Loading...
HomeMy WebLinkAbout94-19 Tanglewood POAPermit'Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and �7 Coastal Resources Commission Ta Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Tanglewood POA PO Box 324 Shallotte NC 28549 Permit Number 94-19 Authorizing development in Brunswick County adj. to AIWW, at 3185 Waterview Drive SW. in Supply , as requested in the permittee's application dated OS/15/19 (MP-1 &MP-2) and O8/08/19 (MP-4) including attached workplan drawings (2) CI-C2 both dated 08/02/19. This permit, issued on December 6, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may To lines, imprisonment or cwu action; or may cause ine permit to oe nuu WILL vviu. Boat Ramp & Fixed Pier Extension 1) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 2) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the attached workplan drawings. 3) In accordance with commitments made by the permittee, the boat ramp shall be poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. f� Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Tanglewood POA (7 Permit No. 94-19 O Page 2 of 3 M -G ADDITIONAL CONDITIONS 4) Placement of fill materials below normal high water level shall be limited to the concrete ramp structure, rip rap, and vinyl sheet pile walls. 5) Excavation and ground disturbing activities, associated with the placement of the boat ramp, rip rap and sheet pile walls, above and below the normal high water line shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached permit application and workplan drawings. 6) Any portion of the permitted access pier built over Coastal Wetlands shall not exceed six (6) feet in width and shall be elevated a minimum of three (3) feet over the wetland substrate as measured from the bottom of the decking. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Sedimentation and Erosion Control 8) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property. NOTE: An Erosion and Sedimentation Control Plan may be required for this project. This plan should be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Energy, Mineral, and Land Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. Stormwater Manaaement NOTE: A Stormwater Permit may be required for this project. This plan should be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Energy, Mineral, and Land Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. General 10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Tanglewood POA ADDITIONAL CONDITIONS Permit No. 94-19 a Page 3 of 3 12) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Nationwide Permit No. 3 (SAW Action Id. No. 2019-01709) which was issued on 12/6/19. NOTE: The N.C. Division of Water Resources assigned the project DWR Project No. DWR-2019-1155. NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc satisfied the Section 401 application processing fee requirements of the Division of Water Resources. Processing Notes Applicant: End PN/Comment De line: 91 Q f(r) 75 day deadline: 11�2/ 30 Day Comment Period: on hold: off hold: 150 day deadline: VVIAJ �er�n;� � V-eo A"). FlPos n , e� �, V ✓wry q p we- paj,�- of iu,vL ju wv-tg d PSI- alp s ctrsl(d Y ki) , wVLv V w" f A ck (,+04(la nl- tv r wo +�fi Gash, m s. itd j f 'PM'c� 04+;C<k44S CorKC �. �Orn's � AeM a'^O— boo- lC;,/rr u'kcG IO1IVI �'(zS, r i6�;rrlsr "�2S r a/z.r L'� Issued: DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Tanglewood POA clo Brandon Isenhour COUNTY: Brunswick PROJECT NAME: Tanglewood Boat Ramp LOCATION OF PROJECT: 3185 Waterview Dr., Adj to AMW DATE APPLICATION RECEIVED COMPLETE BY FIELD: 8-19-19 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: McGuiree / DISTRICT MANAGER REVIEW: B) � DATE RECEIVED BY MAJOR PERMITS UNIT: TV� APPLICATION ASSIGNED TO: Spears PUBLIC NOTICE RECD: 8-22-19 ADJ. RIP. PROP NOTICES RECD: C) 75 DAY DEADLINE: 11-2-19 MAIL OUT DATE: 8-20-19 PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: N/A DISTRICT OFFICE: WILMINGTON FEE RECD: $400 (60140)#3460 END OF NOTICE DATE: 9-12-19 DEED RECD: Yes 150 DAY DEADLINE: t (b q STATE DUE DATE: 9-12-19 AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM - Field Rep lot t1ol j Local Permit Officer DCM DCM — LUP Consistency Determination -L— Rural Development Division DEMLR — Stormwater & Sed/Fsosion DWR-401 DOA — State Property Office 11101M DMF — Shellfish Section �j S I 11 jX NCDOT DMF — Habitat & Enhancement DWR— Public Water Supply 0 `3lJ } %D✓1 "5 USACE—Regulatory 17' 4 pl Itii DNCR—Archives & History DNCR — Natural Heritage Program WRC — Wildlife Resources Commission ({ PS 13 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Tanglewood POA clo Brandon Isenhour COUNTY: Brunswick PROJECT NAME: Tanglewood Boat Ramp LOCATION OF PROJECT: 3185 Waterview Dr., Adj to AIW RECEIVED SEP 1 1 2019 DATE APPLICATION RECEIVED COMPLETE BY FIELD: 8-19-19 DCM-MHD CITY FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: N/A FIELD REPRESENTATIVE: McGuire} DISTRICT OFFICE: WILMINGTON DISTRICT MANAGER REVIEW: /.1� G v B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Spears PUBLIC NOTICE REC'D: 8-22-19 ADJ. RIP. PROP NOTICES RECD: C) 75 DAY DEADLINE: 11-2-19 MAIL OUT DATE: 8-20-19 PERMIT FINAL ACTION: ISSUE DENY FEE RECD: $400 (60140)#3460 END OF NOTICE DATE: 9-12-19 DEED RECD: Yes 150 DAY DEADLINE: STATE DUE DATE: 9-12-19 AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM — Field Rep Local Permit Officer DCM DCM — LUP Consistency Determination Rural Development Division DEMLR— Stormwater & Sed/Erosion DWR — 401 DOA — State Property Office DMF — Shellfish Section NCDOT DMF — Habitat & Enhancement DWR—Public Water Supply USACE — Regulatory DNCR — Archives & History DNCR — Natural Heritage Program WRC — Wildlife Resources Commission RECOMMENDATIONS FOR TANGLEWOOD POA BOAT RAMP REPLACEMENT 8/19/2019 The proposed boat ramp replacement will be within the existing footprint of the Tanglewood boat ramp. No work or expansion is proposed to the existing docking facility. The only new structures proposed are the 60 ft2 of pier located on high ground connecting to the existing pier adjacent to the boat ramp where the existing concrete would be removed and the 159 ft2 of rip rap placed at the waterward end of the boat ramp. As proposed, the project appears to be CONSISTENT with the Specific Use Standards for Estuarine Waters and Public Trust Areas, as set forth in 15A NCAC 07H .0208 (b), and also with the Use Standards for Coastal Shorelines, as set forth in 15A NCAC 07H .0209 (d). This office has no objection to the proposed work, provided that it is consistent with all other local, state, and federal permitting requirements. In the absence of any concerns from the commenting agencies, it is recommended that a permit be issued subject to the standard boat ramp development. RECEIVED SEP 1 1 2019 DCM-MHD CITY MEMORANDUM To: Heather Coats [� From: Michael Christenbury Subject: Consistency Determination, Major Permit Application, Tanglewood POA — Brunswick County Date: September 9, 2019 This project is consistent with the 2007 Brunswick County Land Use Plan Update. The applicant proposes to replace the existing boat ramp and associated structures of the Tanglewood Property Owner's Association private community docking facility. The project is located at 3185 Waterview Drive SW, Adjacent to the AIWW, near Supply in Brunswick County. Areas of Environmental Concern (AEC's) impacted by the proposal are ES, EW, PTS, CW and PTA. Waters at the project site are classified as SA, HQW and are open to the harvesting of shellfish. The area is not a Primary Nursery Area. I have reviewed this proposal for consistency with the Brunswick County Land Use Plan and offer the following comments. The general area of the project is classified as Residential. In general, Brunswick County allows development in Residential classified AECs which is consistent with the State's minimum use standards. The Brunswick County Land Use Plan contains some policies, which exceed the State's minimum use standards. However, none of these standards appear to be applicable to this proposal. This project is consistent and not in conflict with the 2007 Brunswick County Land Use Plan. Cc: File ROY COOPER Govemmr MICHAEL S. REGAN Secretary NORTH. CAROLINA Larirmintenlui Quahr) August 19, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-396-3964 (Courier 04-16-33) courtnev.soears(d)ncdenr.00v SUBJECT: CAMA/Dredge and Fill Application Review BRAXTON DAVIS Director, Division ofComial Management Applicant: Tanglewood Property Owners Association Project Location: 3155 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the ro>osed ro'ect and return this form to Courtney Spears at the address above by `Se tember 12 204 . If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the projectas proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. zRiNT�NAM r k � e, r S j e, ✓' OF 60 to rn �y ce SIGNATUR 2` R—e `a/� RECEIVED AUG 3 0 2019 DCM WILMINGTON, NC State of North Carolina. I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 919 7967215 NORTH CAROLINA Environmental Qualtry August 19, 2019 MEMORANDUM: ROY COOPER Grvemor MICHAEL S. REGAN secretory BRAXTON DAVIS Director, Division iy Coosral Management FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 (Courier 04-16-33) courtney.soears(a.ncdenr. gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Tanglewood Property Owners Association Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the proposed ro'ect and return this form to Courtney Spears at the address above by a 0QHi er 1M M01 . If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. .RINT NAM Dan Sams GENE DEMLR IGNATUR �m , RECEIVED AUG 2 9 2919 AT August 29, 2019 DCM WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 L11, 1�4) ,V- I , I , - 'o, �J, —,;. 0 ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS August 19, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax:910-395-3964 (Couder04-16-33) courtney.spears@ncdenr.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Tanglewood Property Owners Association Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address above by September 12, 2019. If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. 'Additional comments may be attached" This agency has no comment on the proposed project ,5Ge,- c3 This agency approves of the project only if the recommended changes. V`r� R_ are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAMELk/O_Y-Ya U11�'t oval AGENCY S PM9 A��fT{ RECEIVED SIGNATURE SEP 10 2019 DCM WILMINGTON, NC DATE Sr+�yLc t 1�t Zv�q State of NortltCarolina Environmental Quality I Coastal Management 127 Cardinal Drive I!zt., Wilmington, NC 28405 919 7967215 North Carolina Department of Administration State Property Office Roy Cooper, Governor September 10, 2019 TO: Courtney Spears, Assistant Major Permits Coordinator NCDEQ-Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 FROM: Wanda Hilliard i W CAJ-6L (— Real Property Agent Department of Administration SUBJECT: CAMA/DREDGE & FILL AAPPLICATION REVIEW Tanglewood Property Owners Association/Brunswick County RE: Replace existing boat ramp and associated structures Machelle Sanders Secretary Tim Walton Director Please confirm that the facilities are not located within the 1000'USACE AIWW easement area. If not, then the State Property Office has no comment on the proposed project. Thank you. RECEIVED SEP 10 2019 DCM WILMINGTON, NC State of North Carolina I State Property Office 116 West Jones Street, Suite 4055 11321 Mall Service Ctr. I Raleigh, NC 27699 9198074650 T 1 Web: http://www.nespo.com ROY COOPER (mvetnor MICHAEL S. REGAN secrcmr), NORTH CAROLINA Environmental Qualtyo, August 19, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 .Fax: 910-395-3964 (Courier04-16-33) courtnev. spears(a)ncdenr.gov SUBJECT:_ CAMA/Dredge and Fill Application Review Applicant: Tangiewood Property Owners Association BRAXTON DAVIS Diww. Division nJ C(mial Managenuan Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address above by a tembet' 12 201 . If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. @INT NAM Shannon Jenkins GENE NC DMF - Shellfish Sanitation IGNATUR `~.d�_ 9YctDrta¢u_ for Shannon Jenkins AT 08/30/2019 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive E#., Wilmington, NC 28405 919 796 7215 RECEIVED SEP 0 3 2019 DCM WILMINGTON, NC R&'CO'OPHR r MICHAAEL'S. REGAN •.� HRAXTQTI DAVIS _ `NORTH GtiRDi1NA _--� rl're¢Av, I.Waeint/f timed '.%.Lmrra,memtl.Lhx.r?rr,• 1fs�ngxerer AugUstig,;2019': Y'.-. , �4tEMOl2ANfSUtIM:: • ,. 4 - 7 [' FROM! Courtney Spears, Aaalstsnt',Nlajor Permits Coorrllnator c j�CaEQ blliisionofOoastalfiAdnegement a 127 Cardinal ,Drlve E)d; Wilmington, NC 284U5 Fax: 916-8964964 (Courier04-1A-33)' courtney.soearsOncdenr.00v SUSJECTt CAMAl DMd a and Fill g Application Review Applicant: Tanglewood Prope►ty'Owners Assocletlon 4 7 '. ProjectLocation; 3166WNaterviewDrive SW adjacentto A/WW in Supply, Brunswick County ` c� C G ry "'Proposed Project; replace,01sting boat ramp and associated stnrdures �C v • s, (Please indicate below, your agency's position or viewpoint on the proposed project and L 911. return this form to Courtney Spears at the address aboVeL by If you •7 have any gUestions regarding the^proposed iproject;'contact Tyler MdGuire at (91 Q) 796-7424 when appropriates in-depth comments with supporting data tS requesw.,. REPLY: This agency has no objection to the project as proposed. "Additional comments maye be attached" j ThiWdgency has no oommer t pn the proposed project This agency approves of the the recommended'changes _ �J _ project•onty'if are incorporated. See attached: This agency objects to the project for reasons described in itie;attached comments. r .. c:, 1 Noma . RECEIVED �j AUG 2 9 2019 q , 4 NC3 pCM 1NILMINGTON, -cr w a'.E.+2?o ... StemrorNoah t;ft4dl l 8maromgen4l Quaior'c6,ww,,, pad 1 - ., - 127QadtWDnw E><L'il'dmingmo NC294A5 9197967213. 4 441 „ f r,"L. ROY COOPER MICHAEL S. REGAN dory �-y7 STEPHEN W.MU' HE MEM101RANDUM. "J R 'TO:1 CodrtnbySp&ars;,VtMA§$1stant rPe or&;'ator, FROM: CurtWeychert NCI)MF Fisheries Resource Specialist Tanglewood POK11daRaffip Replacement' SUBIECT� lacemen DATE: August 29, 2019 A North Carolina of-Martne Fisheries (DMF) Fisheries Resource S ecialisthas reviewe&the pact .Division LAMA Major Permitapplication for proppsed.,actioos.that impfish and fish habitats, The project. is located, at,31'85'WaterviewDr, SW, Supply,'Brunswick:Cottrity. The projdct'is occurring idwatem classified as SA, ;'HQW in waters that areopexi to the harvest of shellfish., The applicant is proposing to replace an e)dsting boat ramp, associated bulkheads and fixed'pier. Theapplicanthasproposed to use, wcombinationoffurbidity cUrtains-andtoffer dams, to minimize theimpactsof their project on the water quality -of nearby waters to7the1pr9ject area. The NCj)MF encourages and appreciates' the use of all minimization efforts: 'The setup of these ,curtains and dams were explained in the narrative, however, the breakdown ofthese barriers issnotwell documented, In order toreduce impacti towater quality in the area cifthe project, NCI)MF would suggest that prior to. the removal of the coffer dams, the,basin'have water pumped into the coffer dam; urbirlity curtains,be, installed outside of thedam walls and remain in place while the dam walls are removed and the turbidity curtains he removed when the turbidity returns to amblentlevels., ContabtCurIW6ychertat(252)808-8050orCurtWey6herOncdenr.Lo wi h further questions or concerns. RECEIVED AUG 2 9 2019 -ems' N0IbftV Compam,,-, c DCM WILMINGTON, NC 344TArmddSrreK I PA MV69 I M*vtwadC1ty.NwibCmaw2A.W ;t =-726-7021 ic� t ':1 - �-� -.