Loading...
HomeMy WebLinkAbout70-19 City of Wilmington14 Permit Class NEW Permit Number 70-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit RECEIVED SEP 1 1 2019 for DCM-MHU CITY X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to City of Wilmington, c/o Sterling Cheatham, PO Box 1810, Wilmington, NC 28402 Authorizing development in New Hanover County at adi. to the Cape Fear River, at 10 Cowan Street, Wilmington, as requested in the permittee's application dated 05/15/19 (MP-1 & MP-3) & 04/05/19 (MP-2), including attached workplan drawings (14) as referenced in Condition No. 1. This permit, issued on August 26, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, all work shall be completed in accordance with the following list of attached workplan drawings. Sheets 1, 3, & 8-10 of 14 dated revised 02/07/19, 2 & 4-5 of 14 dated revised 07/31/18, 6-7 dated revised 06/04/19 and 11-14 of 14 dated revised 04/19/19. Shoreline Stabilization 2) The authorized marine stabilization mattresses shall be constructed in the same alignment as depicted on the attached workplan drawings. 3) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. 4) All backfill material shall be clean and free of any pollutants except in trace quantities. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Petmittee City of Wilmington ADDITIONAL CONDITIONS Upland Develoyment Permit No. 70-19 Page 2 of 3 5) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the city park, public amphitheater, and other associated infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Stormwater Manaeement 6) Prior to the initiation of any upland development activities the permittee shall apply for and obtain a stormwater management plan permit The permittee shall receive a Stormwater Management Permit, and provide a copy of this permit to DCM, prior to the initiation of any development activities authorized by this permit. Any violation of the permit approved by the DEMLR shall be considered a violation of this CAMA permit. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Energy, Mineral, and Land Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. 7) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 8) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property. 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. General 10) In accordance with commitments made by the permittee and in order to satisfy concerns of the US Army Corps of Engineers. The originally proposed floating dock is hereby deleted from this application. Any reference in the attached permit application and workplan drawings to the aforementioned floating dock is hereby considered null and void. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 12) ' This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. RECEIVED SEP 112019 DCM-MHD CITY City of Wilmington Permit No. 70-19 Page 3 of 3 ADDITIONAL CONDITIONS 13) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 14) No filling of any vegetated wetlands is authorized by this permit. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the project Action ID No. SAW-2012-00965. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. 2019- 0960. NOTE: An application processing fee of $400 was received by DCM for this project. RECEIVED SEP 11 2019 DCM-MHD CITY End PN/Comme6t Deadline: UIZ0(1-1 ON holA.(p�(o/►h 30 Day Comment Period: holcl ; fit(►ti " 3-11� 0✓l2► ►n 1/(`1 iwl}i�( wtctf�v �cr>v> revC�w, nre federal S�fioac�f�urbv,- UAAv ah A,n gs Br ��a v� CAY40y,-cjs— w ,( at.t.,,ucpMLft tYtcw �s ttio-{ laer �v� �scd. ,a use, 9,-ems-, 6,rd fvv IJIzM I �ppgpj_ P! afg fiv wi j d, � "d ewsu l -�" U,S #z:6 CaHrccG,ed) (raoved so>n the�� A�PD 9Y��l t cavil. Swp'rv) A jc,v ,-t ((Awr, -5A v I n d i sa ss �JZtll�i - E i, nn wl lt-wr %( wt ( Con-Fr"y-, 4 ,}ndrav� Gav�SwUf "�SMf AaA tiv, ' 4,6+ wut Q (6 p( u v, d a.&l- a.+✓tfs) ,kc,Ao-v_� vill�iUS bednvbn� (� hab/Nrtiit)}° w,t-ft4vWs or wLT"' yjc++hnj ?aferrcA over Ar--00nj I {,Pr 5e(4. Ong ah.d N#I3 ham, u i U lc kc am -Wit add n o1a j narr�iitiG-ham N-MI( lot ivIfAtcd,'wi q/ (/ ► j - rC UA✓tvk "f Wed vtarro +l ✓,e i dvn;44)'o-9 s - OW p ro)ea r.c lAW cd -{Ynv► V 1 Ujd (.�#�'� 1�d� ►a-U w..�ss a,r►.� i�o .- of-F h,0 L qn- �uu�( ofvJ wp umf -wc cam- Gait (zwt�l Mop - Oclt Y-VNSW -tv V.l v,n.ove, -NOyn kTns,p(wL b\t - &"L,,1 att�. 0 J(�js e i l �i w5� (rt'MOVtOA Pnjecl w, 2i, re�v►Lw toascd 0". r44t;�,° RL9(19- fW �j � �w1+ tb 1 /� elpl Yep fr !Issued: 0) ✓L, Qcw. RECEIVED SEP 1 1 2019 OCM-MHD CITY IV -f q DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: City of Wilmington clo Everett Pannkuk COUNTY: New Hanover PROJECT NAME: North Waterfront Park LOCATION OF PROJECT:10 Cowan Street, adjacent to the NE Cape Fear River, in Wilmington DATE APPLICATION RECEIVED COMPLETE BY FIELD: 5-17-19 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: MacPherson 3 DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Spears PUBLIC NOTICE REC'D: 5-30-19 ADJ. RIP. PROP NOTICES RECD: C) 75 DAY DEADLINE: 7-31-19 It/V ftj (tuwW) HOLDS: uI� 04 ko I a 3NIJ MAIL OUT DATE: 5-24-19 To Be Forwarded: N/A DISTRICT OFFICE: WILMINGTON FEE RECD: $400 (no split) #10111 END OF NOTICE DATE: 6-20-19 DEED RECD: Yes 150 DAY DEADLINE: STATE DUE DATE: 6-20-19 PERMIT FINAL ACTION: ISSUE QM0 DENY AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM-Field Rep ��7.-t �� �ylSjS�(V►J�` Local Permit Officer DCM 5} DCM — LUP Consistency Determination Rural Development Division DEM.R — Stormwater & Sed/Erosion 15(2z 1 v /� DWR-401 �]i0 'ZDI — (PA DOA — State Property Office ppG Ut 111 DMF — Shellfish Section�ftlo)�( NCDOT DMF — Habitat & Enhancement Iy I DWR—Public Water Supply 5 woes USACE—Regulatory /p 9� DNCR— Archives &History DNCR — Natural Heritage Program WRC — Wildlife Resources Commission n p YIMty SEP 112019 -- DCM-MHD CITY OW ROY COOPER Gownwr MICHAEL S. REGAN 0 .%,man BRAXTON DAVIS NORTH CAROLINA Director, Dmqum o)Coavai Environmental Quay Mmwgeme d May 24, 2019 MEMORANDUM. FROM — Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmin ton, NC 28405 Fax:910-395-3964 courtnev. soears(EDncdenr.aov SUBJECT CAMA /Dredge & Fill Application Review Applicant: City of Wilmington/ North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below your a enc 's position or viewpoint on the proposed project and at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: _x_ This agency has no objection to the project as proposed. "'Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. RECEIVED Christine Bouffard SEP 11 2019 1111M _New Hanover County OCM-MHO CITY — _5/28/19 RECEIVED MAY 2 8 2019 DCM WILMU fGToly NC State or North Carolina I Eamonmamal Quality I Coastal Management 127 Cardinal Drive Fm., Wilmington, NC 29405 910 796 7215 MEMORANDUM To: Courtney Spears From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Application, ity of Wilmington — North Riverfront Park, Wilmington, New Hanover County Date: July 15, 2019 The applicant proposes to construct a new public park with an amphitheater, Riverwalk, transient docking facility and shoreline stabilization along the Northeast Cape Fear River in Wilmington, New Hanover County. Areas of Environmental Concern (AEC's) impacted by the proposal are EW, ES and PT. Waters at the project site are classified as SC and are not open to the harvesting of shellfish. The area is a Primary Nursery Area. I have reviewed this proposal for consistency with the 2006 Wilmington -New Hanover County Joint Land Use Plan and offer the following comments. The general area of the project is classified as Developed (CBD). In general, Wilmington -New Hanover County allows development in Developed (CBD) classified AECs, which is consistent with the State's minimum use standards. The 2006 Wilmington -New Hanover County Joint Land Use Plan contains some policies, which exceed the State's minimum use standards, including dredging policy. However, none of these standards appear to be applicable to this proposal. This project is consistent with the 2006 Wilmington -New Hanover County Joint Land Use Plan. Cc: File RECEIVED JUL 15 2019 CC.^." WILMINGTON, N11 RECEIVED SEP 11 2019 DCM-MHD CITY ROYCOO PER MICHAEL S. REGAN ,.-crram. BRAXTON DAVIS .. ...(" sm,,,,,,,,,,,,,, May 24, 2019 MEMORANDUM: FROM: Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax:910-395-3964 courtnev.soears(@ncdenr oov SUBJECT: CAMA /Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient Floating dock. Please indicate below our a enc 's osition or viewpoint on the proposed project and at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. M /MA 5% U AV C RECEIVED MAY 3 0 2019 DCM WILtANGTON, NC RECEIVED State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ent., Wilmington, NC 29405 910 796 7215 S E P 1 1 2019 NORTH CAROLINA Environmental Qualim May 24, 2019 MEMORANDUM FROM Courtney 8q Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive 28405 Fax:910-395-3964 Ext., Wilmin ton, NC courtnev. spearsAncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review ROY COOPER (m,Wmar MICHAEL S. REGAN Necretu BRAXTON DAVIS Diraaor, Drvwv,m ,ry C w.aai ,Narwgemew Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below our a enc 's sition or viewpoint on the proposed project and at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. ""Additional comments may be attached" This agency has no comment on the proposed project. X This agency approves of the project only if the recommended changes are incorporated. See attached.: This project will require application and approval from State (Coastal) Stormwater and Erosion and Sediment Control. This agency objects to the project for reasons described in the attached comments. Dan Sams - DEMLR slis� May 22, 2019 RECEIVED SEP 1 1 2019 Stur of North Carolina I Environmental Quality I Coastal Maoagmir m 127 Cardinal Drive Ext., Wilmington, NC 28405 910 796 7215 DCM-M H D CITY DocuSign Envelope ID: 3CAC7C52-D267-43A9-961 F-7670D337ADCE tor- ROY COOPER G..Wn", MICHAEL S. REGAN 0 S-e-13, BRAXTON DAVIS NORTH CAROLINA Director. Divtvitm of'C, avtal Environmental Quality mawgemem May 24, 2019 MEMORANDUM FROM - Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive 28405 Fax:910-395-3964 Ext., Wilmin ton, NC courtnev.soearsCfbncdenr.aov SUBJECT. CAMA /Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of city park & amphitheater with shoreline stabilization, timber walkways & transient Floating dock. Please indicate below your agency's osition or viewpoint on the proposed project and at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: _X_ This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Written approval is not required under GC4175 - Chad Coburn RECEIVED j' _DWR auSignad by: cekwul 7/9/2019 State of North Carolina I Fnviroomental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910 796 7215 SEP 1 1 200 DCM-MHD CITY RECEIVED AUG 2 0 2019 DCM WILMINGTON, NC ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS May 24, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 (Courter04-16-33) courtn e4. spears(ancdenr.aoy SUBJECT: CAMA/Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. Jam- This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. w� RECEIVED PRINT NAME AGENCY rk-A*ZwLA J SIGNATURE wOLAAe'lX— DATE i - '2A 1 o 01 State of North Carolina I Em'iroomental Quality I Coastal Mmagement 127 Cardinal Dme Ext., Wilmington, NC 28405 910 796 7215 SEP 11 2019 DCM-MHD CITY RECEIVED JUN 19 DCM WILMINGTON, NC 74t t r z ' ROY COOPER MICHAEL S. REGAN =1ta►,kOWL BRAXTON DAVIS May 24, 2019 MEMORANDUM: FROM: Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 (Cobrt00/-1") courtnev.spearsRncdenr ciov SUBJECT. CAMA/Dredge & Fill Application Review Applicant: CltyofMIMIngton/North WatertrontPark Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courinev3nears at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed /� "Ad " "Additional comments may be attached �/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated See attached. This agency objects to the project for reasons described in the attached comments. RECEIVED PRINTNAME �/Ifd/i ���(A�- E?YL1 JUN 14 2019 AGENCY SIGNATURE MP SECTION WIRO RECEIVED �:u'�ECfEIVED 1 2019 JUN 1 4 2- , MP SECTION WIR 9CM-MHp CITY Smm of Noah Cwulma Environmental Quality Coa" Mwagemu 127 Cardinal Dnwe Ea., WdmmXtM NC 2P05 910 7% 721i ''_ _ M I NORTH CAROLINA Environmental Quahty May 24, 2019 MEMORANDUM FROM Courtn� Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext . Wilmington, NC 28405 Fax:910-395-3964 94-1&33) Courtney. Spears(aincden r.goy SUBJECT CAMA /Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park ROY COOPER (rmerI r MICHAEL S. REGAN ceom"y BRAXTON DAVIS Dhe,tor Diww,m of (}w.rwl d4anaXvPwn1 Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below our a eenc Is osition or viewpoint on the proposed project and GeV at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "`Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Shannon Jenkins RECEIVED t 06/04/2019 DCM WIL ANGTON C RECEIV� State of North Carolim I Eaviroom atal Quality I Coastal Management 127 Cardinal Drive Eta., Wilmington, NC 28405 910 7% 7215 S E P 11200 DCM-MHD CITY ROY COOPER (tinp/INV 4D MICHAEL S. REGAN .semaw BRAXTON DAVIS NORTH CAROLINA Dnw r. Div ... m o Cnana! Environmental Qualip, Mandgemad May 24, 2019 MEMORANDUM: FROM: - Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 courtnev.soears(ftederingov SUBJECT CAMA/Dredge & Fill Application Review Applicant: City of Wilmington /North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below our a enc .s osition or viewpoint on the proposed project and at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: XC This agency has no objection to the project as proposed. Plate ice A(daL o "Additional comments may be attached" This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. (Yla/k &vino DESK euyii wlw 41r S-df-19 RECEIVED MAY 2 8 2019 MP SECTION WIRO RECEIVED SEP 1 1 2019 Smfe of North Carolina I Fnvvonmemel Quality I Coastal Management 127CatdaarDrive E ,wilmingtmNC28405 9107967215 DCM-MHD CITY May 28, 2019 To: . ' Courtney Spears, NC Division of Coastal Management From: Mark Brown, NC Public Water Supply, Wilmington Regional Office Subject: CAMA/Dredge & Fill Application Review Applicant: City of. Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adl to the NE Cape Fear River, in Wilmington, New Hanover Co Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient boating dock. Please forward the following comments to the applicant: If applicant plans to conduct any work (re -location, installation, extends utilities, etc...) involving the public water supply system per Title 15A Subchapter 18C Section .0301 Rules Governing Public Water Systems, Plans and Specifications should be submitted and approved by the Public Water Supply Section for all new waterlines prior to construction beginning. Please also be aware of our separation requirements in regards to water/sewer according to 15A; NCAC 18C Section .0906 Rules Governing Public Water Systems. Check with the local water system for cross-conriectiioh -requirements for this project. Public Water Supply Section guidelines are listed in Appendix B, Figure 2 in the Rules Governing Public Water Systems but the water system may have additional requirements. Feel free tol call us at,(910) 796-7215, if you have additional questions. Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Thursday, July 11, 2019 10:55 AM To: Arnette, Justin R CIV USARMY CESAW (USA); Spears, Courtney, Huggett, Doug; EthanJ.Coble@uscg.mil; fdtz.rohde; HORTON,1 TODD CIV USARMY CESAW (US); kathryn_matthews@fws.gov; Matthew.K.Creelman2@uscg.mil; DCR - Environmental_Review; Owens, Jennifer L CIV USARMY CESAW (USA); Pace Wilber - NOAA Federal; Pete Benjamin; Bowers, Todd; Twyla.Cheatwood@noaa.gov; John; Coburn, Chad; Ryan.L.Taylor@uscg.mil; Amico, Patrick J Cc: Capito, Rachel A CIV USARMY CESAW (US); Hair, Sarah E CIV CESAW CESAD (US); Crumbley, Tyler A CIV USARMY CESAW (USA); Jessop, Jordan E CIV USARMY CESAW (US) Subject: [External] CAMA Major / SAW-2012-00965 / North Waterfront Park / City of Wilmington Attachments: City of Wilm Bio.Narrative.App.pdf; City of Wilmington JD.pdf; North Waterfront Park City of Wilmington.kmz; CAMA Major Permit Letter Draft 6-27-19.pdf, North Waterfront Park CAMA Major Permit Drawings - 6-26-19.pdf; ePN_SAW-2012-00965 North Waterfront Park City of Wilmington.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspiciotREGONVIRD attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> All, SEP 1 1 2019 DCM-MHD CITY Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a modification report and BioReport for the subject project proposal. The attached notice requests federal agency comments on this project by August 11, 2019. The applicant proposes to construct open buildings, an amphitheater, shoreline protection, and a removable floating dock in the Cape Fear River, Wilmington, New Hanover County, North Carolina. Coordinates in Decimal Degrees 34.247829 N,-77.950992 W. Additionally, a Google Earth .kmz file is attached for reference. Please see the attached Bioreport /LAMA Application and the updated drawings and project narrative for more detailed information and plans for the proposed project. The proposed construction project consists of construction of open buildings, a CMU concession and restroom building, an amphitheater, and a removable floating dock in the Cape Fear River. The project as proposed will avoid impacts to existing coastal wetlands and all grading work will be conducted above MHW. Also included is a proposal to remove existing rip -rap and install marine mattress and flexamat erosion protection in its place. Those impacts total 489 sq. ft. of work below MHW, with no impact to wetlands. The removable floating dock will consist of 17 piles jetted in landward of the harbor line, with the dock proposed to be 240 ft. by 15 ft. with 9 transient slips. Water depths in the area are -14 ft. MLW and the dock itself would encroach 15 ft. into the harbor line, but is proposed to be removable for maintenance events of the federal channel (see attached narrative and updated drawings). This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but will not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. Impacts are expected to be minimal due to the temporary nature of the piling installation and floating dock proposal. No dredging is proposed. The waters within the project area are designated as PNA. SAV is not expected to be present. Short term increases in turbidity are expected during piling installation. The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database, Based on available information, the Corps has determined that the project may affect, but is not likely to adversely affect the West Indian Manatee. The use of Manatee Guidelines may be required as a permit condition. The project would have No Effect on any other federally listed species. Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district file's and records and the latest published version of the National Register of Historic Places and initially determines that no historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area: therefore, there will be no historic properties affected. Please contact me if you have any questions and please provide comments as soon as you can, or by August 11, 2019. Thank you, Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil —2 - C1� Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Monday, June 10, 2019 8:41 AM To: Spears, Courtney Cc: Coburn, Chad; Hair, Sarah E CIV CESAW CESAD (US) Subject: [External] de Beck and North Waterfront Park CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hi Courtney and Chad, Hope you both are doing well. I am back in operation here taking over for Liz on New Hanover and Brunswick County CZMA work. Wanted to let you know the permit types intended for review on the de Beck and N. Waterfront Park projects. I'll attempt to process the de Beck docking upgrades as a GP56 and the Waterfront Park will be reviewed under PGP 291 (PN forthcoming). If you need anything else, please let me know. Thanks and looking forward to seeing you soon. -Tyler Tyler Crumbley PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SEP 11 2019 DCM-MHD CITY WA Spears, Courtne From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Friday, August 16, 2019 3:52 PM To: Arnette, Justin R CIV USARMY CESAW (USA); Spears, Courtney; Huggett, Doug; EthanJ.Coble@uscg.mil; fritz.rohde; HORTON, J TODD CIV USARMY CESAW (US); kathryn_matthews@fws.gov; Matthew.K.Creelman2@uscg.mil; DCR - Environmental_Review, Owens, Jennifer L CIV USARMY CESAW (USA); Pace Wilber - NOAA Federal; Pete Benjamin; Bowers, Todd; Twyla.Cheatwood@noaa.gov; John; Coburn, Chad; Ryan.L.Taylor@uscg.mil; Amico, Patrick J Cc: Capito, Rachel A CIV USARMY CESAW (US); Hair, Sarah E CIV CESAW CESAD (US); Jessop, Jordan E CIV USARMY CESAW (US); Crumbley, Tyler A CIV USARMY CESAW (USA) Subject: [External] RE: CAMA Major / SAW-2012-00965 / North Waterfront Park / City of Wilmington Attachments: CAMA Major Permit Letter 8-15-19.pdf, [Non-DoD Source] RE: [External] RE: NWP: Bank Stabilization Permit CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> All, Through the public comment period of the abbreviated Public Notice, comments were received regarding the docking facility portion of the proposal. On Thursday August 15, 2019 the applicants have removed the docking facility proposal and will now move forward with the plans for upland development and a small section of bank stabilization (498 sq. ft). No pilings or other structures are proposed within the Cape Fear River. This office will subsequently remove the proposal from the GP291 process and will proceed with review of the reduced impact proposal under another permitting mechanism. No additional review from the requested agencies is required. Thank you all very much for your time and comments regarding this project. Sincerely, -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SFF 1 1 2019 DC"-MHD CITY --Original Message -- From: Crumbley, Tyler A CIV USARMY CESAW (USA) Sent: Thursday, July 11, 2019 10:55 AM To: Arnette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil>; Spears, Courtney <courtney.spears@ncdenr.gov>; Doug Huggett (doug.huggett@ncdenr.gov) <doug.huggett@ncdenr.gov>; Ethan.J.Coble@uscg.mil; Fritz.Rohde@noaa.gov; HORTON, J TODD CIV USARMY CESAW (US) <James.T.Horton@usace.army.mil>; Matthews, Kathryn <kathryn_matthews@fws.gov>; Matthew. K.Creelman2@uscg.mi1; DCR- Environmental —Review <Environmental.Review@ncdcr.gov>; Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Owens@usace.army.mil>; Pace Wilber- NOAA Federal <pace.wilber@noaa.gov>; Pete Benjamin <Pete—Benjamin@fws.gov>; Todd Allen Bowers (bowers.todd@epa.gov) <bowers.todd@epa.gov>; Twyla.Cheatwood@noaa.gov; John <john_ellis@fws.