X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Tanglewood POA PO Box 324 Shallotte NC 28549
Permit Number
94-19
Authorizing development in Brunswick County adj. to AIWW, at 3185 Waterview Drive SW.
in Supply , as requested in the permittee's application dated OS/15/19 (MP-1 &MP-2) and
O8/08/19 (MP-4) including attached workplan drawings (2) CI-C2 both dated 08/02/19.
This permit, issued on December 6, 2019 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
To lines, imprisonment or cwu action; or may cause ine permit to oe nuu WILL vviu.
Boat Ramp & Fixed Pier Extension
1) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to
contact waters of the State or waters that will enter waters of the State.
2) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the
attached workplan drawings.
3) In accordance with commitments made by the permittee, the boat ramp shall be poured entirely
within a watertight containment structure. Live concrete shall not be allowed to contact waters of the
State or waters that will enter waters of the State.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
f� Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Tanglewood POA (7 Permit No. 94-19
O Page 2 of 3
M
-G
ADDITIONAL CONDITIONS
4) Placement of fill materials below normal high water level shall be limited to the concrete ramp structure,
rip rap, and vinyl sheet pile walls.
5) Excavation and ground disturbing activities, associated with the placement of the boat ramp, rip rap and
sheet pile walls, above and below the normal high water line shall be limited to that absolutely necessary
to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached
permit application and workplan drawings.
6) Any portion of the permitted access pier built over Coastal Wetlands shall not exceed six (6) feet in
width and shall be elevated a minimum of three (3) feet over the wetland substrate as measured from the
bottom of the decking.
7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors should be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Sedimentation and Erosion Control
8) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
NOTE: An Erosion and Sedimentation Control Plan may be required for this project. This plan should be
filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this
plan to the Department of Energy, Mineral, and Land Resources, Land Quality Section, 127
Cardinal Drive Extension, Wilmington, NC 28405.
Stormwater Manaaement
NOTE: A Stormwater Permit may be required for this project. This plan should be filed at least thirty
(30) days prior to the beginning of any land disturbing activity. Submit this plan to the
Department of Energy, Mineral, and Land Resources, Land Quality Section, 127 Cardinal Drive
Extension, Wilmington, NC 28405.
General
10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
Tanglewood POA
ADDITIONAL CONDITIONS
Permit No. 94-19
a Page 3 of 3
12) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Nationwide
Permit No. 3 (SAW Action Id. No. 2019-01709) which was issued on 12/6/19.
NOTE: The N.C. Division of Water Resources assigned the project DWR Project No. DWR-2019-1155.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
Processing Notes
Applicant:
End PN/Comment De line: 91 Q f(r) 75 day deadline: 11�2/
30 Day Comment Period: on hold:
off hold:
150 day deadline:
VVIAJ �er�n;� � V-eo A"). FlPos n , e�
�, V ✓wry q p we- paj,�- of iu,vL ju wv-tg d PSI- alp s ctrsl(d
Y ki) , wVLv V w" f A ck (,+04(la nl- tv
r wo +�fi Gash, m s.
itd j f 'PM'c� 04+;C<k44S CorKC �. �Orn's � AeM a'^O—
boo- lC;,/rr
u'kcG IO1IVI �'(zS, r
i6�;rrlsr "�2S r a/z.r L'�
Issued:
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
APPLICANT: Tanglewood POA clo Brandon Isenhour COUNTY: Brunswick
PROJECT NAME: Tanglewood Boat Ramp
LOCATION OF PROJECT: 3185 Waterview Dr., Adj to AMW
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 8-19-19
FIELD RECOMMENDATION: Attached: Yes
FIELD REPRESENTATIVE: McGuiree /
DISTRICT MANAGER REVIEW:
B) � DATE RECEIVED BY MAJOR PERMITS UNIT: TV�
APPLICATION ASSIGNED TO: Spears
PUBLIC NOTICE RECD: 8-22-19
ADJ. RIP. PROP NOTICES RECD:
C) 75 DAY DEADLINE: 11-2-19
MAIL OUT DATE: 8-20-19
PERMIT FINAL ACTION: ISSUE DENY
To Be Forwarded: N/A
DISTRICT OFFICE: WILMINGTON
FEE RECD: $400 (60140)#3460
END OF NOTICE DATE: 9-12-19
DEED RECD: Yes
150 DAY DEADLINE: t (b q
STATE DUE DATE: 9-12-19
AGENCY
DATE
COMMENTS
RETURNED
OBJECTIONS:
YES NO
NOTES
DCM - Field Rep
lot t1ol
j
Local Permit Officer DCM
DCM — LUP Consistency Determination
-L—
Rural Development Division
DEMLR — Stormwater & Sed/Fsosion
DWR-401
DOA — State Property Office
11101M
DMF — Shellfish Section
�j S I 11
jX
NCDOT
DMF — Habitat & Enhancement
DWR— Public Water Supply
0 `3lJ
}
%D✓1 "5
USACE—Regulatory
17' 4 pl
Itii
DNCR—Archives & History
DNCR — Natural Heritage Program
WRC — Wildlife Resources Commission
({
PS
13
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
APPLICANT: Tanglewood POA clo Brandon Isenhour COUNTY: Brunswick
PROJECT NAME: Tanglewood Boat Ramp
LOCATION OF PROJECT: 3185 Waterview Dr., Adj to AIW
RECEIVED
SEP 1 1 2019
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 8-19-19 DCM-MHD CITY
FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: N/A
FIELD REPRESENTATIVE: McGuire} DISTRICT OFFICE: WILMINGTON
DISTRICT MANAGER REVIEW: /.1� G v
B) DATE RECEIVED BY MAJOR PERMITS UNIT:
APPLICATION ASSIGNED TO: Spears
PUBLIC NOTICE REC'D: 8-22-19
ADJ. RIP. PROP NOTICES RECD:
C) 75 DAY DEADLINE: 11-2-19
MAIL OUT DATE: 8-20-19
PERMIT FINAL ACTION: ISSUE DENY
FEE RECD: $400 (60140)#3460
END OF NOTICE DATE: 9-12-19
DEED RECD: Yes
150 DAY DEADLINE:
STATE DUE DATE: 9-12-19
AGENCY
DATE
COMMENTS
RETURNED
OBJECTIONS:
YES NO
NOTES
DCM — Field Rep
Local Permit Officer DCM
DCM — LUP Consistency Determination
Rural Development Division
DEMLR— Stormwater & Sed/Erosion
DWR — 401
DOA — State Property Office
DMF — Shellfish Section
NCDOT
DMF — Habitat & Enhancement
DWR—Public Water Supply
USACE — Regulatory
DNCR — Archives & History
DNCR — Natural Heritage Program
WRC — Wildlife Resources Commission
RECOMMENDATIONS FOR TANGLEWOOD POA BOAT RAMP REPLACEMENT 8/19/2019
The proposed boat ramp replacement will be within the existing footprint of the Tanglewood boat ramp.
No work or expansion is proposed to the existing docking facility. The only new structures proposed are
the 60 ft2 of pier located on high ground connecting to the existing pier adjacent to the boat ramp where
the existing concrete would be removed and the 159 ft2 of rip rap placed at the waterward end of the boat
ramp.
As proposed, the project appears to be CONSISTENT with the Specific Use Standards for Estuarine
Waters and Public Trust Areas, as set forth in 15A NCAC 07H .0208 (b), and also with the Use Standards
for Coastal Shorelines, as set forth in 15A NCAC 07H .0209 (d). This office has no objection to the
proposed work, provided that it is consistent with all other local, state, and federal permitting
requirements. In the absence of any concerns from the commenting agencies, it is recommended that a
permit be issued subject to the standard boat ramp development.
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
MEMORANDUM
To: Heather Coats [�
From: Michael Christenbury
Subject: Consistency Determination, Major Permit Application, Tanglewood
POA — Brunswick County
Date: September 9, 2019
This project is consistent with the 2007 Brunswick County Land Use Plan Update.
The applicant proposes to replace the existing boat ramp and associated structures of the
Tanglewood Property Owner's Association private community docking facility. The
project is located at 3185 Waterview Drive SW, Adjacent to the AIWW, near Supply in
Brunswick County.
Areas of Environmental Concern (AEC's) impacted by the proposal are ES, EW, PTS,
CW and PTA.
Waters at the project site are classified as SA, HQW and are open to the harvesting of
shellfish. The area is not a Primary Nursery Area.
I have reviewed this proposal for consistency with the Brunswick County Land Use Plan
and offer the following comments.
The general area of the project is classified as Residential.
In general, Brunswick County allows development in Residential classified AECs which
is consistent with the State's minimum use standards. The Brunswick County Land Use
Plan contains some policies, which exceed the State's minimum use standards. However,
none of these standards appear to be applicable to this proposal.
This project is consistent and not in conflict with the 2007 Brunswick County Land Use
Plan.
Cc: File
ROY COOPER
Govemmr
MICHAEL S. REGAN
Secretary
NORTH. CAROLINA
Larirmintenlui Quahr)
August 19, 2019
MEMORANDUM:
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Fax: 910-396-3964 (Courier 04-16-33)
courtnev.soears(d)ncdenr.00v
SUBJECT: CAMA/Dredge and Fill Application Review
BRAXTON DAVIS
Director, Division ofComial
Management
Applicant: Tanglewood Property Owners Association
Project Location: 3155 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the ro>osed ro'ect and
return this form to Courtney Spears at the address above by `Se tember 12 204 . If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the projectas proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
zRiNT�NAM
r k
� e, r S j e, ✓'
OF 60 to rn �y ce
SIGNATUR 2` R—e `a/� RECEIVED
AUG 3 0 2019
DCM WILMINGTON, NC
State of North Carolina. I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 29405 919 7967215
NORTH CAROLINA
Environmental Qualtry
August 19, 2019
MEMORANDUM:
ROY COOPER
Grvemor
MICHAEL S. REGAN
secretory
BRAXTON DAVIS
Director, Division iy Coosral
Management
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Fax: 910-395-3964 (Courier 04-16-33)
courtney.soears(a.ncdenr. gov
SUBJECT: CAMA/Dredge and Fill Application Review
Applicant: Tanglewood Property Owners Association
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the proposed ro'ect and
return this form to Courtney Spears at the address above by a 0QHi er 1M M01 . If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
.RINT NAM Dan Sams
GENE DEMLR
IGNATUR �m , RECEIVED
AUG 2 9 2919
AT August 29, 2019 DCM WILMINGTON, NC
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215
L11, 1�4) ,V- I , I , -
'o, �J, —,;.
0
ROY COOPER
MICHAEL S. REGAN
BRAXTON DAVIS
August 19, 2019
MEMORANDUM:
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Fax:910-395-3964 (Couder04-16-33)
courtney.spears@ncdenr.gov
SUBJECT: CAMA /Dredge and Fill Application Review
Applicant: Tanglewood Property Owners Association
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by September 12, 2019. If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
'Additional comments may be attached"
This agency has no comment on the proposed project
,5Ge,- c3 This agency approves of the project only if the recommended changes.
V`r� R_ are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
PRINT NAMELk/O_Y-Ya U11�'t oval
AGENCY S PM9 A��fT{
RECEIVED
SIGNATURE SEP 10 2019
DCM WILMINGTON, NC
DATE Sr+�yLc t 1�t Zv�q
State of NortltCarolina Environmental Quality I Coastal Management
127 Cardinal Drive I!zt., Wilmington, NC 28405 919 7967215
North Carolina
Department of Administration
State Property Office
Roy Cooper, Governor
September 10, 2019
TO: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ-Division of Coastal Management
127 Cardinal Drive Ext. Wilmington, NC 28405
FROM: Wanda Hilliard i W CAJ-6L (—
Real Property Agent
Department of Administration
SUBJECT: CAMA/DREDGE & FILL AAPPLICATION REVIEW
Tanglewood Property Owners Association/Brunswick County
RE: Replace existing boat ramp and associated structures
Machelle Sanders
Secretary
Tim Walton
Director
Please confirm that the facilities are not located within the 1000'USACE AIWW easement area.
If not, then the State Property Office has no comment on the proposed project.
Thank you.
RECEIVED
SEP 10 2019
DCM WILMINGTON, NC
State of North Carolina I State Property Office
116 West Jones Street, Suite 4055 11321 Mall Service Ctr. I Raleigh, NC 27699
9198074650 T 1 Web: http://www.nespo.com
ROY COOPER
(mvetnor
MICHAEL S. REGAN
secrcmr),
NORTH CAROLINA
Environmental Qualtyo,
August 19, 2019
MEMORANDUM:
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
.Fax: 910-395-3964 (Courier04-16-33)
courtnev. spears(a)ncdenr.gov
SUBJECT:_ CAMA/Dredge and Fill Application Review
Applicant: Tangiewood Property Owners Association
BRAXTON DAVIS
Diww. Division nJ C(mial
Managenuan
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by a tembet' 12 201 . If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
@INT NAM Shannon Jenkins
GENE
NC DMF - Shellfish Sanitation
IGNATUR `~.d�_ 9YctDrta¢u_ for Shannon Jenkins
AT
08/30/2019
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive E#., Wilmington, NC 28405 919 796 7215
RECEIVED
SEP 0 3 2019
DCM WILMINGTON, NC
R&'CO'OPHR
r MICHAAEL'S.
REGAN
•.�
HRAXTQTI DAVIS _
`NORTH GtiRDi1NA
_--�
rl're¢Av, I.Waeint/f timed
'.%.Lmrra,memtl.Lhx.r?rr,•
1fs�ngxerer
AugUstig,;2019':
Y'.-. ,
�4tEMOl2ANfSUtIM:: •
,. 4
-
7
['
FROM! Courtney Spears, Aaalstsnt',Nlajor Permits Coorrllnator
c
j�CaEQ blliisionofOoastalfiAdnegement
a
127 Cardinal ,Drlve E)d; Wilmington, NC 284U5
Fax: 916-8964964 (Courier04-1A-33)'
courtney.soearsOncdenr.00v
SUSJECTt CAMAl DMd a and Fill g Application Review
Applicant: Tanglewood Prope►ty'Owners Assocletlon 4
7
'.
ProjectLocation; 3166WNaterviewDrive SW adjacentto A/WW in Supply, Brunswick County `
c�
C G ry
"'Proposed Project; replace,01sting boat ramp and associated stnrdures
�C
v •
s,
(Please indicate below, your agency's position or viewpoint on the proposed project
and
L
911.
return this form to Courtney Spears at the address aboVeL by
If you
•7
have any gUestions regarding the^proposed iproject;'contact Tyler MdGuire at (91 Q) 796-7424 when
appropriates in-depth comments with supporting data tS requesw.,.
REPLY: This agency has no objection to the project as proposed.
"Additional comments maye be attached"
j
ThiWdgency has no oommer t pn the proposed project
This agency approves of the the recommended'changes _ �J
_ project•onty'if
are incorporated. See attached:
This agency objects to the project for reasons described in itie;attached
comments.
r
..
c:,
1
Noma
.
RECEIVED
�j
AUG 2 9 2019
q
,
4
NC3
pCM 1NILMINGTON,
-cr
w
a'.E.+2?o
... StemrorNoah t;ft4dl l 8maromgen4l Quaior'c6,ww,,, pad
1
- .,
-
127QadtWDnw E><L'il'dmingmo NC294A5 9197967213.
4 441
„
f r,"L.
ROY COOPER
MICHAEL S.
REGAN
dory
�-y7
STEPHEN W.MU' HE
MEM101RANDUM.
"J
R
'TO:1 CodrtnbySp&ars;,VtMA§$1stant rPe or&;'ator,
FROM: CurtWeychert NCI)MF Fisheries Resource Specialist
Tanglewood POK11daRaffip Replacement' SUBIECT� lacemen
DATE: August 29, 2019
A North Carolina of-Martne Fisheries (DMF) Fisheries Resource S ecialisthas reviewe&the
pact
.Division
LAMA Major Permitapplication for proppsed.,actioos.that impfish and fish habitats, The project.
is located, at,31'85'WaterviewDr, SW, Supply,'Brunswick:Cottrity. The projdct'is occurring idwatem
classified as SA, ;'HQW in waters that areopexi to the harvest of shellfish., The applicant is proposing
to replace an e)dsting boat ramp, associated bulkheads and fixed'pier.
Theapplicanthasproposed to use, wcombinationoffurbidity cUrtains-andtoffer dams, to minimize
theimpactsof their project on the water quality -of nearby waters to7the1pr9ject area. The NCj)MF
encourages and appreciates' the use of all minimization efforts: 'The setup of these ,curtains and
dams were explained in the narrative, however, the breakdown ofthese barriers issnotwell
documented,
In order toreduce impacti towater quality in the area cifthe project, NCI)MF would suggest that
prior to. the removal of the coffer dams, the,basin'have water pumped into the coffer dam; urbirlity
curtains,be, installed outside of thedam walls and remain in place while the dam walls are removed
and the turbidity curtains he removed when the turbidity returns to amblentlevels.,
ContabtCurIW6ychertat(252)808-8050orCurtWey6herOncdenr.Lo wi h further questions or
concerns.
