Loading...
HomeMy WebLinkAbout19-18 Anderson, BillyPermit Class Permit Number NEW 19-18 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ,Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 _ Excavation and/or filling pursuant to NCGS 113-229 Issued to Billy G. Anderson, 102 Arbor Drive. Washington. NC 27889 Authorizing development in Beaufort County at on Tranters Creek, at 102 Arbor Drive, near Washington as requested in the pernuttee's application dated 11/6/17, including attached workplan drawings (2), both dated 10/25/17. This permit, issued on March 2, 2018 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )r mese terms may be subject to tines, imprisonment or civil action; or may cause the permit to be null anct vota. Docking Facility 1) This permit authorizes only the additional lift bunks and boathouse over existing and proposed lifts, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The pemiittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Er U %� Braxt C. Davis, Director // Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee 'G. Anderson Permit No.19-18 Page 2 of 2 r; ADDITIONAL CONDITIONS This permit authorizes an additional formalized slip, for a maximum of 3 formalized boat slips. The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. ` The authorized boathouse shall be single story, and shall not be designed to allow for second story use. o attempt shall be made by the permittee to prevent the full and free use by the public of all navigable aters at or adjacent to the authorized work. General permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the en approval of the Division of Coastal Management. The permittee shall maintain the authorized work in good condition and in conformance with the terms .and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Ei , This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2018-00134), issued 3/2/18. The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 2017-1644. GE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico/Neuse River buffer regulations in place at the time of such development. An application processing fee of $250 was received by DCM for this project. DIVISION OF COASTAL MANAGEMENT Application Processing Notes Applicant:U1 Type: (check all that apply) New_, Major Mod Permit # Minor Mod_ Renewal Transfer_ Permit Coordinator: Field Represe Date Time Messal?e i/4�lif CorKcir� OWVp fC le4- tear. (. on�l 6#e4- 65 6e^ v0rc. I11 15 ie4k 10A CAW— oKk- lin u&fk ` N- t. , Inf eb) la ZYI o )14vq (R Coastal Management ENVIRONMENTAL QUALITY March 8, 2018 Billy G. Anderson 102 Arbor Drive Washington, NC 27889 Dear Sir or Madam: ROY COOPER Governor COPY MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 8082808 f• DCM MP-1 APPLICATION for DCM NOV 0 6 2017 major Development Permit witRC (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name �r (t A G- Ar-ckes.2o Applicant 2: 'First Name7 MI Last Name If additional applicants, please attach an add/tionel page(s) with names listed. Mailing Address PO Box City State 7 04 rbb c be., (Aims ZIP a�g Country Call�� Phone No. ssl_ 1121 FAX No. W.� ext. Street Address (d different from above) City State ZIP Email b ,anderscNlQ yaV.+e,.cenn 2. Agent/Contraetorinformation Business Name x N/A Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box city State ZIP Phone No. 1 - - BxL Phone No. 2 - - ext. FAX No. Contractor # Street Address (d different hom above) City State ZIP Email <Form continues on back> RECEIVED DEC 18 2017 252-808-2008 .. 1-888-4RCOAST .. www.nccoastatmanag a DeA Lq/1 e WD cerY Form DCM MP-1 (Page 2,of 4) APPLICATION for Major Development Permit' *.� �A n� ect � l/�/3�7 �{��1 sry {, f� ' ti s� e f»""-y. � sCx ^� +., a 'L "�^`" i�� a� s'h`•°r 'Yi ,�` �`�'f.�& County (can be multiple) Street Address State Rd. # l�aiti �4rti` 102, At-bbr pr. 1 y.Srs Subdivision Name City State Zip roar lr-�'% Wa51" NC '27V?q Phone No. Lot No.(s) (d many, attach additional page with list) ext. NZ A — a. In which NC river basin is the project located? - b. Name of body of water nearest to proposed project T-A!Z — r Pe c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. (Natural ❑Manmade ❑Unknown P e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes ISiNo - work falls within. N f X�^n° 3x: dA � L' "� S'' S .� ^✓1 "} (L i. i f 1 �'"t t��'itl jf .a�. . v�L",.s:°.".t.�tsz YA,p�,n `xTN"ik r$,n. �',.�i �'sf E ��',tr��Y �".l'x�Vt-<'a?;+b�"✓rv"€:��,�:,:��'�Q�"..,�r5����-YY x, r�.„�.z a. Total length of s reline on the tract (ft.) b. Size of entire tract (sq.ft.)' S GG!✓< �, �Ls c. Size of individual lot(s) �/n - /'r d. Approximate elevation of tract above NHW (normal h1 water) or NWL (normal waferlevel) �. ,pm (If many lotsizes, please attach addition/page with a list)- ❑NHW orgNWL "- G�'4It� t�\I -1 e. Vegetation' on tractI{ 6,ZO,I i-GLyfn 9rC�3� 1^r�'3�/lcrdu.ar.(f oPnarra r'�� Sir-a.bJ �QVO i f. Man-made features and uses now on tract 1 (. S Mg1,e,��M:tr �Mla.l�rry :�u.Ys.N w,� WCij, bn1.L Jvod, b0'-"r g. Identify and describe the existing land uses ad'acent to the proposed project site. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? A % ^ (Attach zoning compliance certificate, if applicable) []Yes ❑No XNA J. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes O?No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes No ❑NA National Register listed or eligible property? <Form continues on next page> 252.808-2808 :: 11-888-4111COAS4 :: www.nccoastaimanagement.net c Form DCM MP-1 (Page 3 of 4) m. (1) Are there wetlands on the site? (it) Are there coastal wetlands on the site? (III) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, ff available) n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source. k7..bkr- %+� P. Describe existing stone water management or treatment systems. $tr. r•" Kuhl e$ APPLICATION for Major Development Permit ❑Yes ❑Yes KNo ❑Yes NNo N/W 5. Activities and Impacts a Will the project be to u r micr::i; I'ut I r prmwe e? (I nrme r ul ❑Public/Government Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. ik ?r4)rya, w ; t l c6 NS: SI• rf- gdiA- -� 4 ^ ockd\Ay c4 bwnV, 4o ?-K,-z5 ..3 ► .,+ 1.C{ bao.+oir Aer&4.�V.fa+.K..�In�dror�r c. Describe the proposed construction methodology, types of construction equipment to be ysed during construction, the number of each type of equipment and where it is to be stored. :1.wtt,46N b«.nks C10001e4SV*4.I% 6e. 6eF44+o -CA-S--76Pre fqSJ Coverall 1040•-4V.-f+. d. List all development activities you propose. Add G� edJY.o...1 bw..l ** .6.4j. S P r epose l co" boe.+1.t(t fo �'e ao-, *o- add�yr.w.4sl•p. To-1.1 s►•`pG.r.A wall b�-3 e. Are the proposed activities maintenance of an existing project, new work, or both? Nc%�) f. What is the approximate total disturbed land area resulting from the proposed project? XSq.Ft Acras + / 70 *10 g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yas �jNo ❑N nc that the public has established use of? 1-r JW h. Describe location and type o_f existing and proposed ddis'charges to waters of the stale. w`O 11 �P I. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ANo DNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No WNA j. Is there any mitigation proposed? ❑Yes ❑No 141NA If yes, attach a mitigation proposal. R <Form continues on back> RECENEU DEC 18 ZOV 252.808-2808 :: 1-888-411COAST :: www.nccoastalmana gep .:nalHD r• Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6: v i Additionallnformai`o'n In addition to this completed application form, (MP-1) the following items below. if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on. how to properly prepare ing required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name loh:-,. AA AAA�cse(J Phone No. 703 'ADS-S%79 Address lot Ar4o, oe w+s1,...1J.A N C .2-?ggq Name hl�.�. P, Address Name L,ar Nod ,.> 7 yGs Phone No(Jr„2) 9N`1-463$9 Address /oy 4,110 Dr NC. o7Yg9. g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permiftee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. N R i. Welland delineation, if necessary. 011:11, j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) N k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ;/ I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date It /oC. 120.?- Print Name IIN i(r/K�. /�gn[iEt$eni Q o�1 Signature Please indicate application attachments pertaining to your proposed project. ° �® ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and C []DCM MP-3 Upland Development `RPECE IVED (�IDCM MP-4 Structures Information DEC 18 2017 DCM- MHD CITY 252.808-2808 :: i-888.4RCOAST :: www. necoasta lmanagement. net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (i) Is the docking facility/marina: []Commercial ❑PubliciGovemment Private/Community a (i) Dock(s) and/or pier(s) (ti) Number r �' (lii) Length (iv) Width _ (v) Floating ❑Yes []No e. (I) Are Platforms included? []Yes No If yes: (ii) Number (III) Length IN) Width _ (v) Floating []Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (I) Number of slips proposed I (tl) Number of slips existing _- i. Check the proposed type of siting: ❑ Land cut and access channel []open water; dredging for basin and/or channel ®Open water; no dredging required []Other: please describe: k. Typical boat length: Z4 M. (i) Will the facility have tie pilings? []Yes ®No (it) If yes number of be pilings? --±!LA b. (i) Will the facility be open to the general public? ❑Yes ko d. (i) Are Finger Piers included? []Yes ❑No 111/A If yes: (i) Number _ (III) Length (iv) Width _ (v) Floating []Yes []No f. (i) Are Boatlifts included? QlYes []No If yes: (ii) Number I 164•% ad .f (III) Length wn� 4, a. (w) Width 41 % " h. Check all the types of services to be provided` ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage (wet slips' only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: Rother, please describe: ,f 1 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). (i) Will the facility be open to the general public? ❑Yes WNo RECEIVED DEC 182017 DCA4. 252-SM28W :: 1.889 4RCOAST :: www.nccoastalmanagen ent.net Form DCM MP-4 (Structures, Page 2 of 4) a 2. DOCKING FACILITY/MARINA OPERATIONS) This section not appficable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: Q Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage fromboats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of'Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ i. Give the location of fuel -handling facilities, and descdbe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? IL Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marinatdocking facility proposed within a primary or secondary nursery area? ❑Yes ❑No RECEIVED L DCM- MHD CITY 252.808-2808 :: 1l-888-4RCOAST :: www.neconstalmanagement.net revised: 112127;88 •• Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? [-]Yes []No o. Is the marinaldocking facilityproposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE ;(including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliGGovernment I5(private/Community (ii) Number (iii) Length / Z16 rr (iv) Width i 3,7 Note: Roofed areas are calculated from dripline dimensions. 4 GROIN (e.g., wood, sheetpile, etc It a rock groin, use MP-2, Excavation and Fill.) This section not applicable' a. (i) Number :r (ii) Length ni Width r 15 BREAKWATER (e.g., wood,'sheelpile, etc.) WThis sectioanotapplicablei a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands L6. MOORING PILINGS and BUOYS- T s�ction not applicable a. Is the structure(s): ❑Commercial ❑PubliGGovernment ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number V fa IV d. Description of buoy (color, inscription size, an i tAy RECEIVED 7. GENERAL E C 18 2017 ®Colds MHD CITY 252-808-2808 :: 9-688-4RCOAST e: www.necoastalmanagemant.rret revised: 12127/B6 Form ®CM MP-4 (Structures, Page 4 of 4) a` Proximity of strucure(s) to adjacent riparian property lines .i0 �,&s4 50 f kw5+ Note: For buoy or mooring piling, use arc of swing including length of vessel.. c. Width of water body { ZZ.Qr e. () Will navigational aids be required as a result of the project? []Yes IJNo ❑NA (it) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. SD" Sa5j`, /pdiAtyL d. Water depth at waterward end of structure at NLW or NAIL Zo 8. OTHER ❑This section not applicable a. Give complete description: Add Ad4'-f eh / SIOP40 Px:4 ccf-F Add Cox.. tx 4AI yc.4 -tf Date Project Name ApplicantN Applicant nature RECEIVED DEC 18 2017 DCM- MHD CITY 252-809-2808 :: 1-888-4RCOAST :: v w.nccoastaimanagement.nst revised: 12127/06 H � � Yee• U `� � l3� �� ULLJ � U Py C i -s e-o/ 644Lr -VN r^�145ON �;+@ -JgAb► 'levl W19iyfpl9q:wan-?= - -- - S d- ,v 1a)Sojo.,d = f �'=-�M� � �•r�;l Imo_ ----•-_� + � � � jj �� - `C V39;c4 � �P2fd 3 swi4'a% 4 0'( ISlr N ° ,: r- �;C p,(90 t F 7co p:s J ioz Arl�� Droge lgnd�rso�1 �ro��rir q ex, 4„� P411,=fl DCM Coordinator: �O l Permit #: MAB ING DISTRIBU IONSM-E-T-•-,-: -.... _ .. . im Agents: DCMFfeld Offices 3 I.Q Elizabeth City (with revised work drawin plan Morehead City p �� Washington .V�ilmington US ACOF Omees: Washington: Raleigh Bland (Beaufort, Camden Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bettie, Cutrituck, Dare, Gates, Pamlico, Pasquotank, Washington)' T.om Steffens (NC, DOT- IIoaufotf Carteret, Craven Pamlico) Bill Biddleczime (NCDOT-Remainder ECity/Washington IJistriot) Wilmington: Tyler Crunibley (Brunswick, Now Hanover) Liz Hair (Caxteaet, Onslow, Ponder) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Earley -Se N,; far ms Public Water Supply: Heidi Cox (W1RO) Clif Whitfield (WARD) Marine Fisheries; Shane Staples CurtWeyebert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins fro p a17 State Property: Tim Walton ✓ (�'� i {� DEMLR/DWIL Karen Higgins v ` Kristy Lynn Carpenter (NC DOT -All Projects) Washington: WAnthony Scarbraugh-401 