LETTER OF REFINEMENT
Permit #10.19
August 12, 2019
This letter is in response to correspondence received on August 9, 2019, from your agent Hal Goodman, of
Construction Engineering Services, Inc., requesting a refinement on your behalf to the recent Minor
Modification that was issued for Major Permit #10-19. In the correspondence, Mr. Goodman requested that
the alignment of the permitted bulkhead be refined such that the wall will extend straight across the shoreline
from the authorized retaining wall versus an angled wall, tying into the authorized return wall. This request
also clarifies that the refined alignment will be above the current Normal Water Level, and provide better
protection from future erosion.
Major Permit #10-19 was originally issued to the Tale of the Whale Restaurant on February 12, 2019, for a
pier extension and wet slips, and was modified on August 9, 2019 for shoreline stabilization. The project is
located at 7575 S. Virginia Dare Trail, in the Town of Nags Head, Dare County.
Your modification request as described and/or depicted in the submittal dated August 9, 2019, is hereby
authorized as a refinement to CAMA Major permit #10-19. All existing conditions remain in effect, including
the expiration date of December 31, 2022. This letter is provided to you as a record of the authorization, and
should be included with the Permit file.
Please be advised that you may need to obtain a building permit from the Town of Nags Head. If you have
any questions, please contact Yvonne Carver, of the Elizabeth City office, or me at 252-948-3851.
Sincerely,
Jonathan Howell, District Manager
Washington Office
JH/yc
cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Hal Goodman, Construction Engineering Services
RECEIVED
IEQAUG 26 2019
North Caroline Department of FnNronmental Quality 1 Divlslon of Coastal Management DCM-MHD CITY
Elizabeth City Office 1 401 South Gnffln Street, Suite 300 1 Elizabeth City, North Caroline 2T909
252.264.3901
CONSTRUCTION ENGINEERING SERVICES, INC.
1 P.O. BOX 665 OFFICE: 33 HAMMOCK DRIVE
MANTEO,NC 27954 MANTEO,NC 27954
PHONE: (252) 473-9733 FAX: (252) 473-4191
August 9, 2019
N.C. Division of Coastal Management
Elizabeth City District Office
401 S. Griffin Street, Suite 300
Elizabeth City, NC 27909
Attention: Yvonne Carver
I�
Reference: Refinement to Minor Modification to Major Permit MPA19
Tale of the Whale Restaurant
7575 S. Virginia Dare Trail
Nags Head, NC 27959
Yvonne:
We are requesting to refine the alignment of the permitted bulkhead as shown on the attached sketch
so that it will better protect the shoreline from erosion above the Normal Water Line and straighten
the tie in to the adjacent retaining wall. If you have any questions or if you require any additional infor-
mation please contact us.
Very truly yours,
CONSTRUCTION ENGINEERING SERVICES, INC.
Hal Goodman, P.E., SECB
President
PURPOSE: CONSTRUCTION OF
TRANSIENT PIER
DATUM: N.W.L.
ADJACENT PROPERTY OW NERS-
1. S & S INVESTMENTS GROUP
2. STEPHANIE SELCKMANN
pN
=loll �
RECEIVED
AUG26Z�
5 DCM-MHp C
c
` 0 == d
Y �
�t O
.00
Ol 0 C
°7A Z_ Q O 0 Ol
>
n c t
ft`+A Tn LL u
� o L E
v �a
g
✓O Q W Q Q
DRAWN BY: H.G.
CONST OF PIER & BULKHEAD
CONSTRUCTION OF IN: ROANOKE SOUND
TRANSIENT PIER FOR
RESTAURANT PATRONS AT NAGS HEAD/MANTEO CAUSEWAI
COUNTY: DARE STATE: NC
TALE OF THE WHALE RESTAURANT
7575 S. VIRGINIA DARE TRAIL APPLICATION BY: CONSULTANT
NAGS HEAD, NC 27959 SHEET 1 OF 3 DATE: 67-19
c
Carver, Yvonne
From: Carver, Yvonne
Sent: Monday, August 12, 2019 7:02 PM
To: Jonathan Howell Qonathan.howell@ncdenr.gov)
Subject: Letter of Refinement request from Tale of the Whale Restaurant
Attachments: Letter of Refinement for MP 10-19, Tale of the Whale.docx; Tale of the Whale Minor
Mod Permit 10-19.pdf, Tale of the Whale Permit 10-19; 02122019.pdf, Refinement
request for Tale of the Whale 10-19, CGS.pdf
Importance: High
Good afternoon Jonathan,
I met onsite with Dan Bibey and his contractor on August 2nd regarding the pending modification to
MP 10-19 for shoreline stabilization that included a retaining wall, bulkhead and return. At that time
there was a discussion that the angled bulkhead alignment that was originally submitted by
Construction Engineering Services was not the best design. This information had been relayed to me
by Hal Goodman prior to the site visit. I mentioned the potential refinement request, and Gregg
Bodnar had stated that they should request the refinement after the minor mod was issued, or they
would have to start the process over.
So, as soon as the minor mod was authorized and sent out, I received a letter and refined
drawing. The adjacent property owner to the left (next to the project), has signed the drawing noting
that he has no objection to the change.
Please find attached a refinement letter drafted for your review/changes/approval, as well as the
correspondence received from Construction Engineering. Don't hesitate to contact me or Hal
Goodman if you have any questions or need further documentation.
Thanks!
VMn"
Yvonne B. Carver
Environmental Specialist II
Division of Coastal Management
NC Department of Environmental Quality
252-264-3901, ext. 237
252-331-2951 (fax)
Yvonne . ca rve r(cD n cd e n r.4 ov
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Email correspondence to and from this address is subject to the RECEIVED
North Carolina Public Records law and may be disclosed to third parties.
AUG 2 6 2019
DCM-MHD CITY