RECEIVED
AUG 2 9 2019
-ems' N0IbftV Compam,,-, c DCM WILMINGTON,
NC
344TArmddSrreK I PA MV69 I M*vtwadC1ty.NwibCmaw2A.W
;t
=-726-7021
ic�
t ':1 - �-� -.� .' '�:
WZ
ROY COOPER
r imvmnr
MICHAEL S. REGAN
se:rrlan,
NORTH CAROLINA
Envirol"Itenral UaoLA•
August 19, 2019
MEMORANDUM:
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28406
Fax: 910-395-3964 (Courier 04-16-33)
courtnev.spears(a)ncden r.gov
SUBJECT: CAMA/Dredge and Fill Application Review
BRAXTON DAVIS
brrrdnr, lUvranur n/'f'nanal
.1lneµ¢un,mi
Applicant: Tanglewood Property Owners Association
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address.above by If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: x This agency has no objection to the. project as proposed. i 1w" sec oaia kad
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
ih IK %own
Do, P,31-L wrav %oljl
RECEIVED
AUG 3 0 2019
7� `►4 DCM WILMINGTON, NC
Bute of North Carolina I Environmental Quality l Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
NORTH CAROLINA
Environmental Quality
August 30, 2019
To: Courtney Spears, NC Division of Coastal Management
From: Mark Brown, NC Public Water Supply, Wilmington Regional Office
Subject: CAMA/Dredge and Fill Application Review
Applicant: Tanglewood Property Owners Association
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please forward the following comments to the applicant:
If applicant plans.to conduct any work (re -location, installation, extends utilities, etc...)
involving the public water supply system per Title 15A Subchapter 18C Section .0301 Rules
Governing Public Water Systems, Plans and Specifications should be submitted and
approved by the Public Water Supply Section for all new waterlines prior to construction
beginning. Please also be aware of our separation requirements in regards to water/sewer
according to 15A NCAC 18C Section .0906 Rules Governing Public Water Systems. Check with
the local water system for cross -connection requirements for this project. Public Water
Supply Section guidelines are listed in Appendix B, Figure 2 in the Rules Governing Public
Water Systems but the water system may have additional requirements.
Feel free to call us at (910) 796-7215, if you have additional questions.
RECEIVED
AUG 3 0 2019
DCM WILMINGTON, NC
North Carolina Depart_menr_of Environmental Quality ; Division of Water Resources __
Wilmington Regional Office 1127Cardinal Drive Extension i Wilmington. North Carolina 2&405
910.796.7215
Spears, Courtney
From: WilmingtonNCREG <WilmingtonNCREG@usace.army.mil>
Sent: Monday, September 9, 2019 8.44 AM
To: Pietila, Tanya K; Montalvo, Sheri A, Coburn, Chad
Cc: Spears, Courtney; McGuire, Tyler D; Day, Susan; Mickey Sugg
Subject: [External] 2019-01709 CAMA Major Application: Tanglewood Property Owners
Association
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Good Morning!
On 8/28/19 we received your application for Tanglewood Property Owners Association and have assigned the request
AID number SAW-2019-01709. Currently we do not have a project manager for Brunswick County projects, so I have
forwarded your request to Mr. Mickey Sugg and he will assign it to a project manager within our office.
Thanks! Christy
-----Original Message -----
From: Pietila, Tanya K [mailto:tanya.pietila@ncdenr.gov]
Sent: Wednesday, August 28, 2019 12:42 PM
To: Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Coburn, Chad <chad.coburn@ncdenr.gov>; WilmingtonNCREG
<W ilmingtonNCREG@usace.army.mil>
Cc: Spears, Courtney <courtney.spears@ncdenr.gov>; McGuire, Tyler D <Tyler.McGuire@ncdenr.gov>; Day, Susan
<susan.day@ ncdenr.gov>
Subject: [Non-DoD Source] CAMA Major Application: Tanglewood Property Owners Association
Good afternoon I
Please accept this correspondence as the official distribution of CAMA application from Tanglewood Property Owners
Association for development in Supply, Brunswick County. Attachments include: Field Investigative Report, work plans,
comment sheet, and any other documents intended for you.
NOTE: Please complete the bottom portion of the comment sheet with your information and signature.
NO oversized work plans have been submitted by the applicant
For questions or concerns, please contact Courtney Spears at courtney.spears@ncdenr.gov
<mailto:courtney.spears@ncdenr.gov> or (910) 796-7426.
Thank you!
Tanya
Tanya Pietila
Permit Support Specialist
NC Department of Environmental Quality
NC Division of Coastal Management <Blockedhttp://www.nccoastaImanagement.net/>
127 Cardinal Drive Ext.
Wilmington, NC 28405
Phone:(910)796-7226
Tanya.Pietila@ncdenr.gov <mailto:Tanya.Pietila@ncdenr.gov>
E-mail correspondence to and from this address
may be subject to the North Carolina Public
Records Law and may be disclosed to third parties.
4�3
G °-.°L 0 •l;4x�y,�g�''r � �.�^. '+ /'A�, ,f� '/��e��� �ji� r'}'� "1* 1 •� tl
v+�''��-s�`.'t��-s.j.a`�� ����Z�i���s�P�i_;7�.'�lR �� + 4 xCa y��,a4�➢3+...♦, �'�� ����^..,
JI
0.
°rjrx' ac" �• Elr� Y i °"'tS`�:}ey�'�'-M ..�".. �,� t,�a `a
_71 �� ,•.f ��� � "�'.�'. � =./ --?&ifCF�EI��S-+u4�,1�U� g t
I�Sf4iti"nyntV TJ,414,
�'''.'r,,��
ti ra °:4 �4. ram, ^y '1
Jt
yl-oy-`a .-' y. a '�,r'/r^i_� li ].I �'f '} �'"r •� ''' 7t�'�. .d°a- j-a/-�s`gi`7 �`S
i �14
%- r i d-, vy a> �,1 f •"-Y,r-,y 8 "e y s- +°,', Y � } ]
.�(3OM; . z ��t�L�y' rti gBPettnitb`�on�tlffiatnt � 1� �
-n]„ay .�z�.._..... f sq■( K�'f`9�1�����pp�
Jl YI
"2T�Cardin3
aDdkdE�e,l�lCGfbm�tonEi�C890`?y
� ,
CkfRrQr�9eandl�pcafiolevle,ra4
Ica aqa irfi,k'<yx yx ,a
llCani; " z» TeA91 ohs pertjirOwn sJAss c/ t%R'.) '
r� Ptoj-�r�yafogallon r3We(eaprve,S.ed cb fzA1W�4�mc7pply9t7r�isw�aleim'?ya
O
.s *."+,`*�... x y ti f �. m,sPS' i� rt ..�r� :^ i,,-r, rx»s�7m t' �.,,•_� as � .l
capSgp!'raprsprrn9lb{fetiemp+lissco�ceEt�Gtl�ius'°t '"a. ,
i'1 � s S � � 5 .i � � � '� "by� rLs•y'e i^ w d,"iT w Ynx7 d J °s.} 3 ..,. i3 °° i -
� - pleaa8�dicajielielow�ou�'a�eGby`s�ds�,onorv,evr ,�boiiuie� ro fed' ec%a[id � , `�
iahmwt�ilsformfoCour�tev�nearsafttjd�le5sa6ovebl a emberl2 201 dtfo�r+
iaveanrquestoregarrllp sp[o �j rgiCt,,eon c�Txi�[McGwre<at�(3m0�796,7 ?r�wh6rs 3
1 .!.� P iT- — _'a-1"i � xi S'-' ! *mot, .( }'f " � 7'.r rt i "[ A LZ a-z `� p �' 'A"G••l � �'�1
?REP4Y�S—'�aiage_'�icyhas'noobject,op�iatheProjecEasgp'roasec�s
AddT0*6
-Arngfs
^Xm
, axt '+. +'
l� topznbe� tached'rJ 33� v
f sTh,s ,6q t
o4GYae aravQs �heQmjbcto2ifrecAni�jdddchanges tP, � 4--•,
aieInncoipora�ed fee chi, a 5
- r ��js`a�et>cy abfecTs,�Zhe:��ol�c�3'o�t`XeasonsrdescnFle�f �t�i�ie,a�}�e�edco�,mep>,� V,
-,� � ty- �ti: qrr q^f'a� * r°'may �{�'+J �,s Sav a f3'�j �aa§ "ar;11S �'+,'y�: "L .x '� . "J "'iN+j"}a; •.,pyr i :� '.,1 P't..
Renee k�ledilil` Earle ' -� -" '
fi
l
:.ryYx T'S ". a y t�' x S h ./4K�s`'�� rc° a 3 ✓'.a rtd�+'3 ,d*-9'^°ry�.S* 3 J
cErtc�@+ 4�xState H r� sF �es,(ts rattdit ofrl
a w,d> RECEIVED
SEPi62019
'421,
CM WIL
D MINGTON NC
q , -I, - -� axe z.s L`, y 4:...t ) `� { 'J
+7� yk"J :fr •µ. .�
a�!NerRa.9�.6���'
,:� � _�'°� �-�• ��---•:.,-.ems-m"`_ —_y�. � �`-�.......�-_ a v 4 a _.,_7�'� .:.P-��-�Z.�.-o-�1
Aqpst
fOEMORAND
FKOM
VA:T7-ff:;
I T
Coordinator
t& AlWW, Y! sfikl, Biun-sMdck, Codn&l
�ctuFe%
dh th6 Aifo§M offlect art
f�q p�9j'qi#.«rs..ons-d6sciibedmshdAllbbh6dbo #ft,
RECEIVED
Se 0 4 2019
DCM WILMINGTON, NC
III DocuSign Envelope 10: 28A6F18D-F892-424E-A742-3CF69DABOCEI
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Dtrertor
NORTH CAROLINA
Envtronmenfat Qualify
October 11, 2019
Brunswick County
DWR Project: 2019-1155
Tanglewood Property Owners Association
Mr. Brandon Isenhour
P.O. Box 324
Shallotte NC 28459
Subject Property: Tanglewood Boat Ramp
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Isenhour,
You have our approval, in accordance with the attached conditions and those listed below, to
impact an additional 159 square feet of open waters replace an existing boat ramp and docking
facilities at a private residential docking facility as described in the application received by the
N.C. Division of Water Resources (DWR) on August 28, 2019. After reviewing your application,
we have decided that the impacts are covered by General Water Quality Certification Number
4175 (GC4175).
In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 Permit. This Certification can also be found on line at:
httv://Portal.ncdenr.org/web/wq/swr)/ws/40 I/certsandoermits.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 21-1.0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If
am�D na Q > North Carolina Department of Environmental Quality I Division of Water Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension Wilmington, North Carolina 28405
910.7%.7215
DocuSign Envelope ID: 2BA6FI8D-F892-424E-A742-3CF69DABOCEI
Page 2
Brunswick County
2019-1155
you change your project, you must notify the Division and you may be required to submit
a new application package with the appropriate fee. If the property is sold, the new owner
must be given a copy of this approval letter and General Certification and is responsible
for complying with all conditions. Any new owner must notify the Division and request
the Certification be issued in their name {I 5A NCAC 02H .0501 and .0502).
2. Any final construction plans for this project must include or reference the application and
plans approved by the Division under this authorization letter and certification. The
applicant will also be required to evaluate all acquired permits to assure that they are
consistent and all relative impacts are accounted for and shown on the construction plans.
[15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his
contractors (and/or agents) to comply with all of the terms of this Certification and shall
provide each of its contractors (and/or agents) a copy of this Certification.
3. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded
as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices
must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please
notify this Office if any turbidity issues arise at 910.796.7215
4. This General Certification shall expire on the same day as the expiration date of the
corresponding General Permit. The conditions in effect on the date of issuance of the
Certification for a specific project shall remain in effect for the life of the project, regardless
of the expiration of this Certification.
5. The permittee shall require its contractors and/or agents to comply with the terms of this
permit in the construction and maintenance of this project and shall provide each of its .
contractors and/or agents associated with the construction or maintenance of this project a
copy of this certification. A copy of this certification including all conditions shall be
available at the project site during the construction and maintenance of this project. (15A
NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
6. Continuing Compliance:
The applicant/permittee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with 303(d) of the Clean Water Act), and any other appropriate requirements
of State and Federal law. If the Division determines that such standards or laws are not
being met, including failure to sustain a designated or achieved use, or that State or Federal
law is being violated, or that further conditions are necessary to assure compliance, than
_A DocuSign Envelope ID: 2BA6F18D-F892-424E-A742-3CF69DABOCEI
Page 3
Brunswick County
2019-1155
the Division may reevaluate and modify this General Water Quality Certification. [15A
NCAC 02H .0507(d)]
All mechanized equipment operated near surface waters or wetlands will be regularly
inspected and maintained to prevent contamination of waters and wetlands from fuels,
lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a
hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the
Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional
Office at 910.796.7215 and after hours and on weekends call (800) 858-0368.
Management of such spills shall comply with provisions of the North Carolina Oil
Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and
(c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A].
8. Fueling, lubrication and general equipment maintenance should not take place within 50
feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC
02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)].
9. This certification grants permission to the director, an authorized representative of the
Director, or DEQ staff, upon the presentation of proper credentials, to enter the property
during normal business hours 15A NCAC 02H.0502(e).
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant and/or
authorized agent is required to return a completed certificate of completion form to the
NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617
Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The
certification of completion is available at:
htty://iiortal.ncdenr.orgVwebi'wq/ swp/ws/401 /certsandi)ermitsfapply/forms).
Violations of any condition herein set forth may result in revocation of this Certification and
may result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification shall expire upon expiration of the 404 or CAMA Permit.
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by
filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known as OAH). A petition form may be obtained from the OAH at
http://www.ncoali.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for
information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with
the OAH. A petition is considered filed when the original and one (1) copy along with any
DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI
Page 4
Brunswick County
2019-1155
applicable OAH filing fee is received in the OAH during normal office hours (Monday through
Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition maybe faxed
to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any
applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
Ijsending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DEQ:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Resources under Section 401 of the
Clean Water Act. I.f you have any questions, please telephone Chad Coburn in the DWR
Wilmington Regional Office at (910)796-7379 or Chad.Coburn(amcdenr.eov.
Sincerely,
CDocuSigned by: S " 64
EJAEAI4ACIDC*14...
Morelia Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Enclosure: GC4175
cc: Shane Lippard— Right Angle Engineering (via email)
Tyler Crumbley - USACE Wilmington Regulatory Field Office (via email)
Courtney Spears — DCM Wilmington (via email)
0
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2019-01709 County: Brunswick U.S.G.S. Quad: NC -Holden Beach
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Address:
Telephone Number:
E-mail:
Tanelewood Property Owners Association
Brandonlsenhour
PO Box 324
Sootily, NC 28459
910-512-4803
bwisenpg0l (a),email.co m
Size (acres) 0.06 acres
Nearest Town Sootily
Nearest Waterway AIWW
River Basin Lower Shallotte River
USGS HUC 0304020802
Coordinates Latitude: 33.91451
Longitude:-78.339128
Location description: To replace an existing degraded boat ra
Description of projects area and activity: This verification authorizes the repair and replacement of an existing degraded boat
ramD (1220 square feet). bulkheads (244 square feet) and rioraD (159 square feet) Of imracts to Oren water.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 3. Maintenance
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 7/30/2019, and the enclosed plans entitled, "Tanelewood Boat Ramp, Existing
Conditions and Demolition Plan,' dated 8/2/2019. Any violation of the attached conditions or deviation from your submitted
plans may subject the permittee to a stop work order, a restoration order, a Class 1 administrative penalty, and/or appropriate
legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would -
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact Jordan E. Jessop at 910-2514810or iordan.e.iessopnusace.armv.mil.
Corps Regulatory Official o Dit.201912M1l3150-05110' 150905G6 Date:12/06/2019
m,.azo». nebt ia3iSOP"D
Expiration Date of Verification: 03/18/2022
v
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.arrny.mil/em apa x/f?p=13 6:4:0
Copy furnished:
Agent:
Right Angle Engineering
Shane Lippard
Address:
2 12 Princess Street
Wilmington, NC 28401
Telephone Number:
910-251-8544
E-mail:
bwisenag0M,gmail.com
Permittee: Tanelewood Property Owners Association
Brandon Isenhour
Address: PO Box 324
Supply, NC 28459
Telephone Number: 910-512-4803
E-mail: bwisenagemail.com
Action ID Number: SAW-2019-01709 County: Brunswick
Permittee: Tanelewood Property Owners Association, Brandon Isenhour
Project Name: Tanalewood POA Boat Ramp
Date Verification Issued: 12/06/2019
Project Manager: Jordan E. Jessop
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Jordan E. Jessop
Wilmington Regulatory Office
U.S Army Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403
or
jordan.e.jessop@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
NORTH CAROLINA
Environmental Quality
October 11, 2019
Brunswick County
DWR Project: 2019-1155
Tanglewood Property Owners Association
Mr. Brandon Isenhour
P.O. Box 324
Shallotte NC 28459
Subject Property: Tanglewood Boat Ramp
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Isenhour,
You have our approval, in accordance with the attached conditions and those listed below, to
impact an additional 159 square feet of open waters replace an existing boat ramp and docking
facilities at a private residential docking facility as described in the application received by the
N.C. Division of Water Resources (DWR) on August 28, 2019. After reviewing your application,
we have decided that the impacts are covered by General Water Quality Certification Number
4175 (GC4175).
