Loading...
HomeMy WebLinkAbout10-19 Letter of RefinementROY COOPER Governor MtCHAEL S. REGAN senerory BRA)CrON C: DAVIS Dirx1or Mr. Dan Bibey Tale of the Whale Restaurant P.O. Box 98 Nags Head, NC 27959 Dear Mr. Bibey: NORTH CAROLINA Environmental Qualify LETTER OF REFINEMENT Permit #10.19 August 12, 2019 This letter is in response to correspondence received on August 9, 2019, from your agent Hal Goodman, of Construction Engineering Services, Inc., requesting a refinement on your behalf to the recent Minor Modification that was issued for Major Permit #10-19. In the correspondence, Mr. Goodman requested that the alignment of the permitted bulkhead be refined such that the wall will extend straight across the shoreline from the authorized retaining wall versus an angled wall, tying into the authorized return wall. This request also clarifies that the refined alignment will be above the current Normal Water Level, and provide better protection from future erosion. Major Permit #10-19 was originally issued to the Tale of the Whale Restaurant on February 12, 2019, for a pier extension and wet slips, and was modified on August 9, 2019 for shoreline stabilization. The project is located at 7575 S. Virginia Dare Trail, in the Town of Nags Head, Dare County. Your modification request as described and/or depicted in the submittal dated August 9, 2019, is hereby authorized as a refinement to CAMA Major permit #10-19. All existing conditions remain in effect, including the expiration date of December 31, 2022. This letter is provided to you as a record of the authorization, and should be included with the Permit file. Please be advised that you may need to obtain a building permit from the Town of Nags Head. If you have any questions, please contact Yvonne Carver, of the Elizabeth City office, or me at 252-948-3851. Sincerely, Jonathan Howell, District Manager Washington Office JH/yc cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City Hal Goodman, Construction Engineering Services RECEIVED IEQAUG 26 2019 North Caroline Department of FnNronmental Quality 1 Divlslon of Coastal Management DCM-MHD CITY Elizabeth City Office 1 401 South Gnffln Street, Suite 300 1 Elizabeth City, North Caroline 2T909 252.264.3901 CONSTRUCTION ENGINEERING SERVICES, INC. 1 P.O. BOX 665 OFFICE: 33 HAMMOCK DRIVE MANTEO,NC 27954 MANTEO,NC 27954 PHONE: (252) 473-9733 FAX: (252) 473-4191 August 9, 2019 N.C. Division of Coastal Management Elizabeth City District Office 401 S. Griffin Street, Suite 300 Elizabeth City, NC 27909 Attention: Yvonne Carver I� Reference: Refinement to Minor Modification to Major Permit MPA19 Tale of the Whale Restaurant 7575 S. Virginia Dare Trail Nags Head, NC 27959 Yvonne: We are requesting to refine the alignment of the permitted bulkhead as shown on the attached sketch so that it will better protect the shoreline from erosion above the Normal Water Line and straighten the tie in to the adjacent retaining wall. If you have any questions or if you require any additional infor- mation please contact us. Very truly yours, CONSTRUCTION ENGINEERING SERVICES, INC. Hal Goodman, P.E., SECB President PURPOSE: CONSTRUCTION OF TRANSIENT PIER DATUM: N.W.L. ADJACENT PROPERTY OW NERS- 1. S & S INVESTMENTS GROUP 2. STEPHANIE SELCKMANN pN =loll � RECEIVED AUG26Z� 5 DCM-MHp C c ` 0 == d Y � �t O .00 Ol 0 C °7A Z_ Q O 0 Ol > n c t ft`+A Tn LL u � o L E v �a g ✓O Q W Q Q DRAWN BY: H.G. CONST OF PIER & BULKHEAD CONSTRUCTION OF IN: ROANOKE SOUND TRANSIENT PIER FOR RESTAURANT PATRONS AT NAGS HEAD/MANTEO CAUSEWAI COUNTY: DARE STATE: NC TALE OF THE WHALE RESTAURANT 7575 S. VIRGINIA DARE TRAIL APPLICATION BY: CONSULTANT NAGS HEAD, NC 27959 SHEET 1 OF 3 DATE: 67-19 c Carver, Yvonne From: Carver, Yvonne Sent: Monday, August 12, 2019 7:02 PM To: Jonathan Howell Qonathan.howell@ncdenr.gov) Subject: Letter of Refinement request from Tale of the Whale Restaurant Attachments: Letter of Refinement for MP 10-19, Tale of the Whale.docx; Tale of the Whale Minor Mod Permit 10-19.pdf, Tale of the Whale Permit 10-19; 02122019.pdf, Refinement request for Tale of the Whale 10-19, CGS.pdf Importance: High Good afternoon Jonathan, I met onsite with Dan Bibey and his contractor on August 2nd regarding the pending modification to MP 10-19 for shoreline stabilization that included a retaining wall, bulkhead and return. At that time there was a discussion that the angled bulkhead alignment that was originally submitted by Construction Engineering Services was not the best design. This information had been relayed to me by Hal Goodman prior to the site visit. I mentioned the potential refinement request, and Gregg Bodnar had stated that they should request the refinement after the minor mod was issued, or they would have to start the process over. So, as soon as the minor mod was authorized and sent out, I received a letter and refined drawing. The adjacent property owner to the left (next to the project), has signed the drawing noting that he has no objection to the change. Please find attached a refinement letter drafted for your review/changes/approval, as well as the correspondence received from Construction Engineering. Don't hesitate to contact me or Hal Goodman if you have any questions or need further documentation. Thanks! VMn" Yvonne B. Carver Environmental Specialist II Division of Coastal Management NC Department of Environmental Quality 252-264-3901, ext. 237 252-331-2951 (fax) Yvonne . ca rve r(cD n cd e n r.4 ov 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 Email correspondence to and from this address is subject to the RECEIVED North Carolina Public Records law and may be disclosed to third parties. AUG 2 6 2019 DCM-MHD CITY