Roger Thorpe-Stormwater V . Gamy Ward- (NCI)OT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs - 401(Carteret, Onslow, Ponder, New Hanover) Chad Coburn - 401(Bnmswick) Georgette Scott : Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARO) V� LPO: Fax Distribution: Permittee #: Agent# Coastal Management ENVIRONMENTAL QUALITY January 18, 2018 Mr. Billy G Anderson 102 Arbor Drive Washington, NC 27889 Dear Mr. Anderson, ROY COOPER Governor MICHAEL S. REGAN sevetary BRAXTON C. DAVIS Dlrecmr This letter is in reference to your application for a Coastal Area Management Act Major Permit to undertake development activities to add an additional slip and boathouse, on Tranters Creek, in Beaufort County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make April 5, 2018 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov). Cc: DCM WaRO Sincerely, Gregory W. Bodnar Assistant Major Permits Coordinator State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Billy Anderson County: Beaufort LOCATION OF PROJECT: off SR 1455 at 102 Arbor Drive on Treaters Creek, near the City of Washington in Beaufort County, North Carolina DATE APPLICATION RECEIVED COMPLETE BY FIELD: 6 November 2017 FIELD RECOMMENDATION: Attached: YES To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Kelly Spivey DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: // �t1 `GtGo' q A B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE RECD: $ 400+0--+6 F40) o�d PUBLIC NOTICE RECD: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES RECD: DEED RECD: APPLICATION ASSI QTO: _ A 6YC- ON: C) 75 DAY DEADLINE' ' I50 DAY DEADLINE: MAIL OUT DATE: STATE DUE DATE: tIK ($ FEDERAL DUE DATE: FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTION S: YES NO NOTES Coastal Management - Regional Representative 1z A // X ``�/ II 5f4.0oj Coastal Management - LUP Consistency t s o K 6,1%,�i— Division of Community Assistance t 2t Fj k Land Quality Section Division of Water Quality yo I t 4 18 t �/ 20 t� �` V f `( Storm Water Management (DWQ) State Property Office t1 Za Division of Archives &History 1 / Qj Division of Environmental Health Division of Highways Wildlife Resources Commission Local Permit Office Division of Marine Fisheries i1ll� h Corps of Engineers 3IZ Irf) K �(gj. ( 31� C l 's 2017 Iky)wkyj77\�117Tri TO: Doug Huggett THROUGH: Jonathan Howell FROM: Kelly Spivey DATE: 1 December 2017 SUBJECT: Billy G. Anderson 102 Arbor Drive Washington, Beaufort County Mr. Anderson has submitted a CAMA Major Permit request for the installation of an additional bunk on an existing uncovered boatlift and to cover the boatlift with a 12'6" x 137' roof at his property located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington in Beaufort County, North Carolina. Staff has reviewed the proposed project regarding rules found in Subchapter 7H concerning development in a Public Trust Area. It is staff s recommendation that the proposed project appears consistent with 15A NCAC 07H .0208 as described below. This office feels the development is consistent with 15A NCAC 07H .0208(bx6)(B) which states in part that "The total square footage of shaded impact for docks and mooring facilities allowed shall be eight square feet per linear foot of shoreline with a maximum of 2,000 square feet". The applicant has proposed a total of 969 square feet of platform. The total platform allowed on this property with 125 linear feet of shoreline is 1,000 square feet. Staff recommends the permit be issued with standard conditions for docking facilities. RECEIVED DEC 18 2017 DCM- MHD CITY C:uus« tl A?[uu ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Shane Staples Division of Coastal Management 943 Washington Sq. Mall FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137' roof. Please indicate below your position or viewpoint on the proposed project and return this form by, 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project When appropriate, in depth comments with supporting data are requested. REPLY / This office has no objection to the project as proposed. This office has no comment on the proposed project This office approves of the incorporated. See attached. This office objects to the comments. proposed project only if the recommended changes are proposed project for reasons described in the attached Date /�/ el % %"'�I\1(.1!".itZi.3 Q.�UiC31rit'f; , ".I+��. S u:�o?\arh Cudina Emimnm,rcaf Q:oliy,Cauu: \luilm+mr 9i3 \\'arhiigron Saws \hh trnhint:on,SC :7SSY :':976 HSl M Coos tat Management ENVIRONMENTAL OUALITV DEC 18 2017 II sh Sanitation 6 Water auali. c fT1ta 7ecreationalon ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Shannon Jenkins NCDENR Division of Environmental Health FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boadift with a 12'6" x 137' roof. Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY / This office has no objection to the project as proposed. V This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Si ed/ ��' ��''E" UC/Gt Date Ia-/i�'l17 gn FICC- 5V r1r1 6-y1 J�� �1✓1S RECEIVED Nothing Compares' DEC 2 0 Z017 stmerNlmec,Nbea.raie dalQa4ty CMW%1.Iu&Mw 9A3WwhigmS4ean.1a0 Walh.r"NC:-SS9 DCM- MHD CITY :5:9"64li Bodnar, Gregg From: Thorpe, Roger Sent: Thursday, December 28, 2017 9:33 AM To: Bodnar, Gregg Subject: CAMA Major - Billy Anderson, Additional Slip and Boatlift cover, Tranters Creek, Beaufort County Gregg The subject project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Nothing Compares .. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. <,uCt.slal ,ldurru,(rnrr7li •*N1.'1 *1W%9%'*A1. Qll"AIP% TO: RECr-:,k v.�D Drc i 8 MR BY:.__ MEMORANDUM Mr. Cliff Whitfield Public Water Supply Section NCDENR WARO ROY COOPER Governor MICHAEL S. REGAN secretory BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137'roof. Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached (' comments. \ p Signed Date $Vp 0{\p6,eLGina En.irorm�rtal Qaa:iH:Cmtu: Afamaxn�m 943%Vashiig,on8ymH%fall Rithinlwn,%C:7$89 :!: 946 6781 Coastal Management ENVIRONMENTAL OUALITY MEMORANDUM ROY COOPER Governor MICHAEL & REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Tim Walton Director State Property Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue _ Morehead City NC 28557 DEC 15 2017 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137' roof. Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached commen . Signed Date 2J t RECEIVED Nothing Compares"' f DEC 2 8 2017 SoNRi\WltlCrdw En". NAIQ'3hly CM01\1aeyama2 943WahnSawa\Ial1 R'aY+inSwn.\C='SS9 DCM^ MI-19,1 CITY n.19a66a61 Coastal Management ENVIRONMENTAL OUAL17Y �• 1'9,1Z.\i -04 MEMORANDUM TO: Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Respond to Greg Bodnar Morehead City Office PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137' roof. Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed cis I��— Date 12-I$-?71it RECEIVED DEC 2 S 2017 DCM- MHD CITY Nothing Compares Saa OlNath Crdma EA.in,nmaat Qoa y Cm WUamNmaet 9a3Wuhugtw%Sawr.