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Ryan.L.Taylor@uscg.mil; patrick.amico@ncdenr.gov Cc: Capito, Rachel A CIV USARMY CESAW (US) <Rachel.A.Capito@usace.army.mil>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; Jessop, Jordan E CIV USARMY CESAW (US) <Jordan.E.Jessop@usace.army.mil> Subject: CAMA Major/ SAW-2012-00965 / North Waterfront Park / City of Wilmington All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a modification report and BioReport for the subject project proposal. The attached notice requests federal agency comments on this project by August 11, 2019. The applicant proposes to construct open buildings, an amphitheater, shoreline protection, and a removable floating dock in the Cape Fear River, Wilmington, New Hanover County, North Carolina. Coordinates in Decimal Degrees 34.247829 N,-77.950992 W. Additionally, a Google Earth .kmz file is attached for reference. Please see the attached Bioreport /CAMA Application and the updated drawings and project narrative for more detailed information and plans for the proposed project. The proposed construction project consists of construction of open buildings, a CMU concession and restroom building, an amphitheater, and a removable floating dock in the Cape Fear River. The project as proposed will avoid impacts to existing coastal wetlands and all grading work will be conducted above MHW. Also included is a proposal to remove existing rip -rap and install marine mattress and flexamat erosion protection in its place. Those impacts total 489 sq. ft. of work below MHW, with no impact to wetlands. The removable floating dock will consist of 17 piles jetted in landward of the harbor line, with the dock proposed to be 240 ft. by 15 ft. with 9 transient slips. Water depths in the area are -14 ft. MLW and the dock itself would encroach 15 ft. into the harbor line, but is proposed to be removable for maintenance events of the federal channel (see attached narrative and updated drawings). This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but will not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. Impacts are expected to be minimal due to the temporary nature of the piling installation and floating dock proposal. No dredging is proposed. The waters within the project area are designated as PNA..SAV is not expected to be present. Short term increases in turbidity are expected during piling installation. The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information, the Corps has determined that the project may affect, but is not likely to adversely affect the West Indian Manatee. The use of Manatee Guidelines may be required as a permit condition. The project would have No Effect on any other federally listed species. Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that no historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area: therefore, there will be no historic properties affected. Please contact me if you have any questions and please provide comments as soon as you can, or by August 11, 2019. Thank you, Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax: 910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SEP 1 1 2019 DCM-MHD CITY U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-00965 County: NEW HANOVER U.S.G.S. Quad: GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Pennittee: MR- STERLING CHEATHAM CITY OF WILMINGTON PO BOX 1810 Address: WILMINGTON.NC 28402 RECEIVED Telephone Number: 910-686-6232 S E P 1 1 2019 Size (acres) 0.011acre Nearest Town: WILMINGTON Nearest Waterway Cape Fear River . River Basin: Cape Fear River DCM-MHD CITY .. USGS HUC: 03030007 Coordinates Latitude: 34.248613 Longitude:-77.951492 Location description: The proiect site is located at 10 Cowan Street, adjacent to the Cape Fear River, in Wilmington, New Hanover County, North Carolina. Description of projects area and activity: Project consists of upland construction components with 0.011 acre (489 sa. ft.) of replacement(enhancement of degraded shoreline orotection in the form of marine mattresses below Mean High Water. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ® Sections 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: N W 18 SEE ATTACHED RGP or NR'P GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated August 15, 2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management, 127 N. Cardinal Drive, Wilmington, NC 28405. or at 910-796-7215. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps "Qgulatory program, please contact Mr. Tyler A. Crumblev. by phone: 910-251-4170, or by email at: tvler.a.crumblevnnsace.armv.mil. Corps Regulatory Official: "` 7y,9.oe.z, iaseosoa°o Date: August 21, 2019 AUG 2 s 2419 Expiration Date of Verification: March 18, 2022 _ __ DCM WILMINGTON, NC FOLDER DA NUMBER: SAW-2012-00965 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at littp://cori)smapu.usace.amiy.mil/em apex/f?n=136:4:0. Copy furnished: Agent: Andrews Consulting Engineers, P.C. Attn: Mr. David Turner Address: 3811 Peachtree Avenue, Suite 300 Wilmington, North Carolina 28403 Telephone Number: 910-202-5555 Mr. Doug Huggett—NCDCM Ms. Karen Higgins -NCD WR Mr. Chad Coburn —NCDWR Ms. Courtney Spears - NCDCM .IttIMNt?4ivitlWl §naQ)e�aw+rtk t4ttbDn- Received: 05/30/2019U. State Historic Preservation OfflteeY COOPER Lowm MICHAEL S. REGAN 961wwy BRAXTON DAVIS A bn„gn,em May 24, 2019 ER 19-1795 MEMORANDUM Due -- 6/7/ 19 FROM: Couttneq Spwil Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 A- VJOVP Fax 910-395-3964 (Coudor04.1001") courtnev.soears@ncdencgov 6151 il SUBJECT CAMA I Dredge & Fill Application Review Due --ulc*jig Applicant: City of Wilmington / North Waterfront Park S- �r'o (Iq Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington. New Hanover Co. Proposed Project: construction of a city park & amphitheater with shonWine Stabilization, timber walkways & transient floating dock.` Please indicate below your agency's position or viewpoint on the proposed project and rearm this form to Courtney Spears at the address above by June 20, 2019. If you have any questions regarding the proposed project.. contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached This agency objects to the project for reasons described in the attached cqm"nts. -, IVED PRINT NAME Renee Gledhill -Farley AGENCY State Historic Preservation Office SIGNATURE & a DATE � -ao - tq S= orNocth Cmi= , Eavuo n) QQmlay i Ceavd Maatp e 127 Cudial nme Fu., WAMUgIM NC 29405 9107%7215 SEP 1 1 2019 d)(:M-MHD CITY RECEIVED JUN 21 2019 MP SECTION WIRO MAY 3 12019 0%(/ ROY COOPER MICHAEL S. REGAN sanw.ry BRAXTON DAVIS IJumRv, lMvrii.+r.A t 4.eNat 1lamrgemw:! May 24, 2019 MEMORANDUM.' FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ Division of Coastal Management 127 Cardinal Drive ER., Wilmington, NC 28405 Fax: 910-395-3964 (Courier04-16-33) Courtney spears(&.ncdenr qov- SUBJECT: CAMA/Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co Proposed Project: construction of a city pads & amphitheater with shoreline stabilization, timber walkways & transient Boating dock. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. / "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME t , RECEIVED AGENCY _ (A-i K_L JUN 21 2019 SIGNATURE _ MP SECTION WIRO RECEIVED_ DATE Ii'Z 01 z] sEP 112019 Swwu Nonh Cuol.. Emlronme (Quality C�WManagement 127CawnalDn; F.,a.wftaapm,NC2WS M796nu DCM-MHD CITY "IF M* Spears, Courtney From: Sent To: Cc: Subject Hi Mr. Andrews, MacPherson, Tara Thursday, June 6, 2019 8:40 AM neil@andrewengineers.com Spears, Courtney City of Wilmington The City of Wilmington Project needs an updated Sheet 3 of 14 project plan view. The Harbor Line, Riparian Lines and Water Depths that are on Sheet 4 of 14 need to be on the project drawing per Agency request. Can you please send a revised Sheet 3 in color and omit Sheet 4 which shows development that is not being proposed at this time. If it is easier you can use the grading plan, that is not submitted, in place of Sheet 4 so the numbering remains consistent. It may make it easier if these can be scaled to 11 x 17 because them we can just print them without worrying about oversize drawings. In addition, EB and I discussed the notification to NRMH Holdings, which is the southern adjacent riparian property owner. We do not have the signed certified mail green card that is necessary for processing. Please let me know if you have any questions. Thank you, Tara Tara MacPherson Field Specialist NC Division of Coastal Management Department of Environmental Quality 910 796-7425 office 910 395-3964 fax tara.macpherson@ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 NC-'" IothtngCompares. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. RECEIVED SEP 11 2019 DCM-MHD CITY µHc Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <TylerA.Crumbley@usace.army.mil> Sent: Monday, June 10, 2019 3:54 PM To: Everett Pannkuk Cc: Spears, Courtney; Coburn, Chad; Hair, Sarah E CIV CESAW CESAD (US) Subject: [External] North Waterfront Park Project (SAW-2012-00965) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hi EB, I hope all is well with you. Ms. Liz Hair received the application from the DCM for the N. Waterfront Park Project on the 24th of May. I have been assigned this project upon my return to work in the Wilmington District and have performed an initial review of the application. I am writing to you to initiate a request for additional information. The application that we received did not contain any impact information, or jurisdictional determination maps. Nor was there any reference to potential impacts to species, critical habitats, or cultural resources. DCM and I are meeting sometime early this week and I will follow up with a more thorough RFL Just wanted to give you a notice of the forthcoming request, and let you know that I have taken this project back over. I look forward to working with you again. Tyler Tyler Crumbley PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SEP 11 2019 DCM-MHD CITY Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <TylerA.Crumbley@usace.army.mil> Sent: Tuesday, June 11, 2019 11:47 AM To: david@andrewengineers.com Cc: Spears, Courtney; MacPherson, Tara; Crumbley, Tyler A CIV USARMY CESAW (USA) Subject: [External] SAW-2012-00965 North Waterfront Park Project Attachments: North Waterfront Park Project (SAW-2012-00965) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hello Mr. Turner, The USACE has received the application for the North Waterfront Park Project. It has been assigned the Action ID of SAW-2012-00965. Please find the email below that I recently sent to E.B. regarding the application. I would like to have brief meeting with you and some other agency folks regarding the project, the required information, and the expected timelines for permit review at a convenient time for you. I was in the original scoping meeting for this project, but I was unaware of any further meetings or furtherance on the submission of the application. There are a few items that will be needed to make the application complete with the us. Please let me know, or coordinate through the DCM, a good date and time for a meeting, so we can get the permit review process moving. Thank you for your time. Tyler Tyler Crumbley PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SEP 11 2019 DCM-MHD CITY Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Tuesday, June 11, 2019 11:47 AM To: david@andrewengineers.com Cc: Spears, Courtney; MacPherson, Tara; Crumbley, Tyler A CIV USARMY CESAW (USA) Subject: [External] SAW-2012-00965 North Waterfront Park Project Attachments: North Waterfront Park Project (SAW-2012-00965) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.Spam@nc.gov<mailto:report.spam@nc.gov> Hello Mr. Turner, The USACE has received the application for the North Waterfront Park Project. It has been assigned the Action ID of SAW-2012-00965. Please find the email below that I recently sent to E.B. regarding the application. I would like to have brief meeting with you and some other agency folks regarding the project, the required information, and the expected timelines for permit review at a convenient time for you. I was in the original scoping meeting for this project, but I was unaware of any further meetings or furtherance on the submission of the application. There are a few items that will be needed to make the application complete with the us. Please let me know, or coordinate through the DCM, a good date and time for a meeting, so we can get the permit review process moving. Thank you for your time. -Tyler Tyler Crumbley PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 29403 Phone:910-251-4170 Fax: 910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SF 11 2019 DCM-MHD CITY ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Dtrwwr SENT VIA EMAIL Andrew Consulting Engineers c/o David Turner david@andrewengineers.com NORTH CAROLINA Envowuneraw QuaUh June 17, 2019 SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for City of Wilmington, at 10 Cowan Street, Wilmington, New Hanover County Mr. Turner: This letter is in response to the above referenced CAMA permit application, which was accepted as complete by the Division's Wilmington office on May 17, 2019. Processing of the applications is ongoing. However, it has been determined that additional information will be required prior to the Division taking final action on your application. These required items are summarized below: 1) The U.S. Army Corps of Engineers (USACE) has requested additional information by way of the attached USACE emails (2) one dated June 10, 2019 and one dated June 11, 2019. Their correspondence requests additional information be provided regarding proposed impacts and any jurisdictional determinations on site. 2) The Division of Coastal Management requests the following information: a. Agent authorization form authorizing Andrew Consulting Engineers as the agent. The form we have on file is specifically for E.B. Pannkuk, PE. b. Updated drawings to including the following information: i. Clearly show the federal harbor and setback lines on the plan view of the project (Page 3 of 12). RECEIVED SEP 1 1 Z019 ` a.m � DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management -- Wilmington Office 1 127 Cardinal Drive Ex slon I Wilmington, North Carolina 2a405 9I0.796.7215 City of Wilmington Page Two ii. A riparian corridor line and associated setback at the southern property boundary. As currently shown, the riparian corridor line extends from property that is not owned by the applicant (Page 3 of 12). iii. Clearly label and identify proposed transient slips (1-9) on Page 3 of 12). c. Please submit updated drawings electronically in a format that can be printed to scale on 11"xl7" paper. If oversized drawings are necessary, please submit an electronic version and six (6) hard copies. Any submitted hard copies need to be folded to fit in a file folder. DCM strongly recommends that you send an electronic copy for approval prior to printing and submittal of any oversized hard copies. Therefore, it is necessary that processing of your permit application be placed in abeyance until such time as you have satisfied the requirements of the USACE and DCM. Once the USACE notifies the Division of Coastal Management Major Permits Section in writing that no further actions are necessary on the part of the applicant and DCM has received updated drawings as described above, we will resume processing of your application. If you can provide to this office a copy of the requested information within five working days from the date of this letter, DCM staff will continue processing of the application andthe processing clock will not be suspended. If the required information is not received in this office within the specified timeframe, processing of the application will be suspended in accordance with 15A NCAC 07J.0204(d) until such time as the requested information is provided. If you have any questions concerning these matters, please feel free to contact me by telephone at (910) 796-7426, or by email at courtnev.spearsaticdenr.gov. cc: Chad Coburn, DWR Tyler Crumbley, USACE WiRO file MHC file S' c ly, iFe ears ivision of Coastal Management Assistant Major Permits Coordinator RECEIVED SEP 112019 arm North Carolina Department of Environmental Quality I Division of Coastal Management 0CM-MHD CITY Wilmington Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Monday, June 10, 2019 3:54 PM To: Everett Pannkuk Cc: Spears, Courtney; Coburn, Chad; Hair, Sarah E CIV CESAW CESAD (US) Subject: [External] North Waterfront Park Project (SAW-2012-00965) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to repo rt.Spam@nc.gov<maiIto: repo rt.spam@nc.gov> Hi EB, I hope all is well with you. Ms. Liz Hair received the application from the DCM for the N. Waterfront Park Project on the 24th of May. I have been assigned this project upon my return to work in the Wilmington District and have performed an initial review of the application. I am writing to you to initiate a request for additional information. The application that we received did not contain any impact information, or jurisdictional determination maps. Nor was there any reference to potential impacts to species, critical habitats, or cultural resources. DCM and I are meeting sometime early this week and I will follow up with a more thorough RFI. Just wanted to give you a notice of the forthcoming request, and let you know that I have taken this project back over. I look forward to working with you again. -Tyler Tyler Crumbley PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil RECEIVED SEP 1 1 2019 DCM-MHD CITY eL� Spears, Courtney From: David Turner <david@andrewengineers.com> Sent: Tuesday, June 18, 2019 11:23 AM To: Spears, Courtney; Neal Andrew Cc: MacPherson, Tara; Coburn, Chad; Crumbley, Tyler A CIV USARMY CESAW (USA) Subject: RE: [External] RE: City of Wilmington Project Hey Courtney, Thank you for the detailed letter listing out the required items. We are working on addressing the comments now from both CAMA and the Corps. As of now, no questions on our end. David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Monday, June 17, 2019 4:32 PM To: David Turner <david@andrewengineers.com>, Neal Andrew <neal@andrewengineers.com> Cc: MacPherson, Tara <tara.macpherson@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: RE: [External] RE: City of Wilmington Project Hi David, Attached please find an additional information request/hold letter detailing the information we need to move forward with permit processing. Please let us know if you have any questions. Kind regards, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office RECEIVED SEP 1 1 2019 DCM-MHD CITY A c % courtnev.soears(a)ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 From: David Turner [mailto:david@andrewengineers.com] Sent: Monday, June 17, 2019 2:27 PM To: MacPherson, Tara <tara.macpherson@ncdenr.gov> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Neal Andrew <neal@andrewengineers.com> Subject: RE: [External] RE: City of Wilmington Project Tara, We just received the return receipt for the southern riparian property owner — see attached. David E. Turner, EIT Andrew Consulting Engineers, P.C. From: MacPherson, Tara <tara.macpherson@ncdenr.gov> Sent: Tuesday, June 11, 2019 9:36 AM To: David Turner <david@andrewengineers.com> Cc: Spears, Courtney <courtnev.spears@ncdenr.gov> Subject: RE: [External] RE: City of Wilmington Project [Filed 11 Jun 2019 09:501 Hi David, Can you please send an entire plan set that is printable to scale on 11 X 17? We will review the riparian lines, but they should go back 90 degrees from the channel to where the property line meets NHW or MHW. As far as the notification goes I would contact the post office and see why it is stuck, verify the address and maybe send again? We need proof of notification to the adjacent riparian property owner. Thank you, Tara Tara MacPherson Field Specialist NC Division of Coastal Management Department of Environmental Quality 910 796-7425 office 910 395-3964 fax tara.macpherson(oncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 Kc- Nothing Compares.., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: David Turner<david@andrewengineers.com> Sent: Monday, June 10, 2019 1:54 PM To: MacPherson, Tara <tara.macpherson@ncdenr.aov> Cc: Neal Andrew <neal@andreweneineers.com> Subject: [External] RE: City of Wilmington Project Tara, Attached is an updated Sheet 3 per request. Let us know if all items have been addressed or you need any additional items from us drawing wise. As for the southern property owner, we have not received the signed green card. Looking up the tracking number that is on the attached receipt shows that the package got stuck in Greensboro. The same notice was sent out to NRMH last October with no luck. How should be address this? Thanks, David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax From: Neal Andrew <neal@andrewengineers.com> Sent: Thursday, June 6, 2019 9:24 AM To: Robert Williams <robert@andrewengineers.com>; James Lawson <iames@andrewenRineers.com>; Kevin Novak <kevi n @ a nd rewen¢i neers.com> Subject: Fwd: City of Wilmington Project Please add to the task list Message sent from a mobile device. Please excuse the brevity of the response and any potential typos. Neal Andrew From: MacPherson, Tara <tara.macpherson@ncdenr.eov> Sent: Thursday, June 6, 2019 7:08:17 AM RECEIVED _3 SEP 1 1 2019 DCM-MHD CITY To: Neal Andrew Subject: City of Wilmington Project Hi Mr. Andrews, The City of Wilmington North Riverfront Park Project needs an updated Sheet 3 of 14 project plan view. The Harbor Line, Riparian Lines and Water Depths that are on Sheet 4 of 14 need to be on the project drawing per Agency request. Can you please send a revised Sheet 3 in color and omit Sheet 4 which