovery Diving Co., Inc./Debora Boyce
np
plicant Name
Ap
p icant Sigi9ture
lkELo o'
�p
A " 2 4 2008
Morehead City DCM
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827
Morehead City, NC 28557
April 23, 2008
Mr. and Mrs. Donald B. Wesley, Jr.
310 Pine Street
Beaufort, NC 28516
Re: Discovery Diving Company Inc.
Debora Boyce
414 orange Street
Beaufort, NC 28516
Dear Mr. and Mrs. Wesley:
Office 252.354.4916
Cell 252.240.9297
Y ^ ,
�.(1�I in
s ll
' " 2 4 2008
Morehead City DCM
Ms. Boyce has retained Coastal Planning Services, hic. to provide CAMA permitting assistance for expansion of
Discovery Diving Marina and for new and maintenance dredging associated with the marina.
Ms. Boyce has applied for a Major CAMA (Coastal Area Management Act) permit to do the work. CAMA requires
that adjacent riparian property owners be notified by certified mail of the proposed work and that an opportunity be
provided to the neighbors to comment or object to the proposal. As the owner of adjacent riparian property we are
hereby notifying you of the proposed plans.
Enclosed with this letter are copies of the
You may reach DCM at the
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Telephone: 252-808-2808
application and plats. If you have objections or comments
address and phone number:
No action on your part is required if you have no objections or comments on the proposal. If you have questions or
need additional information, please feel free to contact me at 252-240-9297.
Sincerely,
9� 1.
Kathy B. inson, AICP
Enclosure(s)
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827 Office 252.354.4916
Morehead City, NC 28557 Cell 252.240.9297
April 23, 2008
Beaufort Partners, LLC
P.O. Box 14165
New Bern, NC 28561
Re: Discovery Diving Company inc.
Debora Boyce
414 Change Street
Beaufort, NC 28516
Dear Sir or Madam:
ppFoRrE,®r�APR 2 4 2008
Morehead City JCM
Ms. Boyce has retained Coastai Pianning Services, inc. to provide CAiviA permitting assistance for expansion of
Discovery Diving Marina and for new and maintenance dredging associated with the marina The marina is located
at 414 Orange Street, Beaufort, North Carolina.
Ms. Boyce has appiied for a Major CAIviA (Coastal Area Management Act) permit to do the work. CAMA requires
that adjacent riparian property owners be notified by certified mail of the proposed work and that an opportunity be
-
provtnea to the neighbors to comment or opiece to the proposer. as the owner of adjacent riparian property we are
hereby notifying you of the proposed plans.
Enciosed with this letter are copies of the permit appiication and piats. if you have objections or comments
regarding the proposal. please write or call the Division of Coastal Management (DCM) within 30 days of receipt of
this notice. You may reach DCM at the following address and phone number:
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Telephone: 252-808-2808
No action on your pan is required if you have no objections or comments on the proposal. if you have questions or
need additional information, please feel free to contact me at 252-240-9297.
Sincerely,
t ;%/V ,
Kathy B. Vinson, AICP
Enclosure(s)
e��
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director
MEMORANDUM
DATE: April 24, 2008
TO: Kathy Vinson
FROM: Brad Connell
SUBJECT: Major Permit Application Revisions
William G. Ross Jr., Secretary
QOopy
I have completed my initial review of your major permit application dated and received
by DCM on April 24, 2008. The proposal is for an 8-slip expansion of an existing marina
and approximately 73,975 square feet of excavation below nhw. This document is
thorough and well prepared. However, the following issues require revisions to your
application package:
1) Form DCM MP-1, 41: please check the "Yes" box;
2) Site Plans: please include 26 copies of drawings larger than 11" by 17," show
the dimensions of the proposed excavation, show the property boundaries more
clearly (esp. western line), and indicate the width of the adjacent waterbody at
the most constrictive point on the property. Cross-section should show the
normal high water line;
3) Location Map: please include a map showing the location of the project site;
4) Adjacent Property Owner Notification: please include the signed return receipts;
5) Application Fee: please include $475 payable to NCDENR.
The District Manager has indicated to me that a "T" section at the terminus of the
existing marina was removed as a result of the 1995 settlement agreement and may
cause the DCM to deny the application. This proposal also exceeds the'/4 width of the
adjacent waterbody and may cause the DCM to deny this proposal.
Thank you for your time and cooperation in this matter. It is much appreciated. Please
feel free to contact me with any questions or concerns you may have.