\1AU %V3%h-Mn.NC:7889 :5.19466431 DEC2017 C7t'3? 3 7 Coastal Management ENVIRONMENTAL OVALITV MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Ms. Rachael Love-Adrick District Planner Division of Coastal Management FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137' roof Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth continents with supporting data are requested. REPLY This office has no objection to the project as proposed. (( This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached o e ts. O SignedL Date 5 12of RECEIVE® DEC 18 2017 Nothing Compares:, $M*N&*CLdw& Z0Vim ddQ#3htY CMW-'AAffi9M -I DCM- MHD CITY %3Wwhiegw Save Wtl Ny%hvWeq%'C:'9S _SISI"61E3 Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner Division of Coastal Management SUBJECT: Major Permit request by Billy Anderson DATE: January 5, 2018 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS DiraTor Consistency Determination: The request is consistent with/not in conflict with the 2007 City of Washington CAMA Core Land Use Plan certified by the CRC on November 30, 2007. Overview: The .5-acre property has approximately" 125 linear feet of shoreline. Existing site improvements includes a single-family residence, retaining wall, 400ft2 boathouse, uncovered 13' x 13' boatlift and 400 ft2 of uncovered platform. The applicant also has an uncovered deck located immediately landward of the bulkhead. The applicant is proposing to add two additional bunk boards to the existing uncovered boatlift to create an additional slip, as well as cover the boatlift with a 12' 6" x 13' 7" roof at 102 Arbor Drive, in the City of Washington ETJ, Beaufort County, North Carolina. The project is in the Public Trust Area (PTA) Areas of Environmental Concern (AEC). The project is located along the Tranters Creek; the water is classified as C/SW/NSW, are closed to the taking of shellfish. The project is located within the Tar -Pamlico Basin and subject to the Tar -Pamlico Basin Buffer Regulations. A review of PNA, SAV, and archaeological/cultural resources was not provided. Anticipated impacts resulting from this project are expected to include: the additional shading of 169 ft2 of creek bottom, for a total shading impact of 969 ftZ. Basis for Determination: The project site is in the ETJ of the City of Washington and is subject to the town's 2007 Land Use Plan. The Future Land Use Map (FLUM) designates the site as Medium Density Residential. Medium Density Residential is defined in the LUP as follows (pg. 227): The Medium Density Residential land use category is primarily intended for residential development of single-family homes on lots between 8,000 and 14,000 square feet in size. Residential densities shall be three (3) to five (5) dwelling units per acre, depending on lot size. This land use category also allows for State of North Carolina I Environmental Quality l Coastal Management Moorhead City Office 1 400 Commerce Avenue I Morehead.aty, NC 28557 -2528082808 Planned Unit Developments (PUD). PUDs are developments that allow for innovation in land use that varies from standard single-family/single use projects as long as they meet certain minimum standards, such as density remaining below or equal to one dwelling unit per every 6,000 square feet of land. Allowable Density: Densities will be three (3) to five (5) dwelling units per acre, depending on lot size. Impervious Surface: The maximum impervious surface shall be 40% coverage of a parcel. Where impervious surface coverage exceeds 2535, an on -site stormwater management plan will be required. This plan should address the first 1-112 inches of rainfall on -site. Maximum Building Height: The maximum building height shall be 50 feet. Permitted Uses: Single-family residential, open space, recreation, and conservation Land Use Policies: The following LUP policies may be applicable to this request. P.29 (pg. 193) Except for policy P.74 and implementing actions 1.24 and 1.25, residential, commercial, and industrial development which meets 15A NCAC 7H use standards will be allowed in estuarine horeline, estuarine water, and public trust areas. Policy P.74 and implementing actions 1.24 and 1.25 are more restrictive than 15A NCAC 7H because the city desires greater control/protection. P.34 (pg. 194) As stated elsewhere in this plan, with the exception of policy P.74 and implementing actions 1.24 and 1.25, the City of Washington supports the enforcement of 15A NCAC 7H in areas of environmental concern. P.69 (pg. 205) The City of Washington supports the Tar -Pamlico River Basin Water Quality Management Plan and the Tar -Pamlico stormwater rule (see pages 99-100 Billand 102-106). State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 Cor2sraP4MALQUALM rlMipeNHrNPAG QU/.4IPP TO: Received: 12/18/17 State Flistoric preservation Office MEMORANDUM Ms.'ReneeGledhill-Early NC QeparimentofCultural Resources Archives &History Building FROM: Greg Bodnar Major Permits ProcessingCoordinator Coastal Management' Division 400'Commerce Avenue Morehead City NC'28557 DATE: 14. December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson ER 17-3.04- ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C.'DAVIS Director Due --12/.29/0_ Rcspo ad.to Greg -Bodnar Morehead City Office PROJECT LOCATION: Project site is.localed off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered bontlilt to create an additional slip and;cover the Iioatlift with a 12'6" x 137' roof. Please indicate belowyourposition or viewpoint onthe proposed:prcject and return this form' by4.January 2018. Please contact Kelly Spivey at 252448-3853,'if you lrave.any questions regarding the proposed project. Wlten appropriate; in depth comments with supporting data are requested. REPLY This office has no objection to the prejectas proposed. This office has no comment on the proposed project. This office approves of the incorporate d.-Sce attached. This office objects to :die comments. E 14" MIN -11 WMMIRM11112" proposed project only if the recommended changes are proposed project for reasons described in the attached Dale I ' `C .19 <�"Notllirtg Cofllpal''.s,µm,.. _ )L3r.Ot:':4Ih C!f{ii4i zrfitltOartNrtl: Q�a:tN itNt4) \IANl/tllnl 14) WohigW'sIwo ilia; %"N*nrsb \C.21M :729r56+St DEC 19 21117 R Consta! Mariagemerit ENVIRONMENTAL O UALI I Y Im BFCEIVEDINCDENRIDWR DEC 14 2017 ROY,COOPER, Governor MICHAEL S. REGAN 5ecrelary Water Quality Regional BRAXTON C. DAVIS. pp ..Oons Section Director Washington Regional Office .MEMORANDUM Mn Anthony Scarbraugh DWR Water Quality Programs 943 Washington Regional Office. FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NG+ 8557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson Rd to Greg,godnar MoreheadesponCityDifice PROJECT LOCATION: Project site is located'off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort.County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards,to the existing uncovered boatho to create an additional slip and cover the boatlift with a 12'6" x 137' roof. Please 'indicate below your position or viewpoint on the proposed project and return this form,by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY >( This office has no objection to the,project as proposed. This office has no comment on the:proposed project. This office approves of'the proposed project only if the recommended changes are incorporated. See attached. Thisi office 'objects to the proposed project for reasons described in'the attached comments. ��aQ.. .