shows development that is not being proposed at this time. If it is easier you can use the grading plan, that is not submitted, in place of Sheet 4 so the numbering remains consistent. It may make it easier if these can be scaled to 11 x 17 because them we can just print them without worrying about oversize drawings, In addition, EB and I discussed the notification to NRMH Holdings, which is the southern adjacent riparian property owner. We do not have the signed certified mail green card that is necessary for processing. Please let me know if you have any questions. Thank you, Tara Tara MacPherson Field Specialist NC Division of Coastal Management Department of Environmental Quality 910 796-7425 office 910 395-3964 fax tara. macoherson(a)ncden r. oov 127 Cardinal Drive Ext Wilmington, NC 28405 %'Nothing Compares� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAMS DOfor SENT VIA EMAIL NORTH CAROLINA Eav&onmfftW Quality July 8, 2019 City of Wilmington c/o Andrew Consulting Engineers - David Turner david@andreweagineers.com SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for City of Wilmington, at 10 Cowan Street, Wilmington, New Hanover County Dear Mr. Turner: This letter is in response the above -referenced Coastal Area Management Act (CAMA) permit application, which was accepted as complete on May 17, 2019. On June 10, 2019, processing of this application was placed on hold pending receipt of additional information requested by the US Army Corps of Engineers and the NC Division of Coastal Management. This office received the additional information on July 1, 2019, which appears to satisfy the request. Therefore, processing of the permit application has officially resumed as of July 1, 2019. The revised projected 75-day deadline for making a decision is August 21, 2019. Please feel free to contact me by phone at (910) 796-7426 or by e-mail (courtney.spears@ncdenr.gov) if you would like to discuss this matter further. Si ely, ney ears cc: Chad Coburn, DWR o Coastal Management Tyler Crumbley, USACE ant Major Permits Coordinator WiRO file MHC file 4, �DKQp DMYw�MNMMtlOWM\ RECEIVED SEP 1 1 2019 North Carolina Department of Environmental Quality I Dfvislon of Coastal Management Wilmington Office 1127 Cardinal Drive Extension I W Inningtom North Carolina 28405 %0J96.rM DCM-MHD CITY go Spears, Courtney From: David Turner <david@andrewengineers.com> Sent: Wednesday, July 10, 2019 4:32 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) Cc: Spears, Courtney; Coburn, Chad Subject: [External] RE: NWP: Bank Stabilization Permit CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Tyler, Makes sense. The square footage amounts for impacts below MHW are: - Marine Mattress: 274 SF - Flexamat: 215 SF Thanks again. David E. Turner, EIT Andrew Consulting Engineers, P.C. -----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Wednesday, July 10, 2019 2:08 PM To: David Turner <david@andrewengineers.com> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: RE: NWP: Bank Stabilization Permit David, I can process it through the GP 291 and use the same application that you sent for the CAMA permit. However, I need to know the square footage of impacts to Waters of the US from the removal of the existing rip rap and installation of the mattresses (anything below MHW). Looking at the plans, it appears that a small corner will catch the MHW line, but most of it will be above that. Please provide the impact amount, so that I can process it the Public Notice that I intend to send out. Thank you. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue RECEIVED Wilmington, NC 28403 SEP 1 1 2019 DCM-MHD CITY Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ----- From: David Turner [mailto:david@andrewengineers.com] Sent: Wednesday, July 10, 2019 1:08 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mi[> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov> Subject: [Non-DoD Source] RE: NWP: Bank Stabilization Permit Tyler, Thanks for getting back to me on this. Does a separate permit application need to be submitted for the Bank Stabilization Permit to the Corps or is that included in the CAMA Major permit application? David E. Turner, EIT Andrew Consulting Engineers, P.C. -----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Tuesday, July 09, 2019 3:58 PM To: David Turner <david@andrewengineers.com> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crum bley@usace.army.miI> Subject: RE: NWP: Bank Stabilization Permit David, I don't see any action in our database showing that Bank Stabilization was authorized recently. If you want to put it in this proposal, the Corps can process it with this GP291 iteration. Not sure about the other agencies though. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil 2 -----Original Message ----- From: David Turner[mailto:david@andrewengineers.com] Sent: Tuesday, July 9, 2019 2:22 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: [Non-DoD Source] NWP: Bank Stabilization Permit Tyler, Question for you regarding North Waterfront Park. I am trying to track down the status of the Bank Stabilization Permit that was submitted by EB to the Corps back on March 29th I believe. Is the Bank Stabilization Permit a part of the CAMA permitting and they get issued together? Or is it a separate permit that needs to be submitted. If yes on needed to submit a separate permit, do you know the status of that permit? David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax RECEIVED SEP 11 2019 DCM-MHD C1TY s 40 Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Thursday, July 25, 2019 9:15 AM To: Spears, Courtney Cc: Coburn, Chad; Crumbley, Tyler A CIV USARMY CESAW (USA) Subject: [External] FW: CAMA Major / SAW-2012-00965 / North Waterfront Park / City of Wilmington (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Courtney, Our Navigation Branch objects to the docking facility component of this proposal. Additionally, the docking component would require a Section 408 analysis and may be found injurious to the federal project through that review. Please let me know how you would like to proceed notifying the applicant of this issue. It may be best to have a teleconference, or I can contact them directly. Thanks. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ---- From: Arnette, Justin R CIV USARMY CESAW (USA) Sent: Monday, July 15, 2019 7:38 AM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Cc: Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer. L.Owens@ usace.army.mil>; HORTON,1 TODD CIV USARMY CESAW (US) <James.T.Horton@usace.army.mil> Subject: RE: CAMA Major / SAW-2012-00965 / North Waterfront Park / City of Wilmington (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED RECEIVED Tyler, SEP 112019 t DCM-MHD CITY M'% Navigation objects to a part of this project. Navigation would not allow the floating dock inside the harborline. This dock would adversely affect the federal navigation channel project impeding our ability to maintain the project.' Thanks. Justin Justin Arnette GIS Coordinator Operations Division Team Lead Cartographer Wilmington District U.S. Army Corps of Engineers 910-251-4196 justin.r.arnette@usace.army.mil ----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) Sent: Thursday, July 11, 2019 10:55 AM To: Arnette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil>; Spears, Courtney <courtney.spears@ncdenr.gov>; Doug Huggett (doug.huggett@ncdenr.gov) <doug.huggett@ncdenr.gov>; Ethan.J.Coble@uscg.mil; Fritz. Rohde@noaa.goV; HORTON, J TODD CIV USARMY CESAW (US) <James.T. Horton@ usace.army.mil>; Matthews, Kathryn <kathryn_matthews@fws.gov>; Matthew.K.Creelman2@uscg.mil; DCR - Environmental —Review <Environmental.Review@ncdcr.gov>; Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Owens@usace.army.mil>; Pace Wilber- NOAA Federal <pace.wilber@noaa.gov>; Pete Benjamin <Pete_Benjamin@fws.gov>; Todd Allen Bowers (bowers.todd@epa.gov) <bowers.todd@epa.gov>; Twyla.Cheatwood@noaa.gov; John <john_ellis@fws.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Ryan.L.Taylor@uscg.mil; patrick.amico@ncdenr.gov Cc: Capito, Rachel A CIV USARMY CESAW (US) <Rachel.A.Capito@usace.army.mil>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah. E.Hair@ usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; Jessop, Jordan E CIV USARMY CESAW (US) <Jordan.E.Jessop@usace.army.mil> Subject: CAMA Major / SAW-2012-00965 / North Waterfront Park / City of Wilmington All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a modification report and BioReport for the subject project proposal. The attached notice requests federal agency comments on this project by August 11, 2019. The applicant proposes to construct open buildings, an amphitheater, shoreline protection, and a removable floating dock in the Cape Fear River, Wilmington, New Hanover County, North Carolina. Coordinates in Decimal Degrees 34.247829 N,-77.950992 W. Additionally, a Google Earth .kmz file is attached for reference. Please see the attached Bioreport /CAMA Application and the updated drawings and project narrative for more detailed information and plans for the proposed project. The proposed construction project consists of construction of open buildings, a CMU concession and restroom building, an amphitheater, and a removable floating dock in the Cape Fear River. The project as proposed will avoid impacts to existing coastal wetlands and all grading work will be conducted above MHW. Also included is a proposal to remove existing rip -rap and install marine mattress and flexamat erosion protection in its place. Those impacts total 489 sq. ft. of work below MHW, with no impact to wetlands. The removable floating dock will consist of 17 piles jetted in landward of the harbor line, with the dock proposed to be 240 ft. by 15 ft. with 9 transient slips. Water depths in the area are -14 ft. MLW and the dock itself would encroach 15 ft. into the harbor line, but is proposed to be removable for maintenance events of the federal channel (see attached narrative and updated drawings). This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but will not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. Impacts are expected to be minimal due to the temporary nature of the piling installation and floating dock proposal. No dredging is proposed. The waters within the project area are designated as PNA. SAV is not expected to be present. Short term increases in turbidity are expected during piling installation. The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information, the Corps has determined that the project may affect, but is not likely to adversely affect the West Indian Manatee. The use of Manatee Guidelines may be required as a permit condition. The project would have No Effect on any other federally listed species. Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that no historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area: therefore, there will be no historic properties affected. Please contact me if you have any questions and please provide comments as soon as you can, or by August 11, 2019. Thank you, Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil CLASSIFICATION: UNCLASSIFIED RECEIVED SEP 1 1 2019 DCM-MHD CITY Spears, Courtney From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Thursday, July 25, 2019 2:09 PM To: David Turner Cc: Coburn, Chad; Arnette, Justin R CIV USARMY CESAW (USA); Spears, Courtney Subject: RE: [External] RE: NWP: Bank Stabilization Permit CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> David, Our Navigation Branch objects to the docking facility component of this proposal. Additionally, the docking component would require a Section 408 analysis and may be found injurious to the federal project through that review. If this portion of the project was removed from the proposal, the Corps could issue a GP within the next week based on the minimal impacts to waters elsewhere on the project site. Please let me know how you would like to proceed. Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax: 910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ----- From: David Turner[mailto:david@andrewengineers.com] Sent: Wednesday, July 10, 2019 11:29 AM To: Spears, Courtney <courtney.spears@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crum bley@ usace.army. mil> Cc: Coburn, Chad <chad.coburn@ncdenr.gov>; Neal Andrew <neal@andrewengineers.com> Subject: [Non-DoD Source] RE: [External] RE: NWP: Bank Stabilization Permit Hey Courtney, Yes. It is shown on sheet 11 of 17 of the drawing packet. David E. Turner, EIT Andrew Consulting Engineers, P.C. RECEIVED SEP 1 1 2019 DCM-MHD CITY -----Original Message ----- From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Wednesday, July 10, 2019 9:06 AM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; David Turner <david @a nd rewengi neers.com> Cc: Coburn, Chad. <chad.coburn@ncdenr.gov> Subject: RE: [External] RE: NWP: Bank Stabilization Permit Hi David, Is the bank stabilization the marine mats that are included on the CAMA permit application drawings? Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtney.spears@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 ----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) [mailto:Tyler.A.Crumbley@usace.army.mil] Sent: Tuesday, July 9, 2019 3:58 PM To: David Turner <david@andrewengineers.com> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: [External] RE: NWP: Bank Stabilization Permit CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> David, I don't see any action in our database showing that Bank Stabilization was authorized recently. If you want to put it in this proposal, the Corps can process it with this GP291 iteration. Not sure about the other agencies though. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil ---Original Message ---- From: David Turner[mailto:david@andrewengineers.com] Sent: Tuesday, July 9, 2019 2:22 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: [Non -DOD Source] NWP: Bank Stabilization Permit Tyler, Question for you regarding North Waterfront Park. I am trying to track down the status of the Bank Stabilization Permit that was submitted by EB to the Corps back on March 29th I believe. Is the Bank Stabilization Permit a part of the CAMA permitting and they get issued together? Or is it a separate permit that needs to be submitted. If yes on needed to submit a separate permit, do you know the status of that permit? David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax RECEIVED SEP 1 1 2019 3_ DCM-MHD CITY ___. Spears, Courtney From: David Turner <david@andrewengineers.com> Sent: Tuesday, August 6, 2019 10:17 AM To: Spears, Courtney Cc: Crumbley, Tyler A CIV USARMY CESAW (USA); MacPherson, Tara Subject: RE: [External] NWP: Old Permit #62-13 Hey Courtney, Thanks for the information. Tyler touched base with me on Friday regarding the question of transferring the existing permit. The fact that it has expired answers my question of transferring the permit. Due to construction wanting to commence later this month, I feel we will go ahead with submitting an updated narrative and dwg not mentioning/showing the floating dock to allow the issuance of the GP. If the City/Owner wants to pursue the floating dock at a later date, then they can submit a modification request with the requested information that Tyler has laid out. If we were going to try and make use of the previous permit, we would've made the width match the previous floating dock width of 8'. David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Tuesday, August 06, 2019 8:22 AM To: David Turner <david@andrewengineers.com> Cc: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; MacPherson, Tar;RECEIVED <ta ra. macpherson@ ncdenr.gov> Subject: FW: [External] NWP: Old Permit #62-13 Hi David, SEP 1 1 2019 DCM-MHD CITY I have copied Tyler and Tara on this reply. I'm not sure if you've been in contact with Tyler or not. State Permit No. 62-13 (SAW 2012-00965) expired on 12/31/16, so no part of that facility, from a CAMA perspective, is authorized any longer. I am not sure where the federal permit stands, but since this is a new permit application the facility would need to meet all regulations and requirements that are in place today, including addressing any navigation concerns relative to the federal channel. David, 1 assume the new proposal is to reduce your current float (452' in length) to an 8' width? Tyler, would you need a new drawing to send to navigation or would an email stating they want to reduce the width suffice? Thank you! Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office cou rtnev. spearsCancdenr.cov 127.Cardinal Drive Ext. Wilmington, NC 28405 From: David Turner [mailto:david@andrewengineers.com] Sent: Wednesday, July 31, 2019 2:09 PM To: Spears, Courtney <courtnev.spears@ncdenr.gov> Subject: RE: [External] NWP: Old Permit #62-13 Courtney, You may be on leave now, if so please direct this message appropriately. Tanya was very helpful in finding the permit requested. Neal informed me that we were the ones who applied for the original permit and I was able to track down the original files —so my apologies on contacting you for those before looking through our files. The original permit #62- 13 included 452' of 8' wide floating docks or 17 boat slips. The current permit application includes 240'-7" of 14' wide floating docks or 9 boat slips. Is there a way we can transfer the floating docks from the previous permit #62-13 into this permit? The floating dock will most likely have to be reduced to 8' wide, but the footprint would be less. Attached are the previous permit, drawings showing the previous dock that was approved and the current dock that is proposed. David E. Turner, EIT Andrew Consulting Engineers, P.C. From: Spears, Courtney <courtnev.spears@ncdenr.gov> Sent: Wednesday, July 31, 2019 11:26 AM To: David Turner <david@andrewengineers.com> Cc: Pietila, Tanya K <tanya.pietila@ncdenr.Rov> Subject: Re: [External] NWP:,Old Permit#62-13 Hi David, I've copied Tanya Pietila on this reply, she should be able to help you with setting up a file review. Thanksl Courtney From: David Turner <david@andrewengineers.com> Sent: Wednesday, July 31, 2019 10:42:15 AM To: Spears, Courtney <courtnev.soears@ncdenr.aov> Subject: [External] NWP: Old Permit #62-13 Courtney, There was a CAMA permit issued May 20, 2013 for construction of the Riverwalk on this parcel permit #62-13. Could you provide a copy of that permit so that we can review what was included? The City believes that the floating dock (currently shown on this permit) was included in that previous permit that was approved. David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax RECENED SEP 112019 DCM-MHD CITY Spears, Courtney From: David Turner <david@andrewengineers.com> Sent: Thursday, August 15, 2019 2:11 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) Cc: Coburn, Chad; Arnette, Justin R CIV USARMY CESAW (USA); Spears, Courtney; Neal Andrew Subject: RE: [External] RE: NWP: Bank Stabilization Permit Attachments: North Waterfront Park CAMA Major Permit Drawings - 7-09-19.pdf; CAMA Major Permit Letter 8-15-19.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Tyler, Attached is an updated narrative and drawings which remove the floating dock from the permit application. Please let me know if you need any additional information from us in order to process the GP + bank stabilization permits. David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 910.202.5555 / 910.202.5558 fax -----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Thursday, July 25, 2019 2:09 PM To: David Turner <david@andrewengineers.com> Cc: Coburn, Chad <chad.coburn@ncdenr.gov>; Arnette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil>; Spears, Courtney <courtney.spears@ncdenr.gov> Subject: RE: [External] RE: NWP: Bank Stabilization Permit [Filed 25 Jul 2019 14:43] David, Our Navigation Branch objects to the docking facility component of this proposal. Additionally, the docking component would require a Section 408 analysis and may be found injurious to the federal project through that review. If this portion of the project was removed from the proposal, the Corps could issue a GP within the next week based on the minimal impacts to waters elsewhere on the project site. Please let me know how you would like to proceed. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District RECEIVED SEP 1 1 2019 DCM-MHD CITY 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ----- From: David Turner [mailto:david@andrewengineers.com] Sent: Wednesday, July 10, 2019 11:29 AM To: Spears, Courtney <courtney.spears@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Cc: Coburn, Chad <chad.coburn@ncdenr.gov>; Neal Andrew <neal@andrewengineers.com> Subject: [Non-DoD Source] RE: [External] RE: NWP: Bank Stabilization Permit Hey Courtney, Yes. It is shown on sheet 11 of 17 of the drawing packet. David E. Turner, EIT Andrew Consulting Engineers, P.C. ----Original Message ----- From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Wednesday, July 10, 2019 9:06 AM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil>; David Turner <david @andrewengineers.com> Cc: Coburn, Chad <chad.coburn@ncdenr.gov> Subject: RE: [External] RE: NWP: Bank Stabilization Permit Hi David, Is the bank stabilization the marine mats that are included on the CAMA permit application drawings? Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtney.spears@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 ---Original Message ---- From: Crumbley, Tyler A CIV USARMY CESAW (USA) [mailto:Tyler.A.Crumbley@usace.army.mil] Sent: Tuesday, July 9, 2019 3:58 PM To: David Turner <david@andrewengineers.com> f - , Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: [External] RE: NWP: Bank Stabilization Permit CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.Spam@nc.gov<maiIto: report.spam @ nc.gov> David, I don't see any action in our database showing that Bank Stabilization was authorized recently. If you want to put it in this proposal, the Corps can process it with this GP291 iteration. Not sure about the other agencies though. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone:910-251-4170 Fax:910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ----- From: David Turner[mailto:david@andrewengineers.com] Sent: Tuesday, July 9, 2019 2:22 PM To: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Subject: [Non-DoD Source] NWP: Bank Stabilization Permit Tyler, Question for you regarding North Waterfront Park. I am trying to track down the status of the Bank Stabilization Permit that was submitted by EB to the Corps back on March 29th I believe. Is the Bank Stabilization Permit a part of the CAMA permitting and they get issued together? Or is it a separate permit that needs to be submitted. If yes on needed to submit a separate permit, do you know the status of that permit? David E. Turner, EIT Andrew Consulting Engineers, P.C. 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 RECEIVED SEP 1 1 2019 3 _ DCM-MHD CITY * - i 910.202.5555 / 910.202.5558 fax ROY COOPER NORTH CAROLINA GMrmtr EnvtranmenW QuaUry MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director SENT VIA EMAIL August 21, 2019 Andrew Consulting Engineers c/o Neal Andrew & David Turner neal0andrewengineers com david (a)andrewengineerc_rr»„ Dear Mr. Andrew & Mr. Turner: This letter is in reference to your application for a Coastal Area Management Act Major Permit on behalf of City of Wilmington c/o Sterling Cheatham to undertake development activities at their property at 10 Cowan Street, Wilmington, New Hanover County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S.113A-122(c) which would make November 4, 2019, the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (910-796-7426) or e-mail (courtney.spears@ncdenr.gov). rS,nrly, l/yA. earsnt ..or its Coordinator cc: WiRO file MHC file Tyler Crumbley, USACE, email cc Chad Coburn, DWR, email cc RECEIVED DEQ�� SEP 112019 ��V✓ 1CM-MHD CITY North Carolina Department of EnvironmentsFQwlity I Division of Coastal Management Wilmington Office 1 127 Cardinal DrI" Extemglon I WMimington. North Carolina 28405 910.796,T,215 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director City of Wilmington c/o Sterling Cheatham PO Box 1810 Wilmington, NC 28402 Dear Mr. Cheatham: NORTH CAROLINA Envtronmenrnt Qualtty August 28, 2019 The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the gold original and the white copy and return the white copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you plan to have the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the yellow Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure: Sincerely, Jeo� I4 Douglatt am Major Permits and Consistency Manager N.C. Division of Coastal Management WiRO Everett Pannkuk —Agent RECEIVED SEP 1 1 2019 DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 ''DRE`A" COPSULTMIG WGIMEERS, P.C.. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT 3811 PEACHTREE AVE SURE 300:: WILMINGTON, NC 28403 :: ANDREWENGINEERS.COM :: PHONE: 910.2025555 Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, N.C. 28405-3845 Re: Major Permit Request, 10 Cowan St., New Hanover County ACE Project No: 17053 On behalf of the City of Wilmington, We are requesting a LAMA Major Permit to convert a currently vacant Brownfields riverfront parcel into an outdoor amphitheater and park. The construction will consist of site grading, an open -building steel -framed amphitheater, steel -framed concession/restroom building with CMU infill walls, and timber -framed elevated walkways connecting to the existing Riverwalk. No excavation below NHW is planned. The contaminated soil will remain on site and property in accordance with the Brownfields Agreement. A portion of the existing riprap protection will be removed and replaced with beach armoring and marine mattress with stone fill. The existing coastal wetlands located at the north end of the property will be left undisturbed. The total tract will be 36% covered by impervious area. The notifications to the adjacent property owners have been sent via registered mail. Please contact me if there are any questions regarding this permit request. Thank you for your assistance. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. Firm PE License #C-2461 Neal W. Andrew, P.E., SECB Attachments: Agent Authorization Form MP-1, MP-2, MP-3 Deeds Certified Mail Receipt Drawings Wetlands Delineation RECEIVED WG 15 2" D.M WILMINGTON, NC RECEIVED SEP 1 1 2019 DCM-MHD-CITY-- {(V JDREW CONSULTING ENGINEERS, P.C. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT 3811 PEACHTREEAVE SUrrE300::WIL.MINGTON,NC28403::ANDREWENGINEERS.COM::PHONE: 910.202.5555 Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, N.C. 28405-3845 Re: Major Permit Request, 10 Cowan St., New Hanover County ACE Project No: 17053 On behalf of the City of Wilmington, We are requesting a CAMA Major Permit to convert a currently vacant Brownfields riverfrom parcel into an outdoor amphitheater and park. The construction will consist of site grading, an open -building steel -framed amphitheater, steel -framed concession/restroom building with CMU infill walls, timber -framed elevated walkways connecting to the existing Riverwalk, a new floating dock with piles landward of the harbor line and an aluminum gangway accessed via the existing Riverwalk. The new floating dock piling will be jetted in place and hammered into place using a conventional diesel hammer only if necessary, to get the required embedment if layers of dense soil are encountered. It is anticipated that this will occur at approximately -43 MLW due to the presence of a 10' thick dense sand layer. There will be 17 timber piling installed along the floating dock. The floating dock will be removable by unbolting the external pile guide from the dock as shown on the attached drawing page 13 of 13. Also, there will be excavation work for grading purposes as shown on the attached drawing page 5 of 13. No excavation below NHW is planned. The contaminated soil will remain on site and property in accordance with the Brownfields Agreement. A portion of the existing riprap protection will be removed and replaced with beach armoring and marine mattress with stone fill. The existing coastal wetlands located at the north end of the property will be left undisturbed. The total tract will be 36% covered by impervious area. The notifications to the adjacent property owners have been sent via registered mail. Please contact me if there are any questions regarding this permit request. Thank you for your assistance. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. Firm PE License #C-2461 Neal W. Andrew, P.E., SECB Attachments: Agent Authorization Form MP-1, MP-2, MP-3, MP-4 Deeds Certified Mail Receipt Drawings Wetlands Delineation RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED JUL 0 1 2019 DCM WILMINGTON, NC I ► �.,: s,; AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: City of Wilmington Mailing Address: PO Box 181 o Wilmington, NC 28402 Phone Number: 910-341-7810 denise.freund@wilmingtonnc.gov Email Address: mike.maklicki@wilmin tonnc. ov I certify that I have authorized Neal Andrew, PE Agent I Contractor ' to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: North waterfront Park at my property located at 10 Cowan Street, Wilmington in New Hanover County. I furthermore certify that / am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Oticer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Sterling Cheatham Print or Type Name City Manager Title bL I �8 /awl Date This certification is valid through 09 / 30 / 2020 RECEIVED SEP 11 2019 DCM-MHD CITY ,'-h c- ■ Complete items 1, 2, and 3. - A. Signatun ■ Print your name and address on the reverse Clt-_ so that we can return the card to you. ■ Attach this card to the back of the mailpleoe, B. Received or on the from if space permits_ NRMH Holding, LLC 720 N. 3rd Street, Suite 301 Wilmington, NC 28401 11 53 ❑ Agent C. Date D. Is delivery address dlflerek.4om Item 17 ❑ yes If YES, enter delivery address below: ❑ No II I IIIIII IIII I'I I IIIII II I'll lII IIII (III I II I III 3.o dW ce Type 9590 9402 4819 9032 5949 65 gturee Restricted Delivery C ifiled Maie 11 Regterms Mad Ratric etl De ❑ Mfiee Mau Restricted Delivery e y ❑ Ratum Receipt for Z. Article Number (Transfer from seryke /aW ❑ Collect m Delivery Me+U�aMlae ❑ Collect an Delivery Restricted Delivery ❑ Signature COMkmatlonTm 7 019 0140 0000 1405 9364 7 Insured Mall 3 luwred Restricted Deilvmy ❑ Signatum Confirmation Restricted Delivery PS Form 3811, July PSN 7530.o2-=-9p53 (wer swotMasi Domestic Return Receipt �r2015 ittAl�� WI I ll� RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED JUN 17 2019 DCM WILIANGTON, NC NC Division of Coastal Management Major Permit Application Computer Sheet AEC: Cape Fear River Fee: $400 #1 ill CDAITS T MHC cc Applicant: City of Wilmington c% Sterling Cheatham AgentlContractor: Andrew Consulting Engineers, P.C. / Everett Pannkuk Project Site County: New Hanover Staff: Tara MacPherson District: Wilmington Project Name: 10 Cowan St, North Waterfront Park Rover File: River Basin: Initial date of application submittal: 2-8-19 Date application "received as complete" in the Field office SITE DESCRIPTIION/PERMIT INFORMATION ORW: Yes No I PNA: Mes No Photos Taken: Yes No❑ d (riparian): Yes o Critical Habitat: Yes o Not Sure 15 foot waiver obtained: Yes o n Returned: 7Hazardk4ptificaVon SAV: Yes o ❑Not Sure ShellBottom: ❑Yes No Not cts: es No Sure Sandbags: ❑Yes No ❑ Not Sure Did the land use classificome from LUP: ❑YeSIN red (optional): ❑Yes o county o Moratorium Conditions: Environ@ental Assessment Done: Length of Shoreline: ❑Yes �,No ❑NA ❑Yes Pb o ❑NA I Zip FT Shellfish Area nation: Project Description: (c de) D velopment Area: (code) Open -or(Closed) SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) ❑Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW) High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORN) WETLANDSIMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemifiora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus 0 (TY) Cattail (Typha sp.) spicata) sp.) (JR) Black needlerush (Juncus El (SP) SalUmeadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 4144 can't be applied - $400 ❑ Minor Modification to a CAMA Major 0 Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer - $100 ❑ I II(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 4144 can be applied - $400 Major development extension request - II. Public or commerciallno dredge RECEIVED $100 r fill - $400 El I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comm w /D&F to 1 MAY 3 0 2019 acre; 4144 can be applied; DCM needs DWQ agreement - $400 Custom Island Homes / Kiser Date: 3-13-19 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One New Work Repla Maint ❑ ❑ Y ©(y U New Work Replace Maint ❑ ❑ Y AN New Work U Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work U Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New WorkJ7 Replace Maint ❑ ❑ Y ❑ N Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any anticipated Excludes any restoration total includes any anticipated Excludes any restoration and/or restoration or and/or temp restoration or temp impact ternimpacts) impactamount) temp im ads amount Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other t it Dredge ❑ Fill ❑ Both ❑ Other ❑ 7 I I Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919-733-2293 :: 1-888.4RCOAST :: www nceoastaimanagemant.net revised: 10/12/06 3 Date Date Check From Name of Vendor ! Check Check Permit Rct. # Received Deposited Permit Holder Number amount Number/Comments 4/15/2019 Andrew Consulting City of Wilmington SunTrust 10111 $400.00 major fee, 10 Cowan Street, Tmac rct. Engineers, PC Wilmington NHCo NO Split 0248 im Q m F_- > o 0 U 0 W M 2 LU q U Major Permit Fee Schedule Project Name: w �I) County: Check No & Amount: Development Type Fee DCM % DWQ % (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or $250 100% ($250) 0% ($0) excavation of any wetlands or open water areas: II. Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality $250 100% ($250) 0% ($0) Certification No. 4175 can be applied: w III(B). Public or commercial developm ` if General Water Quality Certificati $400 100% ($400) 0% ($0) No. 4175 can be applied. III(C). If General Water Quality Certification No. 4175 could be applied, but DCM staff determined that additional $400 60% ($240) 40% ($160) review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality $400 60% ($240) 40% ($160) Certification No. 4175 cannot be applied: IV. Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands and/or open water areas: RECEIVED MAY 3 0 2019 DCM-MHD CITY ROY COOPER ' MICHAEL S. REGAN BRAXTON DAVIS 1 �mcrlor'. Un¢nan o/('uasI'd V,magemrm May 24, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 (Courier 04-16-33) courtnev.spearsna ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: City of Wilmington / North Waterfront Park Project Location: 10 Cowan Street, adj to the NE Cape Fear River, in Wilmington, New Hanover Co. Proposed Project: construction of a city park & amphitheater with shoreline stabilization, timber walkways & transient floating dock. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address above by June 20, 2019. If you have any questions regarding the proposed project, contact Tara Macpherson at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT AGENCY SIGNATURE DATE RECEIVED State of Nonh Carolina I Environmental Quality I Coastal Management MAY 3 0 2019 127 Cardinal Drive Ext., Wilmington, NC 28405 910 796 7215 DCM-MHD CITY Recommendations for State Permit — City of Wilmington North Waterfront Park It is the staffs recommendation that the shoreline stabilization and development along this upland site on the riverfront is CONSISTENT with the Rules of 15 NCAC 7H.0209 (g) Urban Waterfronts. It appears through on -site visits and review of historical aerial photography that the majority of the impacts for these proposed structures along the Wilmington riverfront would be located along a shoreline currently usurped by existing and structures. It is the stab's recommendation that the Riverwalk, platforms, floating dock and shoreline stabilization along this on the riverfront is CONSISTENT with the Rules of 15 NCAC 7H.0209 (g) Urban Waterfronts. The construction of the floating dock would provide public access and transient docking space for up to 9 vessels. It appears that the project is CONSISTENT with the use standards set forth in NCAC 07H .0208(bx6), including the Y. width rule, however the floating dock does encroach into the Wilmington Harbor Line. The application states that pilings for the proposed floating dock would be located just landward of the Wilmington Harbor Line. The application states that these structures are designed to be removed if required by the USACE. This office has no objection to the proposed work, provided it is consistent with all other state and federal permitting requirements. Minor Turbidity should be expected during construction. RECEIVED MAY 3 0 2019 DCM-MHD CITY 0 NORTH CAROIINA (_)nvromnenurl Ch�alit� May 24, 2019 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice in New Hanover County • City of Wilmington Hello Angie: Please publish the attached Notice in the Thursday, May 30, 2019 issue. ROY COOPER Governor MICHAEL S. REGAN Secmmry BRAXTON DAVIS Director, Division of(7 a talMamgement The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Jarimy Springer, (Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. La Support & Customer Assistance cc: MHC file Courtney Spears - WiRO Liz Hair - USACE State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 919 796 7215 RECEIVED MAY 3 0 2019 DCM-MHD CITY NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On April 8, 2019 the City of Wilmington proposed to construct a citypark & amphitheater, shoreline stabilization & transientJloadng dock, adjacent to the Cape Fear River, in Wilmington, New Hanover County. A copy of the application can be examined or copied at the office of Tara MacPherson, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7425) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to June 20, 2019 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECEIVED MAY 3 0 2019 DCM-MHD CITY ROY COOPER NORTH CAROLINA Goremor Enyironmental Qttaflty MICHAELS.REGAN Secretary BRAXTON C. DAVIS May 23, 2019 Director Andrew Consulting Engineers, P.C. c/o EB Pannkuk 3811 Peachtree Ave, Suite 300 Wilmington, NC 28403 Dear Mr. Pannkuk: The Division of Coastal Management hereby acknowledges receipt of your application, as acting agent for the City of Wilmington, for State approval for development of the subject property located at 10 Cowan Street, adjacent to the Cape Fear River, in Wilmington, in New Hanover County. It was received as complete on May 17, 2019 and appears to be adequate for processing at this time. The projected deadline for making a decision is July 31, 2019. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from May 17, 2019, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a 'Notice of Permit Filing' postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Tara MacPherson Field Representative cc: Courtney Spears, DCM Liz Hair, COE Doug Huggett, MHC Chad Coburn, DWR Christine Bullard LPO Mr. Steding Cheatham, City of Wilmington i RECEIVED D-�/''� MAY 3 0 2019 North Carolina Department of Environmental Quality I Division of Coastal Management DCM-MHD Wilmington Office I t27 Cardinal Drive Extension I Wilmington. North Carolina 28405 CITY 910.7967215 W 0 N 0 N0T1(0"*1?j AMA PERMIT APPLIED ,PST. To construct a city park Ro F0,1 • • ♦ • .. . � . . FOR & amphitheatre w/ ,u m 0 m COMMENTS ACCEPTED THROUGH June ZO, 2019 0 APPLICANT: City of Wilmington PO Box 1810 Wilmington, NC 28402 Agent: Everett Pannkuk (910) 202-5555 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: NC �1 Div. of CoastalManagement Cardinal r. x ension M mmg on, ara MacPherson, Field Representati 910-796-7266 1. 2. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: City of Wilmington North Waterfront Park c/o Everett Pannkuk LOCATION OF PROJECT SITE: 10 Cowan Street, adjacent to the Northeast Cape Fear River, in Downtown Wilmington, New Hanover County Photo Index - 2006: 204-6659, 14-16, M-N LAT:34°14'52.71"N LONG:77°57'03.81"W 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visits— 5/15/19 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 04/08/2019 Complete— 5/17/19 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — City of Wilmington/New Hanover County Land Classification From LUP — Developed (Central Business District (CBD)) (B) AEC(s) Involved: EW/ES/PT (C) Water Dependent: Yes (D) Intended Use: Public and Commercial (E) Wastewater Treatment: Existing — None Planned — Stormwater infiltration and City stormwater/ sewer connections (F) Type of Structures: Existing — Vacant Land Planned - Shoreline stabilization, Public amphitheater, walkways and public floating dock for transient vessels. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (coastal and §404 wetlands) (B) Non -Vegetated Wetlands 3600 sq. ft. en water (incorporated) (C) Other - (Highground Disturbance) 42,500 s ft. q 64,800 s ft. 4• 211,995 sq. ft. (D) Total Area Disturbed: 322,895 sq. ft. (7.4 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SC Open: Closed 8. PROJECT SUMMARY: The applicant proposes to construct a city park and public amphitheater with site grading/excavation, shoreline stabilization, timber walkways and a transient floating dock adjacent to a section of the northern Wilmington downtown Riverwalk along the east bank of the Northeast Cape Fear River. RECEIVED MAY 3 0 2019 DCM-MHD CITY City of Wilmington North Waterfront Park c/o Everett Pannkuk Page Two 9. PROJECT DESCRIPTION The project site is a parcel of the old Ahnont Shipping Terminals property adjacent to the Northeast Cape Fear River (NECFR) in downtown Wilmington, New Hanover County. To locate the site from the Wilmington Regional Office (WiRO) travel south on Market Street (U.S. HWY 17) until you reach Martin Luther King, Jr. Parkway (N.C. HWY 74) which will be located on the right. Turn right and travel west approximately 3.5 miles until you arrive at North 31 Street in downtown Wilmington. Tom right onto N. Front Street and then take the second right onto Harnett Street until you reach the property of interest, which is located just to the west of the existing PPD building. The project site is located between Cowan Street to the north and Harnett Street to the south. The applicant's property is an approximately 6.4-acre tract of urban waterfront land, which averages approximately 1Oft. — 14ft. above mean high water (MHW) abutting the NECFR with approximately 800 linear feet of shoreline. The project also includes a 38,769 sq. ft. City of Wilmington right-of-way on the Nutt Street and Old Front Street Promenades. The property was purchased by the City from Riverfront Holdings LLC in December of 2013. The site has been associated with the old Almont Shipping Site along the Northeast Cape Fear River. It is a designated Brownfields site and was most recently utilized for spoil disposal during excavation for the adjacent Northern Riverfrom Marina, the upland portion of the project site was authorized as the designated spoil location for the excavated spoil material associated with State Permit No. 44-07. Once the material was de -watered, it was utilized as backfill for the new bulkhead and fill material and for the authorized upland development under State Permit No. 44-07. This site has also been authorized for re- development through a separate Brownfields Agreement. On March 28, 2014 a Soil Fill Source Approval was issued by the Brownfields Project Manager for the Northern Park Property authorizing the use of "clean fill" from Wilmington Materials on this site. The project limits extend north along Cowan street and the CFPUA pump station. The site is bordered to the south by a parking lot and vacant land, to the west by the Cape Fear River and existing Riverwalk and to the east by vacant land. The high ground areas, due to the industrial activities, are mostly un-vegetated except for sections of Coastal and Section 404 wetlands along the northern shoreline. There is existing rubble/rip-rap shoreline stabilization along a portion of the project site. There was an existing drainage ditch located within the center portion of the project site, located within a 50' City of Wilmington easement. The stormwater pipe has been abandoned and the wetland