In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 Permit. This Certification can also be found on line at:
http://portal.ncdenr.ora/web/wq/swp/ws/40 I/certsandpermits.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If
North Carolina Department of Environmental Quality I Division of water Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 29405
^'�+, �\ �✓ %0.796.7215
DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCE1
Page 2
Brunswick County
2019-1155
you change your project, you must notify the Division and you may be required to submit
a new application package with the appropriate fee. If the property is sold, the new owner
must be given a copy of this approval letter and General Certification and is responsible
for complying with all conditions. Any new owner must notify the Division and request
the Certification be issued in their name {I 5A NCAC 02H .0501 and .0502}.
2. Any final construction plans for this project must include or reference the application and
plans approved by the Division under this authorization letter and certification. The
applicant will also be required to evaluate all acquired permits to assure that they are
consistent and all relative impacts are accounted for and shown on the construction plans.
[15A NCAC 021-1.0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his
contractors (and/or agents) to comply with all of the terms of this Certification and shall
provide each of its contractors (and/or agents) a copy of this Certification.
3. Turbidity Standard
The turbidity standard of 25 NTUg (Nephelometric Turbidity Units) shall not be exceeded
as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices
must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please
notify this Office if any turbidity issues arise at 910.796.7215
4. This General Certification shall expire on the same day as the expiration date of the
corresponding General Permit. The conditions in effect on the date of issuance of the
Certification for a specific project shall remain in effect for the life of the project, regardless
of the expiration of this Certification.
The permittee shall require its contractors and/or agents to comply with the terms of this
permit in the construction and maintenance of this project and shall provide each of its
contractors and/or agents associated with the construction or maintenance of this project a
copy of this certification. A copy of this certification including all conditions shall be
available at the project site during the construction and maintenance of this project. [15A
NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
6. Continuing Compliance:
The applicant/permittee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with 303(d) of the Clean Water Act), and any other appropriate requirements
of State and Federal law. If the Division determines that such standards or laws are not
being met, including failure to sustain a designated or achieved use, or that State or Federal
law is being violated, or that further conditions are necessary to assure compliance, than
DocuSign Envelope ID: 28A6F18D-FB92-424E-A742-3CF69DABOCEt
Page 3
Brunswick County
2019-1155
the Division may reevaluate and modify this General Water Quality Certification. [15A
NCAC 02H .0507(d)]
7. All mechanized equipment operated near surface waters or wetlands will be regularly
inspected and maintained to prevent contamination of waters and wetlands from fuels,
lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a
hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the
Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional
Office at 910.796.7215 and after hours and on weekends call (800) 858-0368.
Management of such spills shall comply with provisions of the North Carolina Oil
Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and
(c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A].
8. Fueling, lubrication and general equipment maintenance should not take place within 50
feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC
02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)].
9. This certification grants permission to the director, an authorized representative of the
Director, or DEQ staff, upon the presentation of proper credentials, to enter the property
during normal business hours 15A NCAC 02H.0502(e).
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant and/or
authorized agent is required to return a completed certificate of completion form to the
NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617
Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The
certification of completion is available at:
http•//portal nedenr org/web/wq/swp/ws/401/certsandpermits/apply/forms).
Violations of any condition herein set forth may result in revocation of this Certification and
may result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification shall expire upon expiration of the 404 or CAMA Permit.
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by
filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known as OAH). A petition form may be obtained from the OAH at
http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for
information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with
the OAH. A petition is considered filed when the original and one (1) copy along with any
DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI
Page 4
Brunswick County
2019-1155
applicable OAH filing fee is received in the OAH during normal office hours (Monday through
Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition may be faxed
to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any
applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DEQ:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Resources under Section 401 of the
Clean Water Act. If you have any questions, please telephone Chad Coburn in the DWR
Wilmington Regional Office at (910)796-7379 or Chad.Coburrigncderingov.
Sincerely,
O SlgneC by:
E
E3ABA1dAC]nC630...
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Enclosure: GC4175
cc: Shane Lippard — Right Angle Engineering (via email)
Tyler Crumbley - USACE Wilmington Regulatory Field Office (via email)
Courtney Spears — DCM Wilmington (via email)
DocuSign Envelope ID: 28A6F18D-F892-424E-A742-3CF69DABOCEI
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
NORTH CAROLINA
Environmental Quality
August 19, 2019
MEMORANDUM.
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Fax: 910-395-3964 (Courier 04-16-33)
courtnev.sDears(a-ncdenr.00v
SUBJECT: CAMA/Dredge and Fill Application Review
BRAXTON DAVIS
Director, Division of Coastal
Managemenr
Applicant: Tanglewood Property Owners Association
Project Location: 3185 Waterview Drive SW, adjacent to AIWW, in Supply, Brunswick County
Proposed Project: replace existing boat ramp and associated structures
Please indicate below your agency's position or viewpoint on the proposed project and
retum this form to Courtney Spears at the address above by September 0 2019. If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7424 when
appropriate, in-depth comments with supporting data is requested.
REPLY: _X_ This agency has no abjection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
RINT NAkk_Morella Sanchez -King
p ENCY _DWR
Docusltmcd W.
Cti'°v�U� Ste, 64
IGNATUR E3ABA76AC7DC439...
10/14/2019
6ATg�
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Fz ., Wilmington, NC 28405 919 796 7215
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Tanglewood POA c/o Brandon Isenhour
2. LOCATION OF PROJECT SITE: 3185 Waterview Drive SW, near Supply in Brunswick County,
adjacent to the AIWW
PHOTO INDEX: 2006 M-6586 4-6214 1-4-5 & M4-5
LATITUDE: 33° 54' 53" N LONGITUDE: 78° 20' 18.6" W
3. INVESTIGATION TYPE: CAMA/D&F
4.
S.
6.
7
INVESTIGATIVE PROCEDURE:
PROCESSING PROCEDURE:
Date of Site Visit:
Applicant/Agent Present:
Application Received:
Application Completed:
Office:
August 7, 2019
NO
June 10, 2019
August 19, 2019
Wilmington
SITE DESCRIPTION:
(A) Local Land Use Plan: Brunswick County
Land Classification From LUP: Residential (R-6000)
(B) AEC(s) Involved: ES, PTS, CW, EW, & PTA
Water Dependent: YES
(C) Intended Use: Private Residential Community Boat Ramp & Docking Facility
(D) Wastewater Treatment: Existing — Municipal
Planned — N/A
(E) Type of Structures: Existing — Boat Ramp & Docking Facility
Planned — Replace Boat Ramp & Associated Structures
(F) Estimated Annual Rate of Erosion: N/A
HABITAT DESCRIPTION: [AREA]
DREDGED FILLED IMPACTS
122
(A) Uplands
N/A
N/A
ft2 (Bulk eadsj
60 2 (Pier)
(B) Vegetated Wetlands
N/A
N/A
N/A
(C) Open Water
N/A
N/A
1220 ft2 Boat Ram )
244 ft2 SBulkheads�
159 ft (Rip Rap)
(D) Total Area Disturbed: 2,765 ft2 (0.06 Acres)
(E) Primary Nursery Area: NO
(F) Water Classification: SA; HQW
(G) Shellfish Harvesting Open: YES
8. PROJECT SUMMARY: The applicant is proposing to replace the existing boat ramp and associated
structures of the Tanglewood Property Owner's Association (POA) private residential community docking
facility along the Atlantic Intracoastal Waterway (AIWW).
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
DCM Coordinator: Permit #: —Iq
MAHdNG DISTRIBUTION SHEET
Permittee: ( wlQ r u�av t�/i G�c� �ris/o� n ./sCN � /�O 3qc �i o Z�N�,n
Agents: 1-Yi / bu--)L6234
DCM Field Offices
Elizabeth City (with revised work plan drawings)
Morehead City
Washington
Wilmington Tnrq ( r I-e'
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecoommee (NC DOT -Remainder ECity/Washington District)
Wilmington: �mbTey ru swick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply: Clif Whitfield (WARD)
Marine Fisheries:
NC DOT: David Ha
Shellfish Sanitation: Shannon Jenkirl�
State Property: Tim Walton / Mike Moser
DEMLR/DWR: Sheri Montalvo / Shelton Swan
Washington: Anthony Scarbraugh-401
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington:
Wildlife Resources:
Natural Heritage Program
LPO:
Robb Mairs — 401 (Carteret, Onslow, Pender)
Chad Coburn — 401 (Brunswick, New IUngv
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Maria Dunn (WAS
Rodney Bu�
Fax Distribution: Permittee #: Agent#
(NCDOT) Travis Wilson
oclM Mr-1
APPLICATION for
Major Development Permit
(last revised 12/27106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. PrimaryApplicant/ Landowner Information
Business Name
Project Name (if applicable)
Tanglewood Property Owners Association
Tanglewood Boat Ramp
Applicant 1: First Name
MI
Last Name
Brandon
Isenhour
Applicant 2: First Name
MI
Last Name
tl additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
city
State
PO Box 324
324
Shallotte
NC
ZIP
Country
Phone No.
FAX No.
28459
USA
910-512-4803 ext.
Street Address (d Werent font above)
City
State
ZIP
3185 Waterview Drive
Supply
NC
Email
bwisenqg0l@gmaii.com
2. Agent/Contractor Information
Business Name
Right Angle Engineering, Pc
Agent/ Contractor 1: First Name
MI
Last Name
Shane
Lippard
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
212 Princess Street
Wilmington
NC
ZIP
Phone No. 1
Phone No. 2
28401
910 - 251 -
8544 ext.
- - aid.
FAX No.
Contractor #
NIA
Street Address (d ddiiinint from above)
City
State
ZIP
Email
bwisenqg0l@gmail.com
.vw
RECEIVED
<Form continues on back> JUL 3 0 2019
SEP 112019 t�rT
252-8a.8 fAMHO (!Ity-4RCOAST .. www.neeoastalmanagemen .IQ ON, NC
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
3185 Waterview Drive, SW
Subdivision Name
City
State
Zip
Tanglewood
Supply
NC
28462 -
Phone No.
Lot No.(s) (If many, attach additional page with list)
910 - 512 - 4803 ext.
I I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber
Atlantic Intracoastal Waterway
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project she.
❑Natural ®Manmade ❑Unknown
Atlantic Intracoastal Waterway
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
Brunswick County
4.
Site Description
a.
Total length of shoreline on the tract (8.)
b. Size of entire tract (sq.8.)
340 LF
N/A common area - 0.41 ac.
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
N/A I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
5.2 above, -3.5 below IRNHW or ❑NWL
e.
Vegetation on bad
grass, trees
I.
Man-made features and uses now on tract
Boat ramp, dock, pier and gazebo
g.
Identity and describe the existing land uses adjacent to the proposed project site.
3183 Waterview Drive - residential; 3189 Waterview Drive - residential
It.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
CO-R-6000
(Attach zoning compliance cerfificate, if applicable)
®Yes ❑No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ONA
National Register listed or eligible property? RECEIVED
<Form continues on next page> JUL 3 0 2019
::DIVED
CC".4 WILMINGTON, NC
252-808.2808 :: 1-888-4RCOAST :. MrWInUNTstalmanagement.not
DCM-MHD CITY
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ❑No
(ii) Are there coastal wetlands on the sfte? ®Yes [:]No
(III) If yes to either (1) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
N/A
o. Describe existing drinking water supply source.
N/A
p. Describe existing storm water management or treatment systems.
N/A
5. Activities and Impacts
a. Will the project be for commercial, public, or private use?
❑Commercial ❑PubliclGovemment
®Privale/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Same as existing. Community boat ramp for Tanglewood Subdivision.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Existing ramp wooden bulkhead and concrete ramp will be removed by excavator.
Sheet piles to be driven by pile
driver and concrete poured to create a new ramp in the same location. Temporary
coffer dam 192' long required to
pour concrete below MHW.
d. List all development activities you propose.
Removal of existing boat ramp. Replace with new concrete boat ramp and bulkheads.
e. Are the proposed activities maintenance of an existing project, new work, or both?
both
f. What is the approximate total disturbed land area resulting from the proposed project?
2,508 ®Sq.FI or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
I. Will wastewater or storrnwater be discharged into a wetland?
❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
[]Yes ❑No ❑NA
J. Is there any mitigation proposed?
[]Yes ®No ❑N.pECEIVED
R
If yes, attach a mitigation proposal.
<Form continues on back> .
NED JUL 3 0 ZUt'
DCr.^. WILMINGTON, PC
SEP 11 nnin
252-808-2808 :: 1-888-4RCOA3T :: www.n000astelmanagement.net
DCKI-MHD CITY
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In adddion to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
Instruction booklet on how to property prepare fhe required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Glenn 8 Camilla Woodcock Phone No.
Address 3251 Withering Heights Dr., Newton, NC 28668
Name Alvin Jernigan Phone No. 910-842-9147
Address 3189 Waterview Drive SW, Supply, NC 28462
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permitlee, and issuing dates.
None
h. Signed consultant or agent authorization form, if applicable.
I. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _5/15/2019 Print Name _Tanglewood PDA, Brandon Isenhour
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development RECEIVED
MDCM MP-4 Structures Information
TM RECEIVED JUN 10 2019
252-808.2808 .. 1-888-4RCOAST .. www. ccoastaimanagement.net
DCM-MHD CITY
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
stabilization
Length
109
Width
20
vg. Existing
0.5 MLW
NA
NA
epth
anal Project
0.5 MLW
NA
NA
pth
1.
EXCAVATION
El This section not applicable
a.
Amount of material to be excavated from below NHW or NWL in
b.
Type of material to be excavated.
cubic yards.
soil and concrete
136
c.
(i) Does the area to be excavated include coastal wetlandslmarsh
d.
High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
D
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ®None
(ii) Describe the purpose of the excavation in these areas:
2.
DISPOSAL OF EXCAVATED MATERIAL
❑This section not applicable
a.
Location of disposal area.
b.
Dimensions of disposal area.
disposal of concrete and debris at landfill
N/A
c.
(1) Do you claim title to disposal area?
d.
(i) Will a disposal area be available for future maintenance?
❑Yes ❑No ®NA
[]Yes ❑No ®NA
(II) If no, attach a letter granting permission from the owner.
(ii) If yes, where?
e.
(i) Does the disposal area include any coastal wetlandstmarsh
f.
(I) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes ®No ❑NA
or other wetlands (WI-)? If any boxes are checked, provide the
number of square feet affected.
(ii) If yes, how much water area is affected?
❑CW ❑SAV 0S13
OWL ®None
(ii) Describe the purpose of disposal in these areas:
RECEIVED RECEIVED
SEP 1 1 2019 JUL 3 0 2019
DCM-n9HD CITY P1`.! W1L"riNGTeN, NC
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
revised: 12/26I06
Form DCM MP-2 (excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ❑This section not applicable
(If development is a wood groin, use MP-4 — Structures)
a. Type of shoreline stabilization: b. Length: 187, 7.5,
®Bulkhead ®Riprap ❑BreakwaterlSill ❑Other. Width: Y. 21.25,
C Average distance watenward o1 NHW or NWL 67' d. Maximum distance waterward of NHW or NWL: 62'
e. Type of stabilization material:
PVC sheet pile, Rip Rap Store
g. Number of square feet of fill to be placed below water level.
Bulkhead backfll 1220(conc. ramp) Riprap 159
Breakwater/Sill Other
i. Source of fill material.
concrete tuck pour, store quarry
I. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ®No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
concrete and rip rap
4. OTHER RILL ACTIVITIES ® This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? Oyes ❑No ❑NA b. (i) Will fill material be placed in coastal wellands/mamh (CM.
It yes,
(ii) Amount of material to be placed in the water
(III) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(n) Describe the purpose of the fill in these areas:
a. How will excavated or fill material be kept on site and erosion b. What type of construcllon equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
any stockpiles out of My buffer In parking area excavator, pile driver, concrete truck
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) It yes, explain what type and how they will be implemented.
d. (p Will wetlands be crossed in transporting egrupmenl to project
site? ❑Yes ®No ❑NA
(a) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
5/1512019 Tangle od Property Owners Association, Brandon Isenhour
Date t a RECEIVED
Tanglewood Boat Ramp
project dame ApplicU
IT 11-Y�'"^`9 ant JUl 3 0 2019
PC'.' 1NILMINGTON, NC
RECEIVED
282.808.2808:: 1.088-4RCOAST :: www.nccoastaimanaeemenx.,w� revised: 12/28100
SEP 1 1 2019
DCM-41HD CITY
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facilitylmanna:
❑Cornmerclal ❑Public/Govemment OPrivate/Community
c. (p Dock(s) and/or piers)
(it) Number
1
(III) Length
20
(iv) Width
3
(v) Floating
❑Yes ONO
a. (1) Are Platforms included? ❑Yes ®No
If yes:
(it) Number
(III) Length
(iv) Width
(v) Floating ❑Yes ❑No
Note: Roofed areas are calculated from dnpline dimensions.
g. (i) Number of slips proposed
0
(ii) Number of slips existing
2
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water; dredging for basin and/or channel
®Open water, no dredging required
❑Other; please describe:
k. Typical boat length: 20'
m. (i) Will the facility have tie pilings?
❑Yes ONO
(ii) If yes number of lie pilings?
❑This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes ®No
d. (i) Are Finger Piers included? ❑Yes ONO
If yes:
(ii) Number
(III) Length
(Iv) Width
(v) Floating Oyes ONO
f. (i) Are Boatlits included? ❑Yes ®No
If yes:
(it) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lit and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage (Wet slips') only, number of slips: 2
❑ Dry storage; number of boats:
® Boat remp(s); number of boat ramps: 1
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
mixed
I. (i) Will the facility be open to the general public?
❑Yes ®No RECEIVED
RECEIVED AUG 8 2019
SEP 1 1 2019 DCM WILMINGTON, NIC
_.,a- M.ae..,DCM-MHDCITY
flr,:P-4 (Strt..