� .' '�: WZ ROY COOPER r imvmnr MICHAEL S. REGAN se:rrlan, NORTH CAROLINA Envirol"Itenral UaoLA• August 19, 2019 MEMORANDUM: FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28406 Fax: 910-395-3964 (Courier 04-16-33) courtnev.spears(a)ncden r.gov SUBJECT: CAMA/Dredge and Fill Application Review BRAXTON DAVIS brrrdnr, lUvranur n/'f'nanal .1lneµ¢un,mi Applicant: Tanglewood Property Owners Association Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the proposed project and return this form to Courtney Spears at the address.above by If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: x This agency has no objection to the. project as proposed. i 1w" sec oaia kad "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. ih IK %own Do, P,31-L wrav %oljl RECEIVED AUG 3 0 2019 7� `►4 DCM WILMINGTON, NC Bute of North Carolina I Environmental Quality l Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality August 30, 2019 To: Courtney Spears, NC Division of Coastal Management From: Mark Brown, NC Public Water Supply, Wilmington Regional Office Subject: CAMA/Dredge and Fill Application Review Applicant: Tanglewood Property Owners Association Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please forward the following comments to the applicant: If applicant plans.to conduct any work (re -location, installation, extends utilities, etc...) involving the public water supply system per Title 15A Subchapter 18C Section .0301 Rules Governing Public Water Systems, Plans and Specifications should be submitted and approved by the Public Water Supply Section for all new waterlines prior to construction beginning. Please also be aware of our separation requirements in regards to water/sewer according to 15A NCAC 18C Section .0906 Rules Governing Public Water Systems. Check with the local water system for cross -connection requirements for this project. Public Water Supply Section guidelines are listed in Appendix B, Figure 2 in the Rules Governing Public Water Systems but the water system may have additional requirements. Feel free to call us at (910) 796-7215, if you have additional questions. RECEIVED AUG 3 0 2019 DCM WILMINGTON, NC North Carolina Depart_menr_of Environmental Quality ; Division of Water Resources __ Wilmington Regional Office 1127Cardinal Drive Extension i Wilmington. North Carolina 2&405 910.796.7215 Spears, Courtney From: WilmingtonNCREG <WilmingtonNCREG@usace.army.mil> Sent: Monday, September 9, 2019 8.44 AM To: Pietila, Tanya K; Montalvo, Sheri A, Coburn, Chad Cc: Spears, Courtney; McGuire, Tyler D; Day, Susan; Mickey Sugg Subject: [External] 2019-01709 CAMA Major Application: Tanglewood Property Owners Association CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Good Morning! On 8/28/19 we received your application for Tanglewood Property Owners Association and have assigned the request AID number SAW-2019-01709. Currently we do not have a project manager for Brunswick County projects, so I have forwarded your request to Mr. Mickey Sugg and he will assign it to a project manager within our office. Thanks! Christy -----Original Message ----- From: Pietila, Tanya K [mailto:tanya.pietila@ncdenr.gov] Sent: Wednesday, August 28, 2019 12:42 PM To: Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; WilmingtonNCREG <W ilmingtonNCREG@usace.army.mil> Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; McGuire, Tyler D <Tyler.McGuire@ncdenr.gov>; Day, Susan <susan.day@ ncdenr.gov> Subject: [Non-DoD Source] CAMA Major Application: Tanglewood Property Owners Association Good afternoon I Please accept this correspondence as the official distribution of CAMA application from Tanglewood Property Owners Association for development in Supply, Brunswick County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE: Please complete the bottom portion of the comment sheet with your information and signature. NO oversized work plans have been submitted by the applicant For questions or concerns, please contact Courtney Spears at courtney.spears@ncdenr.gov <mailto:courtney.spears@ncdenr.gov> or (910) 796-7426. Thank you! Tanya Tanya Pietila Permit Support Specialist NC Department of Environmental Quality NC Division of Coastal Management <Blockedhttp://www.nccoastaImanagement.net/> 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:(910)796-7226 Tanya.Pietila@ncdenr.gov <mailto:Tanya.Pietila@ncdenr.gov> E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 4�3 G °-.°L 0 •l;4x�y,�g�''r � �.�^. '+ /'A�, ,f� '/��e��� �ji� r'}'� "1* 1 •� tl v+�''��-s�`.'t��-s.j.a`�� ����Z�i���s�P�i_;7�.'�lR �� + 4 xCa y��,a4�➢3+...♦, �'�� ����^.., JI 0. °rjrx' ac" �• Elr� Y i °"'tS`�:}ey�'�'-M ..�".. �,� t,�a `a _71 �� ,•.f ��� � "�'.�'. � =./ --?&ifCF�EI��S-+u4�,1�U� g t I�Sf4iti"nyntV TJ,414, �'''.'r,,�� ti ra °:4 �4. ram, ^y '1 Jt yl-oy-`a .-' y. a '�,r'/r^i_� li ].I �'f '} �'"r •� ''' 7t�'�. .d°a- j-a/-�s`gi`7 �`S i �14 %- r i d-, vy a> �,1 f •"-Y,r-,y 8 "e y s- +°,', Y � } ] .�(3OM; . z ��t�L�y' rti gBPettnitb`�on�tlffiatnt � 1� � -n]„ay .�z�.._..... f sq■( K�'f`9�1�����pp� Jl YI "2T�Cardin3 aDdkdE�e,l�lCGfbm�tonEi�C890`?y � , CkfRrQr�9eandl�pcafiolevle,ra4 Ica aqa irfi,k'<yx yx ,a llCani; " z» TeA91 ohs pertjirOwn sJAss c/ t%R'.) ' r� Ptoj-�r�yafogallon r3We(eaprve,S.ed cb fzA1W�4�mc7pply9t7r�isw�aleim'?ya O .s *."+,`*�... x y ti f �. m,sPS' i� rt ..�r� :^ i,,-r, rx»s�7m t' �.,,•_� as � .l capSgp!'raprsprrn9lb{fetiemp+lissco�ceEt�Gtl�ius'°t '"a. , i'1 � s S � � 5 .i � � � '� "by� rLs•y'e i^ w d,"iT w Ynx7 d J °s.} 3 ..,. i3 °° i - � - pleaa8�dicajielielow�ou�'a�eGby`s�ds�,onorv,evr ,�boiiuie� ro fed' ec%a[id � , `� iahmwt�ilsformfoCour�tev�nearsafttjd�le5sa6ovebl a emberl2 201 dtfo�r+ iaveanrquestoregarrllp sp[o �j rgiCt,,eon c�Txi�[McGwre<at�(3m0�796,7 ?r�wh6rs 3 1 .!.� P iT- — _'a-1"i � xi S'-' ! *mot, .( }'f " � 7'.r rt i "[ A LZ a-z `� p �' 'A"G••l � �'�1 ?REP4Y�S—'�aiage_'�icyhas'noobject,op�iatheProjecEasgp'roasec�s AddT0*6 -Arngfs ^Xm , axt '+. +' l� topznbe� tached'rJ 33� v f sTh,s ,6q t o4GYae aravQs �heQmjbcto2ifrecAni�jdddchanges tP, � 4--•, aieInncoipora�ed fee chi, a 5 - r ��js`a�et>cy abfecTs,�Zhe:��ol�c�3'o�t`XeasonsrdescnFle�f �t�i�ie,a�}�e�edco�,mep>,� V, -,� � ty- �ti: qrr q^f'a� * r°'may �{�'+J �,s Sav a f3'�j �aa§ "ar;11S �'+,'y�: "L .x '� . "J "'iN+j"}a; •.,pyr i :� '.,1 P't.. Renee k�ledilil` Earle ' -� -" ' fi l :.ryYx T'S ". a y t�' x S h ./4K�s`'�� rc° a 3 ✓'.a rtd�+'3 ,d*-9'^°ry�.S* 3 J cErtc�@+ 4�xState H r� sF �es,(ts rattdit ofrl a w,d> RECEIVED SEPi62019 '421, CM WIL D MINGTON NC q , -I, - -� axe z.s L`, y 4:...t ) `� { 'J +7� yk"J :fr •µ. .� a�!NerRa.9�.6���' ,:� � _�'°� �-�• ��---•:.,-.ems-m"`_ —_y�. � �`-�.......�-_ a v 4 a _.,_7�'� .:.P-��-�Z.�.-o-�1 Aqpst fOEMORAND FKOM VA:T7-ff:; I T Coordinator t& AlWW, Y! sfikl, Biun-sMdck, Codn&l �ctuFe% dh th6 Aifo§M offlect art f�q p�9j'qi#.«rs..ons-d6sciibedmshdAllbbh6dbo #ft, RECEIVED Se 0 4 2019 DCM WILMINGTON, NC III DocuSign Envelope 10: 28A6F18D-F892-424E-A742-3CF69DABOCEI ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Dtrertor NORTH CAROLINA Envtronmenfat Qualify October 11, 2019 Brunswick County DWR Project: 2019-1155 Tanglewood Property Owners Association Mr. Brandon Isenhour P.O. Box 324 Shallotte NC 28459 Subject Property: Tanglewood Boat Ramp Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Isenhour, You have our approval, in accordance with the attached conditions and those listed below, to impact an additional 159 square feet of open waters replace an existing boat ramp and docking facilities at a private residential docking facility as described in the application received by the N.C. Division of Water Resources (DWR) on August 28, 2019. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 4175 (GC4175). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This Certification can also be found on line at: httv://Portal.ncdenr.org/web/wq/swr)/ws/40 I/certsandoermits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 21-1.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If am�D na Q > North Carolina Department of Environmental Quality I Division of Water Resources Wilmington Regional Office 1 127 Cardinal Drive Extension Wilmington, North Carolina 28405 910.7%.7215 DocuSign Envelope ID: 2BA6FI8D-F892-424E-A742-3CF69DABOCEI Page 2 Brunswick County 2019-1155 you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name {I 5A NCAC 02H .0501 and .0502). 2. Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his contractors (and/or agents) to comply with all of the terms of this Certification and shall provide each of its contractors (and/or agents) a copy of this Certification. 3. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity issues arise at 910.796.7215 4. This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. 5. The permittee shall require its contractors and/or agents to comply with the terms of this permit in the construction and maintenance of this project and shall provide each of its . contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. (15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 6. Continuing Compliance: The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than _A DocuSign Envelope ID: 2BA6F18D-F892-424E-A742-3CF69DABOCEI Page 3 Brunswick County 2019-1155 the Division may reevaluate and modify this General Water Quality Certification. [15A NCAC 02H .0507(d)] All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional Office at 910.796.7215 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A]. 8. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)]. 9. This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours 15A NCAC 02H.0502(e). 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The certification of completion is available at: htty://iiortal.ncdenr.orgVwebi'wq/ swp/ws/401 /certsandi)ermitsfapply/forms). Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoali.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI Page 4 Brunswick County 2019-1155 applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition maybe faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: Ijsending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. I.f you have any questions, please telephone Chad Coburn in the DWR Wilmington Regional Office at (910)796-7379 or Chad.Coburn(amcdenr.eov. Sincerely, CDocuSigned by: S " 64 EJAEAI4ACIDC*14... Morelia Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosure: GC4175 cc: Shane Lippard— Right Angle Engineering (via email) Tyler Crumbley - USACE Wilmington Regulatory Field Office (via email) Courtney Spears — DCM Wilmington (via email) 0 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01709 County: Brunswick U.S.G.S. Quad: NC -Holden Beach GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Address: Telephone Number: E-mail: Tanelewood Property Owners Association Brandonlsenhour PO Box 324 Sootily, NC 28459 910-512-4803 bwisenpg0l (a),email.co m Size (acres) 0.06 acres Nearest Town Sootily Nearest Waterway AIWW River Basin Lower Shallotte River USGS HUC 0304020802 Coordinates Latitude: 33.91451 Longitude:-78.339128 Location description: To replace an existing degraded boat ra Description of projects area and activity: This verification authorizes the repair and replacement of an existing degraded boat ramD (1220 square feet). bulkheads (244 square feet) and rioraD (159 square feet) Of imracts to Oren water. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 3. Maintenance SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 7/30/2019, and the enclosed plans entitled, "Tanelewood Boat Ramp, Existing Conditions and Demolition Plan,' dated 8/2/2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class 1 administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would - no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Jordan E. Jessop at 910-2514810or iordan.e.iessopnusace.armv.mil. Corps Regulatory Official o Dit.201912M1l3150-05110' 150905G6 Date:12/06/2019 m,.azo». nebt ia3iSOP"D Expiration Date of Verification: 03/18/2022 v The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.arrny.mil/em apa x/f?p=13 6:4:0 Copy furnished: Agent: Right Angle Engineering Shane Lippard Address: 2 12 Princess Street Wilmington, NC 28401 Telephone Number: 910-251-8544 E-mail: bwisenag0M,gmail.com Permittee: Tanelewood Property Owners Association Brandon Isenhour Address: PO Box 324 Supply, NC 28459 Telephone Number: 910-512-4803 E-mail: bwisenagemail.com Action ID Number: SAW-2019-01709 County: Brunswick Permittee: Tanelewood Property Owners Association, Brandon Isenhour Project Name: Tanalewood POA Boat Ramp Date Verification Issued: 12/06/2019 Project Manager: Jordan E. Jessop Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Jordan E. Jessop Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 or jordan.e.jessop@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality October 11, 2019 Brunswick County DWR Project: 2019-1155 Tanglewood Property Owners Association Mr. Brandon Isenhour P.O. Box 324 Shallotte NC 28459 Subject Property: Tanglewood Boat Ramp Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Isenhour, You have our approval, in accordance with the attached conditions and those listed below, to impact an additional 159 square feet of open waters replace an existing boat ramp and docking facilities at a private residential docking facility as described in the application received by the N.C. Division of Water Resources (DWR) on August 28, 2019. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 4175 (GC4175). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This Certification can also be found on line at: http://portal.ncdenr.ora/web/wq/swp/ws/40 I/certsandpermits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If North Carolina Department of Environmental Quality I Division of water Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 29405 ^'�+, �\ �✓ %0.796.7215 DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCE1 Page 2 Brunswick County 2019-1155 you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name {I 5A NCAC 02H .0501 and .0502}. 2. Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 021-1.0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his contractors (and/or agents) to comply with all of the terms of this Certification and shall provide each of its contractors (and/or agents) a copy of this Certification. 