Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
51-19 Walthall, Glenn & JoAnn
Permit Class Permit Number 51-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Glenn and JoAnn Walthall 3922 Pinewav Dr Kitty Hawk NC 27949 Authorizing development in Dare County at adi to man-made canal off the Albemarle Sound at 3922 Pinewav Dr., in Kitty Hawk as requested in the permittee's application dated 3/18/19, including attached workplan drawings (2) both dated 3/19/19. This permit, issued on June 24, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation rf these terms may be subject to tines, imprisonment or ctvtt action; or may (:aUSU ute PUIMIL w UV uuu c Iu vU,u. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) No open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. slgneQ oy me autnorlty oI me JCCICIaty UL VZY WIU uu wiau of the Coastal Resources Commission. / Braxto . Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Glenn & ToAnn Walthall Permit No. 51-19 .01 Page 2 of 3 ADDITIONAL CONDITIONS 4) The bulkhead shall be constructed prior to any backfrlling activities. 5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 6) The fill material shall be clean and free of any pollutants except in trace quantifies. 7) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfrlling activities. Docking Facility 9) This permit authorizes only the dock, pier, separated platforms, tie pilings and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 5 formalized boat slips, (three located at the main pier and 1 at each of the separated platforms). 12) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. General 13) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 14) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Glenn & AoAnn Walthall Permit No. 51-19 i Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-00769). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-0551. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. Coastal Management ENVIRONMENTAL QUALITY Glenn & JoAnn Walthall 3922 Pineway Drive Kitty Hawk, NC 27949 Dear Sir and Madam: June 25, 2019 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project.is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request.a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Glenn and Jo Ann Walthall COUNTY: Dare PROJECT NAME: Docking facility and shoreline stabalization LOCATION OF PROJECT: 3912 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk DATE APPLICATION RECEIVED COMPLETE BY FIELD: 4-5-19 FIELD RECOMMENDATION: Attached: No To Be Forwarded: Yes FIELD REPRESENTATIVE: Carver DISTRICT OFFICE: ELIZABETH CITY DISTRICT MANAGER REVIEW: SI� B) DATE RECEIVED BY MAJOR OfRMITS UNIT: _ FEE RECD: $400 (60140) # III (D) APPLICATION ASSIGNED TO: Bodnar `((251(g PUBLIC NOTICE REC'D: 4-28-19 ADJ. RIP. PROP NOTICES RECD: C) 75 DAY DEADLINE: 6-19-19 HOLDS: EMAIL OUT DATE: 4-24.19 PERMIT FINAL ACTION: ISSUE DENY END OF NOTICE DATE: 5-18-19 DEED RECD: Yes a 150 DAY DEADLINE: / Z STATE DUE DATE: 5-15-19 AGENCY DATE NOTES COMMENTS OBJECTIONS: RETURNED YES NO DCM - Field Rdf S 3D% ri�H DCM - LUP Consistency Determination Sit Local Permit Officer 11( (9 )c Corps of Engineers - Regulatory Branch ` 14 DWR-401 Section 130h )e Av - DWR-Public Water Supply '42571tg % iL6 I s _ DEMLR - Stormwater & SedtErosion Y(e CV - DOA - State Property Office SItSI L Wildlife Resources Commission SI(5� X DMF - Shellfish Section 2� DMF - Habitat & Enhancement DNCR - Archives & History b l3l 19 X DNCR- Natural Heritage Program S tt(I( NCDOT Rural Development Division APR 2 5 2019 DCM-MHD CITY r( ,t p g-4 �a �r Coastal ,branagemenr 2NVMONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Assistant.Major Permits Coordinator Division of Coastal Management, Morehead City FROM: Yvonne Carver, Field Representative VA DATE: 05/30/19 ROY COOPER Gotenmr MICHAEL S. REGAN Secret,,, BRAXTON C. DAVIS Di,, to, MAY 3 1 2019 MP SECTION MHD SUBJECT: Major Permit Application Recommendations submitted on behalf of: Glenn and Jo Ann Walthall The development site is located at 3922 Pineway Drive, Lot 27 in the Kitty Hawk Landing subdivision, Kitty Hawk, Dare County, and is adjacent a man-made canal off the Albemarle Sound. Existing structures onsite include a two-story single-family dwelling, driveway, and walkway that connects to an old pier/dock. The applicants are proposing the construction of a 185-Ift vinyl sheet pile bulkhead with associated backfill and upland grading, and a docking facility that will include a 13'x6' pier, 9'x16' upper platform, 70'x 4-5' (average 4.28') lower platform, 2-12'x12' boatlifts, 2 tie pilings in front of the main dock, and 2-6'x20' platforms (along the new bulkhead) each with 2 tie pilings. The existing walkway from the dwelling to the pier will be rebuilt, with approximate dimensions of 28'x4'. The development proposal involves the Estuarine Waters, Public Trust Areas, Estuarine Shoreline, and Public Trust Shoreline AECs. I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this proposal, and my findings are as follows: 15A NCAC 07H .0206 ESTUARINE WATERS (d) Use Standards. Suitable land/water uses shall be those consistent with the management objectives in this Rule. Highest priority of use shall be allocated to the conservation of estuarine waters and their vital components. Second priority of estuarine waters use shall be given to those types of development activities that require water access and use which cannot function elsewhere such as simple access channels; structures to prevent erosion; navigation channels; boat docks, marinas, piers, wharfs, and mooring pilings. In every instance, the particular location, use, and -`"--"Nothing Compares..,,_,.... State of Noah Carolina I Environmental Quality 1 Coastal Management 401 S. Griffin St., Ste 300I Elizabeth City, NC 27909 252-264-3901 1252-331-2951 Iful C Major Permit Recommendations: Glenn and Jo Ann Walthall Division of Coastal Management Page 2 of 5 05/31/19 design characteristics shall be in accord with the general use standards for coastal wetlands, estuarine waters, and public trust areas described in Rule .0208 of this Section. RECEIVED The request is consistent with this rule. MAY 3 1 2019 15A NCAC 07H .0207 PUBLIC TRUST AREAS MP T��� �� (c) Management Objective. To protect public rights for navigation and r i conserve and manage the public trust areas so as to safeguard and perpetuate their biological, economic and aesthetic value. (d) Use Standards. Acceptable uses shall be those consistent with the management objectives in Paragraph (c) of this Rule. In the absence of overriding public benefit, any use which jeopardizes the capability of the waters to be used by the public for navigation or other public trust rights which the public may be found to have in these areas shall not be allowed. The development of navigational channels or drainage ditches, the use of bulkheads to prevent erosion, and the building of piers, wharfs, or marinas are examples of uses that may be acceptable within public trust areas, provided that such uses shall not be detrimental to the public trust rights and the biological and physical functions of the estuary. Projects which would directly or indirectly block or impair existing navigation channels, increase shoreline erosion, deposit spoils below normal high water, cause adverse water circulation patterns, violate water quality standards, or cause degradation of shellfish waters are considered incompatible with the management policies of public trust areas. In every instance, the particular location, use, and design characteristics shall be in accord with the general use standards for coastal wetlands, estuarine waters, and public trust areas. The request is consistent with this rule. 15A NCAC 07H .0208 USE STANDARDS (b) Specific Use Standards (6) Piers and Docking Facilities. (A) Piers shall not exceed six feet in width. Piers greater than six feet in width shall be permitted only if the greater width is necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur; (B) The total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be eight square feet per linear foot (Ift) of shoreline with a maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips shall not be counted in the total. Projects requiring dimensions greater than those stated in this Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur. Size restrictions shall not apply to marinas; Consistent: The proposed pier to access the main dock will be 6' wide. The shoreline is 177 Ift, with a potential allowance of 1,416 sf of platform. The total of platforms proposed is 684 sf. Major Permit Recommendations: Glenn and Jo Ann Walthall Division of Coastal Management Page 3 of 5 05/31/19 (C) Piers and docking facilities over coastal wetlands shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking; Consistent: There are no coastal wetlands located in the project site. (D) A boathouse shall not exceed 400 square feet except to accommodate a documented need for a larger boathouse and shall have sides extending no farther than one-half the height of the walls and covering only the top half of the walls. Measurements of square footage shall be taken of the greatest exterior dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline. Size restrictions do not apply to marinas; (E)The total area enclosed by an individual boat lift shall not exceed 400 square feet except to accommodate a documented need for a larger boat lift; (F) Piers and docking facilities shall be single story. They may be roofed but shall not be designed to allow second story use; Consistent: The proposal does not include a boathouse; 2 boat lifts are proposed with dimensions of 12'x12'; each individual boat lift will be 144 sf. No roofs are proposed for the docking facility. (G) Pier and docking facility length shall be limited by: (i) not extending beyond the established pier or docking facility length along the same shoreline for similar use; (This restriction does not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference with navigation or other uses of the waters by the public); (ii) not extending into the channel portion of the water body; and (iii) not extending more than one-fourth the width of a natural water body, or human -made canal or basin. Measurements to determine widths of the water body, canals or basins shall be made from the waterward edge of any coastal wetland vegetation that borders the water body. The one-fourth length limitation does not apply in areas where the U.S. Army Corps of Engineers, or a local government in consultation with the Corps of Engineers, has established an official pier head line. The one-fourth length limitation shall not apply when the proposed pier is located between longer piers or docking facilities within 200 feet of the applicant's property. However, the proposed pier or docking facility shall not be longer than the pier head line established by the adjacent piers or docking facilities, nor longer than one-third the width of the water body. (H) Piers or docking facilities longer than 400 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at least 1 foot each 100-foot increment of length longer than 400 feet, or, if the additional length is necessary to span some obstruction to navigation. Measurements to determine lengths shall be made from the waterward edge of any coastal