�._ c- Signed tu,r ' ' COL), '`""'3 Date 5�-^-3 aM 1 1 Nothing Compares` Sue o!%aih Cudina I Emimm all Qa!in' ICos a')limpmw 9+3 R11htr4 m Saw* MA I Walhinpen.SC :7SS9 7519i664S1 Bodnar, Gre From: Pullinger, Robert C Sent: Wednesday, January 10, 2018 2:27 PM To: Bodnar, Gregg Cc: Spivey, Kelly Subject: RE: CAMA Major Permit - DWR comment sheet - Anderson (102 Arbor Drive) - Beaufort Co. BIMS Project # 2017-1644 for the Anderson —102 Arbor Drive project in Beaufort Co. 101 Chris Pullinger ,7r�� Environmental Senior Specialist Division of Water Resources —Water Quality Regional Operations Department of Environmental Quality 252 948 3922 office chris.pullinger(a)ncdenr.gov 943 Washington Square Mall Washington, NC 27889 From: Bodnar, Gregg Sent: Wednesday, January 10, 2018 2:07 PM To: Pullinger, Robert C <chris.pullinger@ncdenr.gov> Cc: Spivey, Kelly <kelly.spivey@ncdenr.gov> Subject: RE: CAMA Major Permit - DWR comment sheet - Anderson (102 Arbor Drive) - Beaufort Co. No worries. DO you have a number associated with it? Gregg From: Pullinger, Robert C Sent: Wednesday, January 10, 2018 9:35 AM To: Bodnar, Gregg <ereag.bodnar@ncdenr.gov> Cc: Spivey, Kelly <keIIV.SpiyeV@ncdenr.eov> Subject: CAMA Major Permit - DWR comment sheet - Anderson (102 Arbor Drive) - Beaufort Co. Gregg, Please find attached the DWR comment sheet for this project (102 Arbor Drive, Anderson — Beaufort Co.). Sorry for the (holiday) delay in getting it to you, and if you have any questions please let me know how I can be of help. I've got two more comment sheets that I owe you coming here shortly (this morning), and then hopefully the approval letter for this one will also be coming your way late this afternoon. Chris Pullinger Environmental Senior Specialist Division of Water Resources —Water Quality Regional Operations Department of Environmental Quality 252 948 3922 office chris.pullingerCd ncdenr.gov Water Resources N Environmental Quality January 10, 2018 Mr. Billy G. Anderson 102 Arbor Drive Washington, North Carolina 27889 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interior Director DWR Project # 2017-1644 Beaufort County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS 102 Arbor Drive; Washington, NC— Covered boatlift, additional slip (adding two additional bunkboards to boatlift to create a third slip) Dear Mr. Anderson: You have our approval for the impacts listed below for the purpose described in your application dated November 6, 2017 and received by the Division of Water Resources (Division) on December 14, 2018. These impacts are covered by the attached Water Quality General Certification Number 4144 and the conditions listed below. This certification is associated with the use of Regional General Permit Number 291 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved, provided that all the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)]] Type of Impact Amount Amount Plan Approved Approved location/ (units) (units) Reference Permanent Temporary Attached Open Waters 0.00 (acres) 0 (acres) Sheet 1 of 2 "Nothing Compares"-. State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 102 Arbor Drive ATTN: Billy Anderson DWR# 20171644 401APPROVAL Page 2 of 3 2. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certifications) 4144. [15A NCAC 02B .0507(c)] Continuing Compliance 3. During construction of the proposed project, fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)] 4. This approval and their conditions are final and binding unless contested. [G.S.143115.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along'with any applicable,OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 101 Arbor Drive ATTN: Billy Anderson DWR# 2017-1644 401 APPROVAL Page 3 of 3 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Rules. Please contact Chris Pullinger at 252-948-3922 or chris.ouliinaer@hcdenr.gov if you have any questions or concerns. Sincerely, ?Aj �� Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources; NCDEQ Enclosures: GC 4144 Certification of Completion cc: Raleigh Bland, USAGE Washington Regulatory Field Office (via e-mail) Kelly Spivey, DCM Washington (via e-mail) Gregg Bodnar, DCM Morehead City (via e-mail) DWR WaRO 401 files Laserfiche - � - CjovJ 1.7dSt�JPJ� f ,� ine roNad hx" - rN --� ES MdONOI NO MWOOJMW3E)VNVA VNnoHv0 F ut= -7 a eXc iB*MW ell v i r T ; y J� y vA • 1 9 13 Ileo? t.� cp G i --s e-ol >88c.r„-�N rp ,4 rrm <1 >e 41 Coastal Management CNVIROMMCMTAL OeAL1TV MEMORANDUM Mr. Lee Padrick Division of Community Assistauce , FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 14 December 2017 SUBJECT: CAMA Application Review APPLICANT: Billy Anderson ROY COOPER Governor MICHAEL S. REGAN Secrelary BRAXTON C. DAVIS Director LRespond to. Greg Bodnar Morehead City Office PROJECT LOCATION: Project site is located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to add two additional bunk boards to the existing uncovered boatliR to create an additional stip and cover the boatlift with a 12'6" x 13'7" roof. Please indicate below your position or viewpoint on the proposed project and return this form by 4 January 2018. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project When. appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. _Lef�--Tbis office has no comment on the proposed project; This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed � ,f"/ r7� Data 1"2-s l t< Nothing Compares" 5w otxo* cudi" IPa,i Nal Q925W I cmw: Mhdr,mml 943wNsirg e54wn?na I%kywrm N*C 271V .529466r51 Bodnar, Gregg From: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Sent: Thursday, March 01, 2018 4:13 PM To: Bodnar, Gregg Subject: RE: [External] RE: Zannis Pt 2 (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED Billy Anderson SAW 2018-00134 Your Date 3�L/(g Thanks! -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Thursday, March 1, 2018 8:42 AM To: Bland, Raleigh W CIV CESAW CESAD (US)<Raleigh.W.Bland@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: Zannis Pt 2 (UNCLASSIFIED) Thanks for the update. While I'm here, do you have an update on Billy Anderson in Beaufort Co.? G regg -----Original Message ----- From: Bland, Raleigh W CIV CESAW CESAD (US) [mailto:Raleigh.W.Bland@usace.army.mil] Sent: Thursday, March 01, 2018 7:33 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov> Subject: [External] RE: Zannis Pt 2 (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED Everything good on this end. Needed the pictures to affirm re -development and provide to Federal review agencies. I do not anticipate this project being a problem with our regulations. Thanks! -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Wednesday, February 28, 2018 11:19 AM To: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil>; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov> Subject: [Non-DoD Source] Zannis Pt 2 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANTS NAME: Billy Anderson 2. LOCATION OF PROJECT SITE: Beaufort County off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington in Beaufort County, North Carolina Photo Index— 2006; 100-8162, X12 Coordinates - 350 34' 10" N 770 5' 26" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —16 October 2017 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — 6 November 2017 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -1997 Beaufort County Land Use Plan Land Classification From LUP - Conservation (water), Transition (land) RECEIVED (B) AEC(s) Involved: Public Trust Area (C) Water Dependent: Yes DEC 1 8`2017 (D) Intended Use: private (E) Wastewater Treatment: Existing - on -site septic tank Planned - N/A DCM- MHD CITY (F) Type of Structures: Existing - residence, bulkhead, retaining wall, boatlift, boathouse Planned - bunk on boatlift and 169 ft' roof over boatlift (G) Estimated Annual Rate of Erosion: N/A (H) Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands 1169 ftzShaded River Bottom (C) Other (Uplands) (D) Total Area Disturbed: 169 ftz (0.003 acres) (E) Primary Nursery Area: No (F) Water Classification: C Sw NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 137' roof. Billy G. Anderson 102 Arbor Drive Washington, Beaufort County Project settine Mr. Anderson has submitted a CAMA Major Permit request for development onsite his property. The project site is a single-family residential lot with a bulkheaded shoreline located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington in Beaufort County, North Carolina. The lot is approximately .5 acres (21,780 ft2) in size and has approximately 125 linear feet of shoreline. Man-made features on the lot include a single-family residence, retaining wall, f 400 square foot boathouse, uncovered 13' x 13' boatlift and 400 square foot of uncovered platform (total existing platform square footage including the boathouse and platform is 800). The applicant also has an uncovered deck located immediately landward of the bulkhead. The boathouse is oriented parallel to the bulkhead while the uncovered boatlift is perpendicular to the bulkhead. CAMA General Permit No. 68423-B was issued on 20 April 2017 for the construction of these water dependent structures. Tranters Creek is approximately 220 feet in width at the project site. Water depth at the terminal end of the docking facility is approximately 30 feet below Normal Water Level(NWL). The existing number of slips is two. Landward of the NWL the elevation gradually slopes upward to an approximate elevation of ±10' above the NWL. The lot is mostly vegetated with lawn grasses, ornamental shrubs and lawn trees. There are no Coastal Wetlands located at the project location. Both the adjacent upstream and downstream property is a developed single-family residential lot with a pier and a bulkheaded shoreline. Tranters Creek is classified as C SwNSW by the Environmental Management Commission at the project site. Tranters Creek at this location is designated Inland Waters and is not open to shell fishing. The project is located within the Tar -Pamlico River Basin and therefore subject to the Tar - Pamlico Basin Buffer Regulations. Project description The applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip, as well as cover the boatlift with a 12'6" x 13' 7 ' roof. This will create a total of 3 slips and will create the total shading impacts of 969 W. This new development is located greater than 15' from the adjacent riparian property line. Anticipated impacts The project will result in the shading of an additional 169 ft2 of Creek bottom. The total platform square footage will be 969 ft2. The docking facility will have a total of 3 fixed slips. Kelly Spivey — 30 November 2017 RECEIVED DEC 18:2017 DCM- MHD CITY I Water Resources ENVIRONMENTAL QUALITY Washington Daily News PO Box 1788 Washington, NC 27889 14 December 2017 Attention: Legal Advertising Department RQY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Please include the enclosed Notice of Filing in the Public Notice section of the 16 December 2017 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3820. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to: Thank you. ATTACHMENT Cc: File Melissa Sebastian NCDEQ COASTAL MANAGEMENT DMSION 400 COMMERCE AVENUE MOREHEAD NC 28557 252-808-2808 ext. 229 Sincerely, Della Robbins, Administrative Assistant Division of Coastal Management RECEIVED DEC 18 2017 --'Note*Oompares'�_.,_ DCM- MHD CITY StabeENuth Cw&l Emi>o =.IQsahty: C=W',1z=jmmt 943Wuhug=Sq=*.%tall Ri&binrmq NC2'889 2529456481 • WA NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. 113A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the Coastal Area Management Act (CAMA) was received on 6 November 2017. According to the said application submitted by Billy Anderson, applicant proposes to add two additional bunk boards to the existing uncovered boatlift to create an additional slip and cover the boatlift with a 12'6" x 13'T' roof at 102 Arbor Drive, on Trainers Creek, near the City of Washington, in Beaufort County, North Carolina. A copy of the entire application may be examined or copied at the office of Jonathan R. Howell, District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC, during normal business hours. Public comments received by 5 January 2018 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request. Please publish on: 16 December 2017 Kelly Spivey, Field Representative Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 (252)948-3853 RECEIVED DEC 18 2017 DCM- MHD CITY Jo taw. of CuV'+�w �(f0.� 10 �vs-e ravel LA, CO '7�c, "rs Cv�c�c �C Iota i 01 �v L A v-e�� i�C �%C u toy s �.•ss✓ -1- ha��.w,�yoy(�, �-i+� � �^ � r a G� �-� C. w•.�. t�er��r,/�', �.1 `a w.. 5 � � ` � G �P YV`G Yi^0��-/� �° (l'Y�.��P� SCO-/"u✓V 7'7U 0-+\,::;;(4-6 Ccgv,--r 4i- k L.0,4-k o� r iZ'b'x DCM NOV 062017 RECEIVED DEC 18 2017 DCM- MFiD CITY 102 Arbor Dr, Washington, NC 27889 - Bing Maps Page 1 of 1 to bing maps 102 Arbor Dr, Washington, NC 27889 More Info 3 bed,2 bath,1,800 sq ft ZEstimate 21,780 sq ft Iot,1988 built Data from: Zillow - Realtor GreatSchools your notes here. rtA Nov 0 61p11 RECEIVED pig® DEC 18 2017 DCM- MHD CITY https://www.bing.conilmaps?