3. Turbidity Standard The turbidity standard of 25 NTUg (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity issues arise at 910.796.7215 4. This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. The permittee shall require its contractors and/or agents to comply with the terms of this permit in the construction and maintenance of this project and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 6. Continuing Compliance: The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than DocuSign Envelope ID: 28A6F18D-FB92-424E-A742-3CF69DABOCEt Page 3 Brunswick County 2019-1155 the Division may reevaluate and modify this General Water Quality Certification. [15A NCAC 02H .0507(d)] 7. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional Office at 910.796.7215 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A]. 8. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)]. 9. This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours 15A NCAC 02H.0502(e). 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The certification of completion is available at: http•//portal nedenr org/web/wq/swp/ws/401/certsandpermits/apply/forms). Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI Page 4 Brunswick County 2019-1155 applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Chad Coburn in the DWR Wilmington Regional Office at (910)796-7379 or Chad.Coburrigncderingov. Sincerely, O SlgneC by: E E3ABA1dAC]nC630... Morella Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosure: GC4175 cc: Shane Lippard — Right Angle Engineering (via email) Tyler Crumbley - USACE Wilmington Regulatory Field Office (via email) Courtney Spears — DCM Wilmington (via email) DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI ROY COOPER Govemor MICHAEL S. REGAN Secretary NORTH CAROLINA Environmental Quality August 19, 2019 MEMORANDUM. FROM: Courtney Spears, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Fax: 910-395-3964 (Courier 04-16-33) courtnev.sDears(a-ncdenr.00v SUBJECT: CAMA/Dredge and Fill Application Review BRAXTON DAVIS Director, Division of Coastal Managemenr Applicant: Tanglewood Property Owners Association Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County Proposed Project: replace existing boat ramp and associated structures Please indicate below your agency's position or viewpoint on the proposed project and retum this form to Courtney Spears at the address above by September 0 2019. If you have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when appropriate, in-depth comments with supporting data is requested. REPLY: _X_ This agency has no abjection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. RINT NAkk_Morella Sanchez -King p ENCY _DWR Docusltmcd W. Cti'°v�U� Ste, 64 IGNATUR E3ABA76AC7DC439... 10/14/2019 6ATg� State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Fz ., Wilmington, NC 28405 919 796 7215 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Tanglewood POA c/o Brandon Isenhour 2. LOCATION OF PROJECT SITE: 3185 Waterview Drive SW, near Supply in Brunswick County, adjacent to the AIWW PHOTO INDEX: 2006 M-6586 4-6214 1-4-5 & M4-5 LATITUDE: 33° 54' 53" N LONGITUDE: 78° 20' 18.6" W 3. INVESTIGATION TYPE: CAMA/D&F 4. S. 6. 7 INVESTIGATIVE PROCEDURE: PROCESSING PROCEDURE: Date of Site Visit: Applicant/Agent Present: Application Received: Application Completed: Office: August 7, 2019 NO June 10, 2019 August 19, 2019 Wilmington SITE DESCRIPTION: (A) Local Land Use Plan: Brunswick County Land Classification From LUP: Residential (R-6000) (B) AEC(s) Involved: ES, PTS, CW, EW, & PTA Water Dependent: YES (C) Intended Use: Private Residential Community Boat Ramp & Docking Facility (D) Wastewater Treatment: Existing — Municipal Planned — N/A (E) Type of Structures: Existing — Boat Ramp & Docking Facility Planned — Replace Boat Ramp & Associated Structures (F) Estimated Annual Rate of Erosion: N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED IMPACTS 122 (A) Uplands N/A N/A ft2 (Bulk eadsj 60 2 (Pier) (B) Vegetated Wetlands N/A N/A N/A (C) Open Water N/A N/A 1220 ft2 Boat Ram ) 244 ft2 SBulkheads� 159 ft (Rip Rap) (D) Total Area Disturbed: 2,765 ft2 (0.06 Acres) (E) Primary Nursery Area: NO (F) Water Classification: SA; HQW (G) Shellfish Harvesting Open: YES 8. PROJECT SUMMARY: The applicant is proposing to replace the existing boat ramp and associated structures of the Tanglewood Property Owner's Association (POA) private residential community docking facility along the Atlantic Intracoastal Waterway (AIWW). RECEIVED SEP 1 1 2019 DCM-MHD CITY DCM Coordinator: Permit #: —Iq MAHdNG DISTRIBUTION SHEET Permittee: ( wlQ r u�av t�/i G�c� �ris/o� n ./sCN � /�O 3qc �i o Z�N�,n Agents: 1-Yi / bu--)L6234 DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington Tnrq ( r I-e' US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecoommee (NC DOT -Remainder ECity/Washington District) Wilmington: �mbTey ru swick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Clif Whitfield (WARD) Marine Fisheries: NC DOT: David Ha Shellfish Sanitation: Shannon Jenkirl� State Property: Tim Walton / Mike Moser DEMLR/DWR: Sheri Montalvo / Shelton Swan Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Natural Heritage Program LPO: Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New IUngv Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WAS Rodney Bu� Fax Distribution: Permittee #: Agent# (NCDOT) Travis Wilson oclM Mr-1 APPLICATION for Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. PrimaryApplicant/ Landowner Information Business Name Project Name (if applicable) Tanglewood Property Owners Association Tanglewood Boat Ramp Applicant 1: First Name MI Last Name Brandon Isenhour Applicant 2: First Name MI Last Name tl additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box city State PO Box 324 324 Shallotte NC ZIP Country Phone No. FAX No. 28459 USA 910-512-4803 ext. Street Address (d Werent font above) City State ZIP 3185 Waterview Drive Supply NC Email bwisenqg0l@gmaii.com 2. Agent/Contractor Information Business Name Right Angle Engineering, Pc Agent/ Contractor 1: First Name MI Last Name Shane Lippard Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 212 Princess Street Wilmington NC ZIP Phone No. 1 Phone No. 2 28401 910 - 251 - 8544 ext. - - aid. FAX No. Contractor # NIA Street Address (d ddiiinint from above) City State ZIP Email bwisenqg0l@gmail.com .vw RECEIVED <Form continues on back> JUL 3 0 2019 SEP 112019 t�rT 252-8a.8 fAMHO (!Ity-4RCOAST .. www.neeoastalmanagemen .IQ ON, NC Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 3185 Waterview Drive, SW Subdivision Name City State Zip Tanglewood Supply NC 28462 - Phone No. Lot No.(s) (If many, attach additional page with list) 910 - 512 - 4803 ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber Atlantic Intracoastal Waterway c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project she. ❑Natural ®Manmade ❑Unknown Atlantic Intracoastal Waterway e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Brunswick County 4. Site Description a. Total length of shoreline on the tract (8.) b. Size of entire tract (sq.8.) 340 LF N/A common area - 0.41 ac. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5.2 above, -3.5 below IRNHW or ❑NWL e. Vegetation on bad grass, trees I. Man-made features and uses now on tract Boat ramp, dock, pier and gazebo g. Identity and describe the existing land uses adjacent to the proposed project site. 3183 Waterview Drive - residential; 3189 Waterview Drive - residential It. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? CO-R-6000 (Attach zoning compliance cerfificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ONA National Register listed or eligible property? RECEIVED <Form continues on next page> JUL 3 0 2019 ::DIVED CC".4 WILMINGTON, NC 252-808.2808 :: 1-888-4RCOAST :. MrWInUNTstalmanagement.not DCM-MHD CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the sfte? ®Yes [:]No (III) If yes to either (1) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovemment ®Privale/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Same as existing. Community boat ramp for Tanglewood Subdivision. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Existing ramp wooden bulkhead and concrete ramp will be removed by excavator. Sheet piles to be driven by pile driver and concrete poured to create a new ramp in the same location. Temporary coffer dam 192' long required to pour concrete below MHW. d. List all development activities you propose. Removal of existing boat ramp. Replace with new concrete boat ramp and bulkheads. e. Are the proposed activities maintenance of an existing project, new work, or both? both f. What is the approximate total disturbed land area resulting from the proposed project? 2,508 ®Sq.FI or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None I. Will wastewater or storrnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA J. Is there any mitigation proposed? []Yes ®No ❑N.pECEIVED R If yes, attach a mitigation proposal. <Form continues on back> . NED JUL 3 0 ZUt' DCr.^. WILMINGTON, PC SEP 11 nnin 252-808-2808 :: 1-888-4RCOA3T :: www.n000astelmanagement.net DCKI-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In adddion to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application Instruction booklet on how to property prepare fhe required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Glenn 8 Camilla Woodcock Phone No. Address 3251 Withering Heights Dr., Newton, NC 28668 Name Alvin Jernigan Phone No. 910-842-9147 Address 3189 Waterview Drive SW, Supply, NC 28462 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permitlee, and issuing dates. None h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date _5/15/2019 Print Name _Tanglewood PDA, Brandon Isenhour Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development RECEIVED MDCM MP-4 Structures Information TM RECEIVED JUN 10 2019 252-808.2808 .. 1-888-4RCOAST .. www. ccoastaimanagement.net DCM-MHD CITY Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 109 Width 20 vg. Existing 0.5 MLW NA NA epth anal Project 0.5 MLW NA NA pth 1. EXCAVATION El This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. soil and concrete 136 c. (i) Does the area to be excavated include coastal wetlandslmarsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), D or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. disposal of concrete and debris at landfill N/A c. (1) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ®NA []Yes ❑No ®NA (II) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlandstmarsh f. (I) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV 0S13 OWL ®None (ii) Describe the purpose of disposal in these areas: RECEIVED RECEIVED SEP 1 1 2019 JUL 3 0 2019 DCM-n9HD CITY P1`.! W1L"riNGTeN, NC 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26I06 Form DCM MP-2 (excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 187, 7.5, ®Bulkhead ®Riprap ❑BreakwaterlSill ❑Other. Width: Y. 21.25, C Average distance watenward o1 NHW or NWL 67' d. Maximum distance waterward of NHW or NWL: 62' e. Type of stabilization material: PVC sheet pile, Rip Rap Store g. Number of square feet of fill to be placed below water level. Bulkhead backfll 1220(conc. ramp) Riprap 159 Breakwater/Sill Other i. Source of fill material. concrete tuck pour, store quarry I. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. concrete and rip rap 4. OTHER RILL ACTIVITIES ® This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? Oyes ❑No ❑NA b. (i) Will fill material be placed in coastal wellands/mamh (CM. It yes, (ii) Amount of material to be placed in the water (III) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (n) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. What type of construcllon equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? any stockpiles out of My buffer In parking area excavator, pile driver, concrete truck c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) It yes, explain what type and how they will be implemented. d. (p Will wetlands be crossed in transporting egrupmenl to project site? ❑Yes ®No ❑NA (a) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 5/1512019 Tangle od Property Owners Association, Brandon Isenhour Date t a RECEIVED Tanglewood Boat Ramp project dame ApplicU IT 11-Y�'"^`9 ant JUl 3 0 2019 PC'.' 1NILMINGTON, NC RECEIVED 282.808.2808:: 1.088-4RCOAST :: www.nccoastaimanaeemenx.,w� revised: 12/28100 SEP 1 1 2019 DCM-41HD CITY Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facilitylmanna: ❑Cornmerclal ❑Public/Govemment OPrivate/Community c. (p Dock(s) and/or piers) (it) Number 1 (III) Length 20 (iv) Width 3 (v) Floating ❑Yes ONO a. (1) Are Platforms included? ❑Yes ®No If yes: (it) Number (III) Length (iv) Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dnpline dimensions. g. (i) Number of slips proposed 0 (ii) Number of slips existing 2 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water, no dredging required ❑Other; please describe: k. Typical boat length: 20' m. (i) Will the facility have tie pilings? ❑Yes ONO (ii) If yes number of lie pilings? ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ❑Yes ONO If yes: (ii) Number (III) Length (Iv) Width (v) Floating Oyes ONO f. (i) Are Boatlits included? ❑Yes ®No If yes: (it) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lit and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage (Wet slips') only, number of slips: 2 ❑ Dry storage; number of boats: ® Boat remp(s); number of boat ramps: 1 ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). mixed I. (i) Will the facility be open to the general public? ❑Yes ®No RECEIVED RECEIVED AUG 8 2019 SEP 1 1 2019 DCM WILMINGTON, NIC _.,a- M.ae..,DCM-MHDCITY flr,:P-4 (Strt.. 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpouk Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge'signs proposed. (ii) Give the location and number of'Pumpout Available' signs proposed. 1. Describe the special design, H applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? It. Give the number of channel markers and 'No Wake' signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^ 8 [019 ❑Yes [:]No zECEIVED �Vu rH9 RCM WiLMINGTON, NC ii;i1A•F,�HD CITY n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑cW ❑sAv ❑SB ❑WL ❑None p. Is the proposed marinaldocking facility located within orwilhin close proximity to any shellfish leases? []Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (I) Is the boathouse stmctum(s): ❑Commercial ❑PublicfGovemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Rippled areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable a. (I) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheelpile, etc.) ®This section not applicable a. Length b. Average distance from NFIW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Cornmunity c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED AUG 8 2019 a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 0. Greater than 15' Note: For buoy or mooring piling, use arc of swing including length of vessef c. Width of water body 504' e. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at watenxard end of structure at NLW or NWL NA due to existing structures. 