area was previously filled under State Permit No. 62-13. The drainage ditch located within the center of the project site (City easement) was impacted with 1,402 sq. ft of fill within Section 404 areas under a modification to State Permit No. 62-13 issued on November 14, 2013. Three pockets of Coastal Wetlands (769 sq. ft) along the southern shoreline downstream of the drainage ditch were determined to be insignificant in ecological function and were authorized for fill under an additional modification to State Permit No. 62-13 issued on March 11, 2014. State Permit No. 62-13 expired on December 31, 2016. The majority of the existing Coastal Wetlands in this area consists primarily of Smooth Cordgrass (Sportina alterniora); however, wetland species also includes the invasive species Common Reed (Phragmites australis). The vegetation along the northern end of the project consists of a marsh fringe ranging from approximately 20' to 80' in width as you move from south to north, consisting primarily of Smooth Cordgrass (Spartina alternii fora), Bulrush (Scirpus spp.) and Giant Cordgrass (Spartina cynosi roides). Due to the elevation, the vegetation transitions into §404 type wetlands, consisting primarily of Common Reed (Phragmites australis). Existing Coastal Wetlands and the normal high water boundary (NHW) are located on a Jurisdictional Determination dated March 6, 2019 and have been verified by the U.S. Army Corps of Engineers (USACE) (See Jurisdictional Determination map dated received on May 15, 2019). RECEIVED MAY 3 0 2019 DCM-MHD CITY City of Wilmington North Waterfront Park c/o Everett Pannkuk Page Three This project site is located just south of the old Dean Hardwoods property which has been re -developed under State Permit No. 76-97. Existing structures on this property includes an open water marina facility, shoreline stabilization, a timber Riverwalk and mixed -use upland development. The City of Wilmington/New Hanover County Joint 2006 CAMA Land Use Plan classifies adjacent waters as Conservation, and the adjacent high ground portion of the project area as Urban Conservation. The waters of the NECFR are classified SC by the Division of Water Resources. They ARE designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries and they are CLOSED to the harvest of shellfish. The USACE federally maintained channel and associated Wilmington Harbor is located adjacent to the project site. PROPOSED PROJECT: The applicant proposes to construct a city park and public amphitheater with site grading/excavation, shoreline stabilization, timber walkways and a transient floating dock adjacent to a section of the northern Wilmington downtown Riverwalk along the east bank of the Northeast Cape Fear River. The upland portions of this proposed project consist of an open stage with pile supports, concrete mat slabs and a steel frame, a concession building with steel frame, restroom building and park support building with a concrete retaining wall. There would be temporary seating installed directly adjacent to the stage with a concrete banded step area leading to the grass seating area. Timber framed elevated walkways are proposed are proposed with three areas of connection to the existing Riverwalk (see Sheets 3, 7 and 12 of 13). According to the applicant the total impervious coverage for the site would be 36% with 2-4% (portion of the stage and shoreline stabilization) being within the 75 ft. Coastal Shoreline AEC area. A new road would be constructed by the City on the Nutt Street right- of way and the Old Front Street right-of-way as part of this project (see Sheets 3 and 6 of 13). Please note the site development plan has been submitted to the Division of Water Resources Stormwater Section for review. The proposed high ground excavation would result in approximately 13,900 cubic yards of Brownfields site soils being excavated in an area measuring approximately 250 ft. in length by an average of 170 ft. in width (see grading plan Sheet 3 and 7 of 13). According to the applicant the excavation is to create grassed green space for educational areas and walkways within the park. Disposal of this material would be onsite, in an area measuring approximately 360 ft. long by 180 ft. wide and would seek approval through the Brownfields program. The disposal location includes the green space and sitting areas within the amphitheater allowing for the desired elevation change for stage viewing. The application states that 3 sediment basins will be installed for containment of surface water and filter fabric would be installed between contaminated soils and backfilled soils. Please note: Five existing monitoring wells on the southwest side of the property are proposed to be abandoned. There is a Brownfields agreement for this property and it is recorded with the New Hanover County Register of Deeds on Book 53 Pages 55-59. Proposed shoreline stabilization consists of Precast concrete and marine mattresses filled with rock (see sheets 3, 7, 11 and 12 of 13). The existing rip rap would be removed from the NHW line and above only. An approximately 620 ft. long by 19 ft. area along the existing shoreline would be transitioned from existing rip rap to what the applicant refers to as "beach amoring". The area is entirely above NHW and would be excavated back to the flexi mat and marina mattresses. The shoreline stabilization would be installed at a 4:1 slope in areas ranging from 10 ft. to 90 ft. landward of NHW. The area between NHW t7 and the new flexi-mat material would be upland grass. The applicant states that no Coastal Wetlands 0 A would be filled for shoreline stabilization. The application states that the toe of the shoreline stabilization would begin a minimum of 10 ft. landward of NHW. _rn o < The proposed floating dock would be 240 ft. long by 15 ft. in width to provide 9 transient slips associated o M with the park and amphitheater. The floating dock would be oriented parallel to the shoreline with access from the existing Riverwalk. (see Sheet 3 and 13 of 13). According to the applicant, the floating dock City of Wilmington North Waterfront Park c/o Everett Pannkuk Page Four would be located in water depths of -14 ft. at Mean Low Water aad would extend a maximum of 18 ft. waterward of the Riverwalk. Due to the proximity of the Federal channel in this location of the NECFR, the pilings for the proposed floating dock would be located just landward of the Wilmington Harbor Line; however, the floating dock itself would encroach approximately 15 ft. into the Wilmington Harbor Line. The applicant states that there are no services proposed such as fuel, maintenance or a pump out 10. ANTICIPATED IMPACTS The proposed amphitheater park and upland shoreline stabilization would impact approximately 319,295 sq. ft. of high ground area, including the City of Wilmington road construction, essentially within an area of shoreline in the river&ont which has been usurped with historical fill associated with the industrial use of the Brownfields site. The proposed shoreline stabilization portion of high ground area is almost entirely within the 75 ft. AEC. No impacts to Coastal Wetlands are proposed. The proposed floating dock would incorporate 3600 sq. ft. of Estuarine Waters and Public Trust Area immediately adjacent to the existing Riverwalk. As proposed, the proposed structures would conform to the 1/4 distance rule; however, the floating dock would encroach into the Wilmington Harbor Line. The application states that these structures are designed to be removed if required by the USACE. The proposed floating dock would provide side to transient slips for up to 9 vessels. Minor Turbidity would be expected during construction. Submitted by: Tara MacPherson Date:.May 23, 2019 Office: Wilmington RECEIVED MAY 3 0 2019 pCM_MHp CITY ■ ANDREW CONSULTING ENGINEERS, P.C. BE STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT 3811 PEACHTREE AVE SUITE 300:: WILMINGTON, NC 28403 :: ANDREWENGINEERS.COM :: PHONE: 910.202.5555 Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, N.C. 28405-3845 Re: Major Permit Request, 10 Cowan St., New Hanover County ACE Project No: 17053 On behalf of the City of Wilmington, We are requesting a CAMA Major Permit to convert a currently vacant Brownfields riverfront parcel into an outdoor amphitheater and park. The construction will consist of site grading, an open -building steel -framed amphitheater, steel -framed concession/restroom building with CMU infill walls, timber -framed elevated walkways connecting to the existing Riverwalk, a new floating dock with piles landward of the harbor line and an aluminum gangway accessed via the existing Riverwalk. Also, there will be excavation work for grading purposes as shown on the attached drawing page 5 of 14. No excavation below NHW is planned. The contaminated soil will remain on site and property in accordance with the Brownfields Agreement. A portion of the existing riprap protection will be removed and replaced with beach armoring and marine mattress with stone fill. The existing coastal wetlands located at the north end of the property will be left undisturbed. The total tract will be 36% covered by impervious area. The notifications to the adjacent property owners have been sent via registered mail. Please contact me if there are any questions regarding this permit request. Thank you for your assistance. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. Firm PE License #C-2461 Everett B. Pannkuk, P.E., SECB Attachments: Agent Authorization Form MP-1, MP-2, MP-3 Deeds Certified Mail Receipt Drawings Wetlands Delineation RECEIVED MAY 3 0 2019 RECEIVED MAY 2 2 201q DCM-MHD CITY DCM WILMINGTON, NC 11CM MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name City Of Wilmington Project Name (if applicable) North Waterfront Park Applicant 1: First Name Sterling MI Last Name Cheatham Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 1810 City Wilmington State NC ZIP 28402 Country New Hanover Phone No. 910 - 341 - 7810 ext. FAX No. Street Address (d different from above) City State ZIP Email sterling.cheatham@wilmingtonnc.gov 2. Agent/Contractor Information Business Name Andrew Consulting Engineers, P.C. Agent/ Contractor 1: First Name MI Last Name Everett B Pannkuk Agentl Contractor 2: First Name MI Last Name Mailing Address PO Box City State 3811 Peachtree Ave Suite 300 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403 910 - 202 - 5555 ext. ext. FAX No. Contractor # 910 202 5558 Street Address (if different from above) City State ZIP Email RECEIVED RECEIVED <Form continues on back> MAY 3 0 2019 MAY 16 2C19 DCM WILMINGTON, NC DCM-M!" 013ITY08 .. 1-888-4RCOAST .. www.nccoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # New Hanover 10 Cowan Street Subdivision Name City State Zip Code 058310 Wilmington NC 28401 - Phone No. Lot No.(s) (rf many, attach additional page with list) ext. Parcel ID: R04716-001-003-000, , , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project NE Cape Fear NE Cape Fear River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Atlantic Ocean e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Wilmington 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 800 319,295 entire tract (lot 280,526 and 38,769 right of way) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 6.44 acres, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) +10' to +14' NAVD88 ❑NHW or ®NWL e. Vegetation on tract Predominately grass with a small gravel access road from Harnett St. The shoreline consists of stone rip rep for — 90% of the shoreline. The remaining 10% consits of unreinforced shoreline waterward of the existing riverwalk boardwalk. Some of the unreinforced shoreline consists of coastal wetlands. f. Man-made features and uses now on tract The Wilmington Riverwalk is waterward of this parcel. There are I monitoring wells. All monitoring wells will be abandoned per the Brownfield agreement. g. Identify and describe the existing land uses adiacent to the proposed project site. A forty (40) boat marina adjacent to the north with a newly developed apartment complex landward of the marina. To the immediate south is unused land followed by a marina and 2 restaurants. Landward of the southern marina is the PPD headquarters building. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? CBD - Central Business District (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA J. Is the proposed activity part of an urban waterfront redevelopment proposal? ®Yes []No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECEIVED RECEIVED <Form continues on next page> M4 10 2019 [)CM WILMINGTON, NC 252-808.2808 .. 1.888.4RCOASt veww.nccoastat management. net DCM-MHD CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? ®Yes ❑No (it) Are there coastal wetlands on the site? ®Yes ❑No (ili) If yes to either (i) or (li) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Unused land o. Describe existing drinking water supply source. Unused land p. Describe existing stone water management or treatment systems. Unused land 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ®PubliciGovemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. A new public ampitheatre and park. It has fixed seating for 2,400 and lawn seating for 4,380. Area will be open to the public. There will be a series of walkways tying into the existing Riverwalk for pedestrian traffic and improved access to the Riverwalk. There will also be a public floating dock. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The proposed shoreline stabilization is precast concrete blocks and marine matresses filled with stone. The work should be performed by cranes and bobcats from the land. Elevated timber walkways connected to the Riverwalk will be constructed from the land as well. Floating dock and gangway will be installed from a barge crane. d. List all development activities you propose. Shoreline protection, elevated timber walkways to the Riverwalk, floating dock - waterward of NHW. Ampitheatre, concession building, park office, restroom builing, concrete retaining walls - landward of the NHW. The project will not impact existing identified wetlands. New man-made marshes will be constructed. e. Are the proposed activities maintenance of an existing project, new work, or both? New I. What is the approximate total disturbed land area resulting from the proposed project? 7.33 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Existing: surface runoff to the river. New: Stomtwater infiltration system under park lawns. Connections to City stormwater and sewer systems. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No DNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA I. Is there any mitigation proposed? ❑Yes ❑No NA 'RECEIVED If yes, attach a mitigation proposal. RECEIVED <Form continues on back> MAl 16 ' MAY 3 0 200 DCM WILMINGTON, NC D252r8,Qa•a% :- 1-888-4RCOAST .. www. n cc oasta l management. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application Instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that Is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Sawmill Point Marina, LLC Phone No. Address 1015 Nutt Street Wilmington, NC 28401 Name NRMH Holdings, LLC Phone No. Address 720 N. 30 Street, Third Floor Wilmington, NC 28401 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pernittee, and issuing dates. CAMA Permit # 44-07, Subject parcel spoil disposal area only CAMA Major Permit # 62-13, Issued May 20, 2013, Issued to: Riverfront Holdings II, LLC, For construction of the Riverwalk timber -framed boardwalk h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date S�ts�/9 Print Name E.B. Pannkuk Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development RECENED RECEIVED ❑DCM MP-4 Structures Information 11AY 3 0 2019 MAY 16 A-MHDCITY DCM WILMINGTON 252-808-2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length N/A N/A WA WA N/A N/A N/A Width N/A WA WA WA N/A N/A WA Avg. Existing N/A N/A N/A N/A NA NA WA Depth Final Project WA N/A N/A WA NA NA WA Depth 1. EXCAVATION ❑This section riot applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Brownfields site soils. 0 c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), 13,900 CY or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None III) Describe the purpose of the excavation in these areas: Provide an educational space for the public to learn about tides. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Location will be approved through the Brownfields program. TBD c. (1) Do you claim title to disposal area? d. (1) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA Dyes ❑No ®NA (ii) If no, attach a letter granting permission from the owner. (11) If yes, where? e. (i) Does the disposal area include any coastal wetlandstmarsh f. (1) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: Contaminated soil will be properly disposed RECEIVED RECEIVED NI aspects of this will be specifically approved through the Brownfields program. APR 0 S 2019 MAY 3 0 2019 DCM-MHD City DCM WILMINGTON, NC 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaAement.net revised: 12126'06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: []Bulkhead ❑Riprap ❑Breakwater/Sill ®Other: see e. c. Average distance waterward of NHW or NWL: N/A e. Type of stabilization material: Precast concrete and marine mattress filled with rock. g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other i. Source of fill material. N/A b. Length: 620' Width: 19' d. Maximum distance watenvard of NHW or NWL: 10' f. (I) Has there been shoreline erosion during preceding 12 months? []Yes ®No [_-]NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. N/A 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? []Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (II) Amount of material to be placed in the water _ (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL submerged aquatic vegetation (5AV), shell bottom (55), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Retained excavated material will meet requirements of Brownsfield Badkhoe. agreement. Erosion control design includes BMPs. c. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (11) If yes, explain what type and how they will be implemented. r5% Date North Waterfront Park Project Name d. (1) Will wetlands be crossed in transporting equipment to project site? []Yes ®No []NA (11) If yes, explain steps that will be taken to avoid or minimize environmental impacts. E.B. Pannkuk Applicant Name RECEIVED Applicant Signature APR 0 S 2019 RECEIVED DCM WILMINGTON, NC 252-808-2808 :: 1.8884RCOAST :: _w_ww.nccoastalmanaa ement.net DCM-MHD CITY revised: 12126/06 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. (1) Stage: aggregate pile supported, concrete mat slab, with steel frame, open bldg. (1) Concession building:concrete slab on grade, steel frame, CMU infill walls (1) Back of house / restroom building: concrete slab on grade, steel frame. (1) Park support building: concrete slab on grade Concrete retaining walls around perimeter (landward side) Timber framed elevated walkways c. Density (give the number of residential units and the units per acre). 0 e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes ®No ❑NA (ii) If yes, list the date submitted: N/A g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or bullt-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 2% I. Give the percentage of the entire tract to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 36% j. Describe proposed method of sewage disposal. Connect to the Wilmington public santitary sewer system. I. Describe location and type of proposed discharges to waters of the b. Number of lots or parcels. 1 parcel, upgrades to public right of ways d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 7.33 acres of land disturbance. 6.44 acre parcel and 0.89 acre road right of way. A new road will be constructed on the right of way as a part of this project. f. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. Pavers, concrete, asphalt h. Projects that require a CAMA Major Development Permit may also require a Stornwater Certification. (1) Has a site development plan been submitted to the Division of Water Quality for review? []Yes ®No ❑NA (II) If yes, list the date submitted: Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. RECEIVED MY 16 m. Does the proRE46 MiDide an innovative sto lwater019 DCM WILMINGTON, NC 252-808-28082 :: 1-888-4RCOAST :: www.nccoastaimanamement.net revised: 12/26/06 DCM-MHD CITY Form DCM MP-3 (Upland Development, Page 2 of 2) state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, 'Wash down" and residential discharges). Surface runoff, (3) sediment basins for containment of surface water with filter fabric separation between contaiminated soils and backfill soils, and connection to City sewer and stonnwater m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Wilmington public water system. o. When was the lot(s) platted and recorded? December 2, 2013 S/i S/i y Date North Waterfront Park Project Name E.B. Pannkuk Applicant Name C- - Applicant Signature design? ❑Yes ®No ❑NA If yes, attach appropriate documentation. n. (1) Will water be impounded? []Yes ®No ❑NA (ii) If yes, how many acres? N/A p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes []No ®NA RECEIVED MAY 3 0 2019 RECEIVED MAY 16 2019 DCM-MHD CITWCM WILMINGTON, NC 252-808-2808 :: 1.088-4RCOA5T :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please indude all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina. ❑Commercial ®PublidGovernment ❑Private/Community c. (I) Dock(s) and/or piers) (11) Number 1 (!if) Length 240' (iv) Width 1s (v) Floating ®Yea []No N q e. (i) Are Platrt rms included? ❑Yes ONc If yes: fill Number _ (ai) Length _ (IV) Width (v) Floating []Yes []No Note: Roofed areas are calculated from dnpline dimensions. g. (i) Number of slips proposed 9 transient slips (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: m. (i) Will the facility have tie pilings? ❑Yes ONO (11) If yes number of be pilings? ❑This section not applicable b. (I) Will the facility be open to the general public? ®Yes ❑No d. (i) Are Finger Piers Included? ❑Yes ®No If yes: (it) Number _ (III) Length (Iv) Width _ (v) Floating []Yes ❑No f. (i) Are Boatlitts included? ❑Yes ®No If yes: (g) Number (ru) Length (tv) Width _ h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage (Wet slips") only, number of slips: $ ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: _ ❑ DOW, please describe: I. Describe the typical boats to be served (e.g., open runabout. charter boats, sail boats, mixed types). private boats for transient use I. (1) Will the facility be open to the general public? ®Yes ❑No "EIVED MAY 3 0 Z019 RECEIVED i"M-MHD CITIDCM WILMINGTON NC 252-808-2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 2 of 4) 2. DOCKING FACILIT y/MARINA OPERAnoNs ®This section not appltcabte a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons: Number: _; Locat7on: ❑ Showers ❑ Boatholding tank pumpout; Give type and locatlon: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge' signs proposed. (it) Give the location and number of "Pumpout Available" signs proposed. I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. I. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED RECEIVER APR 0 8 2019 in. Is the manna/docking facility proposed within a primary or secondary nursery area? eves oNo MAY 3 0 2019 DCM WILMINGTON, NC 252-806-2808 :: 1-088-4RCOAST :: www.nccoastalmanagemgnt,n@t R CITY revised: 12127106 Form DCNI MP-4 (structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wedandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marma/docking facility located within or within close proximity to any shelf ish leases? ❑Yes ®No If yes, give the name and address of the leasehoider(s), and give the proximity to the lease. 3. BOATHOUSE (including covered IlRs) ®This section not applicable a. (1) Is the boathouse suucture(s): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (N) Length (iv) Width _ Note: Rooled areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill) ®This section not appltcable a. (i) Number _ (u) Length (ili) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 16. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Govemmenl ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED APR 0 8 Z019 DCM WILMINGTON, NC 252-808-2808 :: 1-888.4RCOAST :: www.nccoa§jal nanagement.net revised: 12127/06 Form DCM MP-4 (structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines -40' Mote: For buoy or mooring piling use arc of swing including length of vessel. c. Width of water body _1000 e. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (0) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adlecent docking facilities. -70' from the City Marina to the south d. Water depth at waterward end of structure at NLW or NWL Aooroxjmately -15' MSL or -14' MLW & OTHER ❑This section not applicable I a. Give complete description: The proposed floating dock is (1) 240' long by 15 wide timber floating dock adjacent to the Wilmington Riverwalk. It will be oriented parallel with the shoreline. Access will be from the existing Riverwalk boardwalk via a new aluminum gangway. The boat slips will be available to the public and are transient boat slips. Y� fZ/!`i Date North Waterfront Park Project Name E.B.Pannkuk Applicant Name Applicant Signature RECEIVED MAY 3 0 2019 n, ^ITY RECEIVED APR 0 S 2019 DCM WILMINGTON, NC 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanaeement.net revised: 12127/06 WATERFRONT PARK a — aszstt..... r� e SHOREME STMILV TIp1ww APR 0 S 2019 DCM WILMINGTON, NC AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: city of Wilmington Mailing Address: PO Box 1810 Wilmington, NC 28402 Phone Number: 910-341-7810 denise.freund@wilmingtonnc.gov Email Address: mike.naklicki®wilmingtonnc.gov I certify that I have authorized E.B. Pannkuk, PE Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: North waterfront Park at my property located at 10 Cowan Street, Wilmington in New Hanover County. I furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Sterling Cheatham Print or Type Name City Manager Title / //1 //9 Date This certification is valid through 07 / 31 / 2019 RECEIVED MAY 3 0 2019 DCM-MHD CITY RECEIVED APR 0 8 201P DCM WILMINGTON, NC USPS.com® - USPS Tracking® Results https://tools.usps.com/go/TrackConfumAction?tLabels=70181130... USPS Tracking® FAQs >(httpsJ/www.usps.com/fagatuspatmking-faqs.htm) Track Another Package + Tracking Number. 70181130000103018716 Remove x Your item was delivered to an individual at the address at 1:43 pm on October 4, 2018 in WILMINGTON, NC 28403. G Delivered October 4, 2018 at 1:43 pm m Delivered, Left with Individual m a WILMINGTON, NC 28403 rr v Tracking History n October 4, 2018, 1:43 pm Delivered, Left with Individual WILMINGTON, NC 28403 Your item was delivered to an individual at the address at 1:43 pm on October 4, 2018 in WILMINGTON, NC 28403. October 3, 2018, 9:54 am Out for Delivery WILMINGTON, NC 28401 October 3, 2018, 9:44 am Sorting Complete WILMINGTON, NC 28401 RECEIVED MAY 3 0 2019 DCM-MHD CITY of 4 i/20ftt#,,t1-M A%f, Com ■ Print your name a, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, La �'�e�� on the front if space permits. _or t, e,«�in nnn.nceM tn' D. Is deliv Sawmill Point Manna, LLC RYES, 1015 Nutt Street Wilmington, NC 28401 ❑ Agent Q dress different trDm item 17 ' U let delivery address below. ❑ No 1-16j,5 1 �IIIIIIII IIII IIIIIIIIIIIIN III III 111111111111 2 Pi:ZedMallRQSW AdultS ub" Resbicted Delivery 13 9590 9402 4819 9032 5949 96 M I- a Mail® D� d Mall Restrkted Dell%wy B206 o Delivery d Return Receipt for Mercha+rdiee _ 2. Prticie N,—� QQDQ 1yQ5 C ;. t m DeL,ery Restmied Deiiveq ❑sg anae con xrreb D1 {Q Irsumd NW Inswed ❑ Sips m CaM matln PRsd fed Delivery ❑ Ma Restrkted Delon (over f5001 PS Form 3811, July 2015 PSN 7530-02-000-9053 Dorrlesbc Retum Recet RECEIVED MAY 2 2 2019 DCM WILMINGTON, INC Postal mCERTIFIED MAIL@ a Domestic ru m m WI'0'P Pa C"I A L U $ rtlgetlMeAFaa $3.I150 0406 p _ o- ❑neMnnnelgtm•�xP�1 02 p O ❑g•W Ra pt(v ft.b) : it lift ❑C«t wnwl n.mt�Me owy $ ?(� I'(J paw � O ❑wultsig„ paq.yw $wry pw-rc S19M Hnfttcntl"ni -- e Flel. � Postage r-1 � °°`ag'a NRMi Holdings LLC 04/01/2019 � $ �•^�� 720 N 3ro St M1 snaatawxF? Wilmington, NC 28401 Postal CERTIFIED MAIL@ RECEIPT ru W WIL Gppi VOI A L USE Certigee Melt se 83.50 0406 ,q O $ roo eearxex.ce ❑gn Ptft tl W $ 1 1 02 O ❑� Ra ptl•Ix o $ tt7.1711 PaVMtk O M -❑Cw MellFnlMyD*M t er. r •, Owuftsom.pqu � � H" O ❑weft SWn RenletMDk" -I-Postage $i ri p $ TOW Poetageanl - — 04/01/2019 Sfiill Point Manna, LLC a $ SOW To 1015 Nutt Street static IV, Wilmington, NC 28401 RECEIVED MAY 3 0 2019 D CEIVED CITY APR 0 8 2019 DCM WILMINGTON, NC U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-00%5 County: New Hanover U.S.G.S. Quad: NC -Wilmington NOTIFICATION OF JURISDICTIONAL DETERMINATION Applicant: City of Wilmington Agent: S&EC Sterling Cheatham Bob Zarzecki 102 N 3rd St 8412 Falls of Neuse Road Wilmington, NC. 28401 Suite 104 Raleigh, NC 27615 Size (acres) 7.08 Nearest Town Wilmington Nearest Waterway Cave Fear River Basin Cape Fear USGS RUC 03030007 Coordinates Latitude: 34.248246 Longitude:-77.950904 Location description: Progect is located southwest of Cowan Street in Wilmington, New Hanover County, North Carolina. Property is bordered to the west by the Cape Fear River Sawmill Point Apartments to the North and Harnett Str a the South. The Cape Fear Riverwalk runs along this property. R - Indicate Which of the Followin¢ Aanly: MAY 3 0 2013 A. Preliminary Determination DCM-MHD CITY ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated MAP DATE. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHAjurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ® There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our publiPtd>ID, this determination may be relied upon for a period not to exceed five years from the date of this notificatio . MAY 16 2019 DCM WILMINGTON, 41C ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated MAP DATE. If you wish to have the delineation surveyed, the Corps can review and verify the survey upon completion. Once verified, this survey will provide an accurate depiction of all areas subject to CWA and/or RHA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ® The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 3/26/2019. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA) You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Capito at (910)-251-4487 or Rachel.A.Caoito(a),usace.armv. mil C. Basis For Determination: Basis For Determination: See the approved jurisdictional determination form dated 3/26/2019. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 5/25/2019. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence." CAPITO.RACHELAN.", .,...� RECEIVED Corps Regulatory Official: N.1536276790 d „ Y� Date of JD: 3/26/2019 Expiration Date of JD: 3/26/2024 MAY 3 0 2019 DCM-MHD CITY NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: City of Wilmington, Sterling h atham I File Number: SAW-2012-00965 Date: 3/26/2019 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or the Co s reaulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Pemussion (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this forth and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section H of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further considG[s1[ip>l Corps to reevaluate the JD. Frit ttll::tt�t �/ED SECTION iI - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT MAY 3 0 Z019 uCM-MHD CITY REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However,you may provide additional information to clarify the location of information that is already in the administrative record. b—RACT FOR QUESTIONS OR2IFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: Rachel Capito CESAD-PDO Wilmington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 10M15 69 Darlington Avenue Atlanta, Georgia 30303-8801 Wilmington, North Carolina 28403 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni to varticivate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this farm to: District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito , 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8901 Phone: (404) 562-5137 RECEIVED MAY 30 23'19 DCM-MHD CITY EXISTING PK WVL f20 •" ^°' IN INTERSECTION OF COWAN STREET AND NORTH FRONT STREET / W152.4121,6M1- / RFFERENCES: E=2,311.616.BBIB" OFF. BOOK. SIM PAGE 729 EL'40.4' / MAP BOOK 58 12 PAGE 310 MAP BOOK PAGE D6 APODK MB59 PAGE 55 0X L/ MAP B0PAGE J MAP BOCONCRETE MONIRENT Y6 MAP BLOCK / K 6 60 PAGE 319 60 PAGE 9 XM83,09).B)31' NOTES: I. ALL DISTANCES ARE HORIZONTAL GROIM 2. ALL AREAS BY COORDINATE CGIWRATIGN / 14• Y\H(NAX GYIBI! "M BCQ W P/AE Ii1 ruP a9BIr ¢ PAre a PA4E ]Y NM Y.VI lE P16E 3 80 40 0 80 160 240 SCALE: 1 "=80' wfu mT . SngiRwXiRg DBTWPO • Pub&SM N RaY.0 Nn. NIyYp.IICfI1f. RNI YI-'.Y wTEa SURVEY: X,% wuWx. MAV 2,, 20,8 HAS CXEOKFD: EA PRW.FNGR: XX e®6IKKK IXY 0 P40[nm MV BOXt OB Pm Sn -TAL MA .,IN aR. A. ALREB x TRACT 1-8 REVISED DEED BOOK 57N PAGE 2955 HA` BOOK 58 PAGE 310 MAP BOOK 60 PAGE 09 / TOTAL AREA / "0,084&F.=6.43 ACRESJOR4 N WATERS THE NATION STA THEOF TES / 'v a �fy ..,10W. �TLANDS NORMAL HIGH WATER LINE m°O0H1mo / i Y33 / itNcn. mrM . µ4rtL WETIMN CZ:) U SCAR Q I ag 2 aR' SEAL 5 - i , 070 bt9 So OLO FRONT STREET xnt'A,w �MMI6YV 9YVmVY \ SS tim \\ WrWn„ eM•M'Yw `-`��. \ SLIK 1 \ 6'E aaro I MS•y.'ISM ' 1 •THIS CERTIFIFG THAT THIS COPY OF THIS RAT IDENTIFIES ALL AREAS OF WATERS OF THE UNITED STATES REGUATEO MRSUAIT TO SECTION 4" OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS THERE IS CHANGE IN THE LAW OR OU2 MIBLISHED REGU.ATIMS, THIS DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE YEARS FROM THIS DATE. THE UNDERSIGNED COMRETEU THIS DETERMINATION UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 19117 U.S. ARMY CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL. 33 C.F.R. PART S25 AND OTHER U.S. MMY COINS DF ENGINEERS GUIDANCE.' REGUATORY OFFICUL: Rachel Capito TITLE; Regulatory Specialist DATE 03/26/2019 IUP BDACE ACTION ID HO.: snw-2012Doses �. LGW PIBE E]B "`CPATN JURISDICTIONAL BOUNDARY MAP OF THE NORTH RIVERFRONT PARK SCALE GK`K ffi YRa. PM °" "°'"R""" NORTH RIVERFRONT PARK �1l=eor PMMITN9WBnVXeMVpa FILE RAWE CITY OF WILMINGTON PARKS BOND -2018 SHEET I I[TN RN tPerE20 retry CITY OP NiLMINOTON VALMINGTp1 TOWNSHIP NEW HWOVPR COUNTY NORTH CAROLW4 2 of MAY 15 2019 DCM WILMINGTON, NC ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director May 9, 2019 W y NORTH CAROLINA Environmental Quality City of Wilmington Attn: Sterling Cheatham, City Manager PO Box 1810 Wilmington, NC 28402 Subject: State Stormwater Management Permit No. SW8 190401 North Waterfront Park High Density Commercial Project New Hanover County Dear Mr. Cheatham: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for the subject project on April 1, 2019, with final information on May 8, 2019. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. SW8 190401 dated May 9, 2019, for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until May 9, 2027 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that maybe required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and are herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filingfee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Linda Lewis in the Wilmington Regional Office, at (910) 796-7215 or linda.lewis@ncdenr.eov. SincereRECEIVED MAY 3 0 2019 fe, S. Daniel Smith, Interim Director Division of Energy, Mineral and Land Resources DCM-MHD CITY Enclosures: Attachment A- Designer's Certification Form RECEIVED Application Documents GDS/arl: G:\\\Stormwater\Permits & Projects\2019\190401 HD\2019 05 permit 190401 my 1 0 ?019 cc: Adam Pike, P.E., Stewart, Inc.(223 S. West Street Suite 1100 Raleigh NC 27603) New Hanover County Building Safety Department. Division of Coastal Management QCM WILMINGTON, NC Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796,7215 nuuiiwawi rv,a ,ayc, m � Permit No. SW8 190401 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules - the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO The City of Wilmington North Waterfront Park 10 Cowan Street, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) and two (2) infiltration basins (RainTank©) and 5 areas of permeable pavement ("stormwater control measures" or "SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until May 9, 2027 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 90,560 square feet. The runoff from all BUA within the permitted drainage areas of this project must be directed now and in the future, into the permitted SCMs. The fouowing specific requirements pertain to the BUA on this project: a. SCM BUA LIMITS. The SCMs labeled DA1, DA2, DA3, DA4, DAS, DA6 and DA7 have been designed using the runoff treatment method to handle the runoff from 36,437 sf (square feet); 6,637 sf; 10,175 sf; 8,186 sf; 13,463 sf; 8,724 sf; and 6,938 sf of BUA, respectively, within the delineated drainage areas. This permit does not provide any allocation of BUA for future development within the delineated drainage area(s). b. CAMA AECs. Where a project or lot is located within CAMA's Area of Environmental Concern (AEC), the Division of Coastal Management (DCM) may calculate a different maximum BUA based on CAMA regulations. The more restrictive BUA limit will apply to the project RECEIVED MAY 3 0 2019 Page 1 of 6 DCM-MHD CITY HO rr write Vldlldye(TtdflL Permit No. SW8 190401 Z SCM REQUIREMENTS. The following requirements pertain to the SCMs on this project. a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated SupplementEZ form and as shown in the approved plans and specifications. The SCMs must be provided and maintained at the design condition. b. PRETREATMENT. The following pretreatment device(s) has (have) been provided to prevent clogging: sumps in catch basins, c. PERMEABLE PAVEMENT The following considerations pertain to the proposed infiltrating permeable pavement: i. Except for the incidental, unavoidable runoff from the stable vegetated areas shown on the approved plans, runoff from adjacent pervious areas shall be prevented from reaching the permeable pavement. ii. It is recommended that during the installation of the permeable pavement, care is taken to avoid compaction of the underlying subgrade soils. To confirm compaction has not occurred, it is recommended that a direct measurement of the soil's infiltration rate be conducted after excavation and before the aggregate is placed. If the infiltration rate has diminished, it is recommended to scarify, rip, or trench the subgrade to restore the infiltration rate. iii. After installation, the permeable pavement shall be protected from sediment deposition until the site is completed and stabilized. iv Concentrations of oils, grease, heavy metals, and toxic chemicals shall not be stored or handled where they may enter the permeable pavement. V. At no time shall the approved permeable pavement be paved over or repaired with any type of conventional paving material. STORMWATER OUTLETS. This project has demonstrated that the on -site stormwater systems will not discharge from the 10-year storm event and therefore will not have the opportunity to cause erosion during the 10-year storm event. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a- BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans or in the following instances where the BUA has been minimized and channelizing runoff from the BUA is avoided: i. Water dependent structures; and ii. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights that cannot practically be located elsewhere. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, ancii-E ED permanent drainage easements, in accordance with the approved plans. Page 2 of s MAY 3 0 2019 DCM-MHD CITY Permit No. SW8 190401 d. DEED RESTRICTIONS. The permittee shall incorporate specific restrictions and conditions into a facility management plan or another legal instrument in lieu of deed restrictions and protective covenants. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. UNDERGROUND SCMs. It is recommended that during the installation of the underground SCM, photos be taken documenting the construction and demonstrating that the constructed SCM meets the approved design. It is further recommended that these photos be submitted with the required Designer's Certification. b. SCM OPERATIONAL PRIOR TO DEVELOPMENT. During construction now and in the future, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are fully converted to SCMs. The permittee shall ensure that the SCM is protected from any sediment and erosion generated by any future construction within the project area The permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. c. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 7. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails; or landscaping material to be considered a permeable surface, not already shown on the approved plans and specifications. g. Any other modifications as determined by the Director. RECEIVED MAY 3 0 2019 Page 3 of 6 DCM- MHD CITY Permit No. SW8 190401 8 DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division. ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants, and iv. A copy of the recorded plat delineating the public rights -of -way; dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans; the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance 9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary; as listed in the signed operation and maintenance agreement; to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 10. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 11. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project, c. A mailing address change of the permittee. RECEIVED MAY 3 0 2019 Page 4 of 6 DCM-MHD CITY AUI I flWdIM lVidl ldyc'c 11 Permit No. SW8 190401 12. PERMIT TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure; subject to the requirements of Session Law 2013-121, b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA for the entire project and within the drainage area of each permitted SCM, does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. RECEIVED Page 5 of 6 MAY 3 0 2019 DCM.MHD CITY Permit issued this the 9`" day of May 2019. State Stormwater management Permit No. SW8 190401 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION x Daniel ith, Int9fim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 190401 RECEIVED MAY 3 0 2019 Page 6 of 6 DCM-MHD CITY State Stormwater Management Permit No. SW8 190401 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project. • As -Built Permittee Certification • As -Built Designer's Certification General MDC • As -Built Designer's Certification for Infiltration Project • As -Built Designer's Certification for Permeable Pavement Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. RECEIVED MAY 3 0 2019 Page 1 of 1 DCM-MHD CITY )LU1111WdLU1 vial aye iic l Permit No. SW8 190401 AS-BLILT PERMIITTEE CERTIFICATIONS I hereby state that I am the current perminee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. 8 Check here if this is a partial certification. Section/phase/SCM 4? Check here if this is part of a Fast Track As -built Package Submittal. Printed a Notary Public in the State of County of do hereby certify that personally appeared before me this day of and acknowledge the due execution of this as -built certification. Witness my hand and official seal My commission expires (SEAL) 20 Petmittee's Certification NCAC .1042(4) leted / Com Pr rovided N/A A. DEED RESTRICTIONS / BUA RECORDS 1. The deed restrictions and protective covenants have been recorded and Y or N contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants has been Y or N provided to the Division. 3. Records which track the BUA within each DA are being kept. Y or N B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N i 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection / conveyance system y or N are located in recorded drainage easements, Tights -of -way or common areas. 2. A copy of the recordedplat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that y or N N/A have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N N/A 2. A typical detail for the SCM. Y or N N/A 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in NCGS 143 Article Y or N N/A 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the fmal recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and appears in y or N the chain of title. 