wetland vegetation that borders the water body; (1) Piers and docking facilities shall not interfere with the access to any riparian property and shall have a minimum setback of 15 feet between any part of thREGEIVED docking facility and the adjacent property owner's areas of riparian access.... M AY 3 1 2019 MP SECTION MHD r2 Major Permit Recommendations: Glenn and Jo Ann Walthall Division of Coastal Management Page 4 of 5 05/31/19 Consistent: The main docking facility proposed will extend a total distance of 28' into the adjacent waterbody that measures 234' to 320' wide. All portions of the structures proposed will conform to the 'A distance rule, and will be outside of the riparian setback. (7) Bulkheads (A) Bulkhead alignment, for the purpose of shoreline stabilization, shall approximate the location of normal'high water or normal water level; (B) Bulkheads shall be constructed landward of coastal wetlands in order to avoid significant adverse impacts to the resources; (C) Bulkhead backfill material shall be obtained from an upland source approved by the Division of Coastal Management pursuant to this Section, or if the bulkhead is a part of a permitted project involving excavation from a non -upland source, the material so obtained may be contained behind the bulkhead; (D) Bulkheads shall be permitted below normal high water or normal water level only when the following standards are met: (i)the property to be bulkheaded has an identifiable erosion problem, whether it results from natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep grade bank, which will cause the applicant unreasonable hardship under the other provisions of this Rule; (ii) the bulkhead alignment extends no further below normal high water or normal water level than necessary to allow recovery of the area eroded in the year prior to the date of application, to align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the unusual geographic or geologic features; (iii) the bulkhead alignment will not adversely impact public trust rights or the property of adjacent riparian owners; (iv) the need for a bulkhead below normal high water or normal water level is documented by the Division of Coastal Management; and (v) the property to be bulkheaded is in a non -oceanfront area. The 177-Ift shoreline of the development site is natural, with no erosion control structure(s) present. The property has experienced accelerated erosion due to natural effects of storms and possibly from adjacent bulkheads. Shoreline erosion averaging 4' has been noted within the past year, with a total of 10'+ over a 5-year period. The applicants are requesting authorization to reclaim a practical amount of shoreline so that they can match the alignment of the riparian properties and tie into their bulkheads. The maximum distance waterward of NWL is 12', with an average distance of 8-9'. The amount of backfill for the bulkhead will'be 1,450 sf, and the fill material will be clean sand. The request is consistent with the intent of this rule. RECEIVED MAY 3 1 2019 MP SECTION MHD t .d Major Permit Recommendations: Glenn and Jo Ann Walthall Division of Coastal Management Page 5 of 5 05/31/19 15A NCAC 071-1.0209 COASTAL SHORELINES (c) Management Objective. All shoreline development shall be compatible with the dynamic nature of coastal shorelines as well as the values and the management objectives of the estuarine and ocean system. Other objectives are to conserve and manage the important natural features of the estuarine and ocean system so as to safeguard and perpetuate their biological, social, aesthetic, and economic values; to coordinate and establish a management system capable of conserving and utilizing these. shorelines so as to maximize their benefits to the estuarine and ocean system and the people of North Carolina. (d) Use Standards. Acceptable uses shall be those consistent with the management objectives in Paragraph (c) of this Rule. These uses shall be limited to those types of development activities that will not be detrimental to the public trust rights and the biological and physical functions of the estuarine and ocean system. Every effort shall be made by the permit applicant to avoid or minimize adverse impacts of development to estuarine and coastal systems through the planning and design of the development project. Development shall comply with the following standards: (1) All development projects, proposals, and designs shall preserve natural barriers to erosion, including peat marshland, resistant clay shorelines, and cypress - gum protective fringe areas adjacent to vulnerable shorelines. (2) All development projects, proposals, and designs shall limit the construction of impervious surfaces and areas not allowing natural drainage to only so much as is necessary to service the primary purpose or use for which the lot is to be developed. Impervious surfaces shall not exceed 30 percent of the AEC area of the lot, unless the applicant can demonstrate, through innovative design, that the protection provided by the design would be equal to or exceed the protection by the 30 percent limitation. Redevelopment of areas exceeding the 30 percent impervious surface limitation shall be permitted if impervious areas are not increased and the applicant designs the project to comply with the rule to the maximum extent feasible. Consistent: The only new development proposed landward of the bulkhead and docking facility, other than fill and upland grading, is to rebuild the wooden walkway from the residence to the pier. 15A NCAC 07K.0208(b), Single Family Residence Exemption, allows for the construction of a generally shore perpendicular access to the water, provided that the access shall be no wider than six feet. The dimensions of the walkway are estimated at 28'x4'. Based on my review of the applicable subsections of the North Carolina Administrative Code, the permit application and plans, the proposal requested by Glenn and Jo Ann Walthail meet the intent of the rules of the CRC. I recommend a permit be issued with standard permit conditions. RECEIVED MAY 3 1 2019 MP SECTION I'! HD ROY COOPER Governor MICHAEL S. RECAN Secretary BRAXTON C. DAVIS Director April 24, 2019 NORTH CAROLINA Environmental Quallry FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) greqq:bodnar@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing. Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" his agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINTNAME AGENCY &if c�/MJmt, RECEIVE® SIGNATURE v y— DATE �" o2L —� 9 APR 2 5 2019 ��l' A-P SECTION VlgiT[nlNNiun� North Gvolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office i 401Sotah Coffin Street.Sulre300 I Elizabeth Clty.North Cm'olina27909 252.161.3401 ROY COOPER Governor MICHAEL.S, REGAN. Seemary BRAXTON C DAVIS Dimaor April 24, 2019 MEMORANDUM:' FROM: SUBJECT: Applicant: Project. Location: Proposed Project: Gregg Bodnar, Assistant' Major Permits Coordinator NCDEQ, Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax; 252-247-3330'(0ourifer 04-46-33) areco.bodnarftcdenrmov. CAMA / Dredge & Fill Application, Review Glenn and Jo A.nn Walthall 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk DockingFacility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed:.project and. return this form to Greaar Bodnar at the address.above by MayY5, 2610. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when:appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection: to. the project.as proposed. '*Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described In the attached /comments. PRINT NAME. {hl , �/ T 1AAf'n l'P 1W Y \AGENCY' Npl1C Latep . SY129�U SeC)(Jah RECEIVED SIGNATURE)✓�v f _ DATE a5 a01y. APR 2 5 2019 ava' i'�t.r North Carolina Department of Environmental Quality i Dlvulan or Comm Amnagement Elizabeth City Office I aol South Griffin Strut..Suhe= I Elizabeth City.North C:vnlina279D9. 2512643401 ROY COOPER Gat'ernW MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Oirecror' April 24, 2019 MEMORANDUM. NORTH CAROLINA Environmental Quality FRON",: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar@ncdenr.gov SUBJECT. CAMA/ Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments.. PRINT NAMES 1lXn P1i AGENCY —TO�tltat i rL'� 1 /T� allk SIGNATURE 1LfL�—cy tcs �— DATE �a %�! FCF/VFW APR 2 oCM 1NO c 1 D Q� Y Na,th Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 i Elizabeth City. North Carolina 27409 252.264.3901 ROY'COOPER Governor MICHAEL S.'REGAN Secretary BRAXTON C: DAVIS Director April 24, 2019 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) grega.bodnar@ncdenr.gov SUBJECT: CAMA /Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision,. Kitty Hawk Proposed. Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed, project and return this form to Gregg Bodnar at the address above by May 16, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in. - depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached*" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Jeffrey Rheubottom for Shannon Jenkins AGENCY NCDMF Shellfish Santation SIGNATURE Qg�. �- /cede 61&3i11L DATE 04-25-2019 RECEIVED APR 2 9 2019 IMP SECTION MHD Not Carolina Department of Environmental Quality I Division or Coastal Management Elizabeth City Office 1401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909 252.26,13901 gx,e- ROY COOPER cwmror MICHAEL S. REGAN See"Mry BRAXTON C: DAVIs DOchur April24, 2019' MEMORANDUM: Received: 04/2612019 State Historic Preservation Office. ER 19-1513. FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead Cily, NC 28557 Fax: 252.247-3330 (Courier 04-16-33) grembodnar @ ncde n r.gov SUBJECT: CAMA/Dredge & Fill Application Review Due -- 5/13/19 Applicant: Glenn and Jo Ann Walthall Project Location: 3922.Pineway Drive, Lot 27, Kitty. Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline, stabilization Please indicate below.your agency's position or viewpoint an the proposed, project and refurn.fhls form to Greed -Bodnar at the address above'by hlay 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264.3901, ext. 232) when appropriate; in- depth comments with supporting data is requested. REPLY: This agency has no objection to the.peoject as proposed. '"Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only it the recommended changes are incorporated. See attached. This agency objects to the project for reasons described 1n.the,attached comments. PRINT NAMERenee' Gledhill -Earley AGENCY State Historic Preservation Office RECEIVE® SIGNATURE 5��_ RECEIVED DATE 5 . l ` I�(s r0 MAY 1 4 2019 MP SECTION MHD Va th Carolina Doper tmeui of Lmuuumcnml Qm1ity i Division of Comtal Mcana9emenl Etlrabelh Chy Olhre aol Smah Gnffin Str<GL.Suilei00 l rllzabclh Clty.Norlh Carnitna.?7909 115226.13oo1 APR 2.9 2019 ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Interfm Dlrerm, Mr. Glenn Walthall 3922 Pineway Drive Kitty Hawk, NC 27949 Dear Mr. Walthall: NUR 1 H f AROL INA Environmental Quality May 10, 2019 Subject: Stormwater Permit Exemption Stormwater Project No. SW7190407 CAMA Project at 3922 Pineway Drive Dare County On April 24, 2019, the Washington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of your CAMA Major application for the subject project. The proposed project involves the construction of a docking facility and shoreline stablization at lot 27 in the Kitty Hawk Landing Subdivision. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that the current project will not require a State Stormwater management permit. The stormwater rules require the Division to permit the common plan of development, therefore, any future development on the property, regardless of whether a SEC plan or CAMA Major permit is also required, will require a Stormwater Management Permit application and permit issuance from the Division of Energy, Mineral, and Land Resources prior to any construction. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement actions by this Office. Please keep in mind that this determination does not affectyour legal obligation to obtain other permits and approvals, which may be required by Federal, State, or local government agencies, rule or law. If you have any questions, or need additional information concerning this matter, please contact this office at (252) 946-6481. Cc: WARD Ec: ebodnar Nn6 m,ggy j2C11�1114�—Sj SI! 11 1C,CQ111 D_EQ�� o..,� Sincerely, 2 Bill Moore Environmental Engineer Washington Regional Office RECEIVE® MAY 1 4 2019 MP SECTION MFIC North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 ROY COOPER roe 01,e MICHAEL S. REGAN Senerory BRAXTON C. DAVIS niwfor April 24, 2019, NORTH CAROUNA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management. 400,Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16.33) gregg.bodnar@ncdenr.gov SUBJECT: CAMA/Dredge &'Fill Application Review Applicant: Glenn and Jo Ann Walthall r" Project Location: 3922 Pineway Drive, Lot'27, Kitty Hawk Landing Subdivision, Kitty, Hawk: Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoirit.on the proposed project and return this form to Gregg.Bodnarat the address above by May 15, 2016. If.you haveany questions. regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when :appropriate,'in- deptn comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the -attached comments. PRINT NAME_ Mc nnn AGENCY _ DECEIVED SIGNATURE MAY 1 6 2019 DATE S- I5iT MP SECTION 6l HD Nut th Czivllm:+ Uap:vlr,:ent at Fnvkunn�enml QtcdRy; r17i�551onafCuaxtaf \Inndgemrnt lim,bei filly Otfic• I4011m:th Or,+fin i; r"t.*t?.30 Utzabcm Cltl. Noah Corot,LMUN 2SZt61.2901 ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director `1,/ April 24, 2019 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax:252-247-3330 (Courier 04-16-33) qre.qq.bo�nar@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Applicallon Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pinaway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form fo Grego Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver(252.264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. r REPLY: This agency has no objection to the project as proposed. "Additional comments me be attached" appSGa This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes ^C are incorporated. See attached. _ This agency objects to the protect for reasons described in the attached comments. PRINT NAME r t�qd AGENCY '.�7`���C �AO Q ertj W.i PA—) SIGNATURE LV ol'LCL-- DATE 6- 1.5 -a0 Lq RECEIVED MAY 1 4 2019 MP SECTION MH® North Qvulina Dep,vlmenlo(Bntronmentol Quality I Division or Coastal Management E11zabrih0ty OtOca { 4015outh Gfifrin5treet.5uitc7001 Nlzalscrh City. North Caroilm 27909 151261.7901 ROY COOPER Covmlor MICHAEL S. RECAN 5ecretary 6RAXTON C. DAVIS Director April 24, 2019 MEMORANDUM. FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16.33) ore<in.bodnar@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall APR 2 6 2019 Project Location: 3922 Plneway. Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please Indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by May 15, 2019. li you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. / "Additional comments may be attached** V This agency has no comment on the proposed project. . This agency approves of the project only,if the recommended changes are Incorporated. See attached. This agency objects to the project for reasons described in the attached comments. 1 PRINT NAME �La�1._ �7 �o%/ AGENCY W6,111.'aw of /"/ten: SIGNATURE "AJ L RECEIVE® DATE 5 /ate' 9 MAY 1 6 2019 Noah Gnollnn Department of Envlrormienral Quality Division of CoovalJlanagement Elinberh City Office j 401 Soull, Griffin Strece.Suite300 I Elhaberh City. North C.wlbla 27909 MW43901 ROY COOPER Go'ernnr MICHAEL S. RECAN Secretary BRAXTON C. DAVIS Director April 24, 2019 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247.3330 (Courier 04-1643) cLreaa. bodnar@ ncdenr.cov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. x S LL—+�lT�ctf-tla PRINT NAME G I'sa r l a ry t) we r - AGENCY N�O' ties SIGNATURE DATE �! l3 2019 North Carolina Department of Environmental Quality Division of Coastal 6limagemrnt Elizabeth City Office 401 South Griffin Street. Suite t00 i Elizabeth City. North Carolina 27909 IS_'16-1:401 A110 OHW-0100 610Z 9 1 ON C13AI303H ROY COOPER Governor MICHAEL S. REGAN Seartary BRAXTON C. DAVIS Di ecrur MEMORANDUM NORTH CAROLINA Environmental Quality TO: Gregg Bodnar, Major Permits Processing Coordinator Division of CoZCP, Management FROM: Charlan Owen NE District Planner Division of Coastal Management SUBJECT: Major Permit Request by Glenn and Jo. Ann Walthall to install 185 linear feet of bulkhead, a 6 foot wide by 13 foot long pier with a 9 foot by 16 foot upper platform and a 70 foot by 4 to 5 foot lower platform, two (2) 12 foot by 12 foot boatlifts, six (6) tie pilings, and two (2) 6 foot by 20 foot platforms on a manmade canal that connects to the Albemarle Sound; at 3922 Pineway Drive, in the Town of Kitty Hawk. DATE: May 13, 2019 Consistency Determination: The request is consistent with/not in conflict with the Town of Kitty Hawk 2004 Core Land Use Plan (LUP) certified by the CRC on June 17, 2005. Overview: The .3 acre subject property has approximately 177 linear feet of natural shoreline along a manmade canal that connects to the Albemarle Sound. The canal measures 234 feet to 320 feet wide at the project site. Water depths in the canal range from -1 to -6 feet from Normal Water Level (NWL). The property elevation is 4 feet above NWL. The property is in the AE (EL8) Floodzone. Existing site improvements consist of a two-story single-family house, concrete driveway and wooden walkway. The site is vegetated with yard grasses and some trees and shrubs. Existing shoreline improvements consist of a dock and pier. The wooden walkway extends from the house to the pier. Shoreline erosion averaging 4 feet has been noted in the past year, with over 10 feet of erosion noted over the past 5 years. Installation of 185 linear feet of bulkhead, a 6 foot wide by 13 foot long pier with a 9 foot by 16 foot upper platform and a 70 foot by 4 to 5 foot lower platform, two (2) 12 foot by 12 foot boatlifts, six (6) tie pilings, and two (2) 6 foot by 20 foot platforms are proposed. The existing pier, dock and walkway will be removed. A 4 foot wide by 28 foot long walkway will be installed to replace the existing walkway. The bulkhead will be installed a maximum of 12 feet and an average of 8 to 9 feet waterward of NWL. The bulkhead will connect to the bulkheads on adjoining properties to the north and south. Backfill for the bulkhead will consist of clean sand. The yard will be p�Q-j RECEIVED MAY 16 2019 North Carolina Department of Environmental Quality I Division of Coastal Managetnent Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 25Z2643901 DCM-MHD CITY North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 2 of 4 graded to align with the bulkhead height. The main pier and platform docking facility will extend a maximum of 28 feet into the canal. A total of five (5) boat slips will be provided. The waters of the Albemarle Sound are classified as Joint Waters and SB swimming and are closed to shellfish harvesting at this location. A review of Submerged Aquatic Vegetation (SAV) was not provided. A review of potential historic and archaeological resources was not provided. According to the field investigation report, there is no record that the project site is in a National Registered Historic District. Anticipated Impacts resulting from this project are expected to include: the filling of 1,450 sq. ft. of Public Trust/Estuarine Waters Areas of Environmental Concern (AEC) and 3,037 sq. ft. of High Ground within the Public Trust/Estuarine Shoreline AEC, and; the shading of 1,050 sq. ft. of Public Trust Area/Estuarine Waters AEC. Basis for Determination: The project area is designated as "Lower Density Residential Areas' on the Town of Kitty Hawk Future Land Use Map (FLUM). The following LUP policies may be applicable to this request: Issue Area #5 Community Appearance Policy #5b, page IX-10. "Kitty Hawk supports local identification, recognition, and protection of cultural and historical resources..." Issue Area #6 Currituck Sound Shoreline, Kitty Hawk Bay, and Albemarle Sound: Policy #6a, page IX-10. "Kitty Hawk will continue to adopt, enforce, and amend as necessary ordinances and procedures to regulate land use, development, and redevelopment along and adjacent to the Currituck Sound, Kitty Hawk Bay, and Albemarle Sound. The Town supports applicable State and Federal laws and regulations regarding building, land use, and development in areas of environmental concern." RECEIVED MAY 16 2019 North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 3 of 4 Policy #6b, page IX-10. "Kitty Hawk supports continued management of Currituck Sound, Kitty Hawk Bay, and Albemarle Sound shorelines to protect and preserve the natural resources of the water and shoreline, relying primarily on the CAMA permit program and the Areas of Environmental Concern (AEC) designated under the CAMA program." Policy #6d, page IX-10. "Kitty Hawk supports the construction of properly permitted estuarine bulkheads. It is the policy of Kitty Hawk to support State rules regarding bulkheading. Alternative uses such as sills and marsh plantings and other more environmentally friendly erosion control measures will be welcomed and preferred to bulkheading when conditions are favorable to such use." Issue Area #12 Natural Hazard Areas: Policy #12a, page IX-15. "...The Town supports applicable State and Federal laws and regulations regarding land uses and development in areas of environmental concern. Policy #12b, page IX-15. "Kitty Hawk supports CAMA regulations as applicable..." Policy #12e, page IX-15. "Kitty Hawk supports State and Federal policies that regulate the location and intensity of development in State designated areas of environmental concern." Policy #12g, page IX-15. "Kitty Hawk will allow development and redevelopment within special flood hazard areas subject to the provisions and requirements of the National Flood Insurance Program, CAMA regulations, and the Town's zoning ordinance." 