18. OTHER ®This section not applicable a. Give complete description: 8• 5' Date Tgnl;� s"401_ Beak Ra. ..b Project Name Applicapt-Narpe Applicant Signa RECEIVED SEP 1 1 2019 DCM-N1HD CITY REC5NED AUG 8 2019 DCM WILMINGTON, NC ,,.,�aroomczn .n •. F"I" , - Pb Tanglewood Property Owner's Association c/o Brandon Isenhour Page 2 9. PROJECT DESCRIPTION The applicant's property is located at 3185 Waterview Drive SW in Supply, Brunswick County along the AIWW. To locate the project site from the Wilmington Regional Office (WiRO), travel southwest from Wilmington to Supply on US 74 W (Martin Luther King Jr Pkwy) & US 17 S for approximately 35 miles until you reach Mt Pisgah Road SW and take a left to head towards Holden Beach. Travel about 4 miles down Mt Pisgah Road SW until you reach Oxpen Road SW on the right, just after NC 130 comes into Mt Pisgah Road SW. Go down Oxpen Road SW for about one and three quarters of a mile until you reach Boones Neck Road SW. Take a right onto Boones Neck Road SW and continue about a mile and you will reach W Tanglewood Drive SW on your left. Go left onto W Tanglewood Drive SW and you are now in the Tanglewood Community. Travel almost half a mile to the end of W Tanglewood Drive SW and you have reached Waterview Drive SW. Turn left onto Waterview Drive SW and travel to the end of the road and you have reached the project site of the Tanglewood Community Boat Ramp & Docking Facility located on your right. The project site is bordered by residential properties to the north and west, a tidal creek to the east, and the AIWW to the south. The project site is comprised of one parcel totaling approximately 0.41 acres in size and the elevation is approximately 5.2' above normal high water (NHW) as reported by the applicant. There is approximately 340' of shoreline along the AIWW and tidal creek surrounding the property. The east shoreline adjacent to the tidal creek has been stabilized with rip rap. Coastal Wetland vegetation is present waterward of the existing rip rap along the shoreline around the entire parcel and consists primarily of Smooth Cord Grass (Spartina alterniflora). Currently the high ground of the project site is vegetated primarily with lawn grasses and mature oak trees and supports the community boat ramp and docking facility by a gravel driveway. There is also a gazebo located to the west of the boat ramp on the high ground of the property totaling approximately 215 ftz that leads to the community docking facility. An existing private community docking facility extends from the natural shoreline and the gazebo out into the AIWW and includes a pier, two fixed platforms, and a finger pierthat leads to the floating dock that supports 2 boat slips. The existing docking facility extends into the western adjacent 15' riparian corridor setback and beyond the riparian corridor line as reported by the applicant. An existing boat ramp with associated structures including two stabilizing wooden bulkheads, an adjacent fixed pier, and a single mooring piling is located in the center of the property and provides access to the AIWW. The applicant states that the waterbody measures approximately 504' wide in this location of the AIWW with a water depth of -3.5' at mean low water (MLW) at the waterward end of the existing boat ramp. The Brunswick County Land Use Plan classifies the area in the vicinity of the project area as Residential (R-6000). The waters in the project area are classified as SAIHQW by the N.C. Division of Water Resources (DWR). The waters are not designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries (DMF), and they are open to the harvest of shellfish. 10. PROPOSED PROJECT The applicant is proposing to replace the existing boat ramp and associated structures of the Tanglewood POA private residential community docking facility along the AIWW. Before demolition of the existing boat ramp and wooden bulkheads, the applicant states a turbidity curtain would be installed to prevent materials from accidentally leaving the project site. The existing boat ramp and wooden bulkheads would be removed using an excavator and disposed of at the landfill. The 91 ft2 section of concrete connected to the boat ramp leading to the existing adjacent wooden pier would be removed and not replaced due to not serving as a functioning section of the boat ramp (See Sheet Cl). Excavated materials would be temporarily stockpiled out of the 30' Coastal Shoreline Buffer in the parking area of the gravel driveway using erosion and sediment control practices including silt fencing. After they have dewatered, the spoils would be trucked to the landfill for disposal. SEP 1 1 2019 Once removed, the applicant proposes to replace the boat ramp in the same footprint with dimensions approximately 109' in length by 20' in width (See Sheet C2). Before the new boat ramp can be constructed, two new vinyl bulkheads are proposed to stabilize the sides of the boat ramp. The proposed vinyl bulkheads would each measure approximately 91.5' in length and 2' in width and terminate at the waterward end of the boat ramp. After the proposed vinyl bulkheads have been pile driven into the substrate and constructed, a temporary sheet pile coffer dam is proposed around the limits of disturbance for the boat ramp replacement. Once the temporary sheet pile coffer dam has been constructed around the limits of disturbance for the proposed replacement of the boat ramp, the applicant proposes to construct a new boat ramp using a concrete truck to pour the concrete in place. The concrete would be poured within the control joints of the temporary coffer dam and vinyl bulkheads to construct the new boat ramp in the same location. After the concrete has dried and the boat ramp has been constructed, the applicant proposes to remove the temporary coffer dam and turbidity curtain and add rip rap 1' thick at the waterward end of the boat ramp approximately 21'/4' in length and 7'/2 in width to prevent boat propeller washing from launching and loading vessels. Where the 91 ft2 section of concrete would be removed from the high ground, the applicant proposes to replace this section of the boat ramp with a fixed wooden pier connecting to the existing wooden pier adjacent to the boat ramp. The proposed pier would measure approximately 20' in length and 3' in width totaling approximately 60 ft2. 11. ANTICIPATED IMPACTS The proposed boat ramp replacement and associated structures would disturb a total area of approximately 2,765 ft2. A total of approximately 1,142 ft2would be disturbed within the high ground portion of the property in the 75' Estuarine Shoreline Area of Environmental Concern (AEC). The proposed boat ramp would result in approximately 960 ft2 of disturbance on high ground within this AEC. The proposed vinyl bulkheads would result with a high ground disturbance of approximately 122 Wand the proposed pier addition would result in approximately 60 ft2 of disturbance to this AEC. A total of approximately 1,623 ft2 would be disturbed over open water within the Estuarine Waters & Public Trust Areas AECs. Approximately 1220 ft2 of open water within this AEC would be disturbed by the replacement of the proposed boat ramp. The proposed vinyl bulkheads would result in an open water disturbance of approximately 244 ft2 and the proposed rip rap would result in approximately 159 ft2 of disturbance to this AEC. The boat ramp and associated structures would not encroach into either of the 15' riparian corridor setbacks. As proposed, there would not be a potential for bottom disturbances such as accidental dredging or displacement of the substrate by prop -washing from vessel propellers to utilize the boat ramp at periods of low tide due to adding rip rap 1' thick at the end of the boat ramp. Minor increases in turbidity should be expected during construction. There appears to be no Submerged Aquatic Vegetation (SAV) nor shellfish beds in the project area. This area is a not a Primary Nursery Area (PNA) and is open to the harvest of shellfish by the Division of Marine Fisheries (DMF). Submitted by: Tyler McGuire Date: August 19, 2019 Office: Wilmington RECEIVED SEP 1 1 2019 DCM-MHD CITY DESIGN NARRATIVE FOR TANGLEWOOD SUBDIVISION BOAT RAMP REPLACEMENT BRUNSWICK CO., N.C. June 2019 TABLE OF CONTENTS 1.0 General Information 2.0 Site Description 3.0 Project Description 4.0 Environmental Impacts 5.0 Erosion Control Considerations 6.0 Construction Schedule APPENDIX PROJECT AREA TOTALS FIGURES QUAD SHEET CONSTRUCTION PLANS RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED JUN 10 2019 DCM WILMINGTON, NC Tanglewood Boat Ramp Replacement June 2019 General Information a. Tanglewood Subdivsion Ramp Replacement b. 3185 Waterview Drive, Supply, NC c. 0.41 Acres on Project Site d. 0.06 Acres to be Disturbed for this project e. Wetlands 1. Coastal Wetlands do exist on the site and shown on plans. 2. No wetlands will be impacted by this project. f. Ownership — Tanglewood Subdivision Property Owners Association P.O. Box 324 Shallotte, NC 28459 g. Description of Development The Tanglewood Subdivision is a residential area in the unincorporated district of Brunswick County along the ICWW close to Holden Beach. The subdivision was created with a community boat ramp in approximately 1970. There are existing lakes, roadways, pier, floating dock, gazebo, and concrete ramp. This project proposes to replace the existing wooden bulkhead concrete ramp with new PVC sheetpile bulkhead and new concrete. h. Pre-1988 Built Upon Area, If Applicable — None in this project. I. This project will be one phase. j. Sewer for the site is existing municipal. Water supply is existing municipal system. k. No historic sites exist within the project. I. There are no non-compliance issues known. 2. Site Description: The project site is in Brunswick County, NC. The existing subdivision is located around existing freshwater lakes with a number of lots running along the ICWW. The HOA maintains ownership of one lot at the ICWW that has water access amenities. The amenities include a boat ramp, pier, floating dock, and gazebo. RECEIVED Land use in the vicinity is primarily residential with some commercial. SEP 11 2019 3. Proiect Description: DCM-MHD CITY The proposed project is to remove the existing wooden bulkhead that holds the concrete ramp in place. All of the existing concrete will be removed as well. Once the existing ramp items are gone, then new PVC sheet piles will be installed with vibratory pile driver. Then concrete will be poured back between the sheetpiles to create the new RECEIVED Tanglewood Boat Ramp Replacement June 2019 JUN 10 2019 DCM WILMINGTON, NC ramp. #57 Stone will be placed off the end of the concrete to prevent boat propeller wash when loading/unloading vessels. No canal will be dredged at the ramp. 4. Environmental Impacts The project will disturb only 0.06 acres of land along the ICWW which will comply with the NCDENR requirements of the Sediment Erosion Control rules. The only area to be disturbed will be the amount necessary to completely remove the existing ramp. There will be no impervious areas constructed within 50' of the mean high water line. 5. Erosion Control Considerations: The following erosion control measures are used on this project: Temporary Gravel Construction Entrance/Exit To prevent sediment from leaving the site, temporary gravel construction entrance should be installed where Road enters the site. For dimensions and specifications, see construction details. 2. Floating Boom A floating boom turbidity curtain will be installed around the work area to prevent disturbed materials from floating away from the work area. 6. Construction Schedule: 1. Obtain plan approval and other applicable permits. 2. Hold pre -construction meeting at least one week prior to beginning construction. 3. Install temporary construction entrance/exits. 4. Before demolition, install turbidity curtain. 5. Begin demolition. 6. Install sheet piles. 7. Fill concrete as needed to accomplish finish grades. 8. All erosion and sediment control practices will be inspected bi-weekly and after each rainfall event. Needed repairs will be made immediately. END OF PLAN RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED 1 �i 701� Tanglewood Boat Ramp Replacement June2019 DCM WILMINGTON, NC RIGHT ANGLE �—� ENGINEERING, PC 212 Princess Street Wilmington, NC 28401 Tel. (910) 251-8544 June 10, 2019 To: Debbie Wilson NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 Re: CAMA Minor Permit Application Tanglewood POA Ramp Replacement Shallotte, NC Dear Ms Wilson, Fax (910) 251-2208 The existing Tanglewood neighborhood boat ramp is in severe deterioration of the driving surface, wood bulkheading, and rutting out of the material at the bottom of the ramp as well. The POA wishes to repair the ramp by installing new vinyl sheetpile and new concrete surface to get the ramp back to its full service of providing water recreational access to the ICWW. We believe this repair will be of little environmental impact by keeping the same footprint of the existing ramp. No other ramp or dock work is proposed at this time. The proposed work will be conducted after Labor Day (September 2, 2019). Enclosed are two sets of 11"x17" construction plans, application, and $400 application fee. Please let me know if you have further questions or comments. Thank you, Shane Lippard, P.E. ' Vice President Right Angle Engineering, PC "N F JUN 10 2019 RECEIVED SEP 11 2019 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC I BODY. i1Gr 0646 0378 !-U RAT 14 "! 