3. _Specific restrictions and conditions have been incorporated into a facility management plan or another legal instrument in lieu of deed restrictions and Y or N protective covenants. F. OPERATION AND MAINTENANCE PLAN — maintenance records are y or N beingkept in a known set location for each SCM and are available for review. G. DESIGNER'S CERTIFICATION FORM — has been provided to the y or N Division. CEIVED MAY 3 0 2019 Page 1 of 7 ')CM-MHD CITY State Stormwater Management Permit No. SW8 190401 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC l hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS - BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration SEAL: Signature Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: OO Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) & General MDC .1050OAs-built ON/E ®N/A A TREATMENT REQUIREMENTS / BUA 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is bypassed. Y or N 4. Runoff from offsite areas and/or existing BUA is directed into the permitted SCM and is accounted for at the full build -out Y or N potential. 5. The project controls runoff through an offsite permitted SCM Y N that meets the requirements of the MDC. or 6. All of the constructed BUA has been accounted for in the Y N design of the appropriate SCM s . or 7. The SCM(s) meets all the specific minimum design criteria. Y or N B. VEGETATED SETBACKS / BUA 1. The width of the vegetated setback has been measured from the normal pool of impounded waters, the MHW line of tidal Y or N waters or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y N vegetation. or 3. BUA that meets the requirements of NCGS 143-214.7 (b2)(2) Y or N is located in the setback. 4. BUA that does not meet the requirements of NCGS 143-214.7 (62)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) Y N b. Water -dependent structures or c. Minimal footprint uses (utility poles, signs, security Fi lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at the ! edge of the setback and allowed to flow through the setback as Y or N MA dispersed flow. I DCM-1 CEIVED 3 0 2019 MHD CITY Page 2 of 7 oLaie own I I wa c v a laqVI I M1 R Permit No. SW8 190401 OAs-built OO N/E OO N/A C. STORMWATER OUTLETS — the outlet handles the peak flow y N from the 10 year storm with no downslo a erosion. or D. VARIATIONS 1. A variation (alternative) from the stormwater rule provisions i y N has been implemented. or 2. The variation provides equal or better stormwater control and Y N equal or better protection of surface waters. or E. COMPLIANCE WITH OTHER REGULATORY Y or N PROGRAMS has been met. F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required storm Y or N de th. G. CONTAMINATED SOILS — infiltrating SCM's are not located y N in or on areas with contaminated soils. or H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or other y N surfaces that are steeper than 3H:IV. or 3. Vegetated side slopes are steeper than 3H:1 V (provide y N supporting documents for soils and vegetation). or I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the discharge Y N point during the peak flow from the 10 year storm. or J. EXCESS FLOWS — An overflow / bypass for volumes in excess y N of the treatment volume has been provided. or K. DEWATERING — A method to drawdown standing water has y N been provided to facilitate maintenance and inspection. or L. CLEANOUT AFTER CONSTRUCTION — the SCM has been y N cleaned out and converted to its approved design state. or M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes >3:1. Y or N N. DESIGNER QUALIFICATIONS (FAST-TRACKPERMUP) — The designer is licensed under Chapters 89A, 89C, 89E, or 89F of Y or N the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below. Attach additional pages as needed: RECEIVED MAY 3 0 2019 Page 3 of 7 DCM-MHD CITY State Stormwater Management Permit No. SW8 190401 AS-BtiILT DESIGNER'S CERTIFICATION FOR INFILTRATION PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1051 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(4). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number SEAL: Date Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: 'J Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E = not evaluated (provide explanation on page 2) CN/A = not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1051) OO As -built ON/E ON/A A. Inlets / Pretreatment / Design Depths / Elevations 1. Inlets are located per the approved plans. Y or N 2. Pretreatment measures are provided? (Rooftop runoff does not require re -treatment. Y or N I 3. BASIN only — the area and depth of the basin is consistent with the approved plans I y or N 4. TRENCH only- the provided width, length and height of the trench are consistent with the approved plan. Y or N 5. TRENCH only- the provided length and size of the perforated pipe is consistent with the approved plan. Y or N 6. The bottom elevation of the basin / trench is consistent with the approved plans. y or N 7. The bypass elevation is consistent with the approved plan. Y or N 8. The overflow elevation is consistent with the approved Ian. Y or N B. Soils / SHWT / Subgrade I. The hydraulic properties of the insitu soils are in accordance with the soils report. Y or N 2. The lowest point of the infiltration system i5 a minimum of 2 feet above the SHWT. Y or N 3. If separation to the SHWT is less than I foot, the water table draws down to its re -storm level within 72 hours. Y or N 4. The slope of the soil subgrade is <= 2%. Y or N C. Drawdown Time 1. The system dewaters within 72 hours? Y or N 2. The Insitu soils were removed and replaced with suitable infiltration media to achieve the 72 hour drawdown. Y or N I RE, EIVEQI Page 4 of 7 MAY 3 0 2019 DCM-MHD CITY State Slormwater Management Permit No. SW8 190401 OAs-built ©N/E ©N/A D. Observation Port — for underground systems, a minimum of one y N inspection port has been provided. or Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below. Attach additional pages as needed: RECEIVED MAY 3 Page 5 of 7 DCM-MHD CITY State Stormwater Management Permit No SW8 190401 AS -BUILT DESIGNER'S CERTIFICATION FOR PERNIEABLE PAVEIIENT PROJECT I hereby state that I am a licensed professional and I certify by my signature and sea] below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1055 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per. 1044(4). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number SEAL: Signature Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: (D Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) ©N/A = not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1055) (rDAs-built ON/E OO N/A A. DESIGN / DRAWDOWN 1. Washed aggregate base material has been used. Y or N j 2. The provided amount of permeable pavement surface area is y N consistent with the approved plans. or 3. The amount of non -roof adjacent built -upon area is consistent with the approved plans and is directed onto the permeable pavement Y or N surface and does not exceed the required 1:1 ratio Aa/A . 4. The runoff from adjacent pervious areas is prevented from reaching the permeable pavement except for incidental, Y or N unavoidable runoff from stable vegetated areas. 5. The permeable pavement infiltrates the design volume to the y N bottom of the subgrade within 72 hours. or 6. If the permeable pavement was installed as a detention system, the drawdown assembly releases the stormwater stored in the Y or N aggregate in 2-5 days. B, SOILS / SHWT / SUBGRADE ! 1. The hydraulic properties and characteristics of the in -situ soils N conform to the soils report. or 2. For infiltrating permeable pavement, the lowest point of the Y N ! system is a minimum of 2 feet above the SHWT. or 3. For infiltrating permeable pavement, if the lowest point of the system is less than 2 feet above the SHWT, the soils have been Y or N modified to assure drawdown within 72 hours. 4. The in -situ soils have been removed and replaced with infiltration Y N media in accordance with the approved plan. or 5. Infiltration media has been placed on top of in -situ soils. Y or N ! MAY 3 01 ✓ED 2019 Page 6 of 7 DCM-MHD CITY State Stormwater Management Permit No. SW8 190401 OAs-built I ©N/E I ©N/A C. CONSTRUCTION I I I 1. At least one capped observation well has been provided at the low Y O1 point of each permeable pavement area? 2. The subgrade is terraced in accordance with the approved plans and has at least one capped observation well within each terrace Y or N section. 3. For PICP and concrete grid pavers, an edge restraint has been Y or N used around the perimeter of the permeable pavement. 4. The subgrade for infiltrating permeable pavement was graded Y or N when it was dry and there was no precipitation. D. CERTIFICATION 1. The infiltration rate of the pavement surface is at least 50 inches y per hour using a head less than or equal to four inches. or 2. After installation, the permeable pavement was protected from y sediment deposition. or 3. The site is complete and stabilized. Y or N Provide an explanation for every MDC that was not met, or for every item marked " N/E" or "N/A", below. Attach additional pages as needed: P• 'VED Mai, a tt �lDjq DCM-MHD CITY Page 7 of 7 #AN'W-1 5 01 O� pill FOR REGISTRATION REGISTER OF DEEDS TAPMY THEUSCH REASLEY NEW HANOVER COUNTY, MC 2013 DEC 02 02 49 08 P11 BK 5785 PG 1720-1722 FEE $26 00 NC REV STW $7,293 00 INSitff 1310079 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax $7,293 00 The property conveyed hereby is a portion of New Hanover County Parcel No R04716-001-003-000 After recording, return to Collins & Collins Law Offices, PLLC, 215 Racine Drive, #101, Wilmington, NC 28403 This instrument was prepared by Christopher Thenault, 720 N 3rd Street, Suite 502, Wilmington, NC 28401 Brief description for the Index Tracts I A and I B, Map Book 58, Page 310 THIS DEED is made the 2" d day of December, 2013, by and between RIVERFRONT HOLDINGS 11, LLC, a North Carolina limited liability company 720 N 3rd Street, Thud Floor Wilmington, NC 28401 CITY OF W ILMINGTON, a North Carolina municipal corporation c/o Collins & Collins Law Offices, PLLC 215 Racine Drive, 9101 Wilmington, NC 29403 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby aclmowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that real property located in the City of Wilmington, New Hanover County, North Carolina and more particularly described as follows Being all of Tracts IA and I consisting of 6 63 acres in total as shown on that survey recorded in Map Book 58, Page 310, New Hanover County Registry, North Carolina ("Property") The Property has been classified as a brownfields property under the Brownfields Property Reuse Act and is subject to the Notice of Brownfelds Property recorded with the New Hanover County Registry at Book 5326, Page 1093 RECEIVED The Property was acquired by Grantor by instrument recorded in Book 5105, page 729 All or a portion of the property herein conveyed does not include the primary residence of Grantor MAY 3 0 Z U 19 A survey showing the Property is recorded in Map Book 58, page 310 DCM-MHD CITY TO HAVE AND TO HOLD the Property and all privileges and appurtenances thereto belonging to the Grantee in fee simple And the Grantor covenants with the Grantee, that Grantor is seized of the Property in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions RECEIVED APR 0 8 2019 DCM WILMINGTON, NC Ad valorem taxes for 2013 (which are prorated through closing) and subsequent years, utility easements and unviolated restrictive covenants not materially affecting the value of the Property including those recorded with the New Hanover County Registry at Book 4632, Page 113 and any amendments thereto Furthermore, Grantor is not reserving any easement rights over the Property and Grantee shall receive any riparian rights that come with ownership of the Property Grantor shall retain all riparian rights and all easement rights it currently has associated with any property it owns other than the Property IN WITNESS WHEREOF, GYIC my executes this Deed RIVERFRONT HO NGS By (SEAL) Name & Title Charles J Schoninger. Member -Manager State of North Carolina - County of New Hanover 1, the undersigned Notary Public of the County and State aforesaid, certify that Charles J Schoninger personally came before me this day and acknowledged that he is the Member -Manager of RIVERFRONT HOLDINGS II, LLC, a North Carolina limited liability company, and that by authority duly given and as the act of such entity, he signed the foregoing instrument in its name on its behalf as its act and deed ness my hand end Notarial stamp or seal, this 2"" day of December, 2013 Signature of Notary Public Print Name of Notary Public My Commission Expires on the following date RECEIVED MAY 3 0 2019 DCM-MHD CITY RECEIVED APR 0 8 2019 DCM WILMINGTON, NC TAMMY THEUSCH BEASLEY REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 Hf111f N1Hiif Nf Nf NHtNfNtf 1NNf N1HifN\HfMHH1Mif HfNIN1fH1f f ffiH1ONHMf INfHf fN1if N11NN11HH1f Flied For Registration: Book: Document No.: NC REAL ESTATE EXCISE TAX: Recorder: 1210212013 02:49:08 PM RE 5785 Page: 1720-1722 2013041784 3 PGS $26.00 $7,293.00 CRESWELL,ANDREA State of North Carolina, County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT *2013041784* 2013041784 RECEIVED MAY 3 0 2019 DCM-MHD CITY RECEIVED APR 0 8 2019 DCM WILMINGTON, NC I1LIi111111111 Excise Tax $ p o' Real Estate ID After recording return to FOR TAMMYTRHEUION SCH�aERSLEY GISTER OF DEEDS NEW HANOVER COUNTY NC 2015 MR 06 04 36 k PM BK 5B72 PG 1529-1531 FEE $26 00 MIKE # X150P16044 Recording Time, Book and Page This Instrument was prepared bXeatherspoon & Voltz LLP Brief description for the Index Tract 2 per Plat Book (DO Page i10 NORTH CAROLINA SPECIAL WARRANTY DEED THIS DEED made this 7601 day of February, 2015, by and between GRANTOR SAWMILL POINT APARTMENTS OWNER LLC, a North Carolina limited liability company c/o Gemmi Partners, LLC 8230 Boone Blvd, Ste 340 Vienna, VA 22182 191 .�IYC�9, SAWMILL POINT MARINA LLC, a North Carolina limited liability company c/o Gemmi Partners, LLC 8230 Boone Blvd, Ste 340 Vienna, VA 22182 RECEIVED MAY 3 0 2019 DCM-MHD riT The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminme or neuter as required by context WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the New Hanover County, North Carolina, and being more particularly described as follows 0 K BEING All of Tract 2, containing 3.38 acres, more or less, as shown on the recombination plat entit -� XI "Recombination Survey Plat of the Lower Portion of the Dean Hardwoods Site," recorded in Plat Bqukz M (o0 , Page i 5o , New Hanover County Registry, reference to which Is hereby made for a more particu$r o m description of same. x C 0 U O All or a portion of the property herem conveyed ❑ includes or N does not include the primary residence of a Grantor Z Z The property hereinabove described was acquired by Grantor by instrument recorded in Book 3 Page /Sax N9 Hanover County Registry The subject property has been classified as a Brownsfield Property under the Brownfield Property Reuse Act See Notice of Brownfield Property recorded in Book 5763, Page 764, New Hanover County Registry Return to MTG A Map showing the above described property is recorded in Plat Book iD 0 J Page 15 O New Hanover County Registry TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor recerved, and Grantor win warrant and defend the tide against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated Title to the property heretnabove described is subject to the following exceptions affecting the subject property Ad valorem taxes for the year 2015 and subsequent years All other easements, covenants, declarations, restrictions, maps and rights -of -way of record in the New Hanover County Registry and affecting the property described herein IN WITNESS WHEREOF, the Grantor has hereunto set its hand the day and year first above written SAWMILL POINT AP S OWNER LLC, a North C company By Name David Stallutgs Title Authorized Signatory State of SJ&etn CA.M1Ii(M-- County of LJakt_ 1 certify that the following person personally appeared before me this day and acknowledged to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated above tajld Sta11ir1AS Date OZ - ZO' lrj My Commission Expires c4-1o}-;MIP [Affix Notary Stamp or Seal] Diary Public Print Name A i P M . Fiaa_S in Diu \siiniebhrmalboodi, blita\, ill point Vwt w is - wdniu m\sc1kr documenuVwd sawmill opts to main-= 2 doe RECEIVED MAY 3 0 DCM-MHD CITY RECEIVED APR 0 S 2019 DCM WILMINGTON, NC TAMMY THEUSCH BEASLEY REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NO 28401 f Nf1NNfN1fMf fNfHfMfMfNINfNffMf Nf Nf f HINfNfNtI1t11RMRNff tf Nf Itf Rff I!f Iff INNIfNfNtINfN1f Rff If f 1 Filed For Registration - Book: Document No : Recorder, 0310612015 04:36:30 PM RE 5872 Page 1528-1531 2015006004 3 PGS $26.00 HUGHLEY, CAROL State of North Carolina, County of New Hanover RECEIVED PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. MAY 3 0 DCM-MHD CITY *2015006004* RECEIVED 2015006004 APR 0 8 2019 DCM WILMINGTON, NC WILMINGTON, NORTH CAROLINA NORTH WATERFRONT PARK DESIGN DEVELOPMENT 13 JULY 2018 VICINITY PLAN � v tar my RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED AUG 15 2019 DCM WILMINGTON, NC NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON. NORTH CAROLINA WFvgXn.XaEi WEE!@ FeMpM1 XCPl1f EHmrai Fm sang. E P FP RTES. PA I— IN Ten coxsll�E�i{�llxe F110EEP 'XMnM^. xcTM nnn�nXrnrv9Fnriaem wXo. E/ CXECI SU CONFIDENTIAL NOT FOR CONSTRUCTION "O Plgen2 Nu: XWP iMt pawn BT: CMtluE Br D4: 0!/1YN18 Sale' NTS GENERAL COVER SHEET & LOCATION MAP Paqe 1 of 14 L N F mi Al (s) am F6�/ iskm' w Ix•)ISi Iml)lu »IIxY av' (uta� mlllo 6m (sp b' In I[I �- aex � - � /F � / / / 9 iu m=l'a Z (Rd>w' IS•�D-w, I>6nw IXR•fm•.r>�. u w >xm'P�Y w = K \\ sswY nsYn (») sw E unwa.s« N-xgmznsY wau [-z]nmv3m' - � II �X�, mu»xl'IL-i Xss-IµySY4n1Y [-z]16991.16m' I m II I xxRa 42A6 ew.3m0' . 11' .1S]491bY xnxlzY w e1.Uamm_-- II -Ial NIlea-dmw o-ulv}nrvo' nwn.suv II I Ili Sa VTw'E ISSI.Yw [-ialeml0>A' f I10.9N.Im°' I Yi 110.%I.e1W XxlxxIII x 161Y]a'f ]S6C 42316.M1.]en I £ 1�6j1 --''II nan1.»1P xxae nexonum xmSTJ1T .a1Y o-zalaan,vm I � III X X �lowxna�owzew [-z]16.werev JSRt 1° op a» fsD-3.» (xp_-ImSw.xz» [-x J1aRReR4' X 71 p% T 1LLw (Sx)33i (Ilh SST[. 1.1 3:K xXR11 -IQ n�315m o-2316m1 a30' gym. f �/• /� 9 {mwr >vs <m z.a (whzn-m.zu.wlo o-: 31amT.ro 5 (1Fi m t.m N° SM.SY'X ,,1a'J =bJT-1R n¢•XO [-2>16.31S31w mll 6 13h3w (SIININ' (Xj LM 1 M-IW wt°' [-3 R363A9ne' � @, �'� i / FTY•11 SSWIf 1YN IxM.X' (�% MI ;Th'tl• Mw XIYIf'M ASP I � li uvx / a m1.1I' nJT IUtOw' m 11p Y3-N,1,a]N°' (-3.516 mF6]RY F� �I:w.[ 1@6161nA [-2316xwNM N I x°n' IG1�A' S>3Sb1 XT um,vma �.a .••.e iK r.. a �/y / �� » .. b' • _yy _w \ .ni e.R°»3 — .. ` \ — IV : y Qj — ��i OLOFRO5T EETt o . s — _ t, �GQ ✓i �� - _ " — ac J RI _ OTNna+nry rpmCo _ %, / If / / /�e 41 o 21 471 e / /If - yyam\� panari landowner #2: 411 FROMas ��� Et II •'y. t d s r � �m / If �- a1 `Ac 2 w- �' NRMH Holdings, I: II r� I / 19 Hannett St TRACT 4 RIVERFRgUUOLDINGS II LLC V II ag / ------ - --' / Rz`tj l / p nl.�i. X'V! Fes— • — �� �� � .� I1 N�9TyEgSTCAaFFEA. yq/VE9 2W R. X ®. e e. M1REL N MD 11u3 °X 1.5 q/s 5xyt IN - NII, III, eewti .0 RE an w1 J6 D ,O nµ0 �. u1LR Ix1»Jp 1M1 5 [XO[rzww[1n .w[zzG11D.1 �. �DX� —I »,R .. o'e w INCBw SI RC IxJe 9Wr! = M . . Mi .II, (w...' I1rh 1.n 1u11aw M,w. 14u fi'14' 1116e.m «mm 1 . (� Rb n •a W"I, (INI SmM'Y' IWI (G�0.JI (m m1 LEGEND n6.1c 1mu+. leon_m-a. Im Iv» w 1.rY nxuxm,Im'11W F u) � RG,6 ur 1.6 xc wo xobxur ® ¢NII.STR[ iqW • ww vm roxw B mw R vwW 0 COiW,LD e[w, • mw u, 0 w R[ xwx 0 ..m IRrzv e azn RRxvxN•uc Al mwi.11»ix ••F +r p u6O.n31 z-u112576w' o aY u.1z rn nxul zna o-x sl4vw nla YS`Y 1 AxY CR p 1YY F-S}149m.nn' sw sA'• u.m' °» s'"xlax u 1'z}1av»elm Cx> m1TYwlI I,1 1'E-S}I4666.]SF C6p x-Ipm[9m°1 4 1E-x}I6.6.mw' RECEIVED AUG 15 2019 0H1 2TQI9 D M-. ITY 9 1 is 17 NORTH WATERFRONT PARK WILMINGTON, NORTH CAROLINA w x.N °a Pmmxip ryxn CWF•YYo¢ ..N.�m 1111.x.1.14 m 6[VYn�°q rue NY Iwt] I�A mnF,w 4r ry v tp9 n RWyv nC ZlPv! 41nmm.nw - .ISXIT.xc nns ,.T W. xr lwn o � ,°[Txw.w DxE - MmePmNC mYA 6x II n.x n,a PROGRESS SET '. CONFIDENTIAL NOT FOR CONSTRUCTION NO PI Na., NWP 1](11 Doren BY: NBC Chemed BY:.MP DmB713x18 Bale: ,•eBD• CIVIL EXISTING CONDITIONS PLAN Page 2 of 14 ': - , : � .. j.: � Vy Bz m H.P. ROOF STAGE_ _ 6 -10" LP.RO.— OF STAGE �1 8.0. RIGGING STRUCTI a 4T 0.. V T.O. STAGE 15 -0 0 GRADESVARIIS 10 -0 3 E sl s2- - I I s5 H.P._ROOF STAGE 0660' -10' -. ROOF STAGE. 53 - V. B.O. RIGGING STRI LP. LOADING CAN Z. — T.O. STAGE 015,-0. — GRADE VARIES1.. 9. 9. O" I 4 STAGE WEST ELEVATION 111F. -m m m RECEIVED AUf j 5 11019 -,STAGE SOUTH ELEVATION SEP 112019 DCM'"t ftmN. 14c ' tn3•=r-r DCM-MHD CITY NORTH WATERFRONT PARK WILMINGTON, NORTH CAROLINA ro sa �.�o. wEmmsm. xem cws. zaEce k=VA� : one s rw.ra.Nr awn rv..IN—Nr mois fmwnvm E�prwM1N-C S�iEwnlrt EE��yy na. Wkpi, NC�M Em.&ENMPUEMLL7G LTN vN .swia. wNq. xssms Ends uswncEs� To. e,.�:w«rvc zeae� C. cvreuLtac, ac wrss sN wuw.y.=m w y.Now gi—mo'- .,... TN7 m LIE' L':�7soi,8EsI PROGFESS SEf CONFIDENTIAL NOT FOR CONSTRUCTION I... -- PLyM No. NWP not O w BY MH C"'BY PC DH S. sae: wa ImNMw ARCHITECTURE ELEVATIONS - STAGE Page 4 of 14 y sD ROOF STAGE _ — H.P.H__ LP. ROOF STAGE B.O. RIGGING STRURURE � B R1 INTIYEMENT PAINT UP TO 25- AFF AT EAST COLMS, T P. STAGE NORTH ELEVATION 111c-r.0. H.P. RO 060' -10. LP. LO< �_ Z;' T.O. SD 015' - 0" GRADE �_ 0„ @STAGE EAST ELEVATION LJv1R . J. �\ 3 s6 I s4 f s3 IT LRECEIVED NORTH WATERFRONT PARK WILMINGTON, NORTH CAROLINA i ary GEw�ra _ tio�p%awa..y..°ip�"wnc.a�.zam NRNGIFPVESVES�CS t N.Ant]iw M.IMYN M'1Pou .PP nnr.l�grrnp-Y.mn SOGE64RMEOALxRECR �.Vnw �mm� fFv. Wn YUIt HV 1Po�9 m Aw.Nn YN 1W1s iE brt. w=G srPNM1 Pz- TAiPM14.n. P. not �sw xcEs o. em waGOi.'.�'.: Gin w�camivnm. sc MFAiwuna aswcMR3 .Y �e�tinv wmw«�:w."�c�to� ww�.m-. xcawe aN°aTE;l �,..�� �YBN.1Po1, RECEIVED AUG 15 2019 SCRIP (N.I.E TTP. PAINTED STEELIM-01 SEP 1 1 2019 ii-TY DCM WILMINGTON, NC R20GRESS SET CONFIDENTIAL NOT FOR CONSTRUCTION NRw NO YEINPRNNINNI �� P�NG.: N 1701 p 131'. w CONAb NY: PC pI Wb: Ety,: NiMIu1N0 ARCHITECTURE ELEVATIONS - STAGE IN .. Page 5 of 14 NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA an orwa.wxmvx 513 V AT a:awem� PAM�. x.�iwo cM�M �i°Evacwz°Os""z :`. w°R. ssa. rw..wmmna wale. Mww w..aww w.r.wm zw�s w.r..we-c wa..as.