&ty=18&q=102%2OArbor%2ODr%2c%20 Washington%2c... 10/25/2017 102 Arbor Dr, Washington, NC 27889 -Bing Maps Page 1 of 1 tp bing maps 102 Arbor Dr, Washington, NC 27889 More info 3 bed,2 bath,1,800 sq ft ZEstimate 21,780 sq ft lot,1988 built Data from: Zillow • Realtor GreatSchools notes here. RECEIVED DEC 18 20V tpC1�l�- MHD CITY VC, %101 P:P https://www.bing.com/maps?&ty=18&q=102%2OArbor%2ODr%2c%20 Washington%2c... 10/25/2017 102 Arbor Dr, Washington, NC 27889 - Bing Maps J Page 1 of 1 V bing maps 102 Arbor Dr, Washington, NC 27889 More Info 3 bed,2 bath,1,800 sq ft ZEstimate 21,780 sq ft lot,1988 built �e m b 4 ' } aP ' a� P'P. Williamsy� qa S a nHNP r Data from: Zillow - Realtor - GreaSchools your notes here. �e \, ai Prr4 en T4 9 Nog Neaven '' RrCI O 102 Arbor Or, WmhIngton, NC 27889 rromF.o� �' norningn Qd o s C r mao iem uo_ j ozof'H=RE 6 �P RECEIVED DEC 18 2017 DCM- MHD CITY https://www.bing.com/maps?&ty=18&q=102%2OArbor%2ODr%2c%2OWashington%2c... 10/25/2017 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to C-R. 1`n C' ri e I ,,Name f Property Owner property located at IO Z t{,et �r.� Woo. Si" �� tv N C.27�7 (Address, Lot BBlock, R ad etc.) 1' on f r o ti�o r S C ^�� in br a� C e v ��i N.C. (Waterbody) (CityITown and/or u'nty) The applicant has described to me, as shown below, the development proposed at the above I tion. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must till in description below or attach a site drawing) g p' ,la 0- -' WAIVER SECTION (9 I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or g�r i must be set back a minimum distance of 15' from my area of riparian access unless wa v me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. NOV 0 G Z017 I do not wish to waive the 15' setback requirement. (Property Owner Information) atzire .Ac Print or ape Name )o -- 4r 6nr Z)r.Vo Mailing Address $i` rlylsatGhy�+J r1C 27 aaS1/z9 3 I- 12Z1 Telephone Number/email address Date Print or 1z03 aos 5&sLi Telephone Number/email address FRFc W I)FC 1 $'���] (Revised Aug.2014) 'Valid for one calendar year after signature` o ., ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 1 k b k e'AteSeVJ 's ame of Property Owner) property located at I 2 /�r by r nor W.5 ti..7 (yN ntc 2.7 (Address, Lot, Block, Road, etc.) on Irar,�aas C�-ae.� in ';& a IA- Ca N.C. (Waterbody) (city/Town andio County) The applicant has described to me, as shown below, the development proposed at the above loca o . I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (individual proposing deuelppt enf;lptust rill in description below or attach a site drawing) Ctvaj REri 45� II-- eIVE g, DEC 18 2011r� CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless•waiv60 by me. (If you wish to waive the setback, you mttst initial the appropriate blank below) I do wish to waive the 15' setback requirement. i N0� 6 ZOiI I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adjacent Property Owner Information) Sim nature �p " 1l •1 I�vA CC Pdnt or Type Name 10 2 /arbor �Jt ,vim Mailing Addres Z2.�JL a% � City/State/Zip 2—S.2--531-122) Telephone Number/email address Date / email address Date* 'Valid for one calendar year after signature' (Revised Aug. 2014) ***This is a word processing form to be completed in Microsoft Word*** N NC Division of Coastal Management Major Permit Application Computer Sheet (11/0l/2012) Applicant „L�7 o Date: Projed Site County Staff J District: DEfizabeth, City Washington ❑Morehead City ❑ wlmington Project Name: pier extension with platform Rover File: Date of initial application submittal (DC IA52007): l Date application 'received as complete'tn the Field office (EX., IAV"7): Permit Authorization: MA Dredge & Fill Both PA14 El Yes No Photos Taken: Yes ❑ N Setback Required (riparian): ❑Yes o Critical Habitat: LJ Yes NNO OAlotSum 15 foot waiver obtained: 0 Yes-54116 Hazard Notification Returned: ❑ Yes_pNo SAV: Yes o ❑Not Sure Shell Bottom: Yes Dvo Not Sure Temporary Impacts [1Yes,5No Sandbags: 0 Yes RNo ❑ Not Sure Did the land use classification come from countyLUP:gYes ❑No Mitigation Required (optional): ❑Yes o Moratorium Conditions: Yes �hUo El NA Environmental Assessment Done: ❑Yes ❑No - — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) El Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW) High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORM (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp) El (SS) Glasswort (Salicomia sp.) wetlands) 11 (CJ) Saw grass (Cladium Jarraicense) ❑ (SA) Salt marsh cordgrass (Spardna El (Sr Salt reed grass (Spadina altemiflora) cynosumides) (DS) Salt or spike grass (Distichlis ❑ (SC) Bullmsh or three square (Schp ('fY) Caffail (Typha sp.) spicata) SO (JR) Black needlerush (Juncus ❑ (SP) Salt/meadow grass (Spartina memertanus) patens) No fee required - $0.00 10 III(A) Private w/D&F up to 1 acre; 3490 EJ 111(D) Pm. public or comet w/D&F to 1 can be applied - $250 acre; 3490 cant be applied - $400 El Mirror Modification to a CAMA Major El Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 El Permit Transfer- $1 oo ❑ Ill(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 Major development extension request- ❑ II. Public or cowmen iaVno dredge RECEIVED $100 and/or fill - $400 Private no dredge and/or fill - $250 M(C) Prtv. public or comm wrD&F to 1 DEC 18 2017 acre; 3490 can be applied; DCM needs DWQ agreement - $400 ova t Applicant: Date: t 121 1.1 a tic�cYt sa t 1� r-} Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your AcdvlMw code sheet TYPE REPLACE Number Choose Choose One One Dimension 1 I Dimension 2 I Dimension 3 1 Dimension 4 j New Work R9 Replace 1.3 % Maint ❑ ❑ Y X N 72 New Work Ej Replace - Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Lj Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maird❑ ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work U Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New WkWk= Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace R E E I V E D Maint ❑ ❑ Y ❑ N New Work Replace DE 1 8 ZU17 Maint [I❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace . Maint ❑ ❑ Y ❑ N r revised 02115/10 Applicant '9`LJ ," H-t�lL� CYL 5d t� Date: ug, 1 t l I �- Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. -" DISTURB TYPE Choose One TOTAL Sq. FL (Applied for. Disturbance total includes any anticipated restoration or tem FINAL Sq. FL (Anticipated final disturbance. Excludes any restoration andror temp impact amounQ TOTAL Feet (Applied for Disturbance total includes any anticipated restoration or temp im FINAL Feet (Antcpated final disturbance. Exciudes any restoration andror temp impact amount �.