2 23 STATE OF NORTH CAROINA COUNTY OF BRUNSWICE�!Lr„ TSIS DEED, Made and entered into this 310 day of ,March, 1986, by and between DENNIS 6 THOMPSON# INC., a North Carolina Corporation, party of the first part; and TANGLEWOOD PROPERTY OWNERS ASSOCIATION, INC., a North Carolina Corporation, P, 0, Box 324, Shallotte, North Carolina 28459, party of the second part; W I T N E S S E T H THAT the said party of the first part, for and in consideration of the sum of TEN DOLLARS ($10.00) ADD OTH.tR VALUABLE CONSIDERATIONS to it in hand paid, the receipt of which is hereby acknowledged has remised and released and by these presents does remise, release and forever quitclaim unto the party of the second part, its successors and assigns, all right, title and interest of the said party of the first part in and to those certain tracts or parcels of land lying and being in the County of Brunswick and State of North Carolina, in Lockwood Folly Township, and more particularly described as TRACT 1; Alf streets lying within the subdivision (Tanglewood, Tanglewood, Section 1, and North Tanglewood), all as shown on the various maps of subdivision, to wit: Map Book 10, Page 115, Map Book 11, Page 29; Map Cabinet I, Page 131; and Map Cabinet O, Page 210 of the Brunswick Registry. TRACT 2• All lakes within the subdivision and shown on the maps of the subdivision, to wit: Map Book 10, Page 115; Map Book 11, Page 29; Map Cabinet r, Page 131; and Map Cabinet O, Page 210 of the Brunswick Registry. i RECEIVED TRACT 3: i All drainage ditches constituting a portion of the property as shown on the maps of the subdivision, to wit: Map Book i 1 ; 10, Page 115; Map Book 11, Page 29; Map Cabinet I, Page 1 SEP 1 2019 1 131; and Map Cabinet O, Page 210 of the Brunswick Registry. - TRACT 4: I OCM-MHD CITY All that certain area designated as 'Public Area", lying west of Lot i58 as shown on the map recorded in Map Book j 11, Page 115 of the Brunswick Registry. TRACT 5: RECEIVED All that certain parcel lying between Lots 34 and 35, which serves as an accessway to the U.S. Intracoastal Waterway as I fI shown on the map recorded in Map Cabinet I, Page 131, JUN 1 0 019 Brunswick Registry. PREPARED BY DCMIWILMINGTON, MASON H. ANDERSON NC ATTORNEY AT LAW i Boor. P :re 064E 0379 TRACT 6: A t at parcel designated as 'Parking' on the map recorded in Map Cabinet I, Page 131, Brunswick Registry, TRACT 7: A 1 that area designated as •Boat Ramp- and surrounding area on the plat recorded in Map Cabinet I, Page 131, Brunswick Registry. with regard to Tracts 6 and 7, this conveyance is specifically made subject to the right to use these facilities which has been heretofore granted to property owners of windy Point Park Subdivision, a plat of which duly appears in Map 11 , Page —U_, under agreement duly recorded in Book 437, Page 676, Brunswick Registry. With regard to Tract 1 (Streets), Tract 5 IAccessway), Tract 6 (Parking), Tract 7 (Boat Ramp), the Grantor does specifically hereby reserve for itself, its successors and assigns, the right at its discretion, without obligation, to develop future phases of adjoining property and to constitute such future phases as a part of the subdivision and thereby grant to the property owners in such future phases the right of access over and along the streets herein conveyed and the right of use of the accessway to the Intracoastal waterway and the right of use of the boat ramp and attendant parking areas to the same extent as the property owners in the presently existing sections of the subdivision as described in this deed of conveyance. The Grantor further reserves the right of ingress and egress over and along all these parcels as it deems expedient to carry out any future construction in any future phase or phases. The Grantor specifically reserves the right to maintain the subdivision identification signs at the entrance of the street from the State Highway, said right to include the right of maintenance and repair and the access necessary to do such maintenance and repair. By acceptance of this deed of conveyance Grantee hereby acknowledges that Grantor as Developer of the Subdivision at this time retains ownership of approximately 200 separately numbered and identified lots within the subdivision and therefore does hereby covenant that it will enact no rule or regulation which will allow obstruction or impairment of the use of the streets or any of the other areas described in this deed and further that if any individual property owner places or attempts to place any such obstruction or impairment, to cause such obstruction or impairment to be removed. In the event Grantee fails to enforce this provision, Grantor reserves the right to remove such obstruction or impairment and to charge the cost thereof to Grantee. TO HAVE AND TO HOLD the aforesaid tracts or parcels of land all privileges thereunto belonging to it the said party of RECEIVED SEP 11 Z019 the second part and its successors and assigns free and I CM—M H D CITY discharged from all right, title, claim or interest of the said party of the first part or anyone claiming by, through or under it. RECEIVED JUN 10 Z019 I DCM WI(MINGTON, NC Doug _ f46E 0646 038D IN TESTIMONY WHEREOP, the said party of the first part has caused this deed to be signed in its corporate name by its President and attested by its Secretary -Treasurer and sealed with its corporate seal on the day and year first above written. DENNIS b THOMPSON, INC. By: President CAROLINA BRUNSWICK I, FAARAeZ5 T. Nftt)_rAjZ. . a Notary Public of the County and State aforesaid, certify that HARRIET I. THOMPSON personally came before me this day and acknowledged that she is Secretary/Treasurer of DENNIS 6 THOMPSON, INC., a North Carolina corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its corporate seal and attested by her as its Secretary/Treasurer. Witness my hand and official stamp or seal, 31 St day of March, 1986. Ms�"ry Public Expires: RECEIVED STATE OF NORTH CAROLINA, e,umMck Co -On, S E P 1 1 2019 The Foregoing fenifin¢(a) of Frances T. Williams NotaU Puh) S r 1. ppt�l1 I-� (h)(are) certified Io be mnea. DCM-M 17 V CITY Recmdcd rhh 14th day of MaY )9 E6 „9 c 23 ddock A_M. Roan J. Rabinson. Reesref Of Peeps �- /abbRECEIVED JIIN 10 2019 DCM WILMINGTON, NC OFFER TO PURCHASE AND CONTRACT +,cc as { ip hereby offers purchase and B°r' upon acceptance of said offer, as Seller' agrees to sell and convey ali of plot piece or parcel of land desenbed be[ow, together with all improvements located thereon and such fixtures and personal property as are listed below (collectively referred to as the "Property'), upon the following terms and conditions: I. REAL PROPERTY: Located in the City of _9pp County ofRtIAiSWty State of North Carolina being known as aitd more .yuuRSa we+�e+evt StA/ zin 2a46?- LegalDescrlptuin; q�j,t��. t✓!5/4i� (❑All ❑A portion of the property m Deed Ae ereace: BooJk Page ,3 tl .u; t.+: County.; NOTE:. Prior to signing this Offer to Purchase and Contract, Buyer is advised to review Restrictive Covenants; if any, which may limit the use of the Property, and to read the Declaration of Restrictive Covenants, By -Laws, articles of Incorporation, Rules and Regulations, and other governing documents of the owners' association and/or the subdivision, if applicable. 2• FIXTURES: The following items, if any, are included in the purchase price free of liens: any built-in appliances, light fixtures, ceiling fans, attached floor coverings, blinds, shades, drapery rods and curtain rods, brackets and all related hardware, window and door screens, storm windows, combination doors, awnings, antennas, satellite dishes and receivers, burglarffire/smoke alarms, pool and spa equipment, solar energy systems, attached fireplace screens, gas logs, fireplace inserts, electric garage door openers with controls, outdoor plants and trees (other than in movable containers), basketball goals, storage sheds, mailboxes, wall and/or door mirrors, and any other items attached or affixed to the Property, EXCEPT the following items: J. PERSONAL PROPERTY: The following persoiiel property is meinded in the parcit> a price: J)" A/^ tlAJdC as le a. PURCHASE PRICE, The purchase price is S 4)4h and shall be paid as follows: (s) $ I000, 00 EARNEST MONEY DEPOSIT with this offer by ❑cash �j' personal check EIbank check ❑certified check Outlier; to deposited and held in escrow by < ,kaW L s t ey be f"$scmw Agent") until the sale is closed, at which�ttme it will be credited to Yuyer, or until this contract is otherwise terminated. In the event: (1) this offer is not accepted; or (2) any of the conditions hereto are not satisfied, then all earnest monies shall be refunded to Buyer. In the event of breach of this contract by Seller, upon Buyer's request, all earnest monies shall be returned to Buyer, but such return shall not affect any other remedies available to Buyer for such breach, In the event this offer is accepted and Buyer breaches this contract, then all earnest monies shall be forfeited upon Seller's request, but receipt of such forfeited earnest monies shall not affect any other remedies available to Seller for such breach. NOTE: In the event of a dispute between Seller and Buyer over the return or forfeiture of earnest money held in escrow by a broker, the broker is required by state law to retain said earnest money in the broker's trust or escrow account until a written release from the parties consenting to its disposition has been obtained or untildisbursement is ordered by a court of competent jurisdiction. (b) $ ADDITIONAL EARNEST MONEY DEPOSIT to be paid to Escrow Agent no later than TIME BEING OF THE ESSENCE WITH REGARD TO SAID DATE. (c) $ OPTION FEE in accordance with paragraph 13, Alternative 2, to be paid to Seller on the Effective Date as set fi ttt in paragraph 23. (NOTE: If alternative 2 applies, then do not insert $0, N/A, or leave blank) (d) S . BY ASSUMPTION of the unpaid principal balance and all obligations of Seller on the existing loans) secured by 4& dead of trust on the Property in accordance with the attached Loan Assumption RECEIVED Addendum. NA (e)$ BY SELLER FINANCING in accordance with the attached Seller Financing Addendum. (Q Q + + BALAWCE-of the purchase price in cash at Closing. G 19 201a : IVED Page I of 5 &sy*r .. / [ Seller Initials SEP 1 1 2019 STANDARD o M WILMINGTON, NC DCM-MHD CITY 9. CONDITIONS: (State NIA in Wh Wank 6d is not a condition to this emmict.) (a) Buyer must.be able to obtain a CFHA [1VAattach FIWVA Financing Addendum) Conventional []other: loan at a Fixed Rate ClAdj isaable Rate in the principal amount of 16d qbo. 00 _ (plus any financed VA Funding Fee or FHA M1P) fora term of _ E ' _ year(s); at an initial interest rate not to exceed "14 %per ammm, witit mortgage loan discount points not to exceed _ % of the loan amount. Buyer shall apply for said loan within 7— days of the Effective Date of this contract. Buyer shall use Buyer's best efforts to secure the lender's customary loan commitment letter on or before _ A t�' 7�/ 4 and to satisfy all terms and conditions of the loan commitment totter by Closing. Aft ththe above letter date, Seller may request is writing from Buyer s copy of the loan commitment letter. If Buyer fails to provide Seller a copy of the loan commitment letter or a written waiver of this loan condition within five days of receipt of Seller's request, Seller may terminate this contract by written notice to Buyer at any time thereafter, provided Seller has not then received a copy of the letter or the waiver. (b) There must be no restriction, easement, zoning other governmental regulation that would prevent the reasonable use of the Property for ! purposes- (c)The Property must be in substanttaily the same or better condition at Closing as on the date of this offer reasonable wear and tear excepted. (d) All deeds of trust, liens and other charges against the Property, not assumed by Buyer, must be paid and satisfied by Seiler prior to or at Closing such that cancellation may be promptly obtained following Closing. Seller shell remain obligated to obtain any such cancellations following Closing. (e) Title must be delivered at Closing by GENERAL WARRANTY DEED unless otherwise stated herein, and must be fee simple marketable and insurable title, free of all encumbrances except ad valorem taxes for the current year (prorated through the date of Closing); utility easements and unviolated restrictive covenants that do not materially affect the value of the Property; and such other encumbrances as may be assumed or specifically approved by Buyer. The Property must have legal access to a public right of way. 6. SPECIAL ASSESSMENTS: Seller warrants that there are no pending or confirmed governmental special assessments for sidewalk, paving, water, sewer, or other improvements on or adjoining the Property, and no pending or eonfirtned owners' association special assessments, except as follows: (Insert "None' or the identification of such assessmen% if any.) Seller shall payed owners' association assessments and all governmental assessments confirmed through the time of Closing, if any, and Buyer shall take title subject to all pending assessments, if any, unless otherwise agreed as follows: 7. PRORATIONS AND ADJUSTNMNT5: Unless otherwise provided the fbitawing items shall be prorated and either adjusted between the parties or paid at Closing: (a) Ad valorem taxes on real property shall be prorated on a calendar year basis through the date of Closing; (b) Ad valorem taxes on personal property for the entire year shall be paid by the Seller unless the personal property is conveyed to the Buyer, in which case, the personal property taxes shall be prorated on a calendar year basis through the date of Closing; (c) All late listing penalties, if any, shall be paid by Seiler; (d)Rents, if any, for the Property shall be prorated through the date of Closing; (e) Owners' association dues and other like charges shall be prorated through the date of Closing. Seller represents that the regular owners' association dues, if any, are $_u/a per /VIA 8. EXPENSES: Buyer shall be responsible for all costs with respect to any loan obtained by Buyer. Buyer shall pay for recording the deed and for preparation and recording of all instruments required to secure the balance of the purchase price unpaid at Closing. Seller shall pay for preparation of a deed and all other documents necessary to perform Seller's obligations under this agreement, and for excise tax (revenue stamps) required by law. Seller shall pay at closing $ toward any of the Buyer's expenses associated with the purchase of the Property, including any FHANA lender and inspection costs that Buyer is not permitted to pay, but excluding any portion disapproved by Buyer's lender. 9. FUEL: Buyer agrees to purchase from Seller the fuel, if any, situated in any tank on the Property at the prevailing rate with the cost of measurement thereof, if any, being paid by Seller. 10. EVIDENCE OF TITLE: Seller agrees to use his best efforts to deliver to Buyer as soon as reasonably possible after the Effective Date of this contract, copies of all title information in possession of or available to Seller, including but not limited to: title insurance policies, attorney's opinions on title, surveys, covenants, deeds, notes and deeds of trust and easements relating to the Property. Seller authorizes (1) any attorney presently or previously representing Seller to release and disclose any title insurance policy in such attorney's file to Buyer and both Buyer's and Settees agents and attorneys; and (2) the Property's title insurer or its agent to release and disclose all materials Page 2of5 ZCl C v_ STANDARD FORM 2-T Buyer Initial Seller Initials &V- SEp 1 1209 UCM-MHD C a in the Property's title insurer's (or title insurer's agent's) file to Buyer and both Buyer's and Seller's agents and attorneys. 11. LABOR AND MATERIAL: Seller shall furnish at Closing an affidavit and indemnification agreement in form satisfactory to Buyer showing that all labor and materials, if any, furnished to the Property within 120 days prior to the date of Closing have been paid for and agreeing to indemnify Buyer against all loss from any cause or claim arising there from. 12. PROPERTY DISCLOSURE: NIA ❑Buyer has received a signed copy of the N.C. Residential Property Disclosure Statement prior to the signing of this Offer to Purchase and Contract. rV# ❑Buyer has NOT received a signed copy of the N.C_ Residential Property Disclosure Statement prior to the signing ofthis -Offer to Purchase and Contract and shall have the right to terminate or withdraw this contract without penalty Prim to WFIICHEVER OF TBE FOLLOWING EVENTS OCCURS FIRST: (I) the end of the third calendar day following receipt of the Disclosure Statement; (2) the end of the thirdcalendar day following the date the contract was made; or (3) Closing or occupancy by the Buyer in the case of a. sale or exchange. 