�y.m4-c syanwrt ..sw..ar��w.wrw Kzz® K 11aRm axyxov' `�'srii'mmmama.n B�awm.. wPmKzei� eroe..i wxi � aimn�w �acaxumaac v wM uc awe rtm w.ar�w.Kzmz asdznp..rq-s orzwiiu"scaiza.n irza.Pa..wew�Kx.ws Wwi vga�KNM wno.�.wr 9cx.aa«Mzee rw,xr awn ID Pry No.:N In, Crown By By CNckM : ML I cm Cie: OigYN S. 1�3P-0 oTm�a z LANDSCAPE ENLARGEMENTS KEY PLAN I. .. Page 6 of 14 ' -- AD SHEET NOTES n - MATCHLINE, SEE SHEET L412 -+------------ - ; ; --- ---- ----------------------------.�---�--- ,. SEE SNEEiLIDIS, FOR 6EXEML NORTH 1 T51&GD VMS,, _ WIDSCLPE NO,FS. MBREVNTMX9 SEELt1�l Y, TO W19P1 POR 0 WATERFRONT • EP 12W - EPl � � ! pRgpry3 EXV.RtFMEXi PUNS 1].]0 EP_L�3C \ a • r „' PARK EP 12 �k ,_ m , ]s n _ — 10 COWAN STREET . •V / y - rz� WILMINGTON, NORTH CAROLINA V Iw,X .R z M O PROPOSED CONTWRIM4NR) 'x M'" SRotrs \ iwxw.Vaarva..L 1 wr�EwW.x roux x...a.nnw,. 1P 1 CIS PROPOSED CONTOUR (MINOR) �nrr i�ixan cm 1 _-*/ / I \, .t{gq'PY3-CO I • - -BREM LINE �°va mium uay.x.. rnp nv,w,S EPII- 1 RW1 11 R0 i 1 NRTELPN SCAPE 12rCIVIL WITH CIVIL DVOGS mFx+T��Ta w m O m ""T /t/•i••tP.it EPt2]2 x«o;LF.knRN�m AISTING SPOT GRADE .x1xr . .. PRO�� M�a•sw+L suxwnmzuu PROPOSED SPOT GFPDE 1550 j BR 12)0 / "�( i •• RMRMOA 1 w Do -RAN WA 1 1550 • / y� SLOPE P,m�.miuranmrwn�mn BW 13A, 250 EP 1R D •.� \ It,t1 I x ..0 ccxaUL . TRENCH DRAIN. gryxy P. RYxyL XC Zl91] 5 i5Y E tl STD SEE CIVIL DWGS —'-.`1 .exYrnYe.mm - i �'l MI. BVYF OWGB MMxy BiM.•M.x AREA DRNN. .i TO BII 2M _. - / j' \ 1 - I • SEE CNIL OWG8 xTMt�pA t - _ t B i' - M MPNHOIE COVER ,M AO EP 11.30 ��� ! 1 • H SEE CIVIL DWGS wvx Erynwg�sIts.� _ _ i 1i` I .11 Cool _ Mxngm,rc .nm 1� MH / \ 1 �� LEPL1Y I • I A�o-s As MH E t 7_ i EP,I& FP1�� EP 1158 B -- � _ I I L�-•r- G P .]8 / y 1 Eo,° Lu Ivuws..xn Sy li EPt 5]: ' PI 1R i E _ — RECEIVED r I 1 I : r i 1 SEP 112019 N i $ O•T� � OcM-MHD CITY s k e- I I h,1P I RECE(V ED t ------------- ''•; 1 AUG 23 2019 PA N NM•_NWP,]D, Dunn BY 1 • I _ By ML/W,AL D. 04IOS.MLICM D. OIrP5R019 L �DCM YMMiNGTON, Soak 1'=1P-0 INC LANDSCAPE LII-{l r B GRADING ENLARGEMENT 1 - 1 - ,....__-.'. Page7of14 NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA wx.mrzwX.]..•i w,rPoxew�mrasPo .Y.,.,rvr mw. s a]cs v` s�,.°.` isw,.'E`n : Y. nY 1-3 omws enn' l _.I.,so.n x,.vm.m iPo]s w Em:�•.�p=c w.x.x.mlw�m-c nPo. wLgn xcnPos aws,�w..nN-eE woX]]EwraLcoxsuvcxrs. rn sw.iw. x.o-p. nsns�s c"a"c�°niiwncEp•a I. B. 1� NCi]Nx RTFxa CONSVl1Plc.lnc .n cuss u�=•n=•s,a•is &wnp. pakl9a XCTB1] rmm wnA�mm 0.NNE.9^•^wg:EM FYnsV EM&+ SM a wlnry]m NCieacE " nq. SM cDbuLT]CEIGIXEFA9 maP,nxgl�naavm Tn ,winryX[x&o] wvnW�•WF Co1mm Y+n Oc W.. sWeA �+unamlc Ndi4 Vm•9 MKn• m... . 5uxl. pamw'. m.nm Ymk XY �Po]] MMwtle,pvm- SM,GRYQy Oa% Y• RIb I� Np FW7tl No: NWs]]U] Dmwn By MP/SWI/ Chmk d By: ML/CM LANDSCAPE ENLARGEMENTS KEY PLAN la Page 6 of 14 i 1 - arcD D 1 1 � 1 1 1 D 1 a 1 1 1 1 -+-------------I - ell 1 -e B ,B aN2 NNB Approved Construction Plan Name Date Planning Traffic F Ire I I I I I I It01.N-, I l I �4Pfryf i a� Iffin ¢ IC }fy f I Jleaf fti m 5 .. }r"i55� �S.nn �ij5511 f Sul _ SHEET NOTES �• . YE»EE,.m,. ... .sucSrEwres. I.-avul,oa.s,rwa. w,Dws w*emus : w�,�ro_gaFaN LEGEND —.— �NRaFwmaaFFsen IKB TYPE I \,RRQ\` rpxc mf a. _ evc-1nE! TR, fMFNF LEWxC.M1R, V.W.-lYtEs Lei IEmW£6 FuaMlupE oxu RNn.,rvEu e w,c E.o,-rFF,c � Ma+ sml-nrta. e N.N exa,-ml! WMMI.;r.E, m ' WJLB IIXD PENCEB 1 ' IW4PAI - r_ PuY EQUIP, Ma Fu nrE. LKNY y wa H.r EaNNexr-nFEs �M MY'nIa f-ARs .v Dnn..plm Pn FFaa,wrvly[ TD. N' Mt uY. Y, BO✓ m . MDwDE. ® NVg-®nE1M,Y acw£-WIIlIw1Kx Q NCIP� MBgEmE Q k.Ml{ ry196,E11VE Q IMDw� R t ® wMrtRaLxr�Nx,u a' NTE EOY PPMUFNT ® 60MVED ,6 ,T WNTERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA CfA101au CNY r,P wdm °.P.. w.Ven.Nr,w,. I1.NT ECgIP _ a, sa.,wLTKzm,s � .M�Uumwm�a-.xczeaw 4I�AItNmaP su ,mnYnYn9+e,wW-� c0f1 LTXa.K uwn pse.. Ls NMpi, NCZ18,] Nm 1 ✓M 2 � D... W,niglm NC SUy, I.W m Se,�.my Eq.vin. sl EIIC.Ewe WI-M. XCA109 SDI YM+ni. Fl3eS5e Z W nnsevx sW m3.Ih Vw..Xv,wo, 4 0 o.M. Nnnm N� YM NY,w,s CHECrc SET CONFIDENTIAL NOT FOR CONSTRUCTION N I P'.: .'; NW91701 Cna By: MP, SW ChPdUQ1 By: W MM Cab, wnYNte Sqk. 1' = 30' LANDSCAPE ENLARGEMENT AREA 2 DCM WILMINGTON, Page 8 of 14 —+lt--M--EN--1N— 2A EEC. bCK-2 4. °DD SEE SHEET L-414 --------------- 2A TE BNM � •, TF Approved Construction Plan Name Date Planning Traffic Fire � � 4 TM M TP F v TF% 0 SHEET NOTES EE fEEi �+N fACF1EPµ E.EETL.—EIw.IPm .Ei.m. wmw.a LEGEND —.— wn oP wwwaDPESEn Ills nnw-rnE, mc. PE u ® wwxo-TwEn � Paww-,rPE,. 0 ,aw�.T.PE a w.wG.mE s ,a�acE. 0 I,E�.TYPE� � I>EQaEN.T.PE, s „wG.TYPE, NgNINI(E e-u�-mGu e ws�T��c Wu BEIa Tl£r e R ffHN- 1E< RI �wTM-TRt - ml ,w��DErruu-mE, £3 ..—PE' �c P1AY EQUIP. � xI� kl AEM-TYPE, }� '_•`•\ ._ pIIn vG- .0 S5D Ono OO�O. Y _ _ M1 MYE.PPl _ 0 L1GXTINPAEM.1.pEe a .e �.�. 4/ h PEQE, ' n 1C, / \ YP,x Ee LFa�ZE fJMsxGaD ____ _ _ _____ , M '✓ _. �. MEExv:,FDRD�Dllrai Pain _ _ ____________� n nwHE—,EVE JURESDICTIONKNEMfIDS EDGE \ uTQEED�,w.N.N,aE� 1 —LED uwV1EDFl.,ua `NDRM MGH'WTER LINE \ ® IDFNRRUTw I \ 1 A S '➢ SITE SEUIPVEM nleaE V A 4CE14C z¢auwancmws " .- 8EMRTMMCS - -----------------mm -------------------------------------'I!RECENED.------y o a NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA anwwlL�—m- 00em""�gw.wln� ra�""a c.a.saws N..Ymx.lw,. smEV—, 9bm, EN hs, IMr YaR M \ W 18 AT °�E_'~ax.. reeM woo InEPIAPT D,I-AIENVIRONMENT I �.,:.NT,Pa ti m R ., w�. mm b D P.N ' <nnl NMmmC11m�.C�ivri m m, WE—, -nri—w9n � �vwvFM,w,B CHELKSET CONFIDENTIAL NOT FOR CONSTRUCTION P,y.alw.: ~1mi Dww By. MP, SW C. By: ML MM DYe: 071INA1S SON: T'=30- LANDSCAPE ENLARGEMENT AREA 3 DCM WILMINGTON. NC DCM-MHD CITY Page 9 of 14 Vol ------------------------ v WHO,. Approved Construction Plan Name Date Planning Traffic Fire 1 1 1 1 1 1 1 1 1 1 .i WIDWEHOlE6. x 6EE �'sm��^•sneaz. wTemua LEGEND —.— uxrnvau¢ofsEn ® woNc-T♦eE a ® w..M.TrPE M WF.T.eE>B Exe,a.Tw<.. P.„eM-TNE: o NNL-,wF, wNL.Tr.Es PMgNTONE e NLM �-Trrtu e M! Bvcx-mE! m + Nuu MO FENCES ' 1 _ cur Eowp.ulP. .: T.: ELa qwr EaePL<wr.Trr<; RA MYEp;INM.AfEe 1 cTT1 1; t 1 n MMH True 1 . 1 �, rE�emueou.m CO RECENED o w P 112019 1 ® 9 S[ C 9TE OUMEMQUEMEW ,�,�-: ECEaK- CM_MH CITE' p G, -----------------------Q --------- ®a :E SHEET L413 NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA xc,e�ccn i ev °oe:.eu.w,�n °" N::AT „ E...� �Ei:L'EEE LTM PA •..�. �... wwe. xe rvnz �L:woawewiaNN M„ P..w.. n..n.. s..No.wm.Ne., xe M.M CHECK SET CONFIDENTIAL NOT FOR CONSTRUCTION Nei ", B.NWP,>a, Dawn By MP. SW Checked By: ML, MM 0. D)nvm,6 Sale. r=oa- LANDSCAPE ENLARGEMENT AREA 4 acm LMINGTON, NC Page 10of14 ANCHOR TOP OF MAT FLEXAMAT AT SLOPES 1:4 OR STEEPER STORM DESIGN III -ICI= _ ELEV V 54' -- FF 011:611111IIIIIIMHW ELEV. 1.83' �ENALVD8---_——I I III III I —_II I L EV 08 � I I 1 1—I 1-111 I' MLW _I1I K�ELEV 2 St — -- -- -- TRITON MARINE MATTRESS (CONTINUOUS) SECTION JI gCYF n6•+Y FI EI DI cI e1 GENERAL STRUCTURAL NOTES i1 SHORELINE STABILIZATION PLAN 1 .V.E f.OV 1 2 3 4 6 1 1 0 B "'J t i£ t3 Ip 15 tE ,] (— NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA . -A �.�. Ell cumuav�m �K � .12 . --1 n4. ]Vl M. ry b ea v K a X...eX _..-. Muy AE dri 'a N 3EwpY�1Nµ}en Ntatm -nAWmamn m. xv�..m�'clwv eICYm—css~�� brain c�n'vs � ayaYq�� Ira 1A X0 O b� o,..n w.o..a Sr. Ems. MA wo- r.nrrso+r Deb STRUCTURAL MARINE SHORELINE STABILIZATION PLAN ISHEET NO Page 11 of 14 RECEIVED SEP 1 1 2019 DCM-MHD CITY 15 2019 INGTON, NC ►oC ■ c B BOLLARD AND GUARDRAIL T.O. WALKWAY ELEV.� -� VAR�IES � (SEE GRADINGG PL.AL.A :ES .ES MHW ELEV. = 1.83' RECEIVED AUG 15 2019 Al SECTION DCM WILMINGTON, NC WATERFRONT PARK 10 COWAN STREET f'L' wsa"..w"1o.o.aw laienrvYLu.•L B—LBu4n.N-�eAM�NW �nn.IM-P�.Lmn 1HBVSY M Bn Fm. lln �a,. Xv �fq l �.pmnsmn w�pnL x.•M,n �PM6 w Ep�.q•c 9nwYFp—Ype Os1rHBp�•N•O FMe.—WPV�N•¢ err~a N,y IG tR�s segvtxCSY� �n.eynovm. MWLNgR .n.nma.yvspimn�l P. B+.P, xczn�l Eay.a Erp�rq•N--Ea MWEy�•p•I Pm. wwwpsxC NKK w.No..n •n wq ft: Nw lM .BY: RM,JSL ciNul.a By: EeP, xww Wmall STRUCTURAL MARINE SECTIONS RECEIVED SEP 1 1 2019 Page 12 of 14 M-MHD CITY E 0 c P BOLLARD AND GUARDRAIL J au r1 S[ w.,oECTION DECKING STRINGERS @ T-0- O.C. �� 1 �I 1 II I II I II 1 II I II I II 1 II■Ila�a��i,iii■�,iici I I I Iu�..�uI iiiiu�iiii�ll u..i�util I lyl I GIRDERS SIMPSON H6 ZMAX AT EACH STRINGER TO GIRDER CONNECTION T.O. WALKWAY ELEV. �= VARIES� (SEE GRADINGG PL4G L4 KNEE BRACES TIMBER PILES RECrQW 183, 9 AUG 15 2019 DCM W►LMINGTON, NC NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON. NORTH CAROLINA o.eEro�-r-c ra-.ua.�a,�va-o eir..maxa.-ne-¢ ar u�ieM. xMczm. rm�c.xmi� ,mow-u ✓1 W ruc avenrrs-. u.wiy, ncxn,x �+mm• eensvy eve-• sauuv�.a•a � pwawaN�rv•v, I � I..maa.mm,e Prgelft NWPIMI PnnBy: L CMeW Bp ESP. EBP. WA Oaxe: 4VIVl01Y Iew[iimE STRUCTURAL MARINE SECTIONS Page 13 of 14 RECEIVED SEP 1 1 2019 DCM-MHD CITY C E EXISTING BOLLARD ADD NEW BOLLARD WHERE REQUIRED T MATCH NEW RAILIN( NEW ALUMINUM CO\ PLATE TO MATCH EXISTING GUARDRA REMOVE EXISTING ALUMINUM RAILING, NEW WALKWAY OPE REMOVE EXISTING T RAIL AT NEW WALKV OPENING NEW CONTINUOUS ALUMINUM HFP-2-2 SURFACE MOUNT MI COVER SYSTEM BY MM SYSTEMS. FAST EACH EXISTING 2, 2a STRINGER EXISTING DECKING YTINUOUS KWAY WALKWAY ELEV. =VARIES n EE LANDSCAPE ANE CIVIL) G 24. O.0 3NTIN000S 'ER WEAVE 300 All SECTION r 1 SECTION NC LINGER I� NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA L.m,..d....-t r.+e..L.wra-ff b,e.=r,�.a•aL m. �aa.Kb�m s..u. o,p,•Or %+w.a".. 4...�,.r. w+ab.m •. I� 1 �sw..aw 4¢rocrw.� I� NO O r,q.e.xa:. lm GIwJtl 9): EBF, WA Wb: W1MOtY Is:w. : .E STRUCTURAL MARINE SECTIONS I.e... Page 14 of 14 RECEIVED SEP 1 1 2019 DCM-MHD CIT — — 2 FUTURE - /{ •/ "VELOPM4En T SITE l � �7 M � / V I/ , �• i y / " I — — — — — — — — — — --- — — — � I F c e FUTURE DEVELOPMENT SITE -wr OF WORK 12OFFSET FOR CLAR", v I 1,7411 T � _ _ _ -- o --- ------ ---- - N O I \\` NORMAL HIGH WATER UNE I `]// l'{-- T X SUILMNG SETBACK / / ' F IA T 2 STORM rGl � y F F A � � HIGHH TIDE V F R Approved Construction Plan - - Name Date Planning Traffic _ Fie FUTURE DEVELOPMENT SITE FUTURE DEVELOPMENT SITE NORTH I WATERFRONT PARK I 10 COWAN STREET WILMINGTON, NORTH CAROLINA 'I1 w-.-5�".�amr....n.a. . II 1 �A. AT II v m. n PA o . . v,E moNTI� sAlGA a...,v�o..=-... Nra. M xc nnx FMnn.q I I i E rtE ^^5t^nc swvs IIlll i'' 'aw. mmigm.rvc xem ..nans.n..gx..r�.n ss.. m.:a.. nurse II —" ,.. ,... �I ❑ 16 sa l �:�A 1 � i AUG 15 206 M�WI CHECK SET CONFIDENTIAL NOT FOR CONSTRUCTION omm By: Mw a CaeeMM BY MI_ MIS o mBaole r=ro- LANDSCAPE ENLARGEMENTS KEY PLAN a IS Paine 6of14 �YmYS , ...............j '�.u�iffyir, T< 1 � SpRM MGY S(D� 1, E — Nq' 1 1 1 o y_________ ___ TF TF iF Approved Construction Plan Name Date Planning Traffic _ Fire 1 1� SHEET NOTES LEGEND --- ur..raFMaw�aa:,En , "w.TreB u , ®Pr,w.Tn4a � � wxvc.r,sE a I 1711100 .N 1 1 � rEaxw.T.FE, 1 1 1 Tn„ aN� TroEB 1 F-7 I" 1 FUN RE 1 � x.® arcx rnc« stwo n B 1 - MD TNWII,ENCE r RNLa SNe FER. _ u .,� 2 , � awwa-TrrN, PLAY EOW. 1 m w, "AYFpNBrt.TYR, fw q/.YEwgBI,-TVFE, 1 � �,. ,➢I..NNF.TVIE. , y Fv FurnwxNwr.TrFEs YFpM1B1r.}ryE• t rlfnlnNG Lw m Ba w 1 Tc, �xauDFn aaaourwr - E0.LBE eEnN,Hv.o 1 .; Tca «�m,no,MO1j'"nvBE aFi4O°.w� 1 ,B„DxMN,TFaE , .'. ro rFaa,u.A eawm ,. NwxaurNva 1 0 ,�w«ME.�,xP,rwTNx ® o .cN� xD�,NE r iREC , MM EPo�nM f 1 � sewn.D""winPw wa I #AUG 1t NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA n w'm`sr.a rr.vacxr,w,s rc ua.:rc,o�gi��s ,«NN` ,xmoMElrn�" Ecods .xss.n zFWn� Rm.euY,w.PY{Iyi. NC11&s Mre'Ooaa s"`."" sans,. xc z.+s, D"'d 1E E" -P ]f,PF, qF.. M.PAlc ams KIms F�ioEn�w `"" bNL,Ma^9Ex0 W �ra,xr,w„ CHECK SET CONFIDENTIAL NOT FOR CONSTRUCTION IxEYv nr I Pr N, N IM ECP LMm" Dtl OTn3W" Sca 1-=30- EP rraig LANDSCAPE 11_M D Cw.RGEMENT AREA 1 Page 7 of 14 WILMINGTON, NORTH CARC>LINA NORTH WATERFRONT PARK F�se�l` JALE VICINITY PLAN �s A I w a ,m ar I� NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA w m 0. ww MM1 M � � w. P. W HC iHld tll�MY1�.BrtLL � l.x�i. v. SUEm w4PM.P.I.[]xs�5 4Y1LO4R4s xc— vpY�l v� pN~EIw �W�Ev <MENiN4.IXt wvbM/pMYpwn lai>nY•N YY.NL s.Y �eN�6.N�,MCZrtf WMV Fq�Ep•Y EauEiy�n. •E vYMpEp-rnp•P ,.'IYEj1YY{ �Ym.iG. v. Wpv. .�wwrygaiyxc MM CWM�s��®O w. S.Y. aY.Ywh.} .KE.EM W 6 m u o w'z�m�: mar eez. rw va xr.mo� piiala"$ �..mEee. wx. emu IW� cxecY s[r CONFIDENTIAL NOT FOR CONSTRUCTION I I. NO 0 o.: mnrm,s GENERAL COVER SHEET & LOCATION MAP I� Page 1 of 14 0 0 3 -< m 0 m W m 0 0 c ERm E v a 0 3 g n m -a m o n m z o Z °° = < my Z n \ t*K ac �v0 1011, 40C Q C ti 5 /X / . wa 9a IY1,.%' �r9' US' IAYC•' u5_aAi' Y IXp' aw' IApm' I+N9]' msu.'e :n rsm9A' (Srp% IAx`�0j-','„ �a]Aa,. -_-= Imo.'• %.% �.O�Q-�' /,ram / � �v // /. •....� � % &MVE1'I,OTF& m,1p-5S ' yTWM11 6,p' m rm nr 'F 4 . .sr x., K� Caro x ]TSW,5.,0 nxy uwE p x-�,KSsspsm •>.nnsn.3,p' nn ..,um)pma En..6»6%]n G I ,- r l bb ,w»,. •.rryrVER W c • 1 5 1 fi �T- F 19 Harnett St TRACT 4 RIVERFRONT HOLDINGS II LLC M114 m.i ��y%' In3,♦' (Aloe' Rp% Mqz ' m.rr ' rspzr (.par IIwn' , R% ' 6Ma' AInxN mw'r ,a�' IE1-pi Vim, LEGEND mn-. Ar rim, r O p %w.0 g 3,....♦..,.KE ,,, Ex , 4xER (% °- Y Lm 0 5 m ma xaam auE•: t+m Ix......al.... NORTH WATERFRONT PARK WILMINGTON, NORTH CAROLINA qw.iPO wmi m uwtz�ai.. mmz E E„rx..a•p zai "e ` izsS"Ez a w.., . xc zna �rsm,mw uiMCwY CMWMi �aa.0 wa 9a� m.scwm F..xx � w.wxrwm,mi FRIXiItE555ET CONFIDENTIAL NOT FOR CONSTRUCTION MO O F,pMm w: xwv,ro, cn.a%5r: rnv Ew: oi.],aae aws: r•r CIVIL EXISTING CONDITIONS PLAN I•g) Page 2 of 14 a g D A z n o m �I m m Z i7 Z n i;joI g es s_ sa T ST� .,__--.________—_— sm aij `__ OVERALL TIMBER WALKWAY PLAN '° i� 'id� 6. fl i 29 4�6 CD w RIVERWALK EXTENSION e �lot HARNETT STREET TO COWAN STREET WIWINGTON, NORTH CAROIJNA E @VE y�^ x 50 ON 'NOMNIV411M WOO 03AI3038 lx.jw Vr-1vm YJ�t GIN 0 £ J,b'W (13A1303H „I Al SHORELINE STABILIZATION PLAN NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON NORTH CAROLINA W N WP'GMfP WE.�NemEII usM�ivaasn.] �HV�w�E.mnxn vrt xv emu Eb�'tiEY Ma4ME val eYtW1] W Hy�]N •c Yufueryuwpe Osnw�Eryv�]q •G PSIR YY M�tmw Sim wiO•NC ntlO F�N•�W E�]9 •EE e W �ttYMxC ZAGS eifssH.r1G aw5 Etiyaei Rs mn cMM1W Ne Gab W.e�eS�[ Msa �d��nm-a rvumymi.G>wY aw�'A>7pieGfW Y Grn vcx� bVb� ema o. Ygxcfn�f �. wvin cam'xi aM4+a�.F Fl.Y65 �Avairws�aun rMg-Ms y w zm ss.: sw iR w. veE xv �®� PYnw RIIN... CI�Es]E M ®. MIG We: ONEYIDIf STRUCTURAL MARINE SHORELINE STABILIZATION PLAN aEn Eo Page 6 of 14 v 0 3 3 z L) 0 z z 0 v n SECTION n SECTION n SECTION Al SECTION WOOD MATERIAL SCHEDULE Ell�BB .Bw,cE I. NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON NORTH CAROLINA °.°...`.'.'...sue m` ww.u�<ei.u.u., �..a.....N,N� O 'F W, MYP M a...B. ..,% CM W. EBP, NW om: ow is STRUCTURAL MARINE SECTIONS Page 7 of 14 I i < m w n o m o m v 3 � a rt7 m T z 3 m c z °D < m z v Z n M L 0 KA. ROOF fTI,G_F W ^L ROOF SFRGF 53 -3 B.O. RIGGING F_R K �-0' 3 e,_LP. LOPpNG GI ,eLT.O STRG . F _ �RROF�Fg' 9 -O' �m NP ROOF STAGE LP. ROSTAG OF E_ 59'-1' I 38' Y .rod I I I I 015'-O' I I I I 6RgOE F A . STAGEfNT EIEVnnON la u. see 60-SR e LP. RTFST/ E__ S3' 3 B.O. RIGGING Swq .r-o• 0VIE1E 3a-rc revel oZ ?N JL NOTES �mt NT POE E — rm uan ITTLET mEOR[. LEGEND 6&7�jb Po. t. DEL,. T,.. �a maITE....w.ET m .E. ...I. TILE ® Ewar aa.. .e¢Er n..¢ Tv�m eve. mw au. sawn ® .r....ILL. o I.. I. o.u.T E,E. O.I.4. .N..PTE.TE. ® .NwEEEEi ,.RIw ® PIm.F I.. _ NORTH WATERFRONT PARK WILMINGTON, NORTH GAROLINA PIT. .�.. N..m.....1 . N.,m�. .....Rwb..� LT Etr. TE.."OON I.L. TO.. 1e.xY1006 M F,yFa�ypr-�C f P. Ws�C Lp...c.o BIEMMr .�Ps..a Wu.wb, Y M W.q.XCm,s ��®sawPx N.NIP— I ,NICINC 00 , .IT E NL a m..—NN u. ^.M.Ncthe eur.n e..E"-W w.. L...Yvr.. PEY6. weynra L. mn 0—, PROORFBB BET CONFIDENTIAL NOT FOR, CONSTRUCTION m W N O � a I.a* Prt}CM: MhP 1ro1 C`EEEEEE MillGw}eE BY PC. � B.Y: NYtll.lal I.�BY z ARCHITECTURE 0 ELEVATIONS - STAGE 0 Z I. - _ 0 Page 8 of 14 m m n _m m O u FLOATING DOCK DETAIL n GANGWAY AT FLOATING DOCK DETAIL WRApN C FF Po R D1 VERTICAL DATUM CHART Al ADA GANGWAY DETAIL A4 ADD ALTERNATE: FLOATING DOCK PLAN �,vevarrsco GANGWAY ATTACHMENT DETAIL 0 WATERFRONT PARK 10 COWAN STREET WILMINGTON. NORTH CAROLINA Mom® a.wrm�..w,n.a ca,�a�s ecners �:roawz.ws EL ...,.w. u, ...,,......... sr,m...,+m.w� . JSL CM1.cbtl,ly EBP, NW1 �,.: ,sue„ STRUCTURAL MARINE FLOATING DOCK PLANS ADD ALTERNATE 12 v n m A a � m C3 e� 0 o < m v Z Q n � m n o m o < m v III Page 9 of 14 NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA AT e aonacn .a AT �..a..�.K-o mra] ma�� ��os,aw..cnw Kcu.�cm� va�ervao�a.su-� u.n.• m e::nam o-wy..c nsn sr.ro.eo-m.�s•= xcuaac,m ]e]�� ne.]w�aaa.xca.a oan m`0�`ismw •••` i K tl Wnpa.a.rv]a.M�Y'aalM1 �ofi] LaY�.a� CHECK SET CONFIDENTIAL NOT FOR CONSTRUCTION Imo. YO 0 n.e.eem]�W o.r mnvane ear Hama I.e. LANDSCAPE ENLARGEMENTS KEY PLAN Page 10 of 14 v 0 = n c' n m v 0 o o m y � v D C7 m v m o Z Op C m 0 o Z 0 r1 up u ft 1 1 1 1 1 � 1 1 1 1 1 1 1 1 I 1 1 1 1 I 1 1 1 eH z \ :o /O0 Lly/ l-- #Brizi� 46 a aWls °o B Te / BN2 Approved Construction Plan Name Dale Planning Traffic _ Fire III%�I-77 SHEET NOTES 1— SENEH.i LEGEND �.� un°FwaW a°FFaEt1 Ik1 o LJ PAVIp-ttFE 3. O FAY116. M1'FEH , Pww6. E M L— \1 a ' PAVMG-IVFE W 1 0«-. eE�Yac-TYPE, 1 1 � wAu-Trl£l 1 1 AI..TYF.. 1 1 Al. ,YPBe 1 _ Ww..TYPe. 1 1 WALLIYI£6 1 1 rl,en,uta e ew a eaa T= , Tvle c 1 e w oaa, TYraa � Mi FBCI IYPEf 1 µMA ea ]I-TYlEN 1 eras ea,ol-,reEa eo, em1Aro-Wrt, „ wcae PAcx-WrE, 1 EfOl °F, p1N0F HMRNe-T m R-1 1P/Sl11ELE➢rILE lEMEVl£, 1 wauo FsrtBs FNl fE11LEiWEI HER, WIQ -TOO£, 1 M.i HVpUL.T,I£i p I ._ n � 1 dYAWl-tY1E1 �Ff x ��l QYAM.L-TYPE] WA IVWFGPBa-,Yi£e 1 L., _ � �l / I � Ri MYEQMBIr-,YIEF HAY EµtF\ENT.IY{Et cp TB EF2 \ �M -' 1 1 9rTl:2 ' TC 1 i TO wIM 10°Efil♦ff BFAx BREID a Tut wT`Oµmx .eE0.O0Dur T , 1 ry xWBH waTwu 1 � 1 c•. At eEY W XMI N 1 BW3 TB 1 h NtlfILf IUWVXE —1® L.bA1F9 Fo°,1RE BN4 �' , ry BHi1MOE BIfAY4E-CEXIIFIGTXM 1 1B1 Q 4W E-CIXIIFCI.iI[H tlV�.pENNFIGTgN 1 O SiGMIFE. xiFAP1WLNE \ n SiCiNO£MERWEiIVE B 1 161 W w Sqµ(£-RE°µATO0.ft re, P.WK. ® WwW w - . a, T°. 1 15 AIERFPMfNN0.µF8 am: Eartrrer 1 ISIBA O lgYee-YOe ugxt®. ]B'-] B w. ® BE( C1Wf°°1MS +. . . . . . . . . . . . .�.- �CTWOw ow°S 1 MATCHLINE, SEE SHEET L-411 az' 8.B POWW,. FLM.ALE T. S,T-2 ex-z l� aaeFcrrtr mtcs 2 3 a 5 1O1 1 te1 9 10 I 12 1] 14 1 15 1 18 1 17 I� NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA �..aw'�m"e•F.m.. wm,xawmme., w.no.. Wlm amrYxmm,Av.Ar n°"~w�zW.narm..,eae .Wa �m.w x,x„m.e+W„W ate, � pL Bxwp.9,u G�W µtoll. M ,n.ewpxcan,f 21S •�•t seeWn, NO—, 2•u ....erw �01 E'", xcmn a ..a: � . FIIN— FP w arc a.m °A. 1 NOmxm ' Tm e`.ee �10M wWOO'ra.xr lmu �W9a�num CHECK SET CONFIDENTIAL NOT FOR CONSTRUCTION I� H. eE) O Iwgea xo.: tmv lmt pwm By: li. SN cn.ame erw<not ore:amrmu 9Na: 1'�1aL Le. a A LANDSCAPE ENLARGEMENT AREA 2 Page 12 of 14 Q 3 � n � 3 n z Oo _m o m Z c v Z n r. ..... .. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 � i 1 i 1 i 1 � 1 i 1 � I 1 � 1 i 1 i 1 SNCbI NOT t5 rrrrr. r r r r.. r r r.. r r r r r r r. r. r rr G2 sEe sMETLmf PDR rEau a°^ Approved Construction Plan x �E xtl L�lFD Name Date i wcE ,. cRN nw / LEGEND _ Planning DFwawaDFFaEn \ (� y-E'��'- Tmffic P4V:NG TYPE, Fire 1 1 I ! 1 MNY-lN4 Y, / I 11 01P.NMD- Y ' _ P..NIp.rvPE Y ST-1 TrPE LCQOIKi-TY{E, ® x w-rrPEe / Ir-A7 1 ue.TrPPf \ 1 C1 � 1 _U �� Wu.TNE• I JO _i TBACE6 yW. Fum.,uXE o6NU 6EeCx-TY.E f. N G Iw J w �\ Iw eX�NC �>1-TYFE;C �a haw-T„Ex m ee,af-TYI4x rya, - y A/ 6 12RC (x)TC -+ 9)TC-3 .m IN J U, py aY EexcX xYPEY N 8@IfiN TYI£Y 7f eou.Nw TYIE; r 6wf xKx 1 Mlnw aartuR ref �1 TVIpb) F I _ , T6xa RE44n.XaF.,vPE, EHICEa F£KE.IYPE, • N,XPYI.,.FEf �1O` �OV - Pur Eanv. Ra R/.r EGNFXT-T 2 Kd xUrEGWBIx.TKa> , R1 RAV FLWIBIT.T11Ea / I � R6 MVa1LP�1T-T11E6 - M fMrEgNBix-TPE! 1 woX,na //��.. 0. S,XEETPgF 'CJr ra. uwMEDRaaouurt ti TD 'MIX+ODEQREE BFILBIPEM 1 PDw XDDXrEnnnoouLaa C *" ,wmxsce6REE 6Fu•6Mr.Y 1 PdE Y01MIFD BOLO W? vTca M1Mn0EwEE eMuawv.Y 1 ry m«DRX sr vae I . Mf M-W XK•I W.6,FpE + 1 �] ro PEnEsmuryeowvm Ix) -] 1 n TP ,•YUDE,utlwa w+ —1m wE.w wDFrcr:aa 1 sw ucE 6 I o SK.NDE-Ce1l:FIGTXM ® SRwrt. oENnFr ® SC#NGE-iLEN,IF�1CN ^cE- I Q 6:6ry.C£.WiF,IRE,.E I ® PXtla .E�wa,,.Yw, 1 ® s:waDE. DELa,uawx IERFWMury RwE6 1 anE EowwE>rr 0 OME r r r r r r r r r r r r r— r MATCHLINE, SEE SHEET L�13 I P PwM DE sEFLcrRru Dws ® PD.,EA-PDR..,3�To:.E1 NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA �w�N erYMM+tlfE rrnr�a ap�p•a a }�w•aBwe:.Ba,1W YyullCxTm a:�"i"aw�s 8ia,uTYn.n 6..ae.w�tl, �•Yummn �� wv°�'imxa rsXUXe.ac f�r�•a•La xes�y�9w n.wuy,Xtmn Frp�wq•u i M•Patlo�awwww�' �xc aws rc ww. e.:mw•...-aX �hnti� hr.9r Tn.wr•.b�.xLaw, �TiMura� vs re wT=MK•P, gr urt.:s vo-a xr,vsf iia4aweevaaaneea ITT= CXECK$ET CONFIDENTIAL NOTFOR CONSTRUCTION I� 1 X 0 r Pmj. tea, w.w wla:l oxr:arnm,a soX: „• va �X¢F a a ,o LANDSCAPE ENLARGEMENT AREA 4 Page 14 of 14 a C) t� C z 0 0 Z Z 0 D 0 O m /mom \/ m/_ m 0 m m 0 m_ m 0 Al10 CIHW-WDp RECEIVED 6lOZ 0 E AVY4 43AI3338 4PR 0 8 2019 DCM WILMINGTON, NC 2A`V 1 am, 1 1 1 1 D 1 " 1 1 1 1 c 1 1 1 . ft .. fly. .fi.. Vp. CM JURISDICIO° WETANDS EDGE 1 NOR HIGH TER UNE 1 1�1 1 1 1 L............. MATCHLINE, SEE SHEET L-414 —+n................. is x mm F enwY 0000°o°0000°o°o°oy Approved Construction Plan Name Date Planning Traffic Fim C 3 1� 1� Iw 1m w _ --------J --------------- 1 1 1 C1 A 1 �. . . .... . . . ... . . .. . � .............. ............. � ................. SHEET NOTES �SIEE,L61 F0R(EIENK 0.5<..ExDIFS. 3. eEE61EEf LdL.,M,EgI ENMOE1Ell,3. LEGEND �.� WfOFwax RC,E8.T1 MVNG ,YFEI ® MNNO.TYI£'A � wraG.,rrE r I —. E. \OWN MNIG. E w .YNRED6aR%LF- ,YFE , OfOOb.,Y.E, 6Ed.ING.,YVE, NL. ,YM1.,Y14, WNy.,YRE, wiu.]wE, 0 ,,� ,ElNfF6 suwmuxe c N;C 6ENCH IY.E,. Wi .BMS, IVPE, �6Mi..BNYI-,Y6EM e bl.. 1d01 ...EY .. pl NWr101Y.E, BR-, BIfiYgE P.W% 1YR1 ow, D.xaxDra,rta]arrE, 1R� TPA6X IE4Br/i1E-1ME, waa •ND EENCFJ, Ew, rEr«£ ,rsE, IR3 NMfML-lYl£i .ur eats. :T.= R,, yr EaJmr,]r-rvrEz 0.d MYEq,REN]-lYR] 0.J MY KUPIFH,-IYiE♦ � W6 MY KUREM-1Y14, �R! MYEtUMFN]-lVi£8 uax,.fD OT. 3�REEi� aTD ble�D�II,EDI6D,DDaR C Tcx vn,H�oEaREeReE.�iJam�Ein n ]rrew N.e.rue m rmEs,nlrHeouJaD e Tr LEw I.E.RIE.E. ie vDrfeae am I� 6lrrr.aE.own=rw„DN ® 6pIMfE-WrrFIG1tlX ® 6luorrE.aa,su,v] 0 6if.ufE-EnwrelxE Q 6xw.Z..,,ER$,ME ,,,ER rarrux bleb � EDIIsaar I� acm.oi�I gxnawoE 6Eencc]RIc,E�DIw6 rune-rwmaa,Ie saeenarx Dxafi I-- NORTH WATERFRONT PARK 10 COWAN STREET WILMINGTON, NORTH CAROLINA fanuO,�Mv. Po , .P=.. cNECIf sET CONFIDENTIAL NOT FOR CONSTRUCTION "O O Dwn aY IP, aN D,a:mnaa,e LANDSCAPE ENLARGEMENT AREA 3 Page 13 of 14 v C D 0 _ m v n o o < m � � v a m F n o m z n OD < O o v z co Z n