11'�CEIVI_D MA r 16 2019 DCM-MHO CITY North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 4 of 4 Issue Area #21 Stormwater Management: Policy #21a, page IX-22. "Kitty Hawk is committed to minimizing and mitigating the effects of storm water drainage and to implementing a comprehensive approach to storm water management... Kitty Hawk supports the concept that all storm water should be contained on the property where it was generated, except in circumstances where rainfall exceeds that of a five-year storm." Issue Area #24 Uses of and Activities in and on Ocean and Sound Waters: Policy #24a, page IX-24. "Kitty Hawk will continue to adopt, enforce, and amend as necessary ordinances and procedures to regulate uses of and activities in and on the Atlantic Ocean and Currituck Sound." Issue Area #25 Water Quality: Policy #25a, page IX-25. "Kitty Hawk will use its zoning ordinance, flood damage prevention ordinance, environmental control ordinance, and soil erosion and sedimentation control ordinance to protect water quality." RECEIVED MAY 16 2019 DCM-MHD CITY ROY COOPER Governor MICHAELS.'REGAN Secretary BRAXTON C. DAVIS Director April 24, 2019. .MEMORANDUM. NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead .City, W, 28557 Fax 252-247-3330 (Courier 04-16-33) gregg bodnar(Wriodenr.gov, SUBJECT: GAMA l Dredge &FillApplication Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline,stabilization Please indicate below your agency's position or viewpoint on the proposed project'" return this form ro Grego Bodnar at the address above. by May 15 2019. f you have any questions regarding the proposed project, contact'Yvonne Carver (252-2643901, ext 232) when appropriate, in- depth comments with supporting data is requested. REPLY: -This agency-h s b-objection to the project as proposed )XiM— 'Additional comments may be attached" This agency.has nocomment on the, proposed project This agency approves of the project only f the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME: Rodney Butler AGENCY: NC Natural Heritage Program 41MLITA1110 DATE: 5/7.412019 � : North Carolina Department of Environmental Quality I Division of Coastal Management EUzabNh City Office i 401 South Griffin Street Suue 300 i ElizabNh City, North Carolina 27909 252.26=U101 MAY 2 8 2019 I ROYGOOPER_ _NORTHCAROLINA__:... - - - G4vcrnor Erivlronntenf8l Qudllly _ _ _ MICHAEL S, REGAN-_ .. . - ..:.. _. - . -_, . - ._ -BRAXTON DAVIS: Wraivor- --.MEMORANDUM• FROM:. Gregg-Bodner,,Asaistant Major Permits Coordinator .NQDEQ-. Division of;Coastal Mapagement--; -: ---- - -- - — -- 400 Commerce Aye.,,Moiehead:City,.NC28557 Fax: 252-247.3.330 (Courler'04.16-33) dr__IgbodnarCstncdenroov SUBJECT: GAMAlDredge.& Fill Application Review Applicant: Glenn and Jo AnnWalthall, Project Location: 3922.PinewayDrive, Lot27, Kitty Hawk Landing Subdlvlslon;,Kitty:Hawk. Proposed Project: Docking .Facility and,shorellne stablliatlon Please indicate:below your agency's position or viewpoint on proposed,project and, return4hls4orm fo Greaa Bodnar at the address above by May't5, 2019. If you have any questions regarding thepropo'sed'project, contact Yvonne Carver-(252-264,3901, ezti 232) when appropriate, in- depth comments with supporting data is requested. This agency has no objection to the project u)proposed, "Additional comments may be attached'" This agency has no comment on the,proposed project. This agency approves of the`project only if the recommended changes are incorporated.'See attached. This agency -objects to the project for reasons described in the attached comments. PRINT NAME - 5A4MCfZ _D0rARC -- AGENCY' SIGNATURE DATEfZS/j 9�.. 2A Not th t ormlin., Ik portwmt'If Enmlol n wlal Quplity I NNW... ur{oaual Man„yfiwi1 ElivActh ClryOffuc 401Suu1h Griffin titrhl, 5uitr lUtl '' plrehfth Cirri North Catalano 21909 252.26 0,161 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director' April 24, 2019 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Pax: 252-247-3330(Courier 04-16-33) gregg.bodnar@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X . This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the, project for reasons described in the attached comments. PRINT NAME Chris Pullinger AGENCY DWR-WaRO SIGNATURE 6/5/2019 DATE June 5, 2019 RECEIVED JUN 7 2019 13IMSIDWR Project #2019.0551 v1 MP SECTION MH® IXpYPq�INN +xoMenW OuYM1r. l North Carolina Department of Environmental Quality I Division of Coastal Minagement Elizabeth City Office 1 401 South Griffin Street. Suite3001 Elizabeth City. North Carolina 27909 252.26-1.3901 Bodnar, Gregg From: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.army.mil> Sent: Monday, June 24, 2019 9:31 AM To: Bodnar, Gregg Subject: [External] RE: Projects CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hey Gregg, Below are the following numbers for the projects. Standard conditions apply. Paperwork will follow later today. Let me know if you have any other questions! Josh Perry, SAW-2019-00422 Bosomworth, SAW-2019-00936 Walthall, SAW-2019-00769 -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Monday, June 24, 2019 9:14 AM To: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh. R.Pelletier@ usace.army.mil> Subject: [Non-DoD Source] Projects Hey Josh, Just checking in Walthall Perry Bosomworth Hope all is well and thanks as always, DCM Coordinator: 30CYJ AQ Permit #: MAILING DISTRIBUTION SHEET Permittee:4t&A. < Jo w "({'144 5922. t7aeu wyZ>r. 4 11,k I I I b ru6s'A'O &'�ia, NC . COv'( DCM Field Offices / kPizabeth Cityt YJott oke�� (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) M1osh Pelletier (Bettfe, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) �'I'om Steffan (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) iledhill-Earley at Environmental.Review@ncdcr.gov / Heidi Cox (WIRO) Shane Staples David Hams Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser she4•Mont;dvo skliw, SwII;uan Clif Whitfield (WARD) Curt Weychert Washington: Anthony Scarbraugh-401 g' Roger Thorpe-Stormwater / Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: (NCDOT) Travis Wilson Natural Heritage Progr ^^ 1 Fax Distribution: Permittee #: Agent#_ Received DCM MP-1 APPLICATION for Major Development Pear iI!f' (last revised 12!27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicentl Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Glenn MI Last Name Wafthall Applicant 2: First Name Jo Ann MI Lest Name Walhall If additional applicants, please attach an additional pages) with names listed. Mailing Address 3922 Pineway Dr. PO Box City Kitty Hawk State NC ZIP 27949 Country USA Phone No. 540-892-4910 ext. FAX No. - - Street Address (if (Wllarent from above) city State ZIP Email hooknhoot@gmaii.com 2. Agent/ContractorInformation Business Name Quible & Associates P.C. Agent/ Contractor 1: First Name MI last Name Troy Murphy Agent/ Cantractor 2: First Name MI Lest Name Brian Rubino Mailing Address PO Box City state 870 Kitty Hawk NC ZIP Phone No, 1 Phone No. 2 27949 252 - 491 .8147 ext. - - ext. FAX No. Contractor s Street Address (it different from above) City State ZIP 8466 Caraloke Highway Bldg 400 Powells Point NC 27966 - Emeil tmurphy®quible.com and brubino®quible.com <Form continues on back> 2019 APR 2 5 252.006.2808 :: 1.888-4RCOAST :: www.nccoastalmanagem . c Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address Slate Rd. e Dare 3922 Pineway Dr Subdivision Name City State Zip Kitty Hawk Landing Kitty Hawk NC 27949 - Phone No. Lot No.(s) (Il many, attach additional page with list) ext. Lot 27, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Unnamed canal c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. []Natural ®Manmade ❑Unkrwwn Albemarle Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Kitty Hawk 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) +/- 177 it 12,998 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) fit many lot sizes, please attach additional page with a first) 4 fl ❑NHW or ®NW L e. Vegetation on tract Maintained grasses, ornamental bushes, Red Cedars, Live Oaks, Loblolly Pines f. Man-made features and uses now on tract Two story single family residence, concrete driveway, and timber pier and walkway g. Identify and describe the existing land uses adiaceirl to the proposed project she. Private single family residences with piers h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? VR-1 Village Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA It yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECENEU <Form continues on next page> A?RSSZ 19 252.808-2806 .. 1.888-4RCOAST .. viww.nr. �}lyPp115!LSnagemen Received alm 21 [i; '. Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (if) Are there coastal wetlands on the site? []Yes ®No (fit) If yes to either (i) or (it) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Onsite septic and drainfield o. Describe existing drinking water supply source. Dare County Water Distribution System p. Describe existing storm water management or treatment systems. Roadside ditches and swales 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete, Single family residence, this use will remain the same. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Barge, vibrating hammer, skidsteer, dumptrucks, handtools .................. _...... ...,.. _ d. List all development activities you propose. Proposed shoreline reclamation due to extensive recent shoreline loss. Reclamation includes construction of a bulkhead in aligment with adjacent land owners and backfilling to natural connecting grade. A new pier and docking system is proposed to replace the existing pier and walkway. See attached project narrative for detailed desciption of proposed work. e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? 4,487 total ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Minor surface runoff- No direct discharges 1. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity, as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes []No ®NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED Received R r 21 Rohl 252-808.2808 .. 1 - 8 8 8 4R C 0 A S f .. w w W. n c c 0 a s t a t m a n a g e m en DCM-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional information In addition to this completed application loan, (MP- I) the following items below, it applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-secfional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENA. I. A fist of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Windforce LLC Phone No. Address ISS23 Hillvfew Cf. Culpepper, VA 22701 Name Douglas M. Vaughn Phone No. Address 3926 Pineway Dr. Kitty Hawk, NC 27949 Name Phone No. --- Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, If necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. 1 certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 5' I1$'�' ("I Print Name &l'ebn eAAvA�3� A.�n W(%o�lhtnll Signature of Ali' .1l �C�°r^ �"^b,�a t &.:ble 2AsioL,tp•L. Please indicate application attachments pertaining to your proposed project. A5"-V ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts �j ❑DCM MP-3 Upland Development RECEIVED Received ®DCM MP-4 Structures Information APR 2 5 2019 W 2,11 21'' DCM-MHD CIT''�C( IC 252-808-2808 .. 1488.4RCOAST .. www.nccoastalmanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NW L) stabilization Length Width Avg, Existing NA NA Depth Final Project NA NA Depth 11. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in cubic yards. c. (1) Does the area to be excavated include coastal wetlandsrmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (W L)? If any boxes are checked, provide the number of square feel affected. ❑CW ❑SAV ❑SB _ OWL ❑None (k) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (1) Do you claim title to disposal area? ❑Yes LING []NA (it) If no, attach a letter granting permission from the owner. e. (1) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL []None (ii) Describe the purpose of disposal in these areas: b. Type of material to d. High -ground excavation in cubic yards. ®This section not applicable b. Dimensions of disposal area. d. (1) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (II) If yes, where? f. (1) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (il) If yes, how much water area is affected? RECEIVED APR 2 5 2019 Receive W7 21 D M-EC ^0;.; AHD CITY252-808-2806 :: 1-8884RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Received Forth DCM MP-2 (Excavation and Fill, Page 2 of 3) mg 3. SHORELINE STABILIZATION ❑This section not applicable (it development is a wood groin, use MP-4 - Structures) a Tvna of ah.rwli.a etahilizalionb. Lenath: 185.E ®Bulkhead ❑Riprap ❑ereakwater/Sin []Other: ___ c. Average distance waterward of NHW or NWL: 8 it e. Type of stabilization material: Vinyl sheetpiling and wood g. Number of square feet of fill to be placed below water level. Bulkhead backfill 1,450 SF Riprap _ Breakwater/Sill _ Other _ I. Source of fill material. Clean fill sand Width: 1 it d. Maximum distance waterward of NHW or NWL: 12If (avg. distance is 8-9') f. (1) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount infoanation. 4 R, survey data, owner photos, Aerial imagery. And, there has been greater than 10 it of erosion over the last 5 yrs. h. Type of fill material. Clean fill sand 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), It yes submerged aquatic � getation (SAV), shell bottom (SB), or ii Amount of material to be laced in the water other wetlands (WL). If any boxes are checked, provide the () P �/A number of square feet affected. (fii) Dimensions of fill area 3.037 SF ❑CW ❑SAV _ ❑SB _ (iv) Purpose of fill OWL ®None To connect bulkhead backfill to exisitng grade near the (ii) Describe the purpose of the fill in these areas: residence Na 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? No material to be excavated. Silt fencing will be used to contain fill material. c. (f) Will navigational aids be required as a result of the project? ❑Yes p9No []NA (if) If yes, explain what type and how they will be implemented. b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Barge, vibrating hammer, dumptruck, skidsteer, excavator d. (I) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (11) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 1'«,�� ov.ot —10 A ^ ukitbwtl RECEIVED Date C 1e Applicant Name �q22 pine.xDr:ve granlZwb;�., Project Name ""6� �(ni4>iayQ Ar�o!_.tP.t_. APR 2 5 2019 AAM 252-808.2808 :: 11.888.4RCOAST :: www.nccoastalmai)agcincnt.uct CITY Received Form DCM MP-4 mg 21 2019 STRUCTURES DIME, C (Construction within Public Trust Areas) LJl�1Y1 E, Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Govemment ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ONO c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes ONO (if) Number 1 If Yes: (ill) Length 13 ft (if) Number (iv) Width 6 ft (ill) Length (v) Floating ❑Yes ONO (iv) Width _ (v) Floating ❑Yes ❑No e. (1) Are Platforms Included? ®Yes ONO f. (i) Are Boatlifts included? ❑Yes ❑No It yes: If yes: (if) Number 3 (oil Number 2 (ill) Length 01 16 ft. (1) 70 ft (2) 20 ft (ill) Length 12 ft (iv) Wkf h (1) 9 ft (1) 4.28 ft (2) 6 ft (iv) Width 12 ft (v) Floating ❑Yes ONO Note: Roofed areas are calcuiated from ddpline dimensions. g. (1) Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or (if) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 1 ® Dockage ("wet slips') only, number of slips: 5 ❑ Dry storage; number of boats: _ ❑ Boat ramp(s): number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel Open runabouts ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 22 ft 1. (1) Will the facility be open to the general public? ❑Yes ONO in. (i) Will the facility have tie pilings? ®Yea ONO RECEIVED (ii) If yes number of tie pilings? 6 APR 2 5 W9 252.808.2808 :: t-888.411COAST :: www.nccoastalmanagement.net e : 129 06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. b. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _� location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? In. i. Give the number of channel markers and "No Wake" signs proposed. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marine policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an exbsting marina, what types of services are currently provided? Received Mart 221 2G�i m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ONO DPM-E v RECEIV D OR 2 5 252.808-2808 :: 1-868-4RCOAST :: www.necoastalmanagement.net revised: 1212V06 DCM-MHD CITY Form DCM MP-4 (structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes [:]No It yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 13. BOATHOUSE (including covered lift) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑PrivatetCommunity (if) Number (III) Length Irv) Width Note: Rooted areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (1) Number (ii) Length (III) Width 15. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable I a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 16. MOORING PILINGS and BUOYS ®This section not applicable a. Is the struclum(s): ❑Commercial ❑Public/Govemment ❑Privale/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing _ 7. GENERAL b. Number _ d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED Received f4m 21 20!9 D M-EC 252.806-2808:: 1.888-4RCOAST :: www.nccoastalmnnallemeot.nrt revised: 1222T,06 DCM-MHD CITY Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. Approx. 38 it to the south and 32 to the north Approx 61 ft to the north and 73 it to the south Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body Varies: 234 ft to 32Q it e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 4 to 6It NWL 18. OTHER ❑This section not applicable a. Give complete description: Existing wood walkway to access central pier to be extended or re -built as necessary after bulkhead and backfill complete (• 4-i d• I K.4,v rg ttfi .�af�t1 -fib yc ..:If.s' s F {-!.c reef �--f 1— .�rS�f9 1151'70- Date 3°I22 Fine rtom or. Project Name 6�'e',, at,(se �r,f. �Aratih�l Applicant Name 'Ar Applicant Signature �� SIOL-tP.L Received RM 21 K13 DCM-EC RECENEl) 252-808-2808 :: 1.888-4111COAST :: www.nccoastalmanagement,not 1h ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Quible & Associates P.C. Troy Murphy & Brian Rubino PO Box 870 Kitty Hawk, NC 27949 Dear Mr. Murphy and Mr. Rubino, NORTH CAROLINA Environmental Quality June 19, 2019 This letter is in reference to the application submitted for Glenn and Jo Ann Walthall, for a Coastal Area Management Act Major Permit to undertake development activities to construct and bulkhead and docking facility at 3922 Pineway Dr., Kitty Hawk, in Dare County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make September 2, 2019 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov). Sincerely, Gregory odnar Assistant Major Permits Coordinator Cc: DCM Elizabeth City (via email) North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8081808 Bodnar, Gregg From: Bodnar, Gregg Sent: Wednesday, June 19, 2019 11:32 AM To: Brian Rubino; Troy Murphy Cc: Carver, Yvonne Subject: Walthall Extension Attachments: Walthall EXT.pdf Morning all, Please see above for the extension notice for Mr. and Mrs. Walthall. I'm only waiting on USACE which I have requested Josh for comments as recently as Monday. Once those come in I'll be able to move shortly thereafter. Thanks and give me a call if you need anything, Gregg ,wnmew�a>M Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 (Office) Grege.Bodna r@ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANTS' NAME: Glenn and Jo Ann Walthall 2. LOCATION OF PROJECT SITE: 3922 Pineway Drive, Lot 27 in the Kitty Hawk Landing subdivision, Kitty Hawk, Dare County, adjacent a man-made canal off the Albemarle Sound Photo Index - 2006: 183-7182 (H-15) Latitude: 36003'18"N Longitude:-75044'19"W 3. INVESTIGATION TYPE: CAMA / D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 04/05/18; 03/22/19 Was Applicant Present - Yes; No 5. PROCESSING PROCEDURE: Application Received Complete - 04/05/19 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Town of Kitty Hawk Land Classification From LUP — VR-I Village Residential (B) AEC(s) Involved: EW, PTA, ES, PTS (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Onsite septic Planned - n/a (F) Type of Structures: Existing - Single-family residence, pier, walkway Planned — Bulkhead, pier, platforms, boat lifts, slips, tie pilings (G) Estimated Annual Rate of Erosion: 4' Source - applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Open Water (EW, PTA) n/a n/a 1 ,050 sf shading (B) Shallow Bottom (EW, PTA) ! n/a 1,450 sf (bulkhead) n/a -- —I -- (C) High Ground (ES, PTS) n/a 3,037 sf (grading) n/a (D)Total Area Disturbed: 5,537 sf (0.13 acre) (E) Primary Nursery Area: No (F) Water Classification: SB Open: Closed to shellfishing 8. PROJECT SUMMARY: The applicants propose to construct a bulkhead an aECOVED average of 8' waterward of NWL and backfill, fill and grade the yard, install a pier 2p1g with an upper and lower platform, 2 boatlifts, 2 additional platforms, and createA�R 2 5 total boat slips. pCM.MNO VV Field Investigation Report: Glenn and Jo Ann Walthall Page 2 Proiect Setting The location of the proposed development site is 3922 Pineway Drive, Lot 27 in the Kitty Hawk Landing subdivision, Kitty Hawk, Dare County, and is adjacent a man-made canal off the Albemarle Sound. The residential parcel is a 12,998-sf tract, with an elevation of 4' above normal water level (NWL). The existing man-made structures are a two-story single- family dwelling, concrete driveway, and a walkway that connects to an old pier and dock. Existing vegetation on the project site include indigenous yard grasses, loblolly pines (Pinus taeda), Eastern red cedar (Juniperus virginiana), live oaks (Quercus virginiana), American holly (ilex opaca), and camellias. There are no coastal wetlands present onsite. The 177-Ift shoreline of the development site is natural, with no erosion control structure(s) present. Shoreline erosion averaging 4' has been noted within the past year, with a total of 10'+ over a 5-year period. The '+water depths in the project area range from -1 to -6 NWL. The substrate type encountered in the canals of Kitty Hawk Landing are predominantly an organic mud/muck. The riparian properties to the north and south are developed with single-family dwellings, bulkheads, piers, and boat slips. The Albemarle Sound is classified as Joint Waters by agreement with the Marine Fisheries Commission and Wildlife Resources Commission. The waters of the Albemarle Sound in this area are classified as SB and are closed to shellfish taking. The project area is not in a primary nursery area. There are no previous permits on file for this parcel. There is no record that the project site is in a National Registered Historic District. Development Proposal The Waithails are proposing to construct a vinyl sheet pile bulkhead totaling 185 [ft. They are requesting authorization to reclaim a practical amount of shoreline so that they can match the alignment of the riparian properties and tie into their bulkheads. The maximum distance waterward of NWL is 12', with an average distance of 8-9'. The amount of backfill for the bulkhead will