4-DExempt from N.C. Residential Property Disclosure Statement because (SEE GUIDELINES) The Property is residential and was built prior to 1979 (Attach Lead -Based Paint or Lead -Based Paint Hazards Disclosure Addendum.) 13. PROPERTY INSPECTION, APPRAISAL, INVESTIGATION (Choose ONLY ONE of the following Alternatives); ❑ALTERNATIVE 1: (a) Property Inspection: Unless otherwise stated heroin, Buyer shall have the option of inspecting, or obtaining at Buyer's expense inspections, to determine the condition of the Property. Unless otherwise stated herein, it is a condition of this contract that: (i) the built-in appliances, electrical system, plumbing system, heating and cooling systems, roof coverings (including flashing and gutters), doors and windows, exterior surfaces, structural components (including foundations, columns, chimneys, floors,. walls, ceilings and roofs), porches and decks, fireplaces and flues, crawl space and attic ventilation systems (if airy), water and sewer systems (public and private), shall be performing the function for which intended and shall not be in need of immediate repair; (it) there shall be no unusual drainage conditions or evidence of excessive moisture adversely affecting the structure(s); and (lii) there shall be no friable asbestos or existing environmental contamination. Any inspections shall be completed and written notice of necessary repairs shall be given to Seller on or before . Seller shall provide written notice to Buyer of Seller's response within days of Buyer's notice. Buyer is advised to have any inspections made prior to incurring expenses for Closing and in sufficient time to permit any required repairs to be completed by Closing. (b) Wood -Destroying Insects: Unless otherwise stated herein, Buyer shall have the option of obtaining, at Buyer's expense, a report from a licensed pest control operator on a standard form in accordance with the regulations of the North Carolina Structural Pest Control Committee, stating that as to all structures, except there was no visible evidence of wood -destroying insects and containing no indication of visible damage there from. The report must be obtained in sufficient time so as to permit treatment, if any, and repairs if any, to be completed prior to Closing. All treatment required shall be paid for by Seller and completed prior to Closing, unless otherwise agreed upon in writing by the parties. The Buyer is advised that the inspection report described in this paragraph may not always reveal either structural damage or damage caused by agents or organisms other than wood - destroying insects. If new construction, Seller shall provide a standard warranty of termite soil treatment. (e) Repairs: Pursuant to any inspections in (a) and/or (b) above, if any repairs are necessary, Seller shall have the option of completing them or refusing to complete them. If Seller elects not to complete the repairs, then Buyer shall have the option of accepting the Property in its present condition or terminating this contract, in which case all earnest monies shall be refunded. Unless otherwise stated herein, any items not covered by (a)(i), (a)(H), (a)(iii) and (b) above are excluded from repair negotiations under this contract. (d) Radon Inspection: Buyer shall have the option, at Buyer's expense, to have the Property tested for radon on or before the date for completion of inspections as set forth in paragraph 13 (a) above. The test result shall be deemed satisfactory to Buyer if it indicates a radon level of less than 4.0 pico curies per liter of air (as of January 1,1"7, EPA guidelines reflect an "acceptable" level as anything less than 4.0 pico curies per liter of air). If the test result exceeds the above -mentioned level, Seller shall have the option of: a) remediating to bring radon level within the satisfactory range; or b) refusing to remediate. Upon the completion of remediation, Buyer may have a radon test performed at Seller's expense, and if the test result indicates a radon level less than 4.0 pico curies per liter of air, it shall be deemed satisfactory to the Buyer. If Seller elects not to remediate, or if remediation is attempted but fails to Page 3 of 5 STANDARD FORM 2-T Buyer Initials ) Seller Initials SDI S E P L Y L U !:1 ��YY DCM-MHD CITY bring the radon level within the satisfactory range, Buyer shall have the option of: a) accepting the Property with its then current radon level; or b) terminating the contract, in which case all earnest monies shall be refunded. (a) Cost Of Repair Conthageney: Notwithstanding the above and as an additional remedy of Buyer, if a reasonable estimate obtained by Buyer of the total cost of repairs required by (a) and (b) and/or remediation required by (d) above equals or exceeds $ then Buyer shall have the option to terminate this contract pursuant to the Cost of Repair Can agency no later than seven days following the inspection date and all earnest monies shall be refunded to Buyer. (I) Appraisal Contingency: The Property must appraise at a value equal to or exceeding the purchase price or, at the option of Buyer, this contract may be terminated and all earnest monies shall be refunded to Buyer. If this contract is not subject to a financing contingency requiting an appraisal, Buyer shall arrange to have the appraisal completed on or before �it :KZ 9 . The cost of the appraisal shalt be home by Buyer. (g) CLOSING SHALL C -SITTUTTE ACCEPTANCE OF THE PROPERTY IN ITS THEN EXISTING CONDMON UNLESS PROVISION IS OTHERWISE MADE IN WRITING. DALTERNATIV E 2: (This Alternative applies ONLY i(Alternative 2 is checked AND Buyer has paid the Option Fee) (a) Property Investigation with Option to Terminate: In consideration of the sum of $ (do not insert $0, N/A, or leave blank) paid by Buyer to Seller (not Escrow Agent) and other valuable consideration, the receipt and sufficiency of which is hereby acknowledged (the "Option Fee"), Buyer shall have the right to terminate this contract for any reason or no reason, whether related to the physical condition of the Property or otherwise, by delivering to Seller written notice of termination (the "Termination Notice") by 5:00 p.m, on 20_, lime being of the essence (the "Option Termination Data"). At any time prior to Closing, Buyer shall have the right to inspect the Property at Buyer's expense (Buyer is advised to have all inspections and appraisals of the Property, including but not limited to those matters set forth in Alternative 1, performed prior to the Option Termination Date). (b) Exercise of Option: If Buyer delivers the Termination Notice prior to the Option Termination Date, time being of the essence, this comi'act.shall become null and void and all earnest monies received in connection herewith shall be refunded to Buyer; however, the Option Fee will not be refunded and shall be retained by Seller. If Buyer fails to deliver the Termination Notice to Seller prior to the Option Termination Date, then Buyer will be deemed to have accepted the Property in its physical condition existing as of the Option Termination Date, excluding matters of survey. The Option Fee is not refundable, is not a part of any earnest monies, and will be credited to the purchase price at Closing. (c) CLOSING SHALL CONSTYTM ACCEPTANCE OF THE PROPERTY IN iTS'THEN EXIS MG CONDITION UNLESS PROVISION IS OTHERWISE MADE W WRnWG. 14. REASONABLE ACCESS: Seger will provide reasonable access to the Property (including working, existing utilities) through the earlier of Closing or possession by Buyer, to Buyer or Buyer's representatives for the purposes of appraisal, inspection, and/or evaluation. Buyer may conduct a walk-through inspection of the Property prior to Closing. IS. CLOSING: Closing shall be defined as the date and time of recording of the deed. All parties agree to execute an and all documents and papers necessary in connection with Closing and transfer of title on or before 2 alq __,. at a place desi oared by Buyer. The deed is to be made to c a%I e° ma„t 'iaieb�Jg K 1 �rS mAr! 16. POSSESSION: Unless otherwise provided herein, possession shall be delivered at Closing. In the event �ossession is NOT to be delivered at Closing: []a Buyer Possession Before Closing Agreement is attached. OR, a Seller Possession After Closing Agreement is attached. 17. OTHER PROVISIONS AND CONDITIONS: (ITEMIZE ALL ADDENDA TO THIS CONTRACT AND ATTACHHERETO.) I$. RISK OF LOSS: The risk of loss or damage by fire or other casualty prior to Closing shall be upon Seller. If the improvements on the Property are destroyed or materially damaged prior to Closing, Buyer may terminate this contract by written notice delivered to Seller or Seller's agent and all deposits shall be returned to Buyer. In the Page 4 of 5 Setter InitialsG'r)T S E P 11 2019 STANDARD FORM 2-T DCM-MHD CITY , i d Md event Buyer does NOT elect to terminate this contract, Buyer shall be entitled to receive, in addition to the Property, any of the Seller's insurance proceeds payable on account of the damage or destruction applicable to the Property being purchased_ 19. ASSIGNMENTS: This contract may not be assigned without the written consent of all parties, but if assigned by agreement, then this contract shall be binding on the assignee and his heirs and successors. 20. PARTIES: This contract shall be binding upon and shall inure to the benefit of the parties, i.e., Buyer and Seller and their heirs, successors and assigns. As used hereto, words in the singular include the plural and the masculine includes the feminine and neuter genders, as appropriate. ZI. SURVIVAL: If any provision herein contained which by its nature and effect is required to be observed, kept or performed after the Closing, it shall survive the Closing and remain binding upon and for the benefit of the parties hereto until fully observed, kept or performed. 22. ENTIRE AGREEMENT: This contract contains the entire agreement of the parties and there are no representations, inducements or other provisions other than those expressed herein. All changes, additions or deletions hereto must be in writing and signed by all parties. Nothing contained herein shall alter any agreement between a REALTORV or broker and Seller or Buyer as contained in any listing agreement, buyer agency agreement, or any other agency agreement between them. 23. NOTICE AND EXECUTION: Any notice or communication to be given to a party herein may be given to the Party or to such parry's agent This offer shall become a binding contract (the "Effective Date") when signed by both Buyer and Seller and such signing is communicated to the offering party. This contract is executed under seat in signed multiple originals, all of which together constitute one and the same nstnurtent, with a signed original tieing retained by each party and each REALTOR0 or broker hereto, and the parties adopt the word "SEAL" beside thew signatures below. Buyer acknowledges having made an on -site personal examination of the Property prior to the making of this offer. THE NORTH CAROLINA ASSOCIATION OF REALTORSO, INC. AND THE NORTH CAROLINA BAR ASSOCIATION MAKE NO REPRESENTATION AS TO THE LEGAL VALIDITY OR ADEQUACY OF ANY PROVISION OF THIS FORM IN ANY SPECIFIC TRANSACTION, IF YOU DO NOT UNDERSTAND THIS FORM OR FEEL THAT IT DOES NOT PROVIDE FOR YOUR LEGAL NEEDS, YOU SHOULD CONSULT A NORTH CAROLINA REAL ESTATE ATTORNEY BEFORE YOU SIGN IT. Daten Buyer Date: _ Dt1 hkt� Elbtviaa K Date: (SWSelle�� �c (SEAL) Dater (SB4) Seller (MAL) Escrow Agent acknowledges receipt of the earnest money and agrees to hold and disburse the same in Accordance with the terms hereof. ?;yy Date: -I f ) Firm: iLl �V Vfvt v G rep Selling AgenflFirm/Ptione AU gas uyer's Agent OSeller's (suti)Agent Agent Listing AgetitlFitrtltPhone Actin¢as Seller's (auhlAeent IDrai AweSC Page 5 of 5 1 STANDARD FORM 2-T $uyerInitials Seiler Ltitlals��. SEP. 1 lj DCM-MHD CITY CERTIFIED ML - RETURN RECEIPT 89 UESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMIAIVER FORM Name of Property Owner�� Address of Property. 3 i g S0 (Lot or Street #, Street or Road, City & County) Agent's Name #:�� g !�4, n s� VP TPoPMailingAddress: PLC �o y S a`4 Agent's phone# q1"i7- o-;L`tS S k�-' � �o�A-Q, v! (- a�45 I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing with dimensions must be provided with this letter. I bave no objections to this proposal. _ T have objections to this proposal. If you have objections to what is being proposed, you mustnotify the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be maifed to 127 Cardinal Drive Ext, Wilmington, NC, 28405-3845. DCM representatives can also be contacted at (910) 79&7215. No response is considered the same as no objection if you have been notified by Certified tta8: WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 16 from my area of riparian access unless waived by me. (if you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement- 1 do not wish to waive the 15' setback requirement. 1 (Property Owner Information) .Sigi1 O 4 c .0 T ) Print or -type Naifie P o &"'� Mailing Address Sk,'t'l0�te. ,NC. agyS9 City/statelzip ' C�l19- Log '-oagS Telephone Number Property Owner Information) Print or Type Name RECEIVED SEP 11 2019 3CAt-M.,1D CITY Mailing Address AJE-ltiio,v NC 28(6S8 City/ tatelzip i(5 �8) RECEIVED Z3;g_g35� Telephone Number Date 0 S - i 9 D DLM WILMINGTON, NC f-rz2 Revised 611WO12 `1#t ii'ittiY �.finrr' ' "` �.'fti.� Gfyc -- -�--- .. . vX. y nxT.%'—w I is 2111 r c cv DMSION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATiONiWAIVER FORM Name of Property Owner:- h r� E �a o c� Vr o P-QJ%y Dvo n e rS )0 Address of Property. 