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastaimanagement.net
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper
05/23/2008 14:59 FAX 2523215525
IN
rA
FA X
As -ZO& - Or
o: Sna de co pt " c it
FR�rI : 8ew`��'�� I`�rfl+ns LLC
J41len 7A 00 w A
p & : (*Z si') 902 —"Woommm
72C�F : '
— Do6*m &icc,
1>iscovar7 vape. s4ep
docA GkPAMm7N S66M"HYl
05/23/2008 14:59 FAX 2523215525
[a002
4e
Beaufort Partners LLC
P.O. Box 14165
New Bern, NC 28561
Re: Submittal for Major CAMA Permit
Letter from Kathy B. Vinson, AICP, representing
Debora Boyce, Discovery Diving Company Inc.
414 Orange Street, Beaufort, NC 28516
May 22, 2008
To the North Carolina Division of Coastal Management,
We are responding to a letter sent to us by Kathy B. Vinson, representing Ms. Debora S.
Boyce and her request for a Major CAMA permit to expand the existing dock and
dredging at 414 Orange Street, Beaufort, NC 28516. Ms. Vinson requested our
comments as an adjacent property owner.
We are currently in the process of evaluating the shared riparian buffer area as it relates
to these properties, To complete our evaluation and provide adequate commentary on
Ms. Boyce's submittal, we are requesting a copy of your complete records on the existing
marina permit granted previously at 414 Orange Street, Beaufort, NC 28516 by the State
of North Carolina.
Based on the map submitted by Ms. Vinson accompanying her letter, it appears Ms.
Boyce's dock pilings on the west side may be encroaching inside the existing riparian
setback area. We would like to review the existing permit in full as it applies to this
question and request the opportunity to reserve our comment on the submittal until such
time as that we receive this copy and respond in full.
We look forward to your response and appreciate your input. Please feel free to contact
me at (252) 902-9021.
Thank you,
Allen Thomas
Beaufort Partners LLC
Cc: Kathy B. Vinson
U gCC,O\\ew -000/05
-
Complete items 1, 2, and 3. Also complete
Va
em 4 ifRestricted Delivery is desired.
rint your name and address on the reverse
o that we can return the card to you.
ttach this card to the back of the mailpiece,
r on the front If space permits.
1. Article Addressed to:
f/J�4u'� �4r'Fners) �
140
�D. <0.S
G lee,�
A.
B.
❑ Agent
C. Datd of
D. Is ciellvery address diRerar t from itei ❑VW
If YES, enter delivery address below: ❑ No
LC
/ 3 S ice Type
W Certified Mail ❑ Express Mail
Registered ❑ Return Recelpt for Merchandise
❑ Insured Mail ❑ C.O.D.
4. Restricted Delivery? Pft Fee) ❑ Vee
z. Aransffrom service
(tr, 7008 0150 0002 6861 5157 J
rrans/er hservice�,
PS Form 3811. February 20WCA., Domestic Return Receipt tt> -tsa
I;C i 6:
UNITED STATES POSTAL JERVICE
ty"¢.jt','k14Fr 5
A qp. Fees
Imo+? ,�:i•�i N�EIl3t �'F8 4.§V51d�"Et' Q'S
• Sender: Please print your name, address, and ZIP+4 in this box
Ca42,57� / �14hA7,,tSe��ic�s� -Z,e,
oa, r�ox 9;?7
Or'ehd'ad
■ Complete items 1, 2, and 3. Also complete
item 4 If Restricted Delivery is desired.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailplece,
or on the front If space permits.
1. Article Addressed to:
Mr. a.id. Mr-s WerkliI.
l3PTell
MAY 2 8 2008 It
A Signature
1� ❑ Agent
Addressee
B. Recely d ' 6 C. Delivery
9
D.b eddressdifferent froml�emt
If 1. emer�rpyyerypragr{Alew: o
3. cs Type
Certified Mall
❑ Express Mall
❑ Registered
❑ Ratum Recelpt for Merchandise
❑ Insured Mail
❑ C.O.D.
4. Restricted Delivery? (Extra Fee) ❑ Yes
2. ArticreN-r�tu tw
(nsns/er Bomservke(�rt V nr..ia �Q 8 0150 0062 6861 5164
Ps Form 3811, February 2004 Domestic Return Recelpt 102595024A-1540 j
UNITED STATES POSTAL SERVICE First -Class Mail
Postage & Fees Paid
LISPS
Permit No. G-10
• Sender: Please print your name, address, and ZIP+4 in this box
8,3 / J