2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpouk Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge'signs proposed.
(ii) Give the location and number of'Pumpout Available' signs proposed.
1. Describe the special design, H applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
It. Give the number of channel markers and 'No Wake' signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^ 8 [019
❑Yes [:]No zECEIVED �Vu
rH9 RCM WiLMINGTON, NC
ii;i1A•F,�HD CITY
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
[]Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑cW ❑sAv ❑SB
❑WL ❑None
p. Is the proposed marinaldocking facility located within orwilhin close proximity to any shellfish leases? []Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (I) Is the boathouse stmctum(s):
❑Commercial ❑PublicfGovemment ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Rippled areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable
a. (I) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheelpile, etc.) ®This section not applicable
a. Length b. Average distance from NFIW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private/Cornmunity
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
RECEIVED
AUG 8 2019
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
0. Greater than 15'
Note: For buoy or mooring piling, use arc of swing including length
of vessef
c. Width of water body
504'
e. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
d. Water depth at watenxard end of structure at NLW or NWL
NA due to existing structures.
18. OTHER ®This section not applicable
a. Give complete description:
8• 5'
Date
Tgnl;� s"401_ Beak Ra. ..b
Project Name
Applicapt-Narpe
Applicant Signa
RECEIVED
SEP 1 1 2019
DCM-N1HD CITY
REC5NED
AUG 8 2019
DCM WILMINGTON, NC
,,.,�aroomczn .n •.
F"I" , - Pb
Tanglewood Property Owner's Association c/o Brandon Isenhour
Page 2
9. PROJECT DESCRIPTION
The applicant's property is located at 3185 Waterview Drive SW in Supply, Brunswick County along the
AIWW. To locate the project site from the Wilmington Regional Office (WiRO), travel southwest from
Wilmington to Supply on US 74 W (Martin Luther King Jr Pkwy) & US 17 S for approximately 35 miles
until you reach Mt Pisgah Road SW and take a left to head towards Holden Beach. Travel about 4 miles
down Mt Pisgah Road SW until you reach Oxpen Road SW on the right, just after NC 130 comes into Mt
Pisgah Road SW. Go down Oxpen Road SW for about one and three quarters of a mile until you reach
Boones Neck Road SW. Take a right onto Boones Neck Road SW and continue about a mile and you
will reach W Tanglewood Drive SW on your left. Go left onto W Tanglewood Drive SW and you are now
in the Tanglewood Community. Travel almost half a mile to the end of W Tanglewood Drive SW and you
have reached Waterview Drive SW. Turn left onto Waterview Drive SW and travel to the end of the road
and you have reached the project site of the Tanglewood Community Boat Ramp & Docking Facility
located on your right. The project site is bordered by residential properties to the north and west, a tidal
creek to the east, and the AIWW to the south.
The project site is comprised of one parcel totaling approximately 0.41 acres in size and the elevation is
approximately 5.2' above normal high water (NHW) as reported by the applicant. There is approximately
340' of shoreline along the AIWW and tidal creek surrounding the property. The east shoreline adjacent
to the tidal creek has been stabilized with rip rap. Coastal Wetland vegetation is present waterward of
the existing rip rap along the shoreline around the entire parcel and consists primarily of Smooth Cord
Grass (Spartina alterniflora). Currently the high ground of the project site is vegetated primarily with lawn
grasses and mature oak trees and supports the community boat ramp and docking facility by a gravel
driveway. There is also a gazebo located to the west of the boat ramp on the high ground of the property
totaling approximately 215 ftz that leads to the community docking facility. An existing private community
docking facility extends from the natural shoreline and the gazebo out into the AIWW and includes a pier,
two fixed platforms, and a finger pierthat leads to the floating dock that supports 2 boat slips. The existing
docking facility extends into the western adjacent 15' riparian corridor setback and beyond the riparian
corridor line as reported by the applicant. An existing boat ramp with associated structures including two
stabilizing wooden bulkheads, an adjacent fixed pier, and a single mooring piling is located in the center
of the property and provides access to the AIWW. The applicant states that the waterbody measures
approximately 504' wide in this location of the AIWW with a water depth of -3.5' at mean low water (MLW)
at the waterward end of the existing boat ramp.
The Brunswick County Land Use Plan classifies the area in the vicinity of the project area as Residential
(R-6000). The waters in the project area are classified as SAIHQW by the N.C. Division of Water
Resources (DWR). The waters are not designated as a Primary Nursery Area (PNA) by the N.C. Division
of Marine Fisheries (DMF), and they are open to the harvest of shellfish.
10. PROPOSED PROJECT
The applicant is proposing to replace the existing boat ramp and associated structures of the Tanglewood
POA private residential community docking facility along the AIWW. Before demolition of the existing
boat ramp and wooden bulkheads, the applicant states a turbidity curtain would be installed to prevent
materials from accidentally leaving the project site. The existing boat ramp and wooden bulkheads would
be removed using an excavator and disposed of at the landfill. The 91 ft2 section of concrete connected
to the boat ramp leading to the existing adjacent wooden pier would be removed and not replaced due
to not serving as a functioning section of the boat ramp (See Sheet Cl). Excavated materials would be
temporarily stockpiled out of the 30' Coastal Shoreline Buffer in the parking area of the gravel driveway
using erosion and sediment control practices including silt fencing. After they have dewatered, the spoils
would be trucked to the landfill for disposal.
SEP 1 1 2019
Once removed, the applicant proposes to replace the boat ramp in the same footprint with dimensions
approximately 109' in length by 20' in width (See Sheet C2). Before the new boat ramp can be
constructed, two new vinyl bulkheads are proposed to stabilize the sides of the boat ramp. The proposed
vinyl bulkheads would each measure approximately 91.5' in length and 2' in width and terminate at the
waterward end of the boat ramp. After the proposed vinyl bulkheads have been pile driven into the
substrate and constructed, a temporary sheet pile coffer dam is proposed around the limits of disturbance
for the boat ramp replacement. Once the temporary sheet pile coffer dam has been constructed around
the limits of disturbance for the proposed replacement of the boat ramp, the applicant proposes to
construct a new boat ramp using a concrete truck to pour the concrete in place. The concrete would be
poured within the control joints of the temporary coffer dam and vinyl bulkheads to construct the new boat
ramp in the same location. After the concrete has dried and the boat ramp has been constructed, the
applicant proposes to remove the temporary coffer dam and turbidity curtain and add rip rap 1' thick at
the waterward end of the boat ramp approximately 21'/4' in length and 7'/2 in width to prevent boat
propeller washing from launching and loading vessels. Where the 91 ft2 section of concrete would be
removed from the high ground, the applicant proposes to replace this section of the boat ramp with a
fixed wooden pier connecting to the existing wooden pier adjacent to the boat ramp. The proposed pier
would measure approximately 20' in length and 3' in width totaling approximately 60 ft2.
11. ANTICIPATED IMPACTS
The proposed boat ramp replacement and associated structures would disturb a total area of
approximately 2,765 ft2. A total of approximately 1,142 ft2would be disturbed within the high ground
portion of the property in the 75' Estuarine Shoreline Area of Environmental Concern (AEC). The
proposed boat ramp would result in approximately 960 ft2 of disturbance on high ground within this AEC.
The proposed vinyl bulkheads would result with a high ground disturbance of approximately 122 Wand
the proposed pier addition would result in approximately 60 ft2 of disturbance to this AEC. A total of
approximately 1,623 ft2 would be disturbed over open water within the Estuarine Waters & Public Trust
Areas AECs. Approximately 1220 ft2 of open water within this AEC would be disturbed by the
replacement of the proposed boat ramp. The proposed vinyl bulkheads would result in an open water
disturbance of approximately 244 ft2 and the proposed rip rap would result in approximately 159 ft2 of
disturbance to this AEC. The boat ramp and associated structures would not encroach into either of the
15' riparian corridor setbacks. As proposed, there would not be a potential for bottom disturbances such
as accidental dredging or displacement of the substrate by prop -washing from vessel propellers to utilize
the boat ramp at periods of low tide due to adding rip rap 1' thick at the end of the boat ramp. Minor
increases in turbidity should be expected during construction. There appears to be no Submerged
Aquatic Vegetation (SAV) nor shellfish beds in the project area. This area is a not a Primary Nursery
Area (PNA) and is open to the harvest of shellfish by the Division of Marine Fisheries (DMF).
Submitted by: Tyler McGuire Date: August 19, 2019 Office: Wilmington
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
DESIGN NARRATIVE FOR TANGLEWOOD SUBDIVISION
BOAT RAMP REPLACEMENT
BRUNSWICK CO., N.C.
June 2019
TABLE OF CONTENTS
1.0 General Information
2.0 Site Description
3.0 Project Description
4.0 Environmental Impacts
5.0 Erosion Control Considerations
6.0 Construction Schedule
APPENDIX
PROJECT AREA TOTALS
FIGURES
QUAD SHEET
CONSTRUCTION PLANS
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
RECEIVED
JUN 10 2019
DCM WILMINGTON, NC
Tanglewood Boat Ramp Replacement
June 2019
General Information
a. Tanglewood Subdivsion Ramp Replacement
b. 3185 Waterview Drive, Supply, NC
c. 0.41 Acres on Project Site
d. 0.06 Acres to be Disturbed for this project
e. Wetlands
1. Coastal Wetlands do exist on the site and shown on plans.
2. No wetlands will be impacted by this project.
f. Ownership — Tanglewood Subdivision Property Owners Association
P.O. Box 324
Shallotte, NC 28459
g. Description of Development
The Tanglewood Subdivision is a residential area in the unincorporated
district of Brunswick County along the ICWW close to Holden Beach.
The subdivision was created with a community boat ramp in
approximately 1970. There are existing lakes, roadways, pier, floating
dock, gazebo, and concrete ramp.
This project proposes to replace the existing wooden bulkhead concrete
ramp with new PVC sheetpile bulkhead and new concrete.
h. Pre-1988 Built Upon Area, If Applicable — None in this project.
I. This project will be one phase.
j. Sewer for the site is existing municipal. Water supply is existing
municipal system.
k. No historic sites exist within the project.
I. There are no non-compliance issues known.
2. Site Description: The project site is in Brunswick County, NC.
The existing subdivision is located around existing freshwater lakes with a number of
lots running along the ICWW. The HOA maintains ownership of one lot at the ICWW
that has water access amenities. The amenities include a boat ramp, pier, floating
dock, and gazebo.
RECEIVED
Land use in the vicinity is primarily residential with some commercial.
SEP 11 2019
3. Proiect Description: DCM-MHD CITY
The proposed project is to remove the existing wooden bulkhead that holds the concrete
ramp in place. All of the existing concrete will be removed as well. Once the existing
ramp items are gone, then new PVC sheet piles will be installed with vibratory pile
driver. Then concrete will be poured back between the sheetpiles to create the new
RECEIVED
Tanglewood Boat Ramp Replacement June 2019 JUN 10 2019
DCM WILMINGTON, NC
ramp. #57 Stone will be placed off the end of the concrete to prevent boat propeller
wash when loading/unloading vessels. No canal will be dredged at the ramp.
4. Environmental Impacts
The project will disturb only 0.06 acres of land along the ICWW which will comply with
the NCDENR requirements of the Sediment Erosion Control rules. The only area to be
disturbed will be the amount necessary to completely remove the existing ramp. There
will be no impervious areas constructed within 50' of the mean high water line.
5. Erosion Control Considerations: The following erosion control measures are
used on this project:
Temporary Gravel Construction Entrance/Exit
To prevent sediment from leaving the site, temporary gravel construction entrance
should be installed where Road enters the site. For dimensions and specifications,
see construction details.
2. Floating Boom
A floating boom turbidity curtain will be installed around the work area to prevent
disturbed materials from floating away from the work area.
6. Construction Schedule:
1. Obtain plan approval and other applicable permits.
2. Hold pre -construction meeting at least one week prior to beginning construction.
3. Install temporary construction entrance/exits.
4. Before demolition, install turbidity curtain.
5. Begin demolition.
6. Install sheet piles.
7. Fill concrete as needed to accomplish finish grades.
8. All erosion and sediment control practices will be inspected bi-weekly and after each
rainfall event. Needed repairs will be made immediately.
END OF PLAN
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
RECEIVED
1 �i 701�
Tanglewood Boat Ramp Replacement
June2019 DCM WILMINGTON, NC
RIGHT ANGLE
�—� ENGINEERING, PC
212 Princess Street Wilmington, NC 28401 Tel. (910) 251-8544
June 10, 2019
To: Debbie Wilson
NCDEQ — Division of Coastal Management
127 Cardinal Drive Ext.
Wilmington, NC 28405
Re: CAMA Minor Permit Application
Tanglewood POA Ramp Replacement
Shallotte, NC
Dear Ms Wilson,
Fax (910) 251-2208
The existing Tanglewood neighborhood boat ramp is in severe deterioration of the driving
surface, wood bulkheading, and rutting out of the material at the bottom of the ramp as well. The
POA wishes to repair the ramp by installing new vinyl sheetpile and new concrete surface to get
the ramp back to its full service of providing water recreational access to the ICWW.
We believe this repair will be of little environmental impact by keeping the same footprint of the
existing ramp. No other ramp or dock work is proposed at this time. The proposed work will be
conducted after Labor Day (September 2, 2019).
Enclosed are two sets of 11"x17" construction plans, application, and $400 application fee.
Please let me know if you have further questions or comments.
Thank you,
Shane Lippard, P.E. '
Vice President
Right Angle Engineering, PC
"N F
JUN 10 2019
RECEIVED
SEP 11 2019
DCM-MHD CITY
RECEIVED
DCM WILMINGTON, NC
I
BODY. i1Gr
0646 0378
!-U RAT 14 "! 2 23
STATE OF NORTH CAROINA
COUNTY OF BRUNSWICE�!Lr„
TSIS DEED, Made and entered into this 310 day of
,March, 1986, by and between DENNIS 6 THOMPSON# INC., a North
Carolina Corporation, party of the first part; and TANGLEWOOD
PROPERTY OWNERS ASSOCIATION, INC., a North Carolina
Corporation, P, 0, Box 324, Shallotte, North Carolina 28459,
party of the second part;
W I T N E S S E T H
THAT the said party of the first part, for and in
consideration of the sum of TEN DOLLARS ($10.00) ADD OTH.tR
VALUABLE CONSIDERATIONS to it in hand paid, the receipt of
which is hereby acknowledged has remised and released and by
these presents does remise, release and forever quitclaim unto
the party of the second part, its successors and assigns, all
right, title and interest of the said party of the first part
in and to those certain tracts or parcels of land lying and
being in the County of Brunswick and State of North Carolina,
in Lockwood Folly Township, and more particularly described as
TRACT 1;
Alf streets lying within the subdivision (Tanglewood,
Tanglewood, Section 1, and North Tanglewood), all as shown
on the various maps of subdivision, to wit: Map Book 10,
Page 115, Map Book 11, Page 29; Map Cabinet I, Page 131;
and Map Cabinet O, Page 210 of the Brunswick Registry.
TRACT 2•
All lakes within the subdivision and shown on the maps of
the subdivision, to wit: Map Book 10, Page 115; Map Book
11, Page 29; Map Cabinet r, Page 131; and Map Cabinet O,
Page 210 of the Brunswick Registry.
i RECEIVED
TRACT 3:
i
All drainage ditches constituting a portion of the property
as shown on the maps of the subdivision, to wit: Map Book
i 1
;
10, Page 115; Map Book 11, Page 29; Map Cabinet I, Page
1
SEP 1 2019
1
131; and Map Cabinet O, Page 210 of the Brunswick Registry.
- TRACT 4:
I
OCM-MHD CITY
All that certain area designated as 'Public Area", lying
west of Lot i58 as shown on the map recorded in Map Book
j
11, Page 115 of the Brunswick Registry.
TRACT 5:
RECEIVED
All that certain parcel lying between Lots 34 and 35, which
serves as an accessway to the U.S. Intracoastal Waterway as
I
fI
shown on the map recorded in Map Cabinet I, Page 131,
JUN 1 0 019
Brunswick Registry.
PREPARED BY DCMIWILMINGTON,
MASON H. ANDERSON
NC
ATTORNEY AT LAW
i
Boor. P :re
064E 0379
TRACT 6:
A t at parcel designated as 'Parking' on the map recorded
in Map Cabinet I, Page 131, Brunswick Registry,
TRACT 7:
A 1 that area designated as •Boat Ramp- and surrounding
area on the plat recorded in Map Cabinet I, Page 131,
Brunswick Registry.
with regard to Tracts 6 and 7, this conveyance is
specifically made subject to the right to use these
facilities which has been heretofore granted to property
owners of windy Point Park Subdivision, a plat of which
duly appears in Map 11 , Page —U_, under agreement duly
recorded in Book 437, Page 676, Brunswick Registry.
With regard to Tract 1 (Streets), Tract 5 IAccessway),
Tract 6 (Parking), Tract 7 (Boat Ramp), the Grantor does
specifically hereby reserve for itself, its successors and
assigns, the right at its discretion, without obligation,
to develop future phases of adjoining property and to
constitute such future phases as a part of the subdivision
and thereby grant to the property owners in such future
phases the right of access over and along the streets
herein conveyed and the right of use of the accessway to
the Intracoastal waterway and the right of use of the boat
ramp and attendant parking areas to the same extent as the
property owners in the presently existing sections of the
subdivision as described in this deed of conveyance. The
Grantor further reserves the right of ingress and egress
over and along all these parcels as it deems expedient to
carry out any future construction in any future phase or
phases.