3385 ti?o?ervt�\J r. SW S�ppl,i �r� -zsV'u.,n (Lot or Street #, Street or Road, City & County) Agents Name # n � VIP TPoWaiting Add. ?k? Soy ? P,`�I AgenYsphone#:�11c1-(aoi%-o�`f.S Sl,c,���oi�c* .tic.. 2?S�-S� 1 hereby certify that I own property adjacent to the above referenced property. The individual applying far this permit has described to me as shown on the attached drawing -the development fhey are proposing. A description or drawing with dimensions must be [Lravided with this ►after, I have no objections to this proposal I have objections to this proposal. ifyouhave objectionstoWhat isbetogproposersyou must nod&WeDivis{onofCoasfatp t(DCA9m wrfting wXdn fP days of receipt ofous notice. Cnrraspondence should be mafted to 127 Cardlrta►Drive Ext, Wr7mingtm NC, 28405,W& DW represenmfives can also be contacted at (910) 79&7215No respwtse fs considered the same as no o yWffon if you have been no~ by Can~ Mail WAIVER SECTION t understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (if you wish to waive the setback, you must tniiial the appropriate blank below.) I do wish to waive the 157 setback requirement. _ x I do not wish to waive the 15' setback requirement (PropertyOwner Si -10 rir cc� �P'T? rq Print o ype Na e P 0�) C, x 3 a1-I Mailing Address Slott . NC. bys� C.itylstat&zip °iis-(Oc)b-0aqs Telephone Number 00') S- i Dare Owner Information) RECEIVED or Z-349�5-v✓,�o*t 'FP 1 1 1.019 Mailing Address i-iWttOJ CITY c_it��C 2u 9ta � RECEIVED `j/o-S78.SS-T-P- Telephone Number l ) d'7 6s1/ rn DCM WILMINGTON, NC Date 3�c�3 T LtJA k J�Crw Uc S(1)Revrsed6/48f2E142 6cWP dU 2P�4�--7 H RIPARIAN NOTIFICATION FOR LAMA MAJOR PERMIT APPLICATIONS Tanglewood Property Owners Association PO Box 324 Shallotte, NC 28459 Certified Mail — Return Receipt Requested August 29, 2019 t U� OXENDINE, DUANE EARL ET DEBORAH 10115 HARRISBURG ROAD CHARLOTTE, NC 28215-9369 Dear Mr.Oxendine: Tanglewood Property Owners Association is applying for a CAMA Major permit to repair the TPOA Community Boat Ramp, located at 3185 Waterview Dr. SW, Supply NC 29462 on the Intracoastal Waterway, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Division of Coastal Management, 127 Cardinal Dr. Ext., Wilmington, NC 28405-3845 within 10 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 10 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 919-696-0245, or e-mail me at dhaggins@nc.rr.com Sincerely, RECEIVED Doug Haggins SEP 10 2019 Vice President Tangle Property Owners Association DCM WILMINGTON, NC Enclosures: Engineering drawings of proposed repair area, Adjacent Riparian Property Owner Notification/Waiver Form, Postage -Paid Envelope RECEIVED SEP 10 2019 DCM WILMINGTON, NC WMIM -m-A ��/�j4a ity�• /p�p�y^G^{_. "5�*zua�m.r�--. Mow,,5 h421t1�`%r:�tl RECEIVED SEP 10 2019 DCM WILMINGTON, NC RIPARIAN NOTIFICATION FOR LAMA MAJOR PERMIT APPLICATIONS Tanglewood Property Owners Association PO Box 324 Shallotte, NC 28459 Certifier) Mail - Return Receipt Requested August 29, 2019 NORRIS, HUGH S ETUX RAMONA L ���✓ P O BOX 271 DUNN, NC 28335 Dear Mr. and Mrs. Norris: Tanglewood Property Owners Association is applying for a CAMA Major permit to repair the TPOA Community Boat Ramp, located at 3185 Waterview Dr. SW, Supply NC 28462 on the Intracoastal Waterway, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Division of Coastal Management, 127 Cardinal Dr. Ext., Wilmington, NC 28405-3845 within 10 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 10 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 919-696-0245, or e-mail me at dhaggins@nc.rr.com Sincerely, Doug Haggins Vice President Tangle Property Owners Association RECEIVED SEP 10 2019 DCM WILMINGTON, NC Enclosures: Engineering drawings of proposed repair area, Adjacent Riparian Property Owner Notification/Waiver form, Postage -Paid Envelope .�canPhmYvm'1:2 en63 '` .M X _....O AgMA 'OAtlC�omoo •.' .. �RnRY�!immevdaddMltl11tli01aJ2166'.. 'm WdweantctYT 1h06(6!6�O y'00.' a; n.mhad M(RiMe6 Ndm2) 0. mot DNS". t �DAdazhltta mdtD in6back ofiMttW�o� .. ",. ': _ ..' m mtM lreM1fl CP�76tmtt% ._ D.%ddwaYimboem. Elm .�, i. la6aaMdma+ea?x _ -nr®.mm><aemm p�,'pw. '! poB6x at � 11A'l�Nl[iIIIf11111111NlIIli11B111111111TVO D.�,6�� o^°a°�" • 9590940234117227539807 z4N[ONfTmv((iW°rhtlllYMmI1EeO RS- <., 4tia� 1{{�:' `9� { :: W' DWu�Ym . Dumv=awum+'+*dtm�en ,6N➢Yt[G M'!N OetvnPaeNDl x pnmesyC ® W M N z > W 0 Z W w g U 0 . �.F,omplela lteim 1.2. 600& a • tz Prtntymrwt ad add2 anVM—Me X ' 6DMMN9WIR M..Wtoy= 8 ,O fltbCll thl6 card N Die packot Me mm�pbee. W PfI NO(N1rt [(8[IPiP PartNtz �aunz.��tbor4h D�te�ePiny� �; C4tgr{P'�e4 NC:. 180115 111111111 Jill 11111111111111111111II1IKIf1111 95910 9402 5411 7227 5883 99 D 77� ❑ a 1PE, r� { PSF 3611.JWY2016ntjn r_ �ja ��►r(^ 'T ka ml !N� ^dk ORRIBLOt1Z�� E11YE17EVIf 1 E 1YC 17137F�FBU -ibit Ah- — RECEIVED SEP ] 0 2019 DCM WILMINGTON, NC" 212 Princess Street July 26, 2019 RIGHT ANGLE u ENGINEERING, PC Wilmington, NC 29401 Tel. (910) 251.85" Fa: (910) 251-2208 To: Tyler McGuire, Environmental Specialist NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 Re: CAMA Major Permit Application Tanglewood PDA Ramp Replacement Shallotte, NC Dear Mr. McGuire, We received your comments and are providing revised plans and application sheet changes to address them. We are still on to begin work after Labor Day if possible. Enclosed are two sets of 11 °x17° construction plans, MP-1, and MP-2. Please let me know if you have further questions or comments. Thank you, 5 . Q, Shane Lippard, P.E. Vice President Right Angle Engineering, PC RECEIVED SEP 11 2019 DCM-MHD CITY RECEIVED JUL 30 211j0 CC�.4 WILMINGTON, NC ROY COOPER Governor MICHAEL S. REGAN Semrary BRAXTON C. DAVIS DuMfor SENT VIA EMAIL Shane Lippard, P.E. c/o Right Angle Engineering, PC 212 Princess Street Wilmington, North Carolina 28401 NORTH CAROLINA Environmental Quaaty June 24, 2019 RE: CAMA Major Development Permit Application Tanglewood Dear Mr. Shane Lippard, The Division of Coastal Management hereby acknowledges receipt of your application on June 10, 2019, acting as agent for Mr. Brandon Isenhour with Tanglewood Property Owners Association, for the proposed replacement of the boat ramp at the Tanglewood POA property located at 3185 Waterview Drive SW in Supply, Brunswick County. However, your application still lacks the information necessary to complete processing. The attached checklist indicates the deficiencies of your application. If you respond within three working days from the date of this E-mail with the required additional information, processing of your application will promptly continue and will not be placed on hold. If you are not able to respond within three days, your application will not be accepted as complete for processing. Additional information may be required pending further review by the fourteen (14) review agencies. The attached checklist indicates the deficiencies of your application. We suggest a preliminary meeting to review the application and address the deficiencies on the checklist. If you have any questions concerning this matter, please call me at my Wilmington Office at (910) 796- 7424. Sincerely, Tyler McGuire Environmental Specialist Enclosures cc: Debbie Wilson, DCM Wilmington Doug Huggett, DCM Morehead City Courtney Spears, DCM Wilmington RECEIVED �FQ> SEP 11 2019 North Carolina Department of Environments] Quality I Divislon of Coastal Management Wilmington office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 DCM-MHD CITY 910.796.7215 0 NORTH CAROLINA I irvi....ww N¢l Oua/ur August 19, 2019 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice Combo: • Tanglewood Property Owners Association • Town of Wrightsville Beach ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON DAVIS Dmaor, Divaton ofCoostal Um Bement Hello Angie: Please publish the attached Notice in the Thursday, August 22, 2019 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Jarimy Springer. Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. kS*cerely, ya I Pi 'lamittin upport & Customer Assistance cc: MHC file Courtney Spears - WiRO USACE RECEIVED SE P 11 2019 State of North Carolina I Envvonmental Quality I Coastal Management DCM-MHD CITY 127 Cardinal Drive Exi, Wilmington, NC 28405 919 7% 7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On August 19, 2019, Tanglewood Property Owners Assoc. proposed to replace an existing boat ramp at 3185 Waterview Drive SW, adjacent to the AIWW, in Supply, Brunswick County; and on July 24, 2019, The Town of Wrightsville Beach proposed to redevelop the ocean access park facilities & reconfigure parking areas along Salisbury St from Banks Channel to the Atlantic Ocean, adjacent to the Atlantic Ocean, Wrightsville Beach, New Hanover County. A copy of these applications can be examined or copied at the office of Debbie Wilson, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7266) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to September 12, 2019 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECEIVED SEP 1 1 2019 DCM-MHD CITY t Ek,& 1003 South 17th Street • Wilmington, NC 28401 • Classified ph: 910,343-2323 - Legal ads ph: 910-343-2342 (910)796-7215 0001 Account: A H9813450 08/22/2019 Name: 4M Simpson, Shaun 08/22/2019 23 8/22 1 x, 8/22 1 x, , , upon written request. r; MIA $ 0.00 $ 160.89 62 08/20/2019 RECEIVED SEP 1 1 2019 DCM-MHD CITY Attention: Fax: This is a final proof. If any information is incorrect, please contact your sales representative prior to the deadline of the first insertion. Oth- erwise your order is accepted as having been approved. ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Seawary BRAXTON C. DAVIS August 19, 2019 Dlrecuw Shane Lippard, P.E. c/o Right Angle Engineering, PC 212 Princess Street Wilmington, North Carolina 28401 RE: CAMA Major Development Permit Application Tanglewood POA Boat Ramp Replacement Dear Mr. Shane Lippard, The Division of Coastal Management hereby acknowledges receipt of your application on June 10, 2019, acting as agent for Mr. Brandon Isenhour with Tanglewood Property Owners Association, for State approval for the proposed replacement of the boat ramp at the Tanglewood POA property located at 3185 Waterview Drive SW in Supply, Brunswick County, adjacent to the Atlantic Intracoastal Waterway. The application was accepted as complete on August 19, 2019 and appears to be adequate for processing at this time. The projected deadline for making a decision is November 2, 2019. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from August 19, 2019, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will fend a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerer, Ty'1 ire tall ` Environmental Specialist cc: Courtney Spears, DCM USACE Doug Huggett, MHC Chad Coburn, DWR Connie Marlowe, LPO Tanglewood PDA do Brandon Isenhour, Applicant RECEIVED QEQ� SEP 11 Z019 DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.796.7215 N(1'1'I(01$1: CAMA PERMIT APPLIED FOR $ m A m N EKrunswick County. J COMMENTS ACCEPTED THROUGH September 12 2019 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Tanqlewood Property Owners Assoc. �Z PO Box 324 INC ' Shallotte, NC 28459 127 Cardinal I ming on, NC 28405 Agent - Shane Lippard (910) 251-8544 Right Angle Engineering, PC May 15, 2019 To Whom it May Concern: This letter serves as my authorization as President of Tanglewood Property Owners Association, for Shane Lippard, P.E. of Right Angle Engineering, P.C. to serve as my agent through the review process of this project. Thank you, .71 Brandon Ise our, President Tanglewood Property Owners Association PO Box 324 Shallotte, NC 28459 910-512-4803 RECEIVED SEP 1 1 2019 DCM-MHD CITY RECEIVED JUN 10 2019 DCM WILMINGTON, NC Major Permit Fee Schedule Project Name: 7A/JGt r Wbep -'N-2 e*k— County: r3Rw ..5&4 tcn gQkT IAHP Check No & Amount: _*34(o0 44<�)6.00 Development Type Fee DCM % DWQ % (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or $250 100% ($250) 0% ($0) excavation of any wetlands or open water areas: II. Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality $250 100% ($250) 0% ($0) Certification No. 4175 can be applied. III(B). Public or commercial development, if General Water Quality Certification $400 100% ($400) 0% ($0) No. 4175 can be applied: III(C). If General Water Quality Certification No. 4175 could be applied, but DCM staff determined that additional $400 60% ($240) 40% ($160) review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). I General Water Quality $400 60% ($240) 40% ($160) ertificati No. 4175 cannot be applied: IV. Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands and/or open water areas: RECEIVED SEP 1 1 2019 DCM-MHD CITY Date Date Check From Name of Vendor Check Check Permit Rct. ## Received Deposited Permit Holder Number amount Number/Comments 6/19/2019 Tanglewood Tanglewood POA CresCom 3460 $400.00 major fee, 3185 Waterview Dr SW, JD rct. Property Owners Bank Supply BrCo SPLIT 60/40 8732 Association } W > LLI N , F- U 0 2 LU w Ix U NC Division of Coastal Management Major Permit Application Computer Sheet AEC: AIWW Fee:$400 #p460 CDAITS _ MHC cc _ Applicant: Tanglewood Property Owners Assoc. Agent/Contractor: Right Angle Engineering, PC / Shane Lippard Project Site County: Brunswick Staff: Tyler McGuire District: Wilmington Project Name: Tanglewood Boat Ramp Rover File: River Basin: Initial date of application submittal: 06-10.19 Date application "received as complete" in the Field office Permit Authorization: CAMA ElDredge & Fill Both SITE DESCRIPTION/PERMIT INFORMATION ORW: Yes No PNA: Yes No Photos Taken: Yes No Setback Required (riparian): (]Yes XNo Critical Habitat: LJYes K No LJNot Sure 15 foot waiver obtained: Yes No Hazard N tification Returned: ❑Yes �No N�A N//� SAV: Yes KNo ❑Not Sure Shell Bottom: OYes Po ❑ Not Temporary Impacts: KYes No Sure Sandbags: ❑Yes No ❑ Not Sure Did the land use cla sift n come fro LUP:AYes [:]No Mitigation equired (optional): ❑Yes county ANo Moratorium Conditions: Environmental ssessment Done: Length of Shoreline: ❑Yes $�No ❑NA `Area ❑Yes ❑No RNA S40 FT. Shellfish Designation: Project Description: (code) Development Area: (code) Open -or- Closed ry , .. ` /y (� �" yam/ AJ/A uooi I SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) I El Swamp Waters (SW) High Quality Waters (HQW) Outstanding Resource Waters (ORW) WETLANDS I ACTIE 4o,16— El (404) Corp. f Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) (SS) Glasswort ( Salicomia sp.) wetlands) ❑ (CJ) Saw gralVladium jamaicense) (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina alterniflora) cynosuroides) rass (DS) Salt or spik (Distichlis (SC) Bullrush or three square (Scirpus El (TY) Cattail (Typha sp.) spicata) SO ❑ (JR) Black needlerush ncus El ( ) Saltimeadow grass (Spartina roemerianus) pat s) APPLICATION FEE RftmopolF No fee required - $0.00 0 III(A) Private w/ D&F up to 1 acre; 3490 III(D) Pnv. public or comm w/ D&F to 1 can be applied - $250 ac e; 4144 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 peril - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 4144 can be applied - $400 El Major development extension request - U. Public or commercial/no dredge RECEIVED $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 El III(C) Priv. public or comm w /D&F to 1 S E P 112019 acre; 4144 can be applied; DCM needs DWQ agreement - $400 4' Tang/ewood POA Date: 6-10-19 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One 8 New Work 0 Ma ntg Replace gY❑ N 10 - l / < 0 ' 8 CT .