be 1,450 sf, and the fill material will be clean sand. In addition to the backfill associated with the bulkhead construction, the applicants would like to grade a portion of their yard and tie into the proposed bulkhead height. The area of upland grading will total approximately 3,037 sf. In addition to the shoreline stabilization project, the Walthalis propose to construct the following structures for a docking facility: • the main dock will total 522 sf, and consist of a 13'x6' pier, 9'x16 upper platform, and 70'x 4-5' (average 4.28') lower platform; • 2-12'x12' boatlifts, which will be located on the north and south sides of the main dock; 2 tie pilings east of the main dock; and 2-6'x20' platforms, each with 2 tie pilings in front of the platforms. o Total slips after construction will be 5. �EGEtVE �cM,MHp OV Field Investigation Report: Glenn and Jo Ann Walthall Page 3 The existing wooden walkway from the dwelling to access the pier will be rebuilt after the bulkhead and land disturbing activities are complete, and the dimensions will be approximately 28'x4'. The main dock proposed will extend a total distance of 28' into the adjacent waterbody that measures 234' to 320' wide. All portions of the structures proposed will conform to the 1/4 distance rule, and will be outside of the riparian setback. The applicants have a 177-Ift shoreline, which allows for 1,416 sf of platform. The project as designed will have 684 sf of platform and is consistent with CRC rules. Anticipated Impacts The installation of the bulkhead and backfill will result in the filling of 1,450 sf of shallow bottom habit of the Estuarine Waters (EW) /Public Trust Areas (PTA) AECs. The filling and grading of the yard will result in high ground disturbance of approximately 3,037 sf of the Coastal Shoreline AEC. The docking facility will result in shading of 1,050 sf of open water habit in the EW/PTA AECs. The breakdown of shading for each component is as follows: o Pier 78 sf o Upper platform 144 sf o Lower level platform 300 sf 0 2 boatlifts 288 sf 0 2 secondary platforms 240 sf Total 1,050 sf Submitted by: Yvonne Carver Date: 04/05/19; Revised 04/15/19 Approved by JH 04/22/19 RSOENf-,D APR252019 Received 3922 Pineway Drive, Kitty Hawk, NC CAMA Major Project Narrative APP 5- 2119 DMEC Existina Conditions The Project Site is a 0.31 acre parcel owned by Glenn and Jo Ann Walthall and located at 3922 Pineway Drive (Kitty Hawk Landing Subdivision) in Kitty Hawk, Dare County, NC. The Site is waterfront, located on the Kitty Hawk Landing canal system that leads to the Albemarle Sound. Current site conditions include a two-story single-family residence with mature Live Oaks and Loblolly Pines and maintained grasses. There are no coastal wetlands or non -coastal Section 404 wetlands present onsite. Adjacent properties to the north and south consist of single-family residences with bulkheading and piers. Extensive erosion has occurred on the Walthall's property based on aerials imagery, anecdotal accounts and recent survey data. It is clear that there has been at least 10 ft of erosion over the last 5 years. Much of the erosion can be attributed to bulkheading on either side of the subject property. A 2ft high erosion escarpment is present along the Normal Water Level (NWL) which is retreating landward due to erosion. Recent survey data between 2018 and 2019 shows that there has been an average of 4 ft of erosion over the last year. The bulk of the recent erosion occurred in response to TS Michael. Until 2016, there had been trees and root systems along the shoreline that had helped keep the loose soils intact, but these trees had been undermined and collapsed. Proposed Work Mr. and Mrs. Walthall wish to construct a bulkhead on their properly, tying into their neighbors to the north and south. Due to extensive loss of shoreline the owner wishes to reclaim a reasonable amount of shoreline to match the alignment of the neighboring properties on either side. The total length of bulkhead proposed is 185 ft. Proposed fill area behind the proposed bulkhead is 1,450 SF below NWL. This proposed fill area will require approximately 240 cubic yards of fill to accommodate the preferred alignment and to match existing grade at the top of the escarpment. Included in this submission package are aerial photographs from 2013 and 2017. The areas where we are proposing the most shoreline reclamation (center portion of the property) would restore the shoreline conditions to what existed in 2013. Mr. Walthall also wishes to grade some of his yard to tie into the proposed bulkhead height and existing grade around the existing residence. Total proposed upland grading is 3,037 SF. The plan includes the limits of disturbance (LD) line. In addition to the proposed bulkhead and shoreline reclamation, the Walthalis proposes to construct a 522 SF Main Dock system extending from the center of the proposed bulkhead into the canal to replace the existing dilapidated pier. The new proposed pier associated with the Main Dock system would be a 13 FT by 6 FT pier with a 16 FT by 9 FT L-platform and a lower level platform measuring 70 LF and varying from 4 to 5 FT in width (totaling 300 SF). The pier will be at the elevation of the new bulkhead. In addition to this pier, a step-down platform is proposed to wrap around the above -mentioned pier. The lower platform will allow safe entry onto and off -of boats and paddle craft. This Main Dock system is depicted in the attached CAMA plan and detail sheet. 3 slips are proposed at the Main Dock, two of which will be 12 ft by 12 ft boat lifts and one side -to at the end of the platform. Two more platforms are proposed along the bulkhead, each measuring 20 LF by 6 FT and a boat slip at each. A total of 5 boat slips are proposed. All proposed work is shown on the attached Plan. RECEIVED APR 2 5 2019 DCM-MHD CITY 3922 Pineway Drive, Kitty Hawk, NC LAMA Major Project Narrative Purpose and Need Mr. and Mrs. Walthall recently purchased this property, and due to the previous owners never bulkheading the shoreline, the property has experienced accelerated erosion due to bulkheading present on the adjacent parcels in combination with natural effects of storm erosion. Mr. and Mrs. Walthall wish to reclaim lost shoreline and install a bulkhead to protect their property. This home is closer to the water's edge than nearly all other homes in the subdivision due to ongoing erosion and the reclamation and stabilization activity is largely to protect the home and associated land. The existing dockage is in disrepair and Mr. Walthall wishes to construct a new system in its place to better accommodate his use of the property. Received q,^ `i 2 ' RECEIVED DCM-EC APR 2 5 2119 DCM-MHD CIT N - WAILK YALV iL o,�•�N CARp-'°•,11 CANAL 09 FCSS10 n SEAL L-4567 s S ryjJ / HP 2 STORY FRAME DWEWNG ON PILINGS WITH \ ENCL ON SLAB AO vY - M1 '.. OHN R. MAYNE, CERTIFY MAT THIS PLAT WAS DRAWN UNDER MY SUPERNSION FROM AN ACTUAL 6URVEY MADE UNDER MY SUPERNSION (DEED DESCRIPTION RECCROEO IN 800K-.1I1L- PAGE 604 i. MAT ME BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN FROM (DEED DESCRIPTION RECORDED IN BOOK PAGE ); THAT THE RATIO OF PRECISION AS CALCULATED IS 1/10.0004; THAT THIS PLAT MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVENNG IN NORTH CAROUNA (21 NCAC 56.1600), DAY OF APRIL , , 20 18 L12 L L�OT 27 wow WAU( I LOT 28 *l, S 0.4' LINE TABLE UNE I LENGTH I BEARING LI 9.35 N2,4M' L2 12.99 ! 1 •4 • r L3 18.73 L4 16.09 L5 23.18 L6 6.14 L7 5.59 '40' 'W L8 12.88 N L9 14.51 LID 13.97 N 221 U1 1 9.62 NO 14'4 ' L12 1 21.64 N27'08' ' L13 10.96 L14 80.00 S 71 ' LI5 25,28 271 0' U6 51.38 4'4 ' 'W AJ CONC; LOT 29 0.5' BG ;p`30' C.A.M.A BUFFER ,M II W N LOT 26 LOT 25 N -75' C.A.M.A - A.E.C. ).3' BG D.S. BG EAs 0.2' B L14 _a PINEWAY (60' R, / _APR 2 5 2019 LOT 90M- HD CITA CURVE TABLE CURVE RADIUS DELTA LENGTH CHORD GHD.BR C1 40.OD 27.19 26.87 C2 50.00 32.00 31.46 4 '4 ' 4' -�G3 50.00 S3.88 51.14 1 50116*23E' C4 50.00 53.68 51.14 '4 ' r I50,00 S3.88 51.1, PHYSICAL SURVEY FOR JAMES GLENN & JO ANN WALTHALL LOT 27 - SECTION 3 - KITTY HAWK LANDING - KITTY HAWK ATLANTIC TOWNSHIP - DARE COUNTY - NORTH CAROLINA 40 20 D a SEABOARD SURVEYING ItPLANNING, INC. 1536 1 inch 40 ft. 103F W. WOOD HILL DR., P.O. BOX 58, NAGS HEAD, NC 27959 e n. ,noi,o yr o rrn.n nnhn ou OFFICE: (252) 480-9998 FAX: (252) 480-0571 3922 Pineway Drive Kitty Hawk, NC 27949 Photographs representing erosion in last 12 months. Prior to 2016, the shoreline had trees and root systems that helped hold the unsolidated soil bank in place. Those trees had been completely undermined by 2016. Spring 2018 February 2019 Spring 2018 February 2019 Received DMEC RECEIVED APR 2 5 2019 DCM-MHD CITY Google Earth 'a a t a^y .. E4a x t u -, t fir' k4�%° •,�� wW4.- 2-4 1� o V r jj}4y� rt• rw3"4 41, • a sx r ...• „a ,....; �,, a8 d� ..,fie as 9+a=+e_2 ., �- A,. r s� -n 1 vy "•� tl i p1- y � � � `�f } } P * • ' v r � 4 � n.I b'���',�r Ord • +��®�,�y.I� ^".a�/' A•. y A4 #"iy�T• x p N 100 ft Cr, f i 44W L w O O U County of Dare, North Carolina -Owner and Parcel Information Is based on current data on file and was last updated on March 01 2019 Primary (100%) Owner information: WALTHALL, GLENN EUX WALTHALL, JO ANN EUX t 3922 PINEWAY DR KITTY HAWK NC 27949 Parcel Information: Parcel:027335000 PIN:986510450183 District: 08- KITTY HAWK Subdivision: KITTY HAWK LANDING SEC 3 LotBlkSect: LOT: 27 BLK: SEC: 3 Multiple Lots: - PlatCabSlide: PL: 6 SL: 37-2 Units: 1 Deed Date:08/10/2017 BkPg:2185/0604 Parcel Status: ACTIVE Property Use: RESIDENTIAL BUILDING USE & FEATURES Building Use: Exterior Walls: Full Baths: Bedrooms: Heat -Fuel: Heat -Type: Air Conditioning: Tax Year Bldg Value: $141,000 TRADITIONAL MODERN FRAME 2 Half Baths: 1 3 3 - ELECTRIC 2 - FORCED AIR 4-CENTRAL W/AC 3922 PINEWAY DR Actual Year Built: 1987 Finished sgft for building 1: 1692 Total Finished SgFt for all bldgs: 1692 Disclaimer: In instances where a dwelling contains unfinished living area, the square footage of that area is included in the total finished sgft on this record. However, the assessed value for finish has been removed. MISCELLANEOUS USE Tax Year Misc Value: $1,600 Misc Bldg b: (RD2) MED. WD. DOCK WD. GIRDERS BOLT Year Built: 1987 sgft: 288 Misc Bldg c: (WD1) WOOD DECK OR RAMP Year Built: 1987 sqft: 116 LAND USE Tax Year Land Value: $117 ,600 Land Description : 08-Canal Front TOTAL LAND AREA: 13500 square feet -- - -Tax Year Total Value: $313,200 i CEAVEQ 'Values shown are on file as of March 012019 DCM-MHD CITY 1h`• N N N N T7 1-4 CD M p Cl CD I fY } i " �tt ppt S d C1f N N n M i N N z, � - . / lip; ,- �.�,• �• i� t r RECEIVED APR 2 5 LH-4 DCM-MHD CITY RE: CAMA Major Permit Agent Authorization Received RO 2 7 i019 Walthall Property DMEC 3922 Pineway Drive Kitty Hawk landing Subdivision Kitty Hawk, Dare County, NC As property owner of the above referenced parcel, I authorize Quible & Associates P.C. (consultant) to act as agent for the purpose of CAMA permitting, including all other accompanying State and Federal permits required. 