The Grantor specifically reserves the right to maintain the
subdivision identification signs at the entrance of the
street from the State Highway, said right to include the
right of maintenance and repair and the access necessary to
do such maintenance and repair.
By acceptance of this deed of conveyance Grantee hereby
acknowledges that Grantor as Developer of the Subdivision
at this time retains ownership of approximately 200
separately numbered and identified lots within the
subdivision and therefore does hereby covenant that it will
enact no rule or regulation which will allow obstruction or
impairment of the use of the streets or any of the other
areas described in this deed and further that if any
individual property owner places or attempts to place any
such obstruction or impairment, to cause such obstruction
or impairment to be removed. In the event Grantee fails to
enforce this provision, Grantor reserves the right to
remove such obstruction or impairment and to charge the
cost thereof to Grantee.
TO HAVE AND TO HOLD the aforesaid tracts or parcels of
land all privileges thereunto belonging to it the said party of
RECEIVED
SEP 11 Z019
the second part and its successors and assigns free and I CM—M H D CITY
discharged from all right, title, claim or interest of the said
party of the first part or anyone claiming by, through or under
it. RECEIVED
JUN 10 Z019
I
DCM WI(MINGTON, NC
Doug _ f46E
0646 038D
IN TESTIMONY WHEREOP, the said party of the first part
has caused this deed to be signed in its corporate name by its
President and attested by its Secretary -Treasurer and sealed
with its corporate seal on the day and year first above written.
DENNIS b THOMPSON, INC.
By:
President
CAROLINA
BRUNSWICK
I, FAARAeZ5 T. Nftt)_rAjZ. . a Notary Public of the
County and State aforesaid, certify that HARRIET I. THOMPSON
personally came before me this day and acknowledged that she is
Secretary/Treasurer of DENNIS 6 THOMPSON, INC., a North
Carolina corporation, and that by authority duly given and as
the act of the corporation, the foregoing instrument was signed
in its name by its President, sealed with its corporate seal
and attested by her as its Secretary/Treasurer.
Witness my hand and official stamp or seal,
31 St day of March, 1986.
Ms�"ry Public
Expires:
RECEIVED
STATE OF NORTH CAROLINA, e,umMck Co -On, S E P 1 1 2019
The Foregoing fenifin¢(a) of Frances T. Williams NotaU Puh) S r 1. ppt�l1 I-�
(h)(are) certified Io be mnea. DCM-M 17 V CITY
Recmdcd rhh 14th day of MaY )9 E6 „9 c 23 ddock A_M.
Roan J. Rabinson. Reesref Of Peeps
�- /abbRECEIVED
JIIN 10 2019
DCM WILMINGTON, NC
OFFER TO PURCHASE AND CONTRACT
+,cc as { ip
hereby offers purchase and B°r'
upon acceptance of said offer, as Seller'
agrees to sell and convey ali of plot piece or parcel of land desenbed be[ow,
together with all improvements located thereon and such fixtures and personal property as are listed below
(collectively referred to as the "Property'), upon the following terms and conditions:
I. REAL PROPERTY: Located in the City of _9pp
County ofRtIAiSWty State of North Carolina being known as aitd more
.yuuRSa we+�e+evt StA/ zin 2a46?-
LegalDescrlptuin; q�j,t��. t✓!5/4i�
(❑All ❑A portion of the property m Deed Ae ereace: BooJk Page ,3 tl .u; t.+: County.;
NOTE:. Prior to signing this Offer to Purchase and Contract, Buyer is advised to review Restrictive Covenants; if
any, which may limit the use of the Property, and to read the Declaration of Restrictive Covenants, By -Laws,
articles of Incorporation, Rules and Regulations, and other governing documents of the owners' association and/or
the subdivision, if applicable.
2• FIXTURES: The following items, if any, are included in the purchase price free of liens: any built-in appliances,
light fixtures, ceiling fans, attached floor coverings, blinds, shades, drapery rods and curtain rods, brackets and all
related hardware, window and door screens, storm windows, combination doors, awnings, antennas, satellite dishes
and receivers, burglarffire/smoke alarms, pool and spa equipment, solar energy systems, attached fireplace screens,
gas logs, fireplace inserts, electric garage door openers with controls, outdoor plants and trees (other than in
movable containers), basketball goals, storage sheds, mailboxes, wall and/or door mirrors, and any other items
attached or affixed to the Property, EXCEPT the following items:
J. PERSONAL PROPERTY: The following persoiiel property is meinded in the parcit> a price:
J)" A/^ tlAJdC as le
a. PURCHASE PRICE, The purchase price is S 4)4h and shall be
paid as follows:
(s) $ I000, 00 EARNEST MONEY DEPOSIT with this offer by ❑cash �j' personal check
EIbank check ❑certified check Outlier; to
deposited and held in escrow by < ,kaW L s t ey be
f"$scmw
Agent") until the sale is closed, at which�ttme it will be credited to Yuyer, or until this contract is otherwise
terminated. In the event: (1) this offer is not accepted; or (2) any of the conditions hereto are not satisfied, then all
earnest monies shall be refunded to Buyer. In the event of breach of this contract by Seller, upon Buyer's request, all
earnest monies shall be returned to Buyer, but such return shall not affect any other remedies available to Buyer for
such breach, In the event this offer is accepted and Buyer breaches this contract, then all earnest monies shall be
forfeited upon Seller's request, but receipt of such forfeited earnest monies shall not affect any other remedies
available to Seller for such breach.
NOTE: In the event of a dispute between Seller and Buyer over the return or forfeiture of earnest money held in
escrow by a broker, the broker is required by state law to retain said earnest money in the broker's trust or escrow
account until a written release from the parties consenting to its disposition has been obtained or untildisbursement
is ordered by a court of competent jurisdiction.
(b) $ ADDITIONAL EARNEST MONEY DEPOSIT to be paid to Escrow Agent no later than
TIME BEING OF THE ESSENCE WITH REGARD TO SAID DATE.
(c) $ OPTION FEE in accordance with paragraph 13, Alternative 2, to be paid to Seller on the
Effective Date as set fi ttt in paragraph 23. (NOTE: If alternative 2 applies, then do not insert $0, N/A, or leave
blank)
(d) S . BY ASSUMPTION of the unpaid principal balance and all obligations of Seller on the
existing loans) secured by 4& dead of trust on the Property in accordance with the attached Loan Assumption RECEIVED
Addendum.
NA (e)$ BY SELLER FINANCING in accordance with the attached Seller Financing Addendum.
(Q Q + + BALAWCE-of the purchase price in cash at Closing. G 19 201a
: IVED
Page I of 5
&sy*r .. / [ Seller Initials
SEP 1 1 2019
STANDARD o M WILMINGTON, NC
DCM-MHD CITY
9. CONDITIONS: (State NIA in Wh Wank 6d is not a condition to this emmict.)
(a) Buyer must.be able to obtain a CFHA [1VAattach FIWVA Financing Addendum) Conventional
[]other: loan at a Fixed Rate ClAdj isaable Rate in the principal amount of
16d qbo. 00 _ (plus any financed VA Funding Fee or FHA M1P) fora term of
_ E ' _ year(s); at an initial interest rate not to exceed "14 %per ammm, witit mortgage loan
discount points not to exceed _ % of the loan amount. Buyer shall apply for said loan within 7— days of
the Effective Date of this contract. Buyer shall use Buyer's best efforts to secure the lender's customary loan
commitment letter on or before _ A t�' 7�/ 4 and to satisfy all terms and conditions of
the loan commitment totter by Closing. Aft ththe above letter date, Seller may request is writing from Buyer s copy
of the loan commitment letter. If Buyer fails to provide Seller a copy of the loan commitment letter or a written
waiver of this loan condition within five days of receipt of Seller's request, Seller may terminate this contract by
written notice to Buyer at any time thereafter, provided Seller has not then received a copy of the letter or the
waiver.
(b) There must be no restriction, easement, zoning other governmental regulation that would prevent the
reasonable use of the Property for ! purposes-
(c)The Property must be in substanttaily the same or better condition at Closing as on the date of this offer
reasonable wear and tear excepted.
(d) All deeds of trust, liens and other charges against the Property, not assumed by Buyer, must be paid and satisfied
by Seiler prior to or at Closing such that cancellation may be promptly obtained following Closing. Seller shell
remain obligated to obtain any such cancellations following Closing.
(e) Title must be delivered at Closing by GENERAL WARRANTY DEED unless otherwise stated herein, and must
be fee simple marketable and insurable title, free of all encumbrances except ad valorem taxes for the current year
(prorated through the date of Closing); utility easements and unviolated restrictive covenants that do not materially
affect the value of the Property; and such other encumbrances as may be assumed or specifically approved by Buyer.
The Property must have legal access to a public right of way.
6. SPECIAL ASSESSMENTS: Seller warrants that there are no pending or confirmed governmental special
assessments for sidewalk, paving, water, sewer, or other improvements on or adjoining the Property, and no pending
or eonfirtned owners' association special assessments, except as follows:
(Insert "None' or the identification of such assessmen% if any.) Seller shall payed owners' association assessments
and all governmental assessments confirmed through the time of Closing, if any, and Buyer shall take title subject to
all pending assessments, if any, unless otherwise agreed as follows:
7. PRORATIONS AND ADJUSTNMNT5: Unless otherwise provided the fbitawing items shall be prorated and
either adjusted between the parties or paid at Closing: (a) Ad valorem taxes on real property shall be prorated on a
calendar year basis through the date of Closing; (b) Ad valorem taxes on personal property for the entire year shall
be paid by the Seller unless the personal property is conveyed to the Buyer, in which case, the personal property
taxes shall be prorated on a calendar year basis through the date of Closing; (c) All late listing penalties, if any, shall
be paid by Seiler; (d)Rents, if any, for the Property shall be prorated through the date of Closing; (e) Owners'
association dues and other like charges shall be prorated through the date of Closing. Seller represents that the
regular owners' association dues, if any, are $_u/a per /VIA
8. EXPENSES: Buyer shall be responsible for all costs with respect to any loan obtained by Buyer. Buyer shall pay
for recording the deed and for preparation and recording of all instruments required to secure the balance of the
purchase price unpaid at Closing. Seller shall pay for preparation of a deed and all other documents necessary to
perform Seller's obligations under this agreement, and for excise tax (revenue stamps) required by law. Seller shall
pay at closing $ toward any of the Buyer's expenses associated with the purchase of the
Property, including any FHANA lender and inspection costs that Buyer is not permitted to pay, but excluding any
portion disapproved by Buyer's lender.
9. FUEL: Buyer agrees to purchase from Seller the fuel, if any, situated in any tank on the Property at the prevailing
rate with the cost of measurement thereof, if any, being paid by Seller.
10. EVIDENCE OF TITLE: Seller agrees to use his best efforts to deliver to Buyer as soon as reasonably possible
after the Effective Date of this contract, copies of all title information in possession of or available to Seller,
including but not limited to: title insurance policies, attorney's opinions on title, surveys, covenants, deeds, notes
and deeds of trust and easements relating to the Property. Seller authorizes (1) any attorney presently or previously
representing Seller to release and disclose any title insurance policy in such attorney's file to Buyer and both Buyer's
and Settees agents and attorneys; and (2) the Property's title insurer or its agent to release and disclose all materials
Page 2of5 ZCl C v_
STANDARD FORM 2-T
Buyer Initial Seller Initials &V- SEp 1 1209
UCM-MHD C a
in the Property's title insurer's (or title insurer's agent's) file to Buyer and both Buyer's and Seller's agents and
attorneys.
11. LABOR AND MATERIAL: Seller shall furnish at Closing an affidavit and indemnification agreement in form
satisfactory to Buyer showing that all labor and materials, if any, furnished to the Property within 120 days prior to
the date of Closing have been paid for and agreeing to indemnify Buyer against all loss from any cause or claim
arising there from.
12. PROPERTY DISCLOSURE:
NIA ❑Buyer has received a signed copy of the N.C. Residential Property Disclosure Statement prior to the signing of
this Offer to Purchase and Contract.
rV# ❑Buyer has NOT received a signed copy of the N.C_ Residential Property Disclosure Statement prior to the signing
ofthis -Offer to Purchase and Contract and shall have the right to terminate or withdraw this contract without penalty
Prim to WFIICHEVER OF TBE FOLLOWING EVENTS OCCURS FIRST: (I) the end of the third calendar day
following receipt of the Disclosure Statement; (2) the end of the thirdcalendar day following the date the contract
was made; or (3) Closing or occupancy by the Buyer in the case of a. sale or exchange.
4-DExempt from N.C. Residential Property Disclosure Statement because (SEE GUIDELINES)
The Property is residential and was built prior to 1979 (Attach Lead -Based Paint or Lead -Based Paint Hazards
Disclosure Addendum.)
13. PROPERTY INSPECTION, APPRAISAL, INVESTIGATION (Choose ONLY ONE of the following
Alternatives);
❑ALTERNATIVE 1:
(a) Property Inspection: Unless otherwise stated heroin, Buyer shall have the option of inspecting, or obtaining at
Buyer's expense inspections, to determine the condition of the Property. Unless otherwise stated herein, it is a
condition of this contract that: (i) the built-in appliances, electrical system, plumbing system, heating and cooling
systems, roof coverings (including flashing and gutters), doors and windows, exterior surfaces, structural
components (including foundations, columns, chimneys, floors,. walls, ceilings and roofs), porches and decks,
fireplaces and flues, crawl space and attic ventilation systems (if airy), water and sewer systems (public and private),
shall be performing the function for which intended and shall not be in need of immediate repair; (it) there shall be
no unusual drainage conditions or evidence of excessive moisture adversely affecting the structure(s); and (lii) there
shall be no friable asbestos or existing environmental contamination. Any inspections shall be completed and written
notice of necessary repairs shall be given to Seller on or before . Seller shall
provide written notice to Buyer of Seller's response within days of Buyer's notice. Buyer is advised to
have any inspections made prior to incurring expenses for Closing and in sufficient time to permit any required
repairs to be completed by Closing.
(b) Wood -Destroying Insects: Unless otherwise stated herein, Buyer shall have the option of obtaining, at Buyer's
expense, a report from a licensed pest control operator on a standard form in accordance with the regulations of the
North Carolina Structural Pest Control Committee, stating that as to all structures, except
there was no visible evidence of wood -destroying insects and containing no indication of visible damage there from.
The report must be obtained in sufficient time so as to permit treatment, if any, and repairs if any, to be completed
prior to Closing. All treatment required shall be paid for by Seller and completed prior to Closing, unless otherwise
agreed upon in writing by the parties. The Buyer is advised that the inspection report described in this paragraph
may not always reveal either structural damage or damage caused by agents or organisms other than wood -
destroying insects. If new construction, Seller shall provide a standard warranty of termite soil treatment.
(e) Repairs: Pursuant to any inspections in (a) and/or (b) above, if any repairs are necessary, Seller shall have the
option of completing them or refusing to complete them. If Seller elects not to complete the repairs, then Buyer shall
have the option of accepting the Property in its present condition or terminating this contract, in which case all
earnest monies shall be refunded. Unless otherwise stated herein, any items not covered by (a)(i), (a)(H), (a)(iii) and
(b) above are excluded from repair negotiations under this contract.
(d) Radon Inspection: Buyer shall have the option, at Buyer's expense, to have the Property tested for radon on or
before the date for completion of inspections as set forth in paragraph 13 (a) above. The test result shall be deemed
satisfactory to Buyer if it indicates a radon level of less than 4.0 pico curies per liter of air (as of January 1,1"7,
EPA guidelines reflect an "acceptable" level as anything less than 4.0 pico curies per liter of air). If the test
result exceeds the above -mentioned level, Seller shall have the option of: a) remediating to bring radon level within
the satisfactory range; or b) refusing to remediate. Upon the completion of remediation, Buyer may have a radon test
performed at Seller's expense, and if the test result indicates a radon level less than 4.0 pico curies per liter of air, it
shall be deemed satisfactory to the Buyer. If Seller elects not to remediate, or if remediation is attempted but fails to
Page 3 of 5
STANDARD FORM 2-T
Buyer Initials ) Seller Initials SDI S E P L Y L U !:1
��YY DCM-MHD CITY
bring the radon level within the satisfactory range, Buyer shall have the option of: a) accepting the Property with its
then current radon level; or
b) terminating the contract, in which case all earnest monies shall be refunded.
(a) Cost Of Repair Conthageney: Notwithstanding the above and as an additional remedy of Buyer, if a reasonable
estimate obtained by Buyer of the total cost of repairs required by (a) and (b) and/or remediation required by (d)
above equals or exceeds $ then Buyer shall have the option to terminate this contract
pursuant to the Cost of Repair Can agency no later than seven days following the inspection date and all earnest
monies shall be refunded to Buyer.
(I) Appraisal Contingency: The Property must appraise at a value equal to or exceeding the purchase price or, at
the option of Buyer, this contract may be terminated and all earnest monies shall be refunded to Buyer. If this
contract is not subject to a financing contingency requiting an appraisal, Buyer shall arrange to have the appraisal
completed on or before �it :KZ 9 . The cost of the appraisal shalt be home by Buyer.