� Dredge [I riff ❑ Both ❑ Other 05 _impacts) I/P't 1-1 Dredge ❑ M ❑ Both ❑ Other ❑ Dredge ❑ Fiff ❑ Both ❑ Other ❑ Dredg&TT--F,#-M Both Ll Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fiff ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fig ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ FiN ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED DEC 18 2017 DCM- MHU CITY K1751 =783 BMWFORT COMM LktW RECOMS Ro0Tim Fm Lama Reoorda Ofriciai Date NORTH CAROLINA COUNTY OF BEAUFORT %OR REGISiRRTION REGISTER OF MQ% Jeru,ifer Leggett Whiteh121Neurst May 10, Beaufort0331 Book 1751 Page 7i3 784 FEE: $22.00 NC REVENUE STAMP $646.00 INSTRUMENT 4 2011002434 Prepared By: L. Return To: PA. THIS DEED, made and entered into this the � day of May 2011, widow, of a ac / �/N S p # a f ` _2 ?cf_? he BILLY G. ANDERSON, JR. and MARY JENNIFER MANNING, of 102 hereinafter called GRANTEES; WITNESSETH: INSIRUNEW 11 1100 i RECEIVED DEC 18 2017 i CM- MHD CITY hiand between MARY C. HULL, Drive, That Grantor, for and in consideration of TEN DOLLARS ($10.00) and other good' consideration to it in hand paid by Grantees, the receipt of which is hereby acknowledged, has bargained, sold and conveyed and by these presents does give, grant, bargain, sell and convey Grantees, their heirs and assigns, in fee simple, the following described real property, to -wit: GRANTOR, and NC 27889, *1e 1 n, Totedq. th-tsai ,� BEING ALL OF LOT No. ONE (1) IN BLOCK "A" OF ARBOR BLUIjFS SUBDIVISION, AS SHOWN ON A MAP ENTITLED "ARBOR BLUFFS" BY W. B. DUKE, R.L.S. CORDED IN PLAT CABINET B, SLIDE 80, BEAUFORT COUNTY REGISTRY, TO WHICI SURVEY REFERENCE IS MADE FOR A MORE COMPLETE AND ADEQUATE DESCRIPTION. THIS IS THE SAME LOT DESCRIBED IN TRACT ONE OF A DEED TO JAMES ELTON SPEIGHT RECORDED IN BOOK 809 AT PAGE 443, OF THE BEAUFORT COIRiTY REGISTRY, HOWEVER, SAID PRIOR DEED IN BOOK 809 AT PAGE 443 FAILED TO DESCRIBE THE LOT AS BEING IN BLOCK "A". i I 5K 17 5 1 l'G 7 bI `f THIS CONVEYANCE IS ALSO SUBJECT TO THOSE CERTAIN SET FORTH IN DEED BOOK 782 AT PAGE 304 OF THE BEAUI ALL OR A PORTION OF THE PROPERTY HEREIN CONVEYED v INCI�TDjES OR DOES NOT INCLUDE THE PRIMARY RESIDENCE OF A GRANTOR II TO HAVE AND TO HOLD the above described real property with all the rights, privileges and appurtenances thereunto belonging or in anywise appertaining unto the said Grantees, their heirs and assigns, in fee simple forever. And the Grantor, for herself, her successors and assigns, covenant with Grantees, their heirs and assigns, that it is seized of said premises in fee and has the right to convey the same in fee simple; that the same is free and clear from all encumbrances except easements and restrictions of record an# 2011 ad v4em taxes which i I I are to be prorated between Grantor and Grantees at the time of closing, noncompliance w1th I�cal, county, state or federal governmental laws, ordinances, or regulations relative to zoning, subdivision, occupancy, use, construction or the development of the subject property, if any, and that it will warrant anil defend the title to the i same against the lawful claims of all persons whomsoever. When reference is made to the Grantor or Grantees, the singular shall int Jude the plural, and any i reference to gender shall include masculine, feminine and neuter. IN WITNESS WHEREOF, Grantor has adopted the word "SEAL" as her seal and has hereunto set her hand and seal on this the day and year first above writteh. Notary Public PiltfttCounty, Kwi • • CM a 1 NoYs t� p17 ^ � �y AR y ® I, NICOLE ALLIGOOD, a Notary Public of the aforesaid County and State do MARY C. HULL either being personally known to me or proven by satisfactory evide NCDL) personally appeared before me this day and acknowledged the voluntary due e: instrument by helshe/them for the purposes stated therein. Witness my hand and Notarial Seal, this the 104 `day2ofay, 2011. NOTARY PUB101 My Commission Expires: 2-28-15 NICOLE ALLIGOOD �,1�.� fl�s6.. 3� if certify that i evidence being 1 of the foregoing RECEIVED DEC 18 2017 DCM- WD C17-y Au®licant: u.�X e Selection Development Type Fee DCM % DWQ % (143001601 4351000931625 6253) (243001602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 00/0($0) involve the filling or excavation of any wetlands or open water areas: 11. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B C, or D below applies: III(A). Private, non - El commercial development, if $250 100% ($250) 00/o($0) General Water Quality Certification No. 3490 (See attached can be a lied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water ❑ Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or a uatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 3900(see attached)cannot be applied: IV. For development that ±QFa involves the filling and/or $475 60% ($285) excavation of more than one acre of wetlands and/or o en water areas: DCM- MHD CITY ROY COOPER Gove,Ttor MICHAEL S. REGAN - Secretary Coastal Management ENVIRONMENTAL QUALITY BRAXTON C. DAVIS Director 11 January 2018 Billy Anderson 102 Arbor Drive Washington, NC 27889 Dear Mr. Anderson: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington in Beaufort County, North Carolina. It was received on 6 November 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is 20 January 2018. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Kelly Spivey, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3853 or via email at Ke11v.Snivey6ia ncdenr.eov if you have any questions. If this agency does not render a permit decision within 70 days from 6 November 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS I I3A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. RECEIVED JAN 1 1 2018 —'7- NothingCompares% DCNI- MHD CITY S hM of14a* Cudi"a E. imo aW Qwliry 1 Cmtd MaM{ t 943W.higtmSq.?,bU W.au.Zm,\C27889 '529466491 Billy Anderson 14 December 2017 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. r yy� Kelly Spivey Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator WARO RECEWED JAN 1 1 2018 DCM- MHD CITY Alm ►vIWsvm1M71m A\TJnjM1=:l®M=aim N Coastal Management ENVIRONMENTAL QUALITY 14 December 2017 Billy Anderson 102 Arbor Drive Washington, NC 27889 Dear Mr. Anderson: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1455 at 102 Arbor Drive on Tranters Creek near the City of Washington in Beaufort County, North Carolina. It was received on 6 November 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is 27 February 2018. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Kelly Spivey, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3853 or via email at Kel Iy.Spiveyna ncdennyov if you have any questions. If this agency does not render a permit decision within 70 days from 6 November 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS I I3A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. !/ Nothinq Compares%, StaNR!\ath Carlo. Emile wal Q.AtYCount M..g m t 943 Rbhu =SRuua MaU lq,hinSt. SC 2-SS9 2529466481 RECEIVED DEC 18 2w "CM- MMID 5� Billy Anderson 14 December 2017 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. T'SM'c rely _� Kelly Spivey Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator WARO RECEIVED DEC 18 2017 DCM- MHD CITY