'tvk� A. I & & — Autho ized Signature Name:J t_f len" a1.0', (( Date z 27-11 RECEIVED p,PR 2 5 Zp19 pCM-MH� CITY Quible & Associates, P.C. EWNEEPINC • ENVW)N%*NM SCI94M • PIPNMNG • $l➢Sv MG SNCE 1959 CERTIFIED MAIL: RETURN RECEIPT REQUESTED February 22, 2019 Wlndforce LLC. 15523 Hillview Ct Culpeper, VA 22701 RE: CAMA Major Permitting 3922 Pineway Drive Kitty Hawk, Dare County, North Carolina Dear sir/madam: PO. dower 070 K" Howk NC 27PW Phone: 252-491 8147 Far. 252-0 81 do w . Wbo cm As adjacent riparian property owner to the above referenced project, it is required by NCDEQ, Division of Coastal Management (NCDCM) that you be notified of the proposed work that requires CAMA Major Permitting. As depicted on the accompanying site plan, the proposed project includes the construction of a bulkhead and associated grading on Mr. Walthall's property, as well as new pier and platforms with associated slips. Should you have no objections to this proposal, please check the appropriate statement on the attached form, sign and date where indicated and return the attached form as soon as possible to: Troy Murphy, Quible & Associates, P.C., P.O. Drawer 870, Kitty Hawk, NC 27949. Should you have comments to this proposal, please send your written comments to the CAMA Field Representative, Ms. Yvonne Carver, 401 S. Griffin Street, Suite 300, NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible Asso tes, P.C. Troy Murphy RECENEo 0,t5J0 CCM.MNC C111 Gceived DCM-EC ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Glenn Walthall s (Name of Property Owner) property located at 3922 Pinewav Drive (Address on Albemarle Sound in (Waterbody) Lot, Block, Road, etc.) Kitty Hawk, Dare County , N.C. (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. i have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (individual proposing development must fill In description below or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Troy Murphy (Quible & Associates - Agent) Print or Type Name PO Box 870 Mailing Address Kitty Hawk NC 27949 CittyylStatelLipp 252-491-8147 / tmurphy@quible.com Tele hZa Nu ber/email address zvt ]Jae 'Valid for one calendar year after signature' (Adjacent Property Owner Information) Signature* Windforce, LLC Print or Type Name 15523 Hillview Ct. Mailing Address Culpeper, VA 22701 City/State/Zip Telephone Number/email address Date* RECEIVED An 2 5 Z519 DCM-MHD CITY (Revised Aug. 2014) Quible Quible & Associates. P.C. ENGINEEPoNC • ENVOONMENTAL SCIENCES -PLANNING • SURVEYING SINCE 1959 CERTIFIED MAIL' RETURN RECEIPT REQUESTED February 22, 2019 Douglas M. Vaughan 3926 Pineway Drive Kitty Hawk, NC 27949 RE: CAMA Major Permitting 3922 Pineway Drive Kitty Hawk, Dare County, North Carolina Mr. Vaughan: P.O. Dma 870 IwN Howk NC 27949 Rh :252491-8147 Fm: 25Z,191.11M web:%A)Wcm As adjacent riparian property owner to the above referenced project, it is required by NCDEQ, Division of Coastal Management (NCDCM) that you be notified of the proposed work that requires CAMA Major Permitting. As depicted on the accompanying site plan, the proposed project includes the construction of a bulkhead and associated grading on Mr. Waithall's property, as well as new pier and platforms with associated slips. Should you have no objections to this proposal, please check the appropriate statement on the attached form, sign and date where indicated and return the attached form as soon as possible to: Troy Murphy, Quible & Associates, P.C., P.O. Drawer 870, Kitty Hawk, NC 27949. Should you have comments to this proposal, please send your written comments to the CAMA Field Representative, Ms. Yvonne Carver, 401 S. Griffin Street, Suite 300, NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates, P.C. T� oy Murphy rFk 2 7 29';9 F01011T, RECEIVED APR 2 5 ZON DCM-MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Glenn Walthall 's (Name of Property Owner) property located at 3922 Pinewav Drive (Address, on Albemarle Sound in (Waterbody) •k, Road, etc.) iy Hawk, Dare County N.C. (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) tgnature Troy Murphy (Quibie &Associates -Agent) Print or Type Name PO Box 870 Mailing Address Kitty Hawk NC 27949 CitylStatelZip 0-491-8147 / tmurphy@quible.com Telephony Nun)ber/email address Date 'Valid for one calendar year after signature* (Adjacent Property Owner Information) Signature* Douglas M. Vaughan Print or Type Name RECEIVED 3926 Pineway Dr. Mailing Address Kitty Hawk, NC 27949 APR 2 5 2019 City/State/Zip Telephone Number/email address M-MHD CITY Date* (Revised Aug. 2014) i � aompioce cpents ■ Frint your Hemp $a thatwe Can r ■ Attach this card or on the front If rid6.,._ Or tess on the reverse no card. to you.. back of the mailpieco, oermits: k,v�)as dj1 U4)OSS &d 9590 9402 3917 8060 6765 93 <007 2680 0002 5930 1008 PS ForrI=T, July 2015 P5N 753a07.-Oon-9 s Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. we JAI d $ !t ,/f . ❑Agent' p;-. is (fe ivory addre dittcrent hnm itom i9 u. yes If YES, enter delivery address below: Q No Received MAI 2 120119 {1Y ,IiOOMWIN revery U Cvnlh. Mdi Re6tdolod D�I'rvy Ci Return Rxelct for f I Collect an Delivery Mc+charot" t l aWect on 0010a Re t. Davprry r] J re Contm st7n^ lnured MA u Sp.1W. Gong t on 71 lm%,ed Mall Restdcted pemery Reetrded udvep 19 �tl�rvc���ac�2. Ltt'_ -1 L) C1i 9590 9402 3917 6060 6765 86 t ❑( 2. Article Number (Transfer from service label) CJ 7007 2680 0002 5930 1015 Ps Form 3811, July 2015 PSN 7530-02-000-9053 Domestic Return Roco pt I Agent _0 Addre C. Date of Del enter delivery address below: [I No Received MAR21 2019 grratura neslrlctarl Dauvay v ❑ heglatered hipA Rp9hiotec f Mahe llivery lod Dolivery ❑ Renonneceipt for Rett. F on andise Mg.t.reco onDeAvery on Deiivpry Rosbictad Delivery Cl si9aturocorp otw, -'Wl .. ❑Signirtum Conlirmatio�� ail Restricted Delivery. Footectm Cetivory li Domestic Return Receipt RECEIVED APR 2 5 2019 DCM-MHD CITY G Recorded: 08/101201703:23:25 PM By: CLAUDIA HARRINGTON VauoRa McMunan, Register of Deeds 0 Dare County, NC Fee Arm 226 UO Tax: NC Exase $620.00 Off, BOOK 2185 PAGE 604 (2) ESTATEREAL 70aW2115 COUNT, TRANSFERTAX II�III�IIINIII� � La%7 s /I �i NORTH CAROLINA LTS: 2778.17 / Jh00.00 GENERAL WARRANTY DEED Excise Tax: $620.00 Tax Map No. Recording Time, Book and Page Parcel Identifier No. 027335000 Mail after recording to: Casey R Ro1b�bins, PC, P.O. Boa 28, Nags Head, NC 27959. This instrument was prepared btl a— P. Meads, Attorney at law. THIS Dade this J-e day of August , 2217 by and between GRANTOR igm M. Ritter, III and wife, Carol S. Ritter �t;) 1607 Rochelle Drive "�2lizabeth City, NC 27909 d GRANTEE GlemWald@l and wife, Jo Ann Waldrall 392'1 ineway Dave Kitty lta�k, NC 27949 The designation Grantor and Grantee as used herein shall Incsaid parties, their heirs, successors, and assigns, and shall Include singular, plural, masculine, feminine or neuter as reaui gg a by context. WITNESSETH, that the Grantor, far a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell andffiionvey unto the Grantee In fee simple, all that certain lot or parcel of land situated in the City of Kitty Hawk, Atlantic TownsU'Dare County, North Carolina and more particularly described as follows: ��!!('''111 Being Lot No. 27, Section 3 of Kitty Hawk Landing, as shown In Ma k 6. Page 37.2 (Sheet 2( In the Register of Deeds Office of Dare County. This instrument prepared by Laura Meads, a licensed North Carolina asomey. Obli}lguent taxes, it any, to be paid by the closing attorney to the county lax collector upon disbursement of closing proceeds l �nnll RECEIVED APR 2 5 2019 DCM-MHD CITY FFR 2 � Y! " Book 2185 Page 604 P.. 4 .. .11 or a portion of the property hereinabove described was acquired by Grantor by instrument recorded in Book j3¢, Page M. re County Registry. AQgg showing the above described property is recorded In Map Book 6. Page 37-2, and referenced within this instrument. Thee$0 described property 0 does ® does not include the primary residence of the Grantor. TO HA\ P(ND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee All a simple. And the GraMtlr covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simplQ, that title is marketable and free and clear of all encumbrances, and that Grantorwill warrant and defend the title against the _ ul claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the propertt(hlireinabove described is subject to the following exceptions: Restrictive CovenantsVill Easements of record. Ad valorem taxes. n IN WITNESS WHEREOF,-" Grantor has hereunto set his hand and seal, or if corporate, has caused this Instrument to be signed in its corporate name by Its duly authorized officer(s), the day and year first above written. (SEAL) (ENTITY NAME) William M. Ritter, 111g �}�-- , By: O l .QA Q�.Q(SEAL) Title: Caml S. Ritter NORTH CAROLINA WR OUNTY I certi to yr r pe son(s) personasy ap�ared before me this day, each acknowledging tome that he or she signed the_ _ dt>c;*,yjiam M. Ritter. III. Wy+pss my hand and official stamp or seal, this the '�� a day of NORTH CAROLINA J w'^rCOUNTY r No Public V �"(� )XXPrint Notary Name: .& t l' appeared before me thi6hy, each acknowledging to me that he or she signed! Witness my hand anoHiaal stamp or seal, this the ZY�i day of �oav r ✓ Notary ubl�J' T Print Notary pipe: 1 er, O+YCiS Ql� RECEIVED APR 2 5 2019 DCM-MHD CITY FcB 27 2A?j EM Book 2185 Page 605 ROY COOPER Govema MICHAEL S. REGAN seartary BRAXTON C. DAVIS Dowf r Glenn and Jo Ann Walthall 3922 Pineway Drive Kitty Hawk, NC 27949 Dear Mr. & Mrs. Walthall: NORTH CAROLINA Environmental Quality April 23, 2019 The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of property located at 3922 Pineway Drive, Lot 27, in Dare County. It was received complete on April 5, 2019 and appears to be adequate for processing at this time. The projected deadline for making a decision is June 19, 2019. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from April 5, 2019, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. DE North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street. Ante 300 1 Elizabeth City, North Carolina 279o9 2522643901 RECEIVED APR 2 5 2019 DCM-MHD CITY T W o q W� 1 T I Wa PROJECT: Construct a bulkhead, fill and grade the yard, install a pier with an upper and lower platform, 2 boatlifts, 2 additional platforms, and create 5 total boat slips. COMMENTS ACCEPTED THROUGH APPLICANT: Glenn and Jo Ann Walthall 3922 Pineway Drive Kitty Hawk, NC 27949 540-892-4910 May 18, 2019 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW. ^- Yvonne Carver 401 S. Griffin Street, Suite 300 Elizabeth City, NC 27909 252-264-3901, ext. 232 1 ROY COOPER NORTH CAROLINA Govm,or Environmental Qualify MICHAEL S. REGAN Sevetm y BRAXTON C. DAVIS Dim, for EMAIL MEMORANDUM TO: Susan Simpson The Coastland Times Manteo, NC 27954 leqals@thecoastiandtimes.net FROM: Ella Godfrey DATE: April 23, 2019 SUBJECT: Public Notice: Glenn and Jo Ann Walthall Please publish the attached Notice in the Sunday, April 28, 2019 issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City Tricia Smith, Public Information Office, DCM, Morehead City Melissa Sebastian, Accounts Payable, DCM, Morehead City File NOTICE OF FILING OF RECEIVED DEQ� APR 2 5 2019 North Carolina Department ofEwIronmental Quality Diviskmof Coastal Management Elizabeth City Office 401 South Griffin Street. Suite W Elizabeth C.t . North Carolina 27909 DCM-MHD CITY 2542643901 APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The NC Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 04/05/19. According to said application, Glenn and Jo Ann Walthall propose to construct a bulkhead, install a pier with an upper and lower platform, 2 boatlifts, 2 additional platforms, and create 5 total boat slips at 3922 Pineway Drive, Lot 27, in the Town of Kitty Hawk. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264- 3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 05/18/19, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Sunday, April 28, 2019 DEQ North Carolina Departmentof Envirwmental4mlity Misionof Coastal Alanugement Elisabeth City Office; 401 Smith Griffin Street. SUlte 300 Elizabeth City, North CarolinaZM9 25226-1.3401 RECENED APR252019 pCM-MHD CITY MAJOR PERMIT FEE MATRIX Applicant: Glenn & Jo Ann Walthall_ Selection Development Type DCM % DWQ % (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non-commercial dee development that does not 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: li. Public or commercial development that does not $400 10 %% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: n Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $2S0 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: III(B). Public or commercial development, if General aU(1 10090 (5400) (SO) Water Quality Certification No. 4097 (See attached) F0`10 can be a lied: III(C). If General Water Quality Certification No. $400 60`t'o ($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water 1 L' Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60% ($285) 40�g excavation of more than one acre of wetlands and/or o en water areas: ocm-MHD CITY NC Division of Coastal Management Cashier's Official Receipt Received From:: /]�/✓'" �,� � '��� Permit No.: Applicant's Name:"7, �� ✓N ,�(/l Project Address: 3 I/ �� / i!�e cJ`�r b r lvc MM Date: 3% L 20 If $ yo 0. Check No.: �7— County: Y G L Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: C' Signature of Field Representativ Date: � � I Date: 3i)1/Irl�i 0 0 N U U U N 2 � Q � U Q —This is a word processing form to be completed in Microsoft Word-" NC Division of Coastal Management Major Permit Application Computer Sheet (1110112012) Applicant Olenn and Jo Ann Walthall Date: 04/22/19 Project Site County DARE Staf.,, Yvonne Carver District: Elizabeth City Washington ❑MoreheatiCity [I Wilmington Project Name: Walthall docking lacittty & shoreline stabilization Latitude: 36003'18"N Longitude:-75044'191W Date o/lnitta/ app/katton submittal (EX: 1/8%2007): 03/21/19 Date application "received as complete' in the Field office (EX: 1/LV1()07): 04/05/79 SITE DESCRIPTtON/PERMIT INFORMATION PNA: C1 Yes No Photos Taken: Yes No❑ Setback Required (riparian): ❑Yes No Critical Habitat El Yes No Not Sure 15 tool waiver obtained: Yes No Hazard Notification Returned: []Yes NNo SAV. Yes N No Not Sure Shell Bottom: Yes No Not Temporary Impacts: Yes No Sure Sandbags: C3 Yes No ❑ Not Sure Did the land use classification come from Mttigalion Required (opttonal): county LUP: ❑Yes ®No El Yes NNo Moratorium Conditions: LJ Yes NNo Environmental Assessment Dare: ❑NA ❑Yes 0No0NA .+wvr.✓nn IF rrA r Crt 1 LAOMI lUA I /DN - OPTIONAL (choose MAX of 4) El Future Water Supply (FWS) NuMent Sensitive Waters (NSW) Swamp Waters (SW) u High I U Outstanding ABSOU/CB Wa18lS (ORW) •• •�.v.aia rwi-^.r Cu (404) .of Engineers (Jurisdictional wetlands) (LS) Sea lavender (Limontum sp.) (SS) G/asswort (Salkomia sp.) (CJ) Saw grass (Cladium jamakense) (SA) Salt marsh cordgraas (Span na (SY) Salt reed grass (Spartina attemiflora) cynosurades) (DS) Salt or spike grass (Dhvkhlis spicata) (SC) Bullrush r three square (Sctrpus --11111 (TY) Cattail (Typha sp.) SO (JR) Back needlerush (Juncus (Sp) Srll1/Meadow grass (Spertine roemenanus) patens) APPLICATION FEE No fee required - $0,00 ❑ III(A) Private w/ OAF up to 1 acre; 0 III(D) Priv. public or canm w/ D&F to 1 3490 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Mina Modification to a CAMA Major C3 Major Modification to a CAMA Mafia 0 IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer - $100 III(B) Pudic or commercial w/ DAF to 1 Express Permit - $2000 acre; 3490 can be applied - $400 LI Major development extension request • tl. Public or commercialrno dredge $100 and/or fill - $400 RECENED I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs A pR 2 5 20I9 DWO agreement - $400 252-808.2808 :: 1.88&4RCOAST :: www.nccoastalmananement.net DCM.VAQU. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Glenn and Jo Ann Walthall Date: 04(22119 Describe below the ACTIVITIES that have been applied for. Aft values should match the dimension order, and units of measurement found in your Activities code street. TYPE REPLACE Activity Name Number choose Choose Dimension t Dimension 2 Dimension 3 Dimension 4 One One Bulkhead- 1 New work® Replace 185 1 vinyl Maint ❑ ❑ Y ® N 8 Fill -shoreline 1 NewWod 0 Replace 185 8 stabilization Maint❑ ❑ Y ® N High ground 1 New Work 0 Replace 178 17 disturbance Maint❑ ❑ Y ® N Pier 1 New Work 0 Replace 13 6 Maint ❑ ®Y ❑ N Platform 1 New Work® Replace g 16 Maint ❑ ®Y ❑ N Platform I New Work E Replace 70 4.28 Maint ❑ ❑ Y ® N Platform •J 2 New Work® Replace 6 20 Maint [I ❑ Y ® N Pilings 6 New Work Replace 6 Maint ❑ ❑ Y ® N Boat lifts 2 New Work® Replace 12 12 Maint❑ ❑Y®N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint❑ ❑Y❑N New Work ❑ Replace Maint❑ ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N RE EIVED New Work ❑ Replace Maint ❑ ❑ Y ❑ N —....un MTV _ Nov. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Glenn and Jo Ann Wallhall Date: 04122119 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Apptied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp !m act amount TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp un cts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 1050 1050 Shallow bottom Dredge ❑ Fill ® Both ❑ Other ❑ 1450 1450 High ground dist. Dredge ❑ Fill ® Both ❑ Other ❑ 3037 3037 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED APR 2 5 Z019 DCM-MHD CITY 252.808-2808 :: i-888-4RCOAST .: www.nccoastalmanagement.not revised: Nov. 2012 ROY COOPER cov MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Apr !24,2019 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar@ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Glenn and Jo Ann Walthall Project Location: 3922 Pineway Drive, Lot 27, Kitty Hawk Landing Subdivision, Kitty Hawk Proposed Project: Docking Facility and shoreline stabilization Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by May 15, 2019. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 232) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DEQ�� N<rtb CaroP,,u Depirtmenlnr Envirocimnlat Qtulity 1 Divhian nF Coa>tal M.mage,nent Elizabeth City Ottice 401 South Grltftn Str"l. Sidtc 3OO Elizabeth City. North Ca, oiina 274t7<, LSZ161.9g1 RECEIVED APR 2 5 2019 IDCM-MHD CITY DCM Coordinator: Greg Bodnar Distributed Yes® No ❑ Applicant: Glenn and Jo Ann Waithall Distribution Date: 4/24/2019 AGENCY ECRO Ben Alexander Community Development/LPO Charian Owens Eliz City DCM Planner US COE: Josh Peletier— (Sertie, Currituck, Dare, Gates, Pamlico, Posquotonk, Washington) Community Assistance Lee Padrick (Beaufort, Carteret, Craven, Eliz City, Pamlico, Washington) Cultural Resources Renee Gledhill -Earley Div. of Water Infrastructure (No longer public Water Supply) Clif Whitfield Marine Fisheries Shane Staples WARO/ECRO NC DOT David Harris Shannon Jenkins Shellfish Sanitation Sharon Gupton Tim Walton State Property Mike Moser DEMLR/DWR: Sheri Montalvo DEMLR Sediment & Erosion- Samir Dumpor Storm water- Roger Thorpe DWR 401- Anthony Scarbraugh WRC Maria Dunn (WARO) National Heritage Program Rodney Butler RECEIVED APR 2 5 2019 DCM-MHD CITY C:\Users\emgodfrey\Documents\Major Permits\Chris Perry\Maj Comment Distribution Sheet -Perry.docx Revised: 6/29/2018 0:\2018\P18120\Drawings\P18120-ENV.Owg 3/19/2019 10:30 AM Tmurphy II I I VA v i'N N n22-3C) o p z z I I 1.0• I o rx I I , o A 1 I 9 O N Q W rC m D O G' aM �,w,� V 0 I I I 1 , I I C'3 I y c o tA3 Sti I msv Z OA < TEA i o � 1 m rA N I I I n-1 I H Z D A n D Tel m m v C < m m v PROJECT COPYRIGHT © 2019 OUIBLE & ASSOCIATES, P.C. � 2' OF 2r � DBTAII.S NC Ucense&: C-0208 P18120 THIS DOCUMENT IS THE PROPERTY OF uible SINCE r959 3�2 pINEWAY DRIVE OUIBLE & ASSOCIATES, P.C. ANY IS 7o 1/v l+� DRAWN BY ALTERATION OF THIS DOCUMENT PROHIBITED. O �yIr i..w q� & Associates, P.C. JTM OTH / IF THIS DOCUMENT IS NOT SIGNED AND SEALED BY A LICENSED PROFESSIONAL THEN THIS DOCUMENT SHALL BE WALTSALL PROPERTY ,�7 d �j n > �y ill ENGINEERING" - CONSULTING ' PLANNING ENVIRONMENTAL SCIENCES - SURVEYING-' '•ENG./SUR. NOT OFFERED AT 9LA" MTN. OFFICE — CHECKED BY KITTY HAWK DARE COUNTY MR CONSIDERED PRELIMINARY, NOT A NOT NORTH CAROLINA t'C YH 8468 Coratoke Hwy, POwells Point, NC 27966 CERTIFIED DOCUMENT AND SHALL BE USED FOR CONSTRUCTION, SALES OR LAND > M�.�.1 Phom (252) 491-8147 Fax: (252) 491-8146 90 Church St., Sh. 8, Black Mountain, NC 28711 0 NTS NTS DATE RECORDATION. /�, y , /r' Phane: (828) 793-0398 Foe: (252) 491-8146 03/19�19 CONVEYANCES, UNLESS OTHERWISE NOTED. GRAPHIC SCALE IN FEET 1"—NTS OominlelrafaNqul8ls.com NOTES 1. OWNER/APPLICANT: GLEN WALTHALL JO ANN WALTHALL 3922 PINEWAY DR. KITTY HAWK, NC 27949 2. PROPERTY INFO: PIN: 986510450183 OB 2185/PG 0604 PL 6 SL 37-2 3, THIS IS NOT A BOUNDARY SURVEY. INFORMATION SHOWN IS BASED ON A SURVEY COMPLETE BY SEABOARD SURVEYING. WATER DEPTHS AND SHORELINE WERE FIELD SURVEYED ON 01-25-19 BY QUIBLE & ASSOCIATES, P.C., USING GPS, RTK NETWORK. THIS INFORMATION SHALL NOT BE CONSIDERED A CERTIFIED SURVEY. THIS SHALL BE CONSIDERED PRELIMINARY AND FOR CAMA PERMITTING ONLY. 4. PROPOSED WORK: A. 185 LF BULKHEAD WITH 1,450 SF OF BACKFILL B. MAIN DOCK - PIER: 6 FT BY 13 FT - PLATFORM (L SHAPE): 16 FT BY 9 FT - LOWER LEVEL PLATFORM: 300 SF - WIDTH VARIES 4 TO 5 FT (AVG 4.28 FT) - CENTERLINE LENGTH 70 FT - (2) 12 FT BY 12FT BOAT LIFTS - ONE SIDE TO SLIP WITH 2 TIE PILES C. TWO SECONDARY PLATFORMS - (2) 20 LF BY 6 FT PLATFORMS - 2 SIDE TO SUPS - 4 TIE PILINGS D. UPLAND GRADING TO MATCH NEW BULKHEAD (3,037 SF) CANAL PROPOSED MAIN DOCK (522 SF) SEE NOTES AND CROSS SECTION PROPOSED EXISTINGTO MOORING PIER TO BE PILES -bx REMOVED ° PROPOSED 12 FT X 12 FT BOAT LIFT LIFT i (TYP.) `•/ / l j - \ r' Lx NINU WUOU WALK TO BE r�7EXTINDED AND REPAIRED r PROPOSED20 LF BY ®/ i \ 6 FT 1 PROPOSED 11 - 20 LF BY 6 FT () PLATFORM -6.- -4 L. ..—._ PROPOSED 185 LF-- BULKHEAD PLATFORM 511251?gFE' oft) / \ 5TORr NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR DISCUSSION PURPOSES ONLY1 EXISTING INFORMATION SHOWN ON THIS DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY. ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. IQUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE USE OF THIS INFORMATION. N/F PIINOFORCE LLC PIN 9865f0451053 MAR 21 7,019 DCM-EG V\ 5m (, IOT27 v \ \ \ i N4- DO UI,i A9 M V/AtOW PIN 065I0451202 uBCfKE yarn SITE VICINITY MAP APR 2 5 2019 - - - ACM-MHD CITY ro••tl�W� U2Z^IONO U vpi AR? VV� m w •�a�wE,^.,E � ,YV/\J • m c � O ? A` (1izZo s�omo V! •ly0u ism m.. .—^I U��4 •mma� evinn- •� �=W�«H�bO r] onnw WZNU•J`0 W O � THIS MAP IS NOT A CERTIFIED SURVEY AND HAS NOT BEEN REVIEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT REGULATIONS. w a AA4 azi �O N = p n ... 0 z :. p- �aQ Y 4 Z W4z p>>rl/1 QpyYW�j F�F pjnml-JZ2lY °' OUP V102 V1�6'� N rcdU rcnM rc00 �OIZ-,. ((SJ�ZmV1N��ZONZ W Z IHfIHO�Sr WULL'WM1' Zz 7 UQ-VIWOZUOLL�O OW i+d� pQN6W'Qp QU V ..AJ � U>>ZW IWilp4 m [OJwrQ ppO�Opp�jr = Q mK p Z H W W O HOn i��O�4 m¢O ti W f/1 U c>