(g) CLOSING SHALL C -SITTUTTE ACCEPTANCE OF THE PROPERTY IN ITS THEN EXISTING
CONDMON UNLESS PROVISION IS OTHERWISE MADE IN WRITING.
DALTERNATIV E 2: (This Alternative applies ONLY i(Alternative 2 is checked AND Buyer has paid the
Option Fee)
(a) Property Investigation with Option to Terminate: In consideration of the sum of $ (do
not insert $0, N/A, or leave blank) paid by Buyer to Seller (not Escrow Agent) and other valuable consideration, the
receipt and sufficiency of which is hereby acknowledged (the "Option Fee"), Buyer shall have the right to terminate
this contract for any reason or no reason, whether related to the physical condition of the Property or
otherwise, by delivering to Seller written notice of termination (the "Termination Notice") by 5:00 p.m, on
20_, lime being of the essence (the "Option Termination Data"). At
any time prior to Closing, Buyer shall have the right to inspect the Property at Buyer's expense (Buyer is advised to
have all inspections and appraisals of the Property, including but not limited to those matters set forth in Alternative
1, performed prior to the Option Termination Date).
(b) Exercise of Option: If Buyer delivers the Termination Notice prior to the Option Termination Date, time being
of the essence, this comi'act.shall become null and void and all earnest monies received in connection herewith shall
be refunded to Buyer; however, the Option Fee will not be refunded and shall be retained by Seller. If Buyer fails to
deliver the Termination Notice to Seller prior to the Option Termination Date, then Buyer will be deemed to have
accepted the Property in its physical condition existing as of the Option Termination Date, excluding matters of
survey. The Option Fee is not refundable, is not a part of any earnest monies, and will be credited to the purchase
price at Closing.
(c) CLOSING SHALL CONSTYTM ACCEPTANCE OF THE PROPERTY IN iTS'THEN EXIS MG
CONDITION UNLESS PROVISION IS OTHERWISE MADE W WRnWG.
14. REASONABLE ACCESS: Seger will provide reasonable access to the Property (including working, existing
utilities) through the earlier of Closing or possession by Buyer, to Buyer or Buyer's representatives for the purposes
of appraisal, inspection, and/or evaluation. Buyer may conduct a walk-through inspection of the Property prior to
Closing.
IS. CLOSING: Closing shall be defined as the date and time of recording of the deed. All parties agree to execute
an and all documents and papers necessary in connection with Closing and transfer of title on or before
2 alq __,. at a place desi oared by Buyer. The deed is to be made to
c a%I e° ma„t 'iaieb�Jg K 1 �rS mAr!
16. POSSESSION: Unless otherwise provided herein, possession shall be delivered at Closing. In the event
�ossession is NOT to be delivered at Closing: []a Buyer Possession Before Closing Agreement is attached. OR,
a Seller Possession After Closing Agreement is attached.
17. OTHER PROVISIONS AND CONDITIONS: (ITEMIZE ALL ADDENDA TO THIS CONTRACT AND
ATTACHHERETO.)
I$. RISK OF LOSS: The risk of loss or damage by fire or other casualty prior to Closing shall be upon Seller. If the
improvements on the Property are destroyed or materially damaged prior to Closing, Buyer may terminate this
contract by written notice delivered to Seller or Seller's agent and all deposits shall be returned to Buyer. In the
Page 4 of 5
Setter InitialsG'r)T S E P 11 2019 STANDARD FORM 2-T
DCM-MHD CITY
,
i d
Md
event Buyer does NOT elect to terminate this contract, Buyer shall be entitled to receive, in addition to the Property,
any of the Seller's insurance proceeds payable on account of the damage or destruction applicable to the Property
being purchased_
19. ASSIGNMENTS: This contract may not be assigned without the written consent of all parties, but if assigned
by agreement, then this contract shall be binding on the assignee and his heirs and successors.
20. PARTIES: This contract shall be binding upon and shall inure to the benefit of the parties, i.e., Buyer and Seller
and their heirs, successors and assigns. As used hereto, words in the singular include the plural and the masculine
includes the feminine and neuter genders, as appropriate.
ZI. SURVIVAL: If any provision herein contained which by its nature and effect is required to be observed, kept or
performed after the Closing, it shall survive the Closing and remain binding upon and for the benefit of the parties
hereto until fully observed, kept or performed.
22. ENTIRE AGREEMENT: This contract contains the entire agreement of the parties and there are no
representations, inducements or other provisions other than those expressed herein. All changes, additions or
deletions hereto must be in writing and signed by all parties. Nothing contained herein shall alter any agreement
between a REALTORV or broker and Seller or Buyer as contained in any listing agreement, buyer agency
agreement, or any other agency agreement between them.
23. NOTICE AND EXECUTION: Any notice or communication to be given to a party herein may be given to the
Party or to such parry's agent This offer shall become a binding contract (the "Effective Date") when signed by both
Buyer and Seller and such signing is communicated to the offering party. This contract is executed under seat in
signed multiple originals, all of which together constitute one and the same nstnurtent, with a signed original tieing
retained by each party and each REALTOR0 or broker hereto, and the parties adopt the word "SEAL" beside thew
signatures below.
Buyer acknowledges having made an on -site personal examination of the Property prior to the making of this
offer.
THE NORTH CAROLINA ASSOCIATION OF REALTORSO, INC. AND THE NORTH CAROLINA BAR
ASSOCIATION MAKE NO REPRESENTATION AS TO THE LEGAL VALIDITY OR ADEQUACY OF ANY
PROVISION OF THIS FORM IN ANY SPECIFIC TRANSACTION, IF YOU DO NOT UNDERSTAND THIS
FORM OR FEEL THAT IT DOES NOT PROVIDE FOR YOUR LEGAL NEEDS, YOU SHOULD CONSULT A
NORTH CAROLINA REAL ESTATE ATTORNEY BEFORE YOU SIGN IT.
Daten
Buyer
Date: _
Dt1 hkt�
Elbtviaa K
Date:
(SWSelle�� �c (SEAL)
Dater
(SB4) Seller (MAL)
Escrow Agent acknowledges receipt of the earnest money and agrees to hold and disburse the same in
Accordance with the terms hereof.
?;yy
Date: -I f ) Firm: iLl �V Vfvt v G
rep
Selling AgenflFirm/Ptione
AU gas uyer's Agent OSeller's (suti)Agent Agent
Listing AgetitlFitrtltPhone
Actin¢as Seller's (auhlAeent IDrai AweSC
Page 5 of 5
1 STANDARD FORM 2-T
$uyerInitials Seiler Ltitlals��. SEP. 1 lj
DCM-MHD CITY
CERTIFIED ML - RETURN RECEIPT 89 UESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMIAIVER FORM
Name of Property Owner��
Address of Property. 3 i g S0
(Lot or Street #, Street or Road, City & County)
Agent's Name #:��
g !�4, n s� VP
TPoPMailingAddress: PLC
�o y
S a`4
Agent's phone# q1"i7- o-;L`tS
S k�-' � �o�A-Q,
v! (-
a�45
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing with dimensions must be provided with this letter.
I bave no objections to this proposal. _ T have objections to this proposal.
If you have objections to what is being proposed, you mustnotify the Division of Coastal Management (DCM) in
writing within 10 days of receipt of this notice. Correspondence should be maifed to 127 Cardinal Drive Ext,
Wilmington, NC, 28405-3845. DCM representatives can also be contacted at (910) 79&7215. No response is
considered the same as no objection if you have been notified by Certified tta8:
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 16 from my area of riparian access unless waived by me. (if you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement-
1 do not wish to waive the 15' setback requirement. 1
(Property Owner Information)
.Sigi1
O 4 c .0 T )
Print or -type Naifie
P o &"'�
Mailing Address
Sk,'t'l0�te. ,NC. agyS9
City/statelzip '
C�l19- Log '-oagS
Telephone Number
Property Owner Information)
Print or Type Name
RECEIVED
SEP 11 2019
3CAt-M.,1D CITY
Mailing Address
AJE-ltiio,v NC 28(6S8
City/ tatelzip
i(5 �8) RECEIVED
Z3;g_g35�
Telephone Number
Date
0 S - i 9 D DLM WILMINGTON, NC
f-rz2 Revised 611WO12
`1#t ii'ittiY �.finrr' ' "`
�.'fti.� Gfyc
-- -�--- .. . vX. y nxT.%'—w I is 2111 r c cv
DMSION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATiONiWAIVER FORM
Name of Property Owner:- h r� E �a o c� Vr o P-QJ%y Dvo n e rS )0
Address of Property. 3385 ti?o?ervt�\J r. SW S�ppl,i �r� -zsV'u.,n
(Lot or Street #, Street or Road, City & County)
Agents Name #
n � VIP TPoWaiting
Add.
?k? Soy
? P,`�I
AgenYsphone#:�11c1-(aoi%-o�`f.S
Sl,c,���oi�c*
.tic..
2?S�-S�
1 hereby certify that I own property adjacent to the above referenced property. The individual
applying far this permit has described to me as shown on the attached drawing -the development
fhey are proposing. A description or drawing with dimensions must be [Lravided with this ►after,
I have no objections to this proposal I have objections to this proposal.
ifyouhave objectionstoWhat isbetogproposersyou must nod&WeDivis{onofCoasfatp t(DCA9m
wrfting wXdn fP days of receipt ofous notice. Cnrraspondence should be mafted to 127 Cardlrta►Drive Ext,
Wr7mingtm NC, 28405,W& DW represenmfives can also be contacted at (910) 79&7215No respwtse fs
considered the same as no o yWffon if you have been no~ by Can~ Mail
WAIVER SECTION
t understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (if you
wish to waive the setback, you must tniiial the appropriate blank below.)
I do wish to waive the 157 setback requirement.
_ x I do not wish to waive the 15' setback requirement
(PropertyOwner
Si
-10
rir cc� �P'T? rq
Print o ype Na e
P 0�) C, x 3 a1-I
Mailing Address
Slott . NC. bys�
C.itylstat&zip
°iis-(Oc)b-0aqs
Telephone Number
00') S- i
Dare
Owner Information)
RECEIVED
or
Z-349�5-v✓,�o*t 'FP 1 1 1.019
Mailing Address
i-iWttOJ CITY
c_it��C 2u 9ta �
RECEIVED
`j/o-S78.SS-T-P-
Telephone Number l )
d'7 6s1/ rn DCM WILMINGTON, NC
Date
3�c�3 T LtJA k J�Crw Uc S(1)Revrsed6/48f2E142
6cWP dU 2P�4�--7
H
RIPARIAN NOTIFICATION FOR LAMA MAJOR PERMIT APPLICATIONS
Tanglewood Property Owners Association
PO Box 324
Shallotte, NC 28459
Certified Mail — Return Receipt Requested
August 29, 2019
t
U�
OXENDINE, DUANE EARL ET DEBORAH
10115 HARRISBURG ROAD
CHARLOTTE, NC 28215-9369
Dear Mr.Oxendine:
Tanglewood Property Owners Association is applying for a CAMA Major permit to repair the TPOA
Community Boat Ramp, located at 3185 Waterview Dr. SW, Supply NC 29462 on the Intracoastal
Waterway, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed
application forms and drawings.
As the adjacent riparian property owner to the aforementioned project, I am required to notify you of
the development in order to give you the opportunity to comment on the project. Please review the
attached permit application and drawings.
Should you have any objections to this proposal, please send your written comments to Division of
Coastal Management, 127 Cardinal Dr. Ext., Wilmington, NC 28405-3845 within 10 days of your receipt
of this notice. Such comments will be considered by the Department in reaching a final decision on the
application. No comment within 10 days of your receipt of this notice will be considered as no
objection. If you have any questions on this project, please call me at 919-696-0245, or e-mail me at
dhaggins@nc.rr.com
Sincerely,
RECEIVED
Doug Haggins SEP 10 2019
Vice President
Tangle Property Owners Association DCM WILMINGTON, NC
Enclosures: Engineering drawings of proposed repair area, Adjacent Riparian Property Owner
Notification/Waiver Form, Postage -Paid Envelope
RECEIVED
SEP 10 2019
DCM WILMINGTON, NC
WMIM -m-A
��/�j4a ity�• /p�p�y^G^{_. "5�*zua�m.r�--.
Mow,,5
h421t1�`%r:�tl
RECEIVED
SEP 10 2019
DCM WILMINGTON, NC
RIPARIAN NOTIFICATION FOR LAMA MAJOR PERMIT APPLICATIONS
Tanglewood Property Owners Association
PO Box 324
Shallotte, NC 28459
Certifier) Mail - Return Receipt Requested
August 29, 2019
NORRIS, HUGH S ETUX RAMONA L ���✓
P O BOX 271
DUNN, NC 28335
Dear Mr. and Mrs. Norris:
Tanglewood Property Owners Association is applying for a CAMA Major permit to repair the TPOA
Community Boat Ramp, located at 3185 Waterview Dr. SW, Supply NC 28462 on the Intracoastal
Waterway, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed
application forms and drawings.
As the adjacent riparian property owner to the aforementioned project, I am required to notify you of
the development in order to give you the opportunity to comment on the project. Please review the
attached permit application and drawings.
Should you have any objections to this proposal, please send your written comments to Division of
Coastal Management, 127 Cardinal Dr. Ext., Wilmington, NC 28405-3845 within 10 days of your receipt
of this notice. Such comments will be considered by the Department in reaching a final decision on the
application. No comment within 10 days of your receipt of this notice will be considered as no
objection. If you have any questions on this project, please call me at 919-696-0245, or e-mail me at
dhaggins@nc.rr.com
Sincerely,
Doug Haggins
Vice President
Tangle Property Owners Association
RECEIVED
SEP 10 2019
DCM WILMINGTON, NC
Enclosures: Engineering drawings of proposed repair area, Adjacent Riparian Property Owner
Notification/Waiver form, Postage -Paid Envelope
.�canPhmYvm'1:2 en63 '` .M
X
_....O AgMA
'OAtlC�omoo •.'
.. �RnRY�!immevdaddMltl11tli01aJ2166'..
'm WdweantctYT 1h06(6!6�O y'00.'
a; n.mhad M(RiMe6 Ndm2)
0. mot DNS".
t
�DAdazhltta mdtD in6back ofiMttW�o� ..
",. ':
_
..'
m mtM lreM1fl CP�76tmtt% ._
D.%ddwaYimboem. Elm
.�, i. la6aaMdma+ea?x _
-nr®.mm><aemm p�,'pw.
'!
poB6x at
� 11A'l�Nl[iIIIf11111111NlIIli11B111111111TVO
D.�,6��
o^°a°�" •
9590940234117227539807
z4N[ONfTmv((iW°rhtlllYMmI1EeO
RS-
<., 4tia� 1{{�:' `9� { :: W'
DWu�Ym
. Dumv=awum+'+*dtm�en
,6N➢Yt[G M'!N
OetvnPaeNDl
x
pnmesyC
®
W
M
N
z
>
W
0
Z
W
w
g
U
0
. �.F,omplela lteim 1.2. 600&
a
• tz Prtntymrwt ad add2 anVM—Me
X
' 6DMMN9WIR M..Wtoy=
8
,O fltbCll thl6 card N Die packot Me mm�pbee.
W PfI NO(N1rt [(8[IPiP PartNtz
�aunz.��tbor4h D�te�ePiny�
�;
C4tgr{P'�e4 NC:. 180115
111111111
Jill 11111111111111111111II1IKIf1111
95910
9402 5411 7227 5883 99
D
77� ❑ a 1PE, r�
{ PSF 3611.JWY2016ntjn
r_
�ja ��►r(^ 'T
ka
ml
!N�
^dk ORRIBLOt1Z��
E11YE17EVIf 1 E 1YC 17137F�FBU -ibit Ah- —
RECEIVED
SEP ] 0 2019
DCM WILMINGTON, NC"
212 Princess Street
July 26, 2019
RIGHT ANGLE
u ENGINEERING, PC
Wilmington, NC 29401 Tel. (910) 251.85" Fa: (910) 251-2208
To: Tyler McGuire, Environmental Specialist
NCDEQ — Division of Coastal Management
127 Cardinal Drive Ext.
Wilmington, NC 28405
Re: CAMA Major Permit Application
Tanglewood PDA Ramp Replacement
Shallotte, NC
Dear Mr. McGuire,
We received your comments and are providing revised plans and application sheet changes to
address them.
We are still on to begin work after Labor Day if possible.
Enclosed are two sets of 11 °x17° construction plans, MP-1, and MP-2.
Please let me know if you have further questions or comments.
Thank you,
5 . Q,
Shane Lippard, P.E.
Vice President
Right Angle Engineering, PC
RECEIVED
SEP 11 2019
DCM-MHD CITY
RECEIVED
JUL 30 211j0
CC�.4 WILMINGTON, NC
ROY COOPER
Governor
MICHAEL S. REGAN
Semrary
BRAXTON C. DAVIS
DuMfor
SENT VIA EMAIL
Shane Lippard, P.E.
c/o Right Angle Engineering, PC
212 Princess Street
Wilmington, North Carolina 28401
NORTH CAROLINA
Environmental Quaaty
June 24, 2019
RE: CAMA Major Development Permit Application
Tanglewood
Dear Mr. Shane Lippard,
The Division of Coastal Management hereby acknowledges receipt of your application on June 10,
2019, acting as agent for Mr. Brandon Isenhour with Tanglewood Property Owners Association, for the
proposed replacement of the boat ramp at the Tanglewood POA property located at 3185 Waterview Drive
SW in Supply, Brunswick County. However, your application still lacks the information necessary to
complete processing. The attached checklist indicates the deficiencies of your application. If you respond
within three working days from the date of this E-mail with the required additional information, processing
of your application will promptly continue and will not be placed on hold. If you are not able to respond
within three days, your application will not be accepted as complete for processing. Additional information
may be required pending further review by the fourteen (14) review agencies. The attached checklist
indicates the deficiencies of your application.