�7 Lf— New Work Man Replace Jj Y ❑ NNew �{� 1 Work Replace Man ❑ ❑YMN New Work 0 Replace Maint ❑ ❑ Y [IN New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any anticipated Excludes any restoration total includes any anticipated Excludes any restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount O W Dredge ❑ Fill ❑ Both Other ❑ 46 Dredge ❑ Fill ❑ Both Other ❑ / C) 0 o 2 l 1 G Dredge ❑ Fill ❑ Both ❑ Other 60 t9 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919.733-2293 :: 1-888.4RCOAST :: www,ngeoastalmanagement.net revised: III Oil 2/06 McGuire, Tyler D To: bwisenqg0l@gmaii.com Subject: CAMA Major Permit Application Tanglewood POA Attachments: Tanglewood POA Add Info.docx; Tanglewood POA Major Application Checklist.pdf; Tanglewood POA Plans.pdf Mr. Shane Lippard, I received the CAMA Major Permit Application for Tanglewood POA's boat ramp replacement on June 10. At this time the application is incomplete and requires additional information necessary to complete processing. I have addressed the deficiencies with this application in the Additional Information letter attached to this email. I have also included the Checklist for CAMA Major Permit Applications as well as the Plans to this email to helpcorrect these deficiencies. I highly recommend a preliminary meeting on site to discuss these deficiencies of your application. Thank You, Environmental Specialist Division of Coastal Manaeement North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 - 7424 Tv1er.McGuire(auncdenr.eov ki -E-mail correspondence to andjrom this address may be subject to the North Carolina Riblic Records Law and may be disclosed to third parries. RECEIVED SEP 11 2019 DCM-MHD CITY CHECKLIST OF ADDITIONAL REQUIRED INFORMATION AND RECOMMENDATIONS FOR PROCESSING APPLICATION DCM MP-1 APPLICATION FOR MAJOR DEVELOPMENT PERMIT Page 2 of 4 • 4.a. — 445' of shoreline? I measure approximately 220'. Please check measurement. • 4.b. — 0.41 acres Page 3 of 4 • 5.c. — Do you plan on installing a temporary coffer dam with sheet piles to construct the concrete boat ramp waterward of the bulkheads? If a temporary coffer dam is proposed to pour the concrete below mean high water, then we will need a description of that structure listed here as well as shown on the plans. DCM MP-2 EXCAVATION & FILL Page 1 of 2 • Boat Ramp Depths — 3.5' MLW (not MSL) • 2.a. — Where? Landfill? Upland Spoil Disposal Area? Page 2 of 2 • 3.b. — Length: 147' , 21.25' Width: 1' , 7.5' • 3.d. — 38' • 3.e. — PVC sheet pile, #57 stone • 3.g. — Bulkhead Fill? Where and what type of fill? • 3.h. — rip rap, clean dirt? • 31 — upland borrow site? • 5.a. — on site out of 30' buffer WORKPLAN DRAWINGS C1 • Site Data Table — where are these proposed structures/amenities located? If these structures/amenities are located outside of the 75' AEC on the main parcel owned by the POA then just remove the table from the plans. • Label Rip Rap Area as Existing and show rip rap on the plans just as shown with the proposed rip rap on C2 at the end of the boat ramp. • Please relabel Normal High Water to Mean High Water (MHW) to be consistent with C2. • Continue the waterward coastal wetland delineation (marsh line) across the entire parcel and add the landward limits of coastal wetlands to the plans. Please show marsh grass on the plans and label the lines. • We need to see the entire docking facility on the plans. Please show the existing footprint of the docking facility and label the structures as existing. • General Note #6 explains that the Atlantic Intracoastal Waterway Right of Way and 80' Setback lines are plotted and there is only the Right of Way shown. Please include the 80' Federal Channel Setback line to both plans. DEQ2� RECEIVED SEP 1 1 2019 North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington office 1 127 Cardinal Drive Extension I Wilmingtoi, North Carolina 28405 DCM-M H D CITY 910.796.7215 C2 • We need to see the Riparian Corridor for the parcel on both plans. Please include the Riparian Lines with the 15' Riparian Setbacks. • What is the width of this waterbody? Please include the width of the waterbody on both plans. • What is the need/purpose of replacing the section of the concrete boat ramp with concrete that is not used for unloading/loading vessels? I've highlighted this section pink on both plans. • Work Note for the Site Contract #4 explains that no work shall occur below the mean high water line. Please remove this note. • General Note #6 explains that the Atlantic Intracoastal Waterway Right of Way and 80' Setback lines are plotted and there is only the Right of Way shown, however this line is labeled incorrectly and says 80' Setback From Dredged Channel. Please correct the line to say Atlantic Intracoastal Right of Way and include the 80' Federal Channel Setback line. • Structural Note #3 explain that the proposed bulkhead length is approximately 310 feet in length? I measure approximately 147 feet in length. • Structural Note #12 explains that backfill for bulkhead shall be clean? Where is backfill proposed or needed for these structures? I'm a little confused by this and the backfill listed on the MP-2. There shouldn't be much, if any, backfill needed for these bulkheads. • Structural Note # 15 explains that anchors will be used for the proposed bulkheads? There shouldn't be any anchors or backfill for these proposed bulkheads. • Label Rip Rap Area as Existing and show rip rap on the plans just as shown with the proposed rip rap on C2 at the end of the boat ramp. • Continue the waterward coastal wetland delineation (marsh line) across the entire parcel and add the landward limits of coastal wetlands to the plans. Please show marsh grass on the plans and label the lines. • We need to see the entire docking facility on the plans. Please show the existing footprint of the docking facility and label the structures as existing. Label the gazebo the same as on Cl. • Label the replaced structures (bulkheads, boat ramp, rip rap) as Proposed. Show an arrow or label both proposed bulkhead replacements. • What does C.J. mean on the boat ramp? • We need to see the Riparian Corridor for the parcel on both plans. Please include the Riparian Lines with the 15' Riparian Setbacks. • What is the width of this waterbody? Please include the width of the waterbody on both plans. • Cross Section A is included, but there is not a line labeled as "A" going across the boat ramp. Where is this cross section from? Leave this cross section, but also add Cross Section B to the plans showing the slope of the boat ramp from beginning to end of the project. • What is the need/purpose of replacing the section of the concrete boat ramp with concrete that is not used for unloading/loading vessels? I've highlighted this section pink on both plans. • Is a coffer dam proposed for the proposed concrete boat ramp replacement below or waterward of the proposed bulkheads? If a sheet pile coffer dam is proposed to replace the boat ramp below MHW and waterward of the ends of the proposed bulkheads, then we will need to see that on the plans too. A description of this construction should be included in the narrative and MP-1, as well as the dimensions included on the MP-2. RECEIVED DEQ�� SEP 11 2019 North Carolina Department of Environmental Quality I Division of Coastal Management DCM—MHD CITY r Wilmington Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.796.7215 ADDITIONAL ITEMS • Where will spoil material and old concrete boat ramp be located during and after removal? Is there a temporary spoil disposal area? What is the final destination of this excavated fill? • Is actual clean dirt/fill proposed for these bulkhead replacements? I'm a little confused with the backfill notes on the plans and the backfill listed on the MP-2. Are you referring to the concrete boat ramp as backfill? • "Concrete Poured in Place" should be labeled as Proposed and concrete cannot be poured below MHW unless a coffer dam is proposed. Is a coffer dam out of temporary sheet pile proposed below the waterward ends of the proposed bulkheads for this method of replacing the boat ramp? If a coffer dam is needed for this method, please include the structure on the plans and on the MP-2. • What is the need/purpose of replacing the section of the concrete boat ramp with concrete that is not used for unloading/loading vessels? I've highlighted this section pink on both plans. This section does not function as a boat ramp and could be replaced with wood. • Have the adjacent riparian property owners (ARPOs) been notified of the proposed development? I didn't receive any notifications or certified letters to the ARPOs with your application. I would recommend notifying the ARPOs with the new plans once these deficiencies have been corrected. • I highly recommend a preliminary meeting on site to discuss these deficiencies of your application. RECEIVED SEP 1 1 2019 North Carolina Department of Environmental Quality I Division of Coastal Management Wilmirgtm Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 29405 910,796,7215 DCM-MHD CITY -WVEQ dMO�VitlMARN k sv X� 0 1 to 40 AR WmWM=Ht(= FAMtoNtIX) EACH N 0 P E PF'E 10 WA -CONE:PAM F"m PY.ww, GRADe SECTION M. SITE PIAN: C2 TANGLEWOOD P.10A. —RI DEED BOOX"ISK PAGE 378 PAR NG AREA GLENN A, CA141LIA WOODCOCK --.I na DEED BOOKLOT, PAGE 787 WA7EkEW DRIVE SW 30' Lis CHARLES &40YCE GANDEE DEM'BW3920 OAdES69 ALViN ARNIGM A, LOT 4' M DEED ,601. PAGE'692 'T4 -SL 'r, LOTSw,ncw &vt _41 r�7 COL »> MU, MIX, r. A mum A6 A. I I- tiSiklWkE 'CANAL Ri� _' k ' I I - VEP Y&TICALD-knim �Il lmim� c7lZm"CT L_._= lom "AUG II& MR FOR_,'REGULATMY"REVl _"NUT fOR_CoNst4c, I MOT Il" CONDITIONS Ab AbEMO.UTION' PLAN' It 'o IS ♦♦` 1 SET81at DIIUIYRAO M1 W W �♦ ` ` ♦♦♦� W 6 Y ASfI w // W w r' MIER IKJO' ♦♦♦� 1 OC D \ W W lw w215 7 II/wvgDOf w W W �♦♦♦\ Il W w W W w w W Ill• u 11 1 W W W W W W -YI W W 11 w W W W 11 W W 1l- w W Z• W W 11 W W 11 W W W `IW W w f W ♦ Q i \ ��,♦ --1—gym r FASI0ID 7ROD 1.1HMX PROPOSED CONCRETE BOUT RAMP N LOCATION OF PROVIDI S / RAMP (SEE DETAIL) W VERTICAL DATUM DIAGRAM TIDAL DATUM NAV.V.SII momE K.W(MHW) ------ ______yAl' .2.%-------------- OAD' ------------- PROPOSED 1VM SHEETPILERACEDED 7 '1 PRIOR TO CONCRETE 1 1 �i COFFER DI STRUCTLXK ACTOR 1>`F gr CONTRPLACE •-1•IJ]1 •I I-� I i 1 •il P1 EXI PUN' ATLANTIC INTRACOASTAL WATERWAY STRUCTURAL NOTES EIL PAt1\FL EIL A PRJPD.YD MA" _ 5E RAID k]£ COW GvG�> - o� �G�jryi J. 1 0011 �!`{ IylG P%%%I'. NfCoII�d'v�!:��!::4�4:�r!:� - S l SGS50 SHEET PILE Y (10' LENGTHS) ENWEN TO SPECIRED DEPTH SECTION A max•-1'-0 WYP p£YA1 SECTION B = -2.85 R RP RD II RP xdroxxc t' ,NEK 75 E. F w aBSES 5 d ®FIMLiS ME ®.9h1® 9E111FP' ,XEZ PMIWS .VD IK NNm lymr yoirc fuNN QUOI IRFR.D ro m mw BEB tlMDCf M cYEOI iPl aMFO1CN. z CSONS M RELL SUBS" NL dA616 ff9P m IFWIG A•D 40iF d omxBSG . MI ]. Ili$ B"B"I M M W61MA:IYM WAIES YIm 9fi, NF BAKSBB/R1YN.' WL IPrgglULLi Im R N . So' G Bork\. YDIT' NpDPM$ YID YGOQ$ ff p}NIAYIbI 'BE.,Iastl®111Y OL [d1WLfd WIIMCIQ 9WL iMi Nl NRSK! FmlWIp6 m wNW1 Yo fIBIIE M MImN" IN IIE SIIOICME pWF YL s110E5 a CGMPIK1dL S WNIKI(Y 9I BAST RtdD RMSK S-0' O.C. FOR ESPL1 B. OYIIWQN( wL qfY BE Ddlpi YD IfC\1Cx Ylt UIWI6 NM DIFMIN ILRI 9N EBI m ESP 0.1 NNYL S 6 WIx ES dw6 B! u0n SISAL Y6[ D6MFMG vE4Y UNR YA vl1 YIiY,R Iml DIPU/ wM ro MIYIYE Ytt 9ED N� SHEET PoLE P.T. CONT. TEMPORARY JIG 9 MI M S IO/ SESS 4 SS19WL BE ISE'Bu CtiWVtE NIN NL WN.Np SORD SG,LS YOtt W5 IS DIAGNOSISIXS E61EAR\6 YU .. BE RPR1916 ". OIIEP ANYCMtYL M1CNM1 E[fAW SB .1 SE RBBBBO N nCCpOYO " BY. _ � SCREW AS REDO. 1 r Y.. IW]FID . Ed .. 16tlCIWS NM EGIp6 ]&U / M, " IIE ... III, dCE xmx t1YIYYl. III YLM .'wl. Sm Ld6 411CM .11 Saw Id6 YD ]Ntlb SAM . m YD w,W N'DNG [OOYIFD 115N6 0.¢ ,. IIE C@N IIW SRRtD 6 ID NM 10. M111R0 IEI®6 9YLL E 4MEA1 EF W. dNF w L n181YWLP5 SN4L E IEAIF➢ M KVYDY4 NIM M11H CRIYJi! IKb (WXIC o]nYa Esx DnYA m IIo a Ed DIRdR Y1D X IEDID DIIC E IRYm N N:mYB.I" RM RPn 12A dma/1 Ec1Y I6i%1D coaxer Nt gS,CiPS IMVFE. YA]M/in Nld. flG 9w1 E w:. PBPE .V6.-B, dLWQID SIDED RECEIVED -1i' q0. WLV. BOLTB 8X8 P.T. COBR.INNLER IL BVISLL M BUNIO DMII E DFMI IXYYYI iLL NPYCIm 1p ffi SINWL d1'IM YWYY M [DEfI. NL K6 DYE E REF" NO NOTCH P.NDB OF w_11w,CR0 m OIDrt VAW.ER FIXt C IM AT SPLICE 11.RIES DWL E 01 FRMI ItOmK FrYO (d AfpAS, Fy Y.5) xlirt DEfI RG M ElA DFE, EE IH O! s-YD (OND6 m IYK11I n YYo m xaBSL nw¢ >E mrwDB wvForXm M Devsr DEET Iy[ n ,v en meFx M IIa rmE11Y1 rwEn cdlwcDl DYY1 DETAIL #1: TYPICAL BULKHEAD PLAN VIEW 9bYn dl PEFi IB FM.lm1 rd /MVM. AF m PAm/¢I[Mr a wThWLS. IDMMfM, IPDACIS 9YO IO, E 19D NILpUI POIIw /WIO,/L AUG I 1 G Z O 1(t, IDI12 ,,, 1.. (WF DWL E DIIIX dA" d tlA 6 IfIDDYIm 9! OIME0. IS WL MW YOGI dpBD6 ME ERIY%l N 11L MAfA1XM )0 ql qAI iBd NM 9RLim dE)ElJll 6Y lR: 1nW 10 RRdI. 91QIU (9NIR4M HAE Nl1 dTYRS tlMIWCIW M RY1.S i0 pYE1SG6 DI.IE llp IDT DYiEN w6NDY M MIIfA .61WCICM 16 RSd Yf"YDLVI 6 M®d EP]PJ N 91RIIEK[ WILF ttY Kassa" uu'S5 M . EVD! 91F EX 9YVA 1,I,. L9OLR DIYL NK.INYY EMIF4M SIRyEIXR;IEp DD/SSMS. RLIISDWIEdYE Wa.\MLi RIMEYINYYff pCiMVJILMINGTON, NCSAMS m TANGLSROOD BOAT RAMP In KH 9w1 E YpRlfp B! pO16A. WIIIgCId DWl IOM1Y p61RA 1 YIY.Y a M xO6 N YppCF RCP ro EGEMF MIYE RR d 3 YR BBd mislRlcml.Cmm L 11Q11DE0 iRLT EEFOII.]( COLAM NdTI 01#%1 DPI FOR REGULATORY REVIEW SITE PLAN NOT FOR CONSTRUCTION I � 7E�1 is 1PaI1 I _,.,,,�1�a Do % I tt V�f I Q[iGgt• .,q GLE scALR I•=m '4'..AwME„�:Iy!Tf Im�iFw®FIar•w BSa M IIIiR c>IIR �/!. 0 5 10 20 40 PO iiN Iv DO M � p� TANGLEWOOD P.O.A. _ DEED BOOK 646, PAGE 378 PARKING AREA --R/W--�— na — _ 3185 WATERVIEW DRIVE SW _ 30• R/W GLENN & CAMILLA WOODCOCK DEED BOOK 4029, PAGE 787 LOT 2 \ 3183 1 I ��T� ,� �GGMCAEIE GPNEIIAY .. 1 1 - IFDIGGI I CHARLES & JOYCE GANDEE DEED BOOK 3920, PAGE 98 ALAN JERNIGAN 1 1 LOT 4 1 DEED BOOK 601, PAGE 692 LOT 3 ` j I 3193 j L3189 GRAVEL 1 I `•.,� X'e `` 11 ��'��-- `+'+'`'`'�`4 `r'+'r'•`�`�� rarr l•+a�1'+ i�ryxa t`i .a.+. a. •. •. a. r. a.r+•YVS1. •a+:,11 +++:+ a a>?�\ r r a ♦♦ r• r J• a . r r a ♦ ♦ a a a a ♦ ♦ + 1 ♦xx'lx1-ma • •raaar as aaar•a•aar•aaWaarara•rr♦r"'L �.• + . . . . . . . . . . . a a . .1 + 1 + r Iv r . . r a . . . . r . � al ♦ r + y ' r a a . a . . . . a ♦ a � al a . 1 a . a}b� + . a. `. ♦.. . . . a+. a.+. . .r. +. IN+tea r . . . a r1 r . 1 >✓ 1 1 R 1 x 1 1 x: 1 11 � 1 1 1. x I 1 1 11 �i 1 1 �31 1 - omirlG WWG Wa 1 .1 - iAM1flW)OO W %E1 1 1 11 — 1 1 ATLANTIC INTRACOASTAL 11 1 - RECEIVED WATERWAY SEP 1 1 2019 sn w W.> iCANAL UNE IkM „' II ayS.l yuYyW„�x �•R1Wi4' nv� now i wive ,i. L �m MM HIGH WAU UW ha Xm o - --X� uur a gSNWBWCE _ - - ' IX. CONCRETE B01T MP A110 NOOOEN LAMS W ' - 6. WOW GOGK— M r. eb'iW aSTK jtWMC -(cCE VFED AUG 5 2019 W TANGIE1W100 WT aoscAlx VERTICAL DATUM DIAGRAM 49R'(. W) -2111' I. nowt mm mlTlmm � a axxxr IWomroui mWo . lit anxMlloc mMrr TM ax¢ L /q.Ppx' A L10.EMI fF1M flg9 W➢ I Jl'AQmW. MS FM.Il anwxs ro ¢ uXMm M Ile muwlo sc vz xxz nom H fW06 IIA' M 160. M50 fLKO SIK IE 0V4 fILN f1E•I.Rt6 16P e0 ISD'. 1 llxi A„eR 6 96CR 10 MR NU ML FAZIFMIS 6ttMW1$. OSIIKIbB ImFd-WK CF R[mm. Lw'FINfIRH OxXIM�i Mp/R Rp.RIpR IxCX WL IBllf ME VZ Cf M6 GMIRFIi: .1fTWe GNM Q 1019A.1y pl PE 9MhY IeP �. 116 9F41 PF@WIm MU WY IAMLO IIIIIWI ME HI61I ff A l�llf W911 MO 6 TEI08! SLBER IO MR ICR IMLN Wtt E � T A RLL MO I6wlL IIIIF 4p6N V316 611(i MI 9OxD WI.VI /e /IXYMIC IE4V. (A1I1610 4ilE1dP 1xMx M mxows a Iw w S n .A2MS 4xE BbT➢ ql M qD M(ill ,Wf6L166 AI I}, pL osurcs xe xwrzwna amuxo m�uxxs. i xnm: WIRiGSlxL xxrnxxx Won a � Mo m' sxlimx ulx. AD11FL fFOI lVl MNl6 C91NE➢ E1M1 Va NY! RWS 6 LMiRl6 IIxYT#IWN 8rY IIWa. T. Al Euvxrews xrso w xAvn • Wo xex oeweo m m xfx n< n is sX.n rm. 1 vaom2 omm oom SCALE: 1'=0 f. ID 29 i0 0 GCM WILMINGTON, NC FOR REGULATORY REVIEW NOT FOR CONSTRUCTION s/L/1W �I TANGLEWOOD BOAT RAMP ' l LOIXWOW! f y M.WtaIWO{ mNIT 1=111 Q--- y a"t EXISTING CONDITIONS a AND DEMOLITION PLAN aru , �. l� I g..1iQo' 1 �QGBT ANGLE .a.la a x11W WWe:w w WIWaa ISW