We suggest a preliminary meeting to review the application and address the deficiencies on the checklist.
If you have any questions concerning this matter, please call me at my Wilmington Office at (910) 796-
7424.
Sincerely,
Tyler McGuire
Environmental Specialist
Enclosures
cc: Debbie Wilson, DCM Wilmington
Doug Huggett, DCM Morehead City
Courtney Spears, DCM Wilmington
RECEIVED
�FQ>
SEP 11 2019
North Carolina Department of Environments] Quality I Divislon of Coastal Management
Wilmington office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 DCM-MHD CITY
910.796.7215
0
NORTH CAROLINA
I irvi....ww N¢l Oua/ur
August 19, 2019
Advertising@stamewsonline.com
2 Pages
Star News
Legal Advertisement Section
Post Office Box 840
Wilmington, North Carolina 28402
Re: Major Public Notice Combo:
• Tanglewood Property Owners Association
• Town of Wrightsville Beach
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
Dmaor, Divaton ofCoostal Um Bement
Hello Angie: Please publish the attached Notice in the Thursday, August 22, 2019 issue.
The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for
newspaper advertising.
Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal
Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the
attention of Jarimy Springer.
Please email a copy of the credit card receipt to me.
Thank you for your assistance in this matter. If you should have any questions, please contact me at our
Wilmington office.
kS*cerely,
ya I Pi 'lamittin upport & Customer Assistance
cc: MHC file
Courtney Spears - WiRO
USACE
RECEIVED
SE P 11 2019
State of North Carolina I Envvonmental Quality I Coastal Management DCM-MHD CITY
127 Cardinal Drive Exi, Wilmington, NC 28405 919 7% 7215
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-
119(b) that the following application was submitted for a development permit in an Area of Environmental
Concern as designated under the CAMA: On August 19, 2019, Tanglewood Property Owners Assoc.
proposed to replace an existing boat ramp at 3185 Waterview Drive SW, adjacent to the AIWW, in
Supply, Brunswick County; and on July 24, 2019, The Town of Wrightsville Beach proposed to
redevelop the ocean access park facilities & reconfigure parking areas along Salisbury St from Banks
Channel to the Atlantic Ocean, adjacent to the Atlantic Ocean, Wrightsville Beach, New Hanover
County.
A copy of these applications can be examined or copied at the office of Debbie Wilson, N.C. Dept.
of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC
28405, (910-796-7266) during normal business hours.
Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce
Avenue, Morehead City, NC 28557-3421, prior to September 12, 2019 will be considered in making the
permit decision. Later comments will be accepted and considered up to the time of permit decision. Project
modification may occur based on review and comment by the public and state and federal agencies. Notice
of the permit decision in these matters will be provided upon written request.
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
t Ek,&
1003 South 17th Street • Wilmington, NC 28401 • Classified ph: 910,343-2323 - Legal ads ph: 910-343-2342
(910)796-7215 0001
Account: A H9813450 08/22/2019
Name: 4M Simpson, Shaun 08/22/2019
23
8/22 1 x, 8/22 1 x, , ,
upon written request.
r;
MIA
$ 0.00
$ 160.89
62
08/20/2019
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
Attention: Fax:
This is a final proof. If any information is incorrect, please contact your sales representative prior to the deadline of the first insertion. Oth-
erwise your order is accepted as having been approved.
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Seawary
BRAXTON C. DAVIS August 19, 2019
Dlrecuw
Shane Lippard, P.E.
c/o Right Angle Engineering, PC
212 Princess Street
Wilmington, North Carolina 28401
RE: CAMA Major Development Permit Application
Tanglewood POA Boat Ramp Replacement
Dear Mr. Shane Lippard,
The Division of Coastal Management hereby acknowledges receipt of your application on June 10, 2019, acting as
agent for Mr. Brandon Isenhour with Tanglewood Property Owners Association, for State approval for the proposed
replacement of the boat ramp at the Tanglewood POA property located at 3185 Waterview Drive SW in Supply,
Brunswick County, adjacent to the Atlantic Intracoastal Waterway. The application was accepted as complete on
August 19, 2019 and appears to be adequate for processing at this time. The projected deadline for making a
decision is November 2, 2019. An additional 75-day review period is provided by law when such time is necessary
to complete the review. If you have not been notified of a final action by the initial deadline stated above, you
should consider the review period extended. Under those circumstances, this letter will serve as your notice of an
extended review. However, an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from August 19, 2019, you may request a meeting
with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such
a meeting will be held within five working days from the receipt of your written request and shall include the
property owner, developer, and project designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development.
Enclosed you will fend a "Notice of Permit Filing" postcard which must be posted at the property of your proposed
development. You should post this notice at a conspicuous point along your property where it can be observed from
a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-
way fronting your property; or at a point along the road right-of-way where a private road would lead one into your
property. Failure to post this notice could result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate
State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive
a copy of my field report and/or comments from reviewing agencies.
Sincerer,
Ty'1 ire
tall `
Environmental Specialist
cc: Courtney Spears, DCM USACE
Doug Huggett, MHC Chad Coburn, DWR
Connie Marlowe, LPO Tanglewood PDA do Brandon Isenhour, Applicant RECEIVED
QEQ� SEP 11 Z019
DCM-MHD CITY
North Carolina Department of Environmental Quality I Division of Coastal Management
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
910.796.7215
N(1'1'I(01$1:
CAMA PERMIT
APPLIED FOR
$ m A
m
N EKrunswick County.
J
COMMENTS ACCEPTED THROUGH September 12 2019
APPLICANT: FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
Tanqlewood Property Owners Assoc. �Z
PO Box 324 INC '
Shallotte, NC 28459 127 Cardinal
I ming on, NC 28405
Agent - Shane Lippard (910) 251-8544
Right Angle Engineering, PC
May 15, 2019
To Whom it May Concern:
This letter serves as my authorization as President of Tanglewood Property Owners Association, for
Shane Lippard, P.E. of Right Angle Engineering, P.C. to serve as my agent through the review process of
this project.
Thank you,
.71
Brandon Ise our, President
Tanglewood Property Owners Association
PO Box 324
Shallotte, NC 28459
910-512-4803
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
RECEIVED
JUN 10 2019
DCM WILMINGTON, NC
Major Permit Fee Schedule
Project Name: 7A/JGt r Wbep -'N-2 e*k— County: r3Rw ..5&4 tcn
gQkT IAHP
Check No & Amount: _*34(o0
44<�)6.00
Development Type
Fee
DCM %
DWQ %
(14300160143510009316256253)
(2430016024351000952341)
I. Private, non-commercial development
that does not involve the filling or
$250
100% ($250)
0% ($0)
excavation of any wetlands or
open water areas:
II. Public or commercial development that
does not involve the filling or excavation
$400
100% ($400)
0% ($0)
of any wetlands or open water areas:
III. For development that involves the
filling and/or excavation of up to 1 acre
of wetlands and/or open water areas,
determine if A,B, C, or D below applies:
III(A). Private, non-commercial
development, if General Water Quality
$250
100% ($250)
0% ($0)
Certification No. 4175 can be applied.
III(B). Public or commercial development,
if General Water Quality Certification
$400
100% ($400)
0% ($0)
No. 4175 can be applied:
III(C). If General Water Quality
Certification No. 4175 could be applied,
but DCM staff determined that additional
$400
60% ($240)
40% ($160)
review and written DWQ concurrence is
needed because of concerns related to
water quality or aquatic life:
III(D). I General Water Quality
$400
60% ($240)
40% ($160)
ertificati No. 4175 cannot be applied:
IV. Development that involves the filling
and/or excavation of more than one acre
$475
60% ($285)
40% ($190)
of wetlands and/or open water areas:
RECEIVED
SEP 1 1 2019
DCM-MHD CITY
Date
Date
Check From
Name of
Vendor
Check
Check
Permit
Rct. ##
Received
Deposited
Permit Holder
Number
amount
Number/Comments
6/19/2019
Tanglewood
Tanglewood POA
CresCom
3460
$400.00
major fee, 3185 Waterview Dr SW,
JD rct.
Property Owners
Bank
Supply BrCo SPLIT 60/40
8732
Association
}
W
>
LLI
N
,
F-
U
0
2
LU
w
Ix
U
NC Division of Coastal Management
Major Permit Application Computer Sheet
AEC: AIWW
Fee:$400 #p460
CDAITS _ MHC cc _
Applicant: Tanglewood Property Owners Assoc.
Agent/Contractor: Right Angle Engineering, PC / Shane Lippard
Project Site County: Brunswick
Staff: Tyler McGuire
District: Wilmington
Project Name: Tanglewood Boat Ramp
Rover File:
River Basin:
Initial date of application submittal: 06-10.19
Date application "received as complete" in the Field office
Permit Authorization: CAMA ElDredge & Fill Both
SITE DESCRIPTION/PERMIT INFORMATION
ORW: Yes No PNA: Yes No
Photos Taken: Yes No
Setback Required (riparian): (]Yes XNo
Critical Habitat: LJYes K No LJNot Sure
15 foot waiver obtained: Yes No
Hazard N tification Returned:
❑Yes �No
N�A
N//�
SAV: Yes KNo ❑Not Sure
Shell Bottom: OYes Po ❑ Not
Temporary Impacts: KYes No
Sure
Sandbags: ❑Yes No ❑ Not Sure
Did the land use cla sift n come
fro LUP:AYes [:]No
Mitigation equired (optional):
❑Yes
county
ANo
Moratorium Conditions:
Environmental ssessment Done:
Length of Shoreline:
❑Yes $�No ❑NA
`Area
❑Yes ❑No RNA
S40 FT.
Shellfish Designation:
Project Description: (code)
Development Area: (code)
Open -or- Closed
ry
, .. `
/y (� �"
yam/ AJ/A uooi I
SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4)
Future Water Supply (FWS)
❑ Nutrient Sensitive Waters (NSW)
I El Swamp Waters (SW)
High Quality Waters (HQW)
Outstanding Resource Waters (ORW)
WETLANDS I ACTIE 4o,16—
El (404) Corp. f Engineers (Jurisdictional
❑ (LS) Sea lavender (Limonium sp.)
(SS) Glasswort ( Salicomia sp.)
wetlands)
❑ (CJ) Saw gralVladium jamaicense)
(SA) Salt marsh cordgrass (Spartina
❑ (SY) Salt reed grass (Spartina
alterniflora)
cynosuroides)
rass
(DS) Salt or spik (Distichlis
(SC) Bullrush or three square (Scirpus
El (TY) Cattail (Typha sp.)
spicata)
SO
❑ (JR) Black needlerush ncus
El ( ) Saltimeadow grass (Spartina
roemerianus)
pat s)
APPLICATION FEE RftmopolF
No fee required - $0.00
0 III(A) Private w/ D&F up to 1 acre; 3490
III(D) Pnv. public or comm w/ D&F to 1
can be applied - $250
ac e; 4144 can't be applied - $400
❑ Minor Modification to a CAMA Major
❑ Major Modification to a CAMA Major
IV Any development involving D&F of
permit - $100
peril - $250
more than 1 acre - $475
❑ Permit Transfer - $100
❑ III(B) Public or commercial w/ D&F to 1
❑ Express Permit - $2000
acre; 4144 can be applied - $400
El Major development extension request -
U. Public or commercial/no dredge
RECEIVED
$100
and/or fill - $400
❑ I. Private no dredge and/or fill - $250
El III(C) Priv. public or comm w /D&F to 1
S E P 112019
acre; 4144 can be applied; DCM needs
DWQ agreement - $400
4'
Tang/ewood POA
Date: 6-10-19
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found in your Activities code sheet.
TYPE
REPLACE
Activity Name
Number
Choose
Choose
Dimension 1
Dimension 2
Dimension 3
Dimension 4
One
One
8
New Work 0
Ma ntg
Replace
gY❑ N
10 - l /
< 0 '
8 CT
.�7
Lf—
New Work
Man
Replace
Jj Y ❑ NNew
�{�
1
Work
Replace
Man ❑
❑YMN
New Work 0
Replace
Maint ❑
❑ Y [IN
New Work 0
Replace
Maint ❑
❑ Y ❑ N
New Work 0
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft.
FINAL Sq. Ft.
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
anticipated
Excludes any
restoration
total includes
any anticipated
Excludes any
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impact amount)
temp impacts)
amount
O W
Dredge ❑ Fill ❑ Both Other ❑
46
Dredge ❑ Fill ❑ Both Other ❑
/ C) 0 o 2
l 1 G
Dredge ❑ Fill ❑ Both ❑ Other
60
t9
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
919.733-2293 :: 1-888.4RCOAST :: www,ngeoastalmanagement.net revised: III Oil 2/06
McGuire, Tyler D
To: bwisenqg0l@gmaii.com
Subject: CAMA Major Permit Application Tanglewood POA
Attachments: Tanglewood POA Add Info.docx; Tanglewood POA Major Application Checklist.pdf;
Tanglewood POA Plans.pdf
Mr. Shane Lippard,
I received the CAMA Major Permit Application for Tanglewood POA's boat ramp replacement on June 10. At this time
the application is incomplete and requires additional information necessary to complete processing. I have addressed
the deficiencies with this application in the Additional Information letter attached to this email. I have also included the
Checklist for CAMA Major Permit Applications as well as the Plans to this email to helpcorrect these deficiencies. I
highly recommend a preliminary meeting on site to discuss these deficiencies of your application.
Thank You,
Environmental Specialist
Division of Coastal Manaeement
North Carolina Department of Environmental Quality
127 Cardinal Drive Extension
Wilmington, NC 28405
(910) 796 - 7424
Tv1er.McGuire(auncdenr.eov
ki
-E-mail correspondence to andjrom this address may be subject to the
North Carolina Riblic Records Law and may be disclosed to third parries.
RECEIVED
SEP 11 2019
DCM-MHD CITY
CHECKLIST OF ADDITIONAL REQUIRED INFORMATION AND RECOMMENDATIONS FOR
PROCESSING APPLICATION
DCM MP-1 APPLICATION FOR MAJOR DEVELOPMENT PERMIT
Page 2 of 4
• 4.a. — 445' of shoreline? I measure approximately 220'. Please check measurement.
• 4.b. — 0.41 acres
Page 3 of 4
• 5.c. — Do you plan on installing a temporary coffer dam with sheet piles to construct the concrete
boat ramp waterward of the bulkheads? If a temporary coffer dam is proposed to pour the concrete
below mean high water, then we will need a description of that structure listed here as well as
shown on the plans.
DCM MP-2 EXCAVATION & FILL
Page 1 of 2
• Boat Ramp Depths — 3.5' MLW (not MSL)
• 2.a. — Where? Landfill? Upland Spoil Disposal Area?
Page 2 of 2
• 3.b. — Length: 147' , 21.25'
Width: 1' , 7.5'
• 3.d. — 38'
• 3.e. — PVC sheet pile, #57 stone
• 3.g. — Bulkhead Fill? Where and what type of fill?
• 3.h. — rip rap, clean dirt?
• 31 — upland borrow site?
• 5.a. — on site out of 30' buffer
WORKPLAN DRAWINGS
C1
• Site Data Table — where are these proposed structures/amenities located? If these
structures/amenities are located outside of the 75' AEC on the main parcel owned by the
POA then just remove the table from the plans.
• Label Rip Rap Area as Existing and show rip rap on the plans just as shown with the
proposed rip rap on C2 at the end of the boat ramp.
• Please relabel Normal High Water to Mean High Water (MHW) to be consistent with C2.
• Continue the waterward coastal wetland delineation (marsh line) across the entire parcel
and add the landward limits of coastal wetlands to the plans. Please show marsh grass on
the plans and label the lines.
• We need to see the entire docking facility on the plans. Please show the existing footprint
of the docking facility and label the structures as existing.
• General Note #6 explains that the Atlantic Intracoastal Waterway Right of Way and 80'
Setback lines are plotted and there is only the Right of Way shown. Please include the 80'
Federal Channel Setback line to both plans.
DEQ2�
RECEIVED
SEP 1 1 2019
North Carolina Department of Environmental Quality I Division of Coastal Management
Wilmington office 1 127 Cardinal Drive Extension I Wilmingtoi, North Carolina 28405
DCM-M H D CITY
910.796.7215
C2
• We need to see the Riparian Corridor for the parcel on both plans. Please include the
Riparian Lines with the 15' Riparian Setbacks.
• What is the width of this waterbody? Please include the width of the waterbody on both
plans.
• What is the need/purpose of replacing the section of the concrete boat ramp with concrete
that is not used for unloading/loading vessels? I've highlighted this section pink on both
plans.
• Work Note for the Site Contract #4 explains that no work shall occur below the mean high
water line. Please remove this note.
• General Note #6 explains that the Atlantic Intracoastal Waterway Right of Way and 80'
Setback lines are plotted and there is only the Right of Way shown, however this line is
labeled incorrectly and says 80' Setback From Dredged Channel. Please correct the line
to say Atlantic Intracoastal Right of Way and include the 80' Federal Channel Setback line.
• Structural Note #3 explain that the proposed bulkhead length is approximately 310 feet in
length? I measure approximately 147 feet in length.
• Structural Note #12 explains that backfill for bulkhead shall be clean? Where is backfill
proposed or needed for these structures? I'm a little confused by this and the backfill listed
on the MP-2. There shouldn't be much, if any, backfill needed for these bulkheads.
• Structural Note # 15 explains that anchors will be used for the proposed bulkheads? There
shouldn't be any anchors or backfill for these proposed bulkheads.
• Label Rip Rap Area as Existing and show rip rap on the plans just as shown with the
proposed rip rap on C2 at the end of the boat ramp.
• Continue the waterward coastal wetland delineation (marsh line) across the entire parcel
and add the landward limits of coastal wetlands to the plans. Please show marsh grass on
the plans and label the lines.
• We need to see the entire docking facility on the plans. Please show the existing footprint
of the docking facility and label the structures as existing. Label the gazebo the same as
on Cl.
• Label the replaced structures (bulkheads, boat ramp, rip rap) as Proposed. Show an arrow
or label both proposed bulkhead replacements.
• What does C.J. mean on the boat ramp?
• We need to see the Riparian Corridor for the parcel on both plans. Please include the
Riparian Lines with the 15' Riparian Setbacks.
• What is the width of this waterbody? Please include the width of the waterbody on both
plans.
• Cross Section A is included, but there is not a line labeled as "A" going across the boat
ramp. Where is this cross section from? Leave this cross section, but also add Cross
Section B to the plans showing the slope of the boat ramp from beginning to end of the
project.
• What is the need/purpose of replacing the section of the concrete boat ramp with concrete
that is not used for unloading/loading vessels? I've highlighted this section pink on both
plans.
• Is a coffer dam proposed for the proposed concrete boat ramp replacement below or
waterward of the proposed bulkheads? If a sheet pile coffer dam is proposed to replace the
boat ramp below MHW and waterward of the ends of the proposed bulkheads, then we will
need to see that on the plans too. A description of this construction should be included in
the narrative and MP-1, as well as the dimensions included on the MP-2.
RECEIVED
DEQ�� SEP 11 2019
North Carolina Department of Environmental Quality I Division of Coastal Management DCM—MHD CITY
r
Wilmington Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405
910.796.7215
ADDITIONAL ITEMS
• Where will spoil material and old concrete boat ramp be located during and after removal? Is there
a temporary spoil disposal area? What is the final destination of this excavated fill?
• Is actual clean dirt/fill proposed for these bulkhead replacements? I'm a little confused with the
backfill notes on the plans and the backfill listed on the MP-2. Are you referring to the concrete
boat ramp as backfill?
• "Concrete Poured in Place" should be labeled as Proposed and concrete cannot be poured below
MHW unless a coffer dam is proposed. Is a coffer dam out of temporary sheet pile proposed below
the waterward ends of the proposed bulkheads for this method of replacing the boat ramp? If a
coffer dam is needed for this method, please include the structure on the plans and on the MP-2.
• What is the need/purpose of replacing the section of the concrete boat ramp with concrete
that is not used for unloading/loading vessels? I've highlighted this section pink on both
plans. This section does not function as a boat ramp and could be replaced with wood.
• Have the adjacent riparian property owners (ARPOs) been notified of the proposed
development? I didn't receive any notifications or certified letters to the ARPOs with your
application. I would recommend notifying the ARPOs with the new plans once these
deficiencies have been corrected.
• I highly recommend a preliminary meeting on site to discuss these deficiencies of your application.
RECEIVED
SEP 1 1 2019
North Carolina Department of Environmental Quality I Division of Coastal Management
Wilmirgtm Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 29405
910,796,7215
DCM-MHD CITY
-WVEQ
dMO�VitlMARN
k
sv
X�
0 1 to 40
AR WmWM=Ht(= FAMtoNtIX) EACH
N 0 P E PF'E 10 WA
-CONE:PAM
F"m
PY.ww,
GRADe
SECTION
M. SITE PIAN:
C2
TANGLEWOOD P.10A.
—RI DEED BOOX"ISK PAGE 378
PAR NG AREA
GLENN A, CA141LIA WOODCOCK
--.I na DEED BOOKLOT, PAGE 787
WA7EkEW DRIVE SW 30'
Lis
CHARLES &40YCE GANDEE
DEM'BW3920 OAdES69 ALViN ARNIGM
A,
LOT 4' M DEED ,601. PAGE'692 'T4 -SL 'r,
LOTSw,ncw &vt
_41
r�7
COL »> MU,
MIX,
r.
A
mum
A6
A.
I I- tiSiklWkE
'CANAL
Ri� _' k
' I
I - VEP
Y&TICALD-knim
�Il
lmim�
c7lZm"CT
L_._=
lom
"AUG II& MR
FOR_,'REGULATMY"REVl
_"NUT fOR_CoNst4c,
I
MOT
Il" CONDITIONS
Ab AbEMO.UTION' PLAN'
It 'o
IS
♦♦`
1
SET81at
DIIUIYRAO M1
W
W
�♦ ` `
♦♦♦�
W
6 Y ASfI w
//
W w
r'
MIER
IKJO'
♦♦♦�
1
OC D
\
W
W lw
w215 7 II/wvgDOf
w W
W �♦♦♦\
Il
W
w
W
W
w w
W
Ill•
u
11
1 W
W
W
W
W
W
-YI
W W
11
w W
W W
11 W
W
1l-
w
W
Z• W
W 11
W W
11
W W
W
`IW W
w f
W ♦ Q i
\ ��,♦ --1—gym r
FASI0ID 7ROD
1.1HMX
PROPOSED
CONCRETE BOUT RAMP
N LOCATION OF PROVIDI S
/ RAMP (SEE DETAIL)
W
VERTICAL DATUM DIAGRAM
TIDAL DATUM NAV.V.SII
momE
K.W(MHW) ------
______yAl'
.2.%--------------
OAD'
-------------
PROPOSED
1VM SHEETPILERACEDED
7
'1 PRIOR TO CONCRETE
1
1
�i COFFER DI STRUCTLXK
ACTOR
1>`F gr CONTRPLACE
•-1•IJ]1
•I I-�
I
i 1 •il
P1 EXI PUN'
ATLANTIC INTRACOASTAL
WATERWAY
STRUCTURAL NOTES
EIL PAt1\FL EIL A PRJPD.YD MA" _ 5E
RAID k]£
COW
GvG�> - o� �G�jryi
J. 1 0011
�!`{
IylG P%%%I'.
NfCoII�d'v�!:��!::4�4:�r!:�
-
S l SGS50 SHEET PILE Y (10'
LENGTHS) ENWEN TO SPECIRED DEPTH
SECTION A
max•-1'-0
WYP p£YA1
SECTION B = -2.85 R RP
RD II RP
xdroxxc t' ,NEK
75
E. F w aBSES 5 d ®FIMLiS ME ®.9h1® 9E111FP' ,XEZ PMIWS .VD IK NNm lymr yoirc fuNN QUOI IRFR.D ro
m mw BEB tlMDCf M cYEOI iPl aMFO1CN.
z CSONS M RELL SUBS" NL dA616 ff9P m IFWIG A•D 40iF d omxBSG . MI
]. Ili$ B"B"I M M W61MA:IYM WAIES YIm 9fi, NF BAKSBB/R1YN.' WL IPrgglULLi Im R N . So' G Bork\.
YDIT' NpDPM$ YID YGOQ$ ff p}NIAYIbI 'BE.,Iastl®111Y OL [d1WLfd WIIMCIQ 9WL iMi Nl NRSK! FmlWIp6 m
wNW1 Yo fIBIIE M MImN" IN IIE SIIOICME pWF YL s110E5 a CGMPIK1dL
S WNIKI(Y 9I
BAST RtdD RMSK
S-0' O.C. FOR ESPL1
B. OYIIWQN( wL qfY BE Ddlpi YD IfC\1Cx Ylt UIWI6 NM DIFMIN ILRI
9N EBI m
ESP 0.1 NNYL
S
6 WIx ES dw6 B! u0n SISAL Y6[ D6MFMG vE4Y UNR YA vl1 YIiY,R Iml DIPU/ wM ro MIYIYE Ytt 9ED
N�
SHEET PoLE
P.T. CONT. TEMPORARY JIG
9 MI M S IO/ SESS 4 SS19WL BE ISE'Bu CtiWVtE NIN NL WN.Np SORD SG,LS YOtt W5 IS DIAGNOSISIXS
E61EAR\6 YU .. BE RPR1916 ". OIIEP ANYCMtYL M1CNM1 E[fAW SB .1 SE RBBBBO N nCCpOYO " BY.
_ � SCREW AS REDO.
1 r
Y.. IW]FID . Ed .. 16tlCIWS NM EGIp6 ]&U / M, " IIE ... III, dCE xmx t1YIYYl. III YLM
.'wl. Sm Ld6 411CM .11 Saw Id6 YD ]Ntlb SAM . m YD w,W N'DNG [OOYIFD 115N6 0.¢ ,. IIE C@N IIW SRRtD 6
ID NM
10. M111R0 IEI®6 9YLL E 4MEA1 EF W. dNF w L n181YWLP5 SN4L E IEAIF➢ M KVYDY4 NIM M11H CRIYJi! IKb (WXIC
o]nYa Esx DnYA m IIo a Ed DIRdR Y1D X IEDID DIIC E IRYm N N:mYB.I" RM RPn 12A dma/1 Ec1Y I6i%1D coaxer
Nt gS,CiPS IMVFE. YA]M/in Nld. flG 9w1 E w:. PBPE .V6.-B, dLWQID SIDED RECEIVED -1i' q0. WLV. BOLTB 8X8 P.T. COBR.INNLER
IL BVISLL M BUNIO DMII E DFMI IXYYYI iLL NPYCIm 1p ffi SINWL d1'IM YWYY M [DEfI. NL K6 DYE E REF" NO NOTCH P.NDB OF
w_11w,CR0 m OIDrt VAW.ER FIXt C IM AT
SPLICE
11.RIES DWL E 01 FRMI ItOmK FrYO (d AfpAS, Fy Y.5) xlirt DEfI RG M ElA DFE, EE IH O! s-YD (OND6 m
IYK11I n YYo m xaBSL nw¢ >E mrwDB wvForXm M Devsr DEET Iy[ n ,v en meFx M IIa rmE11Y1 rwEn cdlwcDl DYY1 DETAIL #1: TYPICAL BULKHEAD PLAN VIEW
9bYn dl PEFi IB FM.lm1 rd /MVM. AF m PAm/¢I[Mr a wThWLS. IDMMfM, IPDACIS 9YO IO, E 19D NILpUI POIIw /WIO,/L AUG I 1 G
Z O 1(t, IDI12 ,,,
1.. (WF DWL E DIIIX dA" d tlA 6 IfIDDYIm 9! OIME0.
IS WL MW YOGI dpBD6 ME ERIY%l N 11L MAfA1XM )0 ql qAI iBd NM 9RLim dE)ElJll 6Y lR: 1nW 10 RRdI. 91QIU
(9NIR4M HAE Nl1 dTYRS tlMIWCIW M RY1.S i0 pYE1SG6 DI.IE llp IDT DYiEN w6NDY M MIIfA .61WCICM
16 RSd Yf"YDLVI 6 M®d EP]PJ N 91RIIEK[ WILF ttY Kassa" uu'S5 M . EVD! 91F EX 9YVA
1,I,. L9OLR DIYL NK.INYY EMIF4M SIRyEIXR;IEp DD/SSMS. RLIISDWIEdYE Wa.\MLi RIMEYINYYff pCiMVJILMINGTON, NCSAMS
m
TANGLSROOD BOAT RAMP In KH 9w1 E YpRlfp B! pO16A. WIIIgCId DWl IOM1Y p61RA 1 YIY.Y a M xO6 N YppCF RCP ro EGEMF MIYE RR d 3
YR BBd mislRlcml.Cmm L 11Q11DE0 iRLT EEFOII.]( COLAM NdTI 01#%1 DPI
FOR REGULATORY REVIEW SITE PLAN
NOT FOR CONSTRUCTION
I � 7E�1 is 1PaI1 I
_,.,,,�1�a Do % I tt V�f I Q[iGgt• .,q GLE
scALR I•=m '4'..AwME„�:Iy!Tf Im�iFw®FIar•w BSa M
IIIiR c>IIR �/!.
0 5 10 20 40 PO iiN Iv DO M � p�
TANGLEWOOD P.O.A.
_ DEED BOOK 646, PAGE 378
PARKING AREA
--R/W--�— na
— _ 3185
WATERVIEW DRIVE SW _ 30• R/W
GLENN & CAMILLA WOODCOCK
DEED BOOK 4029, PAGE 787
LOT 2
\ 3183
1 I ��T� ,� �GGMCAEIE GPNEIIAY
..
1 1 -
IFDIGGI
I CHARLES & JOYCE GANDEE
DEED BOOK 3920, PAGE 98 ALAN JERNIGAN 1
1 LOT 4 1 DEED BOOK 601, PAGE 692
LOT 3 `
j I 3193 j L3189
GRAVEL
1 I `•.,� X'e ``
11 ��'��-- `+'+'`'`'�`4 `r'+'r'•`�`�� rarr l•+a�1'+ i�ryxa t`i
.a.+. a. •. •. a. r. a.r+•YVS1. •a+:,11 +++:+ a a>?�\
r r a ♦♦ r• r J• a
. r r a ♦ ♦ a a a a ♦ ♦ + 1 ♦xx'lx1-ma
• •raaar as aaar•a•aar•aaWaarara•rr♦r"'L �.• +
. . . . . . . . . . . a a . .1 + 1 + r Iv
r . . r a . . . . r . � al ♦ r + y
' r a a . a . . . . a ♦ a � al a . 1 a .
a}b� +
. a. `. ♦.. . . . a+. a.+. . .r. +. IN+tea
r . . . a r1 r . 1 >✓
1 1
R 1
x
1
1
x: 1 11
� 1 1
1.
x I
1 1
11 �i
1 1
�31 1
- omirlG WWG Wa 1 .1
- iAM1flW)OO W %E1 1
1 11
— 1 1
ATLANTIC INTRACOASTAL 11 1
- RECEIVED WATERWAY
SEP 1 1 2019
sn
w
W.>
iCANAL
UNE
IkM
„' II
ayS.l
yuYyW„�x
�•R1Wi4'
nv� now
i
wive
,i.
L
�m
MM HIGH WAU UW
ha
Xm
o
- --X�
uur a gSNWBWCE
_ -
-
'
IX. CONCRETE B01T MP
A110 NOOOEN LAMS W ' -
6.
WOW GOGK— M
r. eb'iW
aSTK
jtWMC
-(cCE VFED
AUG 5 2019
W TANGIE1W100
WT
aoscAlx
VERTICAL DATUM DIAGRAM
49R'(. W) -2111'
I. nowt mm mlTlmm � a axxxr IWomroui mWo .
lit anxMlloc mMrr TM ax¢
L /q.Ppx' A L10.EMI fF1M flg9 W➢ I Jl'AQmW. MS FM.Il
anwxs ro ¢ uXMm M Ile muwlo sc vz xxz nom
H fW06 IIA' M 160. M50 fLKO SIK IE 0V4 fILN f1E•I.Rt6
16P e0 ISD'.
1 llxi A„eR 6 96CR 10 MR NU ML FAZIFMIS 6ttMW1$.
OSIIKIbB ImFd-WK CF R[mm. Lw'FINfIRH OxXIM�i
Mp/R Rp.RIpR IxCX WL IBllf ME VZ Cf M6 GMIRFIi:
.1fTWe GNM Q 1019A.1y pl PE 9MhY IeP
�. 116 9F41 PF@WIm MU WY IAMLO IIIIIWI ME HI61I ff A
l�llf W911 MO 6 TEI08! SLBER IO MR ICR IMLN Wtt E
� T A RLL MO I6wlL IIIIF 4p6N V316 611(i MI
9OxD WI.VI /e /IXYMIC IE4V. (A1I1610 4ilE1dP 1xMx M
mxows a Iw w
S n .A2MS 4xE BbT➢ ql M qD M(ill ,Wf6L166 AI I}, pL
osurcs xe xwrzwna amuxo m�uxxs.
i xnm: WIRiGSlxL xxrnxxx Won a � Mo m' sxlimx ulx.
AD11FL fFOI lVl MNl6 C91NE➢ E1M1 Va NY! RWS 6 LMiRl6
IIxYT#IWN 8rY IIWa.
T. Al Euvxrews xrso w xAvn • Wo xex oeweo m m xfx n<
n is sX.n rm.
1
vaom2
omm
oom
SCALE: 1'=0
f. ID 29 i0 0
GCM WILMINGTON, NC FOR REGULATORY REVIEW
NOT FOR CONSTRUCTION
s/L/1W
�I TANGLEWOOD BOAT RAMP
' l LOIXWOW! f y M.WtaIWO{ mNIT 1=111 Q--- y
a"t EXISTING CONDITIONS a
AND DEMOLITION PLAN
aru ,
�.
l� I g..1iQo' 1 �QGBT ANGLE
.a